Loading...
HomeMy WebLinkAbout01/18/89TAPE #604 UNAPPROVED DRAFT CITY COUNCIL MEETING MINUTES JANUARY 18, 1989 The regular meeting of the City Council of the Clty of Bremerton was called to order in the City Council Chambers, 239 4Th Street, Bremerton, Washington, Wednesday, January 18, 1989 at 5:30 p.m., with Council Acting President Hank Waibel presiding. Council members present were Lon Overson, Lynn Horton, Shirley Marry Crutcher, Russ Jonnson, Morrie Dawkins, Ai Coivin and C.R. "Tiny~' Collins. Council President Spencer Horning was absent. Also present were City Attorney ~an Sievers and Deputy City Clerk Gil Johnson. The meeting opened with the Pledge of Allegiance led by Council Acting President Hank Waibei and Invocation was given by Reverend George Brown ef First Methodist Church. #0O40 #0059 CONSENT AGENDA A. Minutes of Meeting held - January 4, 1989, #AB89-013 M/S/C/U(Crutcher/Dawkins) to approve Consent Agenda as presented. CLAIMS/WARRANT REGISTERS Vouchers audited and certified by the auditing officer as required by RCW 42.24.080, and those expense reimbursement claims certified as required by RCW 42.24.090, have been recorded on a listing which has been made available to the council. M/S/C/U(Colvin/Crutcher) on January 18, 1989~ the Council does approve for payment those vouchers included and further described as follows: 40722r 40723, 40724, 40866 through 40972 and 40978 through 41078 in the total amount of $227,733.3i. COUNCIL MEMBER REPORTS Mr. Overson reported Fiscal and Budget Committee will meet January 24 - the agenda for that meeting is quite full so if you have something to add please clear it with him. Also, the City Council's 1989 Statements Of Legislative Intent will be included in the Agenda packet for January 25...if anyone has any additions or questions please contact him. Mr. Crutcher reported on the successful Martin Luther King Jr., Scholarship Program event held Sunday, January 15, at the Kitsap Golf & Country Club. Donations to the fund are still coming in and currently three young people are being assisted through this scholarship fund. Mrs. Horton reported during the Council Operations meeting this date discussion on street lighting was held with Puget Power personnel. During this discussion lots of information was given, nowever, the main problem for the City is the limited funding resources. She anticipates having a report to Council by Monday, January 23. On Saturday, January i4r she participated in a tour of the Olympic View Landfill site. She ~ound this to be a very informative opportunity and was pleased that the other elected officials within the County desire to work together addressing the management of solid waste within our communities. A meeting of elected officials to further discuss the waste issue is tentatively set for April 1989. Mr. Johnson expressed how pleased he was that the other elected of~iciais within the County are wishing to work together on the · APE #604 City Council Reg. Mtg. Minutes January 18, 1989 Page 2 of 8 solid waste disposal issue. He had been received to bring the back on line, hoping to solve occurring. also reported that new software Councii's Bulletin Board system the problems that are currently Mr. Colvin stated he also participated in the tour of the Olympic View Landfill, found it very informative and also enjoyed meeting other Council members from other cities. He noted that the scheduled meeting in April of elected officials to discuss disposal of solid waste is to be held at the Silverdale Hotel. Mr. Dawkins reported he would be attending two meetings in Olympia on Thursday, January 19: (1) proposal from EPA to eliminate testing of some vehicles (Emission Control Standard); and (2) the House and Senate Transportation Committees look at long range report. PUBLIC RECOGNITION Deputy Clerk Gil Johnson read Proclamation recognizing the ingenuity, knowledge and creative skills of engineers and the contributions they nave made to mankind, whereby Mayor Gene Lobe did proclaim the week cf February 19-25 as "ENGINEERS WEEK", and urged all citizens to join in celebrating this year's observance under the theme, "Engineers - turning ideas into reality". Acting President Waibei presented the Prociamation to Mr. Ray Stark, President of the local chapter of Washington Society of Professional Engineers. Mr. Stark thanked the Mayor and City Council for the proclamation and noted that their organization seeks recognition not for themselves but to attract students to the field of engineering. Acting President Waibel added that 29~ of the City Council members are engineers. 