BROWN & CALDWELL
Cons~ltant - Sewage Pump Station CE-6 - 2006 Mods
Engineering
LEG 12-1
01/13/2006
08/31/2007
02/15/2009 ...
01/01/2009
Modification #1-6/07
..".
c ;
CONTRACT MODIFICATION AGREEMENT NO.---L-
BETWEEN THE CITY OF BREMERTON AND
BROWN AND CALDWELL
PROJECT Sewage Pump Station CE-6 2006 Modifications
CONSULTANT Brown and Caldwell
DATE May 15, 2007
THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE
Professional Services A2;reement with Brown and Caldwell for Desi2;n of Sewa2;e Pump
Station CE-6 2006 Modifications (the "Contract") entered into between the City of Bremerton
and Brown Caldwell on November 16. 2005
All provisions in the Contract shall remain in full force and effect except as expressly modified by
this document.
For valuable consideration and by mutual consent of the parties, the modifications to the Contract
are as follows:
I.
Section I. Scope, is modified as follows: Exhibit A, Task 207: Biddin2; and Construction
Assistance allowance is increased from $5,000 to $10,000
Section II. Term, is modified as follows: No chan2;e
Section III. Compensation, is modified as follows:
The original contract amount was $88,624.00 Dollars. The City shall pay the Consultant for the
additional work described above, based on time and materials, an amount not to exceed $5,000.00
Dollars for a total amended contract amount of $93,624.00 Dollars, including this Contract
Modification.
II.
Consultant accepts all requirements of this Contract Modification by endorsing below.
Consultant further agrees that this Contract Modification constitutes full and final settlement
of all of the Consultant's claims for contract time and for all costs of any kind, including
without limitation, co~ts of delays related to any work either covered or affected by this
Contract Modification, claims related to on-site or home office overhead, or lost profits. This
Contract Modification does not limit the City's right to bring a claim for past performance.
The undersigned consultant approves the foregoing Contract Modification as to the changes,
if any, in the contract price specified for each item, including any and all supervision costs and
CONTRACT MODIFICATION
Project Number: 574
\.
other miscellaneous costs relating to the change in work, and as to the extension of time
allowed, if any, for completion of the entire work due to said Contract Modification.
This document will become a supplement of the contract and all provisions will apply hereto.
It is understood that this Contract Modification shall be effective when approved by the City.
of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a
contract modification that is binding on the parties of this contract. In addition, Consultant
warrants that it has or will inform the surety of this change, and shall take appropriate action
to modify any bonds required under the contract to address this change.
IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day
and year first written above.
City Engineer / Public Works Director
approved to proce~ {, /2/ /07
Initials and Date
CONSULTANT.
~~~~~
DATE: tt --{ 5- 0 1
R:\LEGAL\Contracts\FORMS\Contract Modification (2003).doc
CONTRACT MODIFICATION
Project Number: 574
------
DATE:
IP -d.S- (j 7
NOTICES TO BE SENT TO:
Mr./Mrs.
Title
City of Bremerton Engineering Department
Address 1
Address 2
Phone/Fax
2
+--------------------------------------------------------------------------+
+Enter Search Criteria, Press Esc Key to Transmit +
+Press Del Key to Terminate Delete Mode +
+ CHANGE Contract Transactions +
+ Contract Number 4538 +
+ +
+Vendor Name BROWN AND CALDWELL +
+Subject CONSULTANT - 2006 MODS - SEWAGE PUMP STATION CE-6 +
+Department ENGINEERING +
+Status Code PRO +
+ Amount $88624.00 +
+ Begin Date 01/13/2006 +
+ Insurance End Date 04/10/2006 +
+ Type Amount Review Date 02/15/2008 +
+ GL $2000000.00 +
+ AL $1000000.00 +
+ E&O $1000000.00 +
+ Insurance Total $4000000.00 +
+ Insurance Review Date 03/01/2006 +
+ +
+ Comments VAULT 01/01/2008 +
+ +
+ +
+--------------------------------------------------------------------------+
.
.
.
PROFESSIONAL SERVICES AGREEMENT
Sewage Pump Station CE-6 2006 Modifications/Project No. 574
The City of Bremerton ("City") and Brown and Caldwell ("Consultant"), referred to
collectively as the "Parties," enter into the following Agreement for professional services:
I. Scope: The Consultant agrees to perform the services more specifically described in the
Scope of Work, dated November 1. 2005, including any attachments thereto, attached hereto as
Exhibit A, which is incorporated by reference herein. The Scope of Work may be modified only
pursuant to Section VII.G. of this Agreement. If the Scope of Work provides for unspecified
additional services such services shall only be performed upon the express written request of the
City. Consultant further represents that the services furnished under this Agreement will be
performed in accordance with generally accepted professional practices in effect at the time such
services are performed.
