HomeMy WebLinkAboutBLUE HERON PL., 6039
BREMERTON BUILDING DEPARTMENT
Inspection Report
Scope of work: V';)'- {~4-(0 I
Address:
Owner: {L:Sj-6q3~
Contractor:
FOUNDATION
Inspection card/approved plans on site Setbacks
Footings: required steel placement Walls: required steel placement
Footings: required width & depth Walls: required size
Bearing soil (soils analysis if applicable) Special inspector (when applicable)
COMMENTS:
~
FOOTINGS APPROVED: 10 Z5 OZ WALLS APPROVED: /0 V- Dc::.
FRAMING
Electricai approved Plumbing & mechanical approved
Crawl space access (min. 18 x 24) Floor joists and beams/proper clearance to earth
Positive connections posts & beams Foundation vents
Posts properly supported Anchor bolts: nuts & washers in place
Mudsill: treated material Floor joists: size & span
Beams/girders: size & span Notching & drilling: joists & beams, studs
Smoke detectors: all required locations Exhaust fans: where required
Exhaust fans insulated: unconditioned space Whole house fan, outside air intakes each bedroom
Fans terminating directly outside Range hood
Dryer exhaust vent All vent terminations: windows & property line
Fireplace combustion air Windows: meets egress requirements
Windows: proper U valve Windows: safety glazed where required
Ceiling heights Stairs: headroom clearance
Stairs: rise & run; proper width Fire blocking wall to ceiling, furred walls every 10'
Fire blocking: stairs, soffits, lowered ceilings Fire blocking: tubs/showers
Fire blocking: lids in void spaces, shafts Fire blocking: stuff holes top & bottom plates
Sheet rock backing Wall bracing
Rafters size/notching Trusses: specs, bracing
Attic access Attic ventilation
Wall & roof sheathing Shear nailing
Building dried in
COMMENTS:
APPROVED: /-/0 -0:) ~
ENERGY CODE COMPLIANCE
Insulation: proper R valve Insulation: proper fastening
Insulation: vapor barrier Bottom plates caulked to floors
Penetrations caulked as required Electrical boxes gasketed or caulked
, . 6 mil black poly in crawl space I
COMMENTS:
UNDER FLOOR/FOUNDA TION INSULATION APPROVED:
WALL INSULATION APPROVED: 1-10 0"3 CEILlNG~~N ~OVED: (-tb 03
MECHANICAL
Appliance location and access, proper support Appliance clearance to combustibles
Venting: clearance to combustibles Venting: size & support
Vent termination Combustion air
Ducts: size & support Gas pipe under test
Gas pipe size & support Gas pipe: underground min. 12" below grade
Gas pipe: within 6" or underground-coated Gas shutoff within 3' of appliance
Gas logs: safety shut-off Gas logs: damper permanently open
Wood stoves EPA certified Wood stoves & fireplaces: Tight-fitting doors
Wood stoves & fireplaces: proper health Manufacturer's specs on site
Chimney liner: when required Chimney: separate flues when required
COMMENTS:
LC LC
GAS PIPING APPROVED: /~7 -0) FURNACE APPROVED: I -7--05
OTHER APPLIANCES APPROVED:
PLUMBING
OWV & water piping under test OWV: proper grade
OWV: proper sizing OWV: proper drainage fittings where required
OWV & water piping proper support OWV: required c1eanouts
Vent termination All fixtures vented properly
Water supply: proper sizing Shut-off valves on all fixtures
Water heater: gate valve on cold water supply Vacuum breakers: where required
Water heater relief valve drain to outside I Water heater: seismic strap
R-10 pad under water heater when required Water-piping insulated as required
Grease traps/interceptors: where required Proper indirect wastes: where required
COMMENTS:
/~e -"-
PLUMBING GROUNDWORK APPROVED: 1(- 15- 6? PLUMBING ROUGH-IN APPROVED: /-2-0<;
t:.C-
SHEETROCK
Proper fastening nails - 7" o.c. horiz. Plane Nails 8" o.c. vertical plane
Proper fastening screws 12" o.C. horiz. Plane (1/2'1 Screws - 12" o.C. horiz. plane (1/2'124" o.C. framing
Proper fastening: screws -16" o.c. vert. Plane (1/2'1 Screws - 12" o.c. vert. plane (1/2j 24" o.c. framing
Proper fastening screws - 12" o.c. horiz. plan (5/8") Screws - 12" o.C. horiz. plane (5/8'124" o.c. framing
Proper fastening screws - 16" o.c. vent. Plane (5/8") Screws - 12" o.c. vert. Plane (5/8'1 24" o.c. framing
Area & occupancy separation walls Oraftstops where required
Usable space under stairs (5/8" required) Waterboard where required (not on ceiling)
Corridors
COMMENTS:
SHEETROCK APPROVED: I-lb.. -03 ~
FINAL
Energy code requirements met, exhaust fans Plumbing & mechanical
Garage/dwelling door self closing solid core Smoke detectors where required
Handrails & guardrails, as required Fire ratings maintained
Exit signs when required Emergency lighting when required
Occupant load posted when applicable Building weatherlight
Wood siding to earth separation (6'1 Building address posted
Randon monitor when required I
COMMENTS:
Z-Z6 -..03 /~ ;dI(
r-I~I" I It. nnnl"'\\ Ir-n.
"', " ," ;r~ _,!:_'_;-:';"'~?'~:',~,-t-<~''.-''---:-c;,~'~~'.',,- '~~~'':'~''~':~';_'Y - . ~ ,,-,-- '7" 1
I
~" ".. I
CENTER I
BREMER TON PERMIT ,
"
I
286 4th Street, Bremerton, IJA 98337 I
I
Phone: (360) 478-5275 FAX: ( 360) 478-5278 i
BUILDING PERMIT i
I Job Addr: 6039 BLUE HERON PL Permit No: 02-0461
t.
I Location: DOCKSIDE LOT 115 Status: ISSUED'
t Parcel No: 5092000-1.15-0000 App lied: 08/20/2002 I
I Issued: 09/25/2002
I Applicant: JAC08S0N BRIAN 731-0932 Expires: 03/24/2003
PO BOX 2274 BREMERTON WA 98310
I
Owner: JACOBSON BRIAN 731-09Z!2
PO BOX 2274 BREMERTON WA 98310
Contractor: SELF Lie :It: SELF Exp:
Subcontr:
Oesc: NEW SINGLE FAMILY RESIDENCE IJJ/ATTACHED GAR & DECK
~*******~********~**~*********************************************~**************************
Valuation * Permit Fees: 1.328.25 Total Calculated Fee: 2,086.93
115,44'2.. 28 * Plan Check Fees: ?04.18 Additional Fees: ..00
* Other Fees: 54.50 Total Permit Fee: 2,086.93
.******-**********************************************~************.*************************
MECHANlCAl..!PLI.JMBING F!XTURES-" MECH-R-.e.f1ge................... : 1 MECH-Wood/Pellet St.ove.......~ 1
MECH-Ga$ Fumace to lOOk btu. ~ 1 ~ECH-r~$ Pipiy~ (outlets)....: 3 MECH-Exhau:$It Fam............ ,.: :3
MECH-Range !-b::ld (yE>$)..".... ..= 1 i'lECH-Clothee Dryer...........: 1 PlBG-'Wl!\ter CIO$et................, :3
Pl.BG-Ba'l:htub. . ... . .. ., . ... ... . . . = :3 PlEIG-Lavat.o'ry. . . .. .. . . . . . .. . . . . . : 4 Pl!?,G"'Showey. .. . .. . .. . . " . . . . .. . . . : 1
PlBH-KitcMn Sink.............: 1 PlBf'~-Oi$hwashljn... ........"....: 1 PLBG'~,Laundn' Tray.........."..: 1
PLBG-CClothE;swasMY.............: ; .1: PLBG~teY HeateY............: .1: PLBG-Hose Bibb$................: 2
********-************************.********************.**************************************
Thbpflirmi t: shall become null and void if the; buildil"l9 0'( wol"k iIll.J.thoYi:z::ed by this pel"mit. is not comn'lenel.td wi thi n
180 dayS frotllthe dat.e of $Uchpe~'mit, .or if t.his buildi'f'19 .or work 3.uthodzed b'/ such permit is suspended .or
aband<~ned .at any time aftel" the work is commenced foy a piity'iod of 180 da>'$.
NOTICE - It is tM Y&eponsibili ty .of HlE' permit. holdey. not.tM City of Bremeyton or Building Offidal to se.&
to it that '(ii!quiyed inspectiom aye made" The permit holder must notify the Buildil"l9 Official when ready foy
inspections. Failul"e of tMPermit. holder to 'notify t.M Buildil"l9 Official of yequiredim.pet:..."i;ioffi may Ye$Ult
,in the stoppage of the wo'rku'f1til $Uchtime that tM peimit holder can eubstanHate to the buildil19 official
that the concealed WOrk meets 01'. exceeds .~?de requirements. Any demolition, tE>$til"l9, or financial burden shall
be borne di yec'l:ly by the; pf.<Y'lrd t holdEn', Failuye to .Sl.lbstantiat,e code requi rE!fllents will indE!fllnify tM Ci t),
against any and all responsibility or liability connected with tM comb'uction.
I here-by CEt'(tify tn-at I have yead and examined this pEmYlit and knOltJ tM sa,me to be true and conect. All
p'(ovisionsof Jaws and Qt'dinance$ 9O'v'emil"l9 this type of Wl?l"k will .~ c:oclIPlied with whethe1" $Piilcified oorein
0\' not. The, anti li9 of ~'mi t does not p ye:iJ\Jllle to 9i VEt authod ty to violate 01" cancel thep t'ovi..ions of
anyothey $ta~e 0)" local... Yeaula~119 coootruction or tM perfonnance of C:Ol1$tYliction"
SigMtu::~R~~ ___ . Date:,_2P-;:-. .'
~ = ~UfYtJ~ ~t f"'.: t'-' ,."", ,_,to " tho .to.. eont ,"",0". ,..,s< yaHoo law, tiM'"
:::>echon ;?'; Ch tat lZe, ...aW$ 0, 1967.
)J
Si9natIJn~:,,~ __. . '_~. /J'. _,,_.._____ Oate:_ --
:~()I(li()l:)lOiOIOk~N* l!()!()j()j()I()l:: lIOIOIOIO!(*)j:; lk .!JL.J. d "
Permit Clnt~~roved 8)1:--... . . ... . Date:~- . 5-od.~
( '. "
..:.....:......'~'--..-:.!.~.:,'~--.:;:~- ~ ,1 '. '"' ~" _~ .:-...;,- ~~' ,~. ,-",-,~.......:....;;._..,' .. ~'- , ':"::"'.' ~ -. ~-. " " -,'. .~''"'
r . " ..r, ,,~'.'" Ij' ~-, ' .;l'. '~ (, .'0 r~ :>"'hf',"~^'~~ .' ~I,' ''',\~,,"l,,!, -, '\?:~"""':"1'-~"''''Jr';'''''''l''': ',',1"'-1;" ~" ..-..~,--,~".-.--;:,....----
. tJ
f!OI!Io~' L.~t
f ,. .... .....~ .
