Loading...
HomeMy WebLinkAbout4538 Contract Number: Vendor: Subject: Department: File Class: Begin Date: End Date: Review Date: Vault Date: Comments: 4538 BROWN & CALDWELL Cons~ltant - Sewage Pump Station CE-6 - 2006 Mods Engineering LEG 12-1 01/13/2006 08/31/2007 02/15/2009 ... 01/01/2009 Modification #1-6/07 ..". c ; CONTRACT MODIFICATION AGREEMENT NO.---L- BETWEEN THE CITY OF BREMERTON AND BROWN AND CALDWELL PROJECT Sewage Pump Station CE-6 2006 Modifications CONSULTANT Brown and Caldwell DATE May 15, 2007 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE Professional Services A2;reement with Brown and Caldwell for Desi2;n of Sewa2;e Pump Station CE-6 2006 Modifications (the "Contract") entered into between the City of Bremerton and Brown Caldwell on November 16. 2005 All provisions in the Contract shall remain in full force and effect except as expressly modified by this document. For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: I. Section I. Scope, is modified as follows: Exhibit A, Task 207: Biddin2; and Construction Assistance allowance is increased from $5,000 to $10,000 Section II. Term, is modified as follows: No chan2;e Section III. Compensation, is modified as follows: The original contract amount was $88,624.00 Dollars. The City shall pay the Consultant for the additional work described above, based on time and materials, an amount not to exceed $5,000.00 Dollars for a total amended contract amount of $93,624.00 Dollars, including this Contract Modification. II. Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement of all of the Consultant's claims for contract time and for all costs of any kind, including without limitation, co~ts of delays related to any work either covered or affected by this Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City's right to bring a claim for past performance. The undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and CONTRACT MODIFICATION Project Number: 574 \. other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Contract Modification shall be effective when approved by the City. of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above. City Engineer / Public Works Director approved to proce~ {, /2/ /07 Initials and Date CONSULTANT. ~~~~~ DATE: tt --{ 5- 0 1 R:\LEGAL\Contracts\FORMS\Contract Modification (2003).doc CONTRACT MODIFICATION Project Number: 574 ------ DATE: IP -d.S- (j 7 NOTICES TO BE SENT TO: Mr./Mrs. Title City of Bremerton Engineering Department Address 1 Address 2 Phone/Fax 2 +--------------------------------------------------------------------------+ +Enter Search Criteria, Press Esc Key to Transmit + +Press Del Key to Terminate Delete Mode + + CHANGE Contract Transactions + + Contract Number 4538 + + + +Vendor Name BROWN AND CALDWELL + +Subject CONSULTANT - 2006 MODS - SEWAGE PUMP STATION CE-6 + +Department ENGINEERING + +Status Code PRO + + Amount $88624.00 + + Begin Date 01/13/2006 + + Insurance End Date 04/10/2006 + + Type Amount Review Date 02/15/2008 + + GL $2000000.00 + + AL $1000000.00 + + E&O $1000000.00 + + Insurance Total $4000000.00 + + Insurance Review Date 03/01/2006 + + + + Comments VAULT 01/01/2008 + + + + + +--------------------------------------------------------------------------+ . . . PROFESSIONAL SERVICES AGREEMENT Sewage Pump Station CE-6 2006 Modifications/Project No. 574 The City of Bremerton ("City") and Brown and Caldwell ("Consultant"), referred to collectively as the "Parties," enter into the following Agreement for professional services: I. Scope: The Consultant agrees to perform the services more specifically described in the Scope of Work, dated November 1. 2005, including any attachments thereto, attached hereto as Exhibit A, which is incorporated by reference herein. The Scope of Work may be modified only pursuant to Section VII.G. of this Agreement. If the Scope of Work provides for unspecified additional services such services shall only be performed upon the express written request of the City. Consultant further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices in effect at the time such services are performed. II. Term: The City and the Consultant agree that work will begin on the tasks described in Exhibit A immediately upon execution of this Agreement. The parties agree that the work described in Exhibit A is to be completed as provided for in the work schedule attached hereto as Exhibit B; provided however, that additional time shall be granted by the City for excusable. delays or extra work as provided for in section IX (A) of this agreement. III. Compensation: In consideration of the services provided pursuant to this Agreement, the City shall pay Consultant in an amount not to exceed $88.624. Consultant's charges and bills shall conform to the fee schedule