Loading...
HomeMy WebLinkAbout02/27/91TAPE #892 UNAPPROVED DRAFT CITY COUNCIL MEETING MINUTES FEBRUARY 27 1991 The regular meeting of the City Council of the City of Bremerton was called to order in the City Council Chambers, 239 4TH Street, Bremerton, Washington, Wednesday, February 27 1991, at 5:30 p.m., with Council President Lynn Horton presiding. Council members present: Lon Overson, Wayne Estes, Spencer Horning, Hank Waibel, C. R. "Tiny" Collins, Morrie Dawkins, A1 Colvin and Russ Johnson. Also present were City Attorney Ian Sievers and City Clerk Kathleen McCluskey. The meeting opened with the Pledge of Allegiance led by Council President Horton and Invocation given by Councilman A1 Colvin. #0020 #0036 CONSENT AGENDA A. Minutes Of Meeting - February 13, 1991, #AB91-040 M/S/C/U(Waibel/Dawkins) to approve Consent Agenda as presented. CLAIMS/WARRANT REGISTERS Vouchers audited and certified by the auditing officer as required by RCW 42.24.080, and those expense reimbursement claims certified as required by RCW 42.24.090, have been recorded on a listing that had been made available to the council. M/S/C/U(Colvin/Dawkins) on February 27, 1991, the Council does approve for payment those vouchers included and further described as follows: 124995 through 124997, 125012 and 125163 through 125342 in the total amount of $668,575.31. PUBLIC RECOGNITION Mayor Louis Mentor read a Proclamation acknowledging the existence of the Bremerton Community Concerts for 50 years and their dedication to promotion and betterment of the cultural development of this community. Mayor Mentor congratulated Bremerton Community Concerns for its golden anniversary and urged the citizens of Bremerton to attend and enjoy the concerts throughout the season. Nitajean Bieger accepted the Proclamation and stated Bremerton Community Concerts is one of the most important cultural organizations in the area, bringing many artist and attractions to Bremerton during their 50 years as an organization. She encouraged everyone to take advantage of this wonderful cultural opportunity. TAPE #892 City Council Reg. Mtg. Minutes February 27, 1991 Page 2 of 29 Mayor Louis= Mentor read a Proclamation acknowledging the contributions made by African American Women in the United States and world wide, playing a vital role towards the common goal of equality for all. Mayor Mentor proclaimed March 2, 1991, as AFRICAN AMERICAN WOMEN'S DAY in the City of Bremerton. Carol Morrison, President of the Student Association for Black Awareness of Olympic College, accepted the Proclamation and stressed that she had seen great strides in the improvement of relations between people of different races, religions, cultural and nationalities. Mayor Louis Mentor read a Proclamation recognizing the contributions of American women of every race, class and ethnic background; and their unique role throughout history of the Nation of providing the majority of the volunteer labor force, charitable, philanthropic and cultural institutions. Mayor Mentor proclaimed the month of March 1991 as WOMEN'S HISTORY MONTH. Dorothy Bristo, Program Manager for the Office Of Women's Program at Olympic College, stated it was her honor to accept the Proclamation and to have the support and encouragement from the community in the College's efforts recognizing the significant contributions that have been made by women in the past, in the public and private spheres; and to support their continued role as history makers in the present. Janins DoughertV, Navy wife whose husband is stationed on the USS Sacramento, thanked the citizens of Bremerton for their support not only for the military members aboard the USS Sacramento but all military serving in Desert Shield. She expressed how much the families of the servicemen and servicewomen appreciated the visible showing of that support through the "yellow ribbon" display and flying of theAmerican flag. She requested that the community continue that support and to display words reflecting "job well done" as a welcome upon return of the USS Sacramento. Mrs. Dougherty announced their support group was selling ribbon and lapel pins as a fund raising project to finance a large "welcome home" for the USS Sacramento when it returned from the Persian Gulf. And, she would be available after the Council meeting if anyone wished to purchase any of the ribbons and lapel pins. Mr. Johnson suggested if anyone listening to this presentation wished to donate reader boards or volunteer to assist in this welcome, they may call the City Council office 478-5280. Mayor Mentor presented the City Council with a framed poster, given by the PSNS Centennial Committee, in appreciation of their purchasing a Centennial plaque to be placed in the PSNS Centennial Plaza. President Hotton accepted the poster. TAPE #892 City Council Reg. Mtg. Minutes February 27, 1991 Page 3 of 29 Jacquie Svidran, Bremerton Community Theater, announced a group from this organization would be participating in a cultural exchange with a theater group in England. The Bremerton group will perform the play "YOU CAN'T TAKE IT WITH YOU" on April 4, 5 and 6 in England and are seeking financial assistance from the general public to help transport the theater group from Bremerton to SeaTac Airport. Anyone wishing to donate funds may call her at 697-2582. Roy McInnis, 2711 Maple Street, stated he was pleased with Council's decision to allow the Fire Department to transport advanced life support patients (ALS). And, he expressed concerned and confusion over Council members using the phrase "I can't support that" prior to their actually voting on an issue. It was not clear if that statement meant they would not support the vote when called or whether they did not support the issue. It was his feeling if the majority of the Council voted to approve an issue, then it became an issue for the City and should receive full support. 