DATE SUBMITTED: 10/24/2005 BILL # oS - ,J.S7
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
........................................................................................
SUBJECT: Contract with Synergy Committee Meeting Date: 10/26/2005
Construction, Inc. for General COUNCIL MEETING Date: 11/02/2005
Manger/General Contractor for Bremerton Department: Economic Dev
Harborside Park, Naval MuseumlBldg. 50 Presenter: Gary Sexton
Renovation and Memorial Plaza Phone: 360-473-5282
SUMMARY: Staff is recommending that the City of Bremerton enter into a contract for General
Manager/General Contractor for Bremerton Harborside Park, Naval Museum/Bldg. 50 Renovation
and Memorial Plaza in order to provide services during the design phase including design
consideratons, value engineering, cost estimating, alternative construction options and project
sequence of work, and to further act as General Contractor and Construction Manager during the
construction phase. Harborside Park will include reconstruction, design and installation of the USS
Stennis mast, placement of _rocks, tr~, artifacts and other elements and materials. Naval
MuseumlBldg. 50 Renovation; consists partly of Bldg. 50 remodel for use as a musuem with build
out of a basement storage and interconnection to a building addition that is constructed partly from
shipyard steel materials. Memorial Plaza: consists partly of stepped plazas, placement of PSNS
artifacts and landscape materials and development coordination with PSNS security and
BCT/Pedestrian Access (Tunnel) Project.
ATTACHMENTS: Bremerton Harborside Park Site Drawing, Detailed Specified General
Conditions Work (Synergy Construction, Inc.), General Contractor/Construction Manager Agreement
FISCAL IMPACTS (Include Budgeted Amount): The $4,504,200. is currently budgeted for this
project .. ~ +~ ~ ~oro ~~'SoQ~ \o~lL ~ .
APPROVALS:
DEPARTMENT DIRECTOR:
CITY ATTORNEY:
FINANCE DIRECTOR:
MAYOR:
FISCALlBUDGET: /ziJ~~.' CONSENT AGENDA 0
OPERATIONS: .
COUNCIL PRESIDENT: y~~. (jJO~
RECOMMENDED MOTION: Move to approve the General Manager/General Contractor
Agreement with Synergy Construction, Inc. for Bremerton Harborside Park, Naval MuseumlBldg. 50
Renovation, and Memorial Plaza in the amount not to exceed $4,504,200.00, and authorize the Mayor
to finalize the agreement in substantialll t~e same form as presented. ;1\.. t.OIII..J~hle..+C OlA. w l~ ~
A-H-o(v'}ey C(ffY'OVc;J M~.
COUNCIL ACTION: ~prove 0 Deny 0 Table 0 Continue 0 No Action