HomeMy WebLinkAbout05/01/91TAPE #917
UNAPPROVED DRAFT
CITY COUNCIL MEETING MINUTES
#0005
#0021
MAY 1, 1991
The regular meeting of the City Council of the City of
Bremerton was called to order in the City Council Chambers,
239 4TH Street, Bremerton, Washington, Wednesday, May 1, 1991,
at 5:30 p.m., with Council President Lynn Horton presiding.
Council members present: Wayne Estes, Spencer Horning, Merck
Waib~l, C. R. "Tiny" Collins, A1 Colvin, Morrie Dawkins and
Johnson. Councilman Lon Overson as absent. Also present
were City Attorney Ian Sievers ' n
McCluskey.
The meeting opened with the Pledge of Allegiance led by
Council President Horton and Invocation given by Jim Hill,
Pastor of Bremerton Christian Church.
CONSENT AGENDA
A. Minutes OF Meeting - April 17, 1991, #AB91-109
M/S/C/U(Dawkins/Horning)
presented.
to approve Consent Agenda as
CLAIMS/WARRANT REGISTERS
Vouchers audited and certified by the auditing officer as
required by RCW 42.24.080, and those expense reimbursement
claims certified as required by RCW 42.24.090, have been
recorded on a listing that had been made available to the
council.
M/S/C/U(Colvin/Estes) on May, 1 1991, the Council does approve
for payment those vouchers included and further described as
follows: check numbers 128536 through 128673 inclusive and
check numbers 128384 through 128387 inclusive in the amount of
$126,615.59, and Retirees Payroll for period ending April 30,
1991 in amount of $65,069.51.
COUNCIL MEMBER REPORTS
Mr. Johnson discussed "Desert Shield" and "Desert Storm" and
yellow ribbons tied on each microphone. He stated he had a
friend who piloted a helicopter during this conflict; she
returned to Bremerton this week and he removed the yellow
ribbon from his microphone.
Mr. Colvin thanked Chief McNeal and Ron Hough for responding
to neighborhood concerns. Mr Colvin stated that he received
a copy of the proposed change to the City's form of
TAPE #917
City Council Reg. Mtg. Minutes
May 1, 1991
Page 2 of 29
government.
Mr. Dawkins briefly discussed the "Christmas in April" program
and concluded it is a great program.
Mr. Collins discussed the third meeting of the Farmers Market
held Tuesday evening. He stated the first market will be this
Sunday from 11 am - 4 pm. He concluded that it can only get
bigger and better.
Mr. Estes discussed his concerns with junk vehicles being left
on City streets. Mr. Estes discussed YMCA's Youth in
Government program. Students are in Olympia on Thursday and
Friday and have been working all year to get their bills
before the Legislature. He stated students also take over the
Supreme Court, and felt everyone could learn from these youth.
PUBLIO RECOGNITION
Mayor Mentor discussed various community activities that took
place last weekend and activities for the coming weekend.
Mayor Mentor read a Proclamation proclaiming May 6 - 13 as
"Kitsap Day Care" week. Barbara Mitchell, president of Kitsap
Day Care accepted the proclamation.
Mayor Mentor read a Proclamation proclaiming May 5 - 10 as
"Crime Stoppers" week in Bremerton. Pat O'Neil, president,
accepted the proclamation.
Howard Hurpps, Bremerton Central Lions Club, discussed Lions
White Cane Days, and their efforts to promote sight awareness.
Mr. Hurpps presented each Council member with a white cane.
Del Knauss and Rusty Rhodes displayed a poster and stated
donations to "Friends of Bremerton Parks" for legal services
can be sent to 280 4th Street.
Don Atkinson briefly discussed the three public meetings
leading up to the Sunday Market which begins this Sunday.
Roy McKinnis discussed backing problems on Mountainview at
Wheaton Way and his concern that emergency vehicles not being
able to get through.
President Hotton asked City Attorney Ian Sievers, if Council
should rearrange the agenda and place Item 7A dealing with ALS
Transport before Item 6B which sets fees for ALS Transport.
Ian Sievers, City Attorney, stated he felt it would be
appropriate to discuss the services before discussing fees.
#1210
TAPE #917
City Council Reg. Mtg. Minutes
May 1, 1991
Page 3 of 29
Ms. Horton stated that they will hear Item 7A prior to Item
6B.
6A - SERVICE CONTRACT FOR MANAGEMENT AND OPERATION OF FLEET
MAINTENANCE -RYDER MANAGED LOGISTICS SYSTEMS (MLS) #AB91-107
In 1986, the City entered into a three year contract with
Ryder Managed Logistics Systems (MLS) to manage the City's
fleet maintenance program. The contract was subsequently
extended.
In September 1990, the City advertised for and received
Statements Of Qualifications from three firms to provide
services. Following evaluations, proposals were requested
from two firms. Proposals were evaluated by the City
Treasurer, Street Superintendent, Deputy Fire Chief and
representatives from the Utilities, Parks and Police
Departments. The team's consensus was the MLS was best
qualified to provide required services.
The contract presented includes provisions for enhanced
operation features and services for the City and Quality
incentives for the contractor. The contract includes
termination provisions for cause or convenience and provides
annual re-opening for fee negotiations.
Gil Johnson, Purchasing Supervisor, stated that following last
week's Council meeting, the City Attorney reformatted the
contract. There is no change in terms, condition or content
of the contract. In response to questions from Council last
week, fire fighting equipment is part of the overall contract.
There was a question on reports, which is discussed in
paragraph 2 of Section 8, and schedules on reports is in
Section 6. Question on Auditor review for performance is
specified in Section 12.02.
Public comment - none
M/S/C/U(Johnson/Dawkins) to award the fleet maintenance
contract to Managed Logistics Systems and require the
contractor to provide the six months reports as discussed last
week.
7A - ORDINANCE (FIRST READING) AMENDING AMBULANCE SERVICE
REGULATIONS TO ALLOW ALS TRANSPORT, #AB91-111
R.C.W. 35.21.766 provides that when the legislative authority
of a City determines that the City is not adequately served by
existing private ambulance service, it may provide for the
establishment of a system of ambulance service to be operated
as a City service. The proposed ordinance amends BMC 5.50 to
TAPE #917
City Council Reg. Mtg. Minutes
May 1, 1991
Page 4 of 29
provide that patients in need of advanced life support
ambulance transport shall be transported in a public aid car
as a standard procedure rather than limited instances where
special circumstances are found. The ordinance sets the
initial transport fee at $125, or $175 where service is
authorized outside the City limits. The ordinance also makes
the private ambulance representative a non-voting member of
the Advisory Committee.
Chet Meiqs, Fire Chief, stated he was directed to bring an
ordinance to Council. He checked with other districts on fees
and believes the proposed fees are fair.
Frank Burk, Director of Operations for Olympic Ambulance,
stated in his opinion the proposal cannot work with the Fire
Department's current staffing.
Harold Pickard commended Chief Meigs for proposing the ALS
transport and requested clarification on the $125 charges for
in City; is this city residents, city voters; physically in
the city. How do you determine whether it is $125 or $1757
David Wingo commended City Council and the Fire Department for
setting up the ALS transport system,. and stated the rates seem
reasonable.
President Hotton asked Mr. Sievers if there was a problem with
Mr. Horning sitting on this hearing since he excused himself
from the last hearing? Ian Sievers, City Attorney, stated the
choice for him to step down was not an Appearance of Fairness
problem and he felt there would be no problem with Mr. Horning
remaining for the hearing.