8A - CONTINUED PUBLIC HEARING - TO ACCEPT COMMENTS AND RECOMMENDATION OF THE PLANNING COMMISSION REGARDING REOUEST FOR A REZONE OF A 20-ACRE PARCEL FROM 8F-3 TO MF, APPLICANT: REDICORP, #AB91-032 American Redicorp, Inc., requested the rezone of a 20 acre undeveloped parcel at the southwest corner of the intersection of Almira Drive and Riddell Road from its present designation of "Single-family (SF-3)" to "Multi-family (MF)". The Planning Commission conducted a public hearing on January 15, 1991, at which time it considered 25 letters in opposition, a petition bearing 223 names in opposition, and testimony in both support and opposition, as well as the staff report and presentations by the applicant and Planning staff. The Commission has forwarded its recommendation to the City Council for consideration. A public hearing before the City Council is required prior to a final decision on a rezone request. President Horton asked the "Appearance Of Fairness/Conflict Of Interest" question with all Council members being seated. Ron Hough, Planning Manager, stated the rezone request involved an undeveloped parcel approximately 20 acres in area. He provided view graphs showing existing developments around the property, such as the Bremerton Shopping Center (Payless Drug, Albertsons, J.K.Gill), small retail businesses on the north side of Riddell Road, some warehouses and the new Fred Meyer complex. He noted he was in receipt of a couple TAPE #892 City Council Reg. Mtg. Minutes February 27, 1991 Page 4 of 29 applications for expansion of the shopping center. Kitsap County is also processing a proposal for approximately 122 additional multiple family units, which would bring some changes to Riddell Road. To the South the only residential area that directly abuts the subject site is a row of houses along Hollis Street and they back up to the area and share a property line. On the east side of Almira Drive there are primarily single family residential neighborhoods. Mr. Hough provided a map showing the Comprehensive Plan (as it is today) and noted the subject property is designated "medium density", actually "Residential, 7-15 units per acre". During the Planning Commission hearing, there was extensive discussion of the relationship between the Comprehensive Plan and zoning. The Comprehensive Plan has three basic categories of density: low, medium and high, but the numbers do not line up with the new Zoning Ordinance. There are three basic levels of zoning as well, but the zoning categories go up to as high as 44 units per acre, however, the Comprehensive Plan stops at 30. East of the shopping area is zoned Single Family (SF-3) and most of it is developed as residential, except for the subject site. All along Wheaton Way is developed Commercial and General Business to the south of Hollis and down to Wheaton. Way. To the north of Riddell Road the property is zoned Commercial on all four corners of this intersection. Mr. Hough provided a chart showing the three major streets that serve the area: Almira Drive, Riddell Road and Hollis Street. Almira Drive and Hollis are considered collector streets with Riddell Road being a minor arterial. All of these streets have a 60 ft. right-of-way. Along Almira Drive, the best section is between Sylvan Way and Riddell Rd. South of Hollis Street, Almira Drive narrows and does not have curbs and gutters. Mr. Hough noted the best section of Almira Drive fronts on the subject property with a width of 36 feet and includes curbs and gutters along both sides, however, there are no sidewalks. Traffic counts along these streets were discussed extensively during the Planning Commission hearing. The Engineering Department was requested to do a current four day count (Friday, Saturday, Sunday, Monday) and came up with a traffic count of about 50 vehicles average daily traffic more than the 1984 count. The residents in the area found it hard to believe this new traffic data as all types of traffic had increased considerably due to its being used as a by-pass as well as a race track. Therefore, there are some traffic related problems that do not have to do directly with the amount of traffic. Mr. Hough noted the traffic counts were TAPE #892 City Council Reg. Mtg. Minutes February 27, 1991 Page 5 of 29 much lower than what the streets can actually handle. The subject property fronts directly on a collector street and secondary arterial, thereby being a good location as it relates to traffic flow. Mr. Hough pointed out the Criteria section of the staff report, noting it did contain explanation as to how staff and the Planning Commission interpreted it. The public need for the rezone was not felt directly by the existing neighborhood residents. It was pointed out that the need for the rezone was to serve people who had not yet come to this area, who were looking for housing but could not afford single family housing. Mr. Hough provided slides showing the surrounding area, accessing streets to the subject property, debris along the roadside of the subject property, existing trails being used by residents and children, and evidence of transients being on the subject property. He pointed out most of the homes in the subject area were faced toward the side streets and not fronting on Almira Dr. Quite a few of the homes already had buffering, i.e., trees, landscaping and solid wood fences along the Almira side. During the Planning Commission's public hearing, the neighborhood presented a petition containing 223 names in opposition and 25 letters opposing the proposal. The objections fall in the following areas: (1) too much additional traffic for local streets; (2) development would cause additional noise in neighborhood; (3) possible transient population with no commitment to the neighborhood; (4) possible increase in crime; (5) adversely affect property values; (6) no room in schools; (7) it will remove a greenbelt; (8) adversely affect the views; (9) project would not be compatible with the neighborhood character. Positive comments made in favor of the proposal were: (1) multiple family was more compatible with commercial neighbor to the west; (2) multiple family allows greater design flexibility on the site and orientation to buildings and green space/belts, setbacks, parking areas, etc.; (3) zoning requires 15% open space for a multi-family development; (4) multi-family makes more efficient use of utilities; (5) Almira Drive is an under utilized collector street and it TAPE #892 City Council Reg. Mtg. Minutes February 27, 1991 Page 6 of 29 can handle additional capacity; (6) very convenient to shopping, employment, transit; (7) definite need for multiple family housing in suitable locations, particularly in urban areas; (8) need for affordable housing opportunities; (9) eliminates problems and hazards on the site. The Planning Commissions held its public hearing on January 15, 1991, and the Planning Commission felt this was a good location for multiple family, but they also felt the density allowed in a MF zone (up to 22 units per acre) was excessive for the neighborhood. Their recommendation was to approve the rezone to Multiple Family (MF) but put a limit on the density of 15 units per acre. Mike Hancock, President of American Redicorp, stated he wanted to set the record straight as to information in a recent news article in The Sun... he represents Hoff Pacific Corporation of Kirkland, who have contracted to purchase the property from the current owners, Merit Corporation and Michael Tucci. He noted a comment was made during the Planning Commission hearing, by one of the neighbors, reflecting his displeasure that he, Mike Hancock was not a resident of Kitsap County. Mr. Hancock's response at that time was that there were few developers in Kitsap County who had the financial capability of building a project of this size. Be believed that 80-95% of all the apartment complexes built in Kitsap County within the past 10 years were constructed by out-of-town developers. Mr. Hancock quoted several passages from the Comprehensive Plan that he, as a developer, reads into that plan and are important and applies to this application. First of all, under the Vision For Bremerton, it indicates "we will have economic diversity. Public and private actions are needed to improve the liveability of the community. Population stability - actions need to be taken to promote increased economic self-sufficiency of residents and new home owners and families who want to live in Bremerton. Liveable neighborhoods - the City will strive to achieve private actions to clean and beautify neighborhood living and shopping areas". Mr. Hancock pointed out currently the property was being used as a refuse collector and haven for transients. And, he further quoted "the role of the City will be to support and stimulate private economics activity in order to expand the Bremerton tax base and thereby support an adequate level of public services and facilities". Mr. Hancock noted this project would carry an approximate cost, including land, between 16-20 million dollars. At the current tax rate per thousand dollars of assessed value, this project TAPE #892 City Council Reg. Mtg. Minutes February 27, 1991 Page 7 of 29 would generate approximately $116-167,000 in annual real estate tax revenues. Under Planning Assumptions, relative issues are people and staff's assumption was that the number of school age children would be relatively stable, meaning this would have little impact on schools. However, this project will bear the burden of any impact fee that would be levied on the property through growth management law, SHB 2929. Under transportation, they assume traffic will continue to increase, as will the cost to operate an automobile. Transit ridership will increase gradually and with the close proximity of this property to existing commercial services will lessen the expected impact on roads and transit. And, it makes more sense to increase density here than away from the conveniences. Mr. Hancock quoted under "Housing, the assumptions are that housing costs will continue to climb and the size of housing units will continue to decrease, and construction of multi-family housing will continue to increase. There is a need for new single family construction and that will continue to decrease". He noted the only projection he felt was not valid at this time was the decreasing number of new single family construction..as there had been a continued increase County- wide in this category and he believed it had also increased in the City. Relative to social services the assumption is that the demand for day care services will increase as more women enter the work force. Mr. Hancock pointed out the current trend in multi- family construction was to provide on site day care facilities. He had discussed this with his clients and it appeared it would be easy to incorporate such care into the project. Under "government" it states that new parks, play fields and other recreational facilities would become necessary. He noted this project would contain many active and passive facilities and open spaces for the benefit of its residents, including tennis courts, basketball, indoor gym, playground, etc. He quoted the following 'from the Comprehensive Plan: "To remain meaningful, the Comprehensive Plan must be updated periodically...", followed by "the plan will never be finished rather it should continue to evolve and change in order to reflect the concerns and values of our ever changing community". Mr. Hancock stated the subject proposal involves a site containing approximately 20 acres and they are requesting a rezone of the property from SF(3) to MF. Under the MF zone they would be allowed to build up to 440 units on the site. The Planning Commission did recommend approval of the rezone but placed a lid on the density of 15 units per acre. However, they are requesting that Council approve the request for rezone to MF without a lid on density. A conceptual site TAPE #892 City Council Reg. Mtg. Minutes February 