BUILDING PERMIT
@)
Applicant: LARSEN ROBERT 425-765-6080
31925 NE 100TH ST CARNATION WA 98014
Permit No:. 03-0170
Status: PENDING
Applied: 04/03/2003
Issued:
Expires:
, Job Addr: 3616 BURWELL ST
Location:
Parcel No: 1524013-111~2000
Owner: LARSEN ROBERT 425-765-6080
31925 NE 100TH ST CARNATION WA 98014
Contractor: SELF
Lic #: SELFExp:
Subcontr:
Desc:.BUILD A 15 X'14 COVERED PORCH
**.1< **'1<*** * *.*. ** *.* I< **.*** ** *** ** * * * **,** *.* * *** *** '" * 1< 1< * *** *** * * * 1< ** ** * * * * * * * *** ** * * ** ***** * **** * **
Valuation ,* pei'mit Fees:
500.00 * Plan Check Fees:
...... t< Other Fees:
23.50
15.28
4.50
Total Calculated Fee:
Additional Fees:
Total Permit Fee:
43.28
.00
43.28
***************'1<*****************************************************************************
This permit shall .become null and void if the building or work authorized by this permit is not commenced within
180 days'from the date of such permit, or if this building or work authorized by such permit is suspended or
'abandonedat.any time after the'work is commenced for a period of 180 days.
- \\ .
NOTICE - It is the responsibility of the perm~t holder, not the City of Bremerton or Building Official to see
to it that required inspections are m~de. The\permit holder must notify the Building Official when ready for
inspections. Failure of the permit holder to notify the Building Official of required inspections may result
in the stoppage of.the work until such time that the permit ho~er can substantiate to the building official
that the. concealed work meets or. exceeds code requirements. An) demolition, testing, or financial burden shall
be borne d~rectly by the permit holder. . Failure to substantiate c requirem~nts will indemnify the City
against any and all responsibility or liability connected witht e struction..
I hereby certify that I have read and examined this :)~- now the same to be true and correct. All
provisions of laws and ordinances governing this type L~ will be complied with whether specified herein
or not. The granting of a permit does not presumt to ve authority to violate or cancel the provisions of
any other state or local law regulating 0 structt,on or the performance of. construction.
**************************
Date:
Signature:
I certify that I am exempt
Section 3, Chapter 126, law
irements .of the state contractor's registration law, under
: Signature:
Date:
Permit Center--Approved
h,_I<D-A<?
te:~
8L~
"~~t-os
~
_~.";i'C.'\=
- :' 1"
". j~(~;:
. : ,~.;. '1
. ; ~ .... ~,1: >1 :'; ~: ". ;" }.': t-"
'~\J ,,:;,~ .J'>l :f) _
(':'r;,,',.J.C ~ 'J :'~ .1,"
~;fl1'0;~ _~::',":::
.'.'7 :-. -; ". :'; 1',:0'" ,
I
., ,
~:::.J~:!~; ,.;:' L, t",
t.:,.r':~ :....:\
~. :d'.'
. ,';) J.~
:.<. ';" .r,;'.
r. oj" ':'f~ ::':'; ,,:
,:) ~":L
'~ . ;~~!~::'I" \ '-. ," .
',:", .L,~',~..;:". f:.
"; '.
.. -.:: r."'
:< ~~ ~i'
,.:' '/'"" :-\);i:i .
>, .';';:; f':'(.~ ~l:~"
t.,' ~ -{J;. '_','.-;
€, :J.~.r;.-:-: .:0:. ..
.----.,--,:...: -:;,~: r"-.
,,'r;' ",',"
,: .:~ 5' c'J]
.\:.
...... '-':'
~--'.. ..-~."
""i
'ct
'.,l.
..,,}-....
'.... .
. ,~'
'J~f ..,:.j
"r;",j \~
j:,,(
I;'
;; ~ .".
,~. ~ '1'; r. :.
~~: ~ .. :"
, ,.,..
. ~'l J ~..
,
,Cl::. r
.;,' z:: ' " : ~ ~'.' .1,:.l ,-'. - , '
"."I,c' [.':~J.L
'LI"~...:.~.~.,r.l.~. .._
.' 'J ,'f:. '~":: J:, r,.
. ,"( ';', ~ ", .~ r 1 :;
). ~ :1 ~ '? .
'?.1
".~:C ~:, 1 I .
. ..u': I:. { r
'.I::":.>~ :- -.:,::C;'~.
,;3 :-
~} ;:.:;.~-;: U'J t"
<~ :"., -'. ~~'~:j:'
;.' :~, ~ "
-. \,' J: I
.:0)' ~;r(l.
;.~
.~/.- :0
- ,-:-- . - ~~ "_.'
-:~\.,' \\ .
~ ..r\:
~\,,<~ '
'j. ';_ -~- o!>_ ~ ," ~,', , , ','-1<
t" '. ~i("' I:" ~:,4~:""
1l.1~; 1t>! ~j , .' ", .11\, ,~~~: .
. ' t '. J ;i; N'i.J'.
-1 ~ . . , .:- -I,' ,'" 1a;'
, . :"il :,
"1lI'\ "'*'lI/"r"'U'in'l"''''~}1;i~~*.,,.*,,, "'* ~}",~ 1<:*.~1< lI<**~~~:Il;,lI*"'~~***~: . ;
,,' ... . . ..... . ,:(
""'1f*l!0I'1t~ \I'll< ~"'~ U1/ 'lI~~".' ":*::~"Il~*"""''I...I'':H U"'~~"'.1t* >'I"':~~:'~:';U"')<"'*U1<.
~~rrr Nu~r: fi3~ .277 '~~t: 15.2~ 04/03(03 1~1~2
hYliclimt Meth.;;ld: eft! ( Ijli.)~'tionl IJlJ?$EK CHl!:\.~ Init: PC
it
,
.,
........, ~'.... ,.... .....,......"....... -....,,.............. -...-......."" -....- -..""_.,.....,..,....... ...."..,..,....... ---- ......~......,....,... -...--.............-
, t>et'JI-it Me; OJ~Ol'}O r~: e~y 5LOO l'!:!Uil!~RO l'mO:U
~I.U'Gd No: Ui240lJ"lJJ..~21)i}O:~' ,,"
SM.. Addr.-esSl: ~616 Bt~Ll. S'r
Total 15'.~1I:
Tot:al Ul. ,Pults:
ealllMil't
\ .
'" ~*"'*w'it"'.'~ I<fi*1t~**;,j; 113*'" * 'If'i'.'I!1! 1, "if'" ~ 'f>':l\'1iI11t1l: jt 11'*.......11I...* >'1*** *""'" **"Hl .,,;,jUrWI\'
''this i?ll~i;
43,2:e
U,2'&
26.00
1.!),2&
,'Wooont C:.x1fi
),(,'-H~. (l~O(1 t 4~.i3G J
Vlll&ctip'l:ion
6Qn..on\'~ PLAN CHltt'Z Fm:S
JU'i0W'\ t
15.29
~~~~_~~__.W_~_~~.~~~~~_~~M._~~'~~~~~__W~*~...._~_~._.~_~__~~___~,__~
:"W" '
W"".<l'
"
/0
~'o
.. f.l.
'/
xl: \_
ffj
," \ --
i
\
~
"
'}
f
-
"",,\
--.., i!
(~" L/'Y~-
)
..i'~;
.,.
, \'
j r
\,
{'
\ ...'
/
.f
~.
\V \. ...,
'\.
....,-
b-I~~~
\ W' - ~
~.~
..,;
.......,', ,:'/; "
/'
'.'
it'
"'-T'
.:"
"".
,...,~
J .'
.\
r
.~.
:~"
."
If
,;'1;
.,.
~ ,; ~
,,',.,.<:-h"/.
~ 'PmiIHJ'J! QI$!'fIra . ' ;..: .
, . ,1:86 4~ $,~_t.Br.ertQr.l...;,.~iit1:
1~1, (3liO) 41"8"'M7J., .i'Mfi. (36(}): *1S"'~2'8
. ., 0.' BUILDDfQ "'BRlUf~ . .
, .
['
> ; /',
.',
\
Job Addtl 3'~16 8~ $'r'
.' .J:;(Xlal.1Gnl
. ..J?~'1'eeJ. i!;oI15~'013~Ul"'20'GO
.; ~ "
'. r)
"piKl'itt No~ 03:,0170
. .
,~tU.ue I Pl!11fi)Uk)
AppUed 1.e4TO~IZ.003
:!istiE\dt .
B.!tPuu:
A)pl,i.cant: I.AMElf.Rai2R't . , '. .25~165,"'.We:Q
31~25. '100"tH ,SIr ~'1'toM;!A ,9&014 . " ,
'. .
, "
, "
OWner' ~ RO!SRf. 425-16fH.OaO
3-1th NE'lOO'$,S'l: CAro(A'J:'tPN'WA,9&~1A;
. . .
. Cdntnct<ttlset.r.
:, ~ont.f:"
Y .
),. ,
. :~. ", -
4!1: .
it
to!e t :SELFbr> r
. .
" ,.0"(::: .atl!UJ 'i\.~5 .ll; '1.4 .OO~ PORCH
';>'
I, ~""v"~
" <. ,:'.' ",' , ' ," , " , '.' ,", '.,.
*** '11.:1<'1< 1: 'I< ;''/1.** iii ** It "*'" ..w I< *1f"'.llt,* t*'" 1: '" *.1<ll'-****1'<**"t '" '*"'. '" lli 1.* ;It*lI' ""* ** ,,'jc* ....'**11<"'..*** 'II'." ****1111" ***"'. "'* **.1t'lt'll.,*
>'f,
Wl.h.tat4.On', .- '.Peclll1t ,FHa ;:2.$. $Q.
"s€i&.eo' . *,.i'iG Gb9<lk. h.~: 1.5.26
l
, .,/<' . Ottu.rr~s: 4,50 Tetal PIi\t-.t Fee., 43.28 ,
'***\lr#*****"'*1<~~*~*"*~**1<~******~~"*****~**********~*;*<<~'*:u2~:~***~*~~*~*******~****~.~~* ' '
, \,
f!\1s )i'en\U.t' e'ha11 b$Q,0ll)$ ft\.l;U, and void :if l~ k authcrizM b1 thh J>$tlUt ill not e0l1llllW0f<i witl\in
liO days ft'Olll tbe date of liUch l>erEj. t. Q s~' < 1.). i ~f' work autn-ot'iz.4 bt .u~h p.1'Mi t .1s aust.nded or
abat'ldO'n$d At ,any tille athr tho li!ocl( nCle( ri.oo of 18Q dltU., . , ,I .
NOf~CE - It' iI' t~. uaponeibil'~' "t~~'~o.l er, not }t(l~ City of "'13~rt;~1.', or flUild1'l19 Otfia:i.al 'to 8M
to' it. that r~ired UUlf$C't1 , f\'ie~ b~~er rnuat not.U, ;the auildinf Oftcio:j)al wbon 1'e4(b f(i)f;"
It)~t,ion$'' 'S'il,iluctt ot tlUt.' ~Q' , 0 notie!fY'. ~Jlhild:j.l1i."o.ffia1..f'of.reqUired iiui,ecU9n' M: .F.fts:ult .
iq -tM' st.oli'pJl9'~ 9't th.' wwk) U' su, illle that t .... .~. "mit ~old~' oan. . :"\1Ji).t~ht:iate: to. the ~H~.' ingoff:i.dal '
.t~~t th~ ~$iC.aled wO:rk1b"t.~r HC " ~. t~ " .' . ta:,. Anf.~-emQ~it;i.or:< ,t"tiM'~ or'fi~Ul.~rc1en shan
beb01'j')e diriK:'t1t.br tl'le pe-1'll\it hO'~d. '. a~~' tOft.~.. 'antiat. .'.1). od. 1'.~ir.aent. wn..' U inddnifl. .tb..c.tti,,'
a~nst; 'fll'iyah<1aH hsponsi.biUtrOc iabJ.l~oonrlwt~ with t,h$ c~~~uction'" .' .., '" ..... ......
" '., ' ',' " c" " ,
,I>.het':ltbr ce~t:j.t! . that 1 he..v. ':-..d end-'-.inlild this :i>$rlU.t and knowtil~, ulil$ to h ttu~ and QOJ:ntct.AU
~tO"lidons' Qf' laws .andGlCdlna1lces 9overniu, thia tlr~of t.fork 1ilill btI ;~t.i.ed ilHh tlhether' &pecifiKliweitl ,
. or not. The, lJtantil"l9 :Q1 a perm;i t' does':nOt ~r"u,.. to 'ifive Qutborih. to violet&'. or aano.! 'th.~r<N~Bion. oi'
aR:z ~th.er stitte or'lCx:!tl ~~r~u:l&ti.:M, oon.truct~on OItM porfo~ of Gl,;m$tcuc:ti?,n.. .
Total calc~lat~F..:
. Add;itioni1 F>MlH .'
. 4J.2S
. CO,
. .l!li'j.!l#t'!.l1;l!l j
, , ~' . i~ (
oa'te. :
I O&t.t1f1tt,al: J amexemrt n61lt.th& r-e<iuire~nts of. the mtat:. contuctoc '$ I'lJ9'istrat.ion lJ\L ~r
SectiO'A 3.,.,C~phr 12~,. lawS! ()f "l%7.
'Si.gnatJ,lr'&f,.1:..: ,I .'
" .~
tie t 9 ~-...'
\lI1rfl;!r'i(,w***.1I'*i**w1l:1t;;****:**".1Ir1t .
:!
'I, '", " "
~:fIllli 'Ii 'Ciirtt1i-l',", "~j>J;'~. .ay:
, .
Ll'(U
NGG.
'1' +.o...,~...".
. . ~ . ,,~ .
.., ,.'" ~ .' *'1'1!'*"', ,,:;;:,.,"e,". ,:~..,
. , . 0/,' c,' , t ",,:" 0 .~ ,'~ ~ I"
\"
1;,
, '
'r't:'
~ ' '\.~~\..~
V~~~ '\JY' ~~...Jfo
\'t""'0~6~' ~~~
~~7
~ ' .~~
~~.~.;;-~~:
'l'
:I
~,\'lt( PElImI:\ ~
,2tf~ 4th Str4'J9t ~ m-~tlWr~
~ "
<Ni0l'l$:.t. {3(ir{}) 1:18-5215 FAX:
i '
" W:n.o:rH9 PmMt'!
fr!
..~ " " , . ,
, ,,\'\~.J;' {'<: ~
'f '''''''ft
. .,:,~l.: .;"
j" ':~f;',
~,
Job Mdl",l 3.(;16 BtI~m:w.. S't
l...0<I:1t1 t;j.1:ln :
l?il.l~;l No: 1~4'013'"j,U.200n
~$~~t No: 03-0170
StatU$: !>ENtll:OO
~l!~: 04/U3/20fiS
IMi!1Jed;
txtiire$ ;
'/wpU.:Ilmt t ~ ROBER? 42~~ :r6~.6000
31~25 ~ 100TK !T (~JroWATIOR ~ geQ14
'j.
Owner: f.ARSE'N MBi';RT 42:HI6./,H,Oe.O
31915 ~ lOOtR s't r.::1\.PN.i\1!W WA 980:1.4
"!
S~l)l:ltr :
\
\;
\,
;: l.ie f~ eJn.F bp:
i
Cont~act~r: SELF
" -'-.'~~. \
tllt5i-:::: ~U1t.:D A .J.5 X .14- e~ l!'OlllCH
"'<'~m~'''''.'
1l"dl,Vi''IIt ,11'''''''''''''' ;<1\'1<"''' i<1I JIt:.", " 'l/ "".". ~"'**f;"'. ".,,>u,'<['It ;.11'1<"'..." "'.,."''''''',. "'",,,"'*"'il:'kllo*'" ",_",*jt;if'" Ir!< '/{"",..11" ~.,.'" "'*)I<<':f<"'*"''','''''I*'''*
, Va'L\1:QUOO
!>OO , l')Q
~ ~~~mit Ee~~;
~ Plan Check ~O$ll
R Oth~r F&G$:
2:tl,5('J
, 15.:aS.
4.50
fotal Calculattll4 1'4$:
~d4i tiona 12'~1i :
'!'::}t$l h(il\it F",
,:1. ~'e
.00
43.21'$
1t*",ik...lt"'**''''", 1r'l< "'II 1('II1I<!t* ** * "'''''''''''''' '10' ill'" 1r*~ ~*,'I< 1< lI-aJt "'''''j( 11<*"**" Ir*",'-.* lI<:i: tr**lI,rl< 11 '1"11'" "'*"'''*1<'*f< ",..."",<#**a:wllili<;l'jlp"ll< '"
,~ "
fh:i,$ P"iI11:llit "!taU l'iOC'O&<S,"U.lll aM void. it thll\\ l:Iuj,J.6,.t~lI or liKJtk 4uthor:h:ad bf thb ",'aUf.: :i.ilI not <:~$d II!:.i.thin
ltlO tW:1.1l ftOll< th$ date of ii!uch "l'lUj,t, IJ( :it thiJi hu:!.l~ ~r work I.ultb(itiz~ by t>il.1Ch P$':Clllit is; tius!>'llInd..d. or
!:i:oo:nd.<l~ ~t JUlY l:irm I'tt.et' tn$ work b <:~l\C~io~ e. ,..rioo of 160 da~l'l,
NO'J.'I~E w a j,,$ the U$J>()OO;iJ:iil1 t:r of the J'GnnH hol\i$r. tiot th$ City (t'f ~1I~t'tr:m or e-uildin~ OffiahJ. t.-o !i~e
to it thiit l'~'l!iHIl\d i~$~!\!et:i.~m.$ arlt made, 'fhe J.'$rW.t heM411I lIlUst ~lQtity Ui$ S\lilding O'fficbl wh",~, ready for
klllil~lICt1e>ns. 11'<I1i1\\I'. (,:.:t' tn'll f.'lO:tl'llit holdl!'! to;:; oo1;it;r the Bu..ldi~ Offioil11 of r~ir.q,d in>lPlJfJtio:t~il l1li!\1 !'~'Hlllt
in th.. dC>.l;>r~gfjl of, tb,$ \Nr!t t!ntil 1I.l'C'.h tiM tbat th.. ,>arm t hole\et' c~.1. l1JU~tl\!it1..t2 t.;' th~ l>~ildi!.""9 oftioial
tlWi: thE. il:~$iiI,lEl'l work ~l:'Jr or t'$i)&;lOibl c~. llIjjlUinwimb, lUw 1erooliti(.l:('.!" h$t1ng, or fin<llooial burdam $ha.ll
l'..'~bcrnl!! dil'OOU;r in th<e p<trl!lci.t hold4'J.", FaJ.hu:. to liub;S\t~r,i'l;i~t$ -eod. uqu:it'1llllltW.-u lolili indll>lllnif:r the Car
~.<JI.ub$t any ~nd aU r"'$t'(,\!\Sibilif l_Habil.it~.etoo with th\l! ~lOl':li1tnwtion. ".
r h~nd'lr i:lflrt.i;fy t\"J.it'; ~: ll.li.'.'$ r.J.\Jl.JmaJl;i1.~ ~V~ Be.lY to lWf ttU$ and <roUltot. All
,~'tO'ifJ.sj,Oi':l; o:t li:lwm a~J(i, 0-,!'dinanees gov.rnill'i1! thSl ifPil of ,tJor1l: ~ill ))$ IJ'CIilllPH<lIld uit/l wbnher apeeitilid. horein
Qt l':I,,~'l:. 'the ~untj,n9 of a. )'1$t'l\lit ~13 not l'r~f;\lll'lfl to 'livE< authc!:$.'tY tc V'i,Q.~"&.t* t';;&1' th$ ~r.?v.;hi.<'Xlliot
41't~1 I.~thn (iit,j\;t~w r~:1~at:rJ!il' F\lIt.rueti.on ot. th. lP1iIrfonm~. ,yf COOll rue'!: ,on. "
5i\1hat'U^lil;_._~~~,~~_.!-_.~__~ f)fJ/t:e:____':/;..,Z .~Q3--_.-
-: '~i,~r;titt tbnt ! 1))1l $;'(fll.lfl;rl: fr':,\\1 the. t"~;Lrmtentlll oi tb.llI ~tlltl!l eO't.itn.l.ltor I II reg:l'stratioo, 1.~'II. uM9r
S.$c.t:l.m) ~. C.IHlpt~~ 1<:6, l'l'..r'B of 1967.
~~\'..~
...."\
Si\~n.lk\tr 9 ~ '!-<__'""""'__._______~_w_~Iw............_...__....,...",.-......____'''',____......_
De. tft ~ ,..............'''..............-",._-......-__
REkEj vEfj.~\
f
APR 0 7 2003
...*'. "''''." ,,*~*ir,,''''~*....1t Ii: "'"*'*"'*"'*'"
~1 LC.
LJ-." .,- 11 - 0':':;:
\ T- ",~'
f :,.'~ .--.
"~+:~ft ~~-e-(~tfl't".AP1'-"t(,'!!t1Jcl uy:_______ tw;te, ~~ 0 rc:;' n \In ~ ij
<--.1I11 .. .\l,9 15 U W 15 l!:V ENGINEERIN
B ......B~t/(
'. ~. I '., '" ,'.
~~\,~ G
.----
SmfEllUmJ PEmtt'l' cdtEa.,
Z86 4th Street, Br~tan."'8ji7'
Jib_. (360J 478-5275'" ~;'(3601478:-52'18
. -"', '. ,'. " ,.
:BUII.DIRGcPEBHlT . ." ;
, -,.
""".' ,
.,~ ~ -
?:'"
r,~
Job.Addr:361.6 BURWELL aT
1.ooation:
P~reel NQI 1524013"111-2000
perlllitNo: ,03-0170
Stat~s: PENDING
Applied: 04/03/2003'
Iuued:
Expires:
T9>plicant:' LARSEN ROBEa~ '425-765-6080
31.925 NE lOOTH ST. CARNATION WA960~4
,
OWnt\r: ~EN: ROBERT 42!d,,6S-60S,O
" '3'1925'.' lOOTH STCARJlATION WA 98014;,";""'"
"'" " \':-'~ .' ~~( :
Su~ontr,: '
. ,),.",~
t"
),:/
.: ~Exp:'
" ,
"<;,
C9ntractori SELF
Da,8C: ;BlriW]l; 15 )[~4 CO~ PORCH
".,":,..'.,.'
"
1~ ~ .
J 1~,.~..,.,...;~",
~*,1\:~11'*11'** ** 11,"'* *'******'1<*******",* **~* *******1""*,*_ ***1.*'****.***********",* ,,******"'''' ,,"'. *** ***11***
~ ,..r. '.' . . t
... \taluat.l;,(:)h<~,p.rfl1it Fees: '23,50 Total Calculated Fee: 43.28
:!)\)" 0;00; ~. '<,Plan Check Fee, Iii ,'15.28;1i AddiHonalFee8: .00
,J,'
,,' .*, Other Fees: " 4.50 ,,' Total Pend t Fee:, 43 . 28
. ._~'t ' ,
,*"'*it*,*~,*:fI'.*:1i#1<,';'1\:*"".,.1(**~***1I**'**1!** ***II"',****1I'*'********tt.!!** ******** ********!< 1<1<1<********"''''*** ***1l
F ,"
,!f:!~hil!~ennt .J1al~,~beC01De n~n and void if the bUildi~ or w~rk ~uthor~Zedbr thiIJpermit is notc01IlIll@nced within
;~,\:~~O~y,s :fr()Ui'th~' 'date'of 'suC;h Perm t., or if tbi~.tuildin9 0'7 WO~k authqriz~ by such pe%1!li t is suspended or
; ,abandoned 'at anytime aft"er.th,e \Jdrk is, cOIlIi8enCJfor a peri6e\ of 180 day.,
',,' '..,' , '" ,"':\:1 , "il" ' , '.' ,
'11~,}11~!IC!: ~I.t is ,the, responsibility of thfliPennit: holder, not'the City of Bremer ton or Building Official to see
{.;::;t9';;~,that r$tiW:t84 inspections are made. The permit holder JlIUst notify the Building Official when ready for
':~<\',';inspeetions. , P'ailuteof the ,permit holder tonotift the Building- Official of required inspections mar result
,:"1.',""0',.<' .,," . . , ..
i~'r:.:in ,~he stoppa<;e of the wO,rk unUli: such time that the pe~m1.t holder can sub8tantiate to the building official
'-" , " ,. .
:;;" 'tMt' the concealed, workmeetlor' 'ox~e9ds code tequ~:r.men:ts'. Any demolition, testing, or financial burden shall
'. ~be borne directly hI the Nrmit hd14er. Failure to substantiate codenquicements will indemnif:r the City
againstan:raJ1d, allresponsibilitr or liability connected with the construction,
, ,
I hereby Cl.1:ti.~y that I have' ree.d,and examined this permit and know the, same to be true aJ)(l. correct. All
provisions of laws and ordinanc,s gover.ning this type, of work vill be cOlIlPlied with whether specified herein
or not. The granting of a ~.rmit does not presum~ to give authorit:r to violate or cancel the prOVisions of
any other state or l~al law regulatin'i eon/ltructionor the ~rformance of construction.
Siijnstute:
,Datei
"
:r eerUf;Ythat 'I aID, exempt from the Cliilczuirements of ,the state contractor's registration law, under
. t, . .
,s~t:i.on 3, Chapter 126, laws of 1967.
Sighat1.,lre: .'
. ,
Date:
, *>l';*:****"'****'**"'*"'****,*1l"''''**
. P.rmit c..ter-:"p~_ .t~~;!:/-J~/lSX)3
8L~
A..-~ /r~ -0' ~.., ",-"",,"'~
. ~~c' '"" T' ':J;,.
i"'.-g" . "
~+.._-"<~" .
h '.: - "~I_____ _~),-~ 'i" """"''',;
, 0 i 1 ,--'- "',, .1" '!,"': ~' ,
~II'---,.='-,.-m.. ...~'--~,.. ---..;~ I'.! ,~... ~!'-.-' IT';':' ,::c:-,~-;:c..,';i---~- I 'I' '
, . ". ' . .C .' ...! '.' i : . -+ .,: .1 Ii'
'I ~~, -- ,.......,1" , '''c-~-'' ./ I i. "''''''\'&' -1P-T--:~,C:j;~:i ' ,i I I ~-r-t,.,
, ~ :-r- ' , . " , ~. ~ 'I~,.... ,t. ~'.' J'~ ,en'" .....,' " " : .',' "I' '
. ,~;,\"-'tt' .' . li,\ ~~:: ! i,ulr-:,4i~:r~: ~:IJY 17 '"' .~.._'..Q,-1} ,--:,~'
r.- T~ _~ r I '1\f''''''-~ ' ,II :i' ' . '. ',,' .'" r ;' .""Q-
--'- r~ ~ rr--~~ '.: ~ <: ~"I - "'. j ~1~}1;; 2f;~3J I5f '.' ." !'"' \~ 'Ai~ D
. Ftt> r" . " - -_h<:j ,..: le, .~ \\'lliR~MERroN ~!=.I','" ,~: '..., , ! ,~,~ ;;Z~~,r'
..J,.. 'I tlllll ' ' ,j, ,~H '. ,! ", ,I T:: ; >, """"r' Al\- '
"v'T' 'I"" ..,. '.' .r''''' .<. ["' .'
~'\..-r'" : 1 ' ',' ill' ',' :/t('-~._""+V'~1r
, I ' ,e ' .. ~ 7 1 " ,. I.' 1"-. ,,,- I ' . ", 1
I /'\ " . '-' _ .. " I' ,I I' i' 1,1 \ ~jl ?'Yl L ---
,~~jr~ 10;, ,--' -:--," ~ -',' " .'~ - "'i
. ! ,1 ...'L:;;t11""". ~.-L' ' ' ., ..' '.;y. ..' ,. -~! r'~' , , ...,1 :1",.,,','
! . ~:C.:.r:' " ", i--,' , .' ..2, , , I;!\ f. ~ --:'~-t - .: "-
,I ." trT .,-~'.i<!' ,,' ','. :/, ' . 'I .1.' " "
". '~,t3;)tn~:gVI :{.,.,. I, ,I';' ..1 (I (1
",;0' ~~'~_~.. ~~i: ,",," . l.l:l!J I~' , il (
$,; ,tfrL;~J: ,in'. , " ,",""v',""",c.o,,~' , \jJ1
': ",,' , , ,;(:i" :,'~ "1 I I',.. , . -,': i I IT
, ," I. rS,~ ""h1.'- --.....-4 ,I IV , [II?\ : ,,' \.1) : -.J==111' ;;-." :J-}I, ~
I"FT;;;I,~hl..l.. I. ' .' , T I I - ~ In '. I! i' (K1' I -6:;t' ,
, I' .,.,... i1'\:0~' I' L.;;.o. , 1 I I , '/ I i~~
'I ,1\1 ! _,I" V\' ~ I' 1 'I"': '; 1
. nl".' ",::;"'" " ,.r 'i ,n:e;;, "li 'J~W
,I Vi /, :", ,""'" :,,;.,;., I" .. t ~ "~./J..., ~;;i:J ~O .]\~~
,'" .. I': ,~, . ,e" "T" ""~' ", .;;:; 'j
" ,,',.,'.,, ' " :"..:' ~ 1 ii' I i l'Y __I " ... ,~
, ~~i'i ].., .!Ii~ +' " ,'. .... I. 00 Q "lj;:{
\' ! ,'~, ,,'(?l~ ' I I "I ,.,"! I .... '"F <=>' ""
,.." ',.1:, I, ,<m, Iii " ,:::;... . ,"'" ." . ""';;n I' , p rlt ..",:"
I I' ," ,.... , , ,,' ",-.,11 'I' 0 - ";7
I " I "'I\N ,I,l..~ . ~,t-..I 1 ,: I ,. I ,!.:'" ,'" '-'.' :.;,':;4>?~.
'i ' ' " ' I-I' ""').' ' ....... X 'Jd31.1" "'C
.. !' 1 ' .... ~~I"~:tIK' I 'j . Ii I"'I[ Ii' , ,,/!,
,",~',l !., i.:: ,/ ',I I i\ '~! G1it;;t;;< ';h 1~(:" ~' , <L +",i . .( I
, [' i < 1;;11",' ~ ,.. l.,.~: ..-:~,",'-VJ~.,;. \ 't;;i'.;<>p" \i..c-;/ '; .:..:. ,-tV)... ' , . -
..II: ',' ',' "I ' , ' ..12I..DLr-' ' '9"....7;'.;.-' r',' " , . ~ ~ _"All I
. i ., 1 \', ~,.... . ,.. , , /~~""-" "" ,.\ ,,~~' "d '): " ~ <'^. I '
I 'i," .... 1'1' W ' l::b 1....~6"""" ""',,, ~."""",,' '\ 1 , ,~ ", 'e- i'" ,
i ' :~ .~, .-... .. I ,.0" I'.'l'].--"i!,'" ' ~" ,'I'"i- ,,-
"'" i,i !']i~~1i~:j .'. ~i I :'~ i.:-J:l ~li},r \ roi \, ~~J...-~;\; I. '
, !.U' 1"- ,~ <. ,. . " ',. .' .. ~,,. , ,,' c ,
,~ ." ~, .' I , "I, '!...'I ,I . I,'" ' '" '. I. " . ,'E'!I\ ' \, "
~Z:,II"'i..;1~t'''"'t:I'' ~l..: bq II, " i'- .\. L \ f1"
.1 -"";1"I,q:~"., -;" ., ,.1 T." '.,.;r--. I I""" i\~ :: 1 ,11
, ,.n",v'- .,;1. '~.::'!i ' I' ' ,1"'-: T ,,\ '\'1.1.' ,,', ! I : 1 '
L v:-' I " ' I ',." " ' ' - I I, i i rY", I I' \ 1"'" ! II :
Ii ,,:,'_. ,,~ ,"I ," .' ,~j ("!}~, :)' I "i
, .~ t~~1 "i 'I, L\j I:" ~ ->,f, ]03'". frEl\'\'I' .1 I
, '!W,:," I~H\! '.', .... '.. I\~ '?,,)!' .' ".... .'. " 1\ \^I
T I' ,:() ~ ""T'.L.. ..' ~_' ,:: I I", ! I ,'\ "~~~~ ' !, , ,,:)[1>1 ; ,': I
" .111 7. ,'1' ',. I.. .,', . " II'I % '. ' ! V / """ . " :'.," '
,,: I ,,' ~':'$h' r ~ H I~ ": . ii" j! ''-L/ " Jil..; '^~~, 1\ 1
i ' . '_':', .,., , .,., .' '," i ,,'" I Ii::t J,.. ~. ...'.' I " '
,','1 I: 6)' +_ !4tL..:. r:::- :..;;... i : [' '>iT. , ,"'i{/~2~~j:.,~'/ I:
'" '1, I '. :..., ).' '" ~,,!::II '/_' V II, 10./1 ,i .' .
..' !' ,,_, ~~ .1:.......' ',,"'" i , , . : ".-,.' ,/,\~: ,.,' 'c IF'
:, "J'/~, l1Y'n .....d- 1 I.,,'~~\I I".' , ' , , ,,'/ ,'\1 ,'1ft!, "'7.~:,\i)F' I '
x'1;I:'-',I><: I ~" ':lbl:..,'" ',-" "I'T." "I '-, I"
,I :"1 'I t-.~II' :' ~ j \" II'lJ, y~, I I' 11,'/ , ,IIi! V ' '; l-t
I' , _ ,I" I r-" \.~ ,I/" ,I ,':' .r I' I'! I, I
'I' ,v' ,..... VL"" ' I . 7<:" . .. ,.,,' 1/1' . ." .
1 "",,''''', ,I, ) "-,,"",, i"t"',J:i.-' ' ,/i,' ;II'I~ 1 /': T
-.j I ~I' I~?": i ~"~i,"",J'"'I'-...r.:...",,~!6:i "l~ 'II ~t"__1 I' (I ',', :W_i 1',,- '.,: /::/ i' I i
"I "II:, I_I I I 1 iri"U'\%,Iv-.: '.U a " !. ,"" v/'\, , ",',1. , ,
:1 i 1.,.1' {I I'w~iv~ """'0. ' I 1 \,1. ~... '.. ' , ,
v , .. . . II.,,:,,:", T'! 'I?~.....:: '."'ii> 1',0/ . ~ . I I ·
., I ! '-1-, I' : "I,' ,': ',!: I,i' I ,"l"
",' ;,,':: " 1 1 '
Ll
__..J
;;1"
,.;
.;.
i
, i
I
a
,
i
I
j
i
i
l
!
\ZS:
I
I qO
/~~,........r:-w" ....
d\'~\
(\)\ ..~.. ",
(W ~
(),'" '
, ,
, ' '
\.,1
~~
~~.
~.
, '5(0 \ (0 ',,' 1
6o~uxLl €>~
W'
I s-+- N
, '~ '
Se.A\~ 10':: 'IL Ivet\-'
(20~~ L-~
, .
l..J2-S- 7~~- S<a90 ~
10 IS 7.0
j f f j {
~o '1{J I.\D SO
~
.