Richard Sears presented Council members with a copy of
pertinent RCWs and read the entire statute and discussed his
interpretation of state statutes and objections to the
ordinance. His main concern was that state law addresses lack
of adequate ALS transport service by private carrier as a
reason for a city to go into the transport business, and in
his opinion there is no lack of adequate service in Bremerton
by the private carriers. The legislature felt they were
passing a bill that would assist those areas that felt they
had a inadequate service due to lack of service. State
statute requires the city to set up a public utility.
According to statute, the city can charge an excise tax or B&O
tax, but there is no authority to charge user fees. The City
can provide free of charge ambulance service for city
residents, but the authority is not there to charge a user
fee. He suggested having Mr. Sievers or perhaps the Attorney
TAPE #917
City Council Reg. Mtg. Minutes
May 1, 1991
Page 5 of 29
General look into it and give an opinion if a user fee is
appropriate. Mr. Sears stated the city is considering
operating a commercial business. If the city does that they
lose the protection provided by the sovereign immunity law of
the state, which means they will be liable for acts the same
as a private carrier. Mr. Sears addressed staffing if they
should have to staff up to provide this service.
Mr. Sievers asked Mr. Horning if he watched the previous
hearing on TV after he stepped down. Mr. Horning responded
no. Mr. Sievers stated since he had not participated in the
previous hearing and did not watch it on TV he could not
participate at this time. Mr. Horning stepped down.
Chief Meiqs responded to Mr. Pickard's inquiry regarding
residents and stated anyone who lives inside the city limits
is a resident of the city. Mr. Pickard stated his concern is
with people living in motels in the city, i.e. military.
Mr. Johnson asked if there will be special provisions for
military personnel? Chief Meigs stated if they are living
within the city limits they are residents.
Mr. Sievers discussed Mr. Sears' assertion that private
carriers service is adequate and stated that during the second
hearing it was determined there are delays in transporting,
Bremerton Fire was required to transport as private carrier
when private ambulance not available. He stated that adequacy
is not an issue as private carrier cannot transport ALS
patients without assistance of Bremerton Fire personnel. In
response to utility and user fees issues, Mr. Sievers stated
a utility is a stand alone enterprise supported by rates. The
City's utilities are supported independently of other revenues
by a system of user fees. These fees can be generated by a
special property levy and user fee such as countyPUD. He
concluded there is no conflict in a utility and user fee as
found in state statute.
Mr. Collins asked Chief Meigs if ALS transport is someone
whose life is in jeopardy and will City transport only when it
is ALS? Chief Meigs responded yes, patients are advised of
alternate methods of getting to the hospital or doctor's
office when it is a BLS call. Mr. Collins discussed normal
practice to have a engine respond to 911 calls. Chief Meigs
stated depending on the nature of the call, an engine is
dispatched. If it is a BLS call and when the ambulance
arrives, the engine is placed back in service and paramedics
and ambulance personnel attend to the injured person. Mr.
Collins inquired if Standard Operating Procedures (SOP) is
TAPE #917
City Council Reg. Mtg. Minutes
May 1, 1991
Page 6 of 29
something the City had developed? Chief Meigs responded yes.
Mr. Collins asked if there is a governing board that has
established training and procedures? Chief Meigs stated the
Emergency Medical Services Council is the basis governing
board that City paramedics and private carrier EMTs must meet.
Chief Meigs further stated the Director Assistance for the
program is a Quality Assurance Nurse. Mr. Collins stated his
concerns with Bremerton residents getting the best service for
the best price.
Mr. Dawkins agreed it is unnecessary to have both city and
private carrier personnel responding, but expressed concern
with the need to buy an ambulance and the need for more fire
fighters. He asked how much more money will the city bring in
by doing the transporting? Chief Meigs estimated it would be
$148,000. Chief Meigs discussed mutual aid contracts the City
has with Fire Districts throughout the county.
Mr. Colvin asked if calls that are not ALS will be referred to
a private carrier? Chief Meigs stated if calls are for
interfacility transport they would be by private carrier. Mr.
Colvin stated his only problem with the ordinance is cost to
military personnel.
Mr. Johnson stated he would like the ordinance to state this
addresses 911 calls for ALS transport. If responding to
residents or businesses in Bremerton he would expect in city
rates. He asked about Jackson Park and Chief Meigs responded
they now respond to Jackson Park as it is in the city limits
and they respond to PSNS for ALS. Mr. Sievers stated he
didn't use residency as a criteria, but simply inside or
outside the city limits. He stated guests and people doing
business in Bremerton would be charged the in-city rates.
Mr. Johnson asked since they have different rates for inside
and outside the city, why don't they double the rates for
those outside? Chief Meigs stated they could, however, they
wanted their rates to be consistent with the rest of the
county. Chief Meigs stated $175 is the basic rate charged by
Olympic Ambulance.
Glenn Jarstad, former Mayor, stated Bremerton was the first
Fire Department in the county to have paramedics and in his
opinion this can only mean better medical services for the
community.
President Horton stated other communities have gone to ALS
transport, Bremerton is not setting precedence. This seems a
viable things to do and encourages economic efficiency. Ms.
TAPE #917
City Council Reg. Mtg. Minutes
May 1, 1991
Page 7 of 29
Horton discussed a previous hearing when discussion centered
on the 25 cent surcharge, and if Olympic Ambulance could get
that 25 cent surcharge they could do ALS transport, which
indicates that without that 25 cent surcharge they cannot do
ALS transport. Ms. Horton concluded during the 14 months
Council had studied ALS transport by the City, Olympic
Ambulance has not come up with a viable alternative
suggestion, which indicates they cannot handle the ALS
program.
#3636 M/S/C(Collins/Colvin) approved the ordinance on first reading.
affirmative:
opposed:
Estes, Horton, Collins, Colvin, Johnson
Dawkins
6B - SETTING FEES FOR ALS TRANSPORT: AUTHORIZE JULY 1, 1991,
START UP DATE: REOUEST FOR BUDGET ADJUSTMENT FOR SET-UP COSTS,
AND AUTHORIZE CALL FOR BIDS FOR NEW RESCUE UNIT, #AB91-110
Pursuant to previous Council action, the Fire Department is
requesting finalization of the ALS transport issue. Under
this Agenda Bill the Fire Department is requesting Council
action to authorize the following:
Set fees for transport.
Authorize a July 1, 1991, start-up-date
Authorize budget adjustment for set-up-costs and
revenue realization from transport fees.
TAPE #918
Authorize the Call for Bid for a new rescue
type vehicle.
Chief Meigs discussed the budget adjustment request totaling
$122,797 and requested authorization to call for bids for a
new rescue unit. They recommend purchasing a new vehicle as
opposed to a used one, change vehicles around where the high
mileage one is removed and the low mileage one is kept moving.
They feel that will extend the life of the current ones by one
or two years and provide them with a viable back up, which
currently they don't have. Chief Meigs also stated they need
a billing service, and Rich Hanna, City Treasurer, has
recommended that they have that service performed by a
professional billing service at about $42,000 a year. Capital
Improvement program requirements are the rescue ambulance at
$110,000, radio equipment at $6,253, air suspension unit,
$6,543.
Public comment - none.