27, 1991 Page 8 of 29 plan was displayed, being very adaptable for a wide range of densities. The MF zone allows building heights up to 40 feet. Because of the contour of the property, it would be easy to make some of the buildings at the lower elevation taller, thereby providing the maximum allowable density without affecting the coverage. Basically, the footprints of the building can remain relatively unchanged. Although this drawing depicted one access to Riddell Road and two to Almira Drive, further study is needed to determine if and where these accesses will be located. As indicated in the mitigated determination of non-significance, a full study will be done by a licensed traffic engineer prior to approval of a final plan. Mr. Hancock emphasized the plan he was showing at this time was only a conceptual drawing and if the rezone was approved, tens of thousands of dollars will be spent to address the issue in order to develop a final plan that will pass the scrutiny of the Planning staff. He was prepared to present visual information, that was presented to the Planning Commission and he could show how the characteristics of the neighborhood had changed in the past eight years, however, he believed Council was already aware of such information. He believed Council was also aware of Congressman Dicks' concern for Bremerton's ability to house the population in the near future. He offered to display comparison site plans depicting how the area might look if developed at different density levels, however, he noted land use issues had been addressed in documents provided. However, he did want to present some information relating to economic realities. If Council's decision included a density lid that made this project unprofitable, it would not get built. He noted that might make the neighborhood residents happy but questioned if that was what was best for the City of Bremerton. He emphasized the fact that economy thrives and relies on businesses and enterprises making a profit. The best profitability is the best way for the City of Bremerton to develop and redevelop into a thriving community. He believed that everyone who is considering investing in the City of Bremerton would be watching to see if they will be allowed to make a profit. Mr. Hancock stated, in his opinion, density should be only a function of topography, handling capability of public facilities, design and market conditions. The developer is in the best position to balance, along with staff, regulations and the market to equal a good investment. And, a good investment for anyone who wants to build in the City of Bremerton is going use that as a basis for their decision to build or not to build.. He noted that comment would probably TAPE #892 City Council Reg. Mtg. Minutes February 27 1991 Page 9 of 2.~ be made that this project was more suited for the downtown area, but at 22 units per acre this is not a downtown project. In fact, it is less dense than projects soon to be under construction to the north in the County, an example being 'Fairgrounds road property -approximately 20 acres and 340 units (about 18 units per acre with little over five acres of environmentally sensitive areas needing to be set aside). Another example is a project soon to be constructed on McWilliams Road (298 units). He pointed out that the City had been passed over as developers had chosen to build under County planning rules and regulations. The land resources of the City will last much longer by allowing density such as this in outlying areas of the City rather than requiring them to all locate downtown. Planning Commissioner Ron Barrington did not want to see the subject site developed at all until the downtown area was fully developed. However, Mr. Hancock warned the Council of a pitfall in considering an idea such as that as it was good in theory but difficult in application. First of all, much has to be done to downtown Bremerton before the kind of housing will be developed there that is best suited for that land. To restrict multi-family construction to downtown would only serve to delay that result and would force prices up on the land downtown and throw off the economic reality that a developer has to face when he makes a decision to build somewhere. Mr. Hancock noted Council's decision would probably be based on a mixture of emotion and conviction, with a sense of responsibility to the residents in the neighborhood versus a commitment to the rest of the taxpayers of the City that the City of Bremerton will grow and prosper. However, the City cannot prosper unless there is economic diversity to all boundaries of the City. He acknowledged Council's decision may be difficult, but he felt it was quite simple...they had shown and supported by the staff report, that their proposal was substantially consistent with the Comprehensive Plan, that the rezone is in the public interest,it would not result in adverse environmental consequences, in fact, it would be the most environmentally prudent use of the land, that there is a need for this project and the essential public facilities and services are available. In closing, Mr. Hancock wanted the Council to think, as they listened to comments of the neighbors, of the words spoken by John F. Kennedy, in 1952, "There will always be dissident voices heard in the land expressing opposition without alternatives, finding fault but never favor and perceiving gloom on every side and seekinq influence without responsibility". And, he emphasized there were lots of other organizations, such as Flagship, who had TAPE #892 City Council Reg. Mtg. Minutes February 27, 1991 Page 10 of 29 developed reports that point to housing in Bremerton; as well as the City's Housing Bremerton Plan and he, as a developer and consultant when reading all these reports, gets the impression that there is a desire for Bremerton to grow and to grow well and diversified. Jim Robinson, President of Bremerton Area Chamber of Commerce, stated