I BREMERTON PERMIT CENTER
l 286'4th street~ Bremerton, WA 98337
Phone: (360) 478-5:?75 FAX; (360) 478-5278
" ;,~ .'i,';"; ,.~" '
Buildin; Permit No: 02w.0461
Job Address: 6039 BLUE HERON PL Status: ISSUED
L.ocation: DOCKSIDE LOT 115 Issued: 09/25/2002
Assr Acct No: 5092000-115-0000 Expi )"es: 03/24/2003
R EQ U IRE 0 IN 5 PE C T ION S
Item: OY100 FOUNDATION-FOOTINGS Dept: BL.DG Division:
Item: 01200 FOUNDATION-WALLS Dept: BLDG Division:
Item: 01400 MECHANI~AL Oept: SLOG Division:
Item: 01500 PLUMBING GROUNDWORK Dept: SLOG . Division:
Item: 01600 PLUMBING ROUGH-U-.I Dept: SLOG Division:
Item: 01700 FRAMING I'.' Dept: SLDG Division:
,t,
Item: 01800 INSULATION Dept= 8LDG Division:
I "tern : 01900 SHEETROCK NAIL1NG Dept.: SLDG Division:
Item: 02250 DRIVEt..,JAY Dept: PU8WOE~KS D1 vision:
It.em: 02300 SEWER LATERAL Dept: PU8WORKS Division:
Item: 02200 PUBLIC RIGHT-OF-WAY Dept: PU8WORKS Division:
Item: 02700 FINAL--8LDG Dept: SLDG Division:
*****************************'****************************************************
TESTING: Must, be recognized by t.he Washington Association of Building Officials
SPECINSP: Must be registered with theSt.ate of WA
ST OF WA: Stat.e of WA Dept. of Labor and lndust.ries 478-4921
HEALTH: Bre~eTton/Kitsap Health District 478'-'5235
ALL INSPECTIONS PERFORMED BY THE CITY OF BREMERTON MUST BE SCHEDULED THROUGH THE
PERMIT CENTER, (360) 478~5275.
************************** ******************************************************
\
"
Permit Holder's A .....-12 .- , /r- .2.>- pi :;l-~-
Slgnature:_..__ _' . w__._____'----__.......;..._____ Date: ......._.___.______
I"f
,-~",--""W.,
:,,~_1~~,~.-, ".~-, .'. .I.' ,- ,,' ;fA' r, ','" .., ~ .~ . ',",,-,- i(' j,;',~"'<'
1:-------- ,- -.....- . -.--------.----.--,
. .
- :.:-~t
"" ~. -
I -----.-----..---~..-==-==--;~;~;;;~~-;;;;;;-~;:;;:--------------------.---=-=
, PERM CONDITIONS
I mi t No: 02-0461\:' Page: 1
I ~..=.....=....-=......~--===.--.------.--....----~--.---------.-----.-.-------
. ~ . ---, -- ------ ~_. ------- --------- ----- - -------
, '
I ,-',,".
Job f~ddr ess : " ",:, ~
I 6039 BLUE HERON PL Appl ied: 08/20/2002'\'
I Assr Acct No: 5092000-115-0000 Approved: 09/25/2002, :jc\
Location: DOCKSIDE LOT 115 Issued: 09/25/2002
Applicant: JACOBSON BRIAN
OIAl ner : JACOBSON BRIAN
Contractor: SELF
Description:
NEW SINGLE FAMILY RESIDENCE,W/ATTACHED GAR & DECK
Conditions:
1. ENGINEERING
A) RIGHT-OF-WAY PERMIT REQUIRED PRIOR TO ISSUANCE OF
BUILDING PERMIT. R~O-W PERMIT 14301 ISSUED 8-20-02. VW
B) SEWER AND WATER ASSESSMENTS SHALL BE PAID PRIOR TO
OCCUPANCY APPROVAL
2. 8UILDING~-APPROVED WI REVISIONS DENOTED ON PLANS.
3. PRIOR TO PERFORMING ANY RENOVATION OR DEMOLITION WORK.
PUGET SOUND CLEAN AIR AGENCY (CLEAN AIR AGENCY) AND
WASHINGTON DEPARTMENT OF LABOR AND INDUSTRIES (L&I)
REGULATIONS REQUIRE AN ASBESTOS SURVEY BE PERFORMED TO
DETERMINE WHETHE~ THERE ARE ASBESTOS-CONTAINING MATERIALS
IN THE 'AORKAREAOR STRUCTURE. THE ASBESTOS SURVEY MUST BE
CONDUCTEDBY AN EPA CERTIFIED (AHERA) BUILDING,INSPECTOR
(EXCEPT RENOVATION OF OWNER~OCCUPIED SINGLE FAMILY
RESIDENCES).
FOR MbRE INFORMATION, PLEASE CONTACT CLEAN AIR AGENCY
THROUGH THEIR WEB,SITE AT www.pscleanair.org OR BY PHONE AT
800-552-3565 OR 206-689-4058. THE L&I WEe SITE CAN BE
FOUND AT www.lni.wa.gov/wisha/p-ts/asbestos/asbestos.htm.
~r;~;~u~~rl ~ Date1;J-s'y~
</
\
,
"">f" 'i"..--",-.-c"'",-_-,,,, ":t--;cirlf,' - -..----~-~~------,------ --.--.,,----
<"
~"":,,
1<
*lK:K,* Jl(n~;((:ll(:i!Or.:$; m)/()j( lIO~:Ii<)I(>>: * ** roil( llt;f\)fl)ll: lI( li(ll( )!OKlt * .tl!{ll: :4':l!t>>: >>: lklk.;U: *Jl<lt *lI: lK )j(;t(JI< l\()kill:t )/(If(lK
RECEIPl
.*IJI(..*.*.*..*...I..t**)j(*~...**..I..*......*...*)j(.~*.**..*..*~...
Rr~CEIPT Numb~r: 02000856 Amount= r",t.- .' "i *5" 'A I' <')"'/
1.332., ,5 09/".. 10.::: 14. <:./
Payment Method: CK Notation: EiJ BLOERS CK !nlt: VW
------_._----------~----~---~-----~--_._-------~._---~~---------~~--
Permit No: 02-04'1 Type ~ eLl)'e, eLOG PtRMIr W/M~tH/P
Parcel No: 5092000-115-0000
Site Addre$$~ 6039 BlUt HERON PL
LocaUon~ DOCKSIDE LOT US I
Total feesl 2.086.'13 !
TII1$ Payment 1. ~ 2<82.75 Total ~ilL Pmt$l 2.086.93
8alance: .00
1ItlJ( ll;>>;ll(;<<ll( l\t:l!illl::l( l(l;*.:<<1I<* )!tJiOIi)l: *11:)1( lIOI\*:~/,)~*;<<::!:* lI<)/t)jf,llt>>::f;)l(>l'i ***'*** It)/i;JI(JI()j( ll( *:$:)I( l\( )I()I(;$:)I( It)UDI( I
I
AccountCodf'J Oe$cription Amount r
16-322.1001 (2211) BUILDING PERMIT FEES 1~083.3S 1
16-345.8300 (4580) 8UILOING PLAN CHECK FEES 50.00
16-322.1005 (2215) MECHAN!CAL PERMIT FEES 108.90
16*322.1003 (2213) PLUMBING PERMIT fEES 1.36 . 00
64:3-2::S7.13 ('023t\ ) Sn,T€: OF WA SURCHARGE 4.50
-_._------------~,---~------~------~,-----------~--~--------------- I
I
I
I
I
I
,
!
I
,
i
I
1
I
I
I
.-. ~ j I
?, !
,
,
I
1
I
I
,
I
I
I
I
ld:
~\
\' .
i
:
I
.
I
I i
I
i
I
I I
.l..k ~ .~ ., ~ ..f;- ~ - - " . - , - .. -' , ~ " '"' .i
r::-~C~"'P'l~~im ~
6- , I .
'-S i
!:or' I
,:.. " ", (I
,-- I
, : Building and Planning Department" Bremerton .. W A .. 98337
~ ,If _ Robert Doobovsky .:. (360) 478-5286 .:. Fax (360) 478-5278
.~~ Ii ~. . . . " e-mail .:. Doobovskvliilci.bremerton.wa.us
i'O. ~",,'
TNt (In' 0' I'IUOI AN_ o""O'.!,,'IINWf . ,,\\:.~j 0 N l1 ~~
~~ z~
BUILDING ~~APPROVED ~~\~
PLAN REVIEW C 'l. ~
Applicant: Brian Jacobson ;: ceD ') r 0('\02 ~
_ v' i t:.I t) Lu -l
Job Address: 6039 Blue HeronPL \ - .
Date: September 16 2002
Permit # 02-0461 I
PLAN REVIEW APPROVED WITH THE FOLLOWING
. Smoke Alarms will need to be interconnected 11 O-volt with battery backup.
One in each bedroom, adjacent hall and on every floor. (UBC-310.9
. CFM fan rating
0 Bath and laundry room fans 50 CFM
0 Range hood 100 CFM
0 Hole house fans (2 bedroom 50-75)(3 bedroom 80 -120)(4 bedroom
100-150)(5 bedroom 150-180)
. 1st floor foundation shall be 12" below undisturbed soil (UBC-1806)
. 2nd floor foundation shall be 18" below undisturbed soil (UBC-1806)
. The ground under the floor may be excavated to the top of the footing and no
lower (UBC- 1806)
. Insulation requirements (over 12% Glazing)
0 Walls R-21 2x6 construction
0 Ceiling R-38
0 Vaulted Ceiling R-30 2x12 construction 2" air space above insulation
0 Floor R-30
. All Building shall conform to the 1997 Uniform Building Code, 2000
Uniform Plumbing Code, 1997 Uniform Mechanical Code, 2001 Washington
State Energy Code
BUILDING PLAN REVIEW APPROVAL ONLY. OTHER CITY DEPARTMENTS ARE
REVIEWING YOUR APPLICATION. YOU WILL BE NOTIFIED BY THIS DEPARTMENT
WHEN TH PPROVAL OR DISAPPROVAL DECISION HAS BEEN MADE
have read and understand the above comments.
icant signature
---- -
o ~- 0% I
Prescriptive Approach - Simple Form ;ijf!J!
,"",' i r... ,'"
For the Washington State Energy Code (2001 Edition) '" l' -. .,-t'., . '
Climate Zone 1
Site Information Building Department Use Only
Lot:_~______ Permit#: ad =-D4CLL__
Address: t IJ 39 /34J~J.JIEI(',jQ/ f~_ Notes:
City: fJ~~'V(hV
State: ~. _ Zip: _fd2I tJ
Contact: -L>fi.J.A.!J:5 IJ-CI8,1PIt/___
Phone: ?3/-~
Phone 2:
Fax:_ :3?.J~t?nr _____
Table 6-1
PRESCRIPTIVE REQUIREMENTS 0,1 FOR GROUP R OCCUPANCY
CLIMATE ZONE 1
(Unlimited Glazing Option Only)
;Glazing Glazing U-Factor Doo~ I Wall Wall Wall I I Slab4
Option Area10 U- Ceiling2 Vaulted Above Int4 Ext4 Floo~ On
% of Floor Vertical Overhead 11 factor Ceilinl Grade Below Below Grade
Grade Grade
=-
III Unlimited
Group R-3 0.40 0.58 0.20 R-38 R-30 R-21 R-21 R-lO R-30 R-lO
Occupancy
Only
See the code text for footnote references
This project complies with ~he following:
,/ The project is a single family residence or duplex.
