Loading...
HomeMy WebLinkAboutBURWELL ST., 1026 1/2BUILDING PERMIT INSPECTION V'� LL CARD SITE ADDRESS Ya, � �IAJP.ciSf PRO EC d em o�I i' i at 0�- 3g$ sa Fr R6,5 Building Plumbing ❑ Mechanical ❑ Fire AlarnVSprinkler ❑ DURING INSPECTIONS THE BUILDING PERMIT & APPROVED PLANS SHALL BE ON SITE Permit # B B 0 5 — For Inspections Call (360) 473- 5870 - Approved Date Notes �i 1 f �O UN DA T ION F)O NOT POl)R ('C)N(`iWIT, Erosion Control In Place Foundation Footing Foundation walls Plumbing Ground Work In Slab Mechanical Footing Insulation - F-1 2nd PLUMBING ,Il is CHA NIC, -1 L 6AS 11'111 Rough In Duct / Vent Support / Test / Meter set rd FRAMINGShear 3 Z„�a are approved Hold down connections Panel nailing L&I Electrical Approved Ventilation requirements Framing t h I NS UTA TION Under floor walls ceilin 5th SHEETROCK V” 6 th F'INAf All of the above Must be approved to final UILDING 473-5870 C- RICAL Dept. of Labor ust 5-4 Grease Trap, P98L<ach 473-5270 Se on 3-5270 E ALL ALL FINAL INSPECTIONS COMPLETED 47 _ Occupancy Approval (Single Family Residence Only) DO NOT OCCUPY BUILDING WITHOUT BUILDING DEPARTMENT APPROVAL PROTECT THIS CARD FROM THE WEATHER 1A INSPECTION RECORD CARD CITY OF BREMERTON BUILDING DEPARTMENT 11617 PERMIT NUMBER ADDRESS OWNER W4 ffLim PHONE 532-5349 CONTRACTOR self PHONE FOUNDATION 1. PERMIT ON SITE 2. CHECK PLANS TO PERMIT 3. CHECK SETBACKS 4. PROPERTY STAKES 5. FOOTING WIDTH & DEPTH 6. SOIL BEARING O.K. FOUNDATION INSPECTION APPROVED BY: 2A FRAMING 7. CHECK FOR FILL 8. REQUIRED STEEL IN PLACE 9. CHECK FIREPLACE FOOTING 10. ANCOR BOLTS 11. FOUNDATION VENTS 12. CRAWL ACCESS COMMENTS: 1.WIRING APPROVED 2.FOUNDATION VENTS 3. SHIELD UNDER POSTS 4. POSITIVE CONNECTIONS 5. SOIL TO WOOD CLEARANCE 6. BEAM SUPPORT 7. TR. MAT. NEXT TO CONC. B. WASHERS ON ANCHOR BOLTS 9. BEAMS PROPER SIZE 10. FLOOR JOIST SPAN 11. NOTCHING & DRILLING 12. STAIRS WIDTH RISE & RUN WINDERS LANDINGS HEADROOM 13. ATTIC VENTILATION (upper & lower) 14. CHIMNEY STRAPS SECURED 15. FIREPLACE COMBUSTION AIR 16. FANS VENTED TO OUTSIDE 17. WATER CLOSET CLEARANCE 18. SMOKE DETECTOR 20. FIREBLOCKING STAIRS DROP CEILINGS TUBS OR SHOWERS ROOF & CEILING LINES FURRED OUT AREAS FIREPLACE AT CEILINGS HOLES PLUGGED TOP & BOTTOM LID IN VOIDS 21. WINDOWS MEETS ENERGY CODE CLASS SAFETY GLAZING REQUIRED FIRE EXITS WINDOW SILL HEIGHT 22. CEILING HEIGHTS 23. SWAY BRACING 24. TRUSSES PROPERLY INSTALLED STAMPED PROPERLY BRACED 25. ATTIC ACCESS 26. RAFTER & JOIST SPAN 27. ROOFING, FLASHING, SHEATHING 28. SIDING 19. SHEETROCK BACKING COMMENTS: UNDER STAIRS ABOVE GARAGE DOOR HANGERS. FRAMING INSPECTION APPROVED BY: 2B, INSULATION 1. PROPER R -VALUE 2. VAPOR BARRIER 3. PROPER FASTENING INSULATION INSPECTION APPROVED BY: COMMENTS: MECHANICAL 1. PERMIT ISSUED 2. FURNACE LOCATION 3. FURNACE CLEARANCE 4. 'B' VENT SIZING 5. 'B' VENT CLEARANCE 6. 'B' VENT SUPPORT 7. COMBUSTION AIR B. DUCT SIZING 9. DUCT SUPPORT & JOINTS 10. GAS PIPING TEST 11. GAS PIPE SIZING 12. GAS PIPE SUPPORT COMMENTS: PLUMBING - 1. PERMIT ISSUED 2. UNDER TEST 3. WATER PIPE SIZING 4. DWV SIZING 5. PROPER SUPPORT COMMENTS: UNDERGROUND APPROVED BY: 3 WALLBOARD 1. LID OVER SIDES 2. NAILING 3. W/R AT TUB OR SHOWER 4.5/8 UNDER STAIRS 5. FURNACE ENCLOSURE COMMENTS: WALLBOARD APPROVED BY: 4 FINAL 1. HANDRAILS 2. GUARDRAILS HEIGHT INTERMEDIATE 3. EXHAUST FANS 4. WATERPROOFING IN SHOWERS 5. DISHWASHER AIRGAP 6. FIRE DOORS LABLED AS REQUIRED SELF CLOSING 7. FIRE DAMPERS INSTALLED B. PENETRATIONS IN FIRE WALLS FIVAC APPROVED BY: GAS PIPING APPROVED BY: 001A 1. WOOD STOVE CLEARANCE 2. CHIMNEY CLEARANCE 3. HEARTH EXTENSION 4. CHIMNEY HEIGHT p, FiN i KAT, j* ej i reiv w"IF. 0111111111111111 0 6. PROPER FITTINGS 7. REQUIRED CLEANOUTS B. PROPER GRADE 9. HWT PRES. RELIEF VALVE & LINE 10. SEISMIC STRAP ROUGH -IN APPROVED BY: 6. FIRE SEPARATION IN GARAGE 7. ATTIC ACCESS B. DRAFT STOP IN ATTIC 9. PROPER CONST. OF FIRE WALLS 10. DROP CEILING & LIGHTING 9. HOT WATER TANK PRL 10. OUTSIDE GRADE 11. SOIL TO SIDING CLEARANCE 12. SMOKE DETECTORS 13. FIREPLACE HEARTH 14. SAFETY GLAZING 15. INSULATION WINDOWS MEET ENERGY CODE UNDERFLOOR & ATTICE INSUL. WATER PIPE & HEAT DUCTS 16. WOODSTOVE APPROVED 17. WINDOWS & DOORS CAULKED FINAL PLMB. APPR, (comm.) COMMENTS: FINAL MECH. APPR, (comm.) FINAL BUILDING APPR.