Contract Number 4544
STAN PALMER CONSTRUCTION INC
Anderson Creek Wellfield Improvements
Engineering
CON File Class LEG 12-1
$436427.15
01/28/2006
08/31/2006
02/15/2009
GL
AL
E&O
$2000000.00
$1000000.00
$
Insurance Total
Insurance Review Date
$3000000.00
07/01/2006
Pump Station 2 Upgrades
Change Order #1-3/07
Vault 01/01/2009
Public Works and Utilities Department - Administration
3027 Olympus Drive. Bremerton, WA 98310 . (360) 473-2327 . FAX (360) 473-5018
June 19,2007
Travelers Casualty And Sqrety Company Of America
Hartford, Connecticut 06183-9062
RE: Release of Retain age Bond for Public Works Contract
Stan Palmer Construction, Inc. Retainage Bond # 1 04652096
Dear Sir or Madam:
Stan Palmer Construction, Inc. has completed all work required under contract for Anderson
Creek Wellfield Improvements and Pump Station No.2 Upgrade.
Please release the retainage bond # 104652096 you are holding in the amount of Twenty- Two
Thousand Nine Hundred Ninety-Six and 05/1 00 Dollars ($22,996.05).
Thank you for your services and your prompt attention to this matter.
Sincerely,
J//JtI~
Mildred H. V ellegas, CPA
PW & U Financial Manager
enc!.
cc: Stan Palmer Construction, Inc.
City Clerk
Contract file
Ned Lever, Project Mgr
'.
RELEASE OF RETAINAGE BOND
Bond 104652096
KNOW ALL MEN BY THESE PRESENTS, That we, Stan Palmer Construction, Inc.
as Principal, and
Travelers Casualty and Surety Company of America
are held and firmly bound unto City ofBremerton
as Surety,
as Obligee, in the sum of
TWENTY -TWO THOUSAND NINE HUNDRED NINETY -SIX AND 5/1 OOTHS Dollars ($ 22,996.05 ),
lawfu I money of the United States of America, to the payment of which, well and truly to be paid, we bind ourselves, our heirs, executors
and successors,jointIy and severally, firmly by these presents.
THE CONDITION OF THE ABOVE OBLIGATION IS SUCH, That Whereas, on 01106/2006
the Principal and Obligee entered into a contract for the construction of-the
Anderson Creek Wellfield Improvements, Pump Station No.2 Upgrade
and;
WHEREAS, the Obligee has elected to withhold from funds due or about to become due the Principal such sum (retainage) as is necessary
to protect itself from claim or claims of lien unless the Principal furnishes as Surety Bond guaranteeing to hold the Obligee harmless from
all loss it may suffer by reason of its releasing final retain age to the Principal.
NOW, THEREFORE, if the Principal shall indemnify and hold harmless the Obligee for all loss that the Obligee may sustain by reason of
release of said retainage to the Principal, then this obligation to be null and void, otherwise to remain in full force and effect.
PROVIDED, HOWEVER: It is expressly understood and agreed that:
I. Any suit or action hereunder must be brought within one (I) year of the date the proper court has rendered its decision on the validity
and enforceability of the liens. -
2. The laws of the State of Washington
of the rights and obligations of the parties hereunder.
and the United States of America shall be applicable in the detennination
3. No right of action shall accrue upon or by reason hereofto, or for the use or benefit of, anyone other than the Obligee herein named.
IN WITNESS WHEREOF, said Principal and Surety have hereunto set their hands and seals this 27th
January ,2006
day of
By:
(Seal)
Principal
Title
Travelers ~~company of America
BY'~. "~. "'-~ Surety
'~ Attorney-in-Fact
S-336B/GEEF 10/99
{AvdAa-a;- B--, .
--
AFFIDAVIT OF PUBLICATION
Account # 42742 / Ad # 197732
ST ATE OF WASHINGTON
COUNTY OF KITSAP
I, Sarah Weller, being first duly sworn on oath, deposes and says: That she is now, and at all times
embraced in the publication herein mentioned was the principal clerk of the printers and publishers of
KITSAP SUN; that said newspaper has been approved as a legal newspaper by order ofthe Superior Court
of the County of Kitsap, in which County it is published and is now and has been for more than six months
prior to the date of the publication hereinafter referred to, published in the English language continually as
a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County,
Washington and is now and during all of said time, was printed in an office maintained in the aforesaid
place of publication of said newspaper; that the following is a true text of a legal advertisement as it was
published in regular issues (and not in supplement form) of said newspaper on the following dates, to wit: ,
April 19, 2007 and that such newspaper was regularly distributed to its subscribers during all of said period.
That the full amount of the fee charged for the foregoing publication is the sum of $32.56 which amount
has not been paid in full.
8t~~u~
(Signature of Principal Clerk)
Subscribed and sworn to before me this day of April 25, 2007
NOTICE OF COMPLETION
"i:f~
..,.'~. j. MO~,"".'
~v ~'.'. 'v~
o 0 0 ~~,?>'2,I01V t';. ~
~ Ilt ~"'tl J:':;,.r.;O 6 0
...... :CJ~O 01 AI,? ~~,oo 1J
CI). .' /' .I
'Wif r.-..
: .of /6'\ \C; ,;
<p a CJ \,-~ ~.:::::..
/' 'o7r,. . . ,,,C) 0 '"
-y/,;/, .:.. ,J b .\Y.' ",0
, ,'.' . '. .. ..:::,.C'J
o .J,. '^ 'A C\-\\\ T
..\..\ \,' "J' . J'
~'5'SSSS"--,-S..' .
Notice of Completion has been issued to Stan Palmer Construction, on Contract No. 4544, for the Anderson
Creek Well field Improvements, Pump Station 2 Upgrades project. Any parties having a claim for material,
labor or damages related to this Contract have forty-five (45) days from the date of first publication of this
notice to file a claim.
~
Notary Public in and for the State of Washington, Kitsap County.
Paula Johnston
City Clerk
345 6th Street
Bremerton, Washington 98337
April 19, 2007...........................AD #20036335
Page 1 of 1
Paula Johnston
From: Russell, Nora [nrussell@kitsapsun.com]
Sent: Tuesday, April 17, 2007 10:00 AM
To: Paula Johnston
Subject: RE: Pump Station 2 Upgrades Project
Hi Paula,
It will publish on Thursday, April 19th.
Thanks,
NORA RUSSELL
Kitsap Sun
Phone: (360) 415-2687
Fax: (360) 792-8557
Email: NRussell@Kitsapsun.com
Legals: Legals@Kitsapsun.com
From: Paula Johnston [mailto:PaulaJohnston@cLbremerton.wa.us]
Sent: Tuesday, April 17, 2007 9:51 AM
To: Russell, Nora
Cc: Ned Lever
Subject: FW: Pump Station 2 Upgrades Project
Hello, Nora. Please publish the attached Notice of Completion as soon as possible and send
me two affidavits. Thanks. pj
Paula Johnston, City Clerk
City of Bremerton
345 6th Street, Suite 600, Bremerton WA 98337
360-473-5323 / 360-473-5200 fax
Pau la .Johnston@ci.bremerton.wa.us
From: Ned Lever
Sent: Monday, April 16, 2007 11:27 AM
To: Paula Johnston
Subject: Pump Station 2 Upgrades Project
Please advertise this in the Kitsap Sun as soon as possible. Project number 4334.
Thanks
Ned
4/17/2007
NOTICE OF COMPLETION
Notice of Completion has been issued to Stan Palmer Construction, on Contract No.
4544, for the Anderson Creek Wellfield Improvements, Pump Station 2 Upgrades
project. Any parties having a claim for material, labor or damages related to this
Contract have forty-five (45) days from the date of first publication of this notice to file a
claim.
Paula Johnston
City Clerk
345 6th Street
Bremerton, Washington 98337
CITY OF BREMERTON
CHANGE ORDER
CONTRACT CHANGE ORDER NO: One
PROJECT NAME: Anderson Creek Wellfield Improvements, Pump Station 2 Upgrades
PROJECT NO:
4334
. CONTRACTOR: Stan Palmer Construction
423,500.00 DAYS:
150
ORIGINAL CONTRACT AMOUNT:
PREVIOUSLY APPROVED CHANGES:
0.00 DAYS:
o
12,927.15 DAYS:
36
THIS CHANGE:
436,427.15 DAYS:
186
REVISED CONTRACT AMOUNT:
This Change Order covers changes to the subject contract as described herein. The Contractor shall
construct, furnish equipment and materials, and perform all work as necessary or required to
complete the Change Order Items. The increase or decrease in contract price shown below includes
any applicable taxes.
DESCRIPTION OF CHANGES
INCREASE IN
CONTRACT
AMOUNT
($)
(DECREASE) IN
CONTRACT
AMOUNT
($)
CONTRACT
TIME
EXTENSION
(DAYS:)
o ..--
I'-- I'--
..-- ..--
(]) ~
"S ::J
0::: 0:::
X 1. Work Change Directive #1: Miscellaneous electrical 8904.47 0.00 0
improvements including replacement of the secondary service,
CT can, meter base, additional conduits, and upgrades to fiber
optic cable.
X 2. Work Change Directive #2: Additional cost for FTS4 Control 1,789.36 0.00 0
Software.
X 3. Work Change Directive #3: Contract Extension due to 0.00 0.00 36
chlorination system failure at Pump Station 2.
X 4. Work Change Directive #4: 4 hours of TSI L 500.00 0.00 0
X 5. Work Change Directive #5: Extra costs associated with utility 1733.32 0.00 0
trench conflicts, and pressure gauges.
NET CHANGE IN CONTRACT AMOUNT 12,927.15 0.00 36
INCREASE OR (DECREASE)
Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims
of any kind or nature arising from or connected with any work either covered or affected by this
CONTRACT CHANGE ORDER NO: 1
PROJECT NAME:
Change Order, including, without limitation, claims related to contract time, on-site or home office
overhead, or lost profits. Nothing in this Change Order shall limit the City's right to bring a claim for
past performance.
The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the
contract price specified for each item, including any and all supervision costs and other miscellaneous
costs relating to the change in work, and as to the extension of time allowed, if any, for completion of
the entire work due to said Change Order.