, ,
w
VICINITY MAP S+ N
E-&
-<
/i\~~\J\S
~
Ij'~'
m~R\\)N I\\j~
~,
\j\~S
~ 3nllr
g0e.~lt
C~~=-=-~~-=~~ '
- '-~T--~~-~~'~-\0
~ bG,\-\}J~'0
->~~
~ cc; ~ [j \:i7 ~ -'\ r ,
Apu "".> 2"fP:.in1-~lIT CENTER
" f'I \1,,' uu3 -'ftJf-ll "
, ~ ~
j :{:~'L~,s:~.i:'fA'~1vr-';I>:i~~'';:~'1''ffl;':':ri{{7~=~~~!~~~~ ;;I<:~~~~~~~~.mi31'~~-:J: . B R EM ERTON
; :",l~,L~~:.,~".;(\.MJ.i.;\.'Lf~ ~Jii..vrt'Ic.;W~*~:::if_~J,1iJ,.;-lIlt, ,~!~nt!.t.~Willl~~..-;.;..l.r~l.'t~I!:~hr.lt:~ B' /)'L
-.---------------------'---....~"'-,-------,"----, L DING DEPARTMENT
03- 011 0
Department of Community Development ::- 286 4th Street ::- Bremerton ::- WA ::- 98337
(360) 478-5275 :;- Fax (360) 478-5278
RESIDENTIAL SITE PL,AN REVIEW QUESTIONNAIRE
Pennit applications are reviewed by our staffto make a preliminary determination of the presence or
absence of unique areas on the property. To help us make tbis determination, please supply the following
information with a scaled and dimensioned site Ian.
Applicant:
Description of Proposal:
Street Address (or street name if no address has been assi
Tax Account Number:
Critical Area Questionnaire:
1 . Is there any standing or rurming water on the surface of the site at ANY time
during the year? liYES, please describe conditions:
DYES ~ NO
2. -"lie there wet areas on the site? liYES, please describe:
DYES ~NO
3. Is the site characterized as: 0 Forest ~ Cleared 0 Developed
4. Please give the overall slope of the parcel 6% and the slope at the building site n %. FLA\.Bu\ltm...~S
5. Is the property 'Within 200 feet of a shoreline?
o 'YES
DYES
6. Will the proposed structure be aesthetically or functionally disruptive to
surrounding properties, the neighborhood or the community?
r)fNO
See diagram explaining the slope calculation on the back.
The applicant hereby certifies that all ofthe above statements and the information contained in any other
transmittals made herewith are true, and the applicant aclmowledges that any action taken by the City of
Brernerton based in who e or in part on tbis application may be reversed if it develops that any such
\
statement or othe info ation contained herein is false.
0JvJ\
L I_? _T\<
--r ,2J G-/,
Date
Site Development Figures
15%
r~/";?\.
Y "\
.. 'h
o F
i' /'
Residential Site Plan Review Questionnaire
Percent Slope Calculation
Slope is calculated by dividing the vertical distcInce
by the horizontal distcInce, then multiplying the result
by 100, Example:
Vertical Distance of20 feet
Horizontal Distance of 100 feet =.2 x 100 = 20% slope
l ; .
i '/
I
Page 2
03-Dl70
~' ~ ~ ~ U ~/(~ ~-O..~ SS; ~
,.' 2111':! ' J)lsr 7
AP~ (\;~ oj,.
BREMERBERl\lIT CENTER
BUILDING OtP~PJMt\H
Department of Community Development::- 286 4th Street ::- Bremerton ,:: WA 'r 98337
(360) 478-5275 ::- Fax (360) 478-5278
Building Permit Application
APPLICANT: ~WNER 0 CONTRACTOR 0 AUTHORIZED AGENT
Site Address 3&; \ lo E> Tax Account Number: I -
Check the type of application for below:
o NEW SINGLE-FAMILY RESIDENCE 0 NEW COMMERCIAL 0 NEW GARAGE/CAR PORT
o NEW DUPLEX 0 COMMERCIAL REMODEL 0 NEW ACCESSORY SLOG
D NEW MANUFACTURED HOME 0 COMMERCIAL ADDITION 0 NEW SIGN
o RESIDENTIAL REMODEL 0 COMMERCIAL REPAIR 0 STRUCTURE DEMOLITION
o RESIDENTIAL ADDITION 0 NEW MUL TI-FAMIL Y 0 GRADING (Cubic yards: -)
o RESIDENTIAL REPAIR 0 TENANT IMPROVEMENT 15Q OTHERCtWE1?J1) W:t.oY.- Polli-')1.
IS THIS PROPERTY WITHIN 200 ~EET OF A SHORELINE! YES 0 NO rxr
Scope of Work Proposed \ 5X [ 4: tJ)VEK~~~r?PO\LQ,\\-
IV/A
CONTRACTOR:
Address:
License #
Contact Name:
Contact Phone #:
)
OWNER Name:
Cit , State, Zip
Phone #:
Cit , State, Zip
Phone #: (
Square Footage:
Dwelling:
I ( ()OSC\-
o ' pr Garage:
Decks:
}5x./~
Surchar e
Total Fees
.1. -
BREMERTON PERMIT CENTER
, 286 4th street.. Bremertan.. WA 98337
, Phone:: ('360 )-478";'~275 FAX: ( 360) 478-5278
BUILDING ,PERMIT
Job Addr: 3616 ,BURWELL Sf:'
Location:
P~rce 1 No:' 1524013-111-"2000
Applicant: LARSEN RQ,&RT 425....765-'6080
3192SNG lOOTH 51 CARNATIONWA,~8014'
,Permit No: 03-0170
Status: ISSUED
Applied: 04j0372bo~
Issued: OS/27/2003
Expires: 11/2~/2003
, Owner: LARSEN ROBERT 425-765'-608'0
31925NE lOOTH,ST CARNATION WA 98014,
c.ont"ra.ctor: SELF
Lie'#': SElf Exp:
Subcontr:
Desc: gUILD A 15 X 14 COVERED PORCH
, "
)I( * *;j(* Ii< * ){(:li:t:,ltil!i)/( Jt;:<< ~**;t: *$.llf*:<<;{( * *)/(:<< it: :/i)j()/C/(:f:,j!)/( *****);( *::K:t: ** *** )/(*:$;*:1(')1: *::l<:)I(::I( * * * * **:/()/: **:i<:::/(:/( * *;(( * ** ** *:f.* *)1( * **:1< *)!( ,
ValuaLton' i'" ,Penldt Fees:' 97.2'5 Total Calculated Fee:' 164.96
8;055.50 * Plan 'Check Fees: 63.21 Additional Fees: .00
" * ' ,Other F~es:4.50 ,'Total Permit Fee: 164.96
lti)l(lI:: **:k**** It: * :t:)l:: **)\\ * ** **** *)\( *)I()\()I( UlRUlII %:!(* 11:* *** lfI.ll( *)1:* n **)I()Ii,)I( * * * *:<< *,)1( ** * '*)\\ * **:1(:<< ** ** * * t* * >>: * *)1; ** *:1()1: * '*
, '
,:.r.niafjeymi:t J~H b~~gw J'1lj1l ~~i':VOid'~J",t~.....ooil<;;lio~slY }>IiJYkau'thod,%~ by this ponnit is rIOt cCIfflIoonced within,
H30 daYs,f'rom ~,~'date)?j. ~h permit. or if th:h~ buildine orwoyk autoo'(ized by ,,$UCh p~Ymit is suspended Ot'
'~ndoned at a~",ti:me~t~y !i);} ~~ i,:l'i"e~~ f,l)?j.....a pQ>Yiod 01'180 da)iS. '"I
>'N0rlcE - It i$ ther'e$ponsibility of too permit hcJlooY~ not the Ci,ty of f:h'eIIleyton 0'( Building Offjcial to ~
. '- \. , . '. " .- .
, to it: that rtil'lljlJ.1rer ir;t$pl\tC.;,t;iJ3rra.....3.rernade. Tlw permit holdet'm\J.stnoti fy the Building Off icLd when n~ady for
., (. ~:. (~.. y ... ''--'-~ ,.~ ^ ~r. ...-J'-'..... , 'l
':':'"I;r~ectiona' FaiJuxt;~ ~~..r/lli;t,;.ktld&r to notif>' the &J.ildirs Official of requinro inspections may l'e$l.llt
, oin ,the $topp~ o.f,the- WI.:wk \.Inti! $U(;,prrtime that t,he pet'mi t ,holde'(eM substantiate to the' building official
. _""1'1' > ::,.-f.< ~,/. . \
that th'<l concealed~~k."~~}?}C~exc~eds cocJe.Yeql.dn:Mn~mts"Any demolition,"t~~iJ19,Ot' financial bUYden shall'
be bbrne directly by t.he 'p~wmit. holdey, Failuye to subst:antiate C:CJde. 'requirements "Jill indemnif)' the City
'agaioot an)' and aH t'e$polieibility ClY liability conneCted wit.h the conSt.Yliction.
, ,
I her'eb)" ceyti fy that I have yead and examined this Plilt'mi t and know the ,$afll(t to be true and conect" ~'ll
, proVisions of ia:u.J.s and ordinances go\.in'nill9 this type Of woyk will be complied with whethet' $peei fied he't'.dn
01' not. The gra\1t.im of a, peymit. <ihes rot p're$ume to give authodty to violate 0'( cancel the pYovi~iort$ of
l!\l1y otrl\'ifrstate '01' local la\~ ,r-estilatiliQ con,at.yuction or ,the perloYffi<1lnCe of COflGtruction.
Signa,tun?:~..:..,~~~______,__
Oate~
t,~.Ye9'Jin~m;;nt$ of the 'state corft:nlctOY'S yeghtration law, uncle\"
",,$iQ\1!!l~tJX~ '
""" ,~.~i'<.'\h.. 1'l"1, <:..<I.,-;:",,L ."" 'it, ~"
, "~~r,,\,:i"'~"\\'0"''''
~
. ...- ,',_'1,,-.'
_ ,00t~H..lEi.," 5~7- 03__--.
. " > ',~ - .. ,
**************~~**.*******~
Oaw~f/k3
Permit Center--Approved B
. ..>. 1 ,.' .1:,,' ~,,\'. ,-,,' "t.... '". ,,' " ~ I. ~,'" ,t, ;',_, " " : '
,'. "'1': _" {' ~,
~'
.Ji~ ~ '?-",
'\J&,;~" .;. ~~.
'"~;~{J::;;n.kt~f;;~:'~:~J"~]~,~:'~:~~:r?C; " I "
,,' '..' ".o","'ll: !.~~'"tJ!l';.l",\ I"" ."""
. ...." ,~-!t.,'\'I;~~ J,
.,"
~ .~_"'_~_>w........-.-....~__ _;~,~......,.....~,.......,...,~...-........,...._-:;-_.
~ - /.
" ('
,', \, ,\,
"./1',1<'
1i,' I,;,' . ....,.\ '\,- ,,:'''':
/'
BREMERTON g.,~,f.<:t1;~:r;;r",,~;ENTER
286 4 th St r eet'i"'!8r'emer't!gi1F; '7' WA 98337
Phone: (36Q) t78-527~ F.6l~i'i"".(360) 47845278
Job Address: 3616 BURWELL ST
Location: ,~
Ass. ACQt."No;., 1524013~;l.11-2000
."...~. 'r"- o'j'"1
Building
Pe,mit "~6:
Status:
Issued,:
Expi'(~:
03-CH 70
ISSUED
OS/27/2003
11/23/2003
"
'-
..,,{.~ f .'
R f;"Q U IRE D
,.,,,,
INS P E C T ION S
Item: 01100 FOUNDATION-FOOTINGS
Item: 01200 FOUNDATION-WALLS
Item: 01700 FRAMING
Item: 01800 INSULATION
ttem: 01900 SHEETROCK NAILING
Item: ' 027q.Q." FINAL.~:;:8LDG
Dept: SLDG Division:
Dapt: SLDG Division:
Dept: SLDG Division:
Dept: SLDG Division:
"".~ Dept: SLDG Division:
Dapt: 8LDG Division:
**********************~*********************************************************
, ," TESTING :;,- J;1u$t~''''be r$eogpizf'...a b/y~ the Wash! ngton Association of 8ui Idi ng Officials
SPECINg~: -'Mu;t-be i~gi~te,~d 'wit~ the State of WA I
ST OF WA: State of WA Dept. of Labo, and -tndustries ,478-4921
HEALTH: 8Ieme,ton/Kltsap Health District 478-5235
P~,mi t, HOlde;<7.: .
Slgnatu,e:" "
THE CITY OF BREMERTON MUST BE SCHEDULED THROUGH THE
** *************************************************
" I1A--
Date?-_~ =-ZZ-f)!-.___
j
.. . . ,
'"
", v~"" :"~;,,
\' "', ,_ ~ ".1 I': ;:,
",;:{. ";~" ..\'t; ,'7
,':"..: r
,... ,:~ ,<t.,,~~:;~"i~:?ir'"''
. ~ l .-' .
, ,t,'
:,.,"
..,..,I'\~'
~
.,'''''~;;~~~~,,~ ~h~.;~~$:::~:T""':Z~~~~~~;~~~+~~ ~<~,F.~~==.= ======~;.,==~""===~==
" " " 'PERMIT ,CQNDITIONS ' ..' ,
permit 'No~'. 03~9.17~)''' .. ' : , Page: 1
:. - ~~~~~;:re: ~~z ~~ ~~P';z'~~ :::::~;Z'?f.5,~~-r;:;;w~:;Y .:~-::~:"~::e::'~~ ~:t':.::<= ~~~,~-='~~ =.~'!:X r::~ =?t :'':::I;;::~ 'Z:. ::::::=::: ::::;:::::5:;:::. ~;:;;:= ~=:=;:;:::;: :-:::1= ~~:=: :::t.:;:::::::::::
J'e';"
'Job' Address: 3616 BURWE\;..L ST,
, "ASSt. Acc.'.t:'.-No:" '1'5-24013-11i-2000~ '~'.,,',
Loc-a't-ioD: , ~:-", ..""..-,.. 0">""" ,,.,.J..'''' ~,:,.,;,.>' ,",-,0'
Applied~ 04/03/2003
Approv~d: OS/27/2003
Issued: OS/27/2003
'. : App 1 i,ca nt: L..~l3r%~t:)l,,;~P.~~~J~,,;f;;M;,\I'''''''''
, OWner: LARSEN ROBERT ,
: ':,:i16:nt~''''c;~o..r~'SELF'' "" ....."..; ,
,,'1 ~);:;,v~.~' "6"-'.- ~\jS: ',~ I ~~ " ,\~,~ ~" -' '.'-<"<. iH"'If"'" '", {)~,<!'" f w,i:~ ,,,,,,,";...~',,"
t'" "..,'~'" ..,,' ,'.... " ,:',.. '"
~i,
,~.,,.;,,,,,D;escJ;,i Pit io,r;r: ,,','
~';(.),'i..:i><<"-" <.-~~'r)I\F",:."",l.c,,*~~,' 00t' ".fW.\<~~f;I.JUi..~,'
" '"';;;~hJilJ)j.1,:J?:"~;':'ft,?~.JX~;"+,4,,,:;~9VE.,gE;~, PQRCH"; "J,\~
Conditions: ' ..
i. PRIOR TO PERFQRMING'ANY RENOVATION OR,DEMOLITION WDRK,
PUGET SOUND CLEAN AIR 'AGENCY '(CU::AN'.AIR ,AGENCY) AND
WASHINGTON DEPARTM,ENT OF 'LABOR AND INDUSTRIES (L&I)
REGULATIONS REQUIR~ AN ASBESTOS SURVEY BE PERFQR~ED TO
DElERMINEWHETHER THERE ARE:. ASBESTO$-CONJAINING MATERIALS
IN THE WORK AREA OR STRUCTURE. THE AS8ESTOS SURVEY MUST BE
'CONDUCTED8Y ANEPA CERTIFIED (.AHERA) BUILDING INSPECTOR
,( EXCeCP1', RENOVATION OF OWNER-OCCUPIED SINGLE FAMILY
HESIDENCES)...
F08 MORE INFORMATION.:PLEA~E CONTACT CLEAN AIR AGENCY
THROUGHTHEIR,WE8 SiTE ATwww.pscleanair,or~;rOR BY PHONE AT
..600-;~52-3565 OR 20 ":--689 4058. THE L&I, WEB S":fTE CAN BE
: FOUND AT i < 1 ni.w .90 /wisha'/p-ts/asbestos/asbostos. htm"
1 ,- .
I "~
~., ,",', .. D t~>.~ 22-($,'.. ,
-',' a .. '
" ,,,,,,.,..-.-..:~..........~~-,..._~-~.~~ .--...---.- . ~""
':~f5~'rrriit Ho..ldey's ,. .
S i/g"na t'u 'r'e ' ',~ ' " "
... '. ",. ,-"".,,~I '~1l~"""Y~~C=+~: .,.-~ ,"
1;'",..
'.",
, " r', '" - ~",'
I ...;.
J,,--. "":,","'~
~~.~ '~
, 1~!P~~Jfr!-"
;111- :, ~ .~'~:~~~~;;.,y
~ -: . \C.' ,l, ~ ~',~;' \ /, l . '.
"",.
. ~ ,
'r* ****'* ,*,*::l' * *"r *lCt-*******:".t:* *'****'** ;t;"**..;t: 1t***~:******%**** .>1::* ***:l<.;;C*," * ***
~',. r' ~.'t..~~ ":~T' .i~:~ . ,. '" ',.. . ..,. ~"., \._.
';;;t~:~". i,,<' :;' RE,CE H I
'* ;f;.;''<i''*:i';*.ol~ :"1::* 'fjf,,** * ** *" *t.,*,*,*:t' **** ** ****:oj?~*i::t:***'* "*,***** ***** *** *** *
H:ECE::li;)1' NumLH;,Jr~ 0300()4!;.7 Amount~ 1'49.68 O~3/27/03 1;?~04
PeY!'n".';nt M~:th',xj: CHI;;:DK, N~)t.s:tion: U\RSEN 1 nit,: PC
<,.. .."........ _,,~ ,., ...... ..... ............." ....... "I~' "'"...... ". ,...~ "".. .,..... "...'.,..,"'..........'" .-,.,.:-' _ ,,.,,....... ~~ '..... ,..,.. "-,,' >,..... _, "" .","~ .__~,... ........ ~_ '~:.t""',..... -.............""" '~.' ___ ,....,.. ,,,.... 4-" _...., ".~ ....""......... c_, ,_",,~, '" ,,"'^ ....'~ '.....-...... ,,_ __ .~..
ow. ',/:'::'
F'0rl11,it No:
Pal"'<.:;el i'>oj!,):
'Si L.3! AddYI)>t:E;,!B~,
03-6170 T~pe:
1 5;240 13'~ 111." 20t)()
.3616 8UI:;;~rrLL._('n
8LOGONLY SLOG PEf:;';rlIT'~NO MEeHl
Tot~l Fees: 164.96
Total ALL Pmts= 164.96
Balanc@: .00
***~***~~***~***~***********************************************
Account Cod~ D~5CTiption Amount
lt~.<t22 "1001 (2;~Z1:l'> B~)lLDING PliRNI T FEES 97. 2ES
H,'<:J45.83Q'~ (:458Q,} f,3AIILDTNG PLAN CHECK FE::ES 47.93
A4'";'~.~'?'Y')' '\'::~ {'")''''3f'~' o;:''\" ','rb:: OLc wr \~ll.f::>"'LJARC't::':' 4 50
'W' ,', ,~,.\. ""~ '. ,,,.z..,. ,",,} ::> ,.11 'I- r ~ ',.'''' ,,1.,.1l'f'1 ,:x~ ' "', '
lId. is P ;a '~:i1l!':~ n t
149.68
"."..." -- ,,,' -. ..... ..."""...... ..... n".......... '"'...~ .-,...., ,...~~....~ "",.....-..,:"' ...,.., _'...... ~;r::4 .... ~- ft.........,... --.. ,7"',:-'" -:.-....~' "~..'H,..,~-:__. -... ~_1 "~~ 7'". -,",,, <... .....~, ~ ---..... ,~~ >t~ ~,,' <,,,,"" ".-<<-,>, ,'-- ..~~ '''''~ ..-
....
iI1i
..,'
, .
Scope of
Address:
Owner:
Contractor:
BREMERTON BUILDING DEPARTMENT
Inspection Report
Permit Number:
03-0l1 0
f:)..-t.A/1A 0/7--.
Phone:
Phone: 3'01-5 - 7 VJ 5(008'0
Inspection card/approved plans on site Setbacks
Footings: required steel placement Walls: required steel placement
Footings: required width & depth Walls: required size
Bearing soil (soils analysis if applicable) Special inspector (when applicable)
FOUNDATION
COMMENTS:
FOOTINGS APPROVED:
:t!) 7 p~~ WALLS APPROVED:
FRAMING
Electrical approved Plumbing & mechanical approved
Crawl space access (min. 18 x 24) Floor joists and beams/proper clearance to earth
Positive connections posts & beams Foundation vents
Posts properly supported Anchor bolts: nuts & washers in place
Mudsill: treated material Floor joists: size & span
Beams/girders: size & span Notching & drilling: joists & beams, studs
Smoke detectors: all required locations Exhaust fans: where required
Exhaust fans insulated: unconditioned space Whole house fan, outside air intakes each bedroom
Fans terminating directly outside Range hood
Dryer exhaust vent All vent terminations: windows & property line
Fireplace combustion air Windows: meets egress requirements
Windows: proper U valve Windows: safety glazed where required
Ceiling heights Stairs: headroom clearance
Stairs: rise & run; proper width Fire blocking wall to ceiling, furred walls every 10'
Fire blocking: stairs, soffIts, lowered ceilings Fire blocking: tubs/showers
Fire blocking: lids in void spaces, shafts Fire blocking: stuff holes top & bottom plates
Sheet rock backing Wall bracing
Rafters size/notching Trusses: specs, bracing
Attic access Attic ventilation
Wall & roof sheathing Shear nailing
Building dried in
COMMENTS:
APPROVED:
;()
7/#/e5
I v
Insulation: proper R valve Insulation: proper fastening
Insulation: vapor barrier Bottom plates caulked to floors
Penetrations caulked as required Electrical boxes gasketed or caulked
6 mil black poly in crawl space
ENERGY CODE COMPLIANCE
COMMENTS:
UNDER FLOORfFOUNDA TION INSULATION APPROVED:
WALL INSULATION APPROVED:
CEILING INSULATION APPROVED:
.~_u \VWUU V I VI"I~
:S.LN3V\1V\108
paJ!nbaJ uallM JOl!uow UOP!1B~
pe}Sod SSeJPPB 5UIPI!ns C,9) UO!lBJBdas lItJBa Ol 5u!p!s pOOM
llj5!1JaljlBeM 5uIPl!ns alqBO!lddB UaljM palsod PBOllUBdnooo
paJ!nbaJ uallM 5u!l1l5!1 l\oua5JeW3 paJ!nbaJ uallM su5!s lP<3
paU!BlUIBW S5U!lBJ aJI::! paJ!nbaJ SB 'SI!BJpJBn5 "l? SIlBJpUBH
paJ!nbaJ aJallM SJopalap a)jows aJOO P!lOS 5UIsoP lias JOOp 5U!IIaMp/a5BJBE)
IBO!UBI.paw "l? 5u!qwnld sUBllsneljxa 'law SlUaWaJ!nbaJ apoo A5JaU3
'''NI:I
:a3^O~dd'v' >l80~.L33HS
:S.LN3V\1V\108
SJOP!J.IOO
(5u!I!ao uo lOU) paJ!nbaJ aJaljM pJBoQJalBM (paJ!nbaJ "S/S) SJ!BlS Japun aOBds alqBsn
paJ!nbaJ aJallM SdO}SYBJa SIlBM UO!lBJBdas 1\0uBdnooo "l? BaJ\f
5U!WBJl '0'0 "tl C,S/S) aUBld 'J.la^ '0'0 "l~ - SM9JOS C,S/g) 9UBld 'lUa^ '0'0 ,,9~ . SMaJOS 6u!UalSBpadoJd
f)U!WBJl '0'0 "vl C,S/S) aUBld 'Z!JOll '0'0 "Z~ - SM9JOS C,S/S) UBld 'Z!JOll '0'0 "l ~ - SMaJOS 6u!UalSBJ JadoJd
5U!WBJl .~)'o "vl ("lH) aUBld 'J.la^ '0'0 "l~ . SMaJOS ("lH) aUBld 'J.la^ '0'0 ,,9 ~ . SMaJOS :6U!Ua}SBJ JadoJd
5U!WBJJ '0'0 "vl C,l/~) aUBld 'Z!JOll '0'0 "U - SMaJOS C,l/~) au Bid 'z!Jolj '0'0 "l ~ SMaJOS 6U!Ua}SBJ JadoJd
aUBld IBO!l.Ia^ '0'0 "S sl!BN aUBld 'z!Jolj .~:)"O "L - SI!BU 6U!Ua}SBJ JadoJd
}400MJ.33HS
:a3^O~dd'v' NI-H8nO~ 8NI8V\1nld
:a3^O~dd'v' >l~OMaNnO~E> 8NI8V\1nld
:S.LN3V\1V\108
paJ!nbaJ aJallM :salSBM paJ!pu! JadoJd paJ!nbaJ aJallM :SJoldaoJalU!/sdBJl aSBaJE)
paJ!nbaJ SB palBlnSU! 5u!d!d-JalBM paJ!nbaJ uallM JalBalj JalBM Japun pBd 0 ~-~
dBJlS o!ws!as :JalBall JalBM ap!Slno ol U!BJp a^IB^ JanaJ JalBall JalBM
paJ!nbaJ aJallM :SJa)fBaJq WnnOB^ I\lddns J9lBM PIOO uo a^IB^ alB6 :JalBalj J9lBM
saJnpclj liB UO Sa^IB^ JJ,O-lnllS 6u!z!s JadoJd :l\lddns J9lBM
I\lJadoJd palUa^ saJnpclJ 1I\f UO!lBU!UUallUa^
slnOUBap paJ!nbaJ :l\Ma J.loddns JadoJd 6u!d!d JalBM "l? l\Ma
paJ!nbaJ aJaljM S6U!ll1J a5IW!BJp JadoJd :l\Ma 5u!z!s JadoJd :l\Ma
apBJ5 JadoJd :l\Ma , ~ }Sal Japun 5u!d!d JalBM "l? l\Ma
DNlswn'd
:a3^O~dd'v' 38'v'N~n~
:a3^O~dd'v' S38NVIlddV ~3H.LO
:a3^O~dd'v' 8Nldld S'v'E>
:S.LN3V\1~O~
paJlnbaJ uallM senu alBJBdas :l\aUW!1I0 paJ!nbaJ UeljM :Jeu!I AaUW!lj8
al!s uo soads s,JaJnpBJnuBVII lIllealj JadoJd :saoeldaJJj "l? saM}S pOOM
aIOOp 6umy.-lllD!1 :saoBldaJy. "l? seMIS pOOM palJ!lJao \fd3 saM}S POOM
uado I\lluauBuuad Jadwep :s501 seE) JJ,O-lnlls AlaJBs :s501 SBE)
aoue!ldde JO ,f; U!lIl!M JJ,OlnllS seE) palBoO-punoJ5Japun JO ,,9 U!lIl!M :ed!d seE)
apBJ6 MOlaq "l ~ .U!W punoJ5Japun :ad!d seE) lJoddns ~ az!s ad!d SBE)
lsal Japun ad!d seE) lJoddns "l? az!s :slona
J!B uO!lsnqw08 UO!lBU!UUallUa^
lJoddns "l? az!s :5u!lua^ salqnsnqwoo Ol aOUeJBalO :6u!lUa^
salq!}Snqwoo Ol aouBJealO aoue!ldd\f lJoddns JadoJd 'SSaooB pUB UO!lBOOI aoue!ldd\f
'''01 N"H03 VII
F. 1
Ma~ 01 02 10:25a
3604785398
7671
Cit~ o~ Bremerton
~
To
3(p l ~c 'A . . <J-
6\A.r~ ~,
Fa,,# 5';L73'
PUBLIC WORKS AND UTILITIES
.4,
, ,
/'l~
ENGL"'EERING neVISION
3027 Ol)mpus Drive. Eremertt)n, WA 98310-4799. (360) 478.;3i8. F:.:..X C3EO) 478-5018
ADDRESS FORM
(360) 478-5270, F -LX (360) 478-3398
APPLICANT INFORMATION ,J:.'{.JiEW ADDRESS _CHANGE ADDRESS
DAii:: 5/1/{jpZ..
NAME: 1C(J);e/'f' kf> 5e/L PHO~E: 4.:z.5 - 765"- 6tJ.? {;)
ADDRESS: ,31975 NE /t'/~ -h( 5~. FAX: -
CITY/STATElZ1P: C(7r/4n/7~~ w/i 9?o/-1-
KlTSAP COUNTY PROPERTY I.D. NO (rOF;, LOT 70 BEADORESSED): ' 15 ;J.4{)1- 3- 1/1- CZ-t2 12.t)
PLE:l,SE DRAW A DIAGRAM OF YOUR PROFE~TY, INClUDING i3.DDRESSES OF NEIGHBORS. DRAW DRIVEWAY LOCATION AND
SHOW STREET. NAME Tri.o,.r DRrv8NAY ACCESSES. INDICA;; WHICr. DIRECTION IS MORTri.
I- /Jew J*V'; e.. I ;'tJ5J
X
~
Bt/I'w&il Sr.
! 1-.1
J4c~~ C?r )1141'! J3(}JL )?er /b..sr t/H/c.<e I
(
I
~I
:1
,~
~
~
~
~
CITY USE ONL.Y. DO NGT WKlfE 8t.LOW fH,S LINE.
NEW ADDRESS: 36/.6 f)U1V../611 Sfred
ZIP CODE #r )}s;-l//l7~ e
APPROVED SYi DATE;, ~ g
! 5/1/t?Z
.
..... k'nn"ll {)"~...t-t,";t'V ];...,.."l^u",,-_ -l...
Revised 12128199
February 28, 2003
".
Building and Planning for the City of Bremerton
286 4th Street,
Bremerton, WA 98337
Supervisor of Building and Planning:
I need your immediate help. '
,'During recent bulldozing of a piece of property located' on the dead end of Burwell
Street west of Marion Avenue, the developer,Mr; Larson, has incorporated at least 4
feet of Burwell Street right of way into his property. His water, sewer, and other hook
ups are clearly on city road right of way. He has not observed property line set backs.
The city' should not allow permits without clearly defined property lines and
very careful, in,spections frorT:l any departments ~lIobserving for city
ordinances.,: ' ,
" . -- ' .
L . . . "I . ". . ~. " < " .
The immediate need is for the city 'toinspect':the' conditions and
, widen this road so th~t it clearly has emergency' vehicle access.
There are 8 current residences that, use this, dead end. Two of the
current'residents have heart conditions. I do not want to call 91'1 for
'<'any of my neigl:lbors for a medical or fire emergency and the
, responding v~hicles notable to arrive quickly and safely. , '< '
This dead end of ,Burwell Street is rapidly shrinking in" width' because of property
~ owners parking vehicles, putting up fences, trees, etc. Because, of these on going
activities, this City road is becoming increasingly blocked for periods of tim~ causing no
mail delivery, no garbagepick,up, etc. The city did not pave the entire width of this road
last year because there were tree stumps on city property in the way. Those, stumps
are now gone. We ,also need a1signfor the road that says "No Parking or Standing"~
This small road should never be, blocked. Please help.
This matter needs immediate attention before a traaedv haooens. Please
,helD, This needst9 be correctedquicklv, " ,~'.)
, 3/?<~ O~ V()J
~t: -to:
~Ke ~~;~
p~W, '
L-~cUV, '
to "
5 {litt\,
, , " ,/!
Sincerely, /;L/4 ~:~-
4/L~~/ / /~ ,
ikha~~rt~ .' .
3633 Burwell, Bremerton, WA 98312
360-479-4739
~
February 28,2003
Building and Planning for the City of Bremerton
286 4th Street
Bremerton, WA 98337
Supervisor of Building and Planning:
I need your immediate help. fi g' .5 ~#
During recent bulldozing of a piece of property located on the dead end of Burwell
Street west of Marion Avenue, the developer, Mr. Larson, has incorporated at least 4 '
feet of Burwell Street right of way into his property. His w,~ter, sewer, and other hook
ups are clearly on city road right of way. He has not obsetved property line set backs.
The city should not allow permits without clearly defined property lines and
very careful inspections from any departments all observing for city
ordinances.
The immediate need is for the city to inspect the conditions and
widen this road so that it clearJY has emergency vehicle access.
There are 8 current residences that use this dead end. Two of the
current residents have heart"conditions. I do not want to call 911 for
any of my neighbors for,"'a medical or fire emergency and the
responding veh~icles not able to arrive quickly and safely. '
This dead end of Burwell Street is rapidly shrinking in width because of property
owners parking vehicles, putting up fences, trees, etc. Because of these on going
activities, this city road is becoming increasingly blocked for periods of time causing no
mail delivery, no garbage pick up, etc. The city did not pave the entire width of this road
last year because there were tree stumps on city property in the way. Those stumps
are now gone. We also need a sign for the road that says "No Parking or Standing".
This small road should never be blocked. Please help.
This matter needs immediate attention before a traaedy happens. Please
help. This needs to be corrected Quicklv.
.4
~r~~, 7 ~;/n
~el
3633 Burwell, Bremerton, WA 98312
360-479-4739
(f)
-
---1
fTl
............. fTl VJ
CDx OJ U
~ I
OJ )>
IT] Z
. .
C
")
~
(f)
.44-
['~_ ______...___-- .c_________..
I
x
P1
~
;"'J(~'
Oi
a.
.....
AVENUE
--
\
,.--'
l"-
cnr
8.:3-
-:::I
.....co
.-.
~I
3
~
-
co
_c::
;=:::
~OJ
oS:
mm
~ =: r:~r:
:0 C
~2
rn
'7
=i
"'"
5 ~
~
[fijli
~.,~,,2)
-0
.
o
.
~~()
f\.) f\.) ·
(J1 (J1 · ·
I I
~ ~ :::0
moo
(J1OOO
I I 0-
m(J1(()
000-,
()) 0 r+-
OO
() ::T r
CDOO
= 3 -,
~ CD CIJ
CJ (()
lfiru :J
L,
c:
Z
.'>.;)
[PITH
=
g>8[:t
a. .., (IJ -.
a.:Jm(IJ
3 3-' ~ a.-.
C (IJ (IJ
(1) 0
'< ::J -h::J :J
(lJO 0
< -. co."'"
o 0 ::J -.
~iia.3c
:IE tT g (IJ
-. g} c (IJ C
5=0 ""'c5"<
:IE :J :J (1)
~.::J 0 (IJ ':C
cD 0 ""'-0
oCilCiag'
o c ::!.s.c
:J -h a. ...
a. -0 -. CD .J
_. -0 (1) 0.. a.
......., a.. 0
-a . .,
g~ '<
(IJ -.
3
o
.....
