HomeMy WebLinkAbout4529
+---------------------------------------------~----------------------------+
+Enter Search Criteria, Press Esc Key to Transmit ,.
=.Press Del Key to Terminate Delete Mode ,.
-.- CHANGE Contract Transactions ,.
,. Contract Number 4529 =1=
+ ==
= =Vendor Name THYSSENKRUPP ELEVATOR CORP =r=
==Subject ELEVATOR - REPLACEMENT/MODERNIZATION - WA GARAGE J:
+Department FACILITIES - -
+Status Code CON --
- - Amount $70831. 09 ==
-.- Begin Date 11/21/2005 ==
,. Insurance End Date 03/05/2006 ,.
t Type Amount Review Date 02/15/2008 ,.
GL $2000000.00 ,.
,. AL $2000000.00 ,.
.l: J=
- - Insurance Total $4000000.00 ==
- - Insurance Review Date 10/01/2006 ==
+ =r=
+ Comments MODIFICATION i1-11/05 +
- - VAULT 01/01/2008 t
== +--------------------------------------------------------------------------+
AFFIDA VIT OF PUBLICATION
Account # 37922 / Ad # 1I697
STATE OF WASHINGTON
COUNTY OF KITSAP
I, Sarah Weller, being first duly sworn on oath, deposes and says: That she is now, and at all times
embraced in the publication herein mentioned was the principal clerk of the printers and publishers of
KITSAP SUN; that said newspaper has been approved as a legal newspaper by order of the Superior Court
of the County of Kitsap, in which County it is published and is now and has been for more than six months
prior to the date of the publication hereinafter referred to, published in the English language continually as
a daily newspaper in Bremerton, Kitsap County, Washington, a weekly newspaper in Kitsap County,
Washington and is now and during all of said time, was printed in an office maintained in the aforesaid
place of publication of said newspaper; that the following is a true text of a legal advertisement as it was
published in regular issues (and not in supplement form) of said newspaper on the following dates, to wit:
May 3, 2006, and that such newspaper was regularly distributed to its subscribers during all of $42.40,
which amount has not been paid in full.
C;;MQ~
ltJ{~
(Signature of Principal Clerk)
Subscribed and sworn to before me this day of May 11, 2006.
Notary Public in and for the State of Washington, Kitsap County.
City of Bremerton
NOTICE OF FINAL COMPLETION
Notice offinal completion has been filed with the City of Bremerton on Thursday, April 27,2006, Thyssen
Krupp Elevator, in Krikland, Washington for Contract No. 4529 - Elevator Replacement and
Modernization, located at 405 Washington Avenue in Bremerton, Washington.
Any parties having a claim for materials, labor or damages with reference to this contract have forty-five
(45) days from the date of publication of this notice to file a claim.
May 3, 2006...............................AD #20002094
..
..- CONTRACT MODIFICATION AGREEMENT NO.1
BETWEEN THE CITY OF BREMERTON AND
THYSSENKRUPP ELEVATOR CORPORATION
PROJECT: Hydraulic Passenger Elevator Replacement and Modernization
CONTRACTOR: ThyssenKrupp Elevator Corporation
TIDS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE
Contract for Hydraulic Passenger Elevator Replacement and Modernization (the "Contract")
entered into between the City of Bremerton and ThyssenKrupp Elevator Corporation.
All provisions in the Contract shall remain in full force and effect except as expressly modified by
this document.
For valuable consideration and by mutual consent of the parties, the modifications to the Contract
are as follows:
I.
A new section, Section VII is hereby added to the Contract to read as follow:
VII. Compensation. Compensation for the Contract shall be Sixty Five Thousand Two Hundred
and Twenty Two Dollars ($65,220), not including Washington State Sales Tax, as per the
ThyssenKrupp Elevator Corporation bid proposal date September 8, 2005.
ll.
Contractor accepts all requirements of this Contract Modification by endorsing below.
This document will become a supplement of the contract and all provisions will apply hereto.
It is understood that this Contract Modification shall be effective when approved by the City
of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a
contract modification that is binding on the parties of this contract. In addition, Contractor
warrants that it has or will inform the surety of this change, and shall take appropriate action
to modify any bonds required under the contract to address this change.
IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day
and year first written above.
UPPELEVATOR T~OFB
ION ,
JAMES M. BAIRD
CONTRACT ANALYST
L. Lusson By: Cary Bozeman
ntract Administration Its: Mayor
DATE: \ \~ -,~S DATE: J 1- cJ../ "'OS
CONTRACT MODIFICATION 1
I Project Number:
I
I - - -------
------ - -----
.
,
APPROVED AS TO FORM:
~~
Br erton Ci ttomey
R:\LEGAL\Conttacts\PUBLIC WORKS\ThyssenKrupp Mod.I.doc
CONTRACT MODIFICATION 2
Project Number:
.;
---'--~----
.. ,
; .
.
.
CONTRACT
HYDRAULIC PASSENGER ELEVATOR REPLACEMENT AND MODERNIZATION
(Page 1 of 4)
This agreement, made and entered into this 5th day of October, 2005 by and between the
City of Bremerton, hereinafter called the City, and Thyssen Krupp Elevator, hereinafter called
the Contractor:
Witnesseth:
That in consideration of the terms and conditions contained herein and attached and made
a part of this agreement, the parties hereto covenant and agree as follows:
I. The Contractor shall perform all work and furnish all labor, tools, materials and
equipment for the Hvdraulic Passenger Elevator Replacement and
Modernization.
All work shall be in accordance with and as described in the Specifications.