II. Term: The City and the Consultant agree that work will begin on the tasks described in
Exhibit A immediately upon execution of this Agreement. The parties agree that the work
described in Exhibit A is to be completed as provided for in the work schedule attached hereto as
Exhibit B; provided however, that additional time shall be granted by the City for excusable.
delays or extra work as provided for in section IX (A) of this agreement.
III. Compensation: In consideration of the services provided pursuant to this Agreement, the
City shall pay Consultant in an amount not to exceed $88.624. Consultant's charges and bills
shall conform to the fee schedule attached hereto as Exhibit C and incorporated herein by this
reference.
The Consultant shall submit regular billing statements detailing work performed and
amount charged on each task or portion thereof. The descriptions shall conform to and fall
within the categories set out in the Scope of Work and/or Fee Schedule. Upon receipt of a
conforming billing statement, the City shall promptly process payment within 30 days of receipt.
PROVIDED, HOWEVER, the City r~serves the right to prioritize scoped work and accelerate
and/or delay work tasks under the time frame set forth in Section II herein. The Consultant's
labor rates and billing fees shall be as delineated in Exhibit C.
Consultant shall not perform work beyond the Scope of Work, nor shall be compensated
for such work, unless the Scope of Work or amount of compensation is modified pursuant to this
Agreement. Consultant shall only be compensated for additional services if requested pursuant
to Section I and, if not otherwise provided, such compensation shall be in accordance with
Exhibit C.
If a billing statement does not conform to this Agreement, the City may withhold
payment until the statement is . brought into compliance. Such withholding does not relieve
Consultant of its obligations under this Agreement.
Bremerton/Brown and Caldwell
Sewage Pump Station CE-6 2006 Modifications
Page 1 of6
.
.
IV. Relationship of Parties: Consultant represents that it is skilled in the matters addressed
in the Scope of Work and is performing independent functions and responsibilities within its
field of expertise. Consultant and its personnel are independent Consultants and not employees
of the City. Consultant and its personnel have no authority to bind the City or to control the
City's employees and other Consultants, None of the benefits provided by the City to its
employees, including, but not limited to, compensation, insurance, and unemployment insurance
are available from the City to the employees, agents, representatives, or sub-Consultants of the
Consultaht. Consultant will be solely and entirely responsible for its acts and for the acts of
Consultant's agents, employees, representatives and sub-Consultants during the performance of
this Agreement. The City may, during the term of this Agreement, engage other independent
Consultants to perform the same or similar work.
As an independent Consultant, Consultant is responsible for its own management. The
City's administration and enforcement of this Agreement shall not be deemed an exercise of
managerial control over Consultant or its personnel. "
As an independent Consultant, Consultant is responsible for payment of all taxes and
licensing fees necessary to perform its obligations under this Agreement. These taxes and fees
include but are not" limited to' State industrial insurance, Business & Occupation, State
professional licensing, and Citybusiness licensing. If any taxes or fees due the City have been
declared delinquent, the City may withhold the delinquent amount, plus any additional charges
arising from the delinquency, from any payments due Consultant.
v. Indemnification:' Consultant shall defend, indemnify and hold the City, its officers,
officials, employees, agents and volunteers harmless from any and all claims, injuries, damages,
losses or suits, including all legal costs and attorney fees, arising out of or in connection with the
Consultant's negligent performance of this Agreement, except for that portion of the injuries and
damages caused by the City's negligence.
The City's review or acceptance of any of the work when completed shall not be grounds
to avoid any of these covenants of indemnification. '
Shou}d 'a court of competent jurisdiction determine that this Agreement is subject to
RCW 4.24.115, then, in the eventofliability for damages arising out of bodily injury to persons
or damages to property caused by or resulting from the concurrent negligence of the Consultant
and the City, its officers, officials, employees, agents and volunteers, the Consultant's liability
hereunder shall be only to the extent of the Consultant's negligence.
IT IS FURTHER SPECIFICALLY ANp EXPRESSLY UNDERSTOOD THAT THE
INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S
WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY
FOR THE' PURPOSES OF THIS INDEMNIFICATION. . THE PARTIES FURTHER
ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER.