6A - ORDINANCE (FIRST READING) OVERSIZED LOADS ON CITY STREETS, #AB89-007 Recently a traffic signal was severely damaged by an oversized load being moved over City streets by a contractor. Repair of the signal was quite costly and the contractor pointed out (correctly so) that the B.M.C. allows for loads up to 16 feet high to be moved without obtaining an oversized load limit permit. The purpose of this revision to Ordinance No. 3564 is: 1) to revise the existing ordinance so that all loads greater than 14 feet high be required to obtain an Oversized Loan Permit; 2) all permlt applications be approved by the City Engineer; 3) notification time to be increased; 4) deposlt, liability insurance and permit fee be increased to better reflect present costs. Ian Sievers, City Attorney, noted several changes include removal of several coverages of the bond, which are more normally purchased as part of the property and liability insurance required; and, clarification of exceptions. Mr. Dawkins questioned the two week time frame for issuance of a permiE...what would happen if someone came into the City not being aware of the requirements and needing ~o pass through in a timely manner? Mr. Baker explained if they had traveled over State Highways they would be under the same criteria as City's guidelines. Mrs. Horton questioned, for ciarification, the section relating to dollies? Mr. Baker explained "dollies," as referred to in the ordinance, pertain to large size dollies used to move houses, etc., not "hand trucks" used by local furniture/appliance businesses. #0642 #0681 ~0717 TAPE #604 City Council Reg. Mtg. Minutes January 18, 1989 Page 3 of 8 Mr. Overson questioned if there is a direct correlation between City guidelines and the State guidelines? Mr. Baker explained not in the past, however, the proposed ordinance would bring the City's requirements in line with State requirements. Mr. Johnson questioned do we have a concern in the area of length of trucks, such as extended trailer types? Mr. Baker stated there is always concern, however, over-the-road type trucks are governed more by State and Federal requirements. The proposed ordinance relates more to house moving trucks, etc. Acting President Waibel questioned if there are weight restrictions on certain arterial roads? Mr. Baker stated weight restrictions were not included in this ordinance, however, the weight restrictions followed by the City are the State guidelines. M/S/C/U(Crutcher/Colvin) to approve Ordinance, on first reading, relating to the transportation of oversize loads upon the streets of the City of Bremerton and amending Chapter 10.24 of the Bremerton Municipal Code. 6B - ORDINANCE #4184 (SECOND READING) AUTHORIZING THE ISSUANCE OF A $1.5 MILLION TAX ANTICIPATION NOTE, #AB89-011 M/S/C/U(Colvin/Horton) to pass Ordinance ~4184 on second reading, authorizing the issuance of tax anticipation notes for the purpose of paying City expenses pending the receipt of general City taxes; creating a note redemption fund; and providing for the sale of those notes to Prudential-Bache Securities inc., of Seattle, Washington. 6C - ORDINANCE #4185 (SECOND READING) METHOD OF PAYMENT OF COUNCIL SALARY, #AB89-012 M/S/C/U(Coliins/Coivin) to pass Ordinance #4185, on second reading, setting forth the method of payment of salary for the Bremerton City Council and amending Ordinance #4009. 7A - PUBLIC HEARING - SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT, LOCATION: BREMERTON FERRY TERMINAL/FIRST & WASHINGTON, APPLICANT: WSDOT/MARINE DIVISION, #AB89-014 The City Council, acting as the Shorelines Hearing Board at a public hearing on 8/31/88, continued the application review to provide time for the applicant to revise the application to include development of facilities without shutting down the vehicular ferry service for 40-pius days. The request is to approve a revised and expanded Shoreline Substantial Development Permit for redeveiopment of the existing ferry slip (No. 1), the construction of a new ferry slip (No. 2), reiocation of the passenger-only ferry slip to the east end of the 1st Street Dock and related improvements (new Duikhead, pedestrian walk, traffic control devices, etc.) Council action is required because the proposed development is located within 200 feet of Sinclair Inlet a shoreline of statewide significance, in the Bremerton Shoreline Master Program