(1)
rJ.Im::,~:v.:~'~~~QE::::!:q:~~:rLi,~~~,ri::~J~:r{:e~:r.i.iiI!::',::,:':::':'::::':,::,::",., '. ':':
:",J~:~g'~"IJI
From:
To:
Date:
Subject:
Laura Freed
Adrianne Ralph; Jim Svensson; Patrick CONROY
7/19/023:09PM
robert larsen SFR permit
f;{jl~.s
Hey folks,
Addendum to the status report erriail:
I have told both Robert Larsen and his surveyor (Con Serve Inc.) that I need a clean, scaled CQPy of the
site plan with tapa lines. The surveyor will be mailing this to us. Mr. Larsen is very anxious to' receive
his building permit. I am sure he will begin calling each of you at 8 am Monday, wondering if you've
gotten the newest surveyor's s,ite map and if it's acceptable and when will his permit be ready. When it
comes in, if dri could look at it and confirm that the house and deck will not encroach on the 15 foot
buffer, that would be great. If someone wants to write any applicable conditions and approve it for
issuance, thatwould be great too. I am sorry to leave this with you all.
--Laura
~
BREMER TON PERMIT CENTER
2864th Street~ Bremerton~ WA 98337,
Phone: (360) 478-5275 FAX: (360) 478..,...5278
BUILDING PERMIT
Job: Addr :3616 BURWELL ST
Location:
Parcel No: 1524013-111-2000
Appl~cant: LARSEN ROBERT 425-765-6080
31925 NE 100TH ST CARNATION UA 98014
Permit ,~o: 02-0254
Status: PENDIN9
Applied: OS/29/2002
'Issued:
Expires:
Owner: LARSEN ROBERT 425-765-6080
31925 NE 100TH ST CARNATION WA 98014
Contractor: SELF
Lie I: SELF Exp:
Subcontr:
Desc,: 1989 28 X 60 MANUFACTURED HOME
'"
*********************************************************************************************
Valuation * Permit Fees: 185.00 fotal ~alcul~ted fee: 189.50
.00 * Plan Check Fees: Additional Fees: .00
* Other Fees: 4.50 Total Permit Fee: 189.50
*********************************************************************************************
This pe'(mit shall become ,0011 and void if the buildil"l9 0'( wops autho'r'ized by this plnmit is not corrmen:ed within
180 dayS fl"om the date of such pe'(mit. 0'( if this buildil"l9 0'( WO,(k~utho' 'zed by such pe'(mit is suspended 0'(
abandoned at any time afte'( the wo'(k is corrmenced fo'( a pe'r'iod of 180 . ,
NOTICE- It is the'(esponsib, ility of the pnmit holde'(. not the$Cl y' Bn~me'(ton 0'( Building Official to see
to it that yequi'(ed inspections aye made, The pe'(mit ~deSS ify the Building Official when Yeady fo'(
inspections. Failu'(e of the pe'(mit holde'( to notify the Bu ' Official of n;~quin~d inspections may n~su1t
in the stoppage of the wO'(k until such time that the pe'(mtt, 00'( can substantiate to the building official
that the con:ealed wo'(k meets 0'( exceeds code '(equi'r'ement~.,i Any demolition. testing. oy finan:ial bu'(den shall :
be bo'(ne di'(ectly by the pe'(mit 110100'(. Failu'(e to substantiate code '(equi'(ements will indemnify the City
againSt any and all n~spons'ibility 9'( liabi~i ted with the constyuction.
I henby ce'(tify that I have '(ead and exami his pe'(mit am know the same to be tYUe and co'('(ect. All
p'(ovisions of laws am o'(dinan:es gave . this ype of wo'(k will be complied with whethe'( specified he'(ein
0'( not. The g'(anting of a pe'(mit P'( to give autho'r'ity to violate 0'( can:el the p'(ovisions of
any othe'( state 0'( local law '(egula t'(uction 0'( the perlo'(mance of constyuction.
Oiate:
Signatu'(e:
FtK
0-0- q --~
the state cont'(acto'('s '(egist'(ation law. unde'(
I ce'(tify that I am exE!'tWt hom
Section 3. Chapte'( 126. laws of
**************************
\ Date:
\,
. I
a oate:l1-v(/ov
, Signatu'(e:
Permit Center--Approved
.),t.'
,tKft'td, $;~, ' ,
...,~" '.. ".,~,,~' "
. "'~;,\~)':~:~:~;, . .. .
a,REME:R'"1:f~' 7'..~~~~\~~"",,~~~\~frER'
I 286, 4th'Stre~t,IBpemerton$ WA' 98337
-,P:h,,'ne,~'(3.~~),',4~t$~~5 " '" EA;<i:.,~~~~.60, J,478-5278
i,,!, ,~" '" " ','..~' '.,BV.Ito.'TNG.PERMIT ',', '> "
. \. ' " '",' _ ~",T~,~:;::/" "~\-::l:"- '. " '\" "'.~' - ,-.,',
Job .'Addr,:,3'616 BURWELL Sf /' ; , ; PermIt No: 02-0254
Loca'Ho~:"" ,\ " . .,', " " Status:, PENOIt>1G
Parcel No :t'~2401.3~11l""2000 ' Applied:' OS/29/2002
, ", Issued~
, APplicant ~ LARSE:N ROBERT 425....765~6080 'Expires:
31}25 NE lOaTH sy CARNATION WA98014
\"..-"
,,~,J
r ",t
t '
1":'~>' "
~.
,~ >,
.'~:~T:~j~~~;~;~:C:~:;';':'::;~.',
'.~"'_' 'i ~
,.' .
, ~-~'
L' , "',
,0 '~',
" '
. "
· a-w,R::
, "
5-alJjd.-
, ".I
Owner: LARSEN ROBERT: 425":765-6080
31925 NE 10~TH'ST CARNATIQN'WA 98014
Contra.ctor: SELF
, , Subcontr:
Lie #: SELF Exp:
Desc~ 1 iS$p~~1(';60MANVF.ACTUREb HOME
- ' , ,", ~: , " - < -' " '}
:<< n ***,*')I(**)\()I(* U *,**:I<:t.n)l()t;::I:)I( **)1( *::1: **,:r:~ ~* lU\ *)I(*:I(:4()I(:I/::t * ***)\()I( t)l( * 11::)1( lKlk)l( *:<<lIe)l(:<<:<<:<<)I()I( *:<< u * ** ***}j(**)I( * ** lie:$: ***:<<
Valuati:oD*:., Permit Fees~ 185.00. Total Calculated Fee: 189.'50
., " .,:00:<< plan C'heck ,'fees': " . Additional Fees: ..00 ,
',,'..' '" ',."'.'",')I('~ Other Fees:, ,'4.-50 ,Total Permit Fee: ,", 189.50
:<< u* * * *)(( l\()I( * *:;: **** *:<< * )ft)j()IOj(*)I(:<< * ** ** *1I::ll:)\( lK***n **:<<:<< * *** >>: *** u *:<<::<< ** ** *.::1<:)1( *)1( * *)1( *)I()I()I()I( * *:4( ;f* *:<<)I()f. U ** ~ *** '
... ~<,
O(t' u'~'
" J ' ,
Thi,$ p'ermi t shall becOme ,roll ,and void if the b..1i ldins Ot': woik' aU1iho.r;'z:,ed by this pe rill i t is ~t COfll1'lenced wi th1)1 , ,
189 daY$ f,YOl1l 't~ date 'of, ~ch p&ni1it", cll'if this buildim or'work al~thOri:z:ed by $Uch peymit is $U$pel'lded'or, J?~'
abandorietd '~;, arlY timq after t~ wor'k i$ coimt6l'1Ced fQY g' pedod of 180 days. "
, .- '-'" ' , , I~,A OJ ' -, ':\:'_'~- _ ' ,
, ,NOTICE ;.. It is the.n,t$Porisibility of the permit holder, hot the City of 6remfJ-t-ton or Building Official to ~ '
J ~ " '. . " ' j . . :. _, _ _, _ " "
, ',to H.'that reqUi yed; imp~ti~.,~r~lf1ade~ The PEil"'mi t ,holdey ftllJ.$t ,Y:lO't1fy the SUlldinsotficial when ready few,
in$pecbori$.: failu're of ,the 'ii>.imit 'hQlder to notify thf;Buildirs Official of requii'ed il1$P~tions lI1lllY result .'
, ',.,' , ' ,"- - ",. '0'
',in tfut :~6ppa...~ of, the ,work untilaucn time that the peymit holdeI' ,can SI.,lOsuntiate to thebui.ldirs official,
th8.t ih.-concealedworK Il1Ht~ 0;" exc~ "Code. nl'~ir~nt$. Am, derriolitioil. teiltins. 0,'1' fil'laocid burden sh....n
bG,bo'r'"fle.di~~tl>, by t:hepe;mit holde'~~ ,Fai1Ul'fl to sUbSt.arrtiate cOde Yequ:inw~l1t$ willi~ify theCHy "
, - . ," , , ' . ~' 0 ' u _
, 'agai'f'i$'l;, ~ny and all Y~on$it:lhity or.lisbility conl~teo with the COt'I$truction~,
, I',heY~Y CEH'UfY"i:hat ,I hitve'resd arid examined 'thh~ peymit ard know the saine to be't'r'llC and Cl)Yr'!~ci'. All:',.
'_ ,,', '- ", " - '.., If' '
, : ;oyov1$10ns of l~ and ordilial1Cft$ 90verniliS, this type of woyk will be ,CQl'Il:>lied with whether $PECifi&d Mt,'ein ' "
Or' not. ',The 9yanti:ns of a eeymiti;:loes."mi: pr~' to giw authoYi t)'to,' violate ,01" cancel t:~: pyoVisio~ of '
any othE<Y$tatiii !orciGx::al l:awyegulatil19 constnJotionoy tf1e. perfor'mance of con$truction~ '
~, "'~' ,:7~~4 -6&- ~"~ IJ ~,11/1 " '
9lgnatUYe~ , ',,) ~ 1 cl14~ CK, (LJC:.lV~te~-:--_
I, Q&~i~Y,t~t I,.~ ,.Xerftpt;fY~, eqJir .: of tbe $tate contractor's yegietrati~n law. 1.Ili:!e-y
sectwn3, C~,t;er't"26, laws 0 1 , " ,', ','
, '.. ~ :("._ '> ,~:,,' " . c, ' " - , ,', ' ',' .,' , ,'. . .,' '0 '
Signatuye: ~ .~
,,-'\,
*~**********%************~*
f?9,
.'.."', .,.,1
, "
..~'~li-~~(f;~])
~~-~~" ~ 7~~-(jf)--J'
ate: " ","\:i, '., ",' '>",\, " "
,:.'.'^' -;...'
" ;;f,
lJc
, 'I
Permi~ Cente0~-AP~roved
'F.",..., ',(I .,.~~.', '" ,',,'
!.,c>.~ _
'CR'JI~ :') 01'.- ^~ I
: ,:;..", ,.(;j.... -I, ~.
. · /I II ,~(' II / '("
"V:,'~".Ct, b~ ',m t:U-fl
. ,
C t~;\.
--, ,
--
. -.....-......--
r~
~t,/'
V', ,
'" ..p""'"
'.\..... L'
" $1!:
'~Q~W) .....
;5 ~<1-q ~()~
().AJ
. ,
','
aREMER~BN., ""e ' "~~7f;,t~~j~DTER
286 4t1f Str.etJ:~r~ r.,?'fpn~' UA 98337'
Phom:t: ' (360) 47li::",~15' FdX'/.:{360 )478-:-5278
'BUILDING PERMIT" . " ' . .
Job A.ddr: 3616 BURWELL Sf
Location:' ,
Parcel No: 1524013-111-2000
,APplican1:: LARS&;N ROSERT , '425-765-6080
3,1 925 He: lQOTH $T CARNATION iliA 9f!014
j,i
#
Permit No: 02-0254
Stat,us,: PENDING
APplied:, 05/Z9/2oo2
Issued :,
, Expires:
Owner: LA,RSEN ROBERT , 425-765-6080
3192S'NE lOOTH $T CARNATION WA 9-S014
Contractor: SELF
Lie ,: SELF Exp:
Subcolit r :
Oesc:U4S~""'21) X 60 41A.NUFACTURED HOME
*Ulk** ** * ********* * U'**~ **:n ** *~lKlI:); ******* :u;:<< n***:M):**** * **U'):JI(* * * **:1( *:r.** lK *** )X*,****:<<:<< * *** :<<'***
Valuation :<< Permit fees: 165,00 Total Calculated Feet H19.50
.00 )It Plan Check fee,s.: Additional Fe-es:.OO
, , * Other feest ' 4.5:0 TQtalPermitFe~~ 189.50
*:at: **_**** * **.******** JlC*:t * ***:<< ******* ****** ******* *** **.*~** *,**** * ** u*** *** *******:+: *:+: * *** lk***
,(
" c, I . . , .
Thi$ PliJrll1it $mll ~' rull and void ~f th&t:;l\.tildins 'Or, WQr~ ~tho.t"ix<<l by this p.1'mit i$ l"'tOt '.~ With~~
1$0 ~,ha.tt'ltt date of euch p$'rmH. err' if ihis b.!il~irls or wode authori:Z:edl;:iy $Uch P,\H'lliit is ,$Uet'><<lndledOY!
,~tKtd "t I\l;I'"Iy time Qn.l" ,,"he- WOrk h~ ~l'1Ced ,(~r a p.;yiod cl' 180 dA>'s.
,;r.~11 . . '
NOnce: .., It i~ ttMt rMPonsibiHty olf the P.\1'IIit ~lckn:. nOt: thlt city of' '8\'"~t'ton or Stti1dil'\g p'l'Hcial to ~ ,
to ittliat y4t~t,\'"td i~ect).on$ aye ll1llde. The- permit holde-r !I1WIt notify the BUildi"l"'S Official ~ y(Ntdy fot'
l\11ilP.ctioliJ$.FaUure of the pe-l'Mit hOldeI' to rotify the BiJildingOfficial of' y~.,~.d:red i~ecti{)ri:\9 my YNllU
i,n ~ the etoPPat;leOf thir work t),ntH SlUCh tiMe t.hat t.h!t p~rm.n holder01!ln ~tantiatet.Qthe bui~flIiij official
, thS.t. the 'OOi'Jc.e-ale4 work ~$ or ~ oo:J;e rftqJ.ireMt,t1'\:$., ;.;ny ~liUon" tdUng, 0'( fimrw:;.ial ~:cde'lt $11811 '
, bit bo'r1"lft di~tly Py the t:lermit holdei'. Failun& to 9Ub$tanti.t..e ~ YeqiJ.ir~nt$ will i~~tle City
, " ~inrt,~Y~rd a~lr~ibtlitY 0'( liability connected with thecol'\$truction. . ,..,., ,
, .
, lbeYeby, e.ert.Hy 'th.-e i haw read al"ld ~ined thilll pnlllitand lcrK:M 'the ~ tq ~ tru* ard conect., All
'Pr~isiOl1$ of laws and' on#y"'f'lON gl;:lW.rnln;t-tli$ type of wod.: will e:. ~Had with wM<ther 9P~ified ,hey.in
Oy"f'Pl:,,, T~ QranUl"l9 of, a p~Ymit: <<wrs not PY~ to Siw aut.ho'rity to Viola": 0'( ~l thot 'iH'O\ii,$ton$: of
a1'lY ot.he\" stat.e ,6r 19Cal'law yeguiatins comtrubUot) or the- J:>ttrf.9};)n$J1JurM 6onetruc:t.iQf'\,.
, . " < ,": ~ . '. ,~. r . . ..... - ,) ~..' .. r, .) , . , , .
, 5t~t4ntl:
Ofl.'t;e<:
I Cl&yttfy that I am e~t hem the l'e'llI,dremeni$l oi-the $~t. contyactcw',. YltS1$t.rat1on ~. umlotr
~ion 3. Chapter 121>. b.W'$t ,ofl~7.
$i'gnatUY~I_--, ,
O#tl1H
.'
, .f '"<(
**~**~***x*~*~**~~***~**.**
Oau,6 ~7-/J~
LlA UC'-
P!e'rmi t ,Cenier--ApprOve,d By.
\FfC~ ...
~.'d0 ~O:X
, " ( ,
.:,'.",:"",d 'fo~' f1IJcuJJ,'
,. ~ .", " ,
/'1
BR:~::TO~ PpRMXT CENT~ ~~
:.?86 '4t.h ~:e4,~"'" ';~I( \~~7 /, "
Phone,: (360) 47$:--S:Z (360:1 ~-5278i 'VVLJ
,r: , "BuxtDtNG PERMIT' "'~ 5-d-.Q -D~
~ . l.: ]Y, . o;.'r:,
(;."'\
;-ci~f" ~""',
ill/! ". ~.
Job Addr: 361~8URWELL, $T
loc~tlo1i:
Parcel No:' t!)24Ql$-11l~200C
Applicant; LARSEt~ ROBERT 4Z5-765-MaO
31125 NE100)'j1 Sf CARNAHON WA 9801.4
'/
.,.
Permit Not '02-0254
$t~tus: PEND!NG
Applied: OS/29/2002
Issued:
Ownen LARSeN ROBERT
31925 NE 100TH Sf CARNATION WA
'~
I
o
~
AI
. :t:)((tn~~u:;j(*,*:<<\i(:~O~
189.50
,00
Tota it Fee: 199.50
'. ~.***..~*.**.*.********)((.*.**
Cont r JI,C tor ; SELF'
Subcontr:
Oese ~ 19.59"'l',) X 60 MANOr ACTURED HOM~
*** ::!()j(* *:It::~:ifi)j( *:r.** ** ** *****)1( **If:)(( * * :+:,:i($. >>: **
Valuation ~ Permit Fees,
.0'0 ~ Plan Check F€es:
* Other Fees:
%;j( 'IiI)I: It * *)((::I( '#. %)j(ii:;I( %,*:<< * *!4()(( )I:::II()((* * * * *:K'): *,): ~;jC *;K*,
\
Thi,.q'll'!''r'mit -$lmll b&\:.cJ9I'~ l'lLtU @nr.:\ '\IOid it tlw buildir\lil ';J~' work autrlCld:;::ii'f.:j !::xl' thie M'r't\1H 1$ not ~11Ced ..<ith~1"I
. . , ,
:iISCu::l4.;x'$ fyOi'll H~ d!t'l:;e O'f $lJcl'l ~*rmit, or if l:hi$ boHdii'1lil 01' "Wt:<Yk autool"ixecl by 5\).ch PfwmH i$ 'JiU$P~nded OJ!'
, aban:lbn.,d at; e.rl}' 'lifM: ~.ft.Il.'\" H~ work ie f.Xm1'J'Sn:&.::! for 1>\ ~riod of 1&."1 ,*"Y~l\. .
\ '
, ~,' ,
~):)nC!: ," 1. t i$ t.h& Y~OO0,i;bU :1:1:.)' ot the per:mi t holdtl&r, not +.1.1. City of 6W!!Nl'iH'tOf1 or e<uildil1g i,}ff i~:i.,*l to ;!>e~
to it that l'~qlJ:hEl<1 tnap<<:t1or\$ Sl~'iI.' tl'rB.dot" j~ tJ~rmi'\t holder I\lt..!$'t notH>' the Buildins Ofh.::;ial Wh$11 'tE'!$\J.:t;." few
i~~io:tl$" FaUWf'1l> 1:)1" thep~J'mit ooldn t.o mUfy too S!"rUding Off.ici;al 01' rltGU1r&d impectior~ may l'4\l!$UH.
[' .~,.)n t:JI(? w1:opp~ of t11f,lc ,-JOy\( tl.tlbU rodl t:illl-l!' that t~ p4}nni~1 l~r can $lJ.l:l$tMrU""t.e,< to:::> th~ DJildil"1l;l offidal
..,.1,hat t.tJe. ~atllfd WOt k fttHbs or 'B'xcWJ!;j$ cu~ r~~r ,n'b$i" ~rr/ ~rlll?H}7lonl t'E'$tiOO. ("l' f:l.nsnci~~".?}.rden @{"i;illl
b~ bO\1"~,dF~th! ';br"'i:l"tfl> ~y~tl:it;_ oola.J. i"$1~ t.o '!'~rttl.$/.d ~~?J"f~~$~11 :~l'ltfy t.he Gii;)'
';"galoot Z\m', and all r~Q~i,.'b)o O~il1;)-' COl ,t~ th~dsrl$trwtJ.Ol1. . /'
1 J\\!'l'".my C~ytit~, th.at I l1flVQ n;iiti ~r&.exa.mi~Vi\.'ljLt and kl"r.JI;J the- ~lW to b<it tr\J& and C;Oll"~t. All
P~Y;Ni$:l,OI'l$ of la\>l$ J\tnc:l '6rdh1l9.~ 9CIV&n1ins this> b.ope- 01' 10101'1>; \.inl be ~l;vtd ...lith whatl'l'lfr- clI1'~if19d herli!<fn
0; ne,lt. T1~ '$1'ilIvr1::ln&1 of tl. ptlYJIljt; del..... not p"(t;$U.~ to siV", alJ.th(:)l'"ity to vio1$.t>!' .;.'Jt c.$iYlC:el t~ JJ.l'.;:t\J.i$.iCl1"i$ 01'
.'" ,,""" '~~,' '.w'_:~"n.c''''''''U?t,'on or.... :p"f"r~. of ",",r.T!~_<A1' /< .
*"""tu<<'. '. . ~~__".c.,_~.U2~___
r c.~).ti r>'the.t :t ;am exoo1fid:. rn;tll t.b", reo;'{lJi rement:l3 01' t;,tw ~ta:t... "'Ont;:ractoT"$r~~I~r'i\t:ion law. w1d*,y
S$Chon 2" C'haWt4W 126, 1<.tW'l\l of t967"
,
.,
"
~
$i'9'(~;b;!\(e-~ \""''''''''''''''~_'''__~~~__'''''''''''~_---''''''''';I''''I'f-''''-'''''-~_-''''''''''''''''''''_ t~b$it,t- "'_,,_.......~_~...............~::...w......__\........_
l~~~*~*m~***~~****~**~*~~~*
F:Lb
- \ '.. c
r:5. J, Cl~ Ux
s
Date;_~~M'''_M___ ,/~~
:.,//' \
I . I / ('
L l/\( CJL
~ernli t Center-~~lPpjo'.,led BY~ ~__~_.~~_____:
lil.L
. Dt~~5f
~ Sr==3
BlJRtue <' S\QtS~::.\' Tax Account Number:
Owner:
Contractor:
C)
~(2r
Contractor License#:
Expiration Date:
Contact Person:
Contact Phone#:
o GARAGE
o ACCESSORY BLDG
o SIGN
o DEMO
o GRADING (Cubic yards: )
o OTHER:
kaT
,
WITHIN 200 FEET OF A SHORELINE?
. I S<l ~ 2. z. 5 S<J. FT:"
Decks:2- g'a x Iq /5 x 15
YES NO-X- .
,.' ..,.~,;~~nU;lti.()p,J;"F' PllinR~~~'F~~;'"
'~ne.rg)':
State:
Applications for which no permit is issued within 180 days following the date of application shall expire by limitation, and plans
and other data submitted for review may thereafter be returned to the applicant or des !:toyed by the building official. The building
official may extend the time for action by the applicant for a period not exceeding 180 days on request by the applicant showing
that circumstances beyond the control of the applicant ha:ve prevented action from being taken. No applicant shall be extended
more than once. In order to renew action on an application aft expiration, the applicant shall resubmit plans and pay a new plan
"-
S- J-q - L) <r-
"' - f
Il~Ju'Z~heJ-JD-' cQe~:~ . , . .
Ko~J: v..JJj) , fzAK Ou-b'( ~~ f(tV/1 Keu/eiu <-bv~ - k ')
DATE:
Lj - Z8--D2
review fee.
APPLICANT'S SIGNATURE:
..;;:ct/;!~f.~WI_'~~ J-6Yf
::: : P:U1MBI.NG:n/}H:L:::d
o ': H: >>MECHA.NlCAL::<O '
Type of Fuel:
Occupancy:
B Electric
Residential
B g:mmercial
pOil
!~ Propane
Site Address:
Owner:
Contractor:
Address:
Address:
Phone:
Phone
Contractor's License }.;'umber/Expiration Date:
No. TYPE OF EQUIPMENT No. TYPE OF FIXTURE
IL'u.'\IGE WATER CLOSET
WOOD/PELLET STOVE/GAS FIREPUCE BA1HTUB
GAS FulL"JACE btu: LWATORY (bath sink)
CONVERsION BURNER bw: SHO'WER
UNIT HEArER btu: KITOffiN SINK
BOILER btu: DISHWASHER
GAS PIPING L'\CNDRY TRAY
EV_<\PORAnON COOLERS btu: CL01HES WASHER
AC UNIT btu: WATER HEATER
REA T PUMP btu: mAL
REHE...-\T BOX btu: DRINKDJG FOUNTAIN
AIR HANDLING UNIT btu: FLOOR SINK OR DRAIN
E"."(H.i\CST FANS SLOP SL,\;K
RANGE HOOD (residential) WATER PIPING & ALTERATION
R.ANGE HOOD (commen:iaI) GREASE TRAP /mTERCE:P1"OR
CLOTIiES DRYER HOSE BIBBS
IN CL"< "ElL-\. TOR LAWN SPRINKLER SYSTEM
DUCT ALTERATION SWI.:vI?vffi.JG POOL
TA.'\IKS type: 7 BLDG. SEWER (mobile/moved house)
REFRIGERATION UNIT , ROOF DRAINS
01HER 01HER
MECHANICAL FEES:
PLUi\1BING FEES:
CITY SURGL\RGE:
TOTAL FEES:
APPLICANT'S SIGNATURE:
DATE:
i!G-~---'Z----1 m
d' , I
:1
I, I
I ~
H I -.-
II'
ill
I111
:11 _
II
1!1 ~~. ~. '
..; " "..:; ',::fHE::C:".I'< OF' P~IDf A~~, q,PPOltlUN.IU < ". ': "
COMMUNITY DEVELOPMENT DEPARTMENT-
Laura Freed ,
Ifreed@cl.bremerton.wa,us '
~
July 16, 2002
Robert Larsen .
31925 NE 100th Street
Carnation, WA 98014
RE: Building Permit #02-0254
for Manufactured Single Family Residence
,at 3616 Burwell St.
Dear Mr. Larsen:
I have reviewed the revised site plan you submitted yesterday for your
manufactured home permit. However, without topographical lines on the plan, it
is 'nearly impossible for us to tell whether the new location for' the home
encroaches on the buffer for the steep slope. ,As you will recall from my last
letter, there must be a vegetated buffer of 15 feet from steep slopes.
Please superimpose your site plan on the contour map provided to you by Con
Serve Inc. and resubmit the site plan. I will, review any new plan quickly,
because I know that you have been waiting for this building permit eagerly.
Please call me if you have any questions.
Sin~~IY'/1
'~~'_/~.
,,' ':/,. ;
L-///Laura Fr~ed '
Current Planner
Enclosure
Cc: Dri Ralph, Environmental Planner
~
-D I I MJl ~ f5
~ c::;:) z~
0 ex) L() C'o.l aCt:
= ""0 ~C1.:
en lO U4 U4
0:::: C\1 :20
U4 C!:l
~ f'-.. Z 0:2
co -
;:::) g
I I J :3
tt:Q ,...
(0 (0
L() L() . :"
. . LO (0 '<<5
N N Q) V "
. E ~ ------~--j ,"
~ ~ I
() :J X
en" i I
enO
. o~ U
0 -- ~ ~-,
------ -,-'- -
en II -- ---- -..~.---'
Ol-
e:
. .- Q)
~-
0... o 0 ---- ----
Q) CJ
CD(/)
! ..---
;--
/ CO
,....----- ....--
. .
-f
(
. -
..
L
-, . ,- -'~ .-;..- -- -~ -------
'Y7~~lm
1111III
-
,. rH' ClrT 01> ".'OF ....0 o"PO.rUHlFr ,
, COMMUNITY DI!VeLOPMI!NT DI!PARTMI!NT
Laura F....d
lfreedQcl.bremerton,wa.us
July 10, 2002
Mr. Robert Larsen',
31925NE 100th Street
Carnation, WA 98014
RE: Building Permit #02-0254
for Manufactured Single Family Residence
at 3616 Burwell st.
Dear Mr. Larsen:
.' . . ,'~, , :: ~::~~:.ii~ ~
. .;:~I
We have reviewed ttie topographic survey made by Con Serve Inc. and
submitted to this office on June 26, 2002. We have also reviewed your revised
parking plan faxed on June 27.
There is a slope of approximately 47% on either side of the area you wish to
place the manufactured home. According to. the Bremerton Critical Areas
Ordinance, slopes greater than 40% may not be disturbed because grading or
vegetation removal on steep slopes is an erosion and landslide hazard (BMC
21.22,100). ,In addition, a 15-foot vegetated buffer must. be maintained from the
top and toe of steep slopes. Th~refore, you may not have the driveway and
parking spaces where you show them on your plan'dated June 27, because to do
that would be to excavate the' top of a steep slope. Also, you must maintain the
fifteen-foot buffer from the slopes, which means that you cannot clear the
blackberries out unless you re-vegetate with some other plants.
'However, you must have two off-street parking spaces for this home (Bremerton
Zoning Ordinance Figure 670a). As we discussed, parking spaces may not be in
a front yard setback (BMC 21.02,590). Since you need to have, two off-street
parking spaces, and the natural topography of the parcel will not allow soil
disturbance to make a parking area, you have a hardship situation that is not
self-created and is inherent to the site. These are the main criteria for granting a
variance. So, you have a few choices with regard to development on this parcel.
. Page 2
July 10, 2002
First, you may apply for a variance to be. allowed, to park cars in the front setback.
However, a variance application costs $636.00 and the Hearings Examiner
makes the decision, not Community Development ,staff. Again.. however, your
building site has topographic conditions that make it almost impOssible for you to
comply with the parking requirements without disturbing the steep slopes, and
this is a main factor in deciding whether a variance is warranted~ A second
choice would be to place a smaller manufactured nome on .the lot that is able to
meet the setbC)ck requirements and the buffer requirements of the code. Third,
you may wish to move the house back.on the lot such that cars can park in the
driveway but out of the 15-foot front yard setback. No matter which option you
choose, .you are required to maintain the 15-foot vegetated buffer around the
tops and toes of all steep slopes. Choosing the third option of moving the house
back from Burwell Street may make it infeasible to have a gravel walk around the
perimeter of the house. '
Please call us if you would like to discuss the pros and cons of any particular
development alternative. We look forward to. receiving any revisions to your
application that you wish to make.
/~Z.
_ Laura Freed
Current Planner
Cc: Ori Ralph, Environmental Planner
File
~--
KINKO'S REDMOND WAY
[4] 001
07/13/2002 11:01 FAX 425 882 2538
--.-
Fax Cover Sheet
Date: l-l~rO 2- '
To: "LA U ~ ~\7-ee()
Company: ~~ Or ~~tJplJ .
FlOC' t~~~ 4l~--:,52l~ -, ,:
,
From: Wb ~"<.
, Company:
Tel: , 41-'5- 7(0 S- (;f)?fJ '
Number of pages including this one: 2.:
kinko's
16815 RedmOnd Way
Red\TIOnCI, WA 98052
Tel: (425) 882-1949
Fax: (425) 882-2536
--'-
Comments:
\,k0-0 Lf\IJ~ 'b
'" ~S ~ S \N-;~
: 'f.evJ s ~W
J: ~~B\-r~
~1IA\J\j\ lJ ~ ~~ I'V\
'4'" .. f). \l ~ S~\.J ~ tVJ
~x~ it:>0'"
?#~'
<;-.
VALLEY MAILBOX
, ..'~rO
- '.'
,.....
"(\J,
4"<:; "8
. :-:: _ ~. ~ 7361
,P.03/06
, ,'-- ~.
.. _ + __ ,__,v1~6;
I _: ! :. '_jf+'!~ '-'~f~~' 1--,,- ~,!_-"
, " ~..' . ,::> _' -9-
, ' ,.....' ' "",- T Ii':!. ~-. - - --,- -
',__ ___-=- ' '-v' . '.:;:;1 4:C v, !
J..~l' __ ! .. -'1'- --'-- I ei ! ~I'~-- _'__.Im
Y>'T ,--.. . ' .., ~ ,'-'"
.., ~L I'" -----.' -.~: -~-- _1 i ":1.- . - -- - L u_ :
__) ~ , ..'..___.1' ,__ _w i' ~,I_....:~~' ,: :"- <" ~_..LL 1
-J!~-1:Ji' ' ' ,., ....' . , "'" ---"-
'r "I ,---~-_...".-,' ,Ii - --'r' -1- . -,- i
..$)_f_,... I i-- .",1..". " :'
-'~_i -- 1- . .~:: i -:-.1 !--~-=:::-:--- I j
sf:"" ,__ __'_ 1--;--' i I __I " i'" _m~
,i ," % . i " ' I:' f--,i--.L.J--- 't-i
~ .'_.......,' - ..", , !,..._ ':'___~! 1 I' I --
". '^. ' ' , ,,-.
__, _ A,--n"- I 'i' , r---' --:-..- .
. .~~I\I -, . -~L-"
"=\' __ '-r- . i-i--', ___L , a!
. ';7)'''-'- ._ _..: m ,-- : - -,- '- I' I i ",_. ~ .... .
':Ai' ,.. i : 'I--r - 1-'--' f' L_J i:
\.ff . '... '.... - ,-::, 1"'T --T' II.. -'I!- j!,.,_I-' : i
'I' . m.j_ - . "i' - - ' ,-
J\: -. --.-, : . -~-- I. ---~--rm. "l'- __I I
,i" ' . m' --- I ,,-. Tm.----! ' .--,.-
, _.: _. ' _'" : i.." I I '. i- ...' I' -- ,_n -- j I
T_~+~9~~~i I ,.' :r" _~,-tfl , --- If '- ;----.i J
...-.,-.---~I,JL-~...J~ ~"-- ,:":' __'-I ,,' I ... ~-' ' __.I. _, 1 -,- -1' '~2~
.____ ....' ! j !. I _,__. ,__ 53 ; - ----~ : I ,- -:---,-.. -.'-- 0
_.i..__, , -I...... _' 'd .-+ - ----'-- , .: --:- ,- -:., 'lj--~ I - 'II" --- - i ~'m
__,-_j,_: : 1 I '-S-'--I'. I' -- -', ' . -: --, '.- ~ i "';;-'-'1 r--I- - ,'Y
, : _ mu I' '__:__'~' _I~' i" '~_L'!" I, I I'.--r--T' '_~u_;_I' r
, fIE. _ i----:--,:.. --:KJ I ,;.~- ~ -----,., - , ,: I i -,..-- 'r-'-''''-, L , I ' I'" !
,..__:__. _I_~_'___'''~: __L_,_!_~'m- ;i"" .'"-1 1-, ....: ..L J ":-1 -r-- .... I
. _:_=! ::;I,.,L , I' .. .- ,,,",, '(\I , ' ,......' , . , .. !