The provisions of this section shall survive the expiration or termination of this Agreement.
.
VI. Insurance:, The Consultant shall procure and maintain for the duration of the Agreement,
insurance against claims for injuries to persons or damage to property which may arise from or in
connection with the performance of the work hereunder by the Consultant, its agents,
representatives, employees, sub-consultants or sub-Consultants.
Before beginning work on the project described in this Agreement, the Consultant shall
provide a Certificate of lnsurance evidencing:
1. Automobile Liability insurance with limits ,no less than $1,000,000 combined single
limit per accident for bodily injury and property damage; and
2. Commercial General Liability insurance written on an occurrence basis with limits no
less than $1,000,000 combined single limit per occurrence and gen.eral aggregate for
personal injury, bodily injury and property damage. Coverage shall include but not be
limited to:' blanket contractual; products/completed operationslbroad form property
damage; explosion, collapse and underground (XCU) if applicable; and employer's
liability; and
3. Excess Liability insurance with limits not less than 1,000,000 limit per occurrence and
aggregate.
4. Professional Liability insurance with limits no less than $1,000,000 limit per claim.
.
Any payment of deductible or self insured retention shall be the sole responsibility of the
Consultant.
All required policies shall be provided on an "occurrence" basis except professional'
liability insurance (if required), which may be provided on a "claims-made" basis.
The City shall be named as an additional insured on the Commercial General Liability
insurance policy, as respects work performed by or on behalf of the Consultant and a copy of an
endorsement that is acceptable to the City, which names the City as an additional insured shall be
attached to the Certificate of Insurance. The' City reserves the right to receive a complete copy of
all the required insurance policies.
The Consultant's Commercial General Liability insurance shall contain a clause stating
that coverage shall apply separately to each insured against whom claim is made or suit is
brought, except with respects to the limits of the insurer's liability.
The Consultant's insurance shall be primary insurance as respects the City and the City
shall be given thirty (30) days prior written notice by regular mail, return receipt requested, of
any cancellation, of suspension or material change in coverage.
The City also reserves its unqualified right to require at any time and for any reason,
proof of coverage in the form of a duplicate of the insurance policy with all endorsements as
. evidence of coverage.
Bremerton/Brown and Caldwell
Sewage Pump Station CE-62006 Modifications
Page 3 of6
. VII. General Conditions:
.
.
A. Reports and Information: When requested by the City, Consultant shall furnish
periodic' reports and documents on matters covered by this Agreement. The reports and
documents shall be, furnished in the time and form requested. Consultant shall maintain
accounting records in accordance with Generally Accepted Accounting Principles (GAAP) to
substantiate all billed amounts.
B. Ownership and Use of Records and Documents: Original documents, drawings,
designs and reports, including those in electronic format, developed under this Agreement are the
property of the City. All written information submitted by the City to the Consultant in
connection with the services performed by the Consultant under thIS Agreement will' he
safeguarded by the Consultant to at least the same extent as the Consultant safeguards like
information relating to its own business. If such information is publicly available or is already in
Consultant's possession or known to it, ot is rightfully obtained by the Consultant, from third
parties, Consultant shall bear no responsibility for its disclosure, inadvertent or otherwise.
All data, documents and files created by Consultant under this Agreement may be .stored
at Consultant's office in Seattle, Washington. Consultant shall make such data, documents; and
files available to the City upon its request at all reasonable times for the purpose of editing,
modifying and updating as necessary until such time as the City is capable of storing such
information in the City's offices. Duplicate copies of this information shall be provided to the
City upon its request, and at reasonable cost.
All documents, including all reports, drawings, specifications, computer software or other
items prepared or furnished by COBsultant pursuant to this Agreement, are instruments of service
with respect to the project and are the property of the City. Any reuse by the City for other than
the specific purpose intended will be at City's sole risk and without liability to Consultant.
c. Work Performed at Consultant's Risk: Consultant shall take all precautions necessary
and shall be responsible for the safety of its employees, agents, and sub-consultants in the
performance of the work hereunder and shall utilize all protection necessary for that purpose.