the Chamber Of Commerce was neutral on this issue. However, the Chamber is allied with all other chambers in Kitsap County and actively involved with growth management strategies. They support informed communications between communities, constituents and decision makers and the overall goal is to influence planning, assist with planning and to educate the affected parties so that in the long term the community continues to offer those qualities that achieved the designation of "most liveable". Increasing population in Bremerton is certain and will be significant. The actual numbers may vary, however, the key to the future will be how well we plan and manage the growth in the City. He noted Vision 2020 designates Bremerton as the "Metropolitan Center" of the County -that means the population center, center for employment, education, health care, etc. Kitsap County is firmly on record that future growth will not be allowed to spread but will be directed to closer proximity of areas with existing infrastructure. The Chamber encourages the City to take as much of the growth as can be accommodated. He strongly supported putting the energy into devising development standards and creative amenities that soften impacts, preserve life, preserve view corridors, making this type of housing not only compatible with neighbors but attractive, and true people places. Richard Hayes, Executive Director Kitsap Transit, stated he supported the proposal as presented. He noted the following positive aspects of the project relating to transit needs: established amenities for bus riders, opportunity to make trips as pedestrians, area well served by bus service; opportunity for growing portion of the community. Ray White, speaking for Kitsap County Economic Development Council (over 120 members), stated this proposal was a step forward in solving one of the biggest problems in the city...additional housing will have to be provided. He suggested if 300-400 units of housing were built, it would not bring one additional person to the City or County. This City needs to upgrade existing housing. This project wouldimprove housing needs in Bremerton, enhance use of already established infrastructure and encourage shopping at those businesses located along bus routes. Mr. White stressed change was TAPE #892 City Council Reg. Mtg. Minutes February 27, 1991 Page 11 of 2~ inevitable and did not support the concept "don't do it in my back yard". Clint Shinkle, Bremerton businessman, gave a lengthy discussion on population needs, income levels and who would be attracted to this type of housing. He stressed the fact that existing populations, including seniors graduating from High School, young couples, senior citizens, families in the low to mid income levels, etc., would be looking to this type of facility. And, he outlined the many positive things happening within the City that will enhance the liveability within the community and act as an attractant for future citizens. He stressed that currently hundreds of people were involved making things happen - doing for Bremerton what should have been done 30-40 years ago. He urged the Council to support this proposal as presented. The following individuals spoke in opposition to the proposal:David Mitchell, 1513 Nome Drive (who also read a letter into the record from Rick Wilson, resident adjacent to the subject property); Carolyn Mercer, 1308 Hollis Street; Thomas Buehler, 1506 Vue Ct., and speaking on behalf of the Viewcrest Neighborhood Association; De1 Knauss, 139 Olympic Avenue and speaking on behalf of BACON; John Cannadv, 4413 Petersville Rd.; Cecil McConnell, 3245 Almira Drive and past President of Viewridge Neighborhood Association; Steve Mandak, 1810 Rustic Drive; Bernie Startton, 4460 Almira Drive; Ronald Sinoga, 2830 Alder Street. Following are comments made by the above speakers: 1. Planning Office and Planning Commission did marginal job of representation of the area. 2. At the Planning Commission's public hearing over 125 people opposed the proposal with one person in favor. 3. During the Planning Commission's hearing, the rules for citizen input were changed...asking that the citizen group be held to 1-2 speakers and for a period not to exceed 10 minutes when applicant and Planning staff were given all the time they wanted. 4. Planning officer painted picture of Almira Drive as a nice, wide, straight street...what was not shown was the area between Sylvan and Hollis where the street narrows to 20-22 feet in width. 5. Engineering Department put traffic counters on corner of Almira Drive and Riddell Road on Friday, Saturday, Sunday and Monday, which did not provide good picture of traffic in the TAPE #893 TAPE #892 City Council Reg. Mtg. Minutes February 27, 1991 Page 12 of ~' area. 6. Planning office stated there were no sidewalks along Almira Drive, which was incorrect (pictures were passed out showing another story). 7. In reference to developers' stance that "rezone need was necessary because immediate area had changed so much that the rezone would be in the best interest of the public"...just because the County made a change to neighboring properties did not warrant the change in zoning. 8. Increase in noise levels. 9. Major impact on local schools. 10. Major change to the neighborhood life style. 11. Project does not fit in with neighborhood. 12. Increase in crime. 13. Drainage runoff problems. 14. Will lower property values. 15. Attitude of Planning Commissions was to roll over to big money, not caring about neighborhood. 16. Question - why asking for a rezone to sell property rather than develop it? 17. Question - what makes it so undesirable to have a home abut a commercial area but is ok for a multi-family project? 18. This request is only about money, not housing for the City. 19. Pictures were provided showing other valid residential areas bordering commercial areas. 20. Put duplexes or small homes on property. 