,/ The project is wood frame QB. all of the insulation is interior or exterior of the framing.
,/ All building components meet the requirements listed in Table 6-1, Option III.
,/ The project will meet all other provisions of the WSEC and VIAQ.
The project will take advantage of the following exceptions to the prescriptive option:
o 602.6 Exception 1. One door, that is 24 ft.2 or less, that does not meet the standards is allowed.
Location of the door taking this exception __ F/<'IJ~{) IJI<. - -
o 602.6 Exception 2. Doors with a U-factor of 0.40 allowed without calculations, Option III only.
Location of the door(s) taking this exception
~
Copyright 2002. WSUCEEP02-056 AUG 2 0 2002
Copied by permission from the Washington State University Cooperative Extension Energy progra
BREMERTON
Prescriptive - Simple Form - Climate Zone 1 BUILDING DEPARTMENT 5/31/2002
\
\
\
\
IJbKMl'l' C..bNTER .
() ~~O4-&(
Residential Site Plan Review Questionnaire
g~/1}ttJ S/k-PtJ.>ofV
I Description of Proposal:
I ##!w SrI<.
J
, Street A.ddress lor cross streets if IlO address Itas been assigned):
I MJ1 f)4J$ 1/8<&IU f'L.
Tu .-\CCOUIlt ~umb~r: ~tl1~ '-(171& -!IS- -(JrJIJO
Critic:tl Area Questions:
I [5 :here :my 5tJr..ding ur running water on the 5ur!J.ce or :he site J.C .-\.. ,,"""t. time during the :/ear?
:l.
[eYES, pie:J.Se describe conditions:
I YES X~O
1 .
: :. d:J.S.my :Jar-ion ,Jf:he 5ice been identiried JS :l '.vedand? v-,:;-- X ~O
. ....,:,
~f ::es ,?iease ,iescribe: r
I
.3. :.5 :te 5ire ..:i1ar:.c:erized JS:. Forest Ceared X Developed
.
, ~ '. .. . rIat . Gentle Siope Steep Slope
.... ~5 :::e 5iope ,J r :::e ;Jroperr:i:
... ..- -;...-.... f""\ ~...~.. "''''0 -" Q,r ", -~ 1,~') ~..~S X' ~o I
.;) "h:: ;-,rv pc.... '''' crun _.J .e_. 'J t J. :)uore....e, , i
I
I
'J. '.V:~~ :::e :Jrc~ascd 5tmC::-ilre 'Je ..lesthe~ic:J.ll::Jr imc~lCnail:/ -iisrlpci';e :0 surrounding ;Jroper!ies :he
-~;'-;";"cr;"c x:' 'r ';"e ':Jmrnuni~,1 fVtJ
_.......-:.-.....1." ... ( ... -4 ..... '0,1 .' . '
is t't I)r more ~~~gn~JI~)
Steep (15%..,..) D
\ . AUG 20 2002 ::J
3 ft or less
:""' BREMERTON
! BUILDING DEPARTMENT
< ~:at (O~/" to 3"1,,} ,
tOO ft.
~:1~ lP9iic:J..nt ~ereby .:e::iries that :111 of the :lbave st:J.temenrs lr:C the infarm:ltion contained in my ocher
::-:l.'1s~ictais mac.~ he:-~with are true, :md the applic:J..I1t J.ck...'1o\vtedges chat any action tak~n by che City or
3...~;r:cr:or. based ir: '."'hole or in part on this application may be reversed if it develops that any such
.':,J.te:ner:t or oche:- ir:.for.TIacion contained herein is false.
~-2$-O?-
Date
,/
\A
.
..
.
PARTIAL SHEAR WALL CALCULATION
Project Name:
BOL TON RESIDENCE
Property Address:
Lot 115 - Blue Heron
Bremerton, Washington
0} ~ <<; ~ U IW ~ -j\
,L AUG 2 0 2002 Q
BREMERTON
BUILDING DEPARTMENT
JOB NO. 30BJ082002
Matthew Gunawan, MSCE, PE
KITSAP CONSUL TING ENGINEER, Inc. 'V
7008 Osprey Circle
Bremerton, WA 98312
Phone 360- 479 4423
Fax 360- 479 4424
E-mail: kce-wa(m~
A"f1Z\.e.t\
STRUCTURAL CALCULATIONS AND DRAWINGS SHALL BE USED FOR ONE
CONSTRUCTION ON THE ADDRESS SHOWN.
--------- ---
.
TABLE OF CONTENT
PAGE
Building material self weight 1 - 3
Lateral design (wind and seismic) 4-8
.
Reference:
Uniform Building Code 1997.
Design Assumption:
Roof dead Load = 17 PSF
Roof Live Load = 20 PSF (minimum)
Snow Load = 25.00 PSF
Wall dead load = 12 PSF (exterior)
Wall dead load = 9 PSF (interior)
Floor dead load = 12 PSF
Floor live load = 40 PSF
Seismic = Zone 3, Site: SO, 1:1.0
Wind = 80 MPH, exposure: B, 1w:1.0
STRUCTURAL CALCULATIONS AND DRAWINGS SHALL BE USED FOR ONE
CONSTRUCTION ON THE ADDRESS SHOWN.
----- --
30BD082002 SELFWEIGHT.xls ROOF: DEAD + LIVE Matthew G 8/17/02 I~
.
JOB LOCATION: SOL TON RESIDENCE - LOT 115 BLUE HERON. BREMERTON WA
ROOF 1.0. : MAIN DWELLING ROOF - TRUSS SYSTEM
.
~ 4.00 Roof Slope adjustment = 1.05
.17 2.00 Ceiling Slope Adjustment = 1.01
12.00 (harz distance)
Default Selected Slope Adjusted NOTE:
Material Weight Weight Adjustment Weight
- (pst) , (uno) (pst) (Y or N) (pst)
ROOFING metal 20 GA 1.80
wood shingle 2.00
asphalt shingle 3.00 3.00 Y 3.16
clay tile shingle 11.50
5 ply felt & gravel 6.50
C) FELT D/sq. O.~ 0.30 Y 0.32
Z SHEATHING 112" plywood or OSB 1.50 1.50 Y 1.58
- 1-11Z' decking 4.50
11. FRAMING 2x4 @24"OC 0.70 1.40 Y 1.48
0
0 2x6 @24"OC 1.10
0::: 2x8 @24"OC 1.50
2x10 @24"OC 1.00
2x12 @24"OC 2.20
INSULATION R 11 glass wool 0.70
(roll I batt) R 19 glass wool 1.10
R~ glass wool 1.80
R38 glass wool 2.20
6.~
FRAMING 2><4 @24"OC 0.70 1.05 Y 1.06
2x6 @24"OC 1.10
2x8 @24"OC 1.50
2><10 @24"OC 1.00
2x12 @24"OC 2.20
INSULATION R 11 glass wool 0.70
(roll I batt) R 19 glass wool 1.10
R~ glass wool 1.80
C) R38 glass wool 2.20 2.20 Y 2.23
Z CEILING acoustical fiber tile 1.00
:::i suspension - metal frmg 1.80
- suspension - wood frmg 2.50
W lIZ' GWB 2.20 2.20 Y 2.23
0 518" GWB 2.80
plaster (1") 8.00
SPRINKLER 1" 111 wet (PLF) 2.10
schdl 40 2" 111 wet (PLF) 5.20
3" 111 wet (PLF) 10.80
4" 111 wet (PLF) 16.40
6' 111 wet (PLF) 31.70
8" 111 wet (PLF) 50.80
MISCELLANEOUS basic -min. 1.50 2.00 Y 2.03
7.551 13.65
ROOF SNOW Basic (x 1.1& IF>300PERSON) 25.00 25.00 N 25.00
Drift (include Basic) 35.00 N
W Sliding (include Basic+Drift) 40.00 N
~ ROOF MIN. LIVE 1997 UBC tab 16-C 20.00 N
..J 25.00. 24.66
CEILING I 10.001 I N I
CEILING OVER STAGE I 20.001 I N I I
D(ri) 6.54 (pst)
O(cl) 7.55 (pst) D(rf) + O(cl) + L(rf) 39.09 (pst) min
D(rf) + D(cl) 14.09 (pst) D(rf) + O(cl) + L(rf&cl) 39.09 (pSt) max
KITSAP CONSULTING ENGINEER 300-479-4423 1 OF 1
L
30BD082002 SELFWEIGHT.xls FLOOR: DEAD + LIVE Matthew G 8/17/02 <~
.