This document will become a supplement of the contract and all provisions will apply hereto. It is
understood that this Change Order shall be effective when approved by the City of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a change order
that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform
the surety of this change, and shall take appropriate action to modify any bonds required under the
contract to address this change.
RECOMMENDED: v;7 ./ c'"
PROJECrENGINEER
RECOMMENDED:~~ ~
CITY ENGINEER / DIRECTOR OF PUBLIC WORKS
5/z/{7
Date
3/~/07
Date
APPROVED:
ACCEPTED:
APPROVED AS TO FORM:
fJdfl '-
. / ( ,
i I~ v/tl
Bremerton' City Attorney
Page 2 of2
/o-Q ! '
CITY OF BREMERTON
'1- '$
WORK CHANGE DIRECTIVE
WCD#: One
Page 1 Of 1
PROJECT: Pump Station 2
Project #: 4334
CONTRACTOR: Stan Palmer Construction
Date: February 9, 2005
VOl J ARF nIRFr.TFn TO PRor.t=Fn PROMPTI Y wIn.... THF 1=01 I OWII\lr- rH~I\Ir-I={C::\.
. - - . .. -- -.. ---. -- . - . . -- ---- . . --.... . -. ...... ...-. ---- .....- -. '~"~~\-J'
1. Puget Sound Energy has required the replacement of the existing Pump Station 2 CT enclosure, CT base, and meter
socket. Provide and install the necessary equipment and conduit to upqrade these items.
2. Delete the spare 4" PVC conduit between the existing PSE power pole and the Primary power junction vault. Replace
this conduit with one two inch PVC conduit between the existinq pole and the first fiber optic iunction vault.
3. Provide one additional 2 inch PVC telemetry conduit between the Well 6R transformer and the first fiber ootic iunction
vault to the East.
4. Provide fiber optic cable with 6 multimode fibers instead of two multi mode fibers.
5. Replace the existinq secondary service wire between the existinq Pump Station 2 transformer and the new CT
Enclosure. Provide and install 3 sets of (4) 300 KCMIL copper wire, Type XHHW-XLP-2. Use the existinq conduit.
A TT ACHMENT(S):
Electrical Sheet E1, Applicable submittal Sheets, Contractor's Proposal.
If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order
is based thereon will involve one or more of the following methods of determining the effect of the change(s). The
Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of
the General Conditions.
Method of determining change in Contract Price:
Method of determining change in Contract Times:
Unit Price
D
D
Contractor's Records
D
[gJ
D
D
Lump Sum
Engineer's Records
Time & Materials
Other:
D
Other:
Estimated increase (decrease) in Contract Price:
Estimated increase (decrease) in Contract Times:
$ 8,904.47
Substantial Completion:
o
days;
If the change involves an increase, the estimated
amount is not to be exceeded without further
authorization.
Ready for final payment: 0 days;
If the change involves an increase, the estimated times
are not to be exceeded without further authorization.
RECOM~MENDED:
CONTRACTOR
By:
AUTHORIZED:
CITY OF BREMERTON
By 1/~
ab, FORMS, Work Change Directive, 3-00
STAN PALMER CONSTRUCTION
CHANGE ORDER PROPOSAL
PROJECT: ANDERSON CREEK WELLFIELD
PUMPST A TION 2 lJPGRADES
TO: CITY OF BREMERTON
PW &U ENGINEERING DIVISION
3027 OL YMPUS DRIVE
BREMERTON,W A 98310
DESCRIPTION:
Install new CT Can with new conductors
change 4" pve to 2" pvc and change
fiberoptic cable changes
DIRECT COSTS FROM WORK SHEET
1 LABOR
2 EQUiPMENT OWNED
3 RENTAL EQUiPMENT
4 MATERIALS
5 SMALL TOOLS
6 DIRECT SUPERVISION
7
SUB TOTAL
8
SUBCONTRACTORS
9 MARK UP ON LABOR
MARKUP ON MATERIALS & SERVICES
MARKUP ON EQUIPMENT
10 MARK UP ON SUBCONTRACTORS
Subcontractor
11 SUBTOTAL
12 WA State Sales tax (8.5% of Line 11)
13 Bonds and Insurance (1 % of lines 11 and 12)
14
Total Change Proposal Cost
(not including WA State Tax, line 12)
3%
0%
29%
21%
21%
5%
8.60%
1%
DATE: 5/3/2006
SPC CO NO: X-I05
0.00 direct labor w/fringes safety
& insurance
0.00 Direct equipment costs
0.00 Direct rental costs
0.00 Direct material costs
0.00 3% of direct labor
0.00
0.00 Prime contractor Direct
Costs, small tools & supervision
8,389.34 Subcontractor Costs
DENO ELECTRIC
0.00
0.00
0.00
419.47
8,808.81 Total Prime and Subcontractors
757.56 For calculating Bonds &
Insurance amount only
95.66 Bond and Insurancce on
increased contract amount
8,904.47 Total Change Proposal
2".~
TELEMETRY
CONDUIT
(1) 4" PVC
POWER CONDUIT
83ER OPTIC
JUNG1l0N VAULT
FOR "TElEMET (2~ 4" PVC POWER CONDUIT
~~~i'ETNL 3~Y~-6. \ (1) 4'\. PVC POWER CONDUIT
COR" DRILL
ADOITlONAL HOLES (1) 2" ivc TElEMETRY CONDUIT
FOR CONDUIT / (1) 4" pvn POWER CONDUIT
(1) 4" pve \ V \
POWER CONDUIT --1 \ ~ 1; 2" PVC Tl\EMETRY CONDUIT
ENLARGED PLAN DETAIL 0\E31 .
NO SCALE ~
:--.... ---- ____ -Q) 4" pve POWER CONDUIT !~{:>- WOODEDjVEGETATED AREA \
:'th'( I - 2 ,r
----- ---- ---- ---- --- - " . '':~ <l
---- I \
~ \ '"
\ " SEE ENLARGED ~ "- '-.... \ </
'~ \ "... OU.' , " -\ \
\ "
~ \ 12"01
~\
(i) 2" PVC TELEMETRY AND CONTROLS CONJul"
(1)1" PVC POWER CONDUIT (FOR FLlTURE :f,G METER)
(1) 4" PVC POWER CONDUIT \
~ "
,
i
~ ~ -"-(1) 2" PVC TELEMETRY CONDUIT
\ r--------~ JUNCTION VAULT FOR TElEMETRY
CONTROLS; CORE DRILL REQUIR
ADDITONAL. HOLES FOR COND
SEE DETAIL 3, E-6
- (1) I" PVC CONDUIT
...V. '. .... D~ISTING TELE
12"01 ~... . I ,:", ,,",,nO' ,
il/ /
~
SEt: DETAIL 2,
THIS SHEET
MAX, PAY WIDTH
FOR EXCAVATION
& BACKRLl
NEAT UNE
PRO\~DE ONLY. 6': CRUSHED
SURFACING TOP COURSE
ALONG DIRT/GRAVEL ROAD
AND GRAVEL AlREA
CONTINUOUS LOCATOR
WIRE - 10GA COATED
COPPER WIRE, (ONE FOOT
ABOVE. PIPE CROWN) TYP
TRENCH ZONE
BACKFlLL, TYP-----
SAND BEDDING
CONDUIT, SEE SITE
PLAN FOR TYPE
AND QUANTITY
3"MIN (TYP)
3' MINIMUM CONDUIT COVER
l : SPACE BE!WEEN POWER CONDUITS AND
TElEMETRY CONDUITS. NO SPACE
NECESSAJRY BrnVEEN TElEMETRY CONDUITS,
~p~<.€ ~~,?A.~~I~
WIU. \I S~ 6K1 Sj11...!6 UIoJ t?u t"[:
..'....'.....
:r
-
.,.
_...............:'..:.
--=.e.
"'-.-:<"",
"
..".~.z,
7;~Xf'i:.
TYPICAL TRENCH BEDDING, BACKFILL
~oN~~URFACE RESTORATION G)
EXISTING TRANSFORMER
GRID #611594-637357
......-:
---
(1) 4" Pve POWER CONDU~ ......-:
,..-;
~
~
.---:::: /'
.--:; : /' /' ~ SERVICE ROAD
--
EDGE OF ASPHALT
PAVING (TYP)
----
----
(2) 2" PVC TELEMETRY CONDUIT (1 FOR FUTURE)
(1) 4" PVC POWER CONDUIT
----
(2) 4" PVC POWER CONDUIT
@
11
4'-8" SQUARE JUNCTION
VAULT, BY UTILITY VAULT
504-LA OR EQUAIL
(SEE NOTE 2)
20 0 20 40
,...,.-------... -=""'~
SCALE IN FEET
SITE PLAN
SCALE: 1:20
G)
<&~~.,
GRAVEL AREA~/
ElECTRICAIL ;'
CABINET, SEE:
DETAIL 2, E-/4
(1) 3" PVe'
POWER;
CONDUIT "
(2) 2" PVC TELEMETRY CONDUIT
(1) 4" PVC POWER CONDUIT
SAWCUT EXISTING
BOTH SIDES OF
TRENCH IN ASPHALT
'~~~J
('} ,. >"'C CON"""~ \
(1 FOR FUTURE MAG
METER POWER).
SEE DETAIL 1, E6
(1) 4" PVC POWER CONDUIT
CONTRAcrOR SHAlL INSTAILl ALL CABLE IN CONDUIT IN
UllLITY TRENCH PER PUGET SOUND ENERGY STANDAlRDS.
~~: SHAll EXCAVATE AlREA FOR JUNCTION VAULT
OF v: ALl CONDUITS 3 FEET FROM EXPECTED EDGE
VAUL~TCO' .PSE REPRESENTATIVE WILL PLUM CONDUIT INTO
. .... ORDINATE LOCATION WITH ENGINEER.
, lOCAnON
' FRoI.4 THE OF THE TRANSFORMER IS APPROXIMATELY 95'
!>ReM ffiGE OF THE ROAD. CONTRACTOR SHAILL
';:COo' DE AND INSTAll VAULT FOR TRANSFORMER,
,?"ROlI-lATE SIZE WITH PSE.
;'COo) ~ APPROXI
,:";;": .. MATE EXISTING SPOT ELEVATION.