21. Subject property possesses no specific quality for high density apartments. 22. Roads inadequate for population increase. 23. School children must walk to schools...undeveloped road TAPE #893 City Council Reg. Mtg. Minutes February 27, 1991 Page 13 of 291 shoulders used by the children would become a dangerous situation with increased traffic. 24. Subject property not near a major work center, such as PSNS or Olympic College. 25. Let population growth be built on a smaller scale and disperse throughout the City. 26. If approved, it will send a signal this Council only cares for big business and unrestrained growth. 27. Growth projections not based on new or increased industry employment. 28. Area will be saturated with high density projects as Kitsap County has approved several projects within a short distance from subject property. 29. Residents do not know what type of project will be built. 30. Planning effort should be going into downtown to improve services and activities for tourist. 31. Neighborhood residents not opposed to development of single family homes, just large complexes that do not blend in. 32. Project will impact water and sewer services. 33. There will be increased demands on Fire and Police Departments. 34. Planning Department not following Comprehensive Plan. 35. Place burden of proof on applicant to 'show the public that the proposed project would be in the best interest of the surrounding property owners.. 36. An EIS Statement should be required prior to voting on a rezone. 37. Impact on air quality due to increased traffic. 38. Population increases and decreases revolve around movement of military personnel. 49. Area is being targeted for growth greater than can be accommodated. TAPE #893 City Council Reg. Mtg. Minutes February 27, 1991 Page 14 of 29 40. Residents and public's need will have been ignored. 41. If approved, developers willdictate where projects will be located. 42. Speakers in favor of proposal live in County. 43. Breaking of Zoning Ordinance covenant (protecting neighborhoods) between the City of Bremerton and residents. 44. Was raised in the area and when looking to purchase home desired that same quality of life he had experienced growing up and would not have purchase his home if a large complex had been developed there. 45. People moving in from out-of-state probably coming from high density areas and are looking for lower density living accommodations. Kathleen McCluskey, City Clerk, read a letter (including the passing of photographs to Council members) into the record from E.L. Sturdivant, 3231 Halverson, expressing his opposition to the subject proposal. Mr. Sturdivant's concerns were listed in above items. Mr. Hancock expressed concern that he had been painted as a "bad guy"and not committed to this area, however, he felt his past record could stand for itself. He noted he was a member of the Kitsap Futures Board involved in long-range planning for all of Kitsap County, is currently and has been for the past three years the Director of the Central Kitsap Public Facilities Board, doing long range planning for public facilities and growth in that area. He was a participant in the Growth Management Symposium, particularly on the Open Space/Preservation Committee, dealing with HB 2929 and long- range growth planning for Kitsap County and all the municipalities within it. He is very sincere in his concern for wanting to make sure that not only Kitsap County but all the urban areas within the County grow in a manner which preserves the quality of life that brought us all here. The question was raised "why a rezone"? The neighbors have enjoyed the fact that this property was undeveloped for a long time, but the property owner does have the right use it for its highest and best use. Apartment building or multi-family construction is considered, throughout the nation and Kitsap County, to be a good transitional use between high intensity commercial/retail business and single family residential TAPE #893 City Council Reg. Mtg. Minutes February 27, 1991 Page 15 of ~ development. He did not know of any other site in the City that fits both of those criteria than the subject site. The neighbors have spoken how such a project would affect the neighborhood and change the liveability of that neighborhood, but all they refer to is the neighborhood east of Almira Drive and there is another neighborhood to consider and that is the commercial area to the west of the site. The project will change the character of that neighborhood as well. The economic conditions are just right and the vacancy rates in Kitsap County and City of Bremerton certainly dictate that there is a need for this type of housing. He pointed out all the builders who built the neighborhood houses would not have built them if the need did not exist or was not economically feasible. Everyone in the United States relies on a return on investment in order for them to maintain their livelihood, even people who live and work in government. The question was asked "what will the buildings look like?". Mr. Hancock stated they have spoken with some of the neighbors and some of them to the south have expressed concern that on this site plan the buildings would be too close to their property and would cause an intrusion on them. He pointed out during discussions with the neighborhood and Planning Commission, what he is showing at this time is only a conceptual drawing. The dollars have not been expended on a plan that would be submitted for construction. Many of the concerns can be dealt with prior to the actual design of the project. Another question raised was "how big will it be?". He noted he had tried to be very careful in all of his presentations not to mislead anyone and had always proposed this project would be built at the maximum density allowed under the zoning that they were requesting. He stated density is a function of topography, of carrying capacity of utilities and the market. He pointed out the Ridgetop area in Silverdale