TAPE #918
City Council Reg. Mtg. Minutes
May 1, 1991
Page 8 of 29
Mr. Johnson felt this budget adjustment request is really for
an interfund loan and asked if an interfund loan request could
be brought to Council next week. Rich Hanna explained the
budget adjustment shows an increase of $74,375 from ALS
transport fees as projected and transfer from Cumulative
Reserve Fund of $48,422. They are proposing this be spent on
Fire Department Capital discussed by Chief Meigs. They
propose reducing the ending cash fund by transferring $48,422
for the expenditures just discussed. The funds used out of
Capital Reserve would be replaced by an increase appropriation
from the General Fund in 1992. Mr. Johnson asked if they are
going to increase the size of the budget by $48,422 by
considering additional revenues that have come over and above
projection? Mr. Hanna responded yes, and only $74,375 will
be realized in the current year. That is why it is necessary
to involve the Capital Reserve Fund in the near term. Mr.
Hanna stated the ending cash they are reducing by $48,422 is
in the Capital Reserve Fund. The budgeted ending cash is
around $450,000. They are proposing to reduce that ending
cash balance by end 1991 by $48,422 as a result of this
transfer. Mr. Johnson asked if it will be paid back? Mr.
Hanna responded yes. Mr. Johnson stated an interfund loan
must be approved.
Mr. Collins inquired if an interfund loan document could be
presented to Council next week? Mr. Hanna responded yes.
Mr. Estes requested clarification of the collection fee.
Chief Meigs stated they based the $42,000 on the estimated
number of calls. Mr. Estes felt the public should be aware
that the billing company fee will be based on percentage of
the number of collection and not a flat fee of $42,000. Mr.
Dawkins asked if this will be by private billing company or by
the City? Chief Meigs stated a private company will do the
billing under City guidelines.
#0534
M/S/C(Johnson/Colvin) to approve the call for bids and
continue discussion of the budget adjustment for one week.
affirmative:
opposed:
Estes, Horton, Collins, Colvin, Johnson
Dawkins
Councilman Horning returned to the meeting.
7B - ORDINANCE #4322 (EMERGENCY READING) AUTHORIZING SALE OF
BOND ANTICIPATION NOTES, #AB91-112
This ordinance authorizes the sale of $1.3 million of Bond
Anticipation Notes for the initial phase of the Public Works
Complex. The financing was described in detail in Budget
TAPE #918
City Council Reg. Mtg. Minutes
May 1, 1991
Page 9 of 29
Adjustment No. 91-2, which was approved by
February. An "emergency reading" is requested
require a unanimous vote of the Council.
Council in
and would
Rich Manna, City Treasurer, stated the Note Ordinance and
resulting debt instrument proposed will provide the funds to
build the first phase construction of the Public Works
Complex. This facility will provide a new home for the Street
Department, Electronics Department, Vehicle Maintenance and
General Facilities Department. By creating these new
facilities, the City will be able to dispose of the properties
known as: old Water shop at 17th and Warren Avenue and the
Street Department facilities on Sheldon Blvd. Both of these
facilities are in a very bad state of repair and beyond their
economic life cycle.
The Bond Anticipate Note will provide temporary construction
financing for these projects. Long-term financing is
projected to be put in place in 1992, at the conclusion of the
construction when there are firm numbers on the demand for
financing. The ordinance does provide authorization for 1
3/4 million dollar of Limited Tax General Obligations Bonds to
be issued in 1992, which is necessary by virtue of the fact
that the immediate transaction at hand is selling and public
marketing bond Anticipation Notes. It is not the intention of
the Mayor or staff that they would go forward with that
transaction without coming back before Council next year,
keeping Council fully aware of all the things going on in the
marketing process. And, the Mayor and staff will be back
before Council many times during the contract bidding, letting
and other steps necessary to complete this project.
The Purchase Offer, which was handed out just prior to the
Council meeting, has been tendered by Seafirst Bank. Their
offer is based on a marketing analysis and dated April 30th.
The City was very timely in entrance to the market and the
Federal Reserve Board chose to make another cut in the
discount rate and that lead directly to a reduced rate of
interest necessary to repay the notes. The Seafirst offer, as
indicated, purchased the notes at a coupon rate of 5.8%
payable at maturity. The last cut in the discount rate
resulted in a savings to the City of approximately $2,500.
Public comment - none.
Mr. Johnson briefly reviewed the need to get some high cost
Public Works equipment into covered storage during the winter
months. Even though the bond issue for this project failed
last year, he supported getting adequate storage for City
TAPE #918
City Council Reg. Mtg. Minutes
May 1, 1991
Page 10 of 29
equipment. He questioned why would the City want to delay a
year before actual bonding was secured? Mr. Manna stated
that direction came from Council as this project was proposed
in several Study Sessions. There was a degree of uncertainty
expressed by Council and staff then presented a "phased"
construction process, which seemed to be favored by Council.
Therefore, they did not go forward with the entire project at
one point of in time. When the City went to the bond market
and committed to long-term financing, the cost of the project
would be more defined. Mr. Johnson questioned if there was
anything in the ordinance that would preclude the City from
actually issuing bonding sooner? Mr. Manna stated no. By
passage of this ordinance they will be selling Bond
Anticipation Notes that are non-callable and will not mature
for 18 months. He was reasonably certain that it would be
within their ability to go forward and sell the bonds that
would provide the permanent financing prior to the maturity of
these Bond Anticipation Notes. President Morton stated it was
her understanding during previous discussions that the City
would go out for the whole bond but then do the construction
in phases. Mr. Manna stated, as outlined, cash flow
projections will provide all of the financing necessary for
first phase of construction and the majority of financing for
the second phase of construction, but a portion of the second
phase would come from the sale of the currently owned City
property located at 17th and Warren.
Mr. Estes requested Mr. Hanna to point out to the public that
some of the financing for this will come from current rents
being paid. Mr. Manna stated Mr. Estes was correct. During
the presentation made to Council they had assumed the annual
amortization of the bonds that will provide the permanent
financing of the project would have an annual amortization
cost of approximately $165,000. By eliminating rent that the
City is currently paying on buildings that are not owned by
the City and some over costly maintenance of City facilities,
it is believed a savings in the annual operating budget of
approximately $115,000 can be made. The difference between
those two amounts would then have to come from the operating
budget or would be the net affect on the operating budget.
#0759
M/S/C/U(Colvin/Dawkins) to pass Ordinance #4322 (emergency
reading), relating to contracting indebtedness; authorizing
the issuance of limited tax general obligation bonds of the
City for general City purposes to provide funds with which to
pay a part of the cost of acquiring land and construction and
equipping a public works complex to house City departments,
including Street vehicle, Electronics and Facilities
Maintenance, and for other capital purposes; authorizing the
TAPE #918
City Council Reg. Mtg. Minutes
May 1, 1991
Page 11 of 29
issuance of bond anticipation notes pending the issuance of
those bonds; establishing a note redemption fund and an
acquisition and construction fund; and approving the sale and
providing for the delivery of the notes to Seattle-First
National Bank of Seattle, Washington.,
7C - RESOLUTION #2342, NAMING THE PROPOSED SPORTS COMPLEX,
#AB91-113
In an attempt to assist the Pendergast Memorial Committee with
it"s $500,000 fund raising commitment toward Phase I
construction of the Athletic Complex, and in response to the
County Commissioner's condition contribution of one million
dollars toward Phase I construction, the Bremerton Parks and
Recreation Commission is submitting for City Council adoption
the recommendation of the Andrew Pendergast Regional Park as
the name for the proposed 40 acre athletic complex. This
recommendation follows the guidelines set forth in the Parks
and Recreation Commission's policy and procedure for naming
parks.
