Loading...
HomeMy WebLinkAbout05-257 -------------- - -- ----- - DATE SUBMITTED: 10/24/2005 BILL # oS - ,J.S7 AGENDA BILL CITY OF BREMERTON CITY COUNCIL ........................................................................................ SUBJECT: Contract with Synergy Committee Meeting Date: 10/26/2005 Construction, Inc. for General COUNCIL MEETING Date: 11/02/2005 Manger/General Contractor for Bremerton Department: Economic Dev Harborside Park, Naval MuseumlBldg. 50 Presenter: Gary Sexton Renovation and Memorial Plaza Phone: 360-473-5282 SUMMARY: Staff is recommending that the City of Bremerton enter into a contract for General Manager/General Contractor for Bremerton Harborside Park, Naval Museum/Bldg. 50 Renovation and Memorial Plaza in order to provide services during the design phase including design consideratons, value engineering, cost estimating, alternative construction options and project sequence of work, and to further act as General Contractor and Construction Manager during the construction phase. Harborside Park will include reconstruction, design and installation of the USS Stennis mast, placement of _rocks, tr~, artifacts and other elements and materials. Naval MuseumlBldg. 50 Renovation; consists partly of Bldg. 50 remodel for use as a musuem with build out of a basement storage and interconnection to a building addition that is constructed partly from shipyard steel materials. Memorial Plaza: consists partly of stepped plazas, placement of PSNS artifacts and landscape materials and development coordination with PSNS security and BCT/Pedestrian Access (Tunnel) Project. ATTACHMENTS: Bremerton Harborside Park Site Drawing, Detailed Specified General Conditions Work (Synergy Construction, Inc.), General Contractor/Construction Manager Agreement FISCAL IMPACTS (Include Budgeted Amount): The $4,504,200. is currently budgeted for this project .. ~ +~ ~ ~oro ~~'SoQ~ \o~lL ~ . APPROVALS: DEPARTMENT DIRECTOR: CITY ATTORNEY: FINANCE DIRECTOR: MAYOR: FISCALlBUDGET: /ziJ~~.' CONSENT AGENDA 0 OPERATIONS: . COUNCIL PRESIDENT: y~~. (jJO~ RECOMMENDED MOTION: Move to approve the General Manager/General Contractor Agreement with Synergy Construction, Inc. for Bremerton Harborside Park, Naval MuseumlBldg. 50 Renovation, and Memorial Plaza in the amount not to exceed $4,504,200.00, and authorize the Mayor to finalize the agreement in substantialll t~e same form as presented. ;1\.. t.OIII..J~hle..+C OlA. w l~ ~ A-H-o(v'}ey C(ffY'OVc;J M~. COUNCIL ACTION: ~prove 0 Deny 0 Table 0 Continue 0 No Action