""> I '~__' a----! b I "~I -1"---- .1 _ ,'i ,,,.- i .-j ---- ' i i; .1---.. --- I
~cJ--,U) ::a: i ~~o'" -'~ _; . : --. '--1--1- I, - ~,: I i"--j-t-t h I'" -. a 1
~*~k-I-W-i3-w~-11 inj ..- Ii! I' ;....j---'i i'--I,-.-~L- r ,- (0---:-
0-', 1 '.~..~S~~_: __,I . -i--+' ..I-i-_~,i-:-~-ni :::-11
, ' ..... 0:<1 ~ :. ~ --; .;.a >, .." , ..' I I -,---,' I I
, 1_ ...~_<(!"'" ' w~l't9'3i --I . r' _:---~' ,-- :--1' : --. !,.._L_l_ t!-' . "Ti, - - :'- L
~ ' _~. _ ~,~I (,.JI I A' ~ ......0, .1 ' .,.--- _,1-... " L i -, -r- ' --
"~ I ~ 1- I.... ,- -- I ,...' ' ----, " --
,0- <:f~~..u-_;U1~ -o-~--- L _ ';'2' .-- -I G;;l:: n,-
---u.-,~ ~ CI l"!:l W ~ . _ I ! -!--2I-- 1- I . --1- - -- I.. !
, . " , f-t .' "" 1 - ,I ' --' - , ..:..
_ I J -~-
I, ' \oJ _____0 ~ '_ --' Ul' ,. m'. . I .
~. ,~:ooL' J- 'jf"'l!~ 1--i __ , I r:;e. ~ ' .- I .L: I 1 rtl~'--- ..
~Zi~\J8-J~W~"')~~~'~~--II_' .n+ . I~--~ i___- :~J~jll 1-1'--' - 1-- --I
__ rft~~-~ __!I,J"" ;c-!-5llL1 __ 1~[Ul,'a: - - : - i 9-1 '-.1
_'I I-'I:~~IO; __;1~~~ "'1'- I. Iii I ' ,'I --I"' " ..
.LJ. '__ .~.._ .! . ;--- I ~'i:J"<-~I' ~' II ' .." 1'1".....'_. I : ' I: I 'I
__ ':'i"'i"''1i-N"'\' ' ,~' '-,-- -, ,I I! .......--,-, ... ! 1-'
_...:.. ,+_....-:_, I I I _ ,..'..n'_......,'..._ ; ~::' I '1'-1'-...'- 1 I : '
, _" , nnr._....l ' , , '" +- ,-..!. . I : '-'j--I---'-t-I '
---. , -, , " +-,. ,- ---.'.
',_ _.._.:,___ I ,,',.., I 1 1- J -- ,-- l.--H--I-~:" '
.._,_.. . r-- I - - I -"F'-. -, ~--' .
,J I r
I i
JUN-27-2002 '11:21
VALLEY t"'A I LBO><
, 425 788 7361 P.04/06
Do you have a Manufaculred Horne
produced after 1976?
. This Approval. Foundation System
and'a 1/2 a Day's Labor Will
Qualify that Home for FHA or.VA
Financing!
I'
@
Magnum Foundation Systems
Manufaatt.r.7j rifBnginracd F'OU:l1dllti,mJ lilr M4m.fitr.m~d
Hmuirr.g Md Earthqti.alu Rui$tri'f7.1 Bracinl
Thi$ product 1s distributed natioilall\i
by a.ffiliatod mem~e~ of the ~
~
For your local T~pr'e$entativt
pkaJe call
1-877 -983-0983
t ~
~
-
...
i 8~
$ +~
r s :2 . +
+ ' ~~
-$- ,.. ;I
0 ~11 ~
? ~~
of, /::""
<;If :.,
,.; ;:s;.c
<:: o.:s ~ .
N ~ ~ .......
.. 3:t
I'l ~ a:
w"': w
. 1 I ~ ..."" "
t t = ... t~ ~
I -:
~r + CE ~ ;
I Z
~ +
+ ""
~ . +
1
~
+
T
:-
-
.1 I"
1~IO'12'14 or 16'-...1 1"'10'1].'14 ~r 1(;'~1
JUH-27-2002 11:21
UALLE\' M=ll LBO>~
lNStR.(' FQR
,'^ X M,B
.T
Q
m
1.
1- 50" ~I
I"
~ ~~1~~
l'i\O NO'tr,
l'AllS ^~I', ~RH O\'I'I(.jm'l)
Tn AU oW P(lj( CI'lil'I"N(;
/I'I\I(:MT. RIllNJ'Q~-t),
1.Jt;H~aR'r. CONc.:~E"rn r,., n
111 T
X
7"
T
425 788 7361
P,0.'5/06
TNSTALlATION INSTllUCTIONS
I 1;-J,'rI\1.1 "'^":>il.lM I'<WNn,\iION~ !'^",
AND 1'!t.R~ TO ~rAC1NC; T,\t\l!' I'I',H 'I'HI,
, ~HII,I':I:
J;01,'Nrl,Hlnr-; [,OR nl,\S~fj nb\\! Sl'l'I'OIt'"
SI~M,l lII' I.DI:,\IT,I' ANI) SIZE:) "(1~ ,..r;
1 OADS. ..\~ $lWWI'l ~y r.f:~Nl.'Fr\(.:TlJRW
110MI' I.~S 1"I.I.A'rl(!:-l~ IN$"1\~IC'n0N~,
,\, I ,,1/:.1. Tll~ Sui!. ,'11'IT'l ftl.Ar:r, I\liNI'OIlClJ}
1'111',(:,>,'1"1' CONCJI.E'i'r: I'..\I! 1jl('I"l'l'.f.;<I ;>1,.,:-;1)-
1'.\<"' Ulll~,) Ilt't>lli ^~ I'I!~ I.AVOVr OF THIS
Mf~.r,T, ;;-..Ij,n CiR ''t.' MIS()~ !\l....\' nt<. U~l',I) 're
I'ILL Ii" \'Oi(l~ Ul'llfo,R, P,\;),,\, WIU.;Jl1i
(;1\OllND I~ \1i'lr:vr,N,
'L ~IN(;IJ( ,\!"ill lJll\JPlI.t' \INri'S:
"R.fi,"",R,RI',~~ r.~n QRII',NTArl()/'" ' WI1fRl:
EVER POSSII\ll':, f5 TI;AT THE: l.ONG l'I;\l~.I'i.
~lnN 11' 'I'm, h,DS !\E IN THr TII1INSV]iJl'l'.
DIHl:(,:lION, ur TO I,; r..r....... ll~ ROTATU.O ~o
n~xr ,]'] IE \."'lNC t1r THE MD~ ,\IU, r..\MI",
i.HI, 'rO'rl m MAIN I'IV.MII" l~t'I',IU ~1'1'1~ srn',
,iP CONI:'>'TJI.1f-1'1,
~, ~I:T "1/\\ ;Nll,\ll'll,,,'m rrs l.o\\:'rs'l' ~r::nINr;,
"I N::r. rr ON ( :i1I'lr; 1\ F,Tl-: lW'lS ,\ N Il ,\'rr,\(:ll
IT Tn 1',\1 , \~'ITII '/1' 8nl <:I,
(\, ~,Af~t: nw ,n~Tl()N i,1f piER ...:NTH, rr
T(l\K;tl1'~ 1\11['1\1.\1 r.:1!..\~~I' ~I{A,\I, 'I'Hf.N
U ",')1.1\ UNTil 1101,1'_' I)NH I cr' 1'( 'I; A:)jI.JS'f,
INr~ ~ocr ^tIIlllN~rM.I, "'" l\rll:r"i'lIR(1)r.ll
fll~R~ nll,N TI\'Hrr.~,
7, T\ll<N 1 ^RCF, tl<lJ~ I:NllFl\ !-II'AD \:)\',"1.
PIlIl'!> CONTACTS OIl,\M ,\ND l:'-l~TAl.l, J.
\.MI.\~ :I:,,\TF,~ ,\Nfll1<:HTf.r-; FIR~I,V
~, ~tm FIN,\1. mn: N:>JUS'll-iF.NT ,\ND J,OM'
T1ViN~PI'R TO MD ,\NiI priR..\ nlRr-; l,\1',(";r.,
NUT \,;N DER HE^tl,
e ;" m..,<t--nllnl
"" .1.... nH~d,n\lli1
*" q"li~..J l'\;u H'P'-:lllrli ~~ vl1lr
i
S;
1
1
"::''<'.11\'' ~
"\', , WI
"./~l
r~')(i"_1
I .7, ,
\JfA(i~mM f"J.n
~l:r.t'
M M~N1,rM ~fF,ll. 'f)JM&i'l~ rom ~.BmE
INC1.UOr. ~" IlOtJNDI\'t'!()N lWU
!'llyn', ~
1';II,/(IIl',1r:J,Tj','On,iArp;::IJ,n \,' '"
M I ',~T 'q: ('I{n", 1\ ND
~(;~I.;I!.nliIN_4\: IY 1\l(..\C r,')
.\, I"' ';:( 11 Ii
(
I:
II
,
,
1\, I';' '1\ 12,\"
C.III',' '1'1' 1;"
II, J.' 'in ,11\'
\I'1,I)Il.,\\n~,j(; 01, ,\;,\1:'1', '~I
J\R,!I,{ :rN(: ,\Ni' / '1....\ \11\: I,'r:
r: \1' T!' ~,1'
.
j
~~
~
I.
JUt'J--27-2002 11: 22
BE.6.M SIZE'NOTEs
S~^(:lI>1(~ ~HOWN ON TKi~ PI,AN M~, lJ\)I~
r'!nMT..~ WITH Ill' ~ ,~. l1r.l\M,
/I NY II' 'TO ll" CHI\3.'l~ lEiIM IS NOT TO 1.::1\1'1.
Tll,.~ MOll.:! ~~ 8' (IN E^Cl.f l'NO 01"
Ul\'lT, ANti Sl'AC1NC OF MM;;NUM HIUNDA.
TION' AAD.~ ANt) MF,lt~ ('-^NNt:1'r r)(~l\O I (t'n-
HOME LENGTHS NOTES
OOUl.\l..t ~IOl1:1
Win<lt 80 M,IlH. lXPOS\,;1\E C
UP TO +'\' ! riAOS AND ,1;>f(~I.\S,
H' TO ro(,' a PA"~ ^NI) f'1F.R.~.
~vr..R M' \(. l'AO$ AN!) I'1E,R~,
llNGLI wtO~j
Wm.t. 10 M,tTtl, iXl'Cllitllt~ c-
liP m~' PAO$ /I.Nr.J ,I'\~
W TO r", , PADS !.NO PI.ItS,
aVRil U' . MD.~ ANO r>rri.M
TIEDOWNN01'ES
SlNClf It'tOE G"JAC"HI\"I ~l-4J\1..1. lMVf, I\~
i\li(;HI. ANn ~!. mt TIE DCWI'l rv.r.eo
:\S Sf(O\'IINON 'nIUIN~U/ WIDF !'I"N
1'11: "O\J\INs ~HAl r. Ill, /IN AUI1~R.\ND ~T!\M
IYI'\! MTED !'OR A M1NIMt.;M OF' 'n'(I U
l'ULtOtfr.
f)t)URI.Ii WlOE c:;c'l,\(:Hr.s TN lJIl M~fl WlNr.J
/lms 'WM'tl t.'<l"OSl.!l\t: C. mt\'f W~l<;fl
MOm> "HAN $~ l& r.>R.Al\t <,:UNS. R\.ICl1~n
\\;11TH "OM~:/ITlON kootl1'<<i ^1''1) "m'r:r
A.OCl< CJ..o\DCIEQ WN.l3. ~.Q:Ui:!W..J:W.
,T:S:a111. n E DO\lVN~ S",OWN f>>.,j TH]!, rUN
"Mil.1i VllO]} COACH~ ,IJ'I 8tl MflH WINfJ
"R,1Vo5 W1T!-l '-Xl'O$t.JRE II ~lO rm tXI'>VNS'
AT ElICH CQRNf.P. ClNI.Y
.
1'Yl'ICAL DIi\M CONN!CTION~
"
~
U L
UHLLEY 1'11=1 I LBO>:
425 7:38 7361
P.I2b/06
GENERAL NOns
~~F..CJF1CJ\TTONS
,U.o;.:,L(,iN l..<.h\l:~~,
RO~'1 \ "^\' ,W !':iI'
FH);',,' I <.>,\11 ,~n 1'$1.
\"'1'1.\1 ,'\;(;r.'illlli'l~; TO 1\,\~,\,ll, l.!.~~
'IT' 'I HI :.\'I'ION:i
:",w.~,,~('I m WII\:'~ f.1\70,,~
rIA"!'S ^ ~..I',,\L ,~,\(\
rrl'~, ,~l: II HI)UI.l'. ~o
l\nr~o;;,~ ,<,,:', (iR,lm: ~
~m" ;~II~1\,I.~S nAYS
I,l( ;IIT\\'Elt;H'r tU~(NI'\iIKr.f) CONCI\(T!:
M,\GNUM r'ClllN[),ITIt:'lN ~l:!IP'C1rn
/'l~~I',Ml111H SI ;.\1.1.111' n),~'I'II.')
\'(1iTH F(,)Rl'.,'q' 'J'!,~~11 NI<;,\I.
cOATING" C:M^S,ll~ t'/IINT ~M;,.W,l
na il(~;IV^1 ';Nl'
~J~
WIND U~ M.I'.H, rX~<.'f.VI,r. <.,;
S~l::;Ml(~ Y,C'lNl<. ,;
S1N<lli:'. 'MOl:
W,~t) ftl1 M,1:11. E)(rn~IW.F. C
m;;:-m: ?:ot-m ~ W'')'l-!
1'111', Oi'.\l<a'.. Inlps ~lIt,L~ nr~ <:Or"SIFE!1Il'
'WIrl,r Ilt'lOF iTVR !.OM), WIND I \lAD lINn
Sr.J!lt.Hc::I'.of'ol~; A~ r(~'!'Al\lI'<;Ht:lJ ~(ll< I'WMA"
Nl'Xf rlIJrU'l'NtJ~ WrrHIN fl ~!'~r..:Wlt; 1,(,1<':1\"
o\~"'^,
TE.~TING
THt~ FOVNt'1ATI0N IS DE5I GN;f.O 'TO Uf, <;0,...
STltU'CT"f.n ON ;ir:t~ "rr~n"1'.o BY "':-;Y CITY,
coUN,-y. 01\ ,n"T!, ~!^VING JlIRI:iOICnON..
WTlHOlrr ,\NY txl$llf'ol'<l :lOlL I'l\OBLEM~
PADS 1\1\1' O!!,I,jN~D fOR 1,000 I'SI ';,>11. 'IN))
~MI\i.L n!! COMrA'rllll,l'. WI'I'H LOU,:' ,~Oll.
CONN1'IONS,
'!l.'l'l':i !'I'IHl~r\Ml~l) ill' \:,,1,1 LIIlb
YoM( YF.lITI<:,\1. 1','_\ 1 !,PAI} .l~,rn:" 1.1l.\.
il./l.'l'w Vl,RTTJ\I,C,\I'^CITY l~ lUO<i U..,
Mr~,I' Lf\'1ER/\l C.-\I'/lt:ITi AT 2<1' M)"x
IH'.lti!I'!' f:irt,oo~ 1.11'.
~IWI'.n 1.1\1 ;':I\AI. C,,\I'^(:ITY
.'\f 2<" i ,\"" MM; 1'1~,I(;jH l~ l,9.H L~'J,
IN 1\ !I I ,1'1" Vt-1F.1lF. ~,!,TnliMENl MoW cJCnlll
MANOFI',(""TUR'-:C' l1CJMI\S .\HOUI!l IlF
I1.f.UVCl.EO WHHN 1'1' I\JWf'H,\F:Y ,\[,r-I'CTS
,,,,,': M~NI,:!'r.c:-rURl',!) 110M",
MAGNUM fOUNDA.TIONS SYSTEMS
CERTIFrc.\TION:
FOR T~lrl,l, \IIFn ANi) W1DEI( CO",l:I">.~, tI"l;,
IHE SJ.~W )'11,'11 I !I'VOUT nor. r.M.I r kH-::rI>"lN
....~ IS SIWW/\ f~)ll, !,:,o,C.1 r ,~F.I~JlQ"-I ~)r!, l)!JU,
nl,l\ WI("lr. Ctl,\\:H ni"'lolE R,\MI~ !.f,N~:TH,
lI';,~ Will, (:f,!l'l'II:Y '1'i I.~T i; [1', ~l.II\JF.C; I'.V,r.NI,.'1,1
~OUNDf\Tl0N~ $YHULi, r~ C".i\1'IIl\U: Of WITH
~'li\Nl'JrN[,: M,) ltAT~I.n n~;\tt;;\; I.DAD" Tlll~ n:I;:II,
ToICATION " 1'~!I,nr(A1T('1 tiPDN TW, l'ROrElI.
, lNi'i'AU,ATIOi'! ,\Nn TIGHTliNfNC 01: 1'1-Ir:. UNf'i.
IN~T^tl.^11uNNtM~ M<:H.t-.IJ!Nq ,'.NII
1Jt.'t;:r:NllfN\: Sl,ol'Fs ~I \AU. \;ii IN I,CClR-
IJ~Nr.F WITH Ul'K: ,{!',CfrON ] R~r., u ,,~n
l-M.'J V'ltF.'i~ ^ sri'):, sn~<.'l~ll: l;\;<.)'IECHI'oiI.
;;':111, 11.I1I'ol\i ~f"'))MM~Nt)~(),I'Hl?~Wr;l:.
COMPACI'hD CRi\I\UI.Ml, Flf.!. OV1'R It' N
n.J'TH ~H^f;1. ,HAVE ^ IX)MMt;;"UN TF.'1T,
!'J;I\.onw.rm TO 1~HW1U!, ^"r.QI..:;,\TE ,;OM
PAC;'n(1l'llS I"II,E,QIiNT,
SPECIAL CONOmONS
CGNI'''C'' MM:NO"J ,I'JUN[)IITlON
W,~TF,M~ f'C~N'Y ,WTHI!
Ftl') il'Ji'INC CONl)rr:nN$'
,IN\ 1W; (l,'I:) O\if',R, ,10 I/~To
WNfI'srnm OYF.I\ ~(l !'.<PH
1'I,{)OO I.'I,^IN T.i1C^Tr~N
1'11',1.1'
Di\fl.l.
1':"':.
u~~_ 11)4 T.NT * s:; AG" Cl1t: TOTAL P, 06
BE!25/2B02 12:50 3503743032
CON SERVE INC
PAGE 131
i-CONSTRUCTION SERVI-CES IA - -ENGIN-EERING DATA. COLLEcTI'ON"!
i ~TOPOGRAPHIC MAPPING i~ -LAND SURVEYS AND SUBDIV!SIO~S I
I 1t ~~' ~
(,- ....-fl" ''h -~ ' qj -,
, , ""~~~ --" "'~.- 'i-l
Q~~ ,.~,~' ' .Q~ SERVE INc~ ~,-~
P, O. BOX 1611, "LAND SURVEYING T~L (360) 874 - 9031 i
PORT ORCHARD, WA 96366 " FAX (36~},.,.~74 - 9032 I
Transmittal Sheet
Date:
June 25, 2002
Chris Hugo
lFma
To:
Company:
City of Bremerton community development
Fax Number:
478-5278
From:
David S. Proctor
Re (Project):
3616 Burwell - - Robert Larsen
Ene:
Site plan and topography as requested for permitting
Number of Pages, including this cover sheet"
13
'i
06/25/2002 12:50
cP
.....
o
E ~
~.~ S
...... . ..... 1"-
t1 "0"0 Q.~
"0 cP 0 g. "'D
~:o!Et1l5
o~Q)oo
CJ~>~
0..... a ~
~ CJ) 0 E:'OS
lPCc~
~ .2 .... ~:5
::I (I'J :JI ".e:
en c:..a ,.
cp "
o.~-g S ~
1J '"0 ~ OJ; >
c: t: '+'- c: ~
0.,<<)0
.!.! -g i.5 E
t')4DC:"O
._ fJ ~ "C
.J: tJ 0 -< c:
.......cu 0
360874ge32
c
Q)
en
!.-
o
--.J
m
~~
.cu
cm~ ~;ER\iE = He
PAGE 02
_tt
Q)
~
It-.
:)
. . m
z
<( lO
~ ~
CL (0
n
w
~
-
(j)
+..I 0 0
000
L OClO
Q)LO<.O
..0 I I
OOOlfJ
rv 00 to
l..l- " '"
I I
. . l,() L()
. N N
o~~
.
o
.
0...
.,
~
~
)(
--'--eo--'------
~,,-,,;~~:
! ~" _ -~=,~, 'Ie; -"
. -' 1')(...'-
,x .;!,,' )(,)(
.,5....
Jl{Q
N
,)(
-D I I
0 co 1.0
~ roc..o
"'''
I I ..... CD
LOLO <0
.. . ,..,
. . "2 10 ~ ~
NN ~
. E o:j
U ~~ ::J '" X,.' X
~..
010 X
. o~
0 oa.
0'''''
E: ----SO
. .- lID
...-
D- O C
IJ U
rDv)
to'
Il') ,'... ,I"') .~
0)' ' ," ~" ~~90"",., ____
, ,,' "to ~, ~ PI'j
1 , e? >.: ...- 'd5X ..' X fb en
-'~ : ' U1a;j 'to '" ": X
~ m', " 'g) - , , 1.0
'I" - ' Cb
,X ~.!~' OJ x. ' -~ Ct h
,'c:o'~~ X IJE: r
g --o~ ' 0
0), - '0.. m 1.0 c; ,
)( o.'i: &r,l , ~ ~ ~ a.
N +" cxi I / / / ,<,/ /~)C J:;...... -c CI)
C',f VI Ol r<<>>: <. to c: " cx:l Q) C7l1Q)
l't") ~ j/// /,<.' - cu !It 0) ~~ t:'tJ
· X ,/,-- ..// ',/ / . Q)'-
(1)' ". .... .....~, . "~ ,,</>:,/'/,~ .' ..<. ~ ,'.--r.. ~') ~-t'c-...
' en ..- '. ....... '::...... '/' // /'/ ......;., .'. I.. ......' -,.
I. ';'0""';" ......\.~~.::lt. // //' <:-".AI_' .: ..... .... '~.: CON
X ,,.:e I"~ " a.. Q.Q.:
..... _ _".J ~ -;
_ :tJ '0,.1 '.
,'" ' :.0 _~. . J
',~ I ~ !!;"~.\ awo'4
~\ .~~ paJ.nfODJnUDUJ
q, oe..: ~ 8Zx 09
~,.. I' . I
t"lll" r5f - "-
"",I:; ~~'.... .."------"...-.~:; .. r# .
P:"~~ .. ~.. ... ~....
~ ~... -.
~ .
0' v-
..... 0
t'l _
XQ"',
~.'
06/25:2002 12:50
36!J8743E:i32
FAGE 133
CON SERvE = tJ,C
f1~1
~\~
t~o O~
'0000
l\\\l
lOo~
OOr:;,O ·
o~~
'IO}\"o~
' 00
000
,,' O~O
O:;'~~(
000
O~
, ~~~'
, Oc:,O,
000
000
'f\\O~C
000
000
o 0
o~\I
0001
~~ .;
o~0~1 ...
}\~ L.~
o~~l
~,\~~O
000
000
000
00
OOe
o,o~
o~
....00
.... '
x
x
x
~
o
~,
~
~
~>
~v
\-
~
~ //0
i30
~O~I~O .
~}'j
~~ /' I~-o
~: 160
\
! /70
,..
VI CINITY MAP
/0 20 3U ~D 50 frO' 70 eo ?o /ttJ //0 /z-o /J..S
. ,
::~ll)f>oWER
iO 181 ,MEiE.R,
~, '
'~~t" -'I ~lo~ "
20 ,~p_ l -=-=' _ 'c _~~,_WA~,W~V~~GRAtiJ
'I I" :QAlLS - I
30'~, ~~ ~' , <DO-~~ \(. /\">- I
,2 CA-R J .(jj-' , i i
. '4o.=~~. J I-II. ~f(,~t~~y,~~ . ..~. ! ~~
SOS\JRFI'CE~ .~,.. i I.,
, FRoI.JT; I' ;
I ;
L . ~~ ,,5'_Li
J~'A\'P~4
~
.
EE R E\}\SEO <:~nu
;:/ /
&b
70
~o
~'
APRo~. '
Cfo
/txJ
IZD
/'
C-, 0'V
./ ./ <<.
2.0
3D
LtO
,
,
<
; ,
\...~/ Ii.
50
JfIO
- ~o
-<05
50 GO (;,2.5
/0 20 30 Liu
30' 10
1 LO
30
L\~
so
lilt)
-10
-~D
.\\0
lO zo 30
_i'tO
...\25
l I
40 5() &0 fGl?
10
3(g1 (n BuRWELL
~WEET
S+rJ
E
, 1 \/
SCA l~ fO ':= ILINt"
RO'OER.T LA~5EtJ'
(4t5') 0 788-5800 H-DW\E"
rli 2.. s"5 7(0 5-loo SO CELL
February 28, 2003
Building and Planning for the City of Bremerton
286 4th Street
Bremerton, WA 98337
Supervisor of Building and Planning:
I need your immediate help.
During recent bulldozing of a piece of property located on the dead end of Burwell
Street west of Marion Avenue, the developer, Mr. Larson, has incorporated at least 4
feet of Burwell Street right of way into his property. His water, sewer, and other hook
ups are clearly on city road right of way. He has not observed property line set backs.
The city should not allow permits without clearly defined property lines and
very careful inspections from any departments all observing for city
ordinances.
The immediate need is for the city to inspect the. conditions and
widen this road so that it clearly has emergency vehicle access.
There are 8 current residences that use this dead end. Two of the
current residents have heart-conditions. I do not want to call 911 for
any of my neighbors fors,- medical or fire emergency and the
responding vehicles not able to arrive quickly and safely.
This dead end of Burwell Street is rapidly shrinking in width because of property
owners parking vehicles, putting up fences, trees, etc. Because of these on going
activities, this city road is becoming increasingly blocked for periods of time causing no
mail delivery, no garbage pick up, etc. The city did not pave the entire width of this road
last year because there were tree stumps on city property in the way. Those stumps
are now gone. We also need a sign for the road that says "No Parking or Standing".
This small road should never be blocked. Please help.
This matter needs immediate attention before a tragedy happens. Please
help, This needs to be corrected Quicklv. .
/1
Sincerely, .'?L---/4, ~ , ". /;/',
~//~ ......
Michael Bortel
3633 Burwell, Bremerton, WA 98312
360-479-4739
., "
':1."
BREME~TONPER~ITCENTER
286 4th' Streett '~,f3remerton ~ WA 98337
Phone: (360) 478-5275 FAX: (360) 478-5278
"BUILDING PERMIT
Job 'Addr: 3616, BURWELL ST
Loca tion:
Parcel No: 1524013-111-2000
Applicant: LARSEN ROBERT 425-765-'6080
31925 NE 100TH ST CARNATION WA 98014
Permit No: 02-0254
Status: ISSUED
Applied: OS/29/2002
Issued: 07/26/2002
!xpires: 01/22/2003
Owner: LARSEN ROBERT 425-765-60-80
,31925 N~,100TH ST CAR~ATION WA 98014
Contractor: SELF
, Lie #: SELF txp:
" Subcont r:
De$c:, 1989 28 X 60 MANUFACTURED HOME
, :tlk:1( *lk *)1( *)I()I()I(* ** **:U:)I( ** **** **:1: *:;:)I()I(:<<)I(:.I( **lK* ***** **:t)f(;n*:lo: *n~ ** * ** **)1()1( ** * ***** *:<< *:t **:*:<< * * * u::<< ** * ** ** '
Valuation ~ Permit Fees: 185.00 "Total Calculated Fee: 189.50
.00 )!( Plan Check Fees': ' Additional Fees: .00
* Qther Fees: 4.50 Total Permit Fee: 189.50
*****************************************************************.*****~*********************
." .
This permit shall become rull an:! void if the buildim or work autho,ri:z:ed by thi$pe'(mit is not ccmmenced within
ieo days fYorn the date of $LIen pei"mit. or if this P.iUdii'Q or WQl"'k authorized by such permit, i$ $lJ$pe!"ldEd or
abandoned at any time after too work is ~l1Ced foy is. period of 18(l daY$.,
i'KlTICE - It is the yesponsibi li ty of the permit holoor. rot the City of Br-emeyton 0'( Buildi 1'\9 Official to m
to it that '(equiyedinspectio\1s s:(e made. The peymit holdey lWst roUfy the Building' ,Official when ready fo'(
1 MlPections. Failuye of the pet'mitholdey to notify the Building Official of yaqui yfiod impectiorl$ may yfi$l.llt
in the stoppage of the work until euch time that the permi tho1OOr can $Ub:$tantiate to the buildi ng otfici~l
that the conceal*cl work meets or ex~ cccfe requiYements., Any demolition, te$til19, or fimocid bun::len$hall
be boYne directly by the permit holder. Failure to eubstantiate code requirements will indemnify the city
ag,ai11$t any an:! all respo1'l$ibility or liability cormectedwith the construction.
~ V \ ~
"'>1\"" of tho .ta.. co",,,.eto,'. ....'.."'''00 law, "roo'
.,....""eo i:~~ c....7-~,.... ~ 04:-
" -- · V\ V \ '\. -~-i- -
********~**.*~**************Jw""
Permit Center-:--Approved By: _---,-_ Date: ,1-- Q& -'O~
~. . .
, '
,
, ,
;',
.:.J/.;:' }f~,"',
, .\,,1';:
"
, ..}: ~: 'f" . -~~.
<
. :t"I'y-~.
" _',', "''1-',,'
"e.
:.{,c
, f ,
. , - .
'C",,' 'BRe::MeR~ON' PERM4XT :C,EN,TER
, 206 4t'h;?~'S;.,~";''';''..""~,:,\>~lo,,r.i<<':jl}t'';'M.,,;,;;~~r''7 '
c .,;, .' SD ~ ,u,'~.,?,f..,.,,,),...,>~f-"'~'f:'~'~,.':rr -':~- "f ~li.Of:V "
, Phone::, (360 )478-5275 ,FAX:: _,(3'6.0) ,04.78-5278
,:,..."",-
ei
\, 1.\\
Job 'Addr ~ss :
Lbcat;lon:
, ',., ,Assr Acct, No.:
,
i ~
0616 ')SURWEl.,.LST
152401'3-11.1-2000,'
t"
Building p.imit No~
,Status:
I~$ued:
"~E'xpi res:
02-0:254
I $SUED ,
07/26/2002
01/22/2003
"
!terft:' 01100
Item 'e, ,02300
Item: 02?50
Item:' 02700
FOUNDATION-~OOTINGS
SEWER LATERAL
DRIVEWAY
FINAL-,,:,,8LDG
~........:.
INS PEe T r 0 N S
'.:
R E au IRE D
"
"
Qept: , BLDG
Dep't1; PUBWORKS
Dept: PU8l,..IORKS
Dept: BLDG
Division:
Division:
Division:
Divlsion~'
- '
,*********************************************************************************
'TESTING= Must be ~ecognized by the Washington Association of Building Officials
SPECINSP: Must b~ registered with ,the Stat~ of WA
5T OF WA: .state of WADept .of Labol a.'nd'Industries 478~4921
HEALTH: 8remelton/Kitsa~ Health Di~trict ' 478-5235
MUST BE SCHEDULED THROUGH THE
, '
******************************************
D. ,
UO, "
1)'
~(
,,\
'Il
~1
ff
,~
, " t,,,~...':'
",
I
I
f '
I
I
.1'
I
I
I" '
I
i
"
"t"
i
I
I,
t
. ,
-_--'-"'.'~'c-~,.._,~~....
Dat,e: '
~~Z~-QL
J '-;:1,
\;" ;....
"
r't"
..:;
. {/"
'" '
,
..,...... . "'<..
"' '''(~', II;;; !
~ , . ,,'
.... I
:'-:~""rl'__
t..,,\
\ l.c..'l.(
1 \ [, ,;)F~) (~-(;;L r 1') ,
, I ' '7""J<:
, '
r
'J~, v
"
<,
'-,
"
"'<;< .(''',
c.t '"~I J j "
~.".. \
! "'"
L~" ({, { ,-,q
, 7'"t' ,
i , ' ;", f\
.1/ ", ~ -f"'>"'~'
I,""......;,." ,-<, ,;'
"~':~'~'~rlI:r~;~~~~t:q1~'" p
~. '\ ",
"0: ~" - r" I..:;; ~', 't:;.' , '. : , . :" '-i"
;'l.i.~c : ~, '
. ::,; = ~:; ~:: ;;~~~ ': J>t); ~,~',~; =~'R~;~ ~~ )';:::~ ~ =,~;:::l ~ =;'= :.~::: l<i:a~: =,%=~~ ==:: =:::: ~ ==:: =:: = ~ %,:,= =:::: ~~=:: ~
; ,., .' '! ,:'..' , , ,'. 'w",ap.EME!:>T()N~P:~',~, !T."IC;EN,;rr:;R'-"~"\\I'
l)-'"' ,,~' :\ ,'~' '\~)'l. ..,f. ~ ,~'~, '~'.' ,.'l',d ',' '!.IX:i . ~~", 't.", -\ ;~~" ""cc.f1~ I,"
" " .,"iPER'Mi.','C NDrr;tO'NS ".,' '-
Pe~mit No: 02-0254 -".".t<':.,ii, 'I" Page: 1
==~~=~=~~===~~~~~i=:~%=='=~~==~==~===~~:=~==~~~=:=======~=~=:=====~=~;=:~=~~==~
, ;~
JO~'Add'.~e:3616SU~WELl ST.
'Assr A.;:;ct No: 152401'8-111-2000
LocatiOn:
. ,
AP91ied: OS/29/2002
A'P'Proved: 07/26/2002
Issued:, 07/26/2002'"
", -,."
Ap~iica~t:LARSEN ROBERT
Owner:, LARSEN ~08ERT
Co~tra9tor: SELF
Deser iptiori':
1989 2B X 60 MANUFACTURED HOM~
,
.
.~,
'f
$
... '
Condi t,ions: " . ;, " I
1. DRIVEWAY APPROACH PERMIT REQUIREb ";'~~~l:,'oR TO ISSUANCE OF,
"SULbINGPERMIT. 7-25-02 R-O-W PERM!:r:'.t# 4251 ,ISSUED
2" FLOOR EL,EVATION OF.~ MANUFACTU~E:D HOME SHALL BE A MAXIMUM OF '
12 'INCHES ASaVE FINlSHED GRADE"~
3. LAND lJSE CONDITlpNS QF APPROV'AL:,
,A) Subject to adherence' to 2:'1 te' plan' recel ved by Depa:Ftment
. of Commu . YDev€:d,\prne t ,on 7-22-02.,
....,,"1','
Date~-Z(()- 07
" , ' , .../
/'
Permit ,Holder'
,:, Signature.
\..' /'
'~~\.<:'
< . !c.:~
, )0
.__,r
.,"
".
"
, ,
v, .
'.. '
',".,: -
. {...... . ~-, ;{,--,
, ~
'"
, ,~/-> ::r."- ,f
1: ,
" <
/,'
'~
"
. ,
,
,
"-t"'~' ,_'., ~. _j
.~{~ .