attached hereto as Exhibit C and incorporated herein by this reference. The Consultant shall submit regular billing statements detailing work performed and amount charged on each task or portion thereof. The descriptions shall conform to and fall within the categories set out in the Scope of Work and/or Fee Schedule. Upon receipt of a conforming billing statement, the City shall promptly process payment within 30 days of receipt. PROVIDED, HOWEVER, the City r~serves the right to prioritize scoped work and accelerate and/or delay work tasks under the time frame set forth in Section II herein. The Consultant's labor rates and billing fees shall be as delineated in Exhibit C. Consultant shall not perform work beyond the Scope of Work, nor shall be compensated for such work, unless the Scope of Work or amount of compensation is modified pursuant to this Agreement. Consultant shall only be compensated for additional services if requested pursuant to Section I and, if not otherwise provided, such compensation shall be in accordance with Exhibit C. If a billing statement does not conform to this Agreement, the City may withhold payment until the statement is . brought into compliance. Such withholding does not relieve Consultant of its obligations under this Agreement. Bremerton/Brown and Caldwell Sewage Pump Station CE-6 2006 Modifications Page 1 of6 . . IV. Relationship of Parties: Consultant represents that it is skilled in the matters addressed in the Scope of Work and is performing independent functions and responsibilities within its field of expertise. Consultant and its personnel are independent Consultants and not employees of the City. Consultant and its personnel have no authority to bind the City or to control the City's employees and other Consultants, None of the benefits provided by the City to its employees, including, but not limited to, compensation, insurance, and unemployment insurance are available from the City to the employees, agents, representatives, or sub-Consultants of the Consultaht. Consultant will be solely and entirely responsible for its acts and for the acts of Consultant's agents, employees, representatives and sub-Consultants during the performance of this Agreement. The City may, during the term of this Agreement, engage other independent Consultants to perform the same or similar work. As an independent Consultant, Consultant is responsible for its own management. The City's administration and enforcement of this Agreement shall not be deemed an exercise of managerial control over Consultant or its personnel. " As an independent Consultant, Consultant is responsible for payment of all taxes and licensing fees necessary to perform its obligations under this Agreement. These taxes and fees include but are not" limited to' State industrial insurance, Business & Occupation, State professional licensing, and Citybusiness licensing. If any taxes or fees due the City have been declared delinquent, the City may withhold the delinquent amount, plus any additional charges arising from the delinquency, from any payments due Consultant. v. Indemnification:' Consultant shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Consultant's negligent performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's review or acceptance of any of the work when completed shall not be grounds to avoid any of these covenants of indemnification. ' Shou}d 'a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the eventofliability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, agents and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence. IT IS FURTHER SPECIFICALLY ANp EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE' PURPOSES OF THIS INDEMNIFICATION. . THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this Agreement. . VI. Insurance:, The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, employees, sub-consultants or sub-Consultants. Before beginning work on the project described in this Agreement, the Consultant shall provide a Certificate of lnsurance evidencing: 1. Automobile Liability insurance with limits ,no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and 2. Commercial General Liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and gen.eral aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to:' blanket contractual; products/completed operationslbroad form property damage; explosion, collapse and underground (XCU) if applicable; and employer's liability; and 3. Excess Liability insurance with limits not less than 1,000,000 limit per occurrence and aggregate. 