Vicki Vanneman, Parks and Recreation Director, stated she was
hired by the City's Parks and Recreation Department in 1984,
some seven years after Mr. Pendergast's retirement. During
the first month of her employment she questioned "who was
Andy?" It was clear that Andy Pendergast, seven years after
his retirement, was still very much a part of the Parks
Department. About a year after that incident, Andy was killed
in a plane crash on his way to a hunting trip in Canada. This
lead to the formation of the Pendergast Memorial Committee and
their number one goal was to build an athletic complex in his
memory. At this point it is apparently going to happen -
sooner than anticipated based on strong support for the
project by Council members, Mayor Mentor and most recently the
Kitsap County Commissioners. One very important step can take
place this evening with Council's consideration of the Parks
and Recreation Commission's recommendation for the name of the
athletic park. They voted unanimously to recommend to Council
the name: "Andrew Pendergast Regional Park" as the name of
the athletic complex. This choice is in keeping with the
policy and procedure for naming parks, which the Commission
developed approximately five years ago. It responds to the
County's very generous financial contribution toward Phase I
and most importantly it honors Andy for the years of service
he gave to the City of Bremerton, Parks and Recreation
Department and to the softball community throughout the
country.
Glenn Jarstad, 2823 Hefner, stated Andy was with the City for
a long time and in checking the records John Jarstad, Glenn's
TAPE # 918
City Council Reg. Mtg. Minutes
May 1, 1991
Page 12 of 29
brother, was the Parks Superintendent prior to Andy. He
supported the name as proposed as Andy's goals were always
regional and State-wide. He hoped it would always be known as
City of Bremerton Andy Pendergast Regional Park. He did not
support the idea of not referring to it as the City of
Bremerton's park just because of the funds given by the
County. He stressed how much Andy was a "family" person and
everyone loved him.
Mr. Dawkins stated Andy was the first person who got him
interested in City government by nominating' him to the Parks
Board. He felt this was one of the best things the City could
do.
Mr. Johnson stated he concurred with Mr. Jarstad's comment
about the "City of Bremerton" being included in the title.
What is being proposed is more than just a park, rather a
recreational complex. He discussed the idea of using the work
"complex" rather than "park" as it would be more descriptive
of what was actually going to be built. President Hotton
stated it was her understanding that the reason it was being
called a "park" is when the City looks for IAC grant funding
it must qualify as a park. Mr. Johnson stated that was an
excellent reason for calling it a park. He noted Andy was on
the leading edge of recreation as a business; and Mr. Johnson
would support the proposal as presented.
Mr. Colvin stated most everyone knew Andy Pendergast as "Andy"
and felt that the name should reflect "Andy" instead of
"Andrew". He did not support the idea of tieing in "City of
Bremerton" on to the title.
Mr. Collins suggested the title be as follows:
Pendergast Regional Park At Bremerton, Washington".
"Andrew
President Morton pointed out this sports complex would be a
joint venture by both the City of Bremerton and Kitsap County.
Yes, it will be a City park and within City limits, but it
will have joint management. She-felt that there would be a
point in time in the future when the City could undertake such
a project themselves, however, with the assistance from the
County the complex can be a realty in the very near future.
Also, it will produce closer ties with the County and region
and because of our shrinking dollars we need to look more
cooperatively to all agencies, including School Districts,
Port Districts and all governmental agencies. She emphasized
her support of the proposal as presented.
Mr. Collins stated it should be recognized that there will be
TAPE #918
City Council Reg. Mtg. Minutes
May 1, 1991
Page 13 of 29
a governing board for this facility that will be made up of a
member designated by the City, one designated by the County
and a member designated by the Pendergast Committee. Not only
has Kitsap County pledged one million dollars towards this
project, but also pledged $50,000 per year for the next five
years to be used towards operation and maintenance of the
complex.
#1192
M/S/C/U(Dawkins/Estes) to approve Resolution #2342, naming the
facility the Andrew Pendergast Regional Park.
8A - PUBLIC HEARING - VACATION OF RIGHT-OF-WAY AT BRENTWOOD
CIRCLE SCHOOL SITE, #AB91-086
The Bremerton School District owns a 10-acre site at the
corner of Harlow Drive and Carr Blvd., which it purchased some
time ago in anticipation of the need for an elementary school
to serve the neighborhood. The City Council has approved a
rezone of that site from "Single Family (SF-1) to "Parks And
Schools" (PS). In order to plan and develop the site for a
future school, the District has requested the vacation of the
Brentwood Circle Street right-of-way which was originally
designed to serve a residential development but was never
improved.
Public hearings before both the Planning Commission and City
Council are necessary in the processing of a rezone and a
right-of-way vacation. The Commission's recommendation and
minutes are enclosed.
Don Pratt, Director of Community Development, stated several
weeks ago there was a hearing which rezoned this property,
allowing the property to be used as a school site. At that
time, the vacation of the right-of-way was tabled because
there were concerns during the testimony about unsafe
walkways.
The site is known as the Brentwood Circle site, located at the
intersection of Carr Blvd., and Harlow in the Kitsap Lake
neighborhood. Years ago there was a public right-of-way
platted in such a manner that it goes through the site. The
issue being presented is the vacation of that right-of-way, so
the School District will control full title to the site and
can show that title to the State and secure their funding.
The School District has no plans to improve the street, in
fact it would be in the way of any school development. The
City also has no plans to improve the street and if approved
as currently aligned, Brentwood Circle would result in an
undesirable, angular intersection with Carr Blvd., and create
a difficult angular intersection at the Carr and Harlow as
TAPE #918
City Council Reg. Mtg. Minutes
May 1, 1991
Page 14 of 29
well.
The City Engineer and Planning staff recommended to the
Planning Commission that this right-of-way be vacated. On
February 19, 1991, the Planning Commission voted unanimously
to recommend City Council approval of this right-of-way
vacation.
In response to some testimony presented to Council during the
rezone hearing, the City Engineer and he met with Field Ryan
and Walt Draper, representatives of the School District, and
a Kitsap Lake resident Marvin Randolph, to discuss concerns
that had been raised. Those concerns related to right-of-way
walking areas in the neighborhood and they came to the
following conclusions:
1. There are no problems associated with the Brentwood Circle
site that do not occur at other Bremerton School District
sites in similar circumstances, such as West Hills Elementary
School and Crownhill Elementary School. The off site walking
situation at Brentwood Circle lies within the loose standards
established by the Superintendent Of Public Instruction and
are not significantly different from those circumstances at
the two referenced elementary schools.
2. The standard for off-site road improvement around schools
in the City of Bremerton are somewhat below the standard which
the City and School District desires and would warrant efforts
for discussion of improvement in the future.
3. They did identify some improvements that could be made
within the City's existing budget:
(1) improve shoulder walking area along Harlow at its
intersection with Francis where there is a very narrow walking
area off the side of the street;
(2) the walking. path entries onto the school property at the
northeast corner of the site at Carr Blvd., will be developed
on the school site and will alleviate the need for sidewalk
development on the shoulder of Carr across the street from the
cemetery where they do not expect pedestrian traffic to be
generated.
3. There is a pedestrian problem at the intersection of
Kitsap and Lyle - southwest corner where a privately developed
fence forces pedestrians too close to the lane of travel.
They believe this can be addressed through some type of right-
of-way improvement undertaken by the City.
TAPE #918
City Council Reg. Mtg. Minutes
May 1, 1991
Page 15 of 29
4. They do believe that proper school signage can be
developed along the roadway and they will request increased
traffic enforcement in the area.
5. The City can scrape the sides of the road on Harlow, Lyle
and Carr in order to remove vegetation which inhibits
pedestrian walking on the shoulder. They will apply gravel on
the freshly scraped areas to limit vegetation regrowth and to
maintain level walking area.
