P. Drouin, Sewer Project Committee Chairman, stated these hear-
ings are to bring this before the people to determine if the
City should proceed with the proposed secondary treatment plant,
and to explain the proposed facility and financing.
Mr. Drouin stated the first hearing is scheduled for Monday,
February 14, 1983 in the Great Northwest Bldg., at 1:00 p.m. and
again at 6:00 p.m. for those not able to attend the afternoon
session. Mr. Drouin introduced Bob Card, CH2M Hill representative.
Mr. Card briefly discussed the project history and grants. He
stated the current plant was built in 1947. In 1972 Congress
enacted public law 92-500 requiring secondary treatment plants.
The City has conducted studies to determine the most economical
method of improving the sewerage system to meet its needs and the
requirements of regulatory agencies. This plan has been approved
and new facilities have been designed. The City has also applied
for and been ~ a 50% grant to construct the facilities.
Mr. Card discussed the Project Planning Goals, stating their goal
is the most cost effective system. He discussed causes of pollu-
tion; levels of treatment; primary and secondary treatment; com-
bined sewer overflow condition and control alternatives. He stated
the original law was not to allow any overflow, but now the law
allows a 2% overflow. He discussed existing overflow locations
and explained the difference between combined sewer and separate
sewer. He discussed monthly rate comparison, stating an estimated
average is $18.00 per month for single family and $9.40 for
multiple family with rate inflation adjustor; approx. $28.00 per
month in 1985 for single family dwelling. Mr. Card discussed
Bremerton sewerage improvements with the proposed plan.
Question: will hackup and flooding continue in the problem areas in
Bremerton with the new plant? Mr. Card stated these problems
might possibly be corrected but not by design. If the problem is
on the land it is not corrected by this project.
Question: If the new plant will not help the problem areas why
should those residents have increased sewer bills? Mr. Drouin
stated regardless of where a person lives the new plant will be used
by them, and the law requires each user to pay for the system
according to the service available.
Question: If bills will continue to reflect how much water is
used? Mr. Card stated they will,
Question: Why is the rate for multiple family less than single
family? Mr. Card stated multiple family rate is calculated on
average consumption used during the winter months. In most cases,
there are fewer people living in multiple family dwellings. It was
emphasized that this rate is for each unit, and each family in
the building will be paying this rate.
Question: How much is the City paying for this project? Mr.
Card stated it depends on construction cost, bond rate, and based
on how much the Navy will be paying.
City Council Meeting Minutes
January 17, 1983
Question: what are the maximum rates? Mr. Card stated a conser-
vative estimate is 10% greater or as much as 10% to 20% less.
Mr. Card stated the design capacity is through the year 2000.
Question: was a phased construction plan considered? Mr. Card
stated this would not be cost effective because of loss of grant
funds, higher construction costs, economic conditions.
Question: When will the new rates go into effect? Mr. Drouin
stated the new rates will be effective April 6, 1983. Mr. Drouin
stated that we need to show intent, need to show earnest, other-
wise we might not be able to sell bonds.
Mr. Drouin further stated it isn't if the plant is built but when.
A year from now this will cost twice as much as there will be no
grant funds. The City received the final grant offer from DOE.
Decision was to be made December 15, 198~. Due to the new form of
government, the City was given an extension until February 1, 1983.
If the grant money is signed for at the time, it will have an
escape clause. He stated if we don't act now, we will find our-
selves under court order. He stated DOE has the right to force
the construction of a new plant.
Mr. Card stated business will pay different rates dependent upon
use. Users outside the City will pay more. He stated it is
rare to go to a vote of the people on something like this.
There was discussion regarding the effect of City growth on the
project. Mr. Card felt it would be minimal.
Concern was expressed regarding increased utility, garbage and
property taxes and the effect upon. low income people of the pro-
posed raise.
Question: was the system used in Shelton considered? Mr. Proctor
has seen plans but not personally toured. It was stated the cost
was 1/3 less. It was suggested this plant be toured and a
comparison be done. Mr. Proctor stated our design includes collec-
tion, pump stations and treatment and Shelton does not.
Questions were directed to Mr. Card regarding the CH2M Hill contract.
Mr. Card stated that of the $18.00 charge 1/3 covers operations,
2/3 debt service. The 20% PILOT was discussed.
Mr. Card discussed the physical changes that will take placer
approximate 32 month to construction completion. Mr. Proctor
discussed sludge disposal.