</,1>'{'"S.' Q
r. Ole "',p II. )l.ot
'"
~ REV!SIONS
DESCRIPTION
ASPHALT CLASS B 3"
MINIMUM OR MATCH
EXISTING. WHICHEVER IS
GREATER
6' CRUSHED SURFACE
TOP COURSE
(2)
(1)
(1) 4" PVC POWER CONDUIT
NOTE: TRENCH EDGE SHAlL MATCH EDGE OF PAVING ALONG SERVICE ROAD.
4" PVC POWER CONDUIT
SINGLE LIFT ASPHALT PATCH
CD
ENLARGED PLAN DETAIL
NO SCAlE
CD
NO SCALE
o 1. 2"
l I
TWO INCHES AT FULL SCAlE
IF NOT SCAlE ACCORDltffiL Y
CITY OF BREMERTON
DEPARTMENT OF PUBliC WORKS & UTILITIES
ENGINEERING DIVISION
WEST 580 PRESSURE ZONE IMPROVEMENTS
PUMP STATION NO.2
ELECTRICAL SITE PLAN
DATE BY
SCALE
DRAWN BY: L lAZO
DATE 07/05/05
DESIGN BY: O. GOWEN CHECKED BY: J. GIBSON
WASH. P.E. U DATE 07/05/05 WASH. P.E. # JJ080 DATE I1/JO/05
HORlZ.
VERT.
.,-----
(2) 2" PVC -TELEMETRY CONDUIT .(1 IS FOR FUTURE)
(1) 2" PVC TELEMETRY CONDUIT .
r (1) 2" PVC TElEMETRY CONDUIT
_~NDUIT
(1) 4' PVC POWER CONDUIT
'. _______ 15" CMP
(82) ".
/......-_.--.-~LE. 75.53
NEW TRANSFORMER, NOTE 3
(1) 2: PVC TELEMETRY CONDUIT
(1) 4" PVC POWER CONDUIT
.~ SERVICE ROAD
- WELL 6R
CALL TWO
BUSINESS DAYS
BEFORE YOU DIG
1-800-424-5555
1JRS
1501 4th A9~n(l. Ste. 1400
S~.tur:. WA. 9810j-18l1S.
Telepbone {ZDa} 4.36-2700
DRAWING NO.
E-1
:Z
0.
STAN PALMER CONSTRUCTION
CHANGE ORDER PROPOSAL
PROJECT: ANDERSON CREEK WELLFIELD
PUMPST A TION 2 UPGRADES
TO: CITY OF BREMERTON
PW &U ENGINEERING DIVISION
3027 OL YMPUS DRIVE
BREMERTON, WA 98310
DESCRIPTION:
Install new CT Can with new conductors
change 4" PVC to 2" pvc and change
fiberoptic cable changes
DIRECT COSTS FROM WORK SHEET
1 LABOR
2 EQUIPMENT OWNED
3 RENTAL EQUIPMENT
4 MATERIALS
5 SMALL TOOLS
6 DIRECT SUPERVISION
7
SUB TOTAL
8
SUBCONTRACTORS
9 MARK UP ON LABOR
MARKUP ON MATERIALS & SERVICES
MARKUP ON EQUIPMENT
10 MARK UP ON SUBCONTRACTORS
Subcontractor
11 SUBTOTAL
12 WA State Sales tax (8.5% of Line 11)
13 Bonds and Insurance (1 % of lines 11 and 12)
14
Total Change Proposal Cost
(not including WA State Tax, line 12)
3%
0%
29%
21%
21%
5%
8.60%
1%
DATE: 5/3/2006
SPC CO NO: X-I05
0.00 direct labor w/fiinges safety
& insurance
0.00 Direct equipment costs
0.00 Direct rental costs
0.00 Direct material costs
0.00 3% of direct labor
0.00
0.00 Prime contractor Direct
Costs, small tools & supervision
8,389.34 Subcontractor Costs
DENO ELECTRIC
0.00
0.00
0.00
419.47
8,808.81 Total Prime and Subcontractors
757.56 For calculating Bonds &
Insurance amount only
95.66 Bond and Insurancce on
increased contract amount
8,904.47 Total Change Proposal
~~~ ttv (tfU"~-;::~---~.~_~~_.:===~_'-_____~._~-~=~~..~.-~:=-__~____..
loj\!OR;<
~ C( t....,,' C_/- ~~
(:
//'" ..... r~~
i... ...-- t_.../'~ :
r";"' ..,;' .. ~~
. ..
, '." 1 ",'.. ..-
-----~_.~------~--
. .
! SI~2:;,
: ,\1c
, ! /1
I 1'1
r-I i
I 'I I ~~". " ,
! J; : (f ('!f ('J 0:;, .rC)/.J~!(./ trrJI::
2!lp!)[y ;J'I/UC Tv Xfin!~'V;i);ji._'i'
I '
^ I? "~" ! ;'.:, -,...,1 '.,"-:'" ~ "U ;....., 1 /.
!.:II L'h;~t-ii~J..~ :--f " .~. ~0 ~l, '~::"'!~
i 4/ I r::!};6~R
I j I
I 51 I
/I-ll
61 I
I J I
W-I
~i I
I 91 ,
1~!IL~,boR
111 I I
I~J I
/131 I
, I I
11.d I
I 'I I
Rl
16' I
.- j I
II I
~h
1,91-1
120 I i
, . I
~I I
'221 I
'I ?3! I
I' i I
i i i
/24 i !
f'/lATERJ.!!.-L
OU.4.NTITY
L.-'\50p'1_)I\II-;-
; i
! cED!
I' "[
i./I.i:..T!.::RIAl... ?RIC~
iv!..L. "'-E8L.'\L EXTENSIO[\j
LASOR
E~:T~i\!SIOI-J
.------.-J
,.
f
!
i r: r- .<:;)
i .;) ';'J, D
(' I I "..La !)
.:;, vI/ I-V j -__\{
I ,-.. !Y)-
~;:; /'0
(J !f {~-~
foTliL
! i
" 2~ j
~!
1 '
I 261
i 27 !
ti
r !
, 1
I 29 I
}-~
, !
; ':l:() I
j ~~ ;
. I
i 31 i
: ,::.<,:!
i 32 I
, ^, ~
, ",;;:: ;=:; ~'; :; =::-~
--II
'~I
';11
, "
~. ~ !
, ,
i'
I'"
-'
<(
C(
LU
,-
<(
2
~)
;:i\'
,
.~; ~ z;: ~; -;\' ~:~ "50 ~;;, f:; 01 \:
t~~1~ l ~5 r...\) ts:. '>, ::::;. .,1... "'''.. \:ti ~"....., .~!~
l:'.J. ':::: 'o" .c~ V}" c} <;;;.C\ ,r'," ~_ I'~ . i"
-1-, Jj~:~ 1~ ,; (' ,~:;, ~:J, - ~.,. ~.- ,,':' ~ ;:~ ':: - ~ l~~~ I I:::
J {J l\~ ':".. ''':;-' "" ~,:-i~ {,'~ t~. l - ~ ~... ""'" ~"'~ 11}
, .. (, ~ 'C', '" 'E " ' , c') ."
I" I ~I _.1 -.." ~ '''''' "', ..: ''-'' . ., I" ~," " I -_J ",)
I c::.. '" ...... .". ~ ......,,"'t, ~~, \ : ""'....:... h""l -....J {~
:_',~:~-II=~ )j-'N =l-;~-I=;ll--;~I~;-F;: -'-~][;"-'L--;;;JI--I---;,-:' -:,;;-I=--;;- -~-I=lO C1 ,- ;';' 'I" -;;"ll,,, ;r;l-~~~\I-- ,;II~;=L-~~~ ~~)I':~ ~ll~'-'~]I~ G":'! "':' ~-I:::;~I::~;-': '--'''''11: ,', I;,;
.______________ ____ _ _ ~___=__~I_=__'- ,- _-=-_~=- .... _~~~_~_~__~. ~__~_ _~__~__~~:~_.__(~~__~~"___~yJ "~."l :~:~
p
\'1;;'
r,~,~
!------------------ _.--
,JOB
i \,"',~C',/
l . ~ '-..-1 il I\.
!--
~~-.-2-~~,i
i 31 i
! i
f;;- ()
1\11,l\T2RIA.L PRiCE PE!~! k;f-;:E?iAL EX-:-=.i\!S!O:\i
;
I c. i
,
i
i
U\80R Uf'.!JT
U\30R
E~TEf\JSiCf\.!
i>;;.!i, TERL!::.L
OUJ~NT!lY
l
'1
t:<O~
".- ........
!
,
"
fF g) {(if;\, ~;
!U;;:) f' 6 [; /;bi) i
t; ()
f"<- L (
,\ /)'1(:1__'
i
j
\--
boor
i
i ~~
i~
,V?; 0..:'1'! + L(I'-, heir
, ,
i 27 i
, ,
I 28 l
J j
I i
I 29 :
r_L.
13G i
! 32
133 ;
-. - ."-
: C';~:;; : ;-.:;;' ;::.~.S,:;~
. ~-S:;-::;':,~;-( ;::~..: .' ~ :
/~
JGB !," "
\t\/ORJ-(
c~/( ...
~~,eo,s ~ -=i
IJ!
i' t
I I I
! i
o i
([. i
31 I
! i
i
t
I
I
UJ
I 81 i
m
~
111 I I
1~'ln ....'
h-"
~I
111.111' I
. I
t I "1
115 i c~
l:! I
117 I
" 18 i
I I
119 i I
/20 I I
~! I
1221 I
'1 : I
. 23 i I
Ii!
L:l!
1251 I
, I ,
125 I
. 1
,
i "i
,-,
5!
I
" !
O!
l;::<
t:Y/I-~!f
, I
!
c,. f (
t""',J -
~~~~O
'\
0~
f) ~f
ot
~7/
LV-. \0 0 r
Tb~u'- [
! 27l
I I
I '
, ,
i 23; i
r-+-;
1 291 I
! , '
! i !
I 30 I !
! I t
I i
I 31 i
i !
! .'32 i
. I
1 34 !
'. 'h" ,_ .._' ~. ,.~: "_' .;:;; .;;:", ,'--,
U\30R
E~~-I-E)',jSiCH
<-
:"":';:,
k
t
.'