, -~
"
,
IJbKLVl.fl' C.ENTER
Residential Site Plan Review Ouestionnaire
O~-(JJSf
Permit J.ppiic:lCions ue revie\ved by our stilffco mJ.ke a preliminary determination of the presence or
J.csenc~ vr"unique J.feas on the property. To help us mJ.ke ~his determination. please supply thefollowina
in:crm:lCion with :1 scaled and dimensioned site plan. " . ~
'APPIiC3nt~3me:r(jb0:~1\\ I A%W
I Description of Proposal: l ~ )v V
I ,\ ~ .... l ~
I :\ " v---
I S treer .-\.ddress lor crostjtr, ee if 110 :Ic;td ess l1a,s bee
I " ( 0 C' ' i UJfj\ ~\ '
I T;lX Account :"iumber: I ' '" '/"',
! :S21.fOt3 - I ll-;<<)u()
I
d())(; Ll
Critical Area Questions:
I 1. ~s :l:ere my 5t3r..ding vr mnning water 0n ,he surface or:he site :It .-\_ ~""'t' :ime during the /e:lr:
[f'l:"ES, ;Jlease -iesc:ibe conditions: rv
YES ~'::-iO
~ E:1.S 1Il'l 'Jor:ion ,Jr' :he site been identined 15 :l ',ve~l:md? ~=S ~O
~:- /es ?ie:lSe ,iesctibe:
.. . '. .
" :..5 :.t:e SIte ';:lJI::c:er:zea. J.S:
?oresr
Gentle SLope
Steep Slope
Ce:lred.
Developed
I #" .. .
-. .5 :::e 3icpe ,:;r :::e ?roperry:
C:-~at
- - .;... - ~r""'c"''-'' 'v; [;.,;,., "fi() ,'e"" r'.l .;"or"i;n 1
-.;) ~........~ ::' \..J _ '-.. "_' . :. L.u..LJ. _\) ... _'- 'J ::u'J. ""....d. e.
~ .
... ~.-
- ~.)
:-io
,'), '1,,':'1 -;..~ '"1r"....os""-i --lc~lr" '..,~ 1~s~;"er;cal'I" Jr ~ {"onal'1'1 ~;S-'iJ(;'.~"O 'u""ouna'l'nCf ~rope,.,..;~s -he
. ........ _.....\0,0 ...... v:," '-- .;a.J.:..l. ...L.. \".. .J...... _\w L.I...l..! _'~.'. _ \"4 ..tr..,~'" J.~. ~''''''. ::..l';' J.=: ...i.l.......
-::=:':~:cr::coc.. ~r :~e~::Jrnmuni[':1 ..---- - ,
Steep ( lS~/f)~)
15 rt I)r more
3 ft or less
Fl:u (O~J'1l co 3~'1))
lOO ft.
-:-::~ lPpiic:mc :-rcreb:: ~e::-:irlcs :hat :lU of:he above 5taterne:HS ::u:c :he inzormation comJ.incd in my other
:::-:l."1::::'.irta~s :r.alic h~re'.vith are true. :md the applicam J.ck.'"1o\vledges [hat any action tak~n by the City of
3:-~:T:e::-:on based ir: ',vhole or part on this application may be reversed if it develops that any such
tai ed herein is taIse.
7-2~-OL
Date
**************************************.*************************
RECEIPT
****************************************************************
RECE:!PT Numb~r: 02.000637 Amount~ 189.50 07,/26/0;;: 09~34
Payment Method: CK Notatioh: LARSEN CK Inlt: VW
--~--~~._----_._---~_._,~~--,------------------------~------~--------,~
Permit No: 02-0254 Type: M08IlE
Parcel No: 1524013-111-2000
5i te I~ddr$s$: 3-616 BURWELL '51
MOBILE HOME PERMIT
Total Fees: 189.60
Thi$ Pay/m~nt, 189.50 Total ALL PfiltS: 189.50
B.lance~ .00
****************************************************************
Acc9unt Code D~scY"ipticn Amount
16-322.1003 (221.3) PUJM81NGi PERMIT FEES ~,5 .00
16-322.1007 (2217) MOBILE HOME SET".UP FEES 150.00
643-237.13 (0236) STAn:, OF WA SURCHARGE 4.5'0
~ ~-~---~~--'----~---__~~__~___~_______~_~__~_____~___,_.__~_~w~_~~__
"
'.
:'>:
- .
";'iii'.~'-~'~' .'
:/
-~.>-
x ~
'..J '..J
PJ 0')
'..J Q)
01
-"
X
'..J
~
..p..
(J1
x
CO
~
o
'-4'
C/)()(J)aJ
r+ 0 () (I)
(I) ::J C Q
(I) r+ - -,
'"0 0 CD -"
C ::J
C/) .., ~ to
- =::UJ
~ S'& a
~ cD6 ~
.., ~
V < c
~~ ~
o 0-
~......
-10,
o
o
r+
i ,. ~...
~;
/
,
~..\
?'\)
\11
CP
-j
~
ciJl'-.
~~
J" ~
~~
[8
If.
{J
N
I~'N
~l ~
V'\"1-
~:S-t:
\:it
-..,Q'-^
~"
\,JJ
V
I
o
}-J
Ut
~
..
~~
NN
(Jl()l
I I
"-J"-J
OJ()J
(Jl()J
..
..
"
-C'.r'"
'"
'J"\
.,',
",
"
"
<,
,i'
~. .
"
~
"f
}.
'....~
~.
-:';
~
,<
I' ~ .>'
Ie'
I
! ..
f ~
; j
t,
t ~
"j
l ;,
p
l (
,I
H
,
~
f
.
',' ~- .
,::,.'
'I~ .
.,~, '
.' .
, ~.
,
<
'il
j :>
,'\
~ , '~:
~ 1\
'J ~~
. ~ .~
'"
,
:~
.,,':'.'
~ ,~.\
.,',.;,.,
.~.... I. "
,Tri'
,'.', ,
, ~,' i
~ " ..'
.,'
:~~~
;"',
.~;" .~.:'.,'~.!~ p~',:~. ,>.~~~' " ~y~\~ .J.,!,';;,: ..~;'r.: ~;li:
[,s' 'J.,'
.,' '~,~
,,:
",
j,
i~\' :
,,:/)';, ",~:'~-I /
,',
, ;, ',' .:.. '. ,.~:~'.... .~
" -~~~~
.,"
'.,
"l!.:
" ,'.,
.. Y'
.' ...l'r
,. \~:~
~'
'j'.',
\"'-
. :;
I:;,
-ii':' ,
,;.
.t~.
~;:;.~.
,';'9
. !.!'
~I:
......,,..
.~~ ~.) ~)
..'< i~_:
j"
",)
;.- ,; ~', ,1'.' :..;r"
~. ~~ "LA;~ ~'..'
,
",
<':,
'. ..! .',-
\~\ .3;
f.,',
"
:~"..' ,'t"
~, '" . .'
:...i {'~' ~.-:'i
~ i ,1
-.-,:
',yl
I:! .,....
'/'1"- \,
'" "
\
"" "
,~:-> \
~ ',. ':.
i ~
"'<,,,
,,\
';.<"
,"\,
~.:
. ~
:~-,
{.
...;;.
.~
..'
,
" "
,
"t,
; .'
,;:
;.\
..
.. .f
,;
',~'
~
"
,
,>
c.;;
r-r
60' x281 CN
.--... I'l OJ -c
CDx manufactured
C -. home ~ I
AJ~
~ :J' OJ )>
rrllO
1 Z
10
'--../(fJ CD 4 4
""D
::J C
0
r+ "'")
~
CD
~ x
X '..J
'..J ?I
f:JJ '..J .j>.
!'l 01
'..J
OJ OJ
....
f
x
OJ
;I'-
o
'..J
(II 0 lIHD
(Dgg~
~ ()Cb::!.
!.O ~~~
0- _.11:(1)
~ ;:t.("JO
.. ~q~
v is 3
.j>... (l)
o a.
~ ~ ..
0-
o
,.,.
-----------------------------
MARION AVENUE
-----------------------------
v
~
o
~
-p>--p>-()
N N ~
(Jl c..n
I I
'-.J '-.J -n
Q) CO /'V
(JlCOO
I I u
Q)U1(l)
oco)
COO,-+-
00
o
(])
::r
o
:3
(()
I
o
)
(f)
CD
=>
0)>00'"-1
:J=oo:y
D.. ""enen
o...:J(()
3 ~r ~ n. (i)'
o (1) en 0
'< ::l -t,,::J :J
en 0 0
< -. C n. r+
D 0 :J -.
'''':In.30
'< en (1)
en
:EenO'":Jc
M= :::r c ~.""
:yor+o<
::E :J (1)
(/):J:Jcn":'<
-. 0
r+ r+
roo "'0
..., < ..., OJ
o (1) CD ~ 0
o ..., _.c
:JO=hn.:J
D.. "'0 CD' (1) n.
M= "'0 n.?- 0
_...., ...,
00 '<
:J X
(/) 3
o
r+
m
m
S
r-
g 0";
~::o
GJ rn
'C] '5
:n rn
'"0 ::0
3:io --i
::0 0
~?1 z
~l
.2:
~1
'~;'Ol
t:"-..!~
[tIlU
~
c: 0'
s \~J;
~
~\.?
r--.,
~
c:::I
i'.)
r.-ifl?
u......t..
=
c:<!
--.,
1-,-1
ijULl
CS.~
'~/-
;;~<^' ~ ",',{
'v,' "
t'
MANUFACTURED HOME INSTAllATION
TECHNICAL MANUAL J1} ~ ^ 'S
FOR vor- (...A:)(
MULTIPLE-SECTION HOMES
Keep this booklet with your mobile home. Title VI
of the Housing ,end Community Development Act of
1974 provides you with protection egeiNt c.rteln
construction IInd ufety hetanIs in yow mobile home.
To help enure your protection. the menufecturer of
your mobile home needs the Information which these
cards. when completed end maIed. wllsupply. If you "
bought your hom.from I deller, plel" be sure thet
your dealer his completed end mil11ec11 card for you.
If you Icquired your home from someone who is not
I dlller. you ihould promptly fDI out Ind send I cerd,
to the inlnufecturer. It Is important that you keep this ,
booklet Ind give It to any penon who buys the mobile
home from you" '
NOTE: Consumer informltion clrdS Ire loclted in
the blck cover lrel of this manuII. Cut off.
send in IS required.
Technical Document Number
72-07-0001-H
REET1IVaJD.
-
,~
~
SECTION l'
FOlJNDATION SYSTEM
1.1 GENERAL
This manual depicts the most widely used method
of supporting mobile homes. Other methods, which
provide equal support to the home at the same loca-
tions shown, may be acceptable provided they do not
stress the structure in a different manner or 1:ause
greater distortion to the structure during setup. Also, ,
other products ancl/or materials equal to or better
than those shown, may be used.
Homes manufactured by subsidiaries of Fleetwood
Enterprises, Ine.: are designed to be supported by in-
dividual supports' or piers and anchored with a
number of tied owns appropriate for local conditions.
These are collectively referred to as the Support and
Anchoring Systems.
The foundation system must resist vertic3lloads from
the weight of the home, plus temporary extra roof
loading and it must resist side loads imposed on the
home by wind blowing against the walls. Design data
describing the roof and wind loads, which your home
has been designed to reSIst, may be found posted in
the home. Load zone maps of the United States
showing roof load, wind load, and thermal zones are
also included in Exhibit 1.
Individual codes governing homeillstallation.in your
area may have specific wind and roof load design
requirements which vary from the indications on the
load zone maps.
1.2 PIERS
The piers used must be strong enough to transmit
the vertical load, which includes the weight of the
home, its furnishings, and temporary roof loading,
to the foundation surface below. Recommended types
of piers and footing sizes are described in Appen-
dix A and Exhibit 2.
Check with local building authorities for any re-
quirements for setup of your home due to ground
, conditions.
1.3 PIER LOADS
The vertical loads imposed on the piers at the various
locations under the home are'shown on the "Pier-
ing Plan" drawing for this home on a loose insert
sheet with this manual.
1.4 The foundation system must also resist the lifting,
sliding and overturning force resulting from side
winds. A method frequently used is to install ground
anchors and tiedown straps in addition to the piers.
Your home has been d'esigned with provision for
tiedown straps to ,resist side and uplift forces.
Each tiedown strap (not furnished by the home
manufacturer) must have a working load capacity
of at least 3,150 pounds and a total load capacity
of at1east 4,725 pounds. Install the straps per recom-
mendations in Appendix B.
Ground anchors (not supplied by the home manufac-
turer) are used with most types of tiedown straps.
Commercial designs are available through your dealer
or installation contractor. Acceptable anchors can be
fabricated from concrete, steel rod or cable or other
similar material. Installed ground anchors must --each
have a working load capacity of at least 3,150 pounds
at an angle of 40 to 55 degrees from the vertical.
Although local sheltered conditions may permit in-
stallation of the home wjthout tied owns, tied owns
as described are the minimum necessary if the home
is ,to withstand its design wind load without
dislocation.
This home is designed for a foundation system which
supports the main frame rails. These are the two main
beams which run the length of the home. Consult
the home manufacturer before using a support
system w~ich does not directly support the main rails
as this may result in damage to the home.
CAUTION
BEFORE INSTALLING A SUPPORT SYSTEM
WITHOUT TIED OWNS, BE SURE THAT SUCH
A METHOD IS ADEQUATE FOR YOUR AREA
AND IS PERMITTED BY THE APPLICABLE
WCAL CODE.
A recommended frame tiedown proc~dure is
described in Appendix B.
1.5 VENTILATION AND WATER VAPOR RETARDER
The under-floor area must be ventilated to minimize
the accumulation of moisture beneath the home. It
is recommended that ventilation be provided by
openings with a net area of at least one square foot
for each 150 square feet of under-floor area. The re-
quired area of' openings should be approximately
equally distributed along the length of at least two
opposite sides with openings located close to <:omers
to provide cross ventilation. It is recommended that
a layer of 6 mil polyethylene plastic or similar
material be used to fully cover the ground under the
home to form a water vapor retarder. '
1
~
"
SECTION 2
"POSITIONING AND SETUP
2,1 PIER POSITIONS
Determine the appropriate foundation system for
local site and wind exposure conditions, as described
in Section, 1.
Establish the location of each pier and tiedown for
the length of home and locale in which the home
is being installed, using the loose insert sheet pro.,.'
vided with this manual entitled "Piering Plan",
Start with the first section (Figure 1) of the home
and install any installation components that might
be difficult to place after the section of the home
is in position. An ,example would be gr:ound anchors
if they are to be installed at an angle. If the recom-
mended moisture retarder is placed on the ground
under the home, placement of the material may be
started at this time. For, conveneience, the material
can be left rolled up with sections unfolded, as need-
ed, during setup to facilitate placement of jacks and
equipment.
2.2 SETTING
Move the' first section of the home into its desired
final position.
WARNING
THIS HOME'S STRUCTURE WEIGHS SEVERAL
ToNS I ADEQUATE SUPPORT BLOCKING SHOULD
BE USED TO SAFEGUARD WORKERS AND THE
STRUCTURE DURING ALL INSTALLATION PRO-
CEDURES.' PERSONNEL SHOULD Nor BE PER-
MInED TO WORK UNDER THE HOME WHERE
THEY MIGHT BECOME INJURED, SHOULD THE
HOME ACCIDENTLY SLIP DURING THE IN-'
STALLATION PROCESS.
SECTION "~' -..
SECTION "B" -..
SECTION "c"
..
FIGURE 1
'MULTIPLE SECTION DESIGNATION
2.3 LEVELING
During leveling, care must be taken to avoid distort-
ing the home.' Excessive and/or noilUniform jacking
, during the leveling will ~ause the home to be racked
and twisted~ This may resultih damage to the home.
CAUTION
USE JACKING REINFORCING PLATES SHOWN
BEWW WHEN JACKING THE FRAME MAIN
BEAM (SEE' FIG. 2) 10 AVOID DAMAGE TO
mE BEAM AND VOIDING OF THE WARRAN-
TY. OTHER EQUIVALENT MEANS MAY BE
USED TO ADEQUATELY DISTRIBUTE THE
CONCENTRATED LOAD OF, THE JACK HEAD
TO mE FRAME MEMBERS
After completion of the leveling and setup procedures
on the first section per Paragraph 2.3, the floor must
be level and the walls must be plumb. All doors and
windows must operate freely without binding.
Proceed as follows for positioning and leveling the
next sections of the home (ReL Figure 1).
A
, JACK PLATE TO BE
CENTERED
JACK
a) 3lia" x 4" ,x lS" long C-Channel
b) 1/4" x l-1/r x lS" long Steel Strap
c) Pipe Coupler or Equal 1" Approx. Depth with lIS" Clearance
for Jack Head '
FIGURE 2
, '
MAIN BEAM JACKING PLATES
2
2.3.1 'Remove the waterproof plastic and all shipping
" braces from the open sides of the first two sections.
NOTE
BEFORE MOVING THE SECOND SECTION
INTO POSITION, IT MAY BE HELPFUL ro
LEVEL TllE GROUND WHERE THE INSIDE
WHEELS (NEXT ro THE MARRIAGE LINE)
WILL REST TO HELP IN SLIDING THE
STRUCTURES roGETHER.
2.3.2 Determine the general location of piers and tie-
downs for the length of the next section of the
home, using the "Piering Plan". Appendix A shows
. various types of piers. Exhibit 2 shows pad sizes '
for pier load capacities.
2.3,3 Install strips of carpet padding or fiberglass (pro-
vided) around the ceiling, end walls and floor mar-
riage line of the first section~ Do not place material
where it could obstruct air ducts in the heating
system supply or return air duct system. If the home
has heating air supply or return ducts passing
through the ridge beam or floor structure, be sure
that the duct connection, seals are in place.
CAUTION ,
SPECIAL CARE MUST BE TAKEN 10 EN-
SURE THAT THIS MARRIAGE LINE JOINT IS
TIGHT 10 RESIST AIR INFILTRATION AND
MINIMIZE CONDENSATION.
2.3.4 Move the section into position alongside the first.
2.3.5 Bring the two floors together in alignment. Then
align the end walls. A recommended alignment pro-
cedure is given in Appendix D.
2.3.6 When the two sections are in place, aligned and
leveled, complete the fastening of the ridge beams
together by one of the alternate methods shown in
Figure 3. Sheetmetal roof joinery is depicted in
Figure 3 detail "B" and shingle roof joinery in detail
''N'. Gaps between ridge beams, 1-1/2 n wide max-
imum, which do not extend the full length of the
home may be closed up by filling with lumber and
plywood shim strips. The lag screws in the shimmed
portion shall be increased in length to ensure that
they engage both top chords of the ridge beams,
NOTE
IT IS IMPORTANT 10 HAVE THE CEILING
BELOW EACH ROOF SECTION FLUSH AT
THE SEAM BEFORE THE ROOF IS TOTALLY
FASTENED. ONE MAN SHOULD WORK IN-
SIDE TO RAISE THE LOW SIDE, AS
REQUIRED, BY JACKING UNDER A WOOD
POST OR SECTION OF STEEL PIPE WITH A
WOOD OR METAL PAD AT THE TOP (FIGURE
5.) PLACE THE BASE OF THE JACK ACROSS
THE FLOOR SEAM 10 DISTRIBUTE THE
LOAD ro BOTH SECTIONS. JACK AGAINST
THE CEILING ONLY IN AREAS TO BE
COVERED LATER WITH TRIM MOLDING.
FIGURE 5
ALIGNING THE CEILING WITH JACK AND POST
2.3.7 Additional piers must be placed under each ridge
beam column along the marriage line in accordance
with the following steps. This includes fJeld-installed
columns as well as factory-installed columns,
Ridge beam column locations and configurations
are shown on th~ floor pl,an loose insert sheet with
this manual. The locations are shown on the floor
plan by a square with a number in it, i.e., 11J.
Exhibit 3 of this manual shows post configurations
which require field installation (F. I.) of one or more
members. These posts shall be installed at setup per
details in Figure 6.
NOTE
IT IS IMPORTANT TO HAVE THE RIDGE
BEAM PROPERLY ALIGNED AND SECURE-
LY FASTENED TOGETHER BEFORE AT-
TEMPTING TO SET COWMNS.
Fasten the frames or floors together. (See Figure 4).
Fasten the endwalls together with No. 8 x 4-inch
wood screws installed at an angle at 12 inch on
center and staggered.
2.4. TIEDOWN
If applicable, connect tiedown straps to ground an-
chors in accordance with the ground anchor
3
~
manufacturer's instructions. A recommended frame
" tiedown procedure is included In Appendix R
Observe proper tensioning procedures, to, avoid
disturbing the level of the home or damaging the
home or foundation. Tiedown straps, must be ten-
sioned 'alternately on opposite sides to avoid dis-
turbing the setup of the home.
Over-the-roof tiedown straps are not required on
this home to maintain its stability.' The roof,
sidewall, floor and frame are all fastened together
internally to provide resistance to wind loads. Con-
, cealed metal straps on the exterior walls tie the roof
to the walls and the walls to the floor. In turn, the
floor is bolted to the frame members. These con-
cealed fasteners provide the same unifying function
as the over-the-roof straps. By providing frame
tiedowns, as reCommended in Appendix B or by an
equivalent method, the anchoring of the home is
c6mpl~ed. These diagonal frame ,ties resist the
sideways movement due to wind 'forces and the same
diagonal ties plus the concealed fasteners resist the
overturning of the home due to the wind forces..
2.5; COMPLETING SETUP
Remove all shipping blocks and clips from ap-
, pliances,' windows, and doors. Install fIxtures,
shelves or other loose items packaged or attached
for shipping. Special details for completing the
home, if applicable, are shown on insert sheets at-
'., tached-tCuhe tab inside the front cover.
2.6. EXPANDING ROOM
See Appendix C for Expanding Room installation
instructions.
4
,
3/8" x 6" MINIMUM LAG SCREWS WITH
WASHER AT 32" O.c. MAXIMUM STAGGERED.
THRU TOP CHORD OF BOTH RIDGE BEAMS.
PREDRIll 1/4" PILOT HOLE. LAG SCREW
MUST ENGAGE TOP CHORD OF BOTH
RIDGE BEAMS AND PLYWOOD WEB
OF OPPOSITE RIDGE BEAM.
ROOF SHEATHING
& ROOFING PAPER
(TYPICAL)
RIDGE BEf'M
(CONSTRUCTION
MAY VARY)
12" WIDE SHINGLE
RIDGE CAPi=ORMEO
FROM STANDARD
SHINGLES OR ROLL
,ROOFING FASTENED
WITH 1" x 1" x 16
, GAUGE STAPLES OR '
GALV. SHINGLE NAIlS
APPROX. 6" O.c.
8" STRIP OF METAL OR 8"
STRIP 'oF "PLY-DRY" PAPER
OR 15 LB. ROOFING PAPER MAY
BE INSTAlLED UNDERNEATH
OR ON TOP OF LAST COURSE
OF SHINGLES.
INTERIOR WALL
3/8" x 6" MINIMUM LAG
SCREWS WITH WASHER
AT 32" O.C. MAXIMUM
STAGGERED, THRU TOP
CHORD OF BOTH RIDGE
BEAMS. PREDRILL 1/4"
PILOT HOLE. LAG SCREW
MUST ENGAGE TOP CHORD
OF BOTH RIDGE BEAMS
AND PLYWOOD WEB OF
OPPOSITE RIDGE BEAM.
RIDGE BEAM
(CONSTRUCTION
MAY VARY)
A. ALTERNATE SHINGLE ROOF CONNECTION
8" x 30 GAUGE
GALVANIZED
SHEHMETAL
1" SEALANT TAPE
INTERIOR WALL
B. ALTERNATE SHEETMETAL'ROOF CONNECTION
F,IGURE 3
TYPICAL ROOF CONNECTION DETAIa.S
5
, '
1/2 ell x r MACH. BOLT
W/LOCK WASHER & NUT
OUTRIGGERS ALIGN
1/2- 4> x 2- MACH. BOLT
W/LOCK WASHER & NUT --"I
MAIN SECTION
OUTRIGGER
ADD-ON SECTION
OUTRIGGER
OUTRIGGERS MAY OR MAY NOT ALIGN
I--- MATING LINE
RIM JOIST
3/8- 41 x 6- LAG SCREWS @ 18- O.c.
(PAIR @ 36- O.c.)
, FIGURE 4 ,
MULTIPLE SECTION FRAME CONNECTIONS
6
.
,
FIELD INSTALLEDPOST
UPLIFT STRAP. SEE
NOTE #1.
FIELD INSTALLED
POST. SEE NOTE #2
I
L_
TYP. NAILS
SEE NOTE #1
TYP. NAILS
SEE NOTE #1
FIELD INSTALLED POST
UPLIFT STRAP, SEE
NOTE #1
TYP. PIER
RIDGE BEAM
RIM JOIST
RAFTER
CEILING BOARD
U Il~
NOTES:
1. When sections are joined 6 - tabs of field
installed post uplift straps shall be folded
vertical and fastened to post as follows:
3 - Wide steel strap:
14 - 7/16 x 1- x 16 ga. staples or
12 - 10d Nails
4 - Wide steel strap:
20 - 7/16 x 1 x 16 ga. Staples or
17 - 10d Nails
2. After uplift straps are fastened field
installed post shall be snugly fitted
between ceiling and floor and attached
to adjoinini,post with #8 wood screws
at Min. 12 O.c. for entire post height.
Alternate fasteners: 16d nails at 12- O.C.
FIGURE 6
CENTER BEAM POST"FIELD INSTALLED
7
..
MAIN SECTION
ADD-ON SECTION
4" x 30 GA. GALV. STEEL STRAP
ATTACH WITH NO. S x 2" SCREWS @S" O.c.
EXTENDS FULL LENGTH OF JOINT BETWEEN
SECTIONS
EXTERIOR SIDING CONNECTION TO BE
FLASHED AND CLOSED AS APPROPRIATE
FOR TYPE OF SIDING USED.
FIGURE 4.1
MUlTIPLE SECTION CONNECTION ALTERNATE
STANDARD SIDING
NOTES:
1. GARAGE STRUCTURE SHALL BE DESIGNED
SUCH THAT NO GARAGE LOADS ARE
TRANSMITTED INTO THE HOME'S SIDEWALL.
2. GARAGE AND DORMER SHALL BE DESIGENED
AND BUILT PER LOCAL REQUIREMENTS.
3. PONY WALL OR SKIRTING TO SEPARATE
GARAGE AND UNDER-HOME AREA MAY BE
PART OF GARAGE WALL IF PROPERLY SEALED
TO HOMEWALL. '
NON LOAD BEARING PONY
WALL OR SKIRTING
(SITE-BUILT)
GYPSUM BOARD ON FACTORY
INSTALLED CONSTRUCTION.
GYPSUM BOARD TO BE
INSTALLED ON FIELD
CONSTRUCTION.
SITE-BUILT GARAGE
28 GA. METAL FLASHING UNDER
ROOFING., ATTACH ONLY TO MOBILE
HOME OR GARAGE WITH 8d NAILS @6"O,C. 7
3/8" COX. 24/0WITH 8d NAILS @ 6" O.C. EDGE
& 12" O.C. FIELD
8" x 8" x 3/8" PLYWOOD OR 8" x 8" x 26 GA. GALV.
SHT, TYP. BOTH SIDES OF TRUSS JOINT WITH '
S-16 GA. x 7116" x 1-1/2" STAPLES IN TO EACH
2 x 4 MEMBER EACH SIDE OF JOINT
ROOFING TO MATCH MOBILE HOME.
TRUSSES@ 16" O.C. TO
,MATCH TRUSS BELOW
TOENAIL TRUSS TO
1 x 4 WITH 2-16d
EXISTING ROOF NAILS (TYP.)
1 x 6 OR 2 x 6 NO.3 H.F.; ONE SIDE
1 x 4 (REMOVE ROOFING TO PROVIDE WOOD TO WOOD BEARING FOR.
1 x 4 TYP.) FASTEN 1 x 4 TO ROOF WITH2-16d GA. x 7/16" STAPLES
@ 16" O.C. TO TRUSS BELOW
FASTEN 1 x 6 TO 2 x 4 WITH 14-16 GA. x 7/16" x 2" STAPLES (TYP.)
(USE 3-1/2" LAG STAPLE IF BOTTOM CHORD IS 2 x 6)
MOBILE HOME
ON SIDE CONSTRUCTION
MOBILE HOME ALTERATION
8
SECTION 3
UTILITIES
All utility systems are given a fmal quality assurance
test at the home manufacturing facility. To ensure
that no damage occurred in transit and that the final
connections are proper,specific field tests of the utili-
ty service connections must be made during installa-
tion of the home.
,--All utility. connections must be made _by__qualified
service personnel who are familiar with local
regulations.
See the Owner's Manual for other impor:tant infor-
mation concerning utility connections.
3.2.3 The gas system must be tested to ensure that
it is free from leaks.' A 'recommended gas
s~stem test procedure is included in Appen-
dIX E. Do not pressurize the gas line in excess
of 8 ounces maximum to avoid possible
damage to the gas vlaves and regulators.
3.2.4 After completion of recommended tests, con-
nect home gas inlet, to gas' supply line using
a listed gas connector of the capacity indicated
on the 'label by the gas inlet. '
3.1 SYSTEMS TEST
INSULATED CROSSOVER DUCTING
CAUTION
THE APPLIANCES IN THIS HOME ARE
EQUIPPED FOR NATURAL GAS. IF THE GAS
SUPPLY IS LIQUlFlED PETROLEUM GAS
(LPG), IT IS NECESSARY THAT THE AP.
PLIANCES BE CONVERTED 1'0 LPG IN
ACCORDANCE WITH INSTRUtnONS PRO-
VIDED BY THE MANUFACfURER OF EACH
APPLIANCE. '
3.2,5 Connect the provided flexible heat duct
crossover between the two duct connectors that
extend below the floor bottom closure. Ar-
range duct as straight and smooth as possi-
ble, do not ~ompress or kink.
Support the duct with metal straps or
plumbers' tape secured to floor joist as shown
in Figure 7. Do not permit the duct to rest
upon the ground.
NOTES:
1. Install collars extending through botlom
board.
2. Secure collar to duct with sheetmetal
screws at 3" a.c. Cover joints with duct
tape.
3. Opening in crossover collar is to be sealed
with poly sheeting and duct tape for '
transporting. Crossover duct to be shipped
loose for field installation.
"S" SECTION "A" SECTION
, MAIN DUCT ! MAIN DUCT
INSULATION
3.2 GAS SYSTEM AND HEATING DUCT,
3.2.1 The gas piping supply system has been
designed fora maximum pressure of 14 inches
water column (1/2 psi). For the safe and ef-
fective operation of this system, thecgas supply
pressure should be between 14 and 7 inches
water column.
3.2.2 Check to determineifthe home has a gas line
crossover between home sections. The gas
crossover is located below the floor structure
on the marriage line between sections. It is
equipped with a flexible metal connector and
a quick-disconnect device.
Remove the plastic covers from the quick:'
disconnect device and snap the two halves
together to complete the connection.
COLLA~
SHEETMETAL : 'G' '.'
SCREWS
SEE NOTE 2
MAIN DUCT
"f>!' SECTION
METAL SUPPORT
STRAP
2 . 12 REDWOOD, OR
PRESERVATIVE,
INSULATED TREATED PAD
CROSSOVER
DUCTING
UNDER CHASSIS
INSULATED, CROSS,
OVER DUCT,
OUCT TO BE SECURED WITH METAL
STRAP UPON INSTALLATION. AS REOUIRED
INSULATED
CROSSOVER
DUCT lNG,
HEAT RISER
JOIST
INSULATION
COLLAR
CLAMP
ALTERNATE CROSSOVER DUCT SUPPORT
WARNING
DO Nor LIGHT APPLIANCE PIlDT LIGHT
UNTIL EACH APPLIANCE HAS BEEN
CHECKED 1'0 MAKE SURE THAT ITS ROOF
JACK (VENT) HAS BEEN INSTALLED, AND
ALL HOME UTILITY CONNECIlONS HAVE
BEEN MADE AND TESTED.
FIGURE 7
HEAT DUCT ,CROSSOVER
9
~
3.3 ELECTRICAL SYSTEM
3.3.1 This home is designed to be connected to a
service nominally rated 115/230 volts, 3-wire
AC, with grounded neutral.
NOTE
THE CONNECTION TO THE HOME IS A FEEDER,
NOT A SERVICE.'WHEN WIRING THE FEEDER,
GROUNDING (GREEN) CONDUCTOR MUST BE IN-
STALLED, AND THE NEUTRAL (WHITE)' CON-
DUCTOR MUST NOT BE GROUNDED IN THE
HOME DISTRIBUTION PANEL
3.3.2 Electrical crossovers between home sections
are located along the marriage line between
sections. Each crossover location is covered by
two plywood covers set 1 \I2-inches below the
bottom closure material.
Remove the covers, Uncoil cables on B section
(Ref. Figure 1) of home and run to junction
boxes in accordance with the diagrams in Ex-
hibit 5. Secure cables entering boxes within 12
inches of boxes, Close junction box covers, ad-
just or replace any damaged fiberglass insula-
tion, and replace plywood covers.
NOTE
ON DOUBLE CROSSOVERS WHERE ONE CIRCUT
IS 20 AMPS AND THE OTHER IS 15 AMPS, THE 20
AMP CIRCUIT CONNECTS 10 THE RED CONDUC-
lOR COMING FROM THE DISTRIBUTION PANEL
(REF. EXHIBIT 5).
3.3.3 The electric system must be tested to ensure
grounding continuity, polarity, and operation.
A recommended electrical system' test pro-
cedure is included in Appendix F. Complete
the grounding continuity tests before connect-
ing the home to electrical power.
3.3.4 Home with Permanent Feeder Cord. A per-
manently connected 50 AMP feeder cord is
stored in a compartment under the floor. The
cord is ready to be plugged into the, 50 AMP
service receptacle after recommended tests
have been completed (Ref. Paragraph 3.3.3).
3.3.5 Home with Under-Chassis Feeder. A raceway
is provided from the distribution panel to the
underside of the home. A suitable conduit fit-
ting or a junction box must be installed on the
exposed end of the raceway as shown in Figure
8. See Exhibit 4 for minimum junction box
size and for feeder conductor sizes required.
Make final connections after completion of
recommended tests (Ref. Paragraph 3.3.3).
3.3.6 Home with Overhead Feeder. An over-head en-
trance with, feeder conductors installed has
been provided. See Exhibit 4 for feeder con-
ductor sizes required. Make connections after
completion of recommended tests {Ref.
Paragraph 3.3.3).
3.3.7 CONTINUOUS ELECTRICAL GROUND
REARMOST OUTRIGGER AT MARRIAGE LINE
I .
-- MARRIAGE LINE
NOTES~
SOLDERNESS LUG (TYP,)
BARE CU WIRE COILED UP AT SET-UP,
SECURE LOOSE END OF CU WIRE TO
SOLDERLESS LUG ON "B" UNIT. LOCATE
AGAINST STRUCTURE FOR PROTECTION.
Ground' wire connection between chassis is required
only when the outriggers of adjoining units are not
bolted together on houses which have shingle roof
and non-m~tallic siding. Continuity is provided on
other types of units by the metallic roof or metallic
siding or by bolting outriggers together.