6. There are mailboxes, rockeries and other private
improvements which have been made on the right-of-way and
which force pedestrians off the shoulder and into the lane of
travel. The City will identify them and discuss with the
owners the development of their improvements on right-of-ways
and probably have those that are problems removed.
7. The City and the School will investigate the installation
of yellow warning lights at various areas around the school
site.
8. The School Principal is required to identify safe walking
routes. The safe walking routes will be coordinated with the
yellow warning lights and that will all be coordinated with
the City's Traffic Safety personnel to provide a coordinated
program for the school.
Public comment - none.
Mr. Johnson thanked both the School District and the people
who participated on the committee addressing the concerns.
The reason he pushed for it kind of hard when originally
hearing the issue, was because when the Kitsap Lake
neighborhood held a meeting the traffic safety/walking problem
was the only major problem repeatedly mentioned by the
residents. It was not mentioned during the presentation made
by the School District or anyone else at the time of the
Rezone hearing. He felt that the Kitsap Lake residents
deserved some attention to their concern. The Kitsap Lake
residents fully support the neighborhood school. Right now
children are required to walk along the streets and are
transported by bus to their schools. He felt there were some
excellent suggestions made, however, there are some that do
not make a lot of sense, particularly along the Harlow area
where there are drainage ditches on both sides and/or grass/
vegetation absorbing a lot of water. It is not desired that
this water source flow directly into the lake. He pointed out
there are no street lights along the route and there will be
times when it would be dark out when children would be walking
TAPE #918
City Council Reg. Mtg. Minutes
May 1, 1991
Page 16 of 29
to school. He felt without a lot of City investment along
with some Puget Power investment there should be some
coordination with the neighbors to place street lights along
Harlow Drive and Carr Blvd. He suggested coordinating that
effort with the neighbors so that the lighting can be placed
causing the least amount of negative impact on the residents.
He expressed concern about the double bottomed dump trucks
full of rocks rolling down Harlow Drive going much faster than
25 miles per hour and they are wider than the average car. He
suggested that a load limit be placed on Harlow Drive and
force those trucks out on Kitsap Way, where they belong in the
first place. He felt the list of recommendations were an
excellent start and wanted to see that come back to Operations
Committee when considering the whole package.
President Morton questioned Mr. Baker if this were a
commercial development, such as a housing complex, would he
recommend that the developer put in sidewalks? Dave Baker,
City Engineer, stated yes, along the property that would be
developed. President Morton questioned if the School District
was treated like a developer, would we assume they would put
in sidewalks? Mr. Baker stated yes, some type of walkway,
path or sidewalk along the street. Mr. Johnson stated he
assumed the School District would be putting sidewalks around
the school. President Hotton questioned would the City
require sidewalks on the street side? Mr. Baker stated
perhaps, we require some method of pedestrian traffic. It
would not necessarily be sidewalk next to the street, it could
be back away from the street. President Morton reminded the
Council that several weeks ago they approved a rezone at which
time they talked about having the developer not only put in
sidewalks but also upgrading the street. A short time ago
they had a seminar on "impact fees" and one of the issues
raised was in order for the cities to start charging impact
fees they had to show cause for their level of standards. She
felt if the City did not require sidewalks in this vicinity,
that would be taking a step backwards as far as impact fees
and treating the School District differently than a developer.
Right now, if impact fees are to be charged, we need to show
a level of standards that we expect a developer to rise to.
If the City allows the School District to follow their pattern
with West Hills and Crownhill, we'll be stepping backwards
from where we need to go. She minded everyone that Crownhill
and West Hills schools are located in the County. There has
been a lot of property annexed into the City that was
developed under County rules and now we are paying for it.
She would like to help the School District, but she believed
they should be treated as any other developer and if City
standards say that they should put in sidewalks adjacent to
TAPE #918
City Council Reg. Mtg. Minutes
May 1, 1991
Page 17 of 29
the street then we need to adhere to that.
Mr. Collins stated he agreed with Ms. Horton and was sorry he
was not present at the prior meeting regarding this issue. He
believed there were two separate issues, the first being the
vacation of these streets that were dedicated; and the second
is the walking area around the school. What he would like to
see happen is to go ahead and vacate the right-of-way and
continue the dialogue with the School District, making a
notation that there has to be something more done than what is
proposed under the conditions listed. The primary point to
remember is that we want something "safe". Because the school
site property was such an attractive area to locate new homes,
he wished the School District would sell the property and
locate the school on a more flat area.
Mr. Estes questioned if there wasn't some consideration for
interior walkways to take the place of sidewalks? Mr. Pratt
stated yes, and it is important to think of the improvements
that are being made in two stages: (1) on-site improvements,
which are within the property the school controls. They are
being required to develop according to any other developer
standards and have been asked to provide sidewalks and in one
area across from the cemetery, where they are not being asked
to provide sidewalks, there is another entryway into a play
field area. It is his belief that the School District is
being held to the standard that would have been required for
other type developments. (2) Off-site improvements are called
system improvements and are subject to impact fees. They are
not directly attributable to that development but do serve the
neighborhood. The School District is not being asked to
provide those off-site improvements or to pay for them. Mr.
Estes questioned would interior pathways be considered as an
alternate means of walking or transportation instead of
sidewalks? Mr. Pratt stated yes, in some cases they are and
in this case there are some instances. Field RVan, Bremerton
School District, explained if the code requires sidewalks all
the away around the outside of the school property they would
comply. However, the reason for looking at different options
on some of the internal pathways is that they felt it made
more sense. President Morton questioned if it was the School
District's intention to place the walkways within the school
property lines? Mr. RVan stated that is what they will talk
about when they get into the Building Permit process. He felt
it was rather independent from the question of the vacation of
rights-of-way.
#2287
M/S/C/U(Johnson/Collins) to approve the vacation of the
Brentwood Circle right-of-way and note in the motion that the
TAPE #918
City Council Reg. Mtg. Minutes
May 1, 1991
Page 18 of 29
City reserves it's options regarding impact fees and
establishment of minimum school transportation access and
other standards as they relate to growth management and impact
fee assessment until such time as the City and the School
District can jointly agree on what those will be.
Mr. Johnson stated the reason he included the impact fee
notation in the motion was that he felt inadequate in his
understanding of impact fees, all the implications and all the
financing. He felt there might be an option that makes a lot
of sense where if we establish reasonable standards that are
higher than those of which we have been accepting until now,
and even if it meant the School District paid some impact fee
at some later date, that may result in a lot of reasonable
impact fees coming in from other developers. By not assessing
impact fees and accepting the current standards, he did not
know what that means as far as what we do to other developers.
His position is to do whatever is the most beneficial to the
School District and the City, providing good access to the
school.
Mr. Estes questioned Mr. Johnson how could the City charge a
fee in the future that had not been established yet? Mr.
Johnson stated he did not say we were going to...all he did
was to make it perfectly clear in the motion that all the City
is doing is giving up the right-of-way and by doing this it
was no statement on the Council's part with regard to
standards for getting the school what other developers might
have to do or what the impact fees might be. It may be found
that the City and School District agree jointly on $100
because it might mean $5,000 revenue down the line with
anticipated development in the area.