JOB LOCATION: BOLTON RESIDENCE;;. LOT 115 BLUE HERON, BREMERTON WA
FLOOR LOCATION: FLOOR - MAIN
Default Selected NOTE:
Material Weight Weight
(pst) . (uno) (pst)
- linoleum I vinyl
COVERING 1.00
carpet & pad 1.5) 3.00 TILE IN SA TH
wood -1" nom. 4.00
tile I ceramic - 314" 10.00
UNDERLAYMENT OSB - 112" 1.5)
gyp-crete - 314" 6.5)
concrete (LW) - 1 112" 11.00
SHEA THING 314" T&G 2.30 2.30
1-1/8" T&G 3.70
1-1/Z' decking 4.5)
0 FRAMING 2x4@16"OC 1.10
<C 2x6 @16"OC or 9.5' T JII PRO 15) 1.70 1.70
0 2x8 @16"OC or 14" T JII PRO 250 2.20
..J 2x10@16"OCor 16" TJII PRO 350 2.80
0 2x12@16"OCor 3.30
<C 16" TJII PRO 550 (pit) - or 3.98 psf @ 16"oc 5.30
W INSULATION R11 0.70
0 (roll I batt) R19 1.10 1.10
0:: R30 1.80
0 CEILING acoustical fiber tile 1.00
0 suspension - metal frmg 1.80
..J suspension - wood frmg 2.5)
LL 1/Z' GWB 2.20 2.20 USE 1/2@ MAIN
5/8" GWB 2.80
plaster (1") 8.00
SPRINKLER 1" III wet (PLF) 2.10
Z' III wet (PLF) 5.20
3" III wet (PLF) 10.80
4" III wet (PLF) 16.40
6" III wet (PLF) 31.70
10' III wet (PLF) 74.00
PARTITION access floor system 10.00
office or partition subjected to change 20.00
-
MISCELLANEOUS basic -min. 1.5) 1.50
Iive- over stage 20.00
LIVE LOAD Snow (verify): basic + drift + sliding 45.00
Assemblylauditoriumlbalcony - fix seat 5).00
Assembly/auditoriumlbalcony - moveable 100.00
Stage area and enclosed platform 125.00
Garage - general storage and/or repair (40% gross: 100.00
Garage - private I pleasure (2CXX)#) 5).00
W Exit facility (?J:X)# Stair Tread) 100.00
~ Library - reading room (HXD#) 00.00
..J Library - stack room (1500#) 125.00
Office (2CXX)#) 5).00
Residential - basic Ideck Istorage (?J:X)# - Str) 40.00 40.00
Residential - exterior balcony 00.00
School- classroom (1CXD#) 40.00
Storage - light 125.00
Store-retail (3CXXJ#) 100.00
D(f1r) 11.80 (pst)
D(f1r) + Live 51.80 ( pst)
KITSAP CONSULTING ENGINEER 360-4~23 1 OF 1
. 3/s
30B0082002 SELFWEIGHT.xls Matthew G 8/17/02
WALL DEAD LOAD
JOB LOCATION: BOLTON RESIDENCE - LOT 115 BLUE HERON, BREMERTON WA
WALL HEIGHT: 8 (ft)
STUD SPACING: 16 (in)
Default Adjusted Selected NOTE:
Material Weight Weight Weight
(PLF) , (uno) (PSF) (PSF)
FRAMING top plate - dbl 2 x 41 ft 2.80 0.35
DOUGLAS- top plate - dbl 2 x 61 ft 4.40 0.55 0.55
FIR top plate - dbl 2 x 8 I ft 5.80 0.73
stud-2x4/ft 1.40 1.05
stud-2x6/ft 2.20 1.65 1.65
stud-2x8/ft 2.00 2.18
bot (sole) plate - 2 x 41 ft 1.40 0.18
bot (sole) plate - 2 x 61 ft 2.20 0.28 0.28
bot (sole) plate - 2 x 81 ft 2.00 0.36
bot (sole) plate - 4 x 61 ft 5.20 0.65
bot (sole) plate - 4 x 81 ft 6.80 0.85
ICF 4'[4] cone wall 50.00
6' [6 1/4] cone wall 78.13
~ 8" [7 7/8] cone wall 98.44
~
~ 10" [97/8] cone wall 123.44
INSULATION R11 glass wool 0.70
(roll I batt) R19 glass wool 1.10 1.10
rigid insulation 5.5" thick (ICF) 1.65
SHEA THING exterior - 112" ply 1.70 1.70
exterior - 5J8" ply 2.00
exterior - 5J8" GWB (fire) 2.80
interior - 112" GWB 2.20 2.20
interior - 5J8" GWB 2.80
FINISHING finish ext - wood siding 2.50 2.50
finish ext - gypsum plaster (1") 8.00
finish ext - solid plaster (1 ") 10.00
finish ext - clay brick (4") 35.00
MISCELLANEOUS basic -min. 1.00
others 2.00 2.00
Weight per square foot of wall 11.98 (pst)
Weight per linear foot of wall 95.8 (pit)
KITSAP CONSULTING ENGINEER 360-479-4423 10F1
3080082002 Shear Wall 1997.xls SHEAR WALL CALCULATION Matthew G 8/17/02 4- /
. /8
BUILDING IDENTIFICATION KAREN BOLTON -LOT115 BLUE HERON, BREMERTON, WA
Note: For the purpose of this calculation -
the NORTH direction will be assume in the direction from the BOTTOM to the TOP of the DRAWING PAGE.
Loading - per UBe 1997
SEISMIC FORCE WIND FORCE
PROJECTED AREA METHOD
MARK EIG <-- Base on lump sum weight
(11 ) WIND SPEED = 80 [mph]
Roof-2nd FL 8.00 <- Base on diaph height EXPOSURE = B
2nd -1st FIoo 9.00 <-- Base on diaph height IMPORTANT FACTOR = 1
!:!5!Q!:! Ce
30-40 . 0.84
sum(weight) 64.9 25-30 0.76
70.9 20-25 0.72
15-20 0.67
Z = 0.30 0-15 0.62
I = 1.00 N-S DIRECTION
SO L PROFILE = SO WIDTHI-IEIGH1PRESS FORCE X F X sum F ;um F) X avg
R = 5.50 (FT) (FT) (PSF) (KIPS) (FT) (K-F)
Ca = 0.36 ROOF TOP
CV = 0.54 EXP AREA 1 36.0.........JLQ 14.82
Na= 1.00 EXPAREA2__
NY= 1.00 EXPAREA3__
Ct = 0.020 Ct = (.035)-steel, (.03)-concrete MRF & (.02) other 2nd LEVEL WALL
hn roo = 17.00 uppermost level (11) EXP AREA 1
EXP AREA 2
Bldg Period(T)= 0.17 see T = Ct*(hn)^(3/4)
FI (top) = 0.000 kips MIN(IF(T>0.7,0.07*T*V,0),O.25"V)
ROOF 1st
IBASE SHEAR I EXP AREA 1
Vmln = 0.040 xW 0.11 xCaxl xW EXP AREA 2
Vmax = 0.164 x W 2.5 x Ca x I x W / R
V (zone 3) = 0.586 x W CV x I x W / (R x T) 1st LEVEL WALL
Eh = V ; Ev = 0 ; E = Eh*rho + Ev EXP AREA 1 34.0 9.0 5.08 1.56 17.00 26.4
EXP AREA 2 -- - 0.00 0.0
Irho I Area ofGr flr = 784 SF EXPAREA3 ====== 0.00 0.0 1.561 26.4/17.001
Wall Shear (N-S)= 4.24 kips Wall L (N-S) = 13.00 LF
Wall Shear (E-W)= 1.57 kips Wall L (E-W) = 4.00 LF E-W DIRECTION
story shear = 10.6 kips WIDTHI-IEIGH1PRESS FORCE Y F Y sum F ;um F) Yavg
r_max (N-S)= 0.307 1.0 < rho = -0.32 <1.5 (FT) (FT) (PSF) (KIPS) (FT) (K-F)
r_max(E-W)= 0.370 1.0< rho= 0.07 <1.5 ROOF2~
rho = 1 EXPAREA1 ~~ 15.78~ 20.00
EXP AREA 2 ~~ 15.35 0.69 11.00
E = (Vmin < V < Vmax)*rho = 10.6 kips AT WALL EXP AREA 3 ~ ~ 14.28 ~ 9.50
11.6 kips ATGROUNO
MARK VEIGff lEIG W*H .~!".':m!:~! E per Mo per
_ SUM(W"H Level Level
Roof (Top) 34.21 273.7 5.3
5.31 42.31
Floor(n-O) 130.681 9.00 1 276.21 5.3 ROOF 1st
10.61 137.91 EXP AREA 1
Floor(n-l) I 0.00 I 0.00 I 0.01 0.0 EXP AREA 2
I I
Floor(n-2) I 0.00 I 0.00 I 0.01 0.0 1st LEVEL WALL
1 I EXPAREA1. 13.5 -. 9.0 8.13 0.99 ~
EXP AREA 2 0.00 --l-Jl.:Q.
EXP AREA '3 == =-= == 0.00 I -0:0 ---o.99I'17."8T18.OOl
N-S N-S E-W
Xcf-s N-S Xcf-w E-W Ycf-w
~ ~ ~ ~
Roof 18.49 5.29 Roof 17.73 Roof 10.68
Floor 18.18 10.&2 Floor 17.53 Floor 11.59
KITSAP CONSULTING ENGINEER 360-479-4423 Input; 1/4
3080082002 Shear Wall 1997.xls SHEAR WALL CALCULATION Matthew G 8/17/02 t; /
. /~
CENTER OF MASS
WALL TYPE: I E INTERIOR WALL 0.009 ksf SHEAR WALL TYPE: G = GWB - UNBLOCKED (5d Cooler or Walboard @7"O.C.)
II = INT. INSULT; PAR- 0.012 ksf GB = GWB WITH BLOCKING (5d Cooler or Wallboard @ 4" O.C.)