was a good example of how those projects are developed. In response to the concern of capacity of utilities, he had not arbitrarily come out with a statement that the utilities in the immediate vicinity have the ability to handle this project. That information was provided by the City Planners and Utility operators. This does not mean that some kind of upgrading may need to be done to service the project. DelKnauss, President of BACON, stated everything shown on the developers map did not have anything to do with the request for rezone. The Council's decision should be simple...that being leave it zoned as it is, single family, which is the TAPE #893 City Council Reg. Mtg. Minutes February 27, 1991 Page 16 of 29~ reason why people purchased homes in that area. He urged the Council to vote to retain the area as it is currently zoned. Mr. Overson stated the City was losing housing all over the City and he currently lives in an area that was zoned for 15 units or more and felt it provided a good lifestyle. He stressed as Bremerton grows there will be change. Mr. Estes questioned if 440 units were built, would it be responsible for about 600 vehicles per day to those residences? Mr. Hancock stated that sounded close to what was in the report and the study that was made on this issue was based on national statistics for vehicle trips generated by multi-family construction. At the time of final construction proposal was brought forth, the impact study would cite specific numbers of car trips per day that would be generated from the project. Mr. Estes noted this project would impact Almira Drive, Hollis and Riddell Road and questioned if any provision was included to handle foot traffic, i.e., adequate sidewalk facilities, etc.? Mr. Hancock stated he did have discussions with the Planning staff and they indicated they felt if the project went forward that sidewalks would be a requirement in order to mitigate the impact to traffic. They are also working with the owners of the commercial center to the west to come up with some joint pedestrian use to move people through the project and into the commercial area without sending them out on the surrounding streets. Mr. Estes stressed he was concerned with two things, liveability and quality of life. He questioned how would this improve the liveability and quality of life for the entire neighborhood? Mr. Hancock stated the liveability, quality of life and need for housing would not affect only the people already living in the City, but would also affect those moving into the community. The quality of life that would be available to new residents in this location, if a high quality job was done, would be obvious. Any time there is new development there is an impact on the surrounding area. One could look at different areas around Kitsap County where multi-family development had taken place adjacent to a single family development and, in fact was planned that way and there is little negative impact on liveability of existing neighborhoods. Mr. Hancock acknowledge there were examples of both good and bad developments. Mr. Collins questioned if there had been the same amount of land downtown that was owned by a single owner and the subject property had been owned by 20 people, which piece of property would he be requesting a rezone? Mr. Hancock stated downtown is already zoned at a higher density, double what was being TAPE #893 City Council Reg. Mtg. Minutes February 27, 1991 Page 17 of 29 requested of the subject site, so to try and make that comparison would be difficult. If the land downtown was available at a cost per unit comparable with what this property might be available for, it would be hard to tell which area would be selected. Mr. Collins felt the developer would buy the property downtown because they would be dealing with a single owner and not trying to aggregate the property. Therefore, that was one of the reasons he felt the subject site had been selected to develop. And, he questioned if Mr. Hancock would pay for road rebuilding plus sidewalk and gutters on Almira Drive and Riddell Road where they abut the subject site? And, he noted Almira Drive was 21 feet wide and questioned if the developer would build to specifications? Mr. Hough stated the section in front of the subject site was 38 feet wide from curb- to- curb and the section further south toward Sylvan Way was the part that did not have curbs and gutters, as well as being 21 feet wide. Mr. Collins questioned what the anticipated rents would be for the subject development? Mr. Hartcook stated the market would determine what the rental value of the property would be. He could give a wide range that could cover everything that is available in new multi-family construction in Kitsap County .... about $375.00 for one bedroom units to $850.00 per month for 3-bed room units. Also, rents depend on other amenities that are included in such projects. Mr. Collins pointed out previous speakers had shared that there was a need for housing for people in the $20,000 per year income range and questioned if these people would be able to afford this housing? Mr. Hancock stated he could not say this entire project would serve the needs of that income group, but as multi-family projects are built and developed they are designed to fit a range of income needs. Mr. Collins referenced a letter to Mr. Hancock, dated September 27, 1990, from Mr. Pratt, that indicated Planning's review of the Check List had been completed and they had identified a potential significant adverse environmental impact in the ingress and egress, which was proposed for Riddell Road. Although the Check List covers a rezone action, which typically does not include identification of ingress and egress, he felt that additional clarifying information or changed project design would eliminate a significant adverse environmental impact. Mr. Collins pointed out the plan showed two entrances and exits, one on Almira and one on Riddell Road