HomeMy WebLinkAbout02/09/66 February 9, 1966
Regular meeting o£ the City Council of the City of Bremerton, Washington,
was held in the Council Chambers of the City Hall at l~:OO b'clock A.M., Paci-
fic Standard Time, on Wednesday, February 9, 1966, with Mayor Jarstad pre-
siding. Also present were the following: Commissioners Clark and Schoneman,
~ity Attorney Fisher, City Clerk McGowan, Fire Chief Tillett, City Engineer
Mebus, Captain of Traffic Ingram, City Planner McConnell, and representatives
of the press and radio.
Meeting was called to order by the Mayor and the invocatloh was given by
Reverend Clifford Ponnikas, Pastor, Our Savior's Lutheran Churche
City Clerk read t~e minutes of the previous meeting and they were approved
as amended.
City Clerk rea~ a Notice of ~nployment for:
LYLE R. STEVENSON, Extra Labor, Engineering Department, at $1.90 per hour,
effective February 14, 1966 (temporary. employee) '
Motion by Mr. Clark and Mr. Schoneman the employment b~ approved, car-
ried unanimously.
City Clerk had planning Commission Resolution No. 125 for presentation to
the Co~mcil providing for a rezone from R-1 and B-2 to R-2 of an area between
Jerry's Market and Oyster Bay.
Motion by Mr. Clark and Mr. Jarstad the Resolution be accepted and the hear-
ing be set for February 23 at the regular Council meeting and the City Attorney
be instructed to prepare the necessary Ordinance for consideration at that
time, carried unanimously.
City.Clerk read a letter from City Engineer Mebus stating the signatures
on the 7~ petition for annexation of an area North of Sylvan Way, West of
Pine Road and South of Pinewood Addition are deemed sufficient and valid.
Motion by Mr. Jarstad and Mr. Clark the letter from the City Engineer
be accepted, carried unanimously.
City Clerk had a letter from the State of Washington Census Board re-
questing the annual population count in the City of Bremer~on as of April l,
1966.
Motion by Mr. Clark and Mr. Jarstad the estimate be made as is custom-
ary and sent to the Census Board, carried unanimously.
City Clerk had a memo signed by Andrew Pendergast, Superintendent, Parks
and Recreation, requesting a 194V model Game Time electric basketball score
clock be declared surplus and sold in the best interests of the City.
In the discussion, Mr. Jarstad stated the participating teams in the City
League have bought a new clock score board for the City.
Motion by Mr. Jarstad and Mr. Schoneman the clock be declared surplus,
carried unanimously.
City Clerk had a ~artial Release of Mortgage of Guy R. Pearson and Mary
Jane Pearson, Husband and Wife, for a portion of property through which the
City acquired an easement for a sewer line.
Motion by Mr. Schoneman and Mr. Clark the Partial Release of Mortgage
be accepte~, carried unanimously.
City Clerk had an~easement from Frank W. and Billie J. Ryan, Husband
and Wife, for a sewer line to be put in as part of the Ostrich~Bay-Oyster
Bay Sewer Pro~ect.
Motion by Mr. Schoneman and Mr. Jarstad the easement be accepted,
carried unanimously.
In the-discussion, Mr. Schoneman explained the easement is the last and
final easement of some §7 easements for the sewer project and he thanked all
for their cooperation.
City Clerk reported the Committee to whom bids on fire hose for the fire
department had been referred recommend the award b~ made to American Rubber
Company, the low bidder, with a total bid of $§,9?0.88.
Motion by Mr. Jarstad and Mr. Schoneman the award be made according to
the recommendation, carried unanimously.
Fire Chief Tillett expressed pleasure with the extra ~80! they were able
to get as a result of the bid being lower tha~ anticipated.
Mr. Clark commented he is encouraged with the fact that the petition for
annexation discussed earlier in the meeting represents 91.3 per cent of the
assessed valuation of the property involved, when only 75 percent is required.
Motion by Mr. Clark and Mr. Jarstad to ~pay all bills that are approved
by a majority of the Commissioners, carried unanimously.
Mr. Schoneman commented on the Ostrich Bay - Oyster Bay Sewer Project--
Reservoir No. 15 tank is going to be constructed soon
Sewer Line is Just about all in place
Three lift stations out of four are under construction and clearing is begun
for station No. 4.
Chlorine Contact Chamber is just about completed
Everything is on schedule for completion planned for June l, 1985.
Mr. Schoneman reported the construction of a storm sewer on Wheaton Way~
is the first step in widening operations of Wheaton Way. He expressed the
hope that the State will take care of the cost as a result of the reappro-
priation of some funds from the money appropriated to the resurfacing of
Callow Avenue.