3.4 WATER SYSTEM
3.4.1 The hot and cold water system is designed for
a maximum inlet water pressure of 80 psi. If
the local water supply pressure to which the
home is being connected exceeds 80 psi, a
pressure reducing valve should be installed to
limit the supply pressure.
3.4.2 Water crossovers between home sections are
located along the marriage line between sec-
tions and covered by two plywood covers,
Remove the covers and push insulation aside
from below the crossover location. Connect
both hot and cold crossovers using the con-
nectors provided. Run the connectors through
the hole or holes in rim joist, similar to Figure
9. Reposition insulation and replace the covers.
3.4,3 A recommended water system test procedure
is included in Appendix G. The water system
shall be pressuriZed to 100 psiand shall main-
tain that pressure for 15 minutes without loss,
CAUTION
DISCONNECT OR FILL WATER HEATER
TANK WITH WATER BEFORE, TESTING
WITH AIR.
10
~-------
_______ (' =1 --------,
FLOOR I ,..---d :-.-....,
a. Flex conduit
b. Feeder conductors
c. Junction box
d. Raceway
e. Conduit connector
f. Approved electrical connectors
g. Insulated bushing
CONDUCTORS
B - Black "hot"
R - Red "hot"
W - White neutral
G, - Green grounding
e
;~~
~ . I I
c
b
FIGURE 8
TYPICAL UNDERCHASSIS FEED CONNECTIONS
MARRIAGE LINE
&2LO~tWATE:::::CTIONS
! '==::: r _ " COLD LINE
, I'
,.. ,,0 ']. INSULATION
, r- '. ,..0:.. 1 .. ~ BOTTOM BOARD
FIGURE 9
TYPICAL HOT AND COLD WATER
CROSSOVER CONNECTION IN THE FLOOR
HOT
COLD
3.4.4 A shut off valve must be installed on thewater
supply line adjacent to the home at the time
it is connected to the local supply. Use a full-
flow type valve,
3.4.5 When a home is set in an area which is sub-
ject to freezing temperatures, the exposed
water supply connection pipe must be pro-
tected. An electrical receptacle is located near-
by for the llseof electrical heat tape. Any heat
tape used must be listed specifically for use
on a home and must be used strictly in accor-
dance with the heat tape manufacturer's in-
structions. See Appendix K and, the Owner's
Manual for additional data on cold climate
areas.
3,5 DRAINAGE SYSn;M
3.5.1 Connect the drain lines wherever they cross the
marriage line using the couplers provided,
similar to Figure 10. '
Install any portions of the drain system below
the home which were shipped as loose parts
DRAIN LINE
FIGURE 10
TYPICAL DRAIN LINE CROSSOVER CONNECTION
in accordance with the special instructions in
AppendiX L. Connect the home drain system
to the site sewer inlet using a 3-inch plastic or
metal pipe. The pipe must slope at least
lI8-inch per foot toward the site connection.
Use approved 3-inch flexible connectors at
both ends of the 3-inch drain line to .connect
to the home outlet and the site inlet. Support
the pipe at a maximum of 4 ft. intervals. Fill
the fixtures wi~h water and drain them through
the drain system. Check the system for visi-
, ble leaks.
3.6 CLOTHES DRYER VENT INSTALLATION
(option)
Homes equipped with a clothes dryer receptacle, or
a stubbed-in clothes dryer gas supply, have dryer vent
openings roughed-in through the floor or sidewall.
Complete the installation by removing the closure
material over the roughed-in openings and install-
ing the exhaust duct in accordance with the diagram
in Appendix, I and the dryer manu+':lcturer's
instructions.
NOTE
UNDERFLOOR DUer INSTALLATIONS MUST TER-
MINATE 'OUTSIDE THE PERIMETER OF THE
HOME, OUTSIDE OF ANY SKIRTING INSTALLED
AROUND THE HOME.
3.7 EVAPORATIVE COOLER CONNECTIONS TO
5-WAY SWITCH. (option)
Connect the evaporative cooler to the 14-gauge con-
ductors in the weather proof junction box on the roof
adjacent to the roof opening. Use approved wiring
methods and materials and connect in accordance
with the cooler manufacturer's, installation instruc-
tions (Ref. Appendix J.).
3.8 INSTALLATION OF AIR CONDITIONING
Air 'Conditioning may be installed on homes that are
designated "suitable for air conditioning" on their
11
'\
home data plates. Information to assist in calculating the
siZ'e air conditioner needed is included on each data plate.
The air conditioning evaporator may be installed dther
inside the furnace cabinet on homes with 'furnaces listed
for this modification, or exterior to the home and ducted
into the home air supply duct system. In either case, a
heating/cooling thermostat must be installed to control
both heating and cooling with a single device.
When the air conditioning evaporator is installed exterior
to the home, return air grille(s) must be installed in the
floor in a central area of the home that receives the return
'air from the separate rooms and ducted back to the
evaporator.
CAUTION
DO Nor CUT ANY FWOR FRAMING WHEN INSTALL-
ING RETURN AIR GRILLES.
Supply air duct connections from the exterior evaporator
to the home air supply duct system must be made at a
central location on each duct in each section of the home.
Federal Regulations require that automatic damper(s) be
installed to prevent the discharge air from the exterior air
conditioning evaporator from passing back through the
furnace, and that automatic damper(s) be installed to pre-,
vent the discharge air from the, furnace from passing
backwards through the exterior air conditioning
evaporator duct(s).
Install required electrical connections in accordance with
the air conditioner manufacturer's instructions and local
codes.
SECTION 4
FINAL CHECK
4.1 RECAULKING
After the home installation has been completed, ,
carefully inspect the caulking on exterior w3lls, roof
vents or seams, window and door frames.
Check all caulked areas and reseal any area show-
ing evidence of damage or cracked sealant. Do not
overlook voids or cracks in hidden areas, such as
eaves or openings which may be subject to wind-
blown rain.
'4.2 MOLDINGS
Tighten and reseal any loose molding strips, rails,
frames, seams or closures with special attention to
those along the edge of the roof.
4.3 SCREWS
Replace or tighten loose screws as required.
4.4 CLEARANCE
Prune low-hanging trees or bushes near the home
to remove branches which could scrape the walls or
roof. Consider future growth as well as possible
movement during projected wind conditions or under
snow or ice load.
4.5 ROOF COATING
If roof coating is to be applied, cl~oose a product
that will not run or cause streaks on the side of the
home. Follow the roof coating manufacturer's in-
structions on application, including preparation of
the surface. Special solvents may be required to clean
certain types of metals or finishes, or for roofs whiGh
are badly oxidized. Refer to the manufacturer's in-
structions on the container of the roof coating.
CAUTION
IF IT IS NECESSARY 10 WALK ON A METAL ROOF,
WALKBOARDS SHOULD BE USED 10 DISTRIBUTE
YOUR WEIGHT..IF'REQUIRED 10 STEP DIRECT-
LY ON THE ROOF STRUcruRE, WATCH YOUR
STEP AND AVOID WALKING DIRECTLY ON
METAL ROOF BETWEEN THE RAITERS OR ON
CAULKED AREAS.
4.6 DOORS AND WINDOWS
Check all doors and windows for proper operation
after the home installation has been completed. One
window in each bedroom is designated as a secon-
dary means of egress in case of emergency. The -egress
window has a label or decal which states that the win-
dow and gives operating instructions. Check the
operation of these windows to the window manufac-
turer's instructions.
4.7 SMOKE DETECTOR(S)
Smoke detectors have been installed in this home on
a wall near each bedroom area. To ensure that no
damage or dislocation of the detectors occurred in
transit and that the detectors are in working condi-
tion, each smoke detector, shall be field tested in ac-
cordance with the smoke detector manufacturer's
instructions.
12
, SECTION 5 , '
REPAIRING THE. BOTTOM CLOSURE MATERIAL
Fastened to the underside of the floor joists of your home
is a special covering designed to protect against rodents
and moisture as well as to isolate the floor cavity from
unconditioned outside air. This covering was inspected
before the home left the manufacturing facility. It is im-
portant that any areas damaged during transportation or
installation be resealed. A recommended procedure for
repairing this bottom closure material is included' in
Appendix H,
SECTION 6
ACCESSORIES INSTALLATION
6.1 If accessories, such as awnings, skirting or carport,
are to be installed and attache~ to your home, observe
the following practices.
6.1.1 Use the proper awning support railing pro-
vided with the awning or available through
your awning supplier. If possible, choose an
awning which is free-standing design, having
columns to support the additional weight.
6.1.2 Follow the recommendations of the awning
manufacturer and applicable building codes
in installing the ac<:essories.
6.1.3 Always use fasteners of the proper size to
attach mating parts snugly, but without strain-
ing the home or damaging the home structure.
Only make necessary attachments to the upper
wall ,or roof. Be sure there is a solid material
behind metal siding for a positive connection
before making pentrations,
6.1.4 Caulk or seal all seams or openings resulting
from exterior siding modifications, The best
way is to place weather sealing tape or sealing
compound under railing joints or fasteners,
during assembly, and then seal the completed'
seam with a caulking sealant.
CAUTION
REMEMBER THAT MODIFICATIONS
WHICH ARE IMPROPERLY DONE MAY
DAMAGE YOUR NEW HOME OR MAR ITS
APPEARANCE AND COULD AFFECT YOUR
WARRANTY RIGHTS.
6.2 If accessory windows or components are furnished
with your home, they must be installed with the in-
stallation materials supplied and in accordance with
the manufacturer's installation instructions provided
with each window assembly or component.
6.2.1 Storm window components should be secured
in pla<:e with the mechanisms furnished on the
window frame.
6.2.2 Garden window installation instructions,
Remove weather sealing from factory framed
opening. (Check around opening to ensure
that all staples and screws are removed or set
in flush). (Figure ll)
Prepare the garden window for installation by
applying the sealant tape provided around the
inside of the aluminum window frame. All
sealant tape shoud be applied directly over the
screw mounting holes in the window frame.
Use two strips of 1/4 x I12-inch tape across
the top of the window, one strip of 1/4 x
I12-inch tape across the bottom and one strip
of II 4 x II2-inch along each side. Make sure
that the strips of tape overlap at all four
corners.
The window is now ready for installation using
the No.8 x I-inch sheetmetal screws provided.
One person should be located on :!le inside
of the home to assist in aligning the window
with the opening. Place the, window in the
opening and insert one screw approximately
centered on each side to hold in place. Next
insert one screw approximately centered on the
top and bottom and one at each <:orner to
stabilize the window. Add all remaining screws
and trim off excess sealant tape. {Figure 11)
Trim the interior of the window opening with
the prefinished wooden strips provided, Install
the storm window(s).
6.3 If an' accessory fireplace assembly approved for
mobile home installation has been furnished or has
been partially installed at the fa<:tory, the assembly
and installation must be completed in accordance
with the manufacturer's installation instructions pro-
vided with the fireplace. The installation shall be,
located so that no roof truss or floor joist is cut.
13
2 STRIPS 1/4" x 1/2" SEALANT
TAPE ACROSS TOP
I J ____-
o 0 I.
o
No. 8 x 1" SHEffMCT AL
SCREWS EVERY 4"
I
ii,
I 1 STRIP 1/4" x 1/2" SEALANT TAPE
I ALONG SlOES' ACROSS BOTTOM
I
FIGURE 11
GARDEN WINDOW INSTALLATION
14
.,.
APPENDIX A
The pier .can be concrete blocks shimmed with wedges or an adjustable metal or concrete assembly similar
to those shown in Figure A-t. The adjustable piers shown are typical of .commercial designs available in various
heights and base widths. The base of the pier must be relatively wide with respect to the height when suppor-
ting the home. For example, if a pier is 24 inches high, the base should be ~t least to inches wide. The pier
should be high enough so that the riser {Figure A-I, Item B) will be extended only 2 to 3 inches when in
place. Blocking may be used under the base (Figure A-t, Item F) to adjust height. If the pier is directly on '
sailor gravel, a pad (redwood, treated lumber, cedar or concrete) should be placed under the pier base to
minimize settling or tipping. These pads shall be at least 2 x ]2 x ]2 inch nominal size and larger if the
soil is particularly soft or unstable. In unusually soft soil, paved runners or pads can be constructed under
the foundation for better footing., Minimum pad or footing sizes are shown on the Pier Load Capacities
and Footing Sizes Table, in,Exhibit 2. The, type ,and size of the footing selected must take into consideration
possible ground conditions. Final selection of pier type and footing size shall be in accordance with the re-
, quirements of the agency having local jurisdiction.
A.) CONTACT PAD
8.) RISER
C.) ADJUSTABLE NUT
D.l WASHER (IF REQUIRED)
E.) PIER BODY OR FRAME
F.) WOOD OR CONCRETE SOIL
PADS (FOOTINGS)
,\
.~E
",);Lm,;J\/- F
CONCRETE
FLOOR RIM JOIST OR
PERIMETER RAIL
PIERS
METAL
FRAME
WOOD SHIM
CONCRETE BLOCK
11E3111
CONCRETE PAD. ABOVE
OR BELOW -GROUND LINE
PIERS
MINIMUM DIMENSION
PERMITTED BY PIER BASE
FIGURE A-1
RECOMMENDED PIERS
15
\
APPENDIX A. . . Continued
RECOMMENDED PERIMETER PIER INSTALLATION METHODS WHEN PIERING IS
REQUIRED BY BASEMENT FRAME/PIERING PLAN OR BY LONGITUDINAL FRAME
PIERING PLAN~
JAMB STljD IN
SIDEWALL OR
PORCH POST,
10. MAX.
RECESSED
~ SIDEWALL
I I
I I
I I
I I
I I
I I
JAMB STUD IN
SIDEWALL OR
PORCH POST
RECESSED
-tV SIDEWAU
I I
I I
I I
I I
I I
CONCRETE
BLOCKS
TRANSVERSE OR
LONGITUDINAL
FLOOR JOISTS
TRANSVERSE
FLOOR JOISTS
4 x 4 OR 2- 2 x 4
ON EDGE (NAILED
TOGETHER) SPAN
2 FLOOR JOISTS
(SEE NOTE 3)
--
CONCRETE PAD
DETAIL "A" - BASEMENT FRAME ONLY
DETAIL "B" - BASEMENT OR LONGITUDINAL
4 x4 OR 2- 2 x 4
ON EDGE (NAILED
TOGETHER) SPAN
2 FLOOR JOISTS
LONGITUDINAL
FLOOR JOISTS
NOTES:
1. PIERING METHODS
SHOWN ARE
APPLICABLE TO ALL
REQUIREMENTS FOR
PERIMETER PIERING,
NOT JUST JAMB
STUDS OR PORCH
POST CONDITIONS.
2. MINIMUM CAPACITY
FOR PERIMETER
PIERING IS 1400 LBS
PER PIER. SEE EXHIBIT
2 FOR PAD SIZES.
3. 4 x 4. BLOCK MAY BE
OMITTED IF PIER
(METAL STAND) IS
UNDER FLOOR RIM
JOIST.
;1
JAMB STUD IN
SIDEWAU OR
PORCH POST __
RECESSED
1vr~ SIDEWAU
I I
I I
I I
I I
DETAIL "e" - LONGITUDINAL FRAME ONLY
16
APPENDIX A . . . Continued
TYPICAL REQUIRED PIER LOCA nONS
.
I
I
I
I
I I
r--'
1 r--I I
1,1 1 1
1 L _ J I
rn
mmm
l ' l PIER UNDER
PORCH POST
PIER UNDER MASONRY FACED
FIREPLACE ON FLOOR OVERHANG
. "
PIERS UNDER MAIN RAILS &
MATING LINE TYPICAL
PIERS UNDER JAMB STUDS FOR DOOR OPENINGS OVER 24" WIDE
SUCH AS SLIDING GLASS DOORS. ENTRY DOORS. BACK DOORS
CONCRETE BLOCK SUPPORTS
Hollow Load Bearing Concrete Masonry Units may be used as supports for mobile homes when installed
according to the following specifications:
Manufacturer - Blocks shall be manufactured in conformance with ASTM Designation C90-70, Grade N units,
Cross-Sectional Dimensions - 8" minimum width and 16" minimum length,
Height - 36" maximum.
Cell Alignment - blocks shall be stacked so that the cells are aligned verttcally,
Cushion Blocks - although the use of 1 x wood blocks between the concrete blocks is recommended
to distribute the the loads between the concrete blocks, their use is not mandatory.
Cap Block - a 1 " nominal thickness wooden cap block, or 4" concrete cap block should be used as the
top bearing surface to distribute the loads of the chassis beam to the blocks.
Wedges - when wooden wedges are used for height adjustment the wedges shall be extended over
the full width of the block.
Maximum load - 8,000 Ibs, (not considering foundation).
Foundation - an approved foundation shall be used to distribute the loads to the soil so that the soil
bearing pressure will not exceed 1,000 pounds per square foot.
Installations proposing different installation specifications, block sizes, or k>ads shall be justified by
engineering data. Plans, calculations, and/or test data shall be submitted to the enforcement agency
for approval.
17
\.
APPENDIX B
TIE DOWN INSTAllATION
MAIN BEAM
SINGLE TIE-DOWN STRAP
(NOT PROVIDED BY MFR.)
(SEE NOTE No. ,1)
GROUND ANCHOR
(NOT PROVIDED BY MFR.)
(SEE NOTE No. 2)
1. TIEDOWN STRAPS: All tiedown straps shall be 1-1/4" x .035" galvanized (.30 oz. per sq. ft.) steel
strap conforming to Federal Spec. QQ-S-781-H, lYpe 1, Finish B, Grade 1 (or equivalent with ultimate
load capacity of 4725 lbs.)
2. GROUND ANCHORS: Ground anchors shall be capable of resisting an ultimate load of 4725 lbs. (3150
lbs. design) minimum per strap applied at any angle between 40 degrees and 55 degrees from vertical.
Install in accordance, with ground an<;:hor manufacturer's instructions. '
3, Install frame tiedown straps on the most outboard main beam of the home in accordance with the spac-
ing shown on the side view of the home below and as follows:
a. Install the tiedown straps around the main rail beam and connect to ground anchor in accordance
with manufacturer's instructions.
b. Tighten all tension bolts until tied own strap slack is taken up.
c. Strap spacing shown below is based on using piers with minimum 11" square base and maximum
18"' height.
CAUTION: DO notpretension tiedown straps on one side of the home only. If stepb is not performed
alternately on opposite sides, the home may be pulled off the supports.
o
c:::I
o
DO
4' MAX.
. SEE TABLE FOR MAXIMUM SPACING
4' MAX.
MAXIMUM TIEDOWN STRAP SPACING - TABLE
RAIL 15 PSF WIND 25 PSF W1ND
CENTER
MAX. 79.5" O.C 95,S" o.c. 79,S" o.c. 95,S" O.c.
EAVE OR OR OR 199,~R o,c.
WIDTH 82' o.c. 99.5" o.c. 82" o.c.
0" 29'6" 27'0' 10'0" 9'6"
12' 27'0' 25'0' 9'6" 9'0"
18" 26'6' 24'S" 9'6' 9'0"
24' AND 26' W1DE TABLE
RAil 15 PSF W1ND 25 PSF W1NO
CENTER
,MAX. 79.5" o.C 95.5" o.c. 79.S~ o.c. 95.5. o.c.
EAVE OR OR OR ' OR
W1DTH 82' o.c., 99.5. o.c. 82" o.c. 99.5" o.c.
0" 36'6" 35'0. , 11'0" 10'S"
12" 33'0. 32'0' 10'6' 10'0"
18. 32'0. 31'0. " 10'S' 10'0"
2B' AND WIDER TABlE
18
APPENDIX B...Continued
STRAP
INSTAlL PIER UNDER SIDEWAll
AT EACH SUPPLEMENTAL STRAP.
SEE PERIMETER PIER DETAIL
IN APPENDIX A.
GROUND ANCHOR
(NOT PROVIDED BY MFG. I
SEE NOTES: 3 llo 4
FIGURE B-2
COMBINED DIAGONAL FRAME AND SUPPLEMENTAL TIEDOWNS
NOTES:
1. When diagonal frame ties and supplemental ties are used to secure the home, they shall be installed in
accordance with these instructions. The supplemental straps may have been built into the house or may
be field installed according to the strap manufact,urer's instructions. Field installed straps must be located
over rafter/stud 10cations.If the floor of the home overhangs the steel frame in the rear, a strap shall
not be installed in the overhang area.
2. Tiedown strap material shall be 1-1/4" wide x 0,035" thick galvanized with 0.30 oz. per sq. ft., steekon-
forming to Federal Spec QQ-S.,781-H, 1)rpe 1, Finish B, Grade 1, or equivalent. All hardw<;lre shall be
used in accordance with the manufacturer's instructions.
3. Ground anchors shall qe capable of resisting an ultimate load of 4725 lbs. (3150 lbs. design) and shall
be installed in accordance with the anchor manufacturer's instructions. '
4. Both the diagonal tie and the supplemental tie may be connected to the same ground anchor using ap-
propriate hardware.
5. Combined tie down strap spacing shall be the same as shown for diagonal tie down strap spacing.
The indicated spacing may be adjusted, plus or minus, to avoid wall openings. When adjustments are made.
the average spacing shall not exceed the spacing indicated above and adjustment of strap spacing shall not
result in using fewer straps than required in the indicated spacing. Strap spacing is based on using piers with
minin1Um 11" square base and maximum 18" height.
TIE-DOWN OF CENTERLINE STRAPS WHEN PROVIDED ON HOME
- '~'/4. steel straps to be anchored in accordance
with Method , or 2. Straps are marked with a
label designating them as a G-' strap or G.2 strap.
METHOD 1
Install approved ground anchor{s) with working load capacity. 3150 Ibs. (ultimate load capacity. 4725 Ibs.) directly below strap location under the mating
line. Attach strap to tension head on anchor per hardware manufacturer's instructions arid tighten until strap is ,taut. Two, G-1 straps may be anached to a
single ground anchor. Maximum one G.2 strap shall be attached to one ground anchor, (Ground anchor and connecting hardware not proVided by home
manufacturer),
19
APPENDIX B...Continued
METHOD 2
t~ .
~ provided by \.. Loop strapts) around beam and
home manufacturer) to under' fasten with approwd strap buckle
side of main' raitS which are or crimp in accordance, with anchor
neerest the meting line end ' system hardware manufllCtUt8t" s
directly below strep location instruction& Wood or steel beam sizes
per beam support details. msv be taken from Chert below.
3-1Od NAILS EACH
END OF STRAP
AlTERNATE: SUPPORT WITH 1,1/4"
STEel TIEDOWN STRAP WITH
BUCKLE/OR CRIMPS AS SHOWN
FOR STEEL BEAM,
MAIN
RAIL
1-1/4. STEEl TIE-
DOWN STRAP WITH
BUCKLE OR CRIMP
WOOD BEAM SUPPORT
. STEEL BEAM SUPPORT
79-1/2- MAIN RAIL SPACING 95-1/2- I 99- MAIN RAIL SPACING
-24' WIDE 28' WIDE 24' WIDE 28' WIDE
3 - 2 X 8 SPF No. 2 4 - 2 X 8 SPF No. 2 3 - 2 X 8 SPF No. 2 4 - 2 X 8 $PF No. 2
.....(/) ..... 4 - 2 X 8 SO.P No. 3 3 - x.x 10 SO.P No. 3 3 - 2 X 8 SO.P No. 3 3 - 2 X 10 SO.P No. 3
60:: 0 or
10:{ 0 4 - 2 x 8 SO.P No. 3
NO: 0 3 - 2 X 8 HF No. 2 4 - 2 x 8 HF No. 2 3 - 2 x 8 HF No. 2 3 - 2 x 8 HF No. 2
I- 3:
O:(/)
ON or
I.L. , 4 - 2x 6 HF No. 2
(/)e" PACO C10 X 6.48 M10 x 8 PACO C10 X 6.48 10 X 7.5
:EI ..J WELD I-BEAM
o:{..... w
wo: w M8 x 6.5 S3 x 7.5. M8 x 6.5 S3 x 7.5
COo I-
(/), C6 x 8.2
C5 x 6.7 . C4 x 5.4 C5 x 6.7
N 10 x 8.4 M12 x 11.8 10 x 8.4 M12 x 10.8
6(/) ..J WELD I-BEAM
10..
No:{ w
w C7 x 9.8 S5 x 10 S3 x 7.5 S4 x 7.7
0: ~
0:1-
O(/) C8 x 11.5 C6 x 8.2 C7 x 9,8
u.
(1) Nail wood beam w/20d @ 32'" at top and bottom and staggered. 2 - 20d at each end.
RIDGE BEAM COLUMN
9" MAX,
FLOOR JOIST OR
PERIMETER RAIL
4 x 4 x 6" BLOCK
PIERtS) TO SUPPORT
RIDGE BEAM COLUMN
LOAD
ALTERNATE PIER(S) LOCATION AT
RIDGE BEAM COLUMN WITH G-' OR G-2 STRAP
20
APPENDIX C
EXPANDING ROOM INSTALLATION PROCEDURES
CAUTION
DUE TO THE WEIGHT OF THE EXPANplNG ROOM AND FWOR STRUCTURE, TWO OR MORE EXPERlEN,CED
HOME INSTALLATION WORKERS SHOULD WORK TOGETHER IN THIS PORTION OF THE INSTALLATION.
L Check that the main section is level and secure.
2. Place floor support piers as shown on the expando room set-up details.
3, Remoye the weather protective closure covering from the expanding room floor units upright shipping position. .comply
with the requirements on the cautionary label. Remove t~e floor support plate bolts being sure that the floor ~on
does not move outward.
4. Using two or more, workers;'graduaHy-lower the floor until it-is -approximately level. lake care that the floor does not
drop suddenly (Figure C-l). Adjust the supporting piers to provide a floor that is level with reasonable tolerances.
al Tamporary plate CO\lllring roller notches
bl Tamporary support blocka (under 3 walla)
cl Welther seMlg tape
dl Optional outer 4 x 4 inch support beam
e) , Mid,span 4 x 4, inch support beam
fI Rim joist support . main unit
MAIN SECTION
FIGURE C-'
5. Position piers under the floor in accordance with the loose insert sheet provided with this manual entitled "Expando Room
Set-Up Details". A support beam is always required between the center piers and the floor (Figure C-l, Items d and e).
Beams must be "Construction" grade Douglas Fir or equivalent. Recommended material is 4 x 4 x width of floor or shorter
beams of 4 or 6 ft. lengths may be used if a pier is placed at each lapped joint. If skirting is to be installed under the
room, the,outer piers (Figure C-l, Item d) may be inset to provide clearance. Place a second beam to distribut~ ,the load
across the joists when using inset piers.
6. Remove the cleated shipping blocks retaining the expanding room in the main structure and place temporary plates over
the wall roller cutouts in the floor,
7. Carefully roll the expanding room into position on the floor. Remove temporary wall roller cutout plates and place sealant
tape between floor and bottom of wall.
8. Align wall on floor and install 3/8" dia. x 6" lag bolts on 16" centers from floor rim joist into wall bottom plate.
WARNING
KEEP HANDS OUT OF THE SPACES BETWEEN EXPANDING ROOM OUTER 'WALL AND MAIN UNIT OPENING
WIDLE MOVING ROOM INTO PLACE. DO Nor ALWW ROOM TO ROLL PAST THE OUTER EDGEOF THE FWOR.
IT COULD FALL OVER OR TIPOFF THE EDGE.
9, Install insulation, sealing tape and shims, which are provided, as shown in Figures C-2 and C-3. Ensure that all joints and
connections are propetly aligned. For a room with a 60 pfs roof design load an extra 2 x 12 must be installed on the neader
beam as shown in Figure C-4. .019" ALUM, STRIP
(FIELD INSTALL)
\ 1, SEALANT TAPE
- , MAIN SECTION RAFTER
a) Wood shims
b) Insulation (top and side)
c) Pre-finished paneling (sides)
d) Pre-finished paneling (top)
e) Inside corner molding ,
f) Exterior corner molding
gl Batten strip or corner molding
c
NO. B x 1" SHEETMETAL
SCREWS AT 4" O.c.
TOP & BOTTOM
(FIELD INSTALL)
RAFTER
\
g
I'
30 GAUGE
GALV. ROOF
ADD SHIM STOCK AT 8" O.C.
REQ'O THICKNESS x 1-1/2" x 3"
(FIELD INSTALL) ,
, OPTIONAL LAUAN PANEL
(FIELD INSTALL)
,
FIGURE C-2
TYPICAL
INTERIOR DETAILS
FIGURE C-3
21
APPENDIX C...Continued
1 x 4 TOP PLATE
2 x 10 EXPANDING ROOM
HEADER BEAM
CEILING BOARO
60 PSF DESIGN
2 x '12 (FIELD INSTALLl
SEE STEP 6
~
16d BOX NAILS ATS.
, O.C.C TOP & BOTTOM, OR
NO. 8 x 3. SCREW AT
SAME SPACING
(FIELD INSTALL)
10. a.
2 x 6 POST (FIELD INSTALL) UNDER
EACH END OF BEAM. FASTEN
WITH 16 d NAILS AT S. O.c.
FIGURE C-4
TYPICAL INTERIOR DETAILS'
Run one end of electrical wires and flexible conduit through hole in bottom of expando floor and up through
hole in expando wall bottom plate into junction box. Connect wires and flexible conduit into junction box
(See figure C-5), .
2 x 4 STUDS END
OF EXPANDING ROOM WALL
b. Connect other end of electrical wires and flexible conduit into junction box underneath floor of main unit
(See figure C-S).
11. Install exterior closeup trim provided to close each corner at the main unit and the flashing across the expanding
room roof at the main unit. check for adequate roof slope to provide the required drainage at room to main
section roof connection. '
WARNING
CIRCUIT BREAKER MUST BE TURNED OFF BEFORE ATTEMPTING TO CONNECT WIRES.
TYPICAL
DETAIL OF JUNCTION BOX
UNDER
MAIN
SECTION FLOOR
COLOR CODE
B - Black
G - Green
W - White
--r
METALLIC JUNCTION BOX
MUST BE GROUNDED
FIGURE C-5
TYPICAL EXPANDING ROOM ELECTRICAL CONNECTION
12. Install pieces o'f fiberglass insulation in the cativites between the main unit and the' expanding room walls and
ceiling. Install~insulation on the interior face over any exposed surface which might cause condensation on inside
walls because of exposure to cold outside temperatures.
13. Cover the cavities around the room and all exposed unfinished lumber with prefinished panels which are provid-
ed. Fasten with the fasteners provided.
14. Install carpet pad, carpet, and molding if required.
15. Install wall base molding as required.
22
APPENDIX en.Continued
TECHNICAL INSTALLATION MANUAL FOR 7' x 22' EXPANDING ROOM
GENERAL
Comply with the instructions provided on the exposed caution tags on the raised. floor section of the expanding
room before removing the large metal closure plates and fasteners
CAUTION
FOUR OR MORE PERSONS EXPERIENCED IN INSTALLATION ARE REQUIRED 10 INSTALL A 22-FOOT LONG
EXPANDING ROOM. NEVER A'ITI;MPT 10 INSTALL AN EXPANDING ROOM AlONE DUE 10 THE WEIGHT OF
THE FLOOR AND' ROOM STRUCIURE.
Atypical 7' x 22' section of expanding room floor weighs over 5 pounds/sq. ft. (800 pounds). Do not remove all
of the closure plates unless the expanding room floor is stabilized in its vertical or shipping position~ Do not allow
floor section to be lowered without sufficient workers exercising "full control over the operation.
CAUTION
KEEP HANDS OUT OF THE SPACES BETWEEN THE EXPANDING ROOM OUTER WALL AND MAIN UNIT OPEN-
INGS WHILE MOVING ROOM IN10 PLACE. DO NOT PERMIT HANDS OR FINGERS 10 ENTER THE SPACE BE-
TWEEN THE WALLS AND rilE-EXPANDING ROOM FlOOR. DONor ALLOW EXPANDING ROOM TO ROLL PAST
THE OUTER EDGE OF THE FLOOR. IT COULD FALL OVER OR TIP OFF THE EDGE.
22-FOOT LONG EXPANDING ROOM INSTALLATION PROCEDURES
CAUTION
DUE 10 THE WEIGHT OF THE EXPANDING ROOM AND FLOOR STRUCTURE, roUR OR MORE EXPERIENCED
HOME INSTALLATION WORKERS SHOULD WORK TOGETHER IN THIS PORTION OF THE INSTALLATION.
The expanding room installation procedures for a 22-foot long expanding room are the same as the procedures for
shorter expanding rooms as listed on pages 21 and 22 of appendix C with the following exceptions. ~u,_~, ---
Step 4. Using 4 or more workers, gradually lower the floor until it is approximately level. Take ~are that the floor
does not drop suddenly (Figure C-1), Adjust the supporting piers to provide a floor that is level with reasonable
tolerances.
Step 8. Align wall on floor and install 3/8" dia. x 6" lag bolts on 16" centers from floor rim joist into wall bottom
plate, Install the intermediate support wall (Figure C-8).
Step 16, Attach expanding room tiedown straps to ground anchors, as shown in Figure C-7).
Step 17. Seal all flashing joints with sealant and roof coat. Inspect all joints and seams to verify that they are watertight.
a) Exterior siding
b) Galvanized metal straps
c) Tensioni!lg ,head'
d) Ground anchor.
e) Support beam'
Not provided by Manufacturer
_a
_c
SUPPORT WALL
, SUPPORT PIER
_b
WALL PANELING
FASTEN SUPPORT WALL TO FLOOR WITH 4 - NO, 8 x 2-
WOOD SCREWS THROUGH BOTTOM PLATE OF SUPPORT WALL
FIGURE C-7
II
lI_d
..Jl
FIGURE C-8
23
APPENDIX D
MULTIPLE-SECTION ALIGNMENT PROCEDURE
1. Position and levelthefirst section of the home per instructions. Excessive and/or non-uniform jacking during the leveling
will cause the home to be racked and twisted. This may result in damage to the home. Care must be used during leveling
to not distort the home. '
2. Move the second section into position within 6 inches and alongside the first section.
3. Draw the two floors together using winches (come-alongs) and rollers or skid boards,
4. With the two sections together, but with no fasteners installed, check the alignment of the end walls, interior walls, roof
and floor; Determine if the walls and/or the roof of either section mlist move backward or forward with respect to the
floor. Any correction required can be accomplished during the leveling of the second section.
, ~ H~_ ",' NarE , .
THE JOINTS IN THE CEILING ARE ONE GOOD INDICATION OF ROOF POSITION: THE JOINTS SHOULD RUN
STRAIGHT FROM ONE SECTiON TO THE arHER WHEN THE SECTIONS ARE CORRECTLY POSITIONED. IF THE
WALLS REQUIRE ONLY A SMALL CORRECTION, PROCEDURE STEP 5 IS SUGGESTED. IN MORE DIFFICULT
CASES, USE PROCEDURE STEP 6.