All work shall be done at Consultant's own risk, and Consultant shall be responsible for any loss
of or damage to its materials, tools, or other articles used or held for use in connection with the
work.. i
D. Place of Work: ,The Consultant shall perform the work authorized under this
Agreement at its offices in Seattle. Washington. Meetings with the City staff as described in
Exhibit A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed
upon by the parties.,
E. Entire Agreement: This Agreement and its Exhibits constitutes the entire agreement
between the Parties, and the Parties acknowledge that there are no other agreements, written or
oral, that have not been set forth in the text of this Agreement.
BremertonIBrown and Caldwell
Sewage Pump Station CE-6 2006 Modifications
Page 4 of6
.
.
F. Severability: Should any part of this Agreement be found void, the balance of the
Agreement shaJI remain in full force and effect.'
G. Modification: This Agreement may only be 'modified by written instrument signed by
both Parties.
H. Written Notices: All communications regarding this Agreement shall be sent to the
parties at the addresses listed below by registered or 1 st class mail, or by personal service, and
shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement
or such other address as may be hereafter specified in writing.
City Address
C \~ ~.f-By~,-Aoh
.3t+s f)i~+h 5+. s-k- (000 " .
5...C!"'~t'_'t'-fu'r"\ W~ '\'-331- \\13
Consultant Address
1b~OwN ~N\) CAL..-DWf L.L
\O\~\~ S\.j STE \1-00
S'CA-\ILE) \AJA Cl.~\O\
1. Waiver: Failure to enforce any provision of this Agreement shall not be deemed a
waiver of that provision. Waiver of any right or power arising out of this Agreement shall not be
deemed waiver of any other right or power.
~. J. Non-Waiver of Breach: The failure of the City to insist upon strict performance of any
of the covenants and agreements contained herein, or to exercise any option herein conferred in
, one or more instances shall not be construed to be a waiver or relinquishment of said covenants,
agreements or options, and the same shall be 'and remain in full force and effect.
K. Compliance with, Laws: Consultant shall comply with all applicable Federal, State,
and local laws in performing its obligations under this Agreement.
L. Choice of Law and Venue: This Agreement shall be interpreted according to the laws
of the State of Washington: ' Any judicial action to resolve disputes arising out of this Agreement
shall be brought in Kitsap County Superior Court.
M. Attorneys' Fees: In the event of litigation to enforce any of the terms or provisions
herein, each party shall pay all its own costs and attorney's fees. ' '
N. Assignment: Any assignment of this agreement by the Contractor without the written
consent of the City shall be void. '
VIII. Nondiscrimination: Consultant shall not discriminate in employment or services to the
public ,on the basis of race, color, national origin, sex, religion, age, marital status, or disability,
except for employment actions based on bona fide occupational qualification. '
IX. Termination: This Agreement shall remain in force until completion and acceptance of
. the services, terminated by written instrument upon mutual consent, or by the City of Bremerton
Bremerton/Brown and Caldwell
Sewage Pump Station CE.:.6 2006 Modifications
Page 5 of6
.
for convenience. This Agreement may be immediately terminated for cause by a Party if the
other Party substantially fails to perform through no fault of the terminating Party, and the non-
performing Party does not commence correction of the failure of performance within thirty (30)
days of the terminating Party's sending notice to the non-performing Party. Any Notice by
Consultant shall include a report showing the status of all items listed in the Scope of Work
current through the termination date.
If the City receives reimbursement by. any federal, state, or other source for work described in '
Section I herein, and that funding is withdrawn, reduced or limited in any way, or the project is
cancelled or substantially reduced after the execution date of this Agreement and prior to the
completion of the work, the City may summarily terminat~ this Agreement.
A. Excusable Delays: The right of Consultant to proceed shall not be terminated nor shall
Consultant be charged with liquidated damages for any delays in the completion of the work due
to: 1) any acts of the federal government in controlling, restricting, or requisitioning materials,
equipment, tools, or labor by reason of war, national defense, or other national emergency; 2)
any acts of the City, its consultants, or other public agencies causing such delay; and 3) causes
not reasonably foreseeable by the parties at the time of the execution of the Agreement that are
beyond the control and without the fault or negligence of the Consultant, including, l;mt not
restricted to, acts of God" fires, floods, strikes, or weather of unusual severity. PROVIDED,
HOWEVER, that the Consultant must promptly notify the City within ten (10) calendar days in
writing of the cause of the delay. If, on the basis of the facts and the terms of this Agreement,
the delay is properly excusable, the City shall, in writing, extend the time for completing the
work for a period of time commensurate with the period of excusable delay.
.