jurisdiction. Acting President Hank Waibel asked the "appearance Of Fairness/Conflict Of Interest" question with all Council members present being seated. Jack Allingham, Planning Division, started his presentation with a view foil depicting the proposed repair and modification of the existing ferry facility. It incorporates the construction of a concrete trestle that parallels the shoreline, extending 10 ft. in places seaward in the existing facility. Also included is the reconstruction of the concrete trestle, transfer span, transfer ~APE #604 City Council Reg. Mtg. Minutes January 18, 1989 Page 4 of 8 span towers and a new sheet pile Duikhead in front of the existing bul~heado Since the previous public hearing, the Council requested review o~ the possibilities of constructing a new slip. The Department o~ Transportation has amended the plan to show a new proposed slip with a transfer span, transfer span towers, wingwalls and located some distance offshore some 100 pile dolphins. This will involve relocating the existing foot-passenger only ferry to the end of the First Street Dock, using the same barge, gang planks and cylindrical steel piles. This barge is readily removable in the event the proposed fishing pier for this area is constructed. Minor components of the concrete barriers to walkway. construction include separate auto traffic traffic islands, from pedestrian Mr. Allinqham stated there is one issue involved in this application and it has to do with Department Of Fisheries restriction of pile driving during the months March 15 through June 15. During these months juvenile salmon migration along the shoreline occurs. The Department of Fisheries states that the plle driving will interfere with this migration, therefore, restricting pile driving at night thereby allowing pile driving only during daylight hours during the March i5 - June 15 period. The Department of TransporEation may or may not need these months to undergo this project, nowever, in the event they do, there is a condition in the shoreline permit, recommended by staff, to allow pile driving during daylight hours until 11:00 p.m. The Shoreline Substantial Development is reviewed under three criteria: (1) consistency wi~h the policies and procedures of the State Coastal Management Act; (2) consistency with the 1977 Bremerton Shoreline Management Master Program (BSMMP); (3) consistency with the Bremerton Comprehensive Plan. Staff finds that this application is consistent with all three criteria. Mr. Allin~ham read into recommended by staff: the record the following conditions 1. Stormwater run-off shall be collected and then passed through oil/water separators prior to being discharged from the site. The oil/water separator system design shall be approved by the City Engineer. 2. The oil/water separator system shall be regularly maintained by the applicant/developer to insure its maximum efficiency and operation. 3. The applicant/developer shall work with the Director Of Community Development or his appointee to coordinate materials, colors, and landscaping that are consistent with existing ferry terminal and proposed development o~ the City's downtown waterfront, including the Ist Street Pier. 4. The applicant/developer shall work with the Port of Bremerton and the City of Bremerton and provide covered pedestrian passenger ferry walks and holding area between the ferry terminal building and the boarding station (at the point of boarding the ferry) of the passenger-only ferries. This covered facility shall be in place at the time of completion of the floating breakwater/fishing pier, or December 31, 1989, whichever is sooner. 5. Pile driving during the months of March 15 and June 15 shall be only allowed between the hours of 7:00 a.m. and 11:00 p.m., to insure the least disturbance to commercial and residential uses ~APE #604 Clty Council Reg. Mtg. Minutes January 18, 1989 Page 5 of 8 within sound distance of the project. Pile driving during all other months shall be restricted to the hours of 7:00 a.m., to 7:00 p.m., subject to the approval of an Administrative Variance to Noise Standards. Mr. Allin~ham explained that pile driving will be exceeding noise standards BMC Chapter 6, Section 32. Jerry Daniels, Project Development Engineer WSDOT, stated he received a copy of the Shore Line Permit Application and was aware of everything except for the item relating to covered walkways. He noted that as far as being able to provide the covered walkway as part