4. Professional Liability insurance with limits no less than $1,000,000 limit per claim. . Any payment of deductible or self insured retention shall be the sole responsibility of the Consultant. All required policies shall be provided on an "occurrence" basis except professional' liability insurance (if required), which may be provided on a "claims-made" basis. The City shall be named as an additional insured on the Commercial General Liability insurance policy, as respects work performed by or on behalf of the Consultant and a copy of an endorsement that is acceptable to the City, which names the City as an additional insured shall be attached to the Certificate of Insurance. The' City reserves the right to receive a complete copy of all the required insurance policies. The Consultant's Commercial General Liability insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. The Consultant's insurance shall be primary insurance as respects the City and the City shall be given thirty (30) days prior written notice by regular mail, return receipt requested, of any cancellation, of suspension or material change in coverage. The City also reserves its unqualified right to require at any time and for any reason, proof of coverage in the form of a duplicate of the insurance policy with all endorsements as . evidence of coverage. Bremerton/Brown and Caldwell Sewage Pump Station CE-62006 Modifications Page 3 of6 . VII. General Conditions: . . A. Reports and Information: When requested by the City, Consultant shall furnish periodic' reports and documents on matters covered by this Agreement. The reports and documents shall be, furnished in the time and form requested. Consultant shall maintain accounting records in accordance with Generally Accepted Accounting Principles (GAAP) to substantiate all billed amounts. B. Ownership and Use of Records and Documents: Original documents, drawings, designs and reports, including those in electronic format, developed under this Agreement are the property of the City. All written information submitted by the City to the Consultant in connection with the services performed by the Consultant under thIS Agreement will' he safeguarded by the Consultant to at least the same extent as the Consultant safeguards like information relating to its own business. If such information is publicly available or is already in Consultant's possession or known to it, ot is rightfully obtained by the Consultant, from third parties, Consultant shall bear no responsibility for its disclosure, inadvertent or otherwise. All data, documents and files created by Consultant under this Agreement may be .stored at Consultant's office in Seattle, Washington. Consultant shall make such data, documents; and files available to the City upon its request at all reasonable times for the purpose of editing, modifying and updating as necessary until such time as the City is capable of storing such information in the City's offices. Duplicate copies of this information shall be provided to the City upon its request, and at reasonable cost. All documents, including all reports, drawings, specifications, computer software or other items prepared or furnished by COBsultant pursuant to this Agreement, are instruments of service with respect to the project and are the property of the City. Any reuse by the City for other than the specific purpose intended will be at City's sole risk and without liability to Consultant. c. Work Performed at Consultant's Risk: Consultant shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and sub-consultants in the performance of the work hereunder and shall utilize all protection necessary for that purpose. All work shall be done at Consultant's own risk, and Consultant shall be responsible for any loss of or damage to its materials, tools, or other articles used or held for use in connection with the work.. i D. Place of Work: ,The Consultant shall perform the work authorized under this Agreement at its offices in Seattle. Washington. Meetings with the City staff as described in Exhibit A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed upon by the parties., E. Entire Agreement: This Agreement and its Exhibits constitutes the entire agreement between the Parties, and the Parties acknowledge that there are no other agreements, written or oral, that have not been set forth in the text of this Agreement. BremertonIBrown and Caldwell Sewage Pump Station CE-6 2006 Modifications Page 4 of6 . . F. Severability: Should any part of this Agreement be found void, the balance of the Agreement shaJI remain in full force and effect.' G. Modification: This Agreement may only be 'modified by written instrument signed by both Parties. H. Written Notices: All communications regarding this Agreement shall be sent to the parties at the addresses listed below by registered or 1 st class mail, or by personal service, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. City Address C \~ ~.f-By~,-Aoh .3t+s f)i~+h 5+. s-k- (000 " . 