8., Rights Upon Termination:, In the event oftermination, the City shall pay for all
services performed by the Consultantto the effective date of termination, as described on a final
invoice submitted to the City. Aftertermination, the City may take possession of all records and
. data within the Consultant's possession pertaining to this project which may be used by the City
without restriction. Any such use not related to the project which Consultant was contracted to
perform shall be without liability or legal exposure to the Consultant.
CIT~ERTO .
~t ~f2r!~emal1
Date. - -
CONSULTANT
$\C:\:)wu ~ C~wEU-
By: Awr.l:i I ~ W'
its: V~ ~ ,~~
Date: l- 2.-0 (,
.
Bremerton/Brown and Caldwell
Sewage Pump Station CE-6 2006 Modifications
Page 6 of6
EXHIBIT A
CITY OF BREMERTON
SEWAGE PUMP STATION CE-6 2006 MODIFICATIONS
ENGINEERING DESIGN SERVICES
SCOPE OF WORK
INTRODUCTION
The purpose of this contract is for Brown and Caldwell, sometimes referred to as the
Consultant, to provide engineering services to assist the City in the design of the upgrade
of Sewage Pump Station CE-6. Brown and Caldwell's services for this project include
the tasks listed in Table 1. A detailed description of each task is provided below.
Table 1. Scope of Services
Task Description
101 Project Management, Coordination, and Meetings
201 Electrical Design
202 Instrumentation and Control'(I&C) Design
203 Structural AnalysislDesign- Not used
204 Mechanical Design
205 Pumping System Design Review
206 Engineer's Cost Estimate
207 Bidding and Construction Assistance
300 Engine Generator Pre-purchase - Not Used
400 Additional Services
General Project Scope
This project involves the replacement of an existing portable generator set with a fixed
generator set, and thy replacement of three existing 75-horsepower (hp) pump
motors with new 15-hp, VFD-rated motors. Brown and Caldwell will determine power
loading and select a stationary diesel powered generator from the Washington State
City of Bremerton
November !, 2005
1
Sewage Pump Station CE-6 2006 Modifications
Engineering Design Services Scope of Work
generator bid list (Contract # 06605) for the City's purchase. City will develop generator
installation requirements for bid document. The existing dry-well ventilation will be
upgrad~d to increase the air flow to the space, and the dry-well space will be upgraded to
a wet location level of design where practical, thus minimizing the electrical and control
equipment in the dry well.
General Project Assumptions
1. The City of Bremerton will be designing the mechanical pumping system
upgrades for the station upgrade.' Brown and Caldwell has limited interface with
this work with the exception of providing a technical review of the City's
pumping system design and incorporating system power and control requirements
into electrical and I&C designs and generator sizing.
2. Brown and Caldwell will provide dry well ventilation mechanical, electrical, and
instrumentation and control drawings and specifications to the City of Bremerton
for its use ir1 packaging a set of construction documents.
3. Existing controls demolition will be shown on electrical plans. A P&ID diagram
will be created for pumping system only. Control diagram type will match
existing forniat, which does not include loop diagrams.
4. The construction of the improvements included in this scope of work is based on
the existing pump station being taken completely out of service. It is anticipated
that the contractors performing the work specified in Division 16 and 17 will have
access to the site during the pump replacements.
5. No staging of improvements will be incorporated into the design of the
improvements in this scope.
6. Non pumping systems demolition drawings will be developed by Brown and
Caldwell.
7. The contract specifications include the document Standard General ,Conditions of
the Construction Contract as prepared by the Engineers Joint Contract Documents
Committee (EJCDC). This document is located in Section 00700 of the contract
specifications.
8. The City will prepare specifications for Divisions 0 through 10 and the pumping
system upgrade specifications included in Divisions 11 and 15. Brownand
Caldwell will prepare only those sections of Division 11 and 15 that apply to its
work and the applicable sections from Division 16 and 17. Brown and Caldwell
will not prepare specifications in Divisions 12 or 14.
9. There will be only one submittal meeting held during the project. This meeting
will be at the 95 percent submittal stage at the City offices.
City of Bremerton
November 1,2005
2
Sewage Pump Station CE-6 2006 Modifications
Engineering Design Services Scope of Work
10. The City will provide electronic AutoCAD title block and background drawings
of the pump station's upper and lower levels for Brown and Caldwell's use in
preparing the drawings required in this scope of work. City-provided drawings
will include plan views and section views, to which Brown and Caldwell will
apply the design information it is required by this scope to develop.