5. ALIGNMENT PROCEDURE
a. Position the second section to bring the floor seams flush, keeping the roof slightly apart and the end walls
aligned at the floor. At this time, place piers only under the inside frame beam. SeCure the floor together
with bolts at outriggers or lag screws at rim joists.
b. Close ,the gap in the ceiling by raising the outside frame beam using three hydraulic jacks placed ahead of,
behind the wheels and one about half way between wheels and hitch.
c. IF THE TOP MUST BE MOVED FORWARD...With the frame support beams evenly supported, carefully
raise the outside rear corner of the second section (and lower the outside front corner) with the hydraulic
jacks. The roof should shift forward until the end walls come even at the top, When the walls and ceiling
joints are even, raise the outside support frame beam evenly to close the gap.
d. IF THE TOP MUST BE MOVED BACK...with the frame support beams evenly supported, carefully raise
the outside front corner of the second section (and lower the outside rear corner) with the hydraulic jacks.
The roof should shift back until the end walls come even at the top. When the walls and ceiling joints are
even, raise the outside frame support beam evenly at the front and rear to close the gap.
e. Fasten the top of the ridge beam together, as described in Step 2.3.6. When the top and end'walls are aligned
and fastened, proceed with leveling of the second section.
6. ALTERNATE ALIGNMENT PROCEDURE
a. Position the second section so that the floo.rs are together with the ceiling seam flush and the end walls, in-
terior walls and ceiling joints even at the top. Close the gap between the roofs by raising the outside frame
support beam.
b. With the ceiling positioned and the ridge beam halves snug, fasten the top of the ridge beam together, as
des.cribed in Step 2.3.6.
c. With the roof securely fastened, attach a winch (come-along) between spring shackles of each section. Shift
the floor into alig'nment by tightening the winch.
d. When the floors and walls are even, insert bolts in brackets at the ends of the outriggers or install lag screws,
(Ref. Figure 4), With the top, walls, and .floor aligned and fastened at the marriage line, proceed'with piering
and leveling of the second section,
7. If the home is comprised of more than two sections, start with step 2 of this procedure (Appendix D) for each section.
24
APPENDIX E
GAS SYSTEM TEst PROCEDURE
1. Using an ounce gauge, check the gas system for leaks. First close all appliance controls and all appliance pilot
light valves (see appliance instructions included in the home or posted on the appliance).
2. Open the gas shutoff valve on the supply line to each appliance.
3. Attach the ounce gauge on the main gas inlet to the mobile home.
4. Carefully pressurize the system to between 5 and 8 ounces of pressure.
CAUTION
DO Nor PRESSURIZE THE LINE IN EXCESS OF 8 OUNCES MAXIMUM 10 AVOID POSSmLE DAMAGE 10 GAS VALVES
AND REGULA1ORS.
5. Apply a soapy water or ammonia-free bubble solution to the joints at both ends of the appliance connector. If
. bubbles are formed, tighten connector until bubbles cease to be fortned. '
CAUTION
DO Nor BUBBLE CHECK COPPER OR BRASS FITI1NGS WITH SOWTIONS CONTAINING AMMONIA.
APPENDIX F
ELECTRICAL SYSTEM TEST PROCEDURE
1. Perform the following tests after all structural assembly, metal and trim installations, and electrical crossover ~on-
nections are complete.
The grounding continuity test is to be performed before connecting the home and the polarity and operation tests
are to be performed after the electrical installation is complete.
2. Perform the following procedure checks for grounding continuity, polarity, and operation of the electrical system.
a. Before home is connected to n5/230 VAC service, proceed as follows:
(1) Connect one clip of a flashlight continuity tester to a convenient ground {metal skin~ Window frame on metal
skinned 'units, floor duct riser, etc.) and touch the other clip to each fIxture canopy: The continuity light
should light if each fIxture is properly grounded.
(2) Using the continuity tester, check every direct-connected appliance or fan. The tester must be hooked to
a convenient ground and to the metal frame of the appliance.
(3) Using the continuity tester, check the continuity between the following:
(a) Between one riser of furnace duct and convenient ground.
(b) Between metal roof and steel frame.
(c) Between metal skin and steel frame.
(d) Between metal gas piping and steel frame.
(e) Between metal water piping and steel frame.
(NOTE: Continuity to ground is not required on metal inlet of plastic piped water system)
(1) Between metal raceway below distribution panel and steel frame.
NOTE
When plumbing fixtures such as metallic sinks, tubs, faucets and shower risers are connected only to
plastic water piping and plastic drain piping, continuity to ground is not required.
(4) Any loss of grounding continuity found in (1), (2), or (3) above will require investigation and correction.
b. After the home is connected to the electrical service, proceed as follows:
(1) Plug an AC receptacle wiring tester into each receptacle in the home to check for reversed polarity, open
grounds and shorts, ,
(2) Any 'reverse polarity, open grounds or shorts found will require investigation arid repair.
(3) Install1ight bulbs and fluorescent tubes where not already installed. Make sure each light fixture is operable
by turning theuappropriate switch to "ON" position.
(4) Shut off all light switches in the house and perform test on smoke detector(s).
(5) Repair or replace any defective items.
25
APPENDIX G
WATER SYSTEM TESf PROCEDURE
The, water system test is made after any water crossovers are connected by attaching an air pump, valve,and gauge to the home
water inlet and pressurizing the system to 100 psi. Verify that the pressure remains for a period of 15 minutes without loss.
WARNING
IT IS Nor SAFE 10 FILL THE WATER HEATER TANK WITH HIGH PRESSURE AIR. DISCONNECT WATtR HEATER
FROM WATER SYSTEM BY CONNECfING THE HOT AND COLD WATER LINES TOGETHER, OR FILL WATER HEATER
TANK WITH WATER BEFORE PRESSURIZING SYSTEM WITH AIR. '
APPENDIX H
REPAiRING BaITOM CLOSURE MATERIAL
1. If the closure material is asphalt base or composiiton material, it should be repaired by applying a patch of the s~e or similar
material over the damaged area. '
'a. Place beads of adhesive or sealant under all contact edges to ensure an airtight seal.
b. Press the patch firmly into place with your hand or, other object and use fasteners and' tape to hold it in place until the
adhesive sets.
c. Be sure no gaps exist that could permit air or water to enter.
d. It is recommended that fasteners be a type designed to spread and hold in soft material. If these fasteners are not available,
a patch may be cut large enough to span the floor joist. Add blocking between the joists so that the. fasteners used to
secure the patch Will penetrate wood on all edges.
2. If the covering is a vinyl coated material, use vinyl patching tape especially designed to repair tears or holes. Pull torn edges
together then cover, as necessary, with tape or apply a patch of the same material taped all four sides. '
APPENDIX I
CLOTHES DRYER VENT INSTALLATION
1. UNDER-CHASSIS VENT. Terminate vent through skirting or install wood vent frame to outer floor joist or to
wood nailer under perimeter frame as shown. Install vent and run flexible duct up through holes in bottom closure
and floor. Pull duct up through hole until slack is removed from under the floor; secure above floor with metal
clamp as shown. Using plumbers' tape or metal straps, support flexible duct to floor joist, as required, to keep
duct off of ground and provide support against excessive sagging. Seal around duct with durable tape where it
enters the bottom closure material. (Ref. Bottom Closure Repair Procedure, Appendix H).
2. THROUGH-WALL VENT. Install vent as shown below using sheetmetal screws and caulking between vent flange
and siding.
METAL CLAMP
SEAL WITAPE
FLEX. DRYER ,HOSE
FIGURE 1-'
DRYER VENT INSTALLATION
FOR STANDARD CHASSIS
FIGURE 1-2 .
DRYER VENT INSTALLATION
WNENT THROUGH SIDEWALL
26
APPENDIX J
EVAPORATIVE COOLER CONNECTIONS ro 5-WAY SWITCH
The conductors in the junction box are color "Coded as follows:
Blue Connect to "high speed" terminal ,of blower motor.
Red Connect to "low speed" terminal of blower motor.
Black Connect to "hot wire" of pump motor.
White Connect neutral' conductor to neutral terminals of blower and pump motors.
.'" Green Connect to ground terminal or frame of evaporative cooler.
or Green w/Yellow Stripe or Bare Conductor
ROOF MOUNTED APPROVED JUNCTION
6 BOX WICOVER (ALTERNATE INSTALlATION
MAY BE LOCATED UNDERNEATH HOMEI
, ,
WIRE NUT !TYPICAL)
NOTES:
1. Single conductors are 14 gauge
cu; TW. or THW. colored as shown.
WHITE
GREEN
WIRE NUT
LI
~ SHEETMETAL SCREW
1 GANG METAL J.-BOX
5-WAY SWITCH W/COVER
PLATE (BACK VIEW) WHITE
N.M. CABLE
- -
SEE DETAIL A \
DETAIL A
FIGURE J-1
EvApORATIVE COOLER CONNECTIONS TO 5-WAY SWITCH
See evaporative cooler manufacturers installation instructions for equipment installation details.
APPENDIX K
COLD CLIMATE AREA RECOMMENDATIONS AND WATER SYSTEM DRAINAGE
Fleetwood Enterprises, Ine., through its various subsidiary companies, manufactures and warrants its homes to be in
compliance with the applicable standards in effect at the time of production. They are guaranteed to their purchasers
for one year from the date of first retail delivery to be free'from manufacturing defects in materials and workmanship.
,Your home is capable of providing satisfactory and comfortable service as a residence in the specifK: climatic zone
for which it was designed, when properly setup and prepared for the weather conditions likely to prevail at the site.
Complete information related to the design zones for which your home was constructed will be found on its Data Plate
which is posted in the home. Also printed on the Data Plate is the comfort heating certificate for your home. It is
the responsibility of the owner to make sure that the climatic conditions where he introduces his home are compatible
with the design capabilities specified on the Data Plate.
27
\ '
APPENDIX K...Continued
The manufacturer is responsible for the compliance of your home with applicable standards, and its construction to
certified designs and specifications, He is not responsible for the home failing to withstand climatic conditions more
rigorous than those for which it was designed, nor damage caused to the home through failure to prepare it adequately
for extreme temperatures or other climatic conditions that may be encountered.
For occupancy in areas where below freezing temperatures occur, the manufacturer and your dealer make the following
specific recommendations for installing your home and the addition of certain accessories. (For additional informa-
tion, refer to the Owner's Manual supplied with your home.) ,
SKIRTING: Skirting is a highly recommended accessory that will assist your home in withstanding'below freezing
temperatures. Its installation helps to prevent cold air inf1ltrating below the home where the heat ducts and the majority
of the plumbing is located. Its addition should be considered necessary to prevent plumbing freeze-ups if your home
is likely to be exposed to temperatures below 2SoF (_SOC) for any prolonged period, or to temperatures below approx-
imately 100F (-120C) even briefly. The addition of a wind chill factor to the above figures make skirting even more
vital. For your planning purposes, you may consider that each increase of 10 mph in wind velocity may be equivalent
to a drop in air temperature of approximately 200F (-100C), or20F (1OC) for each mph of wind increase. (The informa-
tion on your home's Data Plate is calculated assuming a 15 mpl1 wind factor.)
The use of so-called insulated skirting is probably not required under most conditions. The greatest value of any skir-
ting is as a barrier to air movement, and standard skirting accomplishes this purpose as well as- the insulated type.
Insulated skirting may be considered if prolonged temperatures in the -200 to -300F (-300 to -350C) range is to be
withstood, and then in conjunction with the introduction of auxiliary heating under the home. Consult with your dealer
for further information on the desirability of installing these accessories and whether such installations are compatible
with your own local codes.
Care should always be taken to ensure that adequate ventilation is provided when skirting is installed. Failure to pro-
vide adequate ventilation may allow moisture to build up under a home, and .transfer that moisture via diffusion or
air movement into the home itself. This moisture can result in high humidity in the home, and also in the formation
of condensation, frost ,or ice on cold surfaces.
Entry of outside air into the home's floor cavity is one of the most frequent causes of water pipe freeze-up, Before
the skirting is installed, the bottom covering of a home should be closely inspected to determine that there has not
been any loosening of its attachment or tears which have occurred as a result of highway movement or road hazards.
Openings around the perimeter of the floor covering, around pipes. or pipe hangers, splits or tears should be sealed
with weather resistant tape. Cheek also to ensure that plumbing P-traps are well insulated and covered. It is important
that this inspection be made and any necessary repairs completed whether skirting is to be installed or not. This inspec-
tion and service should be accomplished by your dealer when your home is installed.
GROUND BARRIER: The addition of a ground moisture-vapor retarder under a home laid on the soil surface will
greatly assist in controlling humidity in the home. There is a strong tendency for ground moisture to be drawn into
the home greatly complicating your efforts to control humidity and condensation, Polyethylene or vinyl are widely
used as ground vapor retarder material. '
HEAT TAPE: Heat tape is a linear electric heating element readily available from many dealers, home supply outlets,
and hardware stores, which is designed, to be wrapped around water pipes to protect the~ from freezing. Its use is
usually necessary on exposed fresh water inlet pipes in order to withstand prolonged, exposure to below-freezing
temperatures. Heat tape should completely wrap the pipe being protected, and should extend from below the frost
line at the supply end and terminate under the insulation of the home at the point where the supply line enters the
living space of the home. Heat tape must always be installed in strict accordance with the tape manufacture's instruc-
tions. in order to achieve the highest possible safe heating efficiency. A receptacle outlet is provided under the floor
by the supply inlet for heat tape connection.
HEAT DISTRIBUTION: The circulation of heat within your home is accomplished through the movement of warm
air. Closing off portions of your home may cause localized areas to become cold along with outside low temperatures
unless measures are taken to ensure that the warm air circulates properly. Be sure that all registers and grilles are open
and unblocked by furniture, etc., and that your furnace is operating properly. Hit is equipped with a filter, the filter
shoutd be cleaned or changed frequently. The blower motor must also be performing properly.
28
~
APPENDIX K...Continued
If particularly low temperatures are forecast, you should open closet doors and the doors on the cabinets under the
sinks and pullmans where your pipes are located to allow circulating heat to reach' them. Areas of still air, such as
storage closets, may allow frost or even ice to build up on exterior or outside walls. This may be ~ontrolled by ensuring
air movement to such areas and making an effort to keep humidity low as outside temperatures fall.
,LEAVING YOUR HOME UNATTENDED: If you plan to leave your home unattended, or if it is to be without heat
for any period, measures must be taken to prevent piping damage from water expansion during freezing. Your water
supply pipes may be emptied by performing the following steps in sequence:
WATER SYSTEM DRAINAGE
1. Thrn off the gas or electricity supply to the hot water heater.
2. Shut off the home water inlet valve and uncouple the home fresh water connection.,
3. Attach a hose to the water heater tank drain valve and open the drain valve,
CAUTION,
BE .sURE GAS OR ELECTRICAL SERVICE TO WATER HEATER IS TURNED OFF.
4, Open all the faucets and water control valves in the water system.
5. When gravity drainage of water is complete, close all faucet outlets, leave the water heater drain open
and the home inlet supply connecrtor uncoupled.
6. Open the cold water faucet farthest from the water inlet and connect a source of pressurized air to
blow any remaining water from the cold water line.
7. Open the hot water faucet closest to the hot water tank. Using pressurized air, blow the remaining
water in the line out into the water heater tank where ii will drain. Close the fau~et before proceeding,
to the next farthest faucet.
8. Repeat the operations in step 7 above for each hot water faucet moving progressively farther from the
hot water tank, until the remaining water is blown from the hot water system.
NOTE
BE SURE THE WATER HEATER IS REFILLED COMPLETELY BEFORE PUTTING IT BACK INTO
SERVICE. IF THE WATER HEATER OPERATES WHILE EMPTY, SERIOUS DAMAGE IS LIKELY
TO RESULT. '
To prepare your sewer system to resist freezing temperatures while you are away, you should empty the commode water
chests by flushing the toilets with the water supply turned off. Then pour approved drain system antifreeze into all
drains to preVent freezing of the P-traps. Check with your dealer for his advice as to brands of antifreeze compatible
with your home's type of sewer pipe.
If suitable antifreeze is not available, the toilet bowls and plumbing fIxture drain P-traps must be drained to a point
at which the water level is below the P-trap seal to prevent damage. It will first be necessary to disconnect the ~ewer
line hook-up where it attaches to the home drain outlet. The sewer line on the site should then be capped to prevent
the escape of sewer gases, The home drain outlet must be left open to permit drainage from the traps.
Use a rubber toilet plunger to force the water out of the toilet bowl and fixture traps until only an inch or two remains
in the bottom. Next, using the same rubber toilet plunger (or pressurized air, if available), force the water out of all
lavatory, sink, washing machine, tub, and shower drain water P-traps., (Note that it will be necessary to temporarily
restrict one of the drain openings of double fixtures in order to force the water out of the P-traps from the other drain.)
WARNING
SEWER HOOK-UP MUST BE DISCONNECTED BEFORE EMPTYING DRAIN TRAPS, OR TOXIC
AND EXPWSIVE SEWER GASES MAY BE PERMITTED TO ENTER THE H,OME.
29
APPENDIX'L
INSTALLATION 'INSTRUCTIONS FOR FIELD INSTALLED DWV SYSTEMS
Portions of the DWV system of a home which are below the floor may not have been installed by the manufacturer,
due to the possibility of road damage to thepluinbing system during transit. All materials required to complete the
system have been furnished by the manufacturer and are shipped as loose items in the home. The following instructions
are provided for use in completing the installation of the DWV system in the correct manner. Please read through this
entire instruction sheet before starting, work to familiarize yourself with the proper sequence of installation.
1. Locate the DWV plumbing schematic which is a drawing page attached to the tab behind the front cover in the
Installation Manual supplied with this home and review the layout. AlI'drain lines and fittings marked with an
asterisk(*) on the schematic, drawing are to be field installed.
2. Inventory all loose plumbing parts supplied by the manufacturer by laying them out on the ground under the home
in their correct relationship according to the DWV schematic. All pipe and fittings should be used where indicated
OIi the schematic to insure the correct flow and grade in the drain line.
3. Remove shipping covers from all fittings and pipe stub outs and ensure that all piping is clean and free of burrs.
4, All solvent welded connections should be made in accordance with the instructions furnished by the cement manufac-
turer and included wjth the, loose shipped parts. '
5, Assemble the field installed portion of the DWV system by starting at the most remote end and working toward
the outlet, supporting the piping as you go with temporary blocking to achieve the proper" grade. The grade of
the drain must be at least 1/4 H fall per foot of 'Tim unless noted otherwise on the DWV schematic drawing. When
the entire system is completed the permanent drain line supports should be installed at 4' o.c. See drawings in this
supplement for suggested methods .of installation of supports.
6, The completed DWV system shall be subjected to a flood level test per the requirements of Section 3280.612' (b)
(3) of the Federal Mobile Home Stan,dards as follows: "The mobile home shall be in a level position, all fixtures
shall be connected, and the entire system shall be filled with water to the rim of the toilet bowl. (Thband shower
drains shall be plugged.) After all trapped air has been released, the test shall be sustained for not less than 15'
minutes without evidence of leaks. Then the system shall be unplugged and emptied. The waste piping above the
level of the toilet bowl shall then, be tested and show no indication of leakage when the high fixtures are filled
with water and emptied simultaneously to obtain the maximum possible flow in the drain piping:' .
12"~ Nm,~1
FLOOR JOIST
L,~ N"~ 'Nro
FLOOR JOIST
{21 STAPLES OR SCREWS
EACH SIDE
GALV. OR ALUM, STRIP
MIN. 2 x 3
LUMBER
DRAIN PIPE SUPPORT METHOD
30
<";" '\;'
..
APPENDIX L...Continued
121 16 GA. - m6" ~ ~
STAPLES EACH END (1" LUMBER)
OR (2) 16d NAILS
GALV. OR ALUM. STRIPS
(2) STAPLES EACH SIDE
GALV. OR ALUM. STRIPS
DRAIN PIPE
ALTERNATE PIPE SUPPORT METHOD
APPENDIX M '
INSTALLATION OF RANGE AND/OR COOK lOP AND OVEN
If a range and/or cook top and oven, that was not supplied by the home's manufacturer at the time of purchase, is
to be installed, then following should be observed:
a. Install the appliance to provide the required clearances per Federal Standards whkh may be more restrktive
than appliance manufacturer's normal installation instructions.
b. Do not install an ,appliance which requires a heavier connected energy capacity than the home's system pro-
vides (see capacity label on appliance).
c. Follow appliance manufacturer's installation instructions except as outlined in a. above.
31
",'
EXHIBIT 1
ZONE MAPS OF THE UNITED STATES
STRUCTURAL DESIGN
North
~N_
Note: HaweiI, Cane! Zone. Puerto RIco and
VIrgin Islands are South Zone
DESIGN ROOF LOAD ZONE MAP
, South 20 PSF
Middle 30 PSF
North 40 PSF
Note: Hawaii and Canal Zone ,. Zone 1
Puerto RIco and VIrgin Island - Zone II
DESIGN WIND ZONE MAP
Standard Wind
Hurricane Resistive
Other
Zone I
Zone II
15 PSF Horizontal
25 PSF Horizontal
,9 PSF Uplift
15 PSF Uplift
HEATING AND COOLING DESIGN
- ,Zone II
Zone I "
~"
32
<#
EXHIBIT 2
PIER LOAD CAPACITIES AND FOOTING SIZES
Required Minimum Footing Sizes (1) (or equal area)
Pier Load Allowable Soil Bearing Value ,
Capacity
Pounds 1000 PSF 1500 PSF 2000 PSF 3000 PSF
,
1040 12" x 12" 12" x 12" 12" x 12" 12" x 12"
1200, 12" x 16" 12" x ~2" 12" x 12" 12" x 12"
1400 12" x 18" 12" x 12" 12" x 12" 12" x 12"
1900 12" x 24" 12" x 16" 12" x 12" 12" x 12"
2200 24" x,14" 12" x 16" 12" x 14" 12" x 12"
2600 24" x 16" 12" x 22" 12" x 16" 12" x 12"
2800 24" x 18" 24" x 12" 12" x 18" 12" x 12"
3000 24" X 18" 24" x 12" 12" x 18" 12" x 12"
3200 24" x 20" 24" X 14" 12" x 20" 12" x 14"
3400 24" x 22" 24" x 14" 12" x 22" 12" X 14"
4000 24" x 24" 24" x 16" 24" x 12" 12" x 16"
4300 24" x 26" 24"x 18" 24" x 14" 12" x 18"
4600 24" x 28" 24" x 20" 24" x 14" 12" x 20"
5500 24" x 34" 24" x 22" 24" x 18" 12" x 22"
6000 36" x 24" 24" x 24" 24" x 18" 24" x 12"
6400 36" x 26" 24" x 26" 24" x 20" 24" x 14"
6500 36" x 26" 24" x 26" 24" x 20" 24" x 14"
6800 36" x 28" 24" x 28" 24" x 22" 24" x 14"
7000 36" x 28" 24" x 28" 24" x 22" 24" x 14"
7500 36" x,30" 24" x 30" 24" x 24" 24" x 16"
8000 36" x 32" 24" x 32" 24" x 24" 24" x 16"
8600 36" x 36" 24" x 34" 24" x 26" 24" x 18"
9200 36" x 38" 24" x 36" 24" x 28" , 24" x 20"
11000 36" x 44" 36" x 30" 24" x 34" 24" x 22"
12000 36" x 48" 36" x 3'2" 24" x 36" 24" x 24"
13000 48" x 40" 36" x 36" 36" x 26" 24" x 26"
14000 48" x 42" 36" x 38" 36" x 28" ' 24" x 28 II
15000 48" x 46" 36" x 40" 36" x 30" 24" x 30"
16000 48" x 48" 26" x 44" 36" x 32" 24" x 32"
1600 12" x 20" 12" x 14" 12" x 12" 12" x 12"
1800 12" x 22" 12" x 16" 12" x 12" 12" x 12"
2300 24" x 14" 12" x 20" 12" x 14" 12" x 12"
2500 24" x 16" 12" x 20" 12" x 16" 12" x 12"
2700 24" x 18" 24" x 12" 12" x 18" 12" x 12"
Minimum footing size required for other pier loads may be determined as follows:
Pier Load in Lbs. R . d F . A . S F
' = eqUlre ootmg ream q. 1.
Allowable Soil Bearing Value in PSF
(1) Treated lumber footing dimensions are "nominal width x actual length". Example
24" x 26" above is 2 x 11 \t4" x 26" actual dimensions.
(2) If a pier of sufficient capacity is not available, use 2 piers; each with sufficient capacity to
carry at least half of the required load. Install as shown in Appendix A.
33
EXHIBIT 3
RIDGE BEAM POST CONFIGURATIONS
POST ·
TYPE ..
rF.I,
1-2x6
. #6 -------.,--~-
2-2x3
rEI
1-2x6 ,.'
#7 -~-----,.----
2-2x3
rEI.
1 - 2 x 6
#8 ------~~----
3-2x3
~F.I.
#9 ~---:~~-~----
2-2x4
#10
rEI.
-------~----
...
2-2x6
rEI.
#13 -------~----
3-2x6
":24 ::~~~!-~--
2 - 2 x 6 EI.
":25 ---------;Z~.~
4-2x4
*The broken line in e~ch "Post Type" represents the marriage line between the two ridge beam halves.
* *F.I. designates field installed.
EXHIBIT 4
ELECTRICAL FEEDER AND EQUIPMENT SIZES
fMder ,SIze MInImum SIzes Feeder Conductor SIzes Max. Cllcul8ted
(See IIlIin Iini..
IIld libel on JunctIon Flax Conduit (in.) eo- Conductors (note 11 AIumklum Conckictors NeutnI fMder
Load
dIItributIon panel Boll Copper , Aluminum ~ It IlIack White Gre<<I Red It BIKt WhIte Green (AMPSI
lAMPS! (In.1 Conductors Conductors Powwl (Neutrall ' (Groundlnlll IPowerI INeutr8lI IGroundinnl
50 1011014 1 1 No. 6 THw No. 6 THW No. 8 THW No. 6 THW No. 6 THW No. 8 THW 50
100 1011014 114 1% No. 3 THW No. 3 THW No. 8 THW No. 1 THW No. 1 THW No. 6 THW 100
,
125 1211216 1% 2 No. 1 TlfW No. 2 THW No.6THW No. 2JO THW No. 110 TlfW No. 4 THW 115
150 1211216 1% 2 No.1/OTlfW No. 2 THW No. 6 THW No. 310 THW No.1/OTlfW No. 4 THW 115
200 1211216 2 2 No. 3/0 THW No. 2 THW No. 6 THW 260MCM No.1/OTlfW No. 4 THW 115
Note 1. Copper feeder conductor sizes No. 3 may be replaced by No. 2, No. 1 may be replaced by No. 1/0 & No. 1/0 may be replaced by No.' 210,
Note 2. Support of vertical rigid nonmetallic conduit for feeder cOnductors. when used, is based on feeder conductors rated 600C and below. ,
34
...
,~
~
"
TO DISTRIBUTION
PANEL t
EXHIBIT 5
ELECTRICAL CROSSOVER DETAILS
FLOOR JOIST
t230V ONLY)
A-SECTION
B-SECTION
~
1
.1 ~sc~
PLYWOOD COVERS
TO DISTRIBUTION
PANEL +
PLYWOOD COVERS
TO DISTRIBUTION
PANEL
1
REO "l '
WHT ff
" APPROVED
BLK f \ ~ED . CONNECTORS
,HT
BLK . t~,
GRN ,
FROM
- B-SECTION
SOLDERLESS WG
SINGLE CIRCUIT CROSSOVER, 115 OR 230V
FLOOR JOIST
A-SECTION
B-SECTION
, METAL BOX
~..
1
1,
1)
SCREWS
1
DOUBLE 20A CIRCUIT CROSSOVER OR DOUBLE 15A CIRCUIT CROSSOVER
t
FLOOR JOIST
+
B-SECTION
A-SECTION
~
. II 20. C'RCU>T
JJ - ,.. c'.cun
METAL BOX
1
1)
SCREWS
1
PLYWOOD COVERS
1
20A CIRCUIT AND 15A CIRCUIT DOUBLE CROSSOVER
SOLDERLESS LUG
FLOOR DECKING
SINGLE CIRCUIT CROSSOVER 115V
BonOM BOARD
35
,~ ,,.f,
',J
:/"
~
Printed in USA
FLEETWOOD ENTERPRISES, INC.
RIVERSIDE, CALIFORNIA 92523
c:, c:, c:, c:,
I...., I...., I...., I....,
~ c::. - ~ I....,
~~,
or
~ i ~ c::.
I Ie:, ~
f __~_ I....,
~ I
!
i
~ '
\
<:::::>
r
1
I
1___
:---::
c::.
: '"
'"
'~
...
..
~
I--
~ c:,
c::.
r-r, ~
N
~
DORA
c:,
~
"'-l
c:, c:,
"''''
- c:,
c:, c:,
I...., I....,
01>.. ~
, I
c::.1
-r
<01
I
~~
~~
Q),......
'" ~c::.
~C;; '''rj c......--,......,
,:.c::. ,=>Q)-u
I'- ____
c:---,
A VENUfJ
I I
I I
, I
I I
~ ~'
'f-" -+
I I
I I
I I
I I
I I
---
co,
co,c:,
'(c:,
"'0,
.;:::
'-UNKNOWN ~'II Y'OF
<::::l ~c:,
<::::l ~c:, c:, c:,
"'c:, "'01>.. c::. c:,
-... ';'01>.. ';'<0 I...., '"
:.. ""
" " " rv U1
~
~~ I
~
...;
.". J
~, I
~i
, <::::l
<::::l
,_ -"-r:>.,
..',
103
-
~~
~~~
~;Io..~
~ ~(::)
, ~-r:>.,
:10..-1.....
'"'-UNKNOWN
MAR/ON
A VE N U E
c:,
-
"'-l
<::::l
"-:>
<::::l
'2.5
\:::~"
q - ('S~
o !,
c::. I rt;l.Ji)-
~ " 5 I
\~'I~; ~ '
~ c; ./
o 4 0 It-
Ii-
~I
041 I
I
------- -L. -
--I ----
----- ---,-
101 '
---p-~<:::::>-~'-~--
~~'
""-r:>.,
-~LT
O;;;-T.:;-';;''''~I~r;:;-r.
- l~ I" I... "" I"; I"
I I I I I !
I I I I
I ! I i I !
i lei I ~
I I ~I I t
I"'" l;:
... 1- ,_""~ !_ _ ,:.
Q <0 /q, r.... "10. VI I....
013
: -.... ~ -... -... "-"" -.. ~ -... -...
1- <J-, ~ t.>, t.>, ~'~1 ~, t.>, 0, <;;
It.>, '" I...., -1:00.. ~ 0, 'I Q) <0 c::. _
I-
I .r
L__ ,
'-- - -----,----D-D-R-A-----------~
- I I-.. -, -..... -l _ _ __ i~::: ~I~ !~J::' ~.~
,v. ~_ I ~ -1:00.. -1:00.. -1:00.. ;"t' -1:00.. -1:00.. -1:00.. 1'-' ,;:;! I '" i
t.J c:, <0 I i "'-l 0, t.>, l' '" - c:, I;; r,: I I 'i1 I
-II ~- ~Ii~ I
~<::: <:::'c T-!!,*E O!..." TN EAST 7 A!!rF-Y <I> I"" I <b ~
~ -1:00.. ~I ~ ~ ~ I ~ I;t J.
<::: _ ... ~ '-~! _ _ 't,
........ ~ ~ Q "!<Co Ct> I, VI t-
~~: <::: I <::: Q) C H A
'\'0,1 (..., , '''-IT
: I I 165 r ~ i i J'.;: ~~
A VENUE i ~ ~ ~
117 II ~ S: ~
'l' " t
-" I ~ ~ :l:
_ ~;;; T~ ~ l~ ~ ;-;
012
011
.NI::;I
010 ,'l'll.'1'-< 128 I
;-~ ~27 I
009
-
I....,
, c:,
c::.
c:,
Q)
~
0,
~
<0
Ir.t:.. BER THA
-~,..Jo
'.+
I ~
I
E
I
I
~ -
~
\
119
115 :~ - :~f 'f · !
I
170 I
I - It"l-,J ' 0;:.
830-8 I -
-1:00.. -: ~ I~,
I
113 I I I k I
I
830-A I I Q/8100 I !
11.1 /WN I... II, 1_ 1_ ~ '-
IQo ~ a" ...... 0, ....
c::.
c::.
"'-l
-
'"
c::.
~
~
~
-
.....
O:l
116
V"
/,
/
-
"'-l
Q)
c;
"'-l ~
-
c:,
0,
-
c:,
u,
]ITIT'I'-
I I I ~ I
. L_I,~~I 1;IJ~1,
-
c:,
-1:00..
-
, c:,
I....,
-
c::.
'"
I
./
(COUNTY
ROAD,
/96 )
. ,
. I
. I
, I
, ,
, ,
, ,
, .
, ,
, ,
\; ~.
I I t:::) -..;::;........'
,. ~'~::::::
\\ c:)~Vj
\ \ '--t ~ ~~
; \ .:t:.. .::;: {;"
, , 2? 23' "J
:',..... \ ~ ~ J?
/' \\~--"-'o
,I \ \~ ~,::::::::
,',' \~~2J
,// .~\::;::~
:' "--" ',;g;:
" f'-"'---"'_:"'-.~ 0
" '~/:;;;
.' ::c... ~\
Vo<:::,\'
~ i.f1 \\ '\
f::1 (::) \ "~I
~ ;!j---' \\
~ ~ ..../..'\ \..
D"'- ','
c:::' c.-, , "
~ "'- ""'"
::) ~ " "
fr C'i " -,
""' :& ' "
c..-, '" " "
c::. .::::, ", '_"
020-00
<:.
to
I
""
<:.
""
'"
<:.
I
""
...
..
r: n N ST!1{f-
'--~:-
0/4-0J
.--4.....
A<...L":::
c::.
-
~
~ 0/4-02<;
i
.
1
f
t
~
1
1
1
<:.
'"
, ..
I
<:.
co,
'"
<:.
..
I
<:.
'"
009-0J
co, ~
co, ,..,
! "1;"
<:.
009-02
;:; ;;
r: HART I ~7
005-0/
005-00
------------------------
r-:::
1 ~ <:.~ <:.'"1
~ I :::1
I I I I
T :51 ~ I
J]
TII-I~
I /........
I
~~
(/I
()
",
'/
-
n
\
..---
I', ::-
.9J
o
()1
9-:
f'..
--;-
i
rTi
"'-...,
-'
Vi
,r-
r
,_/
...
-;-
,
,
,
\ ..
, ,
, ,
, ,
,
, ,
,
,
, ,
, '
,
,
-0
::b..
~
~
~
~C)
\:::::)==tJ
CJil"[
~0)
----,
!
~
~ ~ ~;: '.~~ ~1Qo
..... Cb to c:)
I I I ..... _ I
<:::a (:). c:::. Qo
<::) ~"c::. Q
--
---
---
-; - -- ------.~------- - - -- -- ~"'\
<:.:;:
'-
."
I
",'"
'-
'-
,
~~ .~...
c.r- ~;:
I ,
NHUFrAL OYSTEFr FrfS[FrVE
VACA TED 1-11-19JO
BA Y
OYSTER
, 5
Govunment Lot 1
C,O,$, 4-2-1890
'~J;,I/
, "
~ 09<1
~;;.i_:;-;,-:,: _-"L, -' .,11 ~_
.~~-~~
, I
,,;/5A?