//
,,//
-------~--~--_._--_._-------_._-_._-'- --.-----.---
, ' -
,'''i
i 0'....,:.:;
i . .. ~ _y r_
._---------=---~_.-
\/'. C'i-=:~<
, '
----------~-_.._------------~-~-- '
ivl.'\TEi=iIAL
QUANT!T':'
."
j I
L",2C~R Uf\i:T ; C~i=1;
LA3C'R
EXT:=NSICN
rr-;!
I III
n-I
! 'i ! ('t
11 1& F,bQ~:,
L1-1~0,.LJ i L
ii'
I 4 I
I 5 i i
I I
1-'['
I 6,
I t~X(NffJ("'~
Gl! '
11l 7-0 The L.
~
1,1 I 'I'
I~-
I I '
13 I I
1'4\ I
1,51 I
I , '
I 161 I
17H-
01
1'91l
120 I I
r-' ,
I 21 I !
~i I
,i i
I 23 i I
, L-L-
1-; I
1241 I
r 1 I
125 I j
I ,
126! I
:....-.-.:- :.
';'l,.."
(. f~
"ft: t ~n Tf-.~t{(tt~'I~J.:j
t"
..._~
"-~-". ;-
,;,7'
1"-"-
lA-d.;:~ L_
" *:,< i:
!vIi)
0"",,,,
J::; ~J' ~""
/1
~,,:!:)r
;J IC)
/:~
c"
f rt1JI'S
Boy,
; ;
I 2~ I
I !
11
I 28 !
; 1
I ,
i 29 !
i 30 I
! ]
"131 !
: ,
! 32 !
! 33 i
j ''';- ;
-; :::::~::~ : i;iS :;;r,B-::: : ;".:;:;-:;;;.::;; ;":,;-,:.:: T.J F~<'s,.-:;;;,::; i::">f-;/ :~T~,~.'
::-------'~~~~~
.. ;
. '
, '
, ,
, '
, .
, ,
, '
----~---~.~.
Fiber Network Interface (FNI)
1-12 Fibers
Description
The Fiber Network Interface provides an optical demarcation
point for Fiber-to-the-x applications. Mounted on the inside
or outside of the structUre, the optical NID provides physical
protection for the transition benveen provider and customer,
and facilitates system testing.
Note: Cabling is not included in units.
Features I Benefits
· Designed for FITx applications
· Housings for 1 to 12 fibers
· Maintains proper bend radii
· Manages fiber slack
· Integrated strain-relief
· Lockable (with service provider override)
· Molded of engineering-grade thermoplastic that is both
flame-retardant and impact-resistant.
· Snap-tight cover ensures weather-resistant seal
· Indoor and outdoor
"
!l,
I C~.'.~~...
Corning
Ca ble Systems
,-6 Fiber Housing I photo 8825
2-12 Fiber Housing I photo FOHo,
Product Specifications
Fiber Network Interface (FN I)
1-12 Fibers
Corning
Cable Systems
Specifications
Housing
76
Adapters - Ceramic Sleeves
No Splice Capabilities
1 - 6 Fiber Interconnections
1 SC Simplex
1 - 3 SC Duplex
1 - 6 ST" compatible Simplex
Fusion Splice Capable
2 - 12 Fiber Interconnections
1 - 6 SC Duplex
Outside Dimensions- (H x W x D) in
10.2 x 8.5 x 3.0
Strain-Relief
Cable Ties
79
14.2 x 13.5 x 4.0
Cable Clamp on Drop
Cable Ties on Outgoing
Ordering Information
-,9 "Co ~
FNI-Qg- 000- 0
II gOD II
Select housing. (number of fiber inputs, number
of adapters)
76 = CDP0807 /7600
(1 - 6 Fiber: 1 SC Simplex, 1 - 3 SC Duplex, or
1 - 6 ST compatible Simplex Adapters)
79 = CDPI211 / 7900
(2 - 12 Fiber: 1 - 6 SC Duplex Adapters)
r; Select fan-out kit.
A = 6 Line
B = 12 Line (*Standard on 79 housing)
U = Not Equipped
l!J Select number of adapters.
11 - 6 (* See Housing Options in D)
~ Select number of splice trays.
1 - 6 (* Available only with 79 housing)
U = Not Equipped
Select type of fiber adapter.
A APC, SC, SM, Duplex
B = SC, SM, Duplex ./-:---
C = SC, MM, Duplex.oc;;
D = ST compatible, SM, Simplex (*76 housing only)
E SC, SM, Simplex (*76 housing only)
F = SC, MM, Simplex (*76 housing only)
i;
I C~.!.~~.~.
~
Corning Cable Systems LLC . PO Box 489' Hickory, NC ,8603-0489 USA
1-800-743-267S. FAX:828-901-5973 . International: 828~01-5ooo' http://www.coming.com/cabl.'y,tems
Corning Cable Systems reserves the right to improve, enhance, and modify the features and specifications afeaming Cable
Systems' products without prior notification. ST is a registered trademark of Lucent Technologies. All other trademarks are the
properties of their respective OY/ners. Corning Cable Systems is ISO 9001 certjfied. ()2002 Corning Cable Systems. All rights
reserved_ Published in the USA. TfL269B.EN / February 2002/2_SM
CITY OF BREMERTON
WORK CHANGE DIRECTIVE
WGD#: Two
Page 1 Of 1
PROJECT: Pump Station 2
Project #: 4334
CONTRACTOR: Stan Palmer Construction
Date: June 30, 2006
Vf"Ill AD!:' nID!:'f'T!:'n Tf"I DDf"If'!:'!:'n DDf"IJI./IDTI v '^lITU TU!:' l:f"Il I f"I'^lI~J~ f'UAt.J~!:'/C:'.
. ""..., ,"",I"'~ ....(1'\.1-.'-' I L..L.I . '" . .,"''''1-........ I .'''-'1'11 . L.. I .WI.. I I IlL.. 1"'__"'......"'" "'. ,,"'u''-''I-.'''''J-
1. To maintain and program PS2, and future control systems, FTS4Control software is required.
Please provide Protocol Analyizer - By Frontline Test Equipment. Approximate cost - $3;598. This exceeds the $2000
Spare parts allowance identified in Section 170003.5 by $1012.
A TT ACHMENT(S):
If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order
is based thereon will involve one or more of the following methods of determining the effect of the change(s). The
Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of
the General Conditions.
Method of determining change in Contract Price:
Method of determining change in Contract Times:
o
~
D
D
Unit Price
D
D
Contractor's Records
Lump Sum
Engineer's Records
Time & Materials
Other:
D
Other:
Estimated increase (decrease) in Contract Price:
Estimated increase (decrease) in Contract Times:
$ 1,789.76
Substantial Completion:
o
days;
If the change involves an increase, the estimated
amount is not to be exceeded without further
authorization.
Ready for final payment: 0 days;
If the change involves an increase, the estimated times
are not to be exceeded without further authorization.
RECOMMENDED:
CONT~ ~
BY:~
AUTHORIZED:
CITY OF BREMERTON
~~/
I /
By:
V/?/ (
I
;
!
~ /2-/0?
ab, FORMS, Work Change Directive, 3-00
03/05/2007 13:10
350-574-7190
STAN PALMER OONST
PAGE 02/02
CITY OF BREMERTON
WORK CHANGE DIRECTIVE
PROJECT: Pump Station 2
Page 1 Of 1
Project #: 4334
WCD#: Three
CONTRACTOR: Stan Palmer Construction
Date: August 14, 2006
YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOLLOWING CHANGE(S):
1. Extend the contract time for Substantial Completion to Tuesday, August 23. 2006 due to delays caused by the
chlorination system faiiure at Pump Station 2.
ATTACHMENT(S):
If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order
is based thereon will involve one or more of the following methods of determining the effect of the change(s)_ The
Change Order will be exec'....ted in accordance with Section 1"()4.4 of the WSDOT Standard Specffications, or Article 10 of
the General Conditions.
0 Unit Price
0 Lump Sum
0 Time & Materials
0 Other:
Method of determining change in Contract Times:
o Contractor's Records
o Engineer's Records
Method of determining change in Contract Price:
o Other:
Estimated increase (decrease) in Contract Price:
Estimated increase (decrease) in Contract TImes:
$0.00
Substantial Completion:
36
days;
If the change involves an increase, the estimated
amount is not to be exceeded without further
authorization.
Ready for final payment: 36 days;
If the change Involves an increase, the estimated times
are not to be exceeded without further authorization.
AUTHORIZED:
CITY OF BREMERTON
By:
/(
3/2 6)
ab, FORMS. Wort" CI'la~ OirneliVe, 3-00
CITY OF BREMERTON
WORK CHANGE DIRECTIVE
WCD#: Four
Page 1 Of 1
PROJECT: Pump Station 2
Project #: 4334
CONTRACTOR: Stan Palmer Construction
Date: October 2,2006
YOU ARE D!RECTED TO PROCEED PROMPTLY W!TH THE FOLLOW!NG CHANGE(S):
1. The City will compensate SPC for 4 hours of TSllabor which is required to install the current transformers
in the Pump Station 2 VFD enclosures for the 120 V fans.
- ATTACHMENT(S):
If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order
is based thereon will involve one or more of the following methods of determining the effect of the change(s). The
Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of
the General Conditions.
Method of determining change in Contract Price:
Method of determining change in Contract Times:
Lump Sum
D
D
Contractor's Records
D
~
D
D
Unit Price
Engineer's Records
Time & Materials
Other:
D
Other:
Estimated increase (decrease) in Contract Price:
Estimated increase (decrease) in Contract Times:
$ 500.00
Substantial Completion:
o
days;
If the change involves an increase, the estimated
amount is not to be exceeded without further
authorization.
Ready for final payment: 0 days;
If the change involves an increase, the estimated times
are not to be exceeded without further authorization.
AUTHORIZED:
CITY OF BREMERTON
By:
By:
f/.
/ L-.