Mr. Jar~tad requested Council authorization to have the Superintendent
of Parks and Recreation make preliminary application for approximately
acres of land in the Eastpark Government Surplus Lands. This land is a por-
tion of a larger area of land declared surplus by the C~vernment for which
the City has made known its desires of acquiring the land. The 15.5 acres
is behind the Hospital and is to be used as part of the "Green Belt" in the
City.
Motion by Mr. Jarstad and Mr. Clark the Superintendent of Parks and
Recreation make preliminary application for the land with a provision for
90 days to develop the plans for the land, carried unanimously.
Mr. Jarstad reported the Saturday programs in bhe Park and Recreation
Dept. are under way and approximately 1,O00 young people are participating.
Mr. Jarstad reported a meeting held on Tuesday with the Class presidents
and representatives of East and West High Schools to discuss plans for the
use of the Park and Recreation facilities for programs on alternate Satur-
day nights.
Mr. Jarstad presented the minutes of the Review Board Meeting held on
Tuesday, February 8, dealing with the annexation of ~0 acres on Pine Road.
~ City Clerk read the minutes.
Motion by Mr. Jarstad and Mr. Clark the minutes be accepted and accept
the recommendation of the Review Board to proceed with the annexation, car-
ried unanimously.
Motion by Mr. Clark and Mr. Jarstad the date of hearing be set for
February 2~, 1988, at lO:O0 o'clock A.M., and the City Attorney be instructed
to prepare the necessary ordinance for consideration, carried unanimously.
In the discussion, all three commissioners expressed pleasure with the
proposed annexation and expressed a welcome to the area.
Mr. Jarstad stated the next meeting of the City Council will be on
Thursday, February 17, 198~, at 7:~0 P.M. and the topic will be the Civic
Auditorium for the City.
Mr. Jarstad reported that on Thursday, the Council will be attending a
luncheon at the Hearthstone at which time the County Commissioners will be
present and stated they hope people in the area will come and raise any ques-
tions they might have.
The Commissioners hope to meet'with the County Commissioners on Tuesday~
February 16, to discuss common problems in their governments. Mr. Jarstad
expressed the hope that these meetings can become monthly ones.
THE FOLLOWING IS A REPORT TO DATE ON TI{E OSTRICH BAY-OYSTER BAY SEWER PRO-
JECT: (as reported by resident engineer, John A, Peabody)
SCHEDULE A-Sewers; W. J. Schade & Sons, Inc.
January 31, 1966 Excavation of 10" waterfront line at station I and 70 is a
problem. Depth and width of trench is difficult to handle
with any eqdipment
February l, 1966 Able to place three 18w Joints of 19" pipe; two foot cov-
erage is a big advantage laying the pipe on the beach of
Oyster Bay
February 2, 1966 In order to pla~ the 10" pipe, Schade cut six feet off eight
18' joints? Work stopped at 1:30 A.M.
February 3, 1968 Halftrack claimed by tide because it sunk in the mud; crew
could not excavate fast enough, so no 10" pipe layed
February 4, 1966 Much trouble in laying three 12' joints of 10" pipe; worked
until 1:00 A.M.
February 5, 1966 Foreman and four men placed one 12' length of 10" cip; work
started by running three pumps for three hours; crane with ~
drag line bucket and the hoe working jointly cleared out the
channel so the 12' joint could be placed just ahead of the
incoming tide.
February 7, 1966 No pipe laying
February 8, 1966 Commenced laying 18" concrete pipe this morning on Bremerton
Blvd. FiniShed laying 21" pipe
Pump Station No. 13, Del Guzzi, Inc.
February 7, 1966 Clearing operations started
February 8, 1966 One bulldozer building access road to pump station
February 9, 1966 Bulldozer operator and one man clearing trees--also con-
structing access road
February 10,1966 Clearing road and site by bulldozer operator and one
February 11,1966 Rain and wind damaged access road
Pump Station No. 14, Del Guzzi, Inc.
Janu~ry 2S, 1~6 Pil~ buck crew a~e wails for the coffe~ dam
Ja~u~ary 31, 1966 t:'ile buck crew have one ring waler framed
l~'ebr~ary 1, 1966 Pile buck crew have two ring wale framed
February 2, 1966 All wales are framed; steel sheet piling are being delivered
February 3, 1966 Pile buck crew started setting sheet piles in place
February 4, 1966 Finished setting 5~ - 32~6" sheet piles (Larger than Sta
15 or 16)
February 7, 1966 Pile crew started batting away at the ring of 54 sheet piles
February 8,:1966 Pile buck crew pounding pile all day; it looks as if the
foreman has a coffer dam partly driven out of plumb--this
may cause another coffer damwith complications similar
to those that occured at sta. 16.
February 9, 1966 Driving of sheet piles continues; coffer dam Out of plumb--
he drove too long a time on piles nearest the driver.