--.~,
'i
I
- .,
I
...;881-g1
,----- ~- -- -~ 1
----,,~,- -. -- ",.J
1'-
.H'-8~
; .:- ,r..to ;.': ~~ T
I
'/flU
I
\"
.....--............
"u.,.\
..\
161
SA Y
'"
'81l.
~ ~
',It-
01<
t >i:'!:r~ h. ~'~;~~~r-4;""~~ ,t"~:~~-~J ~~. ~.~:.. 'u,o;; ",--::r-~ .;:.~
.~'l:,.':~t':~ ~~'==_=j t'~-~~.7J ,~~ ~~;;,.c.~:-: ,~
"<;''''''''J''C''''''~f'''I' ,:7 ~~1' . ...,...,,,,~ ..., ~
.. ':Ll::~ lh:~lj~ [~}~-~~~~ i~2~ ~~~ !
l.--F~TP~:-r''i:"!~.~q:l71 I' ~' - ~ Ff.- -- ---" - f~;.~;""" fl...H' .'IH-N ~- ''<:!; :.:-.
",,1,11';1'" ':'1,'" ....j--- L '.......<>L.I -" '--- -'
h1:',I.\:,"': :,'J:;" t ~::;: ~:::~ '.0..., q-,~ ,..~nl_...L ~- ~"rn
. '''''1'1 ",1;1' ,.. "'I'C _ --. ",i,' "-'..., .",.,;;11 ::;J L T ,,~'_~~',
--O~2U'---' &;:1,::;.1,..';, L ".. - """-, .n""n~" .~: ~ ..
., ~I.' ' S~;'[;;" 61 !,T; ~6/ rl ,:~n .. -~~:"r~'i S'r'I~'"
, , " f': ' , I r I , " ' I-'-"'- IJ' IJ8 '" 102 "'"
ill,ll., 1601~ -~ 1T4~
r,'..>.!;'~~# ' 11 i' I ~S9 1<2 ~ ::: ::: - L...- '01
1 I 1 I ~8 l'~ ' : I 11 ~ ~ : B-J]'; '38 I fl r '"
I , , I ~ i ! I I i I !! ~ ~ I ,u-'~ f -uj- ~ IJ7 ~,I~- 10'
, ~> '.:"'" j>;' '57 ~ 115 1--. 118 :;:" -, -
'. ,5:';, ','RUr i'" 156 ~ 145 IJ' IJl '05 C'
,,:j:!!'~f:,lTlnl 155 c::. ~ /78 106
t~t:rttrtlL;,'~ ii, ' ,. __.JI)I~) ~ ! ~ P2,1,9" 12~2T - 107
f-' 16<1- f _ ~ ==....:.: -, 1Jq ~ ' 108
rT;'r~~;~i!~ !I~~l ~i~, ~~~T1" II' L '0'
~TI ',~i'fU"'H I' ~ ,'"
043 LL~:,L~~Jl1~! ,~ ~ I~ : ~ -..... - ~ co,
__ u ..... Q ~'. ~ ;; ~ 008
- - - ;-(~r;Tp1P1 ~IT"'I~t~ :1~ :'~;g'~ ~ oj/J ~ IlL<
_________. i ~l,~#t~l~! 1~11;2'I:;;'c, ~ "..",,----
t I I , I l' I I ' :..~.." '" ~~O ....: - ..1115. - --~
i~~~~l~t~" ~ " ~
, 'I" ~ 01'--;
_ 018:
:l r:--:";!"fF' "'Jlo~'l".1'>~ - , --.P..!...i --- 020 ~
~,Jl ~t'~':.'i, - "" tS
l !ll ,i.y' , I I :. ;:. 016 ....El,!- '3 021 Ii
1'1 :"., d7f\t+,t! I :....E!! '" ~2J,
l'I':'ll':;: III ,-
, ; I . I J I ; , ; , I i J . I ~ ; 027 022 I,
,~ ., ~_ ~~~~~_: I' OJO .;15j O?J!, l'
u/-u '/'
f----: ~Ura6 Ul~6li k",.,I .;~ - -
, ' "I I 010
; I!
11;-" ~ ~;~" :u~-,j.
i
093 'j
fM4
0'5
c:
../
..'.'
...."'...,.'
~-//
110
.~
'", ----;-::-...::.:::::-~~{~/ ::
'"-~'''''
007
'~
:::.
~
~,
,'.' 2
001
002
OOJ
020
0.06
.,'..-1'
i
011
0"
'"
'"
'"
'"
'"
005
~q<l
ii}-~
g f:-=-
::: ,"-,a
r, .~
011 I 0121 t --~""i.---
014 I 013 1 ~ ;,--
UI-D6 r 811-11,1 .; .,;,': >,~..
88J./U r U1-U /_~!; ~:"..L<.f.'----
~_u / ,'tl"- -- ~,~J_~~': - -__.
2-
001
~
~
~
~
U/-II I
,-
002
1003
II-'d'-:'
-=-=
=
f>,,,,,"
i "i
009
004
E
, l"'~8
I i I
1I1~"
r';";~
, n
I I
~11-" :
005
I'"
r LEGEND
- !llPLI1'TS1U1l1I~ 006 1llU11lD1U1DI_
l'lA1JlDlUl111_
- M_lLlWl&OlllllWll' I ~' ,: ~ :/~I.PtAI7!t:o'_
~.-
~lt.trlaf~ ~"_H l'WmIlLlW:~
- ~- '.'-..', ............"lIll,LllOf_
=::=J UF-....lllr-. .,.., =:~lIBUIolt"
-~ ~ " V , / "
:,:.~~., '"'" ~ ~' ""f'~_
" l"lIIfiDt....
.. ~ ~,-
ThisIll8Jl...~/()(Ih8KJtsapCoU1lly ,
A..."", as. reC1Jfd of.,;,mg tax ~ts, ~r
lax asS8ssmentpuq:osss oNto
ft~oot'survoymap.
South 1/2,
Section15-24-1~
Scale: 1 = 200'
April 09,2001
Map Number
R15~
STATE APPROVAL
, ENGINEERED T1EDOWN ~ 't ;:, t ::i'.,
APPROVED
SUBJECT TO CORRECTfONS NOTED
ApproVe, doe! n'ot authorize or approve any omissI,,;. or
deviation from requirements of applicable State f~z and
, ~egulations.
'. 'T";I~A'E~:~j~D~~'ftlj%
, '.," " .',/..,.;;: ~,','1~;~?,;'~<t~.~~~y~~'::~:.,;'c(~,:~.
'ENGINEEREDTIEDOWNSYSTEM .",
. ~. '\.'" ,., 'r'~,~ .. , ,; ;
"J '. '. ,. ,~' ."" _
"
\
DESIGN tOADS: , , " ,-
* 1fIND __..;;.;.,.----------~- 15psf (70 MPH EXPOSURE ,"C")
* WIND ~~-...;.------------ 25psf (8S MPH EXPOSURE ~C")
* 1fIND.......:.~-:-:.-----..:.------- 35psf (100 MPH EXPOSURE "C")
* SEISMIC ZONE ---------- 4
* SOIL BEARING ---------- 1000 psf .MQli; MAXIMUM SOIL PRESSURE
IS 1000 psf WITHOUT A SOIL REPORT.
* EARTH AUGERS --------- 475011 MIN. TOTAL LOAD CAPACITY
315011 WORKI~G LOAD CAPACITY
* STABIL-X DRIVE ANCHORS-- 475011 MIN. TOTAL LOAD, CAPACITY.,
31501 WORKING LOAD CAPACITY
* CONCRETE SLAB ANCHORS -- 475011 MIN. TOTAL LOAD CAPACITY
315011 WORKING lOAD CAPACITY
* TIE DOWN STRAPS ------- 475011 MIN. TOTAL LOAD CAPACITY
3150# WORKING LOAD CAPACITY
-',
TIE DOWN STRAPS MEETS FEDERAL SPECIFICATION QQ-S-781 H FOR TYPE " CLASS B:
GRADE 1 STRAPPING AND BE AT LEAST 1 1/4" x .035 ZINC PLATED.
1. THE CHARTS SHOW THE REQUIRED NUMBER OF TIE DOWNS ON THE SIDES AND
ENDS OF, THE, MANUFACTURED HOME. '
2. COMBINATIONS OF THE DIFFERENT TYPES OF TIE DOWNS CAN BE USED.
3. roR ALL TIE DOWN INSTALLATIONS, THE MANUFACTURED HOME CHASSIS MEMBERS
ARE SHOWN AS"I" BEAMS. (FOR ILLUSTRATION PURPOSE ONLY)CHASStS BEAMS
CAN ALSO BE "-C:' SHAPED OR "RFC" SHAPED.
4. SIDE TIE DOWNS ARE REQUIRED ALONG THE OUTSIDE CHASSIS BEAMS. END TIE
DOWNS ARE REQUIRED AT EACH END OF EACH TRANSPORTABLE SECTION OF THE
MANUFACTURED HOME.
5. END TIE DOWNS CAN BE LOCATED WITHIN lS" OF EITHER ~ OF CHASSIS BEAM
AXIS, AND BOLT-ON TOP CAN BE ATTACHED WITHIN 18" TO 60" FROM ill OF CHASSIS BEAM.
6. THE SIZES" TYPES, lENGTHS, ECT. OF MATERIALS SHOWN HEREON ARE MINIMUM.
LARGER, LONGER, HEAVIER MATERIALS SUPPLIED BY SAC INDUSTRIES, INC. MAY
BE USED AT THE SAME SPACING AND LOCATIONS SHOWN.
7. ALL PARTS ARE COATED WITH RUST RESISTANT INDUSTRIAL SHOP PRIMER.
S. THtS TIE DOWN SYSTEM MEETS THE REQUIREMENTS OF SECTION 1336.3 SUB-
SECTION (0).
I
I
'SAC ~g~TED
1722 A BISHOP ROAD
CHEHAUS. WA 91532
Ph: 360-748-8850
,.' _r
tbis Plan Approval Exp~es
". ~"".
"'" '0',
: '. '
' . '
#6005
#6006
Ii Ii .
Ii
. .~~ ".-.-'
'<4002 PIER .
eOLT -ON TOP
'7002
7' STEEL
STRAP ,
W /HOLE
'-.1
,.:. :
;7000 7'STEEl
STRAP W1,'fKLE'
16005SPUT
BOLT at NUT,
." ,. "J,
~ '.'-
.',
16000 SERIES
EARTH AUGER
(TYPiCAl) ,
#6000
#6001
NOTE 4
VERTICAL OR ANGULAR INSTALLATION'IS OPTIONAL
AUGER, TIE-DOWN '
INSTALLATION INSTRUCTIONS
1. CONTRACTORS WARNING: CHECK fiRST fOR UNDERGROUND UTILITIES.
2. INSTALL GROUND ANCHOR INTO GROUND lEAVING 12"-14~ OF SHAFT EXPOSED.
3. PLACE STABILIZER PLATE NEXT' TO SHAFT BETWEEN THE ANCHOR AND CHASSIS
BEAM, AND DRIVE INTO GROUND.
4. FINISH TURNING ANCHOR INTO THE GROUND APPLYING CONSTANT DOWNWARD
PRESSURE TO MINIMIZE SOIL DISTURBANCE, UNTIL ANCHOR HEAD IS FLUSH WITH
STABILIZER PLATE.
5. ATTACH STRAPS TO CHASSIS BEAM IN MANNER SHOWN.
6. IF ANGLE OF SIDE STRAP IS GREATER THAN 60', STRAP CONNECTION CAN BE
MADE FROM ANCHOR TO OPPOSITE CHASSIS BEAM.
7. INSERT STRAP THROUGH SPLIT BOLT. CUT orF EXCESS STRAP AND TIGHTEN
BO,LT UNTIL STRAP IS SNUG.
END TIE DOWN
SEE CHART
...
e
&
,'~
i G_
.' .. lj ~
~ >
III '
, '~... ;:
, ..
:z:
...
( co
l:l
i:
j
\'.. !'.
SINGLE WIDE
DOUBLE WIDE < '
,/,,'"
:~,~'i! ","
. ;
, . ", .
" .
, '.~" '
, '; .
#6013
#6005
#7000
#7001
#7002
# 400 2
'6005 SPUT.,
BOLT &. NUT
'6013 STABILE "X"
DRIVE ANCHOR
GROUND UNE
,4002 PIER
BOLT -ON TOP
CHASSIS~' , _ ~
- ....'
- ....
,....-' --
..",. ,."" ."-~ -:'-i '
",-'. ..-.--: --'
." --.-- --
.......
,7002
7' STEEL
STRAP ,
W/HOLE ~
SEE OETAIL"A"
VERTICAL OR ANGULAR INSTALlATION IS OPTIONAL
STABIL-X DRIVE TIE DOWN
SEE DETAIL "A' __.u._' ."
11000 or '7002
7' STEEL STRAP
OET AI LUA"
INSTALLATION INSTRUCTIONS
,. CONTRACTORS WARNING:, CHECK fiRST fOR UNDERGROUND UTILITIES.
2. DRIVE STABILIZER PLATE INTO GROUND.
3. DRIVE CROSS RODS THROUGH HEAD TUBES INTO SOIL AS SHOWN.
,4. ATTACH STRAPS, TO CHASSIS BEAM IN MANNER SHOWN.
5. If" ANGLE Of SIDE STRAP IS GREATER THEN 60", STRAP CONNECTION CAN BE
MADE fROM ANCHOR TO OPPOSITE CHASSIS BEAM.
6. INSERT STRAP THROUGH SPUT BOLT. CUT orr EXCESS STRAP AND flGHTEN
BOLT UNTIL STRAP IS SNUG.
7. #6002 ANCHOR CAN BE USED WHERE HARD OR, ROCKY SOIL OCCURS. ,IF' THE:
GROUND SURFACE IS OTHER THAN ROCKY SOIL OR MINIMUM t'ASPHALT, USE
STABIL-X ANCHOR OR ENCASE ANCHOR WITH 12"xtt'x1t' CUBE OF -CONCRETE.
8. WHEN #6002 ANCHOR IS USED FOR ANY REQUIRED ANCHOR -- (2) ANCHORS
MUST BE-USED AT THAT LOCATION. ~
b
SEE NOTE #7
AND NOTE fi8
, ' .
, REQUIRED NUMBER OF COMBINED ANCHORS ',FOR EACH .slOE, AND .EHD OF MANUFACTURED HOME
:<-','- ,No. OF ,SIDE No~ OF ENO TOTAL No. OF
WIDTH lENGTH ,WIND SPEED SEISMIC
: , , ' , TIE O,OWNS TIE DOWNS TIE DOWNS
SINGLE 70' MPH EXP .,"C":: 15PSF ZONE 4 4 .. , " 2 12
WIDE 0'-78' ,85 MPH EXP;.C" -25Psr ZONE 4 ,8 ,'" .' 2 20
TO 16' 100 MPH EXP;"e- ::35PSf ZONE 4' 12 ~ ~,~. ~,;2 " '. 28
DOUBLE 70 MPH EXP. .C" -t5PSf ZONE 4 4' , , , , ,4 ,', ,16
WIDE 0'-7&' '8S,MPH EXP. .C' =25PSF ZONE 4 8,,', -4 f,c", 24
TO 28' 100 MPH ,EXP. .CP =35PSf ZONE .oJ .. 120~ 4 ' .. 32
TRIPLE '70 MPH EXP ."C'=15PSF ZONE 4' ~, l" ',',"'4 ",,:< :"';' \,....6 " ;;c 20
WIDE 0'-78' ,85,MPH EXP....C..=25PSF ZONE 4- - .>~.. :8 <,>,','6 ..' 28
..
TO 42' 100 MPHEXP. ':C"=35PSF ZONE, 4 12 : c':,,,; , '."';~ '''6 ' , 36
,.. ' .-
-. . ~ -c:- ""', < - -.~-. ----:-);. ,;.. . ,
WINO= 70 MPH - 85 MPH - 100 MPH EXP. "e: - SEISMIC ZONE 4
#7000
#7001"
#6005
#4002 PIER
SOLT-ON TOP
17002
7' STEEL STRAP
WITH HOLE "
16005 SPUT
.
SAC IND>CONCRETE TIE
.J~'
.. "
"
! '
.
;
#4002
#6003
CONCRETE TIE-DOWN
INSTALLATION INSTRUCTIONS
#6004
f
NFW CONCRETE - 16004
1. PLACE CONCRETE ANCHOR INTO WET CONCRETE, AND ALLOW TO PROPERLY CURE.
2. ALTERNATE CONNECTION REQUIRES tiS REBAR PROPERLY EMBEDDED IN CONCRETE.
EXISTING CONCRETE - 16003
1. CONCRETE MUST BE A MINIMUM .3 1/2- THICK AND IN GOOD CONDITION.
2. MINIMUM SLAB AREA OF EACH ANCHOR IS 28 SQUARE FEET.
3, DRILL PROPER SIZE HOLE IN SLAB, A MINIMUM OF 12- FROM ANY SIDE.
4. EXPANSION BOLT IS 5/P: x 3 1/2- WITH MINIMUM 2 3/4- EMB'EDMENT AND
6.180 POUND PULL OUT, 7,160 POUND SHEAR.
CHASSIS CONNECTION
1. ATTACH STRAPS TO CHASSIS BEAM IN MANNER SHOWN.
2. IF ANGLE OF SIDE STRAP IS GREATER' THAN 60", STRAP CONN.E:CTJON CAN BE
MADE FROM ANCHOR TO OPPOSITE ,CHASSIS BEAM. )
3. INSERT STRAP THROUGH SPUT BOLT. CUT OFF EXCESS STRAP AND TIGHTEN
BOLT UNTIL STRAP IS SNUG.
NOTE: SIDE TIE DOWNS ARE REQUIRED ALONG THE OUTSIDE CHASSIS BEAMS.
END TIE DOWNS ARE REQUIRED AT EACH END OF EACH TRANSPORTABLE SECTION
OF THE MANUFACTURED HOME.
NOTE: A COMBINATION OF DIFFERENT TYPES OF TIE DOWNS CAN BE USED.
ALTERNATE
'CONNECTION
r;J
/' ,'\ , , \
1/\\ '/\\
1/ \ \ " "" \\
/I \\' h,:_ ',\
SIDE VIEW ' ,END VIEW
, :' .';-"';'" :,,- ....." -'
END 'TIE.:'DOWN',:\;~:
-. " .', ,,',', ,_:,.,,?,"'('~'c.~~~ _~?'::_ -'-.-', \'{.
" , NOTE: ENt). tiE ,DOWNSCAtrBE~'
LOCATED WltHIN:l 8"~bF ,EITH.E:R. ,,' "
,SIDE OfCHASSISBE.4M,:AX)S:~>~';"'("'-'
"'.'> '- ~-.""'~'f"-.;,e,..~"~,~,/ ;:'''i.~~\~-_:'_ -.
if
~~' - -
. '
d- -
-"
t- .
SIDE VIEW
tiC' BEAM CHASSIS
SEE GENERAL NOTE ,13
-
DRILL 9/1 ft' HOLE AT ~ID HEIGHT
Of BEA~ AND INSTALL _ ,-,'"'")...
1/2:" 1.307 BOLT " '__,'1
(TYPI~)_ ,> - _: :::tj
"r"-
r::~':'-
~ ,-
,-
-,,"",
,-' -,"'
,-' .
- - ~J
,-
,-
SIDE VIEW
"RFC" BEAM CHASSIS
SEE GENERAL NOTE 13
CONTRACTORS CERTIFICATION "'" '5}{,~;;';>~;''i:{'~';;'
I CERTIFY THAT I HAVE INSTALLED THE SAC IND..:INC.' ANCHORING SYsTEM'~~~:::Y'
PER THE INSTALLATION INSTRUCTIONS. I HAVE MADE NO MODIFlCA1'lONs~'T(fi;THE,;~i '
ANCHORING SYSTEM OR TO THE BUILDING ,STRUCTURE. ' ,"" . ,.' ,:d{;<i:",,?}~~(::
. '.' .' <' : .' i' . ~> ;;~::~~~;):" ":~):"\~'e'
COMPANY NAME: CONTRACTORS LIG~# ,,'"
, ,
Jul 25 02 03:34p
Cit~ OT Bremerton
3604785398
F' 1
O~'~u~54-
~-:y.a};f~H~gt~2,fT \iF?,S!51F.'
CITY Of BREMERT(J1, WASH [flGTON
DEPARTMENT 01" PUBLIC IoJDRKS
JUL 2 r.; 2002
PER ~ I T
r! n'tiI"J ;!\;, t\ ~ :,,f
Ii f.' g ~.I tl.,,~; '~,~ '~~,
~~ f: ~<-"'\\., ~ ~
~~.., \.1 '~ 'i
~ ~:...,::'~,
ft(.~~+-t:r
~l-o
Thu Jun 13. 2002
Permi t 4; 4251
Per!l1it Fee:
$95.00
APPLICANT: BSB LANDSCAPE AND DESIGN * Certificate Of Insurance Is On File
,,675,(,/0 /k/d t~'l'o..:;
j?eL.:I/ /ltJ Y -tyOt? C? ? 6 7 7
l ;M,Ot: I~,d
tee,#t!'04.-tJt:.ICI ;Z?"Z,4-
Owner: ROBERT A. LARSEN Address: 8045 OLD MILITARY RD9B310 Ph:,692.2871
\lork AOCtresses:
3616 BURIIUL ST
TYPE B PERMIT
DRIVEWAY APPROACH
NO CURB & GUTTER OR SIDEWALK
SIDE SEWER CONNECT. IN R!W
A PERMIT IS HEREBY ISSUED for the performarce of the following.
DR IVEWA Y It I?;:J,A!.C lie N
USE OR OCCUPY A PUBLIC PLACE
PERfOR~~CE BOND ON FILE
This work requires blockage of a street or alley ~nd m~y cut off access to
property for emerg~ncy vehicles
This permit is valid for 90 calendar days conmencing with "he date of this permit unless speCifically called
out under limitations below, This perm': must be posted on tne jab site in a location accessible to City
Employees. The Engineering Oepartment must have 24 hours notice of the need for a required inspection. An
inspection ffiust be made prior to any work commencing and after conpletion of the job. Phone 478.5270.
Limitat,ons: SEE ATTACHED C~MENTS AND COND~TIONS. TRAFFIC PLAN ON IOILI.
!.'ORK SCHEDU LE
Commence Work: 07/25/2002 8:00AM
Co"plete Work: 11/25/2002 4:00PM
INSPECTION RECORD
Date of Inspection:
Date of Approval;
Comment: CONTACT PERSO~: BILL PRIGGER 710.4556
")2~? //-./~~?f7
(Si gT1ature of AfiP.M cant)
/~~ "i1,/J4~
/1/ f/~ ~u7..tt--l..:.;w~f
(ISSuer~{ ~, ~B(11)
Ph018 II
Fax #
Jul 25 02 03:34p
Cit~ oT Bremerton
3604785398
~ -.
CITY OF BREMERTON ENGINEERING DEPARTMENT
RlGHT OF WAY PERNUT NO d:li I
1, For undt:rground locates call: 800-424-5555
2, Traffic Control shall be per Washington State M.U.T.C.D. and City of Bremerton
Standards. Notify CENCOM (616-5800), Kitsap Transit, Paratransit, Bremerton
School District (during school year), and Kitsap Disposal of work schedule prior to
start of work, if blocking driving lanes. Sidewalk closed signs shall be used at each
end of the \'r-ork area during construction,
3. The street shall be cleaned each evening. Catch basins and ditches shall be protected
from dirt and debris per City of Bremerton Standards. No dirt or debris shall be left
on a sidewalk. No dirt shall be left on grass or landscaping for such a length of time
that it will result in damaged or dead plants.
4. TIle Contractor shall notify the adjacent property owners and the City of Bremerton
Engineering Department three (3) working days prior to start of Work and the
start of Pavinf.!:.
5. This Permit and a copy of the Approved Plans shall be kept on the work site
durine construction.
6. Received from the City of Bremerton:
Trench and Surface Restorati on Standards
Curb & Gutter, Sidewalk, and Driveway Standards
Other: TN-/ve /A.-'~ ;YjtJHad.. v,it: {'~df.:r.!'td G~1..#;e.r,
7. Any landscaping, pavement, sidewalk, Slgn, mail box, or retaining wall disturbed
during construction shall be restored to its original or better c~mdition per City of
Bremerton Standards,
8. \\'hen installi:1g underground utilities, the Contractor shall maintain a parallel
distance of 5 feet away from other City owned underground 'Jtilities, Buried conduit
and cable shall have a minimum of 2 feet of cover over the top of pipe. In paved
areas that 2 feet minimum is measured from the bottom of pavement to the top of
pipe.
9, The Permittee and any of the Perrnittee's contractors are required to name the City of
Bremerton as additional ins'..lred for the work in the rigb,t-of-way on their insurance
policies.
10, If there is a question abo'.!t, or damage to a City owned utility call 360-478-5920 for
assistance during 7:30am to 4:00pm, After 4:00pm call 911 and request that the
"Standby" Utility Worker be contacted,
, /"1. /?,
RECErv ED BY: /t.~/,;.//; </.~~-o/
/ i,~'
-; -/
DA TE: "I Z. 7 '200 '2--
,
p.2
__ ~j<~~ n-~~ . .. ~>l~~~g~ ~~cp~-,'~
_ I _ tv- ;Ff-'" -L. :7> - ~
-"'V _ _ _ _ - ~-- -~-=i- - Q-S: z:. - <-
_ _I _ __ _ _ I -- --~, - ,------ - -- t - _~~D fj)- ~ -tP2:..~- -;b~'-~
i\~ ~K~ f'r\ b r-D.i--~ CD
____~--:t!::r------.:-~-2 .-:- '.'. xcC:: lS~:E!iVJJ2:
.--~:-~l~ -{---I--- ~'_..' -L:- . :~i~~--~f~~~
, -=~~___~~ ~__. . _ ____ ~ _ .. -;;_~:-_ ....~~~~-~~~ z;
~_~ _ _: _-- . 1__ g;n -:-~Ff'~~:~g~~~- 4:J
____ _N I -- --~ t S~~ITj ~~Lm 0=
u-;:- _____---- __ ... .+-_ ~~~ _v/F>(p."\~':Y
_ jrl=~!.L r--~:n-: ~-~~ -~~-ir11
, ;;zJ--- ,._, Zl --t ----- ,-'>-
ng __ + . '.. . :p', .. ,. --:;I7 _ -I-' '. ,1.1> -
.~Y5~_~r- -~]_t .~~:~...'.].~~_ ...-.~'?~~~~~~r)_..
~_~n_~~~-_- ' -- .,.-. -".-:.~~--~' ..........- '.'.. ..~..-. ..~
_~ ,_ _1__ m __ ,"'. ....- --,-. 'c>i . '-,'
~~:8l~ ~:- -n _ .- 0'2 _-~. -:~ ~ ~ ~~~ .--=i-~
;-_'...-~-:I--::'.-=-J+:D\<i,'ln :'-rn.:' -~ -- -.~-=-~:~-
. . ...+ .. -"'5?:7A~' -I-I\)' . - I ". ..;::::;>--. .
___ _ _~_ ~I-'----.,.-..- ___'.."_1 -1- ~~- -. 1- ~ ~- -0 -ujJl1 0-
_gjn-j 00:-- .. .. - __ --3fCJfd_ 1-.. . ~ - ~_ ~. .. -_-1--
_ ~i __ ~-I- ----=-+F - == -} <be i-un i - ~ ~~. u_
i _~-~- ~~-1_~-_nniZl3-: . ~-,~~ )
r;- 1_-_ - _.L~ ...6'-
rV - · :L~ '"
~ . &> _' '"-3 .:.... ".'. -., '.. .
:co _ 0 . ...... '.. f')~t-':O~--)I
~-- -':N _ -~ 'n -- ;,-
" ' f~~~ I~
I~H - .
rw i '
~iig
~~~i
g. ~
. g S1[
"C ""-f
!ili
i!~i
-8
~ tl !.
fiat
!f~t
i"':~
..I!!
i~!i!
'5"88&
fill
rr'~i
~~=E
{ ::2
~ii~
5'f .. ~
....J;'
~i I
ii':O !
c: 3-
g ~
I
o
o
~ ~ ~I~
~ ~.!l,g:.!.;r ;-; i' ..
j ............ i'r
'~;rll'll'll'r ~g,
.~t:iiii' i e.i
.. ~ ~ i ~; ~ ~ 11 [ OS ~ !
'$ ~~s ~;~'8!. ~ ;I~
S !i r:a" ~.. i.. ! c:
~ _I' .; [11;! ~! 5
II i ~I l!tqU U~
~1'lcla...t8!i
~ I ~ _ i ~_tflf I ! I
· 'ia~~g"~:a 1f~11
· .. ~I Jlitfii t [I
.. Ili.ell ~:: S"
ni~~11 ~~fi~;i!;
,. ,~ ij~ h ~J h ~
~. >~ al! ~ il! I Iil
, 8 1 i! i~r I I
,N N ~ ~I r ~. I !ill II
III i = Ii.".. I
~ ~ = :~t. I
~I ~ mal r ! ~l~ I
:! . ~ ii g ~11 ' I
~. · .1..... I
In!;~ U!:
~ g! . :.9 I
II I t... I
~"~=I! ,I I
~ 5; ~
.. . I
.
i
~
.
a
!
~
-
I
Q
.
i
,--L
I t
I
I
flIlQ ·
llif~ ~
I ~~ !
-~ .
I _;
I
I
I
I
: !
, }:i!
I ~i
I j oc
. I i
I
I
I
I
I
I
'~
Ji
--
----==----=.=:===:=-=~.:==:=
==---- --------- -------
---
, ,,~-......~......--...._-
. . 61' ....<0......
o '-
Q;~ ~
~ ..
.. =.
o ,~
~ ~ i RADeo
.. "ji
4N la'
~ ~,i i ~ ~il
(~ i In
~ APPROVED
03 :'
c.
. ' .
~
ila .
j!~
t~~
. ai
~"4
iI;-
...51
i~
ia
~~ii~'
h~;
e~~2
~.i~~
-E~
~g~?;
al:o~
1iI-
~4 ~
ii~i
ml
ft~~."
!!S sij
..I Q
~~~~
!~g-
i~~;
il-~
~~!g,
-
I
Q
I
!
BREMERTON BUILDING DEPARTMENT
Inspection Report
Scope of work:
Address: '
, Owner:
Contractor:
Permit Number:
Od-nd54-
Phone:
Phone:
Inspection card/approved plans on site Setbacks ,
Footings: required steel placement Walls: required steel placement
Footings: required width & depth Walls: required size
Bearing soil (soils analysis if applicable) Special inspector (when applicable)
/)
FOUNDA liON
:WLoC!C
I~ tV G-/CI uYl g, (1 S
/
FOOTINGS APPROVED:
WALLS APPROVED:
Electrical approved Plumbing & mechanical approved
Crawl space access (min. 18 x 24) Floor joists and beams/proper clearance to earth
Positive connections posts &' beams Foundation vents
Posts properly supported Anchor bolts: nuts & washers in place
Mudsill: treated material Floor joists: size & span
Beams/girders: size & span Notching & 'drilling: joists & beams, studs
Smoke detectors: all required locations Exhaust fans: where required
Exhaust fans insulated: unconditioned space Whole house fan, outside air intakes each bedroom
Fans tenninating directly outside Range hood
Dryer exhaust vent All vent tenninations: windows & property line
Fireplace combustion air Windows: meets egress requirements
Windows: proper U valve Windows: safety glazed where required
Ceiling heights Stairs: headroom clearance
Stairs: rise & run; proper width Fire blocking wall to Ceiling, furred walls every 10'
Fire blocking: stairs, soffits, lowered ceilings Fire blocking: tubs/shqwers
Fire blocking: lids in void spaces, shafts Fire blocking: stuff holes top & bottom plates
Sheet rock backing Wall bracing
Rafters size/notching Trusses: specs, bracing,
Attic access Attic ventilation
Wall & roof sheathing Shear nailing
Building dried in
FRAMING
COMMENTS:
APPROVED:
Insulation: proper R valve Insulation: proper fastening
Insulation: vapor barrier Bottom plates caulked to floors
, Pe'1etrations caulked as required Electrical boxes gasketed or caulked
6 mil black poly in crawl space
ENERGY CODE COMPLIANCE
COMMENTS:
UNDER FLOOR/FOUNDATION INSULATION APPROVED:
WALL INSULATION APPROVED:
CEILING INSULATION APPROVED:
~
Appliance location and access, proper support Appliance clearance to combustibles
Venting: clearance to comoustibles Venting: size & support
Vent termination Comoustion air
Ducts: size & !?UPport Gas 'pipe under test
Gas pipe size & support Gas pipe: underground min. 12" below grade "
Gas pipe: within 6" or underground-coated Gas shutoff within 3' of appliance
Gas logs: safety shut-off Gas logs:,damper permanently open
Wood stoves EPA certified Wood stoves & fireplaces: Tight-fitting doors
Wood stoves & fireplaces: proper health Manufacturer's specs on site
Chimney liner: when required Chimney: separate flues when required
MECHANICAL
COMMENTS:
GAS PIPING APPROVED:
FURNACE APPROVED:
OTHER APPLIANCES APPROVED:
OWV & water piping under test OWV: proper grade
OWV: 'proper sizing OWV: proper drainage fittings where required
OWV & water piping proper support OW: required c1eanouts
Vent termination All fIXtures vented properly
Water supply: proper siting Shut-off valves on all fixtures
Water heater: gate valve on cold water supply Vacuum breakers: where required'
Water heater relief valve drain to outside Water heater: seismic strap
R-10 pad under water heater when required Water-piping insulated as required
Grease traps/interceptors: where required Proper indirect wastes: where required
PLUMBING
COMMENTS:
PLUMBING GROUNDWORK APPROVED:
PLUMBING ROUGH-IN APPROVED:
Proper fastening nails - 7" o.C, horiz. Plane Nails 8" o.c. vertical plane
Proper fastening screws 12" o.C. horiz. Plane (1/2") Screws - 12" o.C. horiz. plane (1/2') 24" o.c. framing
Proper fastening: screws - 16" o.c. vert. Plane (1/2') Screws - 12" o.c. vert. plane (1/2") 24" o.c. framing
Proper fastening screws- 12" o.C. horiz. plan (5/8") Screws - 12" o.C. horiz. plane (5/8') 24" o.c. framing
Proper fastening screws - 16" o.c. vent. Plane (5/8') Screws - 12" o.c. vert. Plane (5/8') 24" o.c. framing
Area & occupancy separation walls Oraftstops where required
Usable space under stairs (5/8" required) Waterboard where required (not on ceiling)
Corridors
SHEETROCK
COMMENTS:
SHEETROCK APPROVED:
Energy code requirements met, exhaust fans Plumbing & mechanical
Garage/dwelling door self closing solid core Smoke detectors where required
Handrails & guardrails, as required Fire ratings maintained
Exit signs when required Emergency lighting when required
Occupant load posted when applicable Building weatherlight
Wood siding to earth separation (6") Building address posted
Randon monitor when required
FINAL
COMMENTS: S';zcdKfC.....APr ~ V5~y Fe 03-630'3
~/t/etf)/.;'7 ML3~~'7/h/ ~-/tr~crs