:3h107
I I
ab, FORMS, Work Change Directive, 3-00
CITY OF BREMERTON
WORK CHANGE DIRECTIVE
VVCD#: Five
Page 1 Of 1
PROJECT: Pump Station 2
Project #: 4334
CONTRACTOR: Stan Palmer Construction
Date: February 27, 2007
YOU ARE DIRECTED TO PROCEED PROMPTLY WITH THE FOllOWING CHANGE(S):
1. Extra costs associated with utility trench conflicts, and pressure gauges.
ATTACHMENT(S): Contractor Costs
If a claim is made that the above change(s) have affected Contract Price or Contract Times any claim for a Change Order
is based thereon will involve one or more of the following methods of determining the effect of the change(s). The
Change Order will be executed in accordance with Section 1-04.4 of the WSDOT Standard Specifications, or Article 10 of
the General Conditions.
Method of determining change in Contract Price:
Method of determining change in Contract Times:
Unit Price
o
o
Contractor's Records
o
o
~
o
Lump Sum
Engineer's Records
Time & Materials
Other:
o
Other:
Estimated increase (decrease) in Contract Price:
Estimated increase (decrease) in Contract Times:
$ 1,733.32
Substantial Completion:
o
days;
If the change involves an increase, the estimated
amount is not to be exceeded without further
authorization.
Ready for final payment: 0 days;
If the change involves an increase, the estimated times
are not to be exceeded without further authorization.
RECOMMENDED:
CONT~
By: / +-
/o/%-~ 1
AUTHORIZED:
CITY OF BREMERTON
~1 / L-- S/z~7
( . I
By:
ab, FORMS, Work Change Directive, 3-00
STAN PALMER CONSTRUCTION
CHANGEO~DERPROPOSAL
PROJECT: ANDERSON CREEK PUMP STATION
DATE: 10/2/2006
TO: CITY OF BREMERTON PW
3027 OL YMPUS DRIVE
BREMERTON, WA 98310
SPCCONO: X-01
DESCRIPTION:
REPAIR WATER SERVICE
DIRECT COSTS FROM WORK SHEET
1 LABOR 66.07 direct labor w/fringes safety
& insurance
2 EQUIPMENT OWNED 0.00 Direct equipment costs
3 RENTAL EQUIPMENT 0.00 Direct rental costs
4 MATERIALS 46.50 Direct material costs
5 SMALL TOOLS 3% 1.98 3% of direct labor
6 DIRECT SUPERVISION 0% 0.00
7 SUB TOTAL 114.56 Prime contractor Direct
Costs, small tools & supervision
8 SUBCONTRACTORS 0.00 Subcontractor Costs
9 MARK UP ON LABOR 29% 19.16
MARKUP ON MATERIALS & SERVICES 21% 9.77
MARKUP ON EQUIPMENT 21% 0.00
10 MARK UP ON SUBCONTRACTORS 12% 0.00
Su bcontractor
11 SUBTOTAL 143.48 Total Prime and Subcontractors
12 WA State Sales tax (8.5% of Line 11) 8.60% 12.34 F or calculating Bonds &
Insurance amount only
13 Bonds and Insurance (1 % of lines 11 and 12) 1% 1.56 Bond and Insurancce on
increased contract amount
14 Total Change Proposal Cost 145.04 Total Change Proposal
(not including WA State Tax, line 12)
<I~ H.D. FOWLER
COMPANY
PO ~Rf 180' BeIlevue, WA . 98009-0160
N~~~~~ r1821162
Bellevue
Bellingham
Bend
Bremerton
Clackamas
Eugene
Hayden
Hillsboro
BRWH
# 162410
To:
425.746.8400
360.734,8400
541.389.7577
360.377-4507
503.656.3900
541-607.0081
208.772-9060
503.626.2466
Ship to: PO BOX 2057
11,1"I..I".III1I1I1I",II.! .1.11,11,.1,,11111'111.1.1.11..,1
3 STAN PALMER CONSTRUCTION
5107 STATE HIGHWAY 3 SW
PORT ORCHARD WA 98367-7486
?
Order#:
..02196932
03/10/06
W ILL CALL
PO/JOB: CHEMICAL PLANT
tOol \-~t
Teims:
. Due:
FOB:
H. D. FOW LER
Ship Via:
~
""""11' Jr-r-"\r""lo. A I r-
.::> IL v t:.,",UAU::
Inv Date:
02/16/06
Marysville
Olympia
Pacific
Pasco
Redmond
Spokane
Wenatchee
Yakima
360.651.2400
360.459.7300
253.863.8600
509.545.0255
541.923.2090
509.568.8400
509.886.8804
509~8'8400
Order Writer:
'vV A 983832057
DONALD SCOTT
Qty Qty Part # Unit Extended T
Ship'd BO'd UoM Description Price Price X
4 0 EA 3/4" FORD CTS STIFFENER FORD #51 0.940 3.76
100 0 FT 3/4" SOR 9 200 PSI POLY TUBING, PE 3408, ASTM 0.240 24.00
02239, COPPER SIZE, 100FT. COIL
Line
2
3
KEVIN
Serving the Pacific Northwest since 1911
Sub Total
Freight
Tax
Grand Total
42.52
0.00
0.00
42.52
~
H.D. FOWLER
COMPANY
p~:~~ - BeIle~~rf~ -f8j9bi 0
To:
3
1I.1..I..I...IIIIIiIlI'llll 11.1.1..11..1111111111.1.1.1.1111.1
STAi~ PALiviER COi'-JSTRUCTiON
5107 STATE HIGHWAY 3 SW
PORT ORCHARD WA 98367-7486
KEVIN
BRWH
# 162410
Bellevue 425.746.8400
Bellingham 360.734.8400 Olympia
Bend 541.389.7577 Pacific
Bremerton 360.377.4507 Pasco
Clackamas 503.656.3900 Redmond
Eugene 541-607 .0081 Spokane
Hillsboro 503.626.2466 Wenatchee
Marysville 360.651.2400 Yakima
Ship to:PO BOX 2057
QII \II=DI\^' C
"'-..,IlL- v L-I '\.LJr-\L-L-
360.459.7300
253.863-8600
509.545.0255
541.923- 2090
509.568.8400
509.886.8804
50@,248.8400
nter:
1M ^ OQ':)Q'Y)/lt::7
v Y 1\ .:JVvUo.JLV0 I
Inv Date:
!~ ~ ~ ~.,
02/01/06
L1NARD KINARD
Terms:
FOB: H. D. FOW LER Ship Via: W ILL CALL
!l.ll Qty Qty Part #
Line Ship'd BO'd UoM Description
( e;lt
Unit
Price
xtended T
Price X
Sub Total
Freight
Tax
Grand Total
Serving Ute Pacific NorU1west since 1935
3.98
0.00
0.00
3.98
&:
STAN PALMER CONSTRUCTION, INC.
EXTRA WORK INITIATION FORM
PROJECT: 6011
DATE: 02/16/06
X OR Z NUMBER ASSIGNED: X-I
BRIEF DESCRIPTION (6 words or less): Repair water service.
IF Z, BACK CHARGE FIRM:
LOCATION (station, address, defined location on site): on site by existing house
NOTIFICA TION:
DATE AND TIME: Feb 16,06
REPORTED TO: Ned Lever
HOW REPORTED: D Phone 0 Fax [ZJ In person D Other:
WHO AUTHORIZED WORK TO PROCEED: Ned Lever
DETAILED DESCRIPTION OF EXTRA WORK AND WHY NECESSARY: Water
service was know but not marked by owner. We were asked to just dig thru it. Ned ask us
afterwards to repair it. ( note the city did insure that the water was off before we hit it)
FOLLOW UP WORK REMAINING:
LOSS OF TIME TO CREW:
ACTUAL
OR ESTIMATED
ESTIMA TED LOSS OF TIME TO PROJECT (work on critical path):
FORSEEN IMPACTS: See daily report for more info.
..
/I~I H.D. FOWLER
COMPANY
PON~b~~. BelleI'fELL-b6L 0
Bellevue 425.746.8400
Bellingham 360.734.8400
Bend 541.389.7577
Bremerton 360.377.4507
Clackamas 503.656.3900
Eugene 541.607.0081
Hayden 208.772.9060
Hillsboro 503.626.2466
Ship to: PO BOX 2057
BRWH
# 162410
To:
11.1, .1..111 ,II, ,11111" ,11'111, I " II. , I" 11111111 I, I ,I, II, ..1
4
STA~~ PALtv1ER COi'-lSTRUCTiOi'-l
5107 STATE HIGHWAY 3 SW
PORT ORCHARD WA 98367-7486
QII \/CDn^ I C
VILVLI'\L.lr\L-L...
Marysville
Olympia
Pacific
Pasco
Redmond
Spokane
Wenatchee
Yakima
360.651.2400
360.459.7300
253.863-8600
509.545.0255
541.923.2090
509.568.8400
509.886.8804
509.24~8'8400
02198861
02/21/06
nter:
\^/ ^ nOiJO')I"')f""\C7
v v r\ VU000L UO (
FOB:
H. D. FOWLER
C4\-
Ship Via:
WILL CALL
ll.l!
Qty
Ship'd
Qty Part #
BO'd UoM Description
Line
DRAIN
MARK PEASE
EMERTON CHEM.
Unit
Price
Extended T
Price X
Sub Total
Freight
Tax
Grand Total
KEVIN INOS
Seruing the Pacific Northwest since 1911
3.88
0.00
0.00
3.88
Job No. 6011
,; Job Name: Pump Station 2 Upgrades
Daily Time Report Prepared By:
Keith Shumaker
Date: Feb 16, 06
THURSDAY
III .... ,
VI s:: ""
.!!! Q.I Q.I ..-
EMPLOYEE and/or u E1U 0
No. 0 ..-
... a.... CD r
SUBCONTIRACTOR 0 .- Q.I ..- ><
..c ::s a.
.E'o .,-'
1Il
...J
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1
2 Adrian Shippen EXC 567 8.5
3
4
5 Chuck Palmer TRK 71 3
6 LAB 5
?