5...C!"'~t'_'t'-fu'r"\ W~ '\'-331- \\13 Consultant Address 1b~OwN ~N\) CAL..-DWf L.L \O\~\~ S\.j STE \1-00 S'CA-\ILE) \AJA Cl.~\O\ 1. Waiver: Failure to enforce any provision of this Agreement shall not be deemed a waiver of that provision. Waiver of any right or power arising out of this Agreement shall not be deemed waiver of any other right or power. ~. J. Non-Waiver of Breach: The failure of the City to insist upon strict performance of any of the covenants and agreements contained herein, or to exercise any option herein conferred in , one or more instances shall not be construed to be a waiver or relinquishment of said covenants, agreements or options, and the same shall be 'and remain in full force and effect. K. Compliance with, Laws: Consultant shall comply with all applicable Federal, State, and local laws in performing its obligations under this Agreement. L. Choice of Law and Venue: This Agreement shall be interpreted according to the laws of the State of Washington: ' Any judicial action to resolve disputes arising out of this Agreement shall be brought in Kitsap County Superior Court. M. Attorneys' Fees: In the event of litigation to enforce any of the terms or provisions herein, each party shall pay all its own costs and attorney's fees. ' ' N. Assignment: Any assignment of this agreement by the Contractor without the written consent of the City shall be void. ' VIII. Nondiscrimination: Consultant shall not discriminate in employment or services to the public ,on the basis of race, color, national origin, sex, religion, age, marital status, or disability, except for employment actions based on bona fide occupational qualification. ' IX. Termination: This Agreement shall remain in force until completion and acceptance of . the services, terminated by written instrument upon mutual consent, or by the City of Bremerton Bremerton/Brown and Caldwell Sewage Pump Station CE.:.6 2006 Modifications Page 5 of6 . for convenience. This Agreement may be immediately terminated for cause by a Party if the other Party substantially fails to perform through no fault of the terminating Party, and the non- performing Party does not commence correction of the failure of performance within thirty (30) days of the terminating Party's sending notice to the non-performing Party. Any Notice by Consultant shall include a report showing the status of all items listed in the Scope of Work current through the termination date. If the City receives reimbursement by. any federal, state, or other source for work described in ' Section I herein, and that funding is withdrawn, reduced or limited in any way, or the project is cancelled or substantially reduced after the execution date of this Agreement and prior to the completion of the work, the City may summarily terminat~ this Agreement. A. Excusable Delays: The right of Consultant to proceed shall not be terminated nor shall Consultant be charged with liquidated damages for any delays in the completion of the work due to: 1) any acts of the federal government in controlling, restricting, or requisitioning materials, equipment, tools, or labor by reason of war, national defense, or other national emergency; 2) any acts of the City, its consultants, or other public agencies causing such delay; and 3) causes not reasonably foreseeable by the parties at the time of the execution of the Agreement that are beyond the control and without the fault or negligence of the Consultant, including, l;mt not restricted to, acts of God" fires, floods, strikes, or weather of unusual severity. PROVIDED, HOWEVER, that the Consultant must promptly notify the City within ten (10) calendar days in writing of the cause of the delay. If, on the basis of the facts and the terms of this Agreement, the delay is properly excusable, the City shall, in writing, extend the time for completing the work for a period of time commensurate with the period of excusable delay. . 8., Rights Upon Termination:, In the event oftermination, the City shall pay for all services performed by the Consultantto the effective date of termination, as described on a final invoice submitted to the City. Aftertermination, the City may take possession of all records and . data within the Consultant's possession pertaining to this project which may be used by the City without restriction. Any such use not related to the project which Consultant was contracted to perform shall be without liability or legal exposure to the Consultant. CIT~ERTO . ~t ~f2r!~emal1 Date. - - CONSULTANT $\C:\:)wu ~ C~wEU- By: Awr.l:i I ~ W' its: V~ ~ ,~~ Date: l- 2.