E=EXTWALL 0.012 ksf PEPLYWOODOROSB-BLOCKED
OE = OPENING EXT. 0.012 ksf
SIN = SHEAR WALL 0.000 ksf # LAYER: NUMBER OF LAYER OF PLYWOOD OR GWB ON THE WALL
X = Measured Distance (PARALLEL to E-W DIRECTION) from REF. POINT to C.G. of member
Y = Measured Distance (PARALLEL to N-S DIRECTION) from REF. POINT 10 e.G. of member
2nd LEVEL ROOF IWIDTHiDEPTH ~ ~ JNIT 1 W W X W Y_ __ ~
, 10 ~1~~-1!!L~~~~~_~
- Note:
1 ROOF-1 ==3600 36.00 18.00 11001 0017 22.0 396.6 242.4 ==== Capacity of SW1 240 PLF
~ ROOF-2 _ 15.00 3.00 28.00 -850 0.017 ~~~__ Capacity of SW2 360 PLF
=E -----~~~.~-~ CapacityofSW3 450 PLF
4 0.0 0.0 0.0 Capacity of SW4 600 PLF 1.33
5 -----t----I~____O:O____O:O____O:O-~ Capacitvof SW5 no PLF 1.71
22.8
2nd LEVEL WALL
_ WALL ENGTI-lEIGH (REO 1 ALLOW) END
TYPE ft ft SEISMIC WIND RXN
2nd LV Wallin N-S direction _ % % (KIPS)
1 1 I 41.30 1.00 9.000.0090 3.0 3.0 26.8 0.00 0.00 0.00 0.00 0.00
22 I 20.00 8.00 16.50 ~ 0.0090 -U 23.8 10.1 I~ 0.00 0.00 0.00 0.00 0.00
3 3 ~ 33.00 8.00 23.00 4.50 0.0090 2.4 54.6 10.7 == == 0.00 0.00 0.00 0.00 0.00
~ 4 E 36.00 8.00 34.00 9.000.0120 3.5 117.5 31.1 __ 0.00 0.00 0.00 0.00 0.00
5 _ 0.0000 0.0 0.0 0.0 _ _ 0.00 0.00 0.00 0.00 0.00
6 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
7 1 SW 12.00 8.001 0.00 4.500.0000 0.0 0.0 0.0 -p~ 45.30 80.85 2.17 OK SlN2
8 4 SW 12.00 ~ 34.00 4.500.0000 0.0 0.0 0.0 P 1 50.30 85.12 2.29 OK SlN2
~ ~ _ _ 0.0000 0.0 0.0 0.0 _ 0.00 0.00 0.00 0.00 0.00
10 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
11 -1- - - 0.0000 0.0 0.0 0.0 ,== 0.00 0.00 0.00 0.00 0.00
12 I _0.0000~~~_~ 0.00 0.00 0.00 0.00 0.00
13 I _ 0.0000 ~~ ~ _~ 0.00 0.00 0.00 0.00 0.00
~ ~ 0.0000 ~~ ~ __ 0.00 0.00 0.00 0.00 0.00
-t}j 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
16 _ o.ooool o.of O.OI-O:OI=i== 0.00 0.00 0.00 0.00 0.00
17 _ 0.0000 I 0.11.1. O.I1.1~ 0.00 0.00 0.00 0.00 0.00
18 _1__ 0.0000~~~_~ 0.00 0.00 0.00 0.00 0.00
19 ___ O.OOOO~~~_~ 0.00 0.00 0.00 0.00 0.00
20 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
21 I == == == 0.0000 -0:0 -0:0 -0:0 - - 0.00 0.00 0.00 0.00 0.00
22 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
23 --- 0.00001 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
24 - -,- 0.0000' 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
251 _ == I 0.0000\ 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
W - 2nd (N-S) = 10.25 [kips)
I I I '----=-'l
WALL .ENGn!:!EI~ Y X JNIT VIi W W X I W V SIN ~ (REO 1 ALLOW) END
TYPE ~ -1!!L (ft) (ft) ~I~ ~ (k-ft) TYPE LAVER SEISMIC WIND RXN
2 nd Wallin E-W direct/on _ _ % % (KIPS)
1 -A E 12.00 8.00 -8.50 28.000.0120 1.2 32.3 -9.8 ___ 0.00 0.00 0.00 0.00 0.00
2 A E 34.00 8.00 2.00 17.000.0120 3.3 55.5 6.5 0.00 0.00 0.00 0.00 0.00
3 B I 68.00 8.00 11.00 17.000.00901 4.91 83.2 53.9 0.00 0.00 0.00 0.00 0.00
4 C E 34.00 8.00 27.50 17.00 0.0120 3.3 55.5 89.8 0.00 0.00 0.00 0.00 0.00
5 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
6 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
7 A SW 2.75 8.00 0.00 1.300.0000 0.0 0.0 0.0 P 1 65.11 97.64 1.94 OK SW1
8 A SW 3.75 8.00 0.00 9.500.0000 0.0 0.0 0.0 p. 1 48.75 73.11 2.06 OK SW2
9 A SW 4.00 8.00 0.00 20.00 0.0000 0.0 0.0 0.0 P 1 49.53 74.28 2.08 OK SW2
10 A SW I 1.80 5.00 0.00 33.000.0000 0.0 0.0 0.0 P 1 63.80 95.67 2.92 OK SlN2
11 C SW I 2.75 8.00 27.50 1.300.0000 0.0 0.0 0.0 P 1 56.77 86.55 1.72 OK SWl
12 C SW I 3.75, 8.00 27.50 9.500.0000 0.0 0.0 0.0 P 1 61.99 94.51 1.83 OK SlN1
13 C SW 4.00 8.00 27.50 20.000.0000 0.0 0.0 0.0 P 1 62.98 96.02 1.85 OK SWl
14 C ~ _..!J1Q 5.00 27.50 33.000.0000 0.0 0.0 0.0 P 1 55.63 84.81 2.59 OK SW2
15 __ 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
16 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
17 I -1-1 _ 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
~ ~ I __ 0.00001_ 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
....!!L _I __!J.OOOO ~ 0.0 0.0 0.00 0.00 0.00 0.00 0.00
20 ~ 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
:;, ~~=-::,.oooo '.'1 "~_____ '.00 '.00 '.00 '.00 '00
it== .i-.- '.001: ,., --"" ~-'" ~-- - '.00 '.00 '.00 '.00 '.00
23 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
"24 - --- -- -1-- --- 0:0000 0.0 -0:0 -0:0 --- 0.00 0.00 0.00 0.00 0.00
25 I 1 ---1--- 0.0000 I 0.0 ------0.0 ------0.0 0.00 0.00 0.00 0.00 0.00
22.8 W - 2nd, (E-W) = 12.58 [kips)
KITSAP CONSULTING ENGINEER 360-479-4423 Input; 2/4
3080082002 Shear Wall 1997.xls SHEAR WALL CALCULATION Matthew G 8/17102 r; /
. Ib
1st LEVEL ROOF & WIDTH'DEPT X Y JNIT V' W W X W Y
(or) 2nd FLOOR ~ (II) (II) (II) (ksf) (kips) (k-II) (k-II) I _
I
1 FLOOR.1 34.00 27.00 17.00 13.50 0012111.0 -187.3 148.71 _ Note:
2 DECK 34.00 6.50 17.00 30.50 0.0101~ 37.6 ~7.4 _ CapacityofSW1 240 PLF
3 0.0 0.0 0.0 Capacity of SW2 350 PLF
4 - -0.0 -0.0 0.0 - Capacity of SW3 450 PLF
5 - -0.0 -0.0 0.0 Capacity of SW4 600 PLF 1.33
6 - -----0:0 -----0:0 0.0 I Capacity of SW5 no PLF 1.71
13.2
1st LEVEL WALL I I I ~
WALL ~ENGTI/-fEIGHl X ~ JNIT V' W W X W Y ~ # OF (REO I ALLOW) END
TYPE I (II) I (II) -.1!!L -.1!!L ~ ~.J.It!!L.J.It!!L TYPE LAYER SEISMIC WIND RXN
1st LV Wall in N-S direction % % (KIPS)
1 1 E 14.00 8.00 0.00 26.500.0120 1.3 0.0 35.6::=::= 0.00 0.00 0.00 0.00 0.00
2 2 I 20.00 8.00 16.50 ---Z:QQ. 0.0090 ~ 23.8 ~ _ _ 0.00 0.00 0.00 0.00 0.00
3 4 E 27.00 8.00 34.00 13.50 0.0120~~ 35.0__ 0.00 0.00 0.00 0.00 0.00
4 __O.OOOO~~~__ 0.00 0.00 0.00 0.00 0.00
5 __O.OOOO~~~__ 0.00 0.00 0.00 0.00 0.00
6 1 SW 13.00 8.00 0.00 27.000.0000 0.0 0.0 0.0 P 1 63.39 81.10 5.16 OK SW3
7 4 SW 13.00 8.00 34.00 27.00 0.0000 0.0 0.0 0.0 ---p 1 68.93 84.22 5.36 OK SW3
8 _ _ 0.0000 ~ ~ ~ =$= 0.00 0.00 0.00 0.00 0.00
9 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
10 _O.OOOO~~~ 0.00 0.00 0.00 0.00 0.00
11 _ 0.0000 ~ ~ ~ _ _ 0.00 0.00 0.00 0.00 0.00
12 _ 0.0000 ~ ~ ~ _ _ 0.00 0.00 0.00 0.00 0.00
13 _ 0.0000 ~ ~ ~ _ _ 0.00 0.00 0.00 0.00 0.00
14 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
15 ::= 0.0000 0.0 0.0 0.0::=::= 0.00 0.00 0.00 0.00 0.00
16 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
17 - 0.0000 -0:0 -0.0 -0:0 - - 0.00 0.00 0.00 0.00 0.00
18 ::=::= 0.0000 0.0 0:0 0.0 ::=1::= 0.00 0.00 0.00 0.00 0.00
19 _ _ 0.0000 ~~ ~ _ _ 0.00 0.00 0.00 0.00 0.00
20 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
~ -::=~o.oo.oo.o::=::= ~~~~~
22 _ 0.0000 ~ ~ ~ _ _ 0.00 0.00 0.00 0.00 0.00
23 _ 0.0000 ~ ~ ~ _ _ 0.00 0.00 0.00 0.00 0.00
24 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
~ ::=~o.oo.oo.o-~ ~~~~~
~1 (N-S) = 5.38 [kips]
I I I I
I WALL ~ENGTIHEIGH" Y X JNIT V' W W X W Y SW # OF (REO I ALLOW) END
I TYPE j (II) 1 (II) (II) -.1!!L ~ (kiDS) (k-ll).J.It!!L TYPE LAYER SEISMIC WIND RXN
1 st LV Wall in E-W direction ~ % % (KIPS)
1 A I 34.001 8.00 0.00 17.000.0090 2.4 41.6 0.0 i 0.00 0.00 0.00 0.00 0.00
2 B I 14.001 8.00 12.00 12.500.0090 1.0 12.6 12.1 0.00 0.00 0.00 0.00 0.00
3 C E 34.001 8.00 27.00 17.000.0120 3.3 55.5 88.1 0.00 0.00 0.00 0.00 0.00
4 I - - 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
5 1 - - - 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
~A SW 2.75 8.00 0.00 1.300.0000~ 0.0 0.0 P 1 75.83 89.73 4.80 OK SW2J fin, (~~
~A SW 3.75 8.00 O.OO~O.OOOO~ 0.0 O.O~~ 82.80 97.98 5.11 OK SW2 - 'f'