-
8 Kevin Hinds PIPLAB 21 1
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
--
~ H.D. fowler Company
~ PO BOl( 1 GO . Bellevue, Washington, 98009-01 GO
Bellevue
Bellingham
Bremerton
Clackamas
Hillsboro
Marysville
Credit
Memo
C136664
To:
BRWH
# 162410
Ship to: PO BOX 2057
STAN PALMER CONSTRUCTION
5107 STATE HWY 3 SW
425.746.8400
360.734.8400
360.377.4507
503-656.3900
503-626.2466
360.651.2400
PORT ORCHARD
(360) 674-2100
Order#:
SILVERDALE
W A 98367
Due: NET 10TH PROX
Olympia
Pacific
Pasco
Spokane
Wenatchee
Yakima
360.459.7300
253.863.8600
509.545.0255
509.568.8400
509.886.8804
509.248.8400
W A 983832057
Inv Date: Order Writer:
02/16106 DONALD SCOTT
PO/JOB:
FOB:
Ship Via:
ll.l2 -
Line Qty UoM Description
This credit belongs to RA: RA*BRWH*70642 WRONG
MATERIAL FOR JOB
1 2 EA <11821102> FORD C66-33Q 3/4" IPS QUICK JOINT
ADAPTER
Sales Invoice <118211 02>
2 4 EA <11821102> 3/4" FORD IPS STIFFENER FORD #71
Sales Invoice <11821102>
Serving the Pacific Northwest since 1935
Unit
Price
Less
%
Credit T
Price X
9.210 -18.42
1.070 -4.28
Coo I \ - Y- \
Sub Total:
CharQes:
FreiQht:
Tax:
Grand Total:
-22.70
0.00
0.00
0.00
-22.70
.~ H.D. FOWLER
COMPANY
PO!~O:~8e~. Bellel'iAS2or-i6b 2
To:
3
11.1111..1...11..1111111.1111.1.1..11..1..11..1'111.1.1.1111.1
STAN PALMER CONSTRUCTION
5107 STATE HIGHWAY 3 SW
PORT ORCHARD WA 98367-7486
Terms:
FOB:
H. D. FOWLER
Ship Via:
llil
Line
Qty
Ship'd
Qty Part #
BO'd UoM Description
BRWH
# 162410
Bellevue
Bellingham
Bend
Bremerton
Clackamas
Eugene
Hayden
Hillsboro
425.746.8400
360.734.8400
541.389.7577
360.377-4507
503.656.3900
541-607.0081
208.772.9060
503.626.2466
Ship to: PO BOX 2057
o EA 3/4" FORD IPS STIFFENER FORD #71
Order#:
,. ". ~
Due:.
02196859
. 03/10/06..
W ILL CALL
SiLVERDALE
Inv Date:
02/16/06
2
4
kevin h inz
Serving the Pacific NOl'thwest since 1911
Marysville
Olympia
Pacific
Pasco
Redmond
Spokane
Wenatchee
Yakima
360.651.2400
360.459.7300
253-863.8600
509.545.0255
541.923.2090
509,568.8400
509.886.8804
5091918.8400
Order Writer:
'vV A 983832057
ROBERT FLOWERS
Unit
Price
Extended T
Price X
1.070
4.28
Sub Total
Freight
Tax
Grand Total
22.70
0.00
0.00
22.70
STAN PALMER CONSTRUCTION
CHANGE ORDER PROPOSAL
PROJECT: ANDERSON CREEK PUMPST A TION
DATE: 10/212006
TO: CITY OF BREMERTON PW
3027 OL YMPUS DRIVE
BREMERTON, W A 98310
SPC CO NO: X-02
n DC' r'D TD'T'T n1\. T.
.lJL>..J~_d'\_U- J.J.\Jl'l.
ELECTRICAL TRENCH CONFLICTS WITH
EXISTING UTILITIES REQUIRED HAND WORK
AND DELAYS
DIRECT COSTS FROM WORK SHEET
1 LABOR
276.16 direct labor w/fiinges safety
& insurance
96.60 Direct equipment costs
0.00 Direct rental costs
0.00 Direct material costs
8.28 3% of dir~ct labor
0.00
381. 04 Prime contractor Direct
Costs, small tools & supervision
0.00 Subcontractor Costs
2 EQUIPMENT OWNED
3 RENTAL EQUIPMENT
4 MATERIALS
5 SMALL TOOLS 3 %
6 DIRECT SUPERVISION 0%
7 SUB TOTAL
8 SUBCONTRACTORS
9 MARK UP ON LABOR
MARKUP ON MATERIALS & SERVICES
MARKUP ON EQUIPMENT
10 MARK UP ON SUBCONTRACTORS
Subcontractor
29%
21%
21%
12%
80.09
0.00
20.29
0.00
11 SUBTOTAL
481.42 Total Prime and Subcontractors
12 WA State Sales tax (8.5% of Line 11)
8.60%
41.40 For calculating Bonds &
Insurance amount only
13 Bonds and Insurance (1% of lines 11and 12)
1%
5.23 Bond and Insurancce on
increased contract amount
14
Total Change Proposal Cost
(not including WA State Tax, line 12)
486.65 Total Change Proposal
STAN PALMER CONSTRUCTION
CHANGE ORDER WORK SHEET
PROJECT
DESCRIPTION
LABOR
OPERATOR
LABORERS-PIPELAYER & CAULKER
TOTAL LABOR
EQ. NO OWNEND EQUIPMENT
567 Crawler Mounted Hydraulic Excavator
TOTAL OWNEND EQUIPMENT
RENTED EQUIPMENT
TOTAL RENTED EQUIPMENT
MATERIALS
TOTAL MATERIALS
SUBCONTRACTORS
TOTAL SUBCONTRACTORS
CO NO:
QNTY UNIT
3
3
3
0.00
UNIT
COST
49.98
42.07
0.00
0.00
0.00
0.00
0.00
0.00
32.20
0.00
0.00
0.00
0.00
0.00
0.00
COST
149.94
126.22
0.00
0.00
0.00
0.00
0.00
0.00
276.16
96.60
0.00
0.00
0.00
0.00
0.00
0.00
96.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Job No. 6011
;
,/ Job Name: Pump Station 2 Upgrades
Date: Feb 17, 06
Daily Time Report Prepared By:
Keith Shumaker
FRIDAY
f/) ....
f/) c:"C
!!! C1l C1l ..-
EMPLOYEE and/or 0
No. u E ca 0 N
... c.... <D I
SUBCONTRACTOR 0 .- C1l '""": ><
.c ~ c.
ra S"o ..-
..J
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1
2
3 Adrian Shippen EXC 567 4.5 3
4
5
6 Chuck Palmer LAB 5 3
7
8
9
10
11
12 .
13
14 ,
15
16
17
18
19
20
21 .
22
23
24
25
26
27
28
29 .
30
S,j(
STAN PALMER CONSTRUCTION, INC.
EXTRA WORK INITIA TION FORM
D.^..TE:
60] ] - Pump Station 2 Upgrades
]:;'p}, 17 ()~
..I. '"'V~ ~ I, vv
PROJECT:
X OR Z NUMBER ASSIGNED: X-2
BRIEF DESCRIPTION (6 words or less): 12" DI pipe unmarked and unknown
IF Z, BACK CHARGE FIRM:
LOCATION (station, address, defined location on site): 20 ft north of existing
transformer.
NOTIFICATION:
DATE AND TIME: Feb 17,06
REPORTED TO: Ned Lever
HOW REPORTED: D Phone D Fax r:g] In person D Other:
WHO AUTHORIZED WORK TO PROCEED:
DETAILED DESCRIPTION OF EXTRA WORK AND WHY NECESSARY:
Because of the 12" line and location ofthe existing direct bury power line ourtrench was
forced even closer to the power line which ment hand work.
FOLLOW UP WORK REMAINING:
LOSS OF TIME TO CREW:
ACTUAL
OR ESTIMATED
ESTIMA TED LOSS OF TIME TO PROJECT (work on critical path):
FORSEEN IMPACTS: See daily report for time.
STAN PALMER CONSTRUCTION
CHANGE ORDER PROPOSAL
PROJECT: ANDERSON CREEK PUMPST A TION
DATE:
TO: CITY OF BREMERTON PW
3027 OL YMPUS DRIVE
BREMERTON, WA 98310
SPC CO NO: X-03
3.00
T'\ DC r<n Tn'T'T r'\lI. T.
LJL0~J.'-J.r J.J.Vl'l.
REMOVE CONCRETE RETAING WALL OBSTRUCTING
TRENCH LINE
DIRECT COSTS FROM WORK SHEET
1 LABOR
319.65 direct labor w/fringes safety
& insurance
162.60 Direct equipment costs
0.00 Direct rental costs
0.00 Direct material costs
9.59 3% of direct labor
0.00
491.83 Prime contractor Direct
Costs, small tools & supervision
0.00 Subcontractor Costs
2 EQUIPMENT OWNED
3 RENTAL EQUIPMENT
4 MATERIALS
5 SMALL TOOLS 3%
6 DIRECT SUPERVISION 0%
7 SUB TOTAL
8 SUBCONTRACTORS
9 MARK UP ON LABOR
MARKUP ON MATERIALS & SERVICES
MARKUP ON EQUIPMENT
10 MARK UP ON SUBCONTRACTORS
Subcontractor
29%
21%
21%
12%
92.70
0.00
34.15
0.00
11 SUBTOTAL
618.67 Total Prime and Subcontractors
12 WA State Sales tax (8.5% of Line 11)
8.60%
53.21 For calculating Bonds &
Insurance amount only
13 Bonds and Insurance (1 % of lines 11 and 12)
1%
6.72 Bond and Insurancce on
increased contract amount
14
Total Change Proposal Cost
(not including WA State Tax, line 12)
625.39 Total Change Proposal
STAN PALMER CONSTRUCTION
CHANGE ORDER WORK SHEET
PROJECT
DESCRIPTION
LABOR
POWER EQUIPMENT OPERATORS-BACKHOE,
EXCAVATOR, SHOVEL (3YD & UNDER)
LABORERS-PIPELA YER & CAULKER
TOTAL LABOR
EQ, NO OWNEND EQUIPMENT
567 Crawler Mounted Hydraulic Excavator
Pick up wI jack hammer
TOTAL OWNEND EQUIPMENT
RENTED EQUIPMENT
TOTAL RENTED EQUIPMENT
MATERIALS
TOTAL MATERIALS
SUBCONTRACTORS
TOTAL SUBCONTRACTORS
CO NO:
QNTY UNIT
3
4
3
3
0.00
UNIT
COST
50.45
42.07
0.00
0.00
0.00
0.00
0.00
0.00
32.20
22.00
0.00
0.00
0.00
0.00
0.00
COST
151.35
168.30
0.00
0.00
0.00
0.00
0.00
0.00
319.65
96.60
66.00
0.00
0.00
0.00
0.00
0.00
162.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0,00
::f-
STAN PALMER CONSTRUCTION, INC.