-0 (, . Bremerton/Brown and Caldwell Sewage Pump Station CE-6 2006 Modifications Page 6 of6 EXHIBIT A CITY OF BREMERTON SEWAGE PUMP STATION CE-6 2006 MODIFICATIONS ENGINEERING DESIGN SERVICES SCOPE OF WORK INTRODUCTION The purpose of this contract is for Brown and Caldwell, sometimes referred to as the Consultant, to provide engineering services to assist the City in the design of the upgrade of Sewage Pump Station CE-6. Brown and Caldwell's services for this project include the tasks listed in Table 1. A detailed description of each task is provided below. Table 1. Scope of Services Task Description 101 Project Management, Coordination, and Meetings 201 Electrical Design 202 Instrumentation and Control'(I&C) Design 203 Structural AnalysislDesign- Not used 204 Mechanical Design 205 Pumping System Design Review 206 Engineer's Cost Estimate 207 Bidding and Construction Assistance 300 Engine Generator Pre-purchase - Not Used 400 Additional Services General Project Scope This project involves the replacement of an existing portable generator set with a fixed generator set, and thy replacement of three existing 75-horsepower (hp) pump motors with new 15-hp, VFD-rated motors. Brown and Caldwell will determine power loading and select a stationary diesel powered generator from the Washington State City of Bremerton November !, 2005 1 Sewage Pump Station CE-6 2006 Modifications Engineering Design Services Scope of Work generator bid list (Contract # 06605) for the City's purchase. City will develop generator installation requirements for bid document. The existing dry-well ventilation will be upgrad~d to increase the air flow to the space, and the dry-well space will be upgraded to a wet location level of design where practical, thus minimizing the electrical and control equipment in the dry well. General Project Assumptions 1. The City of Bremerton will be designing the mechanical pumping system upgrades for the station upgrade.' Brown and Caldwell has limited interface with this work with the exception of providing a technical review of the City's pumping system design and incorporating system power and control requirements into electrical and I&C designs and generator sizing. 2. Brown and Caldwell will provide dry well ventilation mechanical, electrical, and instrumentation and control drawings and specifications to the City of Bremerton for its use ir1 packaging a set of construction documents. 3. Existing controls demolition will be shown on electrical plans. A P&ID diagram will be created for pumping system only. Control diagram type will match existing forniat, which does not include loop diagrams. 4. The construction of the improvements included in this scope of work is based on the existing pump station being taken completely out of service. It is anticipated that the contractors performing the work specified in Division 16 and 17 will have access to the site during the pump replacements. 5. No staging of improvements will be incorporated into the design of the improvements in this scope. 6. Non pumping systems demolition drawings will be developed by Brown and Caldwell. 7. The contract specifications include the document Standard General ,Conditions of the Construction Contract as prepared by the Engineers Joint Contract Documents Committee (EJCDC). This document is located in Section 00700 of the contract specifications. 8. The City will prepare specifications for Divisions 0 through 10 and the pumping system upgrade specifications included in Divisions 11 and 15. Brownand Caldwell will prepare only those sections of Division 11 and 15 that apply to its work and the applicable sections from Division 16 and 17. Brown and Caldwell will not prepare specifications in Divisions 12 or 14. 9. There will be only one submittal meeting held during the project. This meeting will be at the 95 percent submittal stage at the City offices. City of Bremerton November 1,2005 2 Sewage Pump Station CE-6 2006 Modifications Engineering Design Services Scope of Work 10. The City will provide electronic AutoCAD title block and background drawings of the pump station's upper and lower levels for Brown and Caldwell's use in preparing the drawings required in this scope of work. City-provided drawings will include plan views and section views, to which Brown and Caldwell will apply the design information it is required by this scope to develop. 11. Design review submittals (70 and 95 percent) will be submitted electronically. The drawings will be submitted in a PDF format. Specifications will be submitted in Microsoft Word format. SERIES 100 TASKS - PROJECT MANAGEMENT Task 101 - Project Management, Coordination, and Meetings Consultant Responsibilities: 1. Contracting and internal project control and accounting 2. Staff administration and scheduling 3. Monthly reports and invoices 4. Attendance at coordination and review meetings Assumptions: 1. Standard invoices and reports will be submitted on a monthly basis. 