-.!!.- A SW 4.00 8.00 0.00 20.00 0.0000 ~ ~ ~ ~ -L 84.13 99.55 5.17 OK SW2
9 A SW 1.80 4.00 0.00 33.00 0.0000 ~~~~-L 106.38125.88 9.15 VERIF't' SW3
10 C SIN 2.75 8.00 27.50 1.30 0.0000 ~~~~-L 71.50 83.61 4.48 OK SW2 . ,.~...
11 C SW 3.75 8.00 27.50 9.50 0.0000 0.0 0.0 0.0 ~ -L 78.07 91.29 4.76 OK SW2 ~,'
12 C SW 4.00 8.00 27.50 20.00 0.0000 0.0 0.0 0.0 ~-L 79.32 92.76 4.82 OK SW2"
13 C SW 1.80 4.00 27.50 33.00 0.0000 0.0 0.0 0.0 P 1 100.30 117.29 8.52 VERIF't' SW3
14 _ 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
15 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
~. 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
17 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
18 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
19 _ 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
20 _ 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
21 _ 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
22 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
23 - 0.0000 0.0 0.01 0.0 0.00 0.00 0.00 0.00 0.00
24 I - 0.0000 0.0 0.0 I 0.0 0.00 0.00 0.00 0.00 0.00
25 I 0.0000 0.0 0.0/ 0.0 I 0.00 0.00 0.00 0.00 0.00
12.1 W - 1 st, (E-W) = 6.72 [kips]
.W W X W Y Xcf-s Ycf-s
(kips) (k-ll) (k-ll) (ll) (II)
SUM of 2nd --> 42.9 794 427 18.6 """""9.9"
SUM TOTAL--> 68.3 1241 824 18.2 "l2.1
KITSAP CONSULTING ENGINEER 360-479-4423 Input; 3/4
3080082002 Shear Wall 1997.xls SHEAR WALL CALCULATION Matthew G 8/17/02 71
. /~
1st LEVEL ROOF & NI~ WX WY
or 2nd FLOOR ks ki s .~::!IL k-n
I
1 FLOOR.1 17.00 0012111:0 .....!.flZ~ -1481. - Note:
2 DECK 17.00 OO.!QL........2-'-?__~!-'-li~ ___ CapacityofSWl 240 PLF
3 _I 0.01 O.O~Q__ CapacityofSW2 350 PLF
4 ~ 0.0 Capacity of SW3 450 PLF
5 - 0.0 0.0 ----0.0 - --- Capacity of SW4 600 PLF 1.33
6 -- 0.0 0.0 -0.0-- CapacityofSW5 no PLF 1.71
13.2
1st LEVEL WALL I 1 I I I I I
__ WALL .ENGTIHEIGH X Y J:!!,UT ~ W W x I W Y SW # OF I (REO I ALLOW) END
_ TYPE (ll) 1 (ll) Ill) ---.l!!L~~i k-n Ik-ll) TYPE LAYER SEISMIC WIND RXN
1st LV Wall in N-S direction % % (KIPS)
1 1 I E 14.001 8.00 0.00 26.50 0.0120.........!d~ 35.6 0.00 0.00 0.00 0.00 0.00
2 2 I 20.00 8.00 16.50 7.000.0090 1.4 23.8 10.1 0.00 0.00 0.00 0.00 0.00
-}i4 E 27.00 8.00 34.00 13.500.0120 2.6 88.1 35.0 0.00 0.00 0.00 0.00 0.00
4 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
5 1 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
6 11 SW 13.00 8.00 0.00 27.000.0000 0.0 0.0 0.0 P 1 66.21 81.40 5.16 OK SW3
7 4 SW 13.00 8.00 34.00 27.000.0000 0.0 0.0 0.0 P 1 72.53 84.78 5.37 OK SW3
..JI... 0.0000 ~ 0.0 0.0 0.00 0.00 0.00 0.00 0.00
9 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
10 0.00001 0.0 0.0 0.0 I 0.00 0.00 0.00 0.00 0.00
11 0.00001 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
12 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
13 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
14 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
15 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
16 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
17 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
18 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
19 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
20 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
21 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
22 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
23 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
24 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
25 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
_ W -1st (NoS) = 5.38 [kips]
I I I I
= I WAlL ~ENGTIj-lEIGH Y I X _~NIT V W W X W Y SW # OF I (REO I ALLOW) END
I TYPE I (ft\ (ft) (ll) ---.l!!L ~ (kips) (k-ll) (k-ft) TYPE LAYER SEISMIC WIND RXN
1 st LV Wall in E-W direction I % % (KIPS)
1 A I 34.00 8.00 0.00 17.000.0090 2.4 41.6 0.0 I 0.00 0.00 0.00 0.00 0.00
2 B I 14.00 8.00 12.00 12.500.0090 1.0 12.6 12.1 0.00 0.00 0.00 0.00 0.00
3 C E 34.00 8.00 27.001 17.000.0120 3.3 55.5 88.1 0.00 0.00 0.00 0.00 0.00
4 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
5 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
6 A SW 2.75 8.00 0.00 1.300.0000 0.0 0.0 0.0 P 1 78.62 88.91 6.15 OK SW3
7 A SW 3.75 8.00 0.00 9.500.0000 0.0 0.0 0.0 P 1 85.85 97.08 6.55 OK SW3
..JI... A SW 4.00 8.00 0.00 20.00 0.0000 0.0 0.0 0.0 P 1 I 87.23 98.64 6.62 OK SW3
9 A SW 1.80 4.00 0.00 33.00 0.0000 0.0 0.0 0.0 P 0 0.00 0.00 0.00 0.00 0.00
10 C SW 2.75 8.00 27.50 1.300.0000 0.0 0.0 0.0 P 1 74.70 83.74 5.80 OK SW3
11 C SW 3.75 8.00 27.50 9.500.0000 0.0 0.0 0.0 P 1 81.56 91.44 6.16 OK SW3
12 C SW 4.00 8.00 27.50 20.00 0.0000 0.0 0.0 0.0 P 1 -I 82.87 92.91 6.24 OK SW3
13 C SW 1.80 4.00 27.50 33.000.0000 0.0 0.0 0.0 pol 0.00 0.00 0.00 0.00 0.00
14 _ 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
15 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
16 =F - == 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
17 _ _ 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
18 =$= 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
19 I - 0.0000 0.0 0.0 0.0 I 0.00 0.00 0.00 0.00 0.00
20 1 - 0.00001 0.0 0.0 0.0 I 0.00 0.00 0.00 0.00 0.00
21 I ,__ 0.0000 0.0 0.01 0.0 _1_ 0.00 0.00 0.00 0.00 0.00
22 I 0.0000 0.0 0.0 ------.!lJ! _ _ 0.00 0.00 0.00 0.00 0.00
23 ~ 0.0000 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00
_2..!. ____ r_______O.OOOO~~~+-== 0.00 0.00 0.00 0.00 0.00
25 0.0000 0.0 0.0 0.0 I 0.00 0.00 0.00 0.00 0.00
12.1 W - 1 st, (E-W) = 6.72 [kips]
W W X W Y Xcf-s Ycf-s
(kips) (k-n) (k-ft) (fl) (ft)
SUM of 2nd --> 45.6 843 455 18.5 10.0
SUM TOTAL-> 70.9 1290 852 """1'8.212.0
KITSAP CONSULTING ENGINEER 360-479-4423 Input; 3/4
3080082002 Shear Wall 1997.xls SHEAR WALL CALCULATION Matthew G 8/17/02 B4
.
.
SECTION 1632
LATERAL FORCE ON ELEMENTS OF STRUCTURE - wall, penthouse, connection for prefabricated structural elements.
LATERAL FORCE ON NON STRUCTURAL COMPONENTS- ornamentation & appendages, chimneys, billboard & lightlflag pole, storage rack >6', cabinets/book stacks>6', concretelm
LATERAL FORCE ON EQUIPMENT SUPPORTED BY STRUCTURES - tanklvessels wi content, electrical & mechanical & plumbing equipment & associates conduR & ductwork & pip'
SECTION 1632.2 DESIGN FOR TOTAL LATERAL FORCE
32-1) Fp = 4.0 *Ca * Ip *Wp Rho = 1.0 reliability I redundancy factor
32-2) Fp" (ap I Rp)*Ca * Ip *( 1 + 3 hxlhr) *Wp Rho = 1.0 reliability I redundancy factor
ap I Rp = 0.33
Ca= 0.36 Rp= 1.50 shallow expansion anchor boll,
Ip= 1.00 1.5 for essential and hazardous facilRies 1.50 shallow chemical anchor,
hx = 1 7.00 (It) - elevation of attachmenl above the ground 1.50 shallow cast in place anchor,
hr = 1 7.00 (It) - elevalion of roof above the ground SHALLOW = embed LIDia < 8
Wp = 12.00 (psI) Rp= 1.00 anchorage constructed by use of adhesive
1.00 anchorage constructed of non ductile material
. -
cone &
msnwl
~ Rp 1.00 1.50 2.00 2.50 3.00 3.50 4.01
ap
All wall wI flex or rigid diap (1. 1 &2A,2B); rC & Ml wl (1. 3&4) wI rigid diap ...1:22.. 1.00 0.67 0.50 0.40 ~ 0.29 0.25
Concrete (C) & mason (M) wall (1.3&4) wI FLEXIBLE diap ~ 1.50 1.00 0.75 0.60 ~ 0.43 0.38 I
2.00 2.00 1.33 1.00 0.80 0.67 0.57 0.50
~ 2.50 1.67 1.25 1.00 ..ML 0.71 0.63
SECTION 1633.2.4.2 - EXTERIOR ELEMENTS
exterior nonbearing, non-shearwall panels or elements that are attached to or enclose the exterior
Rem #4: body of connection = Rp= 3.0 & Ap = 1.0
Rem #5: fastener: boll welds, dowels, insert = Rp= 1.0 & Ap" 1.0
Rem #6: fasteners embedded in concrete shall be attached to, or hooked around, reinforcing steel or otherwise tenninated to effectively transfer forces to the reinforcing steel.
Z3 & Z 4 - Exterior wall at ground floor or above ground floor & parapet braced above their center of gravity
32-1) Fp= 1.44 * Wp = 17.28 (psI)
32-2) Fp= 0.48 * Wp = 5.70 (psI) MIN = 5 PSF see 1611.5 interior wall load
Top attachment: Fp * Hw I 2 = 48.47 (lbIfl) (Z 1,2A, 2B, 3) - [C & M] wl & RIGID OR FLEXIBLE DIAPHRAGM ==> Min 280 pit
(1. 4) - [C & M] wl & RIGID DIAPHRAGM ==> Min 280 pit
(1. 4) - rC & Ml wl & FLEXIBLE DIAPHRAGM ==> Min 420 pit -
1605.2.3; if spacing of anchor at [C & MJ wl >4' check wall bending
1611.4; anchor capacity shall be > load combination (1612.2, 1612.3) or Emin 280 pit (Z3,2A,2B,1)
1633.2.8.1; Zone 3 & 4 = ap=1.5, Rp=3.0, Emin(Z4)=420 pit
SECTION 1633.2.5. TIES AND CONTINUITY
TIES BETWEEN BUILDING = 05 Ca I Wd of smaller building ===> 0.18 x Wd of smaller building
POSITIVE CONNECTION AT EA. BM, GIRDER, TRUSS = 05 Ca I (Wd+WI) ===> 0.18 x (Wd+WI)
SECTION 1833.2.9. DIAPHRAGM I DRAG STRUT
(WHEN FLEX DIAPH. SUPPORTING CONC OR MASONRY WALL, R<=4 FOR DIAPHRAGM FORCE ONLY; R FOR S.W. REMAIN THE SAME)
DIAPHRAGM LOAD (when dia hra m SU orting shear wall, add s.w. force to diaph. manually) - p = N.A.
Sum 0 Sum Oi Sum 01
MARK EIGH Wi Fi Fi/Wi min max Fpxl N&S E&W N&S E&W N&S E&W
per IevE ea Lvi ea Lvi ea Lvi .5 Ca I 1. Ca I Wpx Wpx Wpx Fpx Fpx Fpxl1.4 Fpxl1.4
~ ~~___ ~~ (kips) ~ (kips) (kips)
Roof (Top) 31.53 31.53 4.86 0.15 0.18 0.36 o:rlI 26.40 25.24 4.75 4.54 3.39 3.24
Floor(n-O) 30.68
Floor(n-1 ) ""'ii.1iO I I I I I I I I I I I I
Floor(n-2) ""'ii.1iO I I I I I I I I I I I I
Floor(n-31
62.21
DRAG STRUT: increase load by Omega-o and use Load Comb 12-17 & 12-18, For ASD (steel) increase all stress by 1.7 (wood) by 1.7x1.33
Em (=E*Omega-o) need not exceed the maximum force that can be transferred to the collector by [1 J diaphragm + [2J other elements of the lateral force resisting system
WOOD EXCEPTION <Omega-o = 1> - [1J light frame (wood frm wi Wd s.w or light gauge frm wi Wd s.w.); [2J entire bldg supported by wood sw as stated on (1J
KITSAP CONSULTING ENGINEER 360-479-4423 Input; 4/4
---- o~-o~
....