Mr. Morning questioned if Mr. Johnson was saying that if
impacts were in the future that this project would be subject
to those fees? Mr. Johnson stated it was his understanding
that the ability to assess impact fees dies at either
occupancy or Building Permit time. But, between now and then
he felt the City needed to get real serious with the School
District, and they have to get serious with the City, because
the Growth Management Act reads that the City has to know what
their long-range capital plans are, what they are going to do
and the type of facilities they will be putting in. If the
City is looking at a large development, the formulas require
us to look at those and then distribute those costs based upon
the scope of the development. He did not know what it means
to make any kind of statement regarding what our standards are
for access to schools right now. Mr. ~orning stated anything
Council is doing here to tie to impact fees for this school,
TAPE #918
City Council Reg. Mtg. Minutes
May 1, 1991
Page 19 of 29
if they are legal to be charged at some later date and we
adopt them and the school is still on line, then that is when
they are addressed. To do what he believes the County is
attempting to do is to say if we give a permit now and the
City initiates impact fees (whatever they are), that they
would owe it...that is an unknown mortgage and he felt it was
absolutely wrong to require it. President Morton stated for
clarification that what Mr. Johnson was saying was that to
establish impact fees the City must establish a level of
service and by allowing the School District to back peddle
from that level of services that we are expecting future
developers to come up to, when it comes time to charge impact
fees the developer can say "you let the School District build
a school with standards less than I have to come up to.
Therefore, you haven't established your level of standards".
Mr. Morning stated he did not believe that the impact fee as
an issue tied to this school is legitimate at this time. He
understands setting standards, etc., but to say it is impact
fees related through the Growth Management Act is not the
right thing to do. It would be fair to say that the City has
standards and they are expected to comply with them. Mr.
Johnson stated the motion as stated was strictly relating to
the vacation of right-of-way, but it also says we reserve
jointly our options and this would be something decided
between the school and the City. If it is in the School's
best interest to have an impact fee charged to them, we still
have our options open. He did not necessarily want to levy
impact fees against the school and there is nothing tied into
the motion as stated. Mr. Morning stated he believed Mr.
Johnson's motion did tie in impact fees. When the School
District goes to the Building Permit stage and if impact fees
are in order at that time, then they will be charged
accordingly. He did not agree to reserve the right to charge
them even it was not appropriate or legal. President Hotton
pointed out if the City had not already gone through the
"hoops" at that point to charge impact fees, the City cannot
legally do it. Mr. Morning emphasized that it was not right
to speak to impact fees as part of the stated motion. Mr.
Johnson stated the purpose of putting it into the motion was
not to charge them impact fees but to let every developer who
might read the minutes know that no way does this motion tell
them anything about impact fees.
Mr. Colvin requested the City Attorney to clarify the motion.
Ian Sievers, City Attorney, stated what Mr. Johnson stated was
that he did not want the public to have the perception that
this is our level of services and we won't expect a high level
of services in setting impact fees or developing standards in
the future. Mr. Horning is absolutely correct in that if we
TAPE #918
City Council Reg. Mtg. Minutes
May 1, 1991
Page 20 of 29
do not have some regulations in place by the time the School
District come in for the Building Permit application we cannot
hold that up or require some delay. That would virtually be
a moratorium on all building until impact fees are
established. Mr. Homing added or to charge people an extra
mortgage in the future. He noted if the motion reflected what
Mr. Sievers just explained he would support the proposal.
Mr. Colvin noted that by the silence of the residents to the
east of the site they give their consent to this proposal.
Vote:
In Favor:
Opposed:
Collins, Dawkins, Colvin, Johnson, Horning
Horton
Estes
Mr..Collins stated he wished to recognized Harold Pickard, who
was the President of the School Board at the time this piece
of property was purchased for this school. Mr. Pickard's
foresight was well taken. Mr. Pickard thanked the Council and
appreciated their action on this proposal.
Field RVan thanked the City staff for their assistance and
City Council for their decision; and they will be working with
the City to better understand SHB 2929.
8B - PUBLIC HEARING - APPEAL OF PLANNING COMMISSION'S APPROVAL
OF VARIANCE TO FENCE HEIGHT REQUIREMENTS, APPELLANT: JAMES
MCKENZIE; LOCATION: LOT #7 DOCKSIDE SUBDIVISION, #AB91-115
On January 29, 1991, the Planning Commission approved a
Variance to Zoning Ordinance Chapter IV, Section 8: Fence and
Wall Height to allow the construction of a six-foot high fence
within the front yard setback at the private park within the
Dockside Subdivision.
The adjacent property owner of Lot #8 is
Planning Commission's decision for reasons
Letter of Appeal, Exhibit #1.
appealing the
stated in the
The City Council, when hearing an appeal shall either: 1)
affirm the decision under review; 2) reverse the decision
under review; 3) modify in whole or part the decision under
review; or 4) remand the matter back to the approving
authority for further consideration.
Such action shall be decided by a majority of the members
present. That vote may be taken at the same or any subsequent
meeting.
President Horton asked the "Appearance Of Fairness/Conflict Of
TAPE #918
City Council Reg. Mtg. Minutes
May 1, 1991
Page 21 of 29
Interest" question with all members being seated.
Jack Allingham, Planning Division, stated Mr. James McKenzie
is appealing a fence variance granted by the Planning
Commission. The property owner of Lot #7, the Osberg
Construction Company being represented by the Dockside Home
Owners Association and further represented by the Common Area
Control Committee, made application to construct a fence
exceeding three feet in height within the front yard setback
of lot #7. Lot #7 is now a small, developed private pocket
park in the Dockside Subdivision.
Chapter 4, Section 8 of the Zoning Ordinance permits the
construction of a fence within a residentially zoned property.
This property is zone Single Family (SF-3), within the front
yard setback but does restrict the height of the fence to
three feet; although it does allow a 42 inch high fence if the
fence is construction of an open mesh cyclone type fence. The
park has been experiencing some trespassing problems and it
was felt that a substantially higher fence was needed in that
area. Mr. Allingham provided some photographs of the site
showing how it related to surrounding properties. President
~orton questioned where the fence would be located? Mr.
Allingham stated the fence would be constructed just behind
the sidewalk and the requested variance to construct a 6 ft.
high fence would be within the first 20 feet of the property.
The appellant's letter of appeal contains four main features:
(1) that the black chain link fence will have an aesthetic
impact on his property; (2) the fence will affect his property
value; (3) fence will have a view impact; (4) the variance is
not necessary due to special circumstances regarding the size,
topography, shape, location and surroundings of the subject
property.
Representing the Planning Commission, the Planning staff
recommends that the City Council uphold the Planning
Commission's decision. The Planning Commission did place two
conditions on the variance: (1) that the site not be sight
obscuring; (2) that the applicant provide a lockbox to allow
emergency vehicle access to the park.
Karlyn Maberly, Attorney representing James and Carol
McKenzie, stated the fencing proposed along the front
(sidewalk area) would actually be four feet into City right-
of-way and then projected to go down the north side (75 ft.).
The variance that was requested by the Home Owners Association
stated the purpose of the fence was for security purposes,
TAPE #918
City Council Reg. Mtg. Minutes
May 1, 1991
Page 22 of 29
litter, unauthorized entry, vandalism and nefarious
activities. She noted the proposed fence would not go all the
way down to the water.
TAPE #919
The McKenzie's are against this proposal on three grounds: (1)
that the fence would substantially interfere with the use of
their property as purchased and as they anticipated using it;
(2) the fence, as proposed, does not provide security; (3) the
fence does not meet the criteria for the variance. The
McKenzies specifically chose this lot because it allowed them
direct access to the dock and water without any blockage. The
proposed fence would take away their access to move from their
lot to the adjoining lot #7. It also will obscure the view of
the lake from their property and as they sit in their yard
their view would then be a black chain link fence. They find
this to be very obtrusive and not aesthetically pleasing.
This fence would provide very little security considering the
current design. If the whole dock were fenced in then it may
provide the security to keep people from coming into the park.