EXTRA WORK INITIA TION FORM
PROJECT:
6011 - Pump Station 2 Upgrades
-r;'p]-",)() ()h
-L VIlJ ~'J, VV
DATE:
X OR Z NUMBER ASSIGNED: X-3
BRIEF DESCRIPTION (6 words or less): power/phone line and concrete wall -in
trench line
IF Z, BACK CHARGE FIRM:
LOCATION (station, address, defined location on site): just south ofVO-l vault
NOTIFICATION:
DATE AND TIME: Feb 21,06
REPORTED TO: Ned Lever
HOW REPORTED: 0 Phone 0 Fax ~ In person D Other:
WHO AUTHORIZED WORK TO PROCEED:
DETAILED DESCRIPTION OF EXTRA WORK AND WHY NECESSARY: The
retaining wall continued under the existing road and had to be removed in order to get
conduit thru. Hand digging need around power and phone lines coming from the existing
house going to the garage. (not shown on plans.)
FOLLOW UP WORK REMAINING:
LOSS OF TIME TO CREW:
ACTUAL
OR ESTIMA TED
ESTIMATED LOSS OF TIME TO PROJECT (work on critical path):
FORSEEN IMPACTS: See daily report for detail time.
Job No. 6011
Job Name: Pump Station 2 Upgrades
Date: Feb 20, 06
MONDAY
Daily Time Report Prepared By:
Keith Shumaker
tIJ +J
tIJ c"'C
~ Q) Q) .,....
EMPLOYEE and/or u E~ (<) 0
No. ... 0.... I 0
SUBCONTRACTOR 0 .- Q) x ~
::s 0.
.0 0"0 .,....
~
~ W
:'<'>". ~.c,.>,.......",....;.;, 1 2 3 4 5 6 ., 8 9 10 11 12 13 14
1
2 Adrian Shippen EXC 567 3 4.5
3
4 Kevin Hinds TRKOT 21 1
5 LAB 2 .
6
7 Keith Shumaker Jackhammer 3
8
9 .
10
11
12
13
14
15
16
17
18 .
19
20
21
22
23
24
25
26
27
28
29
30
Stan Palmer Construction
Daily Report
Job No. 6011 Job Name: Pump Station 2 Upgrades
DATE: Man Feb 20, 06
WEATHER in AM: Clear and Cold
WEATHER in PM: Clear and Cold
WORK TODAY:
Continued conduit installation. Started at VO-1 and headed up the hill. Slow start due to an existina power/phone line running
parallel with trench. These iines not shown on drawing. livhen we got to the retaining wail it was found to continue under the road
so we tried saw cutting it but because of the rebar a iack hammer was called for and after 3 hrs we had it out of the way. These
two items were tracked as X-3.
WORK DELAYS:
EXTRA WORK: X-3 concrete wall removal/ power and phone line not shown on olans.
MATERIALS: Pit run gravel for back fill from RV trucked bv RV 6 loads hauled during the evening (didn't get tickets as of this writing)
MOB & DEMOB:
STAN PALMER CONSTRUCTION
CHANGE ORDER PROPOSAL
PROJECT: ANDERSON CREEK PUMPSTATION
DATE: 10/2/2006
TO: CITY OF BREMERTON PW
3027 OL YMPUS DRIVE
BREMERTON, WA 98310
SPC CO NO: X-103
DESCRIPTION:
REINSTALL PRESSURE GAUGES
NOT SHOWN ON DRAWINGS
DIRECT COSTS FROM WORK SHEET
1 LABOR 281.25 direct labor w/fringes safety
& insurance
2 EQUiPMENT OWNED 0.00 Direct equipment costs
3 RENTAL EQUIPMENT 0.00 Direct rental costs
4 MATERIALS 82.54 Direct material costs
5 SMALL TOOLS 3% 8.44 3% of direct labor
6 DIRECT SUPERVISION 0% 0.00
7 SUB TOTAL 372.23 Prime contractor Direct
Costs, small tools & supervision
8 SUBCONTRACTORS 0.00 Subcontractor Costs
9 MARK UP ON LABOR 29% 81.56
MARKUP ON MATERIALS & SERVICES 21% 17.33
MARKUP ON EQUIPMENT 21% 0.00
10 MARK UP ON SUBCONTRACTORS 12% 0.00
Subcontractor
11 SUBTOTAL 471.12 Total Prime and Subcontractors
12 WA State Sales tax (8.5% of Line 11) 8.60% 40.52 For calculating Bonds &
Insurance amount only
13 Bonds and Insurance (1 % of lines 11 and 12) 1% 5.12 Bond and Insurancce on
increased contract amount
14 Total Change Proposal Cost 476.24 Total Change Proposal
(not including WA State Tax, line 12)
./'
./
Cv;.:::T-~.1 r-r'.:!7.'(1 :._l..'.l;,i_'l(::-r- C::~:~:
1~~25 [..lJ'!"(I ~:l:~~~l~~~
3;:; Cl ,." ,~:i "7 (~J'" j 3 :~.; "1.
EVERGREEN
LUMBER
Smce 1939
:~" ~.[.,~: Gr--:: h ::((-;.-.1 '; ~.J~i ':~.:-~',3r,>'
SOLD TO
SHiP TO
:::;;- .;:-~ P(:Li\iEr~ C:U:'~f::;T",
~1 r ;::: ~"'~ :~. ("; L. /iH ~ F i _: ; ~ i"-~ ::~:: r ,
5:1.0'; Sl'~1'[ j-.:S~ ~~ ;\J
':.~J.i~::7 ~:,T~~T[ !.~~r{ ~~. :-:;f,1
PD;:{T OF{~~: j(ihD,: \.d;~': ;.:.~;e:."3t~:./
~Ol~'r (]RCj"I:~~D~ l~;~ gJ26'7
~; h j. pmr.. ~-~ t
"
n: ~ ..I
~~.IM1i~
:'O~~~50 _ (-p 0 II 1;:' Hljl-I NeT Lt
.-. - 'IEmB~ED
_-eRMS~~~~~~;t;~
m~~_~!Ji\'l=l:il"~".~lR-i~il"I/~IiliJI/~lt.l[oj::~f.ili\1~.][oj=ll'Y:,"~~
1;1(~373:!
0""//12/06
.~la
156')Di
Ei 7 / t ~:~ / ~~.j :.:-
),:i'~ :,~,"{.~;i$;~~ -~~l;~;; ~ :}~,,~:t\ :l' ~\;~~~~;3~~~~;.r:D ES C:RlgrTI OJ~?~'~:!:~~~;~~~~~;~~f~~{~i?~i~~~~ff:?~~J~tk%i
~1.~1i~~~f.lIC~~:~'i{.,,\~? ;!~:
~
1(,
(j
j t. E f) STUD (l!~C--[.!EDGE J/ 8.;< 2: 3/ :';.
;:; LJ(I.:;e.33.:i
0~ 7~5E!
.L:~., ~";~;:I
\ 1- ~j IJ 3 _, 'iD)oo_-,
)t . \~\ \ )
.p\\-
~i~1\ //
\":::----;/000-
I--'
X I AGREE TO
THE CREDIT
TERMS HEREIN
7
./-
,,/-
,0
///1
F / /
/ .//0' ..-_'_.,.
>::r;;:~_____~-"---- "'
J"u 1/
.. ,~.
.~ .~ ~.
e ~j 1.~:~ :~, 1. !J ;~ fj:3 ~ .:'1
[IT: t,.1
DRIVER
MERCHANDISE
'l';':~
'R- '~f ~, :;,-, <. ;~ :!l~' ; f :.r:. t:- x :J: ~.:~ ,'.~'
SHIP VIA
OTHER
,!.:,:::,
l~ I !!'/D T CE
i~' (\i:'::::
!..:i..
r:.~ "'.1'1',-, .::;
TAX
: ~ ~.~
';E- .;:t. .:/ ~f j:- ..<. A. }f: ~.: .\.::. '-;.~. .Y".i ,~ ~.'.
) ,-;" " j }': q ,/ ;3n i'(1 ;,'j ,.:' ,-. H ':~: Cl ""'. '~:.;~ ;'~ ;") ":', -.. ~.. -(.:i ::' ~ [; f1.:.~. HI -- :.':i ;~ ~1 ~;} ;".; r(!
. :~..~'t .~~. {\; :~;:.~')-:7i [\;~.. ;'.::'.1 c: ;., C 1. '~~l~~l::d ~)l_~ rId ,~':_ .'f
FREIGHT
; '.."~
T()TAL
CUSTOMER INVOICE
~/. ..
n FERGUSON
~, ENTERPRISES,INC~
1012 132nd STREET SOUTHWEST
EVERETT, WA 98204-7328
1~::;;;:4NVMI3(;Fl:i6U9~~()MEFlI>;t(GE:1
Please contact with Questions:
PLEASE REFER TO INVOICE NUMBER WHEN
MAKING PAYMENT AND REMIT TO:
~ FERGUSON ENTERPRISES, INC:
425-742-4748
FEI - EVERETT #3023
PO BOX 802806
CHICAGO, IL 60680-2806
111111111111.111.11..1'1.11...111..11..1..11..111..1'1.1.1.1.1
STAN PALMER CONSTRUCTION
5107 STATE HWY 3 SW
PORT ORCHARD, WA 98367-7486
rJ
I....> ........><..>.~HirjQi>................. ........................./...............<.>.....j
00004938
21
4938
vu' \
?~/7
COUNTER PICK UP
1441 LUMSDEN ROAD
PORT ORCHARD, WA 98367-9801
SHIP SELL TAX CODE CUSTOMER ORDER NUMBER SALESMAN
WHSE. WHSE.