! >> BREMER ON CITY. .. RER
CITY OF BREMERTON. WASHINGTON P A I D
DEPARTMENT OF PUBLIC WORKS AUG 2 0 2002
PER M I T I THAN~K YO'U
,4c..~rlf=
Tue Aug 20. 2002 Permit # 4301 Permit Fee: $75.00 r.-7JI-O
APPLICANT: BJ BUILDERS * Certificate Of Insurance Is On File
Owner: BJ BUILDERS Address: PO BOX 2274 Ph: 731-0932
PItt',/(. &!g'3/C)
Work Addresses:
6039 BLUE HERON PL
TYPE B PERMIT r
DRIVEWAY APPROACH D.c ~ (g ~ a o/J ~ ':\
A PERMIT IS HEREBY ISSUED for the performance of the following: I~ ?lUG 2 0 2002 .~
DRIVEWAY
PERFORMANCE BOND ON FILE. BREMERTON
BUILDING DEPARTMENT
This permit is valid for 90 calendar days commencing with the date of this permit unless specifically called
out under limitations below. This permit must be posted on the job site in a location accessible to City
Employees. The Engineering Department must have 24 hours notice of the need for a required inspection. An
inspection must be made prior to any work commencing and after completion of the job. Phone 478-5270.
Limitations: SEE ATTACHED COMMENTS AND CONDITIONS. RESIDENTIAL DRIVEWAY
APPROACH MAX. WIDTH IS 20'. LOCATION PER APPROVED SITE PLAN.
WORK SCHEDULE
Commence Work: 08/20/2002 9:00AM Complete Work: 12/20/2002 4:00PM
INSPECTION RECORD
Date of Inspection: Date of Approval:
Comment: CONTACT PERSON: BRIAN JACOBSON
Ii .-
CITY OF BREMERTON ENGINEERING DEPARTMENT
RIGHT OF WAY PERMITNO. 43t'1
l. For underground locates call: 800-424-5555
2. Traffic Control shall be per Washington State M.U.T.C.D. and City of Bremerton
Standards. Notify CENCOM (616-5800), Kitsap Transit, Paratransit, Bremerton
School District (during school year), and Kitsap Disposal of work schedule prior to
start of work, if blocking driving lanes. Sidewalk closed signs shall be used at each
end of the work area during construction.
3. The street shall be cleaned each evening. Catch basins and ditches shall be protected.
from dirt and debris per City of Bremerton Standards. No dirt or debris shall be left
on a sidewalk. No dirt shall be left on grass or landscaping for such a length of time
that it will result in damaged or dead plants.
4. The Contractor shall notify the adjacent property owners and the City of Bremerton
Engineering Department three (3) workin!! davs prior to start of Work and the
start of Pavin!!.
5. This Permit and a COpy of the Approved Plans shall be kept on the work site
durin!! construction.
6. Received from the City ofBremerton:
Trench and Surface Restoration Standards
Curb & Gutter, Sidewalk, and Driveway Standards
Other:
7. Any landscaping, pavement, sidewalk, sign, mail box, or retaining wall disturbed
during construction shall be restored to its original or better condition per City of
Bremerton Standards.
8. When installing underground utilities, the Contractor shall maintain a parallel
distance of 5 feet away from other City owned underground utilities. Buried conduit
and cable shall have a minimum of 2 feet of cover over the top of pipe. In paved
areas that 2 feet minimum is measured from the bottom of pavement to the top of
pIpe.
9. The Permittee and any of the Permittee's contractors are required to name the City of
Bremerton as additional insured for the work in the right-of-way on their insurance
policies.
10. If there is a question about, or damage to a City. owned utility call 360-478-5920 for
assistance during 7:30am to 4:00pm. After 4:00pm call 911 and request that the
"Standby" Utility Worker be contacted.
RECEIVED BY: rfl-
DATE:
r~------------- -. --
1/ BREMERTON PERMIT CENTER
I 286 4th Street~ Bremerton~ WA 98337
Phone: (360) 478-5275 FAX: (360) 478-5278
I BUILDING PERMIT
Jab Addr: 6039 BLUE HERON PL Permit NO': 02-0461
I Lacatian: DOCKSIDE LOT 115 Status: PENDING
Parcel NO': 5092000-115-0000 Applied: 08/20/2002
I Issued:
I Applicant: JACOBSON BRIAN 731-0932 Expires:
I PO BOX 2274 8REMERTON WA 98310
I
Owner: JACOBSON BRIAN 731-0932
PO BOX 2274 BREMERTON WA 98310
Cantractar: SELF Lic 1t: SELF Exp:
Subcantr:
Desc: NEW SINGLE FAMILY RESIDENCE W/ATTACHED GAR & DECK
*******************************************************************************************~:*
Valuatian * Permit Fees: 1,328.25 Tatal Calculated Fee: 2,086.93
115,442.28 * Plan Check Fees: 704.18 Additianal Fees: .00
* Other Fees: 54.50 Tatal Permit Fee: 2,086.93
*********************************************************************************************
MECHANICAL/PLUMBING FIXTURES-- MECH-Range................... : 1 MECH-Wood/Pellet Stove.......: 1
MECH-Gas Fuynace to lOOk btu.: 1 MECH-Gas Piping (outlets)....: 3 MECH-Exhaust Fans............: 3
MECH-Range Hood (yes)........: 1 MECH-Clothes Dyyey...........: 1 PLBG-\~ate~' Closet............: 3
PLBG-Bathtub. ................ : 3 PLBG-Lavatoyy................: 4 PLBG-Showey. . . . . . . . . . . . . . . . . . : 1
PLBG-Kitchen Sink............: 1 PLBG-Dishwashe~'.............. : 1 PLBG-LaundYy Tyay............: 1
PLBG-Clothes Washey..........: 1 PLBG-W~teY Heatey............: 1 PLBG-Hose Bibbs .............: 2 Pe
r\LL ~ d- 0 d, · '8 li E-R-o-W ~,".1
..............;....{:,(.:..............:;~............. .... ............ .....~~~~lD~1
This peymit shall become null and void if the buildin ~~y woyk authoyized by t eymit is not co nced within
180 days fyom the date of such peymit, oy if this buildi~goY It-Joyk authoYized by such peymit
abandoned at any time aftey the \"Joyk is commenced foy a peYiod of 180 days.
NOTICE - It is the yesPoi1sibility of the peymit holde, not the City of Byemeyton oy Building Official to see
to it that yequiyed inspections aye made. The peymit must noti f>' the Building aff icial vJhen yeady fo'(
inspections. Failuye of the peymi t holdey to n tify e u 'lding Official of yequi yed inspections may ~'esult
in the stoppage of the "-lork until such time t " 1r'.' '~' can substantiate to the building offici.,
that the concealed woyk meets oy exceeds d crnts. demolition, testing, oy financial buyden shall
be boyne diyectly by the peymit holdey. i u , :;. t. code ,"qui'""""ta will ind~ify the City
agai nst any and all yesponsibi li ty oy liabl "S d w'th the conotcuction.
's p mlt and know the same to be tyue and coyyect. All
provisions of laws and Ql"dinances govey'ning 1st e of woyk l,.}ill be complied with whethey specified heyein
oy not. The gyanting of a peymit does no pyesume to give authoYi ty to violate oy cancel the pr"ovisions of
any othey state oy local law yegulating onstyuction 01' the peyfoymance of constyuction.
Signatu're:_ Date:
I ceytify that I am exempt fyom the the state contyactoy's yegistyation law, undey
Section 3, Chaptey 126, laws of 19€
'i_tuco' . . ~ oate::;j ~v
****:!::***:!::*:!::**;u*********** " .'
Permit CenternApproved By:' . ~
f - ":~~~':!'> . -"-~'(.' 'VI~""~)ltll'i"!l~' .~y"",,'";-.:~r:;:'I~"'~'-
':,,1 : ii :~~
" \ '~t
I BAEMERTON PERMXT CEN"re:R
o~, "
I
I 286 4th Stre-et. Sr..mel~ton.WA 98337
I Phone: (360) 478-SfJ75 ,FltX:, (360) 478-:-5278
'- ' "<" - '.j
I ,j}; \ ", I3UILDtNG PER"IT '"
I Job Addr~ 6039 BLUE HERON PL' Permit No: Q2..0461
Lo,;;at.ion: onCKs:tOE un 11$ Status: PENDING
Parcel 1'41.1: 509200Q-HS-OOOO AppHE>d ~ 08/'20/2002
Issued:
I APpHc,ant r" JACOaS,ON I3RIAt4 731-'0'32 Expires:
I PO BOX 2274 BREMERTONWA98310
I OWRl?r~ JACOeSON BRIAN 7::11, -0':;:2 '
!
I PO BOX 2274BREMERTONWA'9S310 --"'~.;
I
'Cent i:Ill.ctor : SELf Lie; t: SELF Exp:
Subcontr:
/Oesc: NEW S!NGLE rAMIL Y, RESIOE),H::tWI(~ HACHEO .GAR lii OECK
, l!Ok*Jkn~*"!OI(*~**U*;$(lIi:uu*n)ll:)IOI(*:n;tj!nK:nO(*,*lii:**U*)!(lIO"~110':;0:**** >ltw:w: *,*~OIOIlU)l( lI'<~jl(lt::ulil(un*u*lli*jUf*:t.)iOIOlt
Valu.atiol1 ili: . Permit ff.'H~$= l.~ 328. :,5 Total cdculaflto Fee; 2 . Oa6 ., '93
115.442.28 * ,PIiHI Chec;:rees: 704.10 Additional Fees: .01) ,
':iII. Other r'ees: 54.50 Total Permit Fee: 2 . 086 . 9:3
*lll::<<~*,IIUI<i!l;:lfi Jl!lJ/{:ij..)j{;<<:II{:f:)ltlKl!l:1<<lll:** *****l\(li\'* ::tCtlk;U:lI:~*)Ulllii JI:~:t* lIe'~ *l\(lIiIKIf.:*l<<~lltlil(Jt1:llt* ll:llt**)It:tfll(3'; ll(lKlf:~** :lY.)lt*~itlt~ It:lIt:f '** *** %;t)lt *'
~.. . . .' '
~CPil>F-'t..t~fi!n;.~ P1XTtJlilEill-.MEtl+!ll\lA:1;........:.".~...".. ~:I. Me;CrH~/P~U>$1t; $to+.>'t...,... ~ 1
Hb,-cH~$ FumJb~ to 1,OOk btu.. 1 l'1tt~ ;:~ .p1r~ (ootl.t$)..". ~ {i HECH'"1S.xh,au.$t fil'aV'tIllI."..,..." ::.::,~"",$ _ .
l'ftCH-!ll\lAr~ ~~ (y").........~ 1 l"ECl+-tlot',", l)ry~'1'...........~l Pl..ae""i./atlil'f' ClOi$l't........\;'C;-~-:-".,~ $ _.~
I PL,BC.Pi~t.htub'" 11> ~l- ~.* *' 1('" t. li -ll II< ~ .,; ., at. '" u:~ J;'L,Btl-l,avatOl:ll U 1': .. 11 h ~ U II .,," 'It 101. '\I m >\0 il'1' =- 4 PLIG"",,"s.~'t""t; ri.'!/ji, '" ,../'~ -It I'J II 'k ill fi JII. c;l 'It .1 ,
, : /
Pl!a-Ki tcn.n 51 nk. .. ,,'. , ..." .. , , . ~ 1. PliG-Oi.$hwiII:'$I14tr. .. . 0 . H . .. >> . .~ PlM-lalJ,l1drx.,, Y$,';Io"........;.." ~ 1
I PI..OO-Clotht$ *~bt '1" . . . ". " " . " , = 1 PlSrEi..~t~r Hthtt.~l'. .'. " , , . . . . , .= 1,. F>l."e,(:;-~ ibb:\l1.. . . . . ... . . , ,,'. .'. : Z .(2 ,r
t [ILL ~ d' O~ .~ ir.;.w, U. c:.. R.C>-~1~l;.~1
I ,~ .' .,~ ., . . """ . . t :5 ,:1' ~^ ~ . ,'g. ,J: a.l.)