11. Design review submittals (70 and 95 percent) will be submitted electronically.
The drawings will be submitted in a PDF format. Specifications will be submitted
in Microsoft Word format.
SERIES 100 TASKS - PROJECT MANAGEMENT
Task 101 - Project Management, Coordination, and Meetings
Consultant Responsibilities:
1. Contracting and internal project control and accounting
2. Staff administration and scheduling
3. Monthly reports and invoices
4. Attendance at coordination and review meetings
Assumptions:
1. Standard invoices and reports will be submitted on a monthly basis.
2. Brown and Caldwell standard monthly invoice format will be utilized. This
format contains an itemized list of project staff who charged to the project, hourly
rates, number of hours charged, and other direct charges (ODCs).
3. Invoice hours will be classified by tasks.
4. No backup information (i.e., time sheets, logs, receipts, etc.) will be submitted
with the invoices unless specifically requested by the City. Backup information
will be available in Brown and Caldwell files for inspection by City project
auditing staff, if requested by the City.
5. The City will maintain the role of overall project coordination with other
governmental agencies.
Work Products:
1. Monthly reports with descriptions of the work performed and cost of associated
work.
2. Monthly invoices.
City of Bremerton
November 1, 2005
3
Sewage Pump Station CE-6 2006 Modifications
Engineering Design Services Scope of Work
SERIES 200 TASKS - DESIGN SERVICES
Task 201- Electrical Design
Consultant Responsibilities:
1. Develop the electrical plans and specifications for the pump station upgrade. It is
assumed that the following drawings will be developed:
1 Electrical Symbols, Legend & Abbreviations
2 Electrical Details,
1 Electrical Demolition Plan
1 Electrical One Line Diagram
1 Electrical Power Plans (1 Upper and 1 Lower), including instrumentation
1 Electrical ATS / Generator / SCADA interface control diagram
1 Electrical drawing showing elevations as necessary
2. Develop technical specifications based on Brown and Caldwell's standard
specifications in the Construction Specification Institute (CSI) format. This will
include CSI Division 16, Electrical Specifications, for electrical equipment,
including the interface to a new standby generator.
3. Research the availability of parts for the main distribution panel board. Prepare a
design to replace the panel board and breakers if required.
4. Redesign the dry wells electrical to meet the requirements of a wet location.
5. Design control strategies for fixed diesel-powered engine generator selected from
the state bid list for the City's purchase
6. Coordinate with the new instrumentation and control requirements for raceway
and wire count and type.
7. Assist in the engineer's cost estimate.
City Responsibilities:
Provide 70 and 95 percent submittal review comments.
Assumptions:
1. One site visit by the electrical engineer will be required.
2. The existing lighting within the pump station will remain. However, the lighting
in the dry well will be wet location rated.
3. The existing pump station's automatic transfer switch, service entrance breaker,
and lighting and power transformer and associated panel will remain in place.
4. The fuel tank for a new standby generator will be incorporated into the base of the
generator. The fuel storage will provide fuel for 24 hour standby generator
operation.
.5. Written responses to City review comments will not be required.
Work Products:
1. Seventy (70) and ninety-five (95) percent submittal design drawings and
specifications.
City of Bremerton
November 1, 2005
4
Sewage Pump Station CE-6 2006 Modifications
Engineering Design Services Scope of Work
2. One set of final design drawings and specifications stamped by the engineer.
3. Electronic drawing files in AutoCAD format and Adobe (.pdt) format.
4. Specifications in Microsoft Word.
Task 202 - Instrumentation and Control Design
Consultant Responsibilities:
1. Develop the instrumentation drawings and specifications for the pump station
upgrade. It is assumed that the following drawings will be developed:
1 Instrumentation Symbols, Legend, and Abbreviations
2 Control Diagrams
1 Instrumentation Details
2. Locate VFDs inside existing control panel unless space constraints including VFD
heating prevent this.
3. Review available signals from existing A TS and determine if additional signals
will be desired by City.
4. Provide design for new Simantec (or equal) operator interface terminal on door of
existing control enclosure. Existing door shall be repaired or replaced.
5. Provide design for new PLC modules and connections to new terminal blocks.
New din rail is required to mount terminal blocks.
6. Reconnect generator alarms after new installation.
7. Develop technical specifications based on Brown and Caldwell standard
specifications in the Construction Specification Institute (CSI) format. This will
include CSI Division 17, Instrumentation Specifications, for narrow scope (one
section).