2. Brown and Caldwell standard monthly invoice format will be utilized. This format contains an itemized list of project staff who charged to the project, hourly rates, number of hours charged, and other direct charges (ODCs). 3. Invoice hours will be classified by tasks. 4. No backup information (i.e., time sheets, logs, receipts, etc.) will be submitted with the invoices unless specifically requested by the City. Backup information will be available in Brown and Caldwell files for inspection by City project auditing staff, if requested by the City. 5. The City will maintain the role of overall project coordination with other governmental agencies. Work Products: 1. Monthly reports with descriptions of the work performed and cost of associated work. 2. Monthly invoices. City of Bremerton November 1, 2005 3 Sewage Pump Station CE-6 2006 Modifications Engineering Design Services Scope of Work SERIES 200 TASKS - DESIGN SERVICES Task 201- Electrical Design Consultant Responsibilities: 1. Develop the electrical plans and specifications for the pump station upgrade. It is assumed that the following drawings will be developed: 1 Electrical Symbols, Legend & Abbreviations 2 Electrical Details, 1 Electrical Demolition Plan 1 Electrical One Line Diagram 1 Electrical Power Plans (1 Upper and 1 Lower), including instrumentation 1 Electrical ATS / Generator / SCADA interface control diagram 1 Electrical drawing showing elevations as necessary 2. Develop technical specifications based on Brown and Caldwell's standard specifications in the Construction Specification Institute (CSI) format. This will include CSI Division 16, Electrical Specifications, for electrical equipment, including the interface to a new standby generator. 3. Research the availability of parts for the main distribution panel board. Prepare a design to replace the panel board and breakers if required. 4. Redesign the dry wells electrical to meet the requirements of a wet location. 5. Design control strategies for fixed diesel-powered engine generator selected from the state bid list for the City's purchase 6. Coordinate with the new instrumentation and control requirements for raceway and wire count and type. 7. Assist in the engineer's cost estimate. City Responsibilities: Provide 70 and 95 percent submittal review comments. Assumptions: 1. One site visit by the electrical engineer will be required. 2. The existing lighting within the pump station will remain. However, the lighting in the dry well will be wet location rated. 3. The existing pump station's automatic transfer switch, service entrance breaker, and lighting and power transformer and associated panel will remain in place. 4. The fuel tank for a new standby generator will be incorporated into the base of the generator. The fuel storage will provide fuel for 24 hour standby generator operation. .5. Written responses to City review comments will not be required. Work Products: 1. Seventy (70) and ninety-five (95) percent submittal design drawings and specifications. City of Bremerton November 1, 2005 4 Sewage Pump Station CE-6 2006 Modifications Engineering Design Services Scope of Work 2. One set of final design drawings and specifications stamped by the engineer. 3. Electronic drawing files in AutoCAD format and Adobe (.pdt) format. 4. Specifications in Microsoft Word. Task 202 - Instrumentation and Control Design Consultant Responsibilities: 1. Develop the instrumentation drawings and specifications for the pump station upgrade. It is assumed that the following drawings will be developed: 1 Instrumentation Symbols, Legend, and Abbreviations 2 Control Diagrams 1 Instrumentation Details 2. Locate VFDs inside existing control panel unless space constraints including VFD heating prevent this. 3. Review available signals from existing A TS and determine if additional signals will be desired by City. 4. Provide design for new Simantec (or equal) operator interface terminal on door of existing control enclosure. Existing door shall be repaired or replaced. 5. Provide design for new PLC modules and connections to new terminal blocks. New din rail is required to mount terminal blocks. 6. Reconnect generator alarms after new installation. 7. Develop technical specifications based on Brown and Caldwell standard specifications in the Construction Specification Institute (CSI) format. This will include CSI Division 17, Instrumentation Specifications, for narrow scope (one section). 8. Assist in the engineer's cost estimate. City Responsibilities: 1. City to provide existing instrumentation drawings for control panel, and make O&M manuals available for copying. 2. City personnel will perform all PLC programming and develop control strategies. 3. City personnel will perform all operator interface programming and develop control strategies. 