JOB NAME
INVOICE DATE
BATCH
3009 3009 WAE 6011
PBPl;HI:;P .($H~pgl;Q .. ...)'.:)]!?MNWMQ!:;:ft.'.:>>
023
X103
10
07/13/06 36236
f(JJ!~JmJ?:~~:!qg} \tJJMi If \~:~~i((~tl~MJ~~:Y~]{:r~~::~:)r
1
1
10
10
1 BRNDK
1 RTC
10 B606
10 B616
1/2X2 BRS NIP
3/8 00 SOFT REF TUBE
3/8 00 COMP SLV
3/8 COMP NUT
2.463 EA
62 .412 EA
0.260 EA
0.299 EA
2.46
62.41
2.60
2.99
INVOICE SUB-TOTAL
70.46
. "
"':1 :1
-1/1/
-c. 1 7
.~~~~~ are due an}p~ableO;W tlfe~R~iced terms. All past due amounts are subject toO"Rle?Jco/},~art~YP.tf~aXimUrn rate allowed>t9t~SB9~r 70.46
state law plus costs at collection including attorney lees if incurred. Freight terms are FOB our dock unless otherwise specified above. WARRANTY PROVISiONS. SEE REVERSE SIDE A A
,,,
^'- FERGUSON
." ENTERPRISES, INC~
1012 132nd STREET SOUTHWEST
EVERETT, WA 98204-7328
~::;;~~~NlJJ\III3E:R<~:9~'T6QMgFf !<;AGE>I
Please contact with Questions:
PLEASE REFER TO INVOICE NUMBER WHEN
MAKING PAYMENT AND REMIT TO:
fi$ FERGUSON ENTERPRISESj INC:
425-742-4748
STAN PALMER CONSTRUCTION
5107 STATE HWY 3 SW
PORT ORCHARD, WA 98367-7486
~ { 0_'3
{;D tI i
FEI - EVERETT #3023
PO BOX 802806
CHICAGO, IL 60680-2806
!':$HII?TQi::1
COUNTER PICK UP
1441 LUMSDEN ROAD
PORT ORCHARD, WA 98367-9801
SHIP SELL TAX CODE CUSTOMER ORDER NUMBER SALESMAN
NHSE, WHSE,
JOB NAME
INVOICE DATE
BATCH
3009 3009 WA3009 6011/TAXABLE
:!:BQl;Bgp ) $.I:Ime~Pt) :;::)tl]l?MNYMEigF{::)
023
X103
IO
07/13/06 36236
,PNrrPRlpg:\;::VM?t ::AMQl.JN1\<:'
R31622
R44852
1/8"- 1-1/8 ENCL FEED CTTR 150
1/4 5/16 3/8 TUBE BENDER 456
INVOICE SUB-TOTAL
TAX WA-B 3009 PT 0 HARD
25.990 EA
36.051 EA
25.99
36.05
62.04
5.34
l;
L
s\~ ~~\
cJ
RMS: NET 10TH PROX ORIGINAl INVpTCE 67.38
ccounts are due ana payable per Hie Invoiced terms. All past due amounts are subject to a servIce cnarge a toe maximum rate allowed
,ate law plus costs of collection including attorney fees if incurred. Freight terms are FOB our dock unless otherwise specified above. WARRANTY PROVISIONS, SEE REVERSE SIDE A A
+--------------------------------------------------------------------------+
tPress Esc Key to Insert new record, Ctrl-Z to Clear form ,.
tPress Del Key to Terminate Insert Mode t
t INSERT Contract Maintenance t
~ Contract Number 4544 ~
tVendor Name STAN PALMER CONSTRUCTION INC t
tSubject ANDERSON CREEK WELLFIELD IMPROVEMENTS t
tDepartment ENGINEERING t
tStatus Code CON t
,. Amount $459921.00 t
,. Begin Date 01/18/2006 t
t Insurance End Date 07/31/2006 ,.
t Type Amount Review Date 07/01/2006 t
t Press Fl for GL $2000000.00 t
t valid insuranceAL $1000000.00 t
T type codes T
t Insurance Total $3000000.00 t
t Insurance Review Date 07/01/2006 t
~ Comments PUMP STATION 2 UPGRADES ~
t t
t ,.
+--------------------------------------------------------------------------+
.
.
.
.
I
I
I
I
I
I
I
II
I
I
I
I
I'
I
I
SECTION 00500 - AGREEMENT
THIS AGREEMENT is dated the 1 Y+-h day of j(l.VlIUl.Ytj-- in the year 20 ao
by and between City of Bremerton (hereinafter called CITY) and
STAN PALMER CONSTRUCTION. INC.
(hereinafter called CONTRACTOR).
CITY and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree
as follows:
ARTICLE 1. WORK.
CONTRACTOR shall complete the WORK as specified or indicated in the CITY's Contract
Documents entitled Anderson Creek Wellfield Improvements, Pump Station No.2 Upgrade
ARTICLE 2. CONTRACT TIMES.
The WORK shall be completed, to Substantial Completion within 150 Calendar Days after the
CITY issues Notice to Proceed, and to Final Completion within 180 Calendar Days after the CITY
issues Notice to Proceed.
ARTICLE 3. LIQUIDATED DAMAGES.
CITY and the CONTRACTOR recognize that time is of the essence of this Agreement and that
the CITY will suffer financial loss if the WORK is not completed within the times and Phases
specified in Article 2 herein, plus any extensions thereof allowed in accordance with the General
Conditions & Supplementary Conditions. The CITY and the CONTRACTOR also recognize the
delays, expense, and difficulties involved in proving in a legal proceeding the actual loss suffered
by the CITY if the WORK is not completed on time. Accordingly, instead of requiring any such
proof, the CONTRACTOR shall pay the CITY $1,000 as liquidated damages for each day that
expires after the dates or times specified in Article 2 herein for Substantial Completion and Final
Completion of the' WORK in accordance with the General Conditions and Supplementary
Conditions.
ARTICLE 4. CONTRACT PRICE.
CITY shall pay CONTRACTOR for completion of the WORK in accordance with the Contract
Documents in the amount set forth in the Bid Proposal, which shall include sales tax as provided
in Section 00100 of the Specifications.
ARTICLE 5. PAYMENT PROCEDURES.
CONTRACTOR shall submit Applications for Payment in accordance with the General Conditions
& Supplementary Conditions. Applications for Payment will be processed by the OWNER as
provided therein.
co~
City of Bremerton
Anderson Creek Wellfield Improvements
Pump Station No.2 Upgrade
AGREEMENT
PAGE 00500 - 1
ARTICLE 6. CONTRACT DOCUMENTS.
The Contract Documents which comprise the entire agreement between CITY and
CONTRACTOR concerning the WORK consist of this Contract (pages Contract-1 to Contract-3,
inclusive) and the following attachments to this Contract:
o Notice Inviting Bids,
o Bidders Checklist,
o Bid Proposal including the Proposal Forms, Information Required of Bidder, Bid Bond,
and all required certificates and affidavits, /
0 Performance Bond,
0 Payment Bond,
0 General Conditiol'Js,
0 Supplementary Conditions,
0 Contract Specifications,
0 Contract Drawings,
o . Addenda numbers
to ---2-, inclusive.
o Change Orders which may be delivered or issued after Effective Date of the Agreement
and are not attached hereto.
There are no Contract Documents other than those listed in this Article 6. The Contract
Documents may only be amended by Change Order as provided in the General Conditions &
Supplementary Conditions.
ARTICLE 7. INDEMNIFICATION.
The CONTRACTOR and CITY acknowledge and agree that they have negotiated the following in
accordance with the requirements of RCW 4.24.115 and the CONTRACTOR specifically waives
his immunity under industrial insurance under Title 51 RCW. To the fullest extent permitted by
Laws and Regulations, the CONTRACTOR shall indemnify, defend, and hold harmless the CITY,
ENGINEER, and DESIGN ENGINEER, their consultants, subconsultants, and the officers,
directors, employees, and agents of each and any of them, against and from any and all claims,
injuries, damages, losses or suits, including all legal costs and attorney fees, all claims and liability
arising under, by reason of, related, or incidental to the Contract Documents or any performance
of the WORK, but not from the sole negligence or willful misconduct of the CITY and/or the
ENGINEER as further defined in the Contract Documents. The provisions of this section shall
survive the termination of the contract. See the Supplementary Conditions for additional
indemnification requirements.
~
Contractor Initials
City of Bremerton
Anderson Creek Wellfteld Improvements
Pump Station No.2 Upgrade
AGREEMENT
PAGE 00500 - 2
I
I
I
I
I
I
I
'I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
,
I
I
ARTICLE 8. ASSIGNMENT
No assignment by a party hereto of any rights under or interests in the Contract Documents will be
binding on another party hereto without the written consent of the party sought to be bound; and
specifically but without limitation monies that may become due and monies that are due may not
be assigned without such consent (except to the extent that the effect of this restriction may be
limited by law), and unless specifically stated to the contrary in any written consent to an
assignment, no assignment will release or discharge the assignor from any duty or responsibility
under the Contract Documents. The CITY, in its sole discretion, may refuse to allow the
CONTRACTOR to assign any or all of its duties, rights and/or responsibilities under the
Agreement, except with regards to an assignment of funds for security purposes. In the case of
an assignment for security purposes the CITY may condition its approval to the extent it deems
necessary to assure that there will be adequate funds to complete the WORK and to pay a
subcontractors and suppliers.
CITY and CONTRACTOR each binds itself, its partners, successors, assigns and legal
representatives to the other party hereto, its partners, successors, assigns and legal
representatives in respect of all covenants, agreements and obligations contained in the Contract
Documents.
CI
IN WITNESS WHEREOF,
the day and year first ab
and CONTRACTOR have caused this Agreement to be executed
ritten.
By
PALMER CONSTRUCITPN, INC.
Attest
Address for giving notices
3"'5 &i~4-h Sf- s\Ja~ 1,,00
6V'e.l'Y\e.-y-ro~ wA (\833; -l~' 3
Address for giving notices
5107 STATE HWY 3 SW, PORT ORCHAR, WA. 98367
License No. ST-AN-PC-*202NF
Agent for service of process:
(Signature)
(Title) /-
City of Bremerton
Anderson Creek Wellfield Improvements
Pump Station No.2 Upgrade
AGREEMENT
PAGE 00500 - 3