of the 1st Street Dock passenger-only facility may not be possible by the date specified. He explained that it was their intent to construct a permanent passenger-only facility in coordination with the Port of Bremerton and Department Of Fisheries with funding coming from the next biennium. Therefore, he was not sure the WSOT could support the proposed date for construction of a covered walkway for the passenger-only ferry. Linda Croix, Horluck Transportation, explained the Port Orchard passenger ferry service~ provided by Horiuck Transportation, will be moved from its current location to the First Street dock upon construction of the fishing pier. Therefore, they are looking for assistance in providing some type of covered area for passengers to wait prior to boarding the ferry. Mr. Allinqham expiained the covered passenger-only ioading area is being requested under Ehe Comprehensive Plans, health and safety aspect. The condition is worded so that it has some flexibility to work with the applicants and how this is to be provided. Until a permanent structure can be provided in future bienniums as stated by Mr. Daniels, a structure that has been utilized in the past will suffice for that condition. Mrs. Croix's concern about the other ferry service will be addressed with the development of the proposed fishing pier. Mr. Johnson stated he would support having a temporary type covered waiting area for passenger-only service for one winter however, questioned how would DOT feel about providing the permanent covered walkway by the end of the first year or by the next biennium? Mr. Daniels stated in the proposal before the Council at this time, the reiocation of the passenger-only ferry involves movement of the barge to the First Street Dock and does not include a permanent covered waiting area. They feel the terminal building itself is adequate and sufficient for whatever waiting area is needed and that it is close enough for the passengers to board. He noted that a temporary tent type covered area could be considered within the existing budget. Mr. Johnson questioned if the passenger-only ferry service would be handicapped accessible? Mr. Daniels stated the current handicapped access is marginal at best. Primarily it is because the length of the gang planks (to be used during the reiocation), and short section of stairway from the landing at the end of the gang planks down to the barge. Mr. Johnson questioned if the new permanent facility for the passenger-only ferry be handicapped accessible? Mr. Daniels stated yes. Mr. Pratt pointed out that the current passenger-only ferry service is handicapped accessible with assist and the proposed permanent passenger-only ferry service will be handicapped accessible. Mr. Johnson questioned who would have control of signage? Mr. Pratt stated Admiral ParKer has exchanged letters with Mayor Lobe offering to make space avaiiabie for the City to develop and maintain a welcome to Bremerton sign on the facility. Also, the Ferry System has agreed to the soft wording in the areas of color and design details. Mr. Johnson questioned if a supplemental transit plan will be developed to assist commuter users of the vehicle ferry during the 6-day shutdown? Mr. Daniels explained #2345 · APE #604 City Council Reg. Mtg. Minutes January 18, 1989 Page 6 o~ 8 discussion has been held which proposes that during construction work on the ferry slip it may be possible to provide passenger- only service via a vehicle ferry by moving the contractor out of the slip long enough for the ferry to dock and off load passengers during peak commuter morning and evening hours. He noted the only time anticipated to shut down the passenger-only vessel/First Street Dock Project is over a weekend. Mrs. Horton questioned if the proposed conditions relating to stormwater separation will be adequate for the next few years considering Federal regulations? Mr. Allin~ham stated quite likely it won't if future regulations require the stormwater system to De pumped through a secondary treatment plant ~aciiity - this type of discharge system will not provide that. However, it would allow collection oi the stormwater which could be contained and then processed through a treatment system later via a greater general transport system. Mr. Johnson thanked the Ferry System Eor their well thought out plan and spirit of cooperation. And, he questioned what would happen if the work required was not completed during the 6-day shutdown? Ian Sievers, City