What is really happening is that people, who are not Dockside
homeowners are using the dock as access to the park. From
reviewing the minutes and the information provided to Council,
it appears that they would be creating an even greater
security problem by fencing this area than leaving it in its
natural state. With the fence in place and a lockbox on it
the Police will not have easy access to get down on the dock
to take care of any problems that may occur. In fact, the
findings and recommendation of the Planning Commission
requests a lockbox, but states it would be for the exclusive
use of the Bremerton Fire Department. She believed there had
been some overlooking as to the role of Police services
considering the kinds of activities that have been cited to
justify the need of a fence.
Upon reviewing the application and the information provided to
the Council does not meet the criteria for a variance. The
current City Ordinance allows a 42 inch fence and there are
no physical barriers to preclude the building of a 42 inch
fence. There has also been no hardship shown or special
conditions which would justify a variance. The request is for
a six foot fence and the variance seems to be based on their
perceived conclusion that they would like more security in the
park area, verses meeting the variance criteria showing a
hardship or something unique about this property or some other
reason that would justify a variance. She believed the
Planning Commissions' findings were erroneous.
If the Council considers granting this variance, they would
TAPE #919
City Council Reg. Mtg. Minutes
May 1, 1991
Page 23 of 29
ask that you consider requiring that a gate be placed along
the McKenzie property line to allow them the access that is
currently available. .Or, they would ask the Council to
consider setting the fence back 30 feet from the sidewalk.
This would reduce the visual impact from the McKenzie's
property and would allow them some aesthetic benefits along
the sidewalk.
Michael St. James, 6037 Blue Herron Place, stated his property
was directly across the street from lot #8, and he was
representing the Dockside Homeowners Association and the
Common Area Control Committee. The reason they wanted to have
a six foot fence was because a 42 inch fence is vaulting
height for a teenager. Having lived in his residence for a
year, he and his neighbors had noted that the preponderance of
the problems occurring are with High School age and 20 year
old people. There is signage in five different locations on
the lot notifying persons that this is a private park for use
of Dockside owners only and further states that it is posted
against trespassing. The signs are routinely ignored by a
particular group of people and they are the same type of
people who would vault a 42 inch high fence. They are not
having a problem with the normal type of people traveling
through the neighborhood. The problem they are experiencing
is not accessing from the lake. After 11/2 years, he could
only recall one incident where the people actually accessed
the park from the lake side. In the proposal for the fence,
they proposed signing on three sides of the dock that this is
a private dock and no trespassing is allowed on the dock or
the park above it.
The reason they requested the variance to come up into the
City right-of-way was due to a real steep trap zone between
the sidewalk and 30-35 feet down into the lot. This area is
almost too steep to mow and to walk across it is difficult.
They felt such a trap zone would be undesirable for litter and
garbage collection. Also, it places an unnatural division on
what is really a recreational property intended for the
enjoyment of the residents of Dockside. If the fence was
built 35 feet into the lot and build the fence on the first
flat ground they would cut the property into thirds and would
put the fence very close to the gazebo. One hundred sixty one
families have paid for the privilege of utilizing this park
and would like to be able to exercise their right to that park
in a safe way without having to worry about the people who do
not belong there.
The construction of the fence will be entirely of decorative
wrought iron and only in the initial request for bids did they
TAPE #919
City Council Reg. Mtg. Minutes
May 1, 1991
Page 24 of 29
ever mention chain link. And, in doing so, they asked that
two separate bids be prepared, one for wrought iron across the
front and chain link down the side sections to lower the
costs. In discussing it with the members of the committee and
the other members of the Homeowners Association, they came to
the conclusion that everyone would like decorative wrought
iron throughout, regardless of the increased cost. The fence
as planned and contracted for never included chain link, but
6 ft. decorative wrought iron, constructed of solid steel
spokes 1/2 inch square cross section - slightly tapered at
each end, protruding through the top and bottom rails of the
fence approximately six inches at each end and they will be
welded into the rails. They will be set on 5/8 centers, as
much as they can, to accommodate the terrain. This will
provide a nearly transparent appearance from across or middle
of the street. The view to the water would not be restricted.
Before they selected the type of fence they propose, they had
the opportunity to view existing fences of the same materials
in the local area. He emphasized they have every interest in
preserving their property values. He, personally, will have
to look across the street at the fence and he has no desire to
diminish his property value. It is their belief that the
slight aesthetic impact would be off set by the reduction of
attractive nuisance, which the park is now experiencing. In
the month of April, he was called five times by the Police to
investigate people using the park improperly. In the summer,
he would expect Police visits to the park to be between 1 and
3 times weekdays and up to as many as one dozen times each day
on the weekends. Mr. St. James briefly reviewed the
attractiveness of the park and described how it attracts
attention of the public as a desirable place to enjoy the lake
front. It is their belief that once the fence is up and
people experience a barred access, they will stop coming and
the whole neighborhood will benefit.
If their request for a variance is not approved, it is their
intent to construct six feet fencing on both sides of the park
area. In response to Mr. McKenzie's comment that on the other
side of his property the fence would not be built completely
to the water. There are two reasons for this, one being it is
tied to a habitat exclusion zone (100 ft. circle from an old
Osprey nest into which no items can be moved).
When the new school is built, it is anticipated a large number
of children will be using the Dockside Subdivision as a
walkway to that school. It is acknowledged that as the
children walk by the park it would attract them as a pleasant
place to be before or after school. Unfortunately, the
Homeowners' Association has a joint liability for what happens
TAPE #919
City Council Reg. Mtg. Minutes
May 1, 1991
Page 25 of 29
in that park. Therefore, it is their desire to have a fence
that would discourage people from gaining access to the park.
Donald Barnes, 7015 Osprey Circle, briefly reviewed the need
for use of City right-of-way, noting that the topography of
the park area would make it difficult to anchor the foundation
posts if it was set back from the right-of-way. The upgrade
will improve the appearance, the controlled access will
control littering and the limited access will protect the
Osprey habitat.
Chuck Melvin, member of the Common Area Control Committee,
related several dangerous incidents that happened to him
personally when he monitored users of the park area when he
first moved in to the Dockside Subdivision. In addition to
physical danger to residents, vandalism had occurred to the
dock. Because of the concerns of the subdivision residents,
the Common Area Control Committee was formed to help resolve
problems in the development area. Moving into the right-of-
way had one great advantage...there is a large concrete pad at
the top, which makes an ideal, safe entrance into the park and
the only real place to place a "gate". He emphasized a 42
inch fence would not provide the security desired. The
subdivision residents have agreed to a special assessment to
met the costs of installing the proposed fencing. He
explained Mr. McKenzie did not respond to the proxy vote that
was taken throughout the subdivision. So, the final vote to
provide a security fence around the park area was 113 in
favor. As a follow up to this they checked into their
insurance coverage and determined they needed some additional
liability insurance under the Homeowners Association. During
research into costs of insurance, the question "how much would
liability insurance cost with or with a fence" was raised.
The quote received was approximately $1,000 per year for a
million dollar coverage without a fence (actual cost $1,200
per year); and with a fence it would be significantly less.
Since they first requested bids for the fencing, costs have
risen and he was concerned that further delays would bring
about greater increased costs. In response to Mr. McKenzie's
comments to several members of this committee, that he was
being discriminated against personally and violating his
individual rights, he was informed that he had the same rights
as any of the owners in the subdivision. Mr. McKenzie then
indicated he wanted direct access to the dock from his lot.'He
was informed that he had the right to use the same gate as all
the other homeowners would use. Mr. Melvin pointed out that
the Articles Of Incorporation and Homeowners Association By-
Laws and CCNR's contain statements that all homeowners should
be treated equally and assessed equally for any special or
TAPE #919
City Council Reg. Mtg. Minutes
May 1, 1991
Page 26 of 29
general assessments for improvements.