Contractor shall begin the work within ten (10) calendar days after the date that
written NOTICE TO PROCEED is issued to the Contractor. The Contractor shall
complete the work no later than ninety (90) calendar days after the date that
NOTICE TO PROCEED is issued.
If said work is not completed within the time specified, the Contractor agrees to pay
to the City an amount in accordance with the Bid Proposal, Item B., of these
Contract Documents for each calendar day said work remains incomplete after
expiration of the specified times as liquidated damages.
The Contractor shall provide and bear the expense of all equipment, tools, materials
and labor of any sort whatsoever that may be required for the transfer of materials
and for construction and completing the work provided for in this Contract and every
part thereof, except such as are mentioned in the specifications to be furnished by
the City.
I
HydrauJ.i.c Passenger E~evat:or R.ep~acement: Bidders Check~ist: & Bid/Contract I
and Modernization
- 26 - I
I
I
I
I
----------
f
.
CONTRACT
(Page 2 of 4)
II. The City hereby promises and agrees with the Contractor to employ and does
employ the Contractor to provide the materials and to do and cause to be done the
above described work to complete and finish the same according to the attached
plans and specifications and the terms and conditions herein contained and hereby
contracts to pay for the same, according to the attached specifications and the
approved bid as attached hereto incorporated by reference, at the time and in the
manner and upon the conditions provided for in this Contract.
III. The Contractor for himself, and for his heirs, executors, administrators, successors,
and assigns, does hereby agree to fulfill the performance of all covenants herein
contained upon the part of the Contractor.
IV. It is further provided that no liability shall attach to the City of Bremerton by reason
of entering into this Contract, except as expressly provided herein.
V. INDEMNIFICATION
Contractor shall defend, indemnify and hold the City, its officers, officials,
employees, agents, volunteers and assigns harmless from any and all claims,
injuries, damages, losses or suits, including all legal costs and attorney fees,
arising out of or in connection with the performance of this contract, except for
injuries and damages caused by the sole negligence of the City.
The City's inspection or acceptance of any Contractor's work when completed
shall not be grounds to avoid any of these covenants of indemnification.
Should a court of competent jurisdiction determine that this contract is subject to
RCW4.24.115, the, in the event of liability for damages arising out of bodily injury
to persons or damages to property caused by or resulting from the concurrent
negligence of the Contractor and the City, its officers, officials, employees,
agents and volunteers, the Contractor's liability hereunder shall be only to the
extent of the Contractor's negligence.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE
INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE
CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE.
TITLE 51 RCW, SOLEY FOR THE PRUPOSES OF THIS INDEMNIFICATION.
THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY
NEGOTIATED THIS WAIVER.
The provisions of this section shall survive the expiration or termination of this
contract.
Hydraulic Passenger Elevator Replacement Bidders Checklist & Bid/Contract
and Modernization
- 27 -
,
.
CONTRACT
(Page 3 of 4)
VI. INSURANCE
The Contractor shall procure and maintain, during the term of construction and
throughout the specified term of maintenance, insurance of the types and in the
amounts described below against claims for injuries to persons or damage to
property that may arise from or in connection with the performance of the work
hereunder by the Contractor, its agents, representatives, employees, sub-
consultants and/or subcontractors.
Before beginning work on the project described in this contract, the Contractor
shall provide a Certificate of Insurance evidencing:
1. Automobile Liabilitv insurance with limits no less than $1,000,000 combined
single limit per accident for bodily injury and property damage; and
2. Commercial General Liabilitv insurance written on an occurrence basis with
limits no less than $1,000,000 combined single limit per occurrence and
general aggregate for personal injury, bodily injury and property damage.
Coverage shall include but not be limited to: blanket contractual;
products/completed operations/broad form property damage; explosion,
collapse and underground (XCU); and employer's liability.
3. Excess Liabilitv insurance with limits not less than $1,000,000 per occurrence
and aggregate.
The insurance must refer to the project name, project location and contain a
brief description of the Contractor.
Any payment of deductible or self insured retention shall be the sole
responsibility of the Contractor.
The City, its officers, officials, employees, agents and volunteers shall be
named as an additional insured on the insurance policy, as respects work
performed by or on behalf of the Contractor and a copy of the endorsement
naming the City as additional insured shall be attached to the Certificate of
Insurance.
The Contractor's insurance shall contain a clause stating that coverage shall
apply separately to each insured against whom claim is made or suit is
brought, except with respects to the limits of the insurer's liability.
The Contractor's insurance shall be primary insurance as respects the City,
and the City shall be given thirty (30) calendar days prior written notice by
certified mail, return receipt requested, of any cancellation, suspension or
material change in coverage.
The City also reserves it unqualified right to require, at any time and for any
reason, proof of coverage in the form of a duplicate of the insurance policy
with all endorsements as evidence of coverage.
Hydraulic Passenger Elevator Replacement Bidders Checklist & Bid/Contract
and Modernization
- 28 -
1 .
.
.
CONTRACT
(Page 4 of 4)
Proof of coverage shall be provided to the City in the form of a Certificate of
Insurance and shall include additional insured endorsements as evidence of
coverage. The City also reserves its unqualified right to require, at any time
and for any reason, proof of coverage in the form of a duplicate of the
insurance policy with all endorsements as evidence of coverage. Approval of
required insurance is a condition precedent to the execution of this contract.
In witness whereof the parties hereto have caused this agreement to be
executed the day and year first herein above written.
CONTRACTOR
By:
MES M. BAIRD
Title: CONTRACT A.t\.IALYST
Date: \ \-- ~-~5
/
Hydraulic Passenger EJ..evator RepJ..acement Bidders CheckJ..ist & Bid/Contract
and Modernization
- 29 -