8. Assist in the engineer's cost estimate.
City Responsibilities:
1. City to provide existing instrumentation drawings for control panel, and make
O&M manuals available for copying.
2. City personnel will perform all PLC programming and develop control strategies.
3. City personnel will perform all operator interface programming and develop
control strategies.
4. Provide 70 and 95 percent submittal review comments.
Assumptions:
1. One site visit by the instrumentation engineer will be required.
2. Existing bubbler system to be retained.
3. The existing pump station control panel, control equipment, and SCADA system
will remain in place. Existing control equipment includes wet well level sensing
check valve limit switches.
4. The fuel tank for a new standby generator will be incorporated into the base of the
generator. With potential Low Fuel alarm being connected to the PLC.
City of Bremerton
November 1, 2005
5
Sewage Pump Station CE-6 2006 Modifications
Engineering Design Services Scope of Work
5. Design review submittals will be submitted electronically. The drawings will be
submitted in aPDF format. Specifications will be submitted in Microsoft Word
format.
6. Written responses to client review comments will not be required.
Work Products:
1. Seventy (70) and ninety-five (95) percent submittal design drawings and
specifications.
2. One set offmal design drawings and specifications stamped by the engineer.
3. Electronic drawing files in AutoCAD format and Adobe (.pdt) format.
4. Specifications in Microsoft Word.
Task 203 - Structural Analysis/Design - Not used
Task 204 - Mechanical Design
Consultant Responsibilities:
1. Evaluate the dry well ventilation requirement based on NFP A 820.
2. Develop technical specifications based on Brown and Caldwell standard
specifications in the Construction Specification Institute (CSI) format for Division
15. The following drawings will be developed for the ventilation system;
1 Dry well ventilation plan and sections.
1 Air flow schematics
3. Provide input for the engineer's cost estimate.
4. Prepare control loop descriptions for ventilation equipment.
5. Size and select diesel-powered generator from state bid list (Contract # 06605)
City Responsibilities:
1. Provide as-built drawings of the existing pump station.
2. Provide 70 and 95 percent submittal review comments.
3. City will coordip.ate purchase and delivery of generator to project site and design of
generator installation.
Assumptions:
1. One site visit by a mechanical engineer.
2. Written responses to client review comments will not be required.
3. Ventilation of the wet well and odor control will not be included.
4. There will be no plumbing design required.
Work Products:
1. Seventy (70) and ninety (95) percent submittal design drawings and specifications.
2. One set of final design drawings and specifications stamped by the engineer.
3. Electronic drawing files in AutoCAD format and Adobe (.pdt) format.
4. Specifications in Microsoft Word.
5. 1 page memo or spreadsheet summarizing loads used in generator selection.
City of Bremerton
November 1, 2005
6
Sewage Pump Station CE-6 2006 Modifications
Engineering Design Services Scope of Work
Task 205 - Pumping System Design Review
Consultant Responsibilities:
Review and comment on City pump selection and specification. The review is not
intended to be a complete design review but will examine City hydraulic system curves
and the application of the City's analysis into the pump specification.
City Responsibilities:
1. Provide design flow basis for design.
2. Provide system hydraulic curves and calculations that show force main performance
and design operating points for pump selection and operating range.
3. Provide draft pumping equipment specifications.
Work Products:
Consultant will provide comments or recommendations to City relative to proposed
design, pump operation and bidding specification.
Task 206 - Engineer's Cost Estimate
Consultant Responsibilities:
1. Provide an engineer's cost estimate for the ventilation, electrical and I&C upgrades.
2. Cost estimate will be supplied electronically and in hard copy
City Responsibilities:
The City will advertise, evaluate, and review the estimate and provide any feedback
necessary for making corrections to the cost estimate.
Assumptions:
Only one cost estimate is required for the project and it will at the 95 percent submittal
stage.
Work Products:
An engineer's cost estimate for the ventilation, electrical and I&C construction work.
Task 207 - Bidding and Construction Assistance
Consultant Responsibilities:
1. Upon request by the City, answer specific technical questions from prospective
bidders regarding the contract documents.
2. Assist the City in preparation of addenda items during the bid process.
3. Review shop drawing submittals and the submittals directly related to specifications
and design provided by Brown and Caldwell.
City of Bremerton
November 1, 2005
7
Sewage Pump Station CE-6 2006 Modifications
Engineering Design Services Scope of Work
4. Consultant shall provide support under this task only to extent of available budget and
shall notify city when available budget has been expended.