Mr. St. James stated none of the residents who policed the
park last year are willing to go through that again this year.
They decided they would call the Police each and every time
they were aware that someone was trespassing because of the
threats, near fights and abuse they received. The fence
design would allow an electronic key access with a key box
specified by the Planning Department for use by the Fire
Department. It was his assumption that the key box would be
used by all emergency services.
Ms. Haberly requested that if the Council does consider the
variance that they provide a gate at the lower side of the
McKenzies. Also, this is a variance request based on a land
use ordinance and the factors of liability and security are
not factors in the ordinance itself. She asked that the
Council review the five criteria for granting a variance under
the Zoning Ordinance.
Mr. Estes stated realizing that a gate costs more than a fence
section, he questioned if Mr. McKenzie would be allowed to
purchase a gate for his use? Mr. St. James stated initially
he was not opposed to Mr. McKenzie having a gate, but when it
was discussed with the Committee and general membership it was
felt strongly that would create a special class of privilege
in accessing that property. Not withstanding Mr. McKenzie's
right-next-door access to the park, he owns an equal share of
that property along with everyone else. It was noted that Mr.
McKenzie already had his own private waterfront access and the
general membership questioned his need to have a special
access to the park. In talking with Mr. McKenzie, it was
learned that he had always viewed that park as a contiguous
part of his lot. Therefore, the Homeowners Association
decided they did not want to create this special class of
privilege and did not want to open a liability door in the
event Mr. McKenzie left a gate open and someone became
injured.
Mr. Johnson stated back when Council considered front yards
and back yards one of the areas discussed was waterfront
property and single lot depth and which was the front and back
yards. As he recalled, at that discussion it came out that
your back yard could be your front yard which was facing the
street. He questioned if this was true or false? Mr.
Allingham stated the Zoning Ordinance defines front yard as
that property that abuts the public right-of-way or a street
and that is why the variance is being requested. Mr. Johnson
questioned if all the people living along Shorewood Drive are
in trouble if their fence falls down. His point was that he
TAPE #919
City Council Reg. Mtg. Minutes
May 1, 1991
Page 27 of 29
was under the impression they could always build a taller
fence than 42 inches. Considering the proposal includes use
of City right-of-way, he questioned if there had been any
negotiations with the residents as to how much the City would
charge for rent, keep an easement, etc of that right-of-way?
Mr. Allinqham stated the variance request was to a fence site
requirement in the front yard setback and it was decided by
the Planning Commission and the Planning Commission does not
normally see the leases of right-of-way. This application is
an appeal of that decision. Mr. Johnson stated to him the
right-of-way issue had nothing to do with the variance, but,
he thought the fence height issue had been taken care of. He
pointed out Exhibit #10, used during the original Dockside
Subdivision hearing, contained the homeowners covenants which
are much more strict than the Zoning Ordinance. Therefore, as
long as the proposed fence would not interfere with the Osprey
and goes along with all of the documentation that was part of
the platting rezone of the subdivision and as long as the City
collects all the appropriate fees for use of City right-of-
way, he supported the proposal as presented. Mr. Homing
stated the if the fence is located on City right-of-way he
would expect City staff to deal with it appropriately and
questioned if that was a correct understanding? Mr. Allingham
stated the issue at this time is the variance question -
strictly the height issue. Mr. Morning stated he personally
would not want to live across the street from a six foot high
fence even if it was out of decorative wrought iron. But, if
113 residents in favor - 6 against want to do it then he
could support the request. Mr. Johnson stated he could
understand the Homeowners Association's desire to do something
prior to summer. And, he raised the question who would deal
with the right-of-way issue? Don Pratt, Director of Community
Development, stated a right-of-way permit would be issued by
the Engineering Department to construct the fence. Mr.
Johnson questioned who gave the Engineering Department the
right to give away City property? President Morton stated
that was an issue that needed to be brought up separately.
#1260
M/S/C(Johnson/Collins) to allow the six foot high fence as
long as it does not interfere with any of the Osprey
provisions of those properties and is subject to all of the
rules of the local Homeowners Association, which are a part of
the approved rezone and that we will address use of the City
right-of-way at a separate time.
Mr. Morning questioned by virtue of the motion stated by Mr.
Johnson could the fence be built? Ian Sievers, City Attorney,
stated he did not know why Council couldn't deal with the
right-of-way through the variance as it is related. The
TAPE # 919
City Council Reg. Mtg. Minutes
May 1, 1991
Page 28 of 29
proposal talks about a certain height fence within a certain
distance within this front yard. You could put this height of
fence this close or more distant from the yard placing it off
the right-of-way. If Council has a concern with the right-of-
way, he suggested they just move it back now. Mr. Johnson
suggested the Mayor either establishes easements for right-of-
way with appropriate rents to the Homeowner Association or we
vacate the right-of-way or no building is allowed on the
right-of-way. Mr. Sievers stated then the variance would only
apply to placing the fence off the right-of-way. Mr. Johnson
stated the only issue to be addressed is fence height and if
that was the case why did the School District just go through
the vacation process on Brentwood Circle. President Morton
questioned who had the permit? Mr. Sievers stated he believed
there had to be some consideration, which he did not see in
the permit. It is revokable and may have to do with some
permanent commitment of the right-of-way, which would need
Council approval. Mr. Johnson stated he believed the staff
could negotiate an easement and get it registered on the deed
without ever coming back to Council. Mr. Morninq restated his
question to Mr. Sievers..." will the motion as given allow the
variance but will not allow the construction on City property
at this point"? President Morton questioned if this could be
handled administratively (the right-of-way issue), without
scheduling a public hearing. Kathleen McCluskey, City Clerk,
stated if Council chooses to vacate the right-of-way and sell
'it, it needs to come back to Council and go through the
vacation process. If the City chooses to grant a right-of-way
permit - what has been happening is as long as it can be
revoked at any time and structures removed, the Engineering
Department had issued Right-of-Way Permits and they do assess
fees. If a more permanent action is wanted, such as an
easement, then it would come back to Council in the form of
"granting an easement of City property". Therefore, it
depends on what course is taken. If it is a Right-Of-Way
Permit for simply use of the right-of-way, they have been
granting that administratively. Typically, there is a fee for
right-of-way leases or permits. Mr. ~crning stated he had the
feeling that staff had already granted the permit. Ms.
McCluskey stated yes, it appears they had. Mr. ~orning
questioned as the motion stands will it allow the fence to be
built in conjunction with the right-of-way permit? Mr.
Sievers stated yes, and the motion was to check up to make
sure nothing else was done improper. Mr. Johnson stated if
the rent for the right-of-way was "$0", that was not
acceptable. President ~orton stated that would be a policy
issue and needed to get down to the staff and Administration.
Vote on motion:
In Favor: Estes, Horning, Collins, Dawkins,
Colvin, Johnson, Horton
TAPE #919
City Council Reg. Mtg. Minutes
May 1, 1991
Page 29 of 29
Mr. Johnson requested that the Right-Of-Way Permit process be
discussed during the next City Council Study Session.
With no further business meeting adjourned at 9:30 p.m.
KATHLEEN L. McCLUSKEY, City
RTONt council President
City of Bremerton
KLM/LH/me
cc: Normal Distribution
File/Vault
Clerk