4. Provide 70 and 95 percent submittal review comments. Assumptions: 1. One site visit by the instrumentation engineer will be required. 2. Existing bubbler system to be retained. 3. The existing pump station control panel, control equipment, and SCADA system will remain in place. Existing control equipment includes wet well level sensing check valve limit switches. 4. The fuel tank for a new standby generator will be incorporated into the base of the generator. With potential Low Fuel alarm being connected to the PLC. City of Bremerton November 1, 2005 5 Sewage Pump Station CE-6 2006 Modifications Engineering Design Services Scope of Work 5. Design review submittals will be submitted electronically. The drawings will be submitted in aPDF format. Specifications will be submitted in Microsoft Word format. 6. Written responses to client review comments will not be required. Work Products: 1. Seventy (70) and ninety-five (95) percent submittal design drawings and specifications. 2. One set offmal design drawings and specifications stamped by the engineer. 3. Electronic drawing files in AutoCAD format and Adobe (.pdt) format. 4. Specifications in Microsoft Word. Task 203 - Structural Analysis/Design - Not used Task 204 - Mechanical Design Consultant Responsibilities: 1. Evaluate the dry well ventilation requirement based on NFP A 820. 2. Develop technical specifications based on Brown and Caldwell standard specifications in the Construction Specification Institute (CSI) format for Division 15. The following drawings will be developed for the ventilation system; 1 Dry well ventilation plan and sections. 1 Air flow schematics 3. Provide input for the engineer's cost estimate. 4. Prepare control loop descriptions for ventilation equipment. 5. Size and select diesel-powered generator from state bid list (Contract # 06605) City Responsibilities: 1. Provide as-built drawings of the existing pump station. 2. Provide 70 and 95 percent submittal review comments. 3. City will coordip.ate purchase and delivery of generator to project site and design of generator installation. Assumptions: 1. One site visit by a mechanical engineer. 2. Written responses to client review comments will not be required. 3. Ventilation of the wet well and odor control will not be included. 4. There will be no plumbing design required. Work Products: 1. Seventy (70) and ninety (95) percent submittal design drawings and specifications. 2. One set of final design drawings and specifications stamped by the engineer. 3. Electronic drawing files in AutoCAD format and Adobe (.pdt) format. 4. Specifications in Microsoft Word. 5. 1 page memo or spreadsheet summarizing loads used in generator selection. City of Bremerton November 1, 2005 6 Sewage Pump Station CE-6 2006 Modifications Engineering Design Services Scope of Work Task 205 - Pumping System Design Review Consultant Responsibilities: Review and comment on City pump selection and specification. The review is not intended to be a complete design review but will examine City hydraulic system curves and the application of the City's analysis into the pump specification. City Responsibilities: 1. Provide design flow basis for design. 2. Provide system hydraulic curves and calculations that show force main performance and design operating points for pump selection and operating range. 3. Provide draft pumping equipment specifications. Work Products: Consultant will provide comments or recommendations to City relative to proposed design, pump operation and bidding specification. Task 206 - Engineer's Cost Estimate Consultant Responsibilities: 1. Provide an engineer's cost estimate for the ventilation, electrical and I&C upgrades. 2. Cost estimate will be supplied electronically and in hard copy City Responsibilities: The City will advertise, evaluate, and review the estimate and provide any feedback necessary for making corrections to the cost estimate. Assumptions: Only one cost estimate is required for the project and it will at the 95 percent submittal stage. Work Products: An engineer's cost estimate for the ventilation, electrical and I&C construction work. Task 207 - Bidding and Construction Assistance Consultant Responsibilities: 1. Upon request by the City, answer specific technical questions from prospective bidders regarding the contract documents. 2. Assist the City in preparation of addenda items during the bid process. 3. Review shop drawing submittals and the submittals directly related to specifications and design provided by Brown and Caldwell. City of Bremerton November 1, 2005 7 Sewage Pump Station CE-6 2006 Modifications Engineering Design Services Scope of Work 4. Consultant shall provide support under this task only to extent of available budget and shall notify city when available budget has been expended. City Responsibilities: 1. The City will advertise, evaluate the bids, and award the contract. 