i '**nlU{lll:Jl<~>>:?ltnJl<*JI!*Q*nn:~o,*~1:lUOi1:nJl!~)j(J:Jti . )i(UUlilUU. .111:<<1<< U ~u :tu:<< , )j(:<<U:ln;f.:r;illli:t~Q1\1: to
Thi..."," fohall _ roll -:did ,f ''''';''11\11"" Qr_' .,"'""i.... bV <hie .. "" to "'" _within
111$0 d<lw$ 'h'ttlm 't.he da~Sf..I(lh r>~ .' t. ,':1"1" if ~~:Udi11li or WCl\,'lr; ~i!td by $lJCh 'Mi*-, i$ $(.\;$p$'l'1t:li\!d "y
faNl'l<:briGld Sit av.}' t1_ . rL t~ ... ~~ ''r'a~~od of 1 .', ~ .,
I ~ - It ... ,,,. ,-.bUitiS tile .em" "'l...r. "'" ,... city 0' Bv_r.'on MldinoOm<1al to -
I t,o :i.t ,that t'~qui:1i!'cl ;!'x~l!i!ctiom,t. . 1r!<lI.~ ~ P.~, hol~' MU~t, l"P;tf}' ~lld1l"'S ~i~\ 1'~d'1 fcw
. -,,j,~'eet1~. paitlYI'e \')1' u~ p~t'hol, .. . ~Ufy th<ll . . id~~f1'ch"l. W4l.rtyed" . *"" .. ...~ y~it
;, irl\l'lfi ~oPt)~ ('iff t~ work until $Uctl tJ~thi!Jilft~'r~,~aT'lt::itl.~~ to t~ !:lUHdirl@G'l'ficial ,
I', t!lilt; .t.~ QQrn~l;td work I!IlMt$ .O'/" .x.c~~ ~ .. '. ~t1f Y'. htlOth t'"tl'l1S~O't rii1lli.l'JC:1al bUi'dIm $lhidl
I .. .. ..,. .. -~--~1l'JX1lt to $tll:l$bll'ltlat,4,II .~ l"El'<i:l\J;;i:r'<<IJil'lf!ll"itllit will i\~nify the Cit:~'
! Ity ~ with tho """"'''''''ih
I V~L.~ ~ .-<L-. ..................... '.. g .......~. ,fh- . ....
ed ~hl$.' J;A~now tWiOO ,...... t{rt} 'aM ~rW AlfD
))?fr ~hi19 \:YPf;ot' wort~ will .I:A comp Ho!&d wi th 4Jr~thl'tr rep$C:l. fifld I1<lJl"dn
B~yG, ~ Sivll\ wt;.ht::;d,t}' t.o violsd;~ Or' o.ll.re.l tJ'\f; Pl"'ovi$iotl$of
I ~t:i..Qn Oyth$ .P.Yf;OYIIllJ,I'iC~ o'f cornrl:;:nu::tiQrl.
1(~L( "~ ....'~/d)L
I
I ~ ..... ~i..'.""" 1"". "OJ ~ @ /I 9 Vi Ill!-.
I
I --- .....--R- SEP 25 21102 J
Ii ~uL
I;
II rJ;a te: ____.._..____.. BREMiR'fON .i'
I,' ~____,<o.. BU{~EllNG;DEI'AFlTMiNT./';
r, ~. "
"::~I!j;~i',. ," ,;~.:if~~~
'-'i'"
, ,",', ,.."........ ,- '1f' "~"I)" '_', ';';-.~i:~'" '. . ...", " '~;i '1
L~'..:'"'.L-.,~\'. ',', <i;< J. .~ j,' ., ';'l<i .'1 ~~ .;I., <" "" 0' ~~'.ML . ,;.' ' .
Build- P · A Ii. ~dr=-Of&(
lng errmt. .pp catton.. ''-..J r- 3
City of Bremerton, W A 98337 Phone: (360) 478.5275 Fax: (360) 478':5278 q /'
. L-/{) "
APPLlCAl'l"T: yaOWNER DCONTRACTOR DAUTHORIZEDAGENT
. :Site .\Jdxess: .: T:lX .\ccounc ~umber: <5119'...2. -~
lTif5 .
Ov,;ne=:: /!:>~/ffn) :jltt:./}t$:JUrt/ . .\ddxess: ;<:0. f50;t ,;l;).? Y I
6(:ti/JJ~(}j1) ~l f9$.J/;>
Conr:.r:l.ctOr: : .\ddxess: !
I
. Expi.r:lrion Date:
COnt:lct Person: ; Contact Phone#: ? ~/ -&;- 3.:1-.. !
. I
!
Check the type of application for below:
~.. SF RESIDENTIAL NEW 0 CO~Th'fERCI.AL NEW 0 GARAGE
o DCPLE..~ 0 COM~fERCI.AL REJ\tfODEL 0 ACCESSORY BLDG
o "'L-\.:.'WFACTURED HOME 0 CO~L"fERCI.AL ADDITION 0 SIGN
o RESIDEl\llLU REMODEL 0 COl\-L1\tfERICU REPAlR 0 DEMO
o RESIDE='lTIAL ADDITION 0 :\tlULTI-FA..vHLY 0 GRADING (Cubic yards:
o RESIDENTIAL REPAIR 0 TENAi'fT IMPROVEMENT 0 OTHER:
Scope of Work Proposed: 6tJkl) I\Jlfv ~11!/6L~ r1PV L )' ('Ge..5)OE,vC:-g;,
1#9'1 rIPOi/1JP .
Square Footage: D\veiling: /'7....~..~{IP,r::JlI4st.A2Var:lge: ?~tJ Decks: /tI tJ
. ~~T
IS THIS PROPERTY WITHIN 200 FEET' OF .\. SHORELl1'ic? 'YES NO X
Valuation Permit fee Sure .::TotalFees
092 35.1 ~nergy: ~50'90 j 21 0 vi q.3
o -..J.. . ':,tate: ~ +..JO 10.. 0 l.tJ.
.-\.pplic:J.tions for which no permit is issued within 180 days following the date of <lpplication shall expire by limitation. .lOJ ?icln,
<lnd other data submitted for review may thereafter be returned to the applicant or destroyed by the building official. The ~uIIJin:;
official may extend the time for action by the <lpplicant for a period not exceeding 180 days on request by the applicant -;nO"lD:!
that circumstances beyond the control of the applicant have prevented action from being taken. No applicant shall be ~:<tendc;:u
more than once. In order to renew action on an application after expiration. the applicant shail resubmit plans and pay <l ne\V ?bn
re'l.-le..v fee.
APPLIG..'li'\lT'S SIGNATURE: ,~A TE: j? ~t'- fJ::J...
AU G;;{) 2002 td
BREMERTON .
EU1LDlNG DEPARTMENT "
IJ' .
._03--6#(
~!.. ....i.. .'. ....r,UMECftA:NlCA.L:.n.:.:...rr.../ug!:(,..n........>:.:.::;::.PLUMBING?)......::......::::....I
Type of Fuel: Electric .p. Gas ~Oil o Propane I
Occupancy: >( Residential Commercial
(
Site Address: t,&31 tL.()~ ~;ftJt1J f'L.
. Owner: f].1f1fJ.tt) cJ~&;tl tJ Contractor:
Address: (:tJ. 6iJ J'l .;:z.;l7'?" Address:
gf?~/U) 1/1-. 9!'3/p
. Phone: '/3/- tJ93Z Phone
Contractor's License Number/Expiration Date:
I No. 'IYPE OF EQUIPMENT No. 'IYPE OF FIXTURE
-
I .", ! W A1ER CLOSET
...:>
I 2- BA1HTh'B
.
I ~...., ~ LW ATORY (bath sink)
CONVERSION BURNER btu: I ! SHOWER
UNIT REA TER btu: / . KITCHEN SINK
BOILER btu: -'--' DISHWASHER
3 GAS PIPING Li L\UNDRYTRAY
EVAPORATION COOLERS btu: I . CLOTIlES WASHER
AC UNIT btu: -L- i WA1ER HEA1ER
HEAT PUMP btu: : G'RL.~AL
REHE..\ T BOX btu: ' DRINKING FOUNT"\IN
AIRHAt"JDLING UNITbtu: . FLOOR SINK OR DRAIN
.3 E.'XH..'\l;ST FANS SLOP SI':--;K
I RANGE HOOD (residential) WA1ER PIPING & ALTERATION
RANGE HOOD (commercial) GREASE TRAP/INlERCEPTOR
I CLOTI-IES DRYER 2 HOSE BIBBS
rNCThiERATOR L\WN SPRINKLER SYSTEM
DUCT ALTERATION -
SWL.\t11vfING POOL
TANKS type: - BLDG. SEWER: (mobile/moved house)
REFRlGERA TION UNIT -
ROOF DRAlNS
OTIIER: -
OTIIER:
MECHANICAL FEES: ( 08 :t () :::J
PLUMBING FEES: / .-3 t:, _ 00
. BREMERTON
CITY SURGIARGE: ---c7 BUILDING DEPARTMENT
TOT"i\L FEES:
APPLICANT'S SIGNATURE: DATE: P* --CJ::L
~ i
I
I
*** '* * ******************* * ** * ****** *;1,(** *** **** ******* *' **:>/<:*** :*** **, 1
I
RECEIPT I
******** *'****** *** * ***** ************ *** ********:t;*** ** ***** *::;::::t:*** I
RECE!PT Number' : 02000720 AmCluht: 704,,18 08/20/0;;;: 10:00 I
I
Payment Method: CK Not.!!ltion: 8J aLDERS CK r.nit,~ vw I
.m~~_.__.______________________~____:~____~__~__~________~__~~_,______ I
Permit No: Ci2~"0461 Type: Bl.DG fj(~DG PERMIT 1.J/MECH/P I
Pav"cel Nl): 5092000--115-00()O I
I site Address: 60:39 SLUE Hf~RON Pt. I
Location: DOCK~IDE LOT 115 I
I Total FiSt.$ ~ ;2 ,,086.93 I
I I
I this ~)a:yment 704 . H~ Total ALL ~~mts: 704.1.8 I
I Balance: .:t ~:3132" 75 I
I **************************************************************** I
I Account Code Description {~mott nt
16-345.8300 (4580) BUILDING PLAN CHECK FEES 704.18
I --------~------~--~~------~---------~-----~----~---------------~
I
'.;.~;
1_"
,-
~,,(.
{
",-.,.f~
-
.
~ ~
- ""