City Responsibilities:
1. The City will advertise, evaluate the bids, and award the contract.
2. The City will administer all aspects of the construction contract, including
coordination with owners of other utilities that must be relocated prior to
construction.
3. The City will prepare and distribute addenda to plan holders
Assumptions:
An allowance of$5000 has been included in the project budget for support during
bidding and construction upon request by the City. Effort will not be expended beyond
this budget without prior written authorization from the City.
Work Products:
1. Telephone records or other documentation of bidding questions answered during
the bidding phase.
2. Shop drawing review comments.
SERIES 300 TASKS - ENGINE GENERATOR PRE-PURCHASE-
Not Used
SERIES 400 TASKS - Additional Engineering Services
Consultant Responsibilities:
1. Prepare cost proposals for additional services requested by the City.
2. Provide assistance as requested by the City.
City Responsibilities:
Request assistance and documents in writing. E-mail is considered suitable for
authorization.
Assumptions:
An allowance of $5000 has been included in the project budget for additional services as
requested by the City. Funds will not be expended from this task budget without prior
written authorization from the City.
Work Products:
Work products will be determined at the time services are requested by the City.
City of Bremerton
November 1, 2005
8
Sewage Pump Station CE-6 2006 Modifications
Engineering Design Services Scope of Work
EXHIBIT B - SCHEDULE
Notice to Proceed
Engine Generator Selection Memorandum
Seventy (70) Percent Design Submittal
Ninety-five (95) Percent Design Submittal
Ninety-five (95) Percent Design Submittal Comments from City
Final Design Drawings and Specifications to the City
November 17,2005
January 14,2006
January 19,2006
March 1, 2006
March 15,2006
April 10, 2006
City of Bremerton
November 1,2005
9
Seivage Pump Station CE-6 2006 Modifications
Engineering Design Services Scope of Work
EXHIBITC - COMPENSATION
Compensation for Consultant's services under this agreement shall be on the basis of an
hourly rate equal to direct labor cost times a multiplier of 3.13 5 to be paid as total
compensation for each hour an employee works on the project, plus reimbursable
expense, with a maximum compensation not to exceed the total amount in Table C-1.
This table provides an estimate of the cost per task as described in Exhibit A. The
Consultant may adjust the distribution of compensation between individual tasks of the
work described herein to be consistent with services actually rendered, but Consultant
shall not exceed the total estimated compensation amount unless approved in writing by
the City.
The amount of any sales tax, excise tax, value added tax (VAT), or gross receipts tax that
may be imposed on this Agreement shall be added to the Consultant's compensation as
reimbursable expenses.
Compensation terms are defined as follows:
Direct labor cost shall mean salaries and wages, (basic and overtime) paid to all
personnel engaged directly on the project.
Reimbursable expense shall mean the actual expenses incurred directly or indirectly in
connection with the project for transportation, travel, subconsultants, subcontractors,
computer usage, telephone, telex, shipping and express, and other incurred expense.
Consultant will ':ldd ten percent (10%) to invoices received by Consultant from sub-
consultants and subcontractors. Charges for typical reimbursable expenses incurred by
the consultant will be at the following rates.
Travel:
Current IRS rate for business use of an automobile
Other travel expenses at cost
Associated project
costs (APC)
$6.19 per labor hour
APCs include
Postage
Phone
Copying
Fax
Computer/software costs
City of Bremerton
November 1, 2005
10 Sewage Pump Station CE-6 2006 Modifications
Engineering Design Services Scope of Work
The approximate distribution of costs with respect the tasks are as follows.
Table C-l. Project Budgetby Task
Task Descripton Estimated
Cost
101 Proj ect Management, Coordination and Meetings $16,672
201 Electrical Design $22,622
202 Instiumentation Design $16,511
203 Structural Anal ysisIDesign Not Used
204 Mechanical Design $14,305
205 Pumping System Design Overview $4,181
206 Engineer's Cost Estimate $1833
207 Bidding and Construction Assistance $7,500
300 Engine Generator Pre-purchase Not Used
400 Additional Services (See Note) $5,000
TOTAL CONTRACT AMOUNT $88,624
Note: No charges will be made to task 400 without prior written approval. Email will
suffice as written authorization.
City of Bremerton
November I, 2005
11
Sewage Pump Station CE-6 2006 Modifications
Engineering Design Services Scope of Work