2. The City will administer all aspects of the construction contract, including coordination with owners of other utilities that must be relocated prior to construction. 3. The City will prepare and distribute addenda to plan holders Assumptions: An allowance of$5000 has been included in the project budget for support during bidding and construction upon request by the City. Effort will not be expended beyond this budget without prior written authorization from the City. Work Products: 1. Telephone records or other documentation of bidding questions answered during the bidding phase. 2. Shop drawing review comments. SERIES 300 TASKS - ENGINE GENERATOR PRE-PURCHASE- Not Used SERIES 400 TASKS - Additional Engineering Services Consultant Responsibilities: 1. Prepare cost proposals for additional services requested by the City. 2. Provide assistance as requested by the City. City Responsibilities: Request assistance and documents in writing. E-mail is considered suitable for authorization. Assumptions: An allowance of $5000 has been included in the project budget for additional services as requested by the City. Funds will not be expended from this task budget without prior written authorization from the City. Work Products: Work products will be determined at the time services are requested by the City. City of Bremerton November 1, 2005 8 Sewage Pump Station CE-6 2006 Modifications Engineering Design Services Scope of Work EXHIBIT B - SCHEDULE Notice to Proceed Engine Generator Selection Memorandum Seventy (70) Percent Design Submittal Ninety-five (95) Percent Design Submittal Ninety-five (95) Percent Design Submittal Comments from City Final Design Drawings and Specifications to the City November 17,2005 January 14,2006 January 19,2006 March 1, 2006 March 15,2006 April 10, 2006 City of Bremerton November 1,2005 9 Seivage Pump Station CE-6 2006 Modifications Engineering Design Services Scope of Work EXHIBITC - COMPENSATION Compensation for Consultant's services under this agreement shall be on the basis of an hourly rate equal to direct labor cost times a multiplier of 3.13 5 to be paid as total compensation for each hour an employee works on the project, plus reimbursable expense, with a maximum compensation not to exceed the total amount in Table C-1. This table provides an estimate of the cost per task as described in Exhibit A. The Consultant may adjust the distribution of compensation between individual tasks of the work described herein to be consistent with services actually rendered, but Consultant shall not exceed the total estimated compensation amount unless approved in writing by the City. The amount of any sales tax, excise tax, value added tax (VAT), or gross receipts tax that may be imposed on this Agreement shall be added to the Consultant's compensation as reimbursable expenses. Compensation terms are defined as follows: Direct labor cost shall mean salaries and wages, (basic and overtime) paid to all personnel engaged directly on the project. Reimbursable expense shall mean the actual expenses incurred directly or indirectly in connection with the project for transportation, travel, subconsultants, subcontractors, computer usage, telephone, telex, shipping and express, and other incurred expense. Consultant will ':ldd ten percent (10%) to invoices received by Consultant from sub- consultants and subcontractors. Charges for typical reimbursable expenses incurred by the consultant will be at the following rates. Travel: Current IRS rate for business use of an automobile Other travel expenses at cost Associated project costs (APC) $6.19 per labor hour APCs include Postage Phone Copying Fax Computer/software costs City of Bremerton November 1, 2005 10 Sewage Pump Station CE-6 2006 Modifications Engineering Design Services Scope of Work The approximate distribution of costs with respect the tasks are as follows. Table C-l. Project Budgetby Task Task Descripton Estimated Cost 101 Proj ect Management, Coordination and Meetings $16,672 201 Electrical Design $22,622 202 Instiumentation Design $16,511 203 Structural Anal ysisIDesign Not Used 204 Mechanical Design $14,305 205 Pumping System Design Overview $4,181 206 Engineer's Cost Estimate $1833 207 Bidding and Construction Assistance $7,500 300 Engine Generator Pre-purchase Not Used 400 Additional Services (See Note) $5,000 TOTAL CONTRACT AMOUNT $88,624 Note: No charges will be made to task 400 without prior written approval. Email will suffice as written authorization. City of Bremerton November I, 2005 11 Sewage Pump Station CE-6 2006 Modifications Engineering Design Services Scope of Work