Loading...
HomeMy WebLinkAbout05-268 DATE SUBMITTED: November 8,2005 BILL#D5-:)kB AGENDA BILL CITY OF BREMERTON CITY COUNCIL ...........................................................................................1 SUBJECT: Professional Services Committee Meeting Date: November 9, 2005 Agreement (PSA) ~ith Parametrix for COUNCIL MEETING Date: November 16, 2005 Sediment Sampling along the Port Department: PW&U, Engineering Washington Narrows Presenter: Phil Williams Phone: 473-5315 SUMMARY: The City is considering the acquisition of the former Chevron Bulk Fuel Facility. The City is additionally considering the development of an expansion to the existing Louis Mentor Boardwalk, beginning with a connection to the existing Boardwalk, and extending north to the Chevron Property. Past practices at the Chevron Property have resulted in contamination to the soil, groundwater and possibly sediments. The extent of the contamination at the site, and possibly along the extended Boardwalk alignment is not known. Staffhas negotiated a Professional Services Agreement with Parametrix not to exceed $55,000 to perform Sediment Characterization Sampling along the entire alignment. The purpose ofthis sampling is to identify whether site contamination has extended into the beach and sub-tidal sediments adjacent to the Chevron Site or along the proposed Boardwalk alignment, to assist in Councils decision of whether to continue to pursue acquisition of the property. ATTACHMENTS: 1. Professional Services Agreement; 2. Environmental Conditions Assessment FISCAL IMPACTS (Include Budgeted Amount): This project is not included in the 2005 Parks or Public Works and Utilities Budgets. Budget adjustments are required. Funding will be from a combination of $40,000 from the Contingency Reserve Fund from the sale of the SR3 Property, and up to $15,000 from the Wastewater Fund. APPROVALS: DEPARTMENT DIRECTOR. CITY ATTORNEY: FINANCE DIRECTOR: MAYOR: FISCAL/BUDGET: . CONSENT AGENDA~ OPERATIONS: ~ COUNCIL PRESIDENT: RECOMMENDED MOTION: Move to approve the P ~ with Parametrix to provide Sediment Sampling along the Port Washington Narrows, amend the 2005 budget to authorize the expenditure including use of funds from the Contingency Reserve Fund, and authorize the Mayor to finalize and execute the necessary contract documents for the agreement in substantially the same form as presented. COUNCIL ACTION: Lve D Deny D Table D Continue D No Action ab/Agenda Bills 2005/PSA with Parnmetrix - Sediment Sampling