Attorney, stated there are substantial civil penalties for violation of the Shoreline Act- at least $1,000 per day as well as injunction relief. Mr. Dawkins questioned if there will be three passenger-only ferries in the system by the time the project is complete? Mr. Daniels stated they are expecting the two new boats to arrive by July and hopefully in service 16 hours per day by August. In answer to the question regarding the 6-day shutdown, he stated they have had enough experience in this type of work to make a very close estimate of required time as well as including incentives in the contractor to meet or beat deadlines. Mr. Daniels compiimented City staff ior their assistance in getting the whole package together as presented at this time. Mr. Dawkins questioned if the DOT knows when the 6-day shutdown may occur? Mr. Daniels stated he could not say at this time, however, it will depend on when the contract is executed. Because of the time constraints on pile driving it will be the middle of summer before considerable amount of work can be undertaken - but he guessed mid-way through the contract (june/July). Acting President Waibel questioned how long would the pile driving take if able to start during the short periods? Mr. Daniels explained normally 6-10 piling can be driven per day on a |q-hour day, however, he estimates 5-piiing per day due to the shortened daylight hours which would come to approximately 3- weeks of pile driving. Acting President Waibel thanked WSDOT for the positive step in working out the problems in the prior proposal and working toward the improvement oE ferry service for the Bremerton area. M/S/C/U(Johnson/Colvin) to approve the Shoreline Substantial Development Permit for the improvements to the Bremerton Ferry Terminal to include the following: 1. New 260-ft long sheet pile bulkhead, nine feet high; 2. New concrete trestle along the bulkhead over the water; 3. New transfer span, transfer span tower, bridge seat and new concrete trestle for Siip #1 (existing south slip); 4. New trestle, towers, wingwalls and two new 100 pile dolphins and reiocation of the existing transfer span from Slip #1 to new slip #2 (north slip); TAPE #604 City Council Reg. Mtg. Minutes January 18, 1989 Page 7 of 8 5. Relocate to the s Street Dock the existing passenger-only facility landing which consists of the 30-ft. x 105-ft. barge and two 6-ft. x 60-ft. gangplanks (ramps); 6. Construct traffic islands, related signage; curbs, traffic barriers and Development shall be undertaken mitigating conditions: subject to the following 1. Stormwater run-off shall be collected and then passed through oil/water separators prior to being discharged from the site. The oil/water separator system design shall be approved by the City Engineer. 2. The oil/water separator system shall be regularly maintained by the applicant/developer to insure its maximum efficiency and operation. 3. The applicant/developer shall work with the Director of Community Development or his appointee to incorporate materials, colors, and landscaping that are consistent with existing ferry terminal and proposed development of the City's downtown waterfront, including the 1st St. pier. 4. The applicant/developer shall work with the Port of Bremerton and the City of Bremerton and provide covered pedestrian passenger ferry walks and holding area between the ferry termiani building and the boarding station (at the point of boarding the ferry) of the passenger-only ferries. And that the time for completion of the permanent covered walkway and permanent passenger ferry slip be established as the end of the first year of the next biennium of the State of Washington and if that cannot be done the Ferry System needs to return to Council for negotiations. 5. Pile driving during the months of March 15 and June 15 shall be only allowed between the hours of 7:00 a.m. and 11:00 p.m., to insure thate least disturbance to commercial and residential uses within sound distance of the project. Pile driving during all other months shall be restricted To the hours Detween 7:00 a.m. and 7:00 p.m. Mr. Johnson requested the Ferry System Public Relations personnel make an extra effort both on this side of the Sound and in Seattle in publicizing how the project is progressing. With no further business meetin KATHLEEN L. MCCLUSKEY, CITY CLERK APPROVED ~APE ~604 City Council Reg. Mtg. Minutes January 18, 1989 Page 8 of 8 City of Bremerton KLM/S/me cc: Normal Distribution File/Vault