and questioned if the developer had made any changes or done anything to mitigate the impact? Mr. Hancock pointed out the conceptual plan was not their proposal...these accesses may or may not exist. Further study is needed and a full traffic impact report must be generated by a licensed traffic engineer so that they can determine, before presenting a plan for construction, that all TAPE #893 City Council Reg. Mtg. Minutes February 27, 1991 Page 18 of 2~ those concerns were addressed. At that time, Mr. Pratt will review that report and the new proposal, and they would work together to place the accesses where they should be. Mr. Collins stated he was basing his decision on the information being provided at this time and may not have the opportunity to rule on the final development plan. Mr. Hancock stated recently the City Council enacted a regulation that allowed multi-family construction to be built, approved and developed through working with the Planning staff alone. However, now he is hearing something to the effect that Council may not have faith in staff's ability to do a good job on something that was only recently empowered them to do. Mr. Collins noted the system will work because staff had specific guidelines on what they must enforce. In good conscience, he did not know if he could reduce or approve a MF zone if other problems still existed. However, if he had information that these items had been mitigated, he would feel more comfortable making a decision. Mr. Hancock stated if City staff is charged with the responsibility to take care of those expressed concerns and they can't be done, then the proposal should not be approved. President Horton stated one of the biggest concerns seems to be that once it was rezoned the design and essential elements of the project would be totally in the hands of the developer and Planning staff. She questioned if it would be possible for Council to place a condition requesting some sort of Planned Unit Development (PUD) review, bringing in the neighborhood in that process, and a design review at that time? In this way, the neighbors would at least feel they were protected and concerns raised would be answered in a forum that would be conducive to public input. Mr. Pratt stated yes, it was possible. However, the developer does not have his way if Council approves the rezone. Recent Council action removed the necessity for a PUD on a project such as this. A site plan review would be required and there is a review by the Engineer for traffic aspects. And, if impact fees are adopted, before the building permit was written, there would be fees assessed to the project. The open space and landscaping plan must be reviewed administratively by the Planning Department. Therefore, there are different layers of oversight that can include conditions stipulated by the Council. One of those conditions could be the request that the site plan be brought back to the City Council for review and approval. However, Mr. Pratt stated he did not prefer that particular condition; or Council could require a PUD be brought forward before the project was developed. President Hortonquestioned if design elements could be incorporated at the time of a PUD? Mr. Pratt stated a PUD must layout in a TAPE #893 City Council Reg. Mtg. Minutes February 27, 1991 Page 19 of 29 preliminary concept generally what will happen and where the transportation and other conditions will be resolved. If there were issues identified at a public meeting, they must be addressed in more detail than other issues. The intent was to not force the developer into a complete expenditure of fees for design effort, but to design remedies for certain issues that were addressed in neighborhood plans. That preliminary plan would be brought before the Planning Commission and Council for approval. President Hotton stated due to the delicacy of trying to balance out the higher density issue with the single family neighborhood issues, density had to match design, and without that she felt the neighborhood residents were at jeopardy. She was not convinced that simply leaving the site zoned single family- low density would not be a poor design and not serve the area any better than anything else. Mr. Pratt explained one other opportunity that provided public review if Council would approve rezone only with no other requirements. An State Environmental Policy Act process (SEPA) had not been completed, however, they did identify three specific issues that must be addressed prior to issuance of a Building Permit. Depending on what kind of information they received on those three issues, further environmental information in the form of an Environmental Impact Statement (EIS) or project redesign may be necessary before the Building Permit could be issued. After a decision was made by the responsible official on whether or not to require more information or project design, that decision is publicly noticed and can be appealed by the public for a public hearing. The three items identified are: storm runoff and assessment of existing utilities, transportation and traffic, and parks and schools. All three of these items must be addressed in more environmental documentation and then must be found to .be either non-significant or significant before issuing a Building Permit. Mr. Johnson explained not only did Council have the Comprehensive Plan as a guide in rezones but now had to deal with Growth Management Act SHB2929, that did influence planning for growth in the City. It was his understanding that SHB2929 was adopted because the people in the Puget Sound area did not want this area to turn into something like Los Angeles sprawl. In order to avoid that happening in this area, there would be designated metropolitan areas which would raise density utilizing the latest urban design techniques making the most liveability environment. By doing this, the intent was to stop or reduce sprawl in the County area by increasing densities