February 10,1966 Pile crew spent considerable time trying to right the coffer
dam
February 11,1966 Coffer dam piling are driven with the top of 54 piles nearly
flush with the ground level--can be seen if it is out of
plumb.
Pump Station No. 15, Del Guzzi, Inc.
January 31,1966 One crane lowering wall forms into coffer dam; one crane
man and oiler and two carpenters on the Job
February 1, 1966 Four man crew setting wall forms in coffer dam; one crane
man and oiler
February'2, 1966 Crew of four men setting wall forms
February 3, 1966 Outside wall forms are set in place; steel workers started
setting steel for walls of sta 15
February 4, 1966 Steel workers placing wall steel against outside wall forms
February 7, 1966 Outside wall forms in place; wall steel is in place both
for barrel and partition; good job of steel placing
February 8, 1986 Steel reinforcing is 95% in place for a wall pour; inside
forms are still to be placed; mechanical work is about 75%
complete
February 9, 1966 Reinforcing steel for wall concrete is in place; carpenters
setting form panels; pipe fitters setting pipe in wall forms
February 10,1966 Steel placers,carpenters and pipe fitters have wall forms
9~% complete and ready to receive concrete
February 11,1966 Crew of men worked washing ~ut forms with water and air
Pump Station No. 16, Del Guzzi, Inc.
January 31, 1966 Foreman and five pile bucks doing fine grade work on bottom
of coffer dam
February l, 1966 Carpenter foreman and 'three carpenters setting a ring form
for concrete base of floor and wall of pump Station 16
February 2, 1966 One foreman and two carpenters; two laborers setting drain
tile in subgrade of coffer dam to drain off water'from
spring in center of subgrade; screened gravel is being
placed over subgrade
February 3, 1966 Foreman, two laborers~ two carpenters, a crane operator
and oiler, one concrete finisher placed the concrete~base
and floor slab in the coffer dam sra. 16; six-test cylin-
ders made from Concrete of this pour
February 4, 1966 Three carpenters setting panel forms in coffer dam; these
will for~ the concrete walls of pump sta. 16
February 7~ 1988 Crew cleaned out all wrecked forms; cause is unknown; coffer
dam flooded~and floated the forms and distorted them all
out of shape and position
February 8, 1988 One carpenter, one laborer, and two steel or Fod men
placing wall steel--first wall steel to be placed
February 9, 1966 Two steelworkers placing wall steel
February 10,1966 Steel being plcced in wall
February 11,1966 Wall steel in Sta 16 is about 30% complete as far as being
in place
Chlorine Contact Chamber~ Del Guzzi, Inc.
February 1, 1986 Completion is near
February 2, 1966 Some clearing of area outside of area which is schedule c
is composed
F~b~uary 3, 1966 Remains to be proven how good a job was done
February 4, 1966 Foreman on finishing the latter half of contact chamber will
take charge of construction of sta l§
February 7, 1966 Very little activity
February 8, 1986 One carpenter and laborer doing a few odds and ends; Con-
sideration by Schoneman and Cook as to repairing after Job
is complete
February 9, 1966 One carpenter and a laborer have been taken to'sta
Febrdary 10~1966 No activity
February 11,1966 .No activity
Reservoir No. 15, Chicago Bridge and Iron
January 31, 1968 Rolley Leichener with two carpenters forming some walls;
three laborers stripping forms from ring wall
February l, 1986 Leichener and five men putting in forms for sum; lay drain
tile
February 2, 1966 Rolley has his job as a whole a bout 65% complete; he has
.had good soil; no caving trench or structure excavation
February 3, 1966 Six concrete test cylinders delivered to Washington Test-
ing Lab
February 4, 1986 Access road gravel has proven to be very good; six cubic
yard mixer trucks have been running on it was well as
other heavy equipment with no apparent ill effects to road
February 7, 1966 Two men removing surface water from the wall enclosed
area; plans to have compactor trucks hauling material and
a crew to place and compact the material;, the material is
bank run sand and gravel from the same pit that material
was obtained from and placed on the access road; material
has proven good on this road
February 8, 1966 Started bac~l~filli~g the foundation material inside the
footing ring
February 9, 1966 Doubtful about compaction of backfill; backfilling had
reached a point 18" below the top of the concrete bearing
ring; soils engineer will be on the Job tomorrow to test
compaction on soil placed and on the tank foundation
February 10,1966 Three man crew doing only compaction of the back fill foun-
dation material; soils engineer from Seattle arrived and
made a test~ which showed the compaction to be well within
the desired range
February 11,1966 Weather not good for compacted backfill--especially after
good results from ~est made showing backfill to be very
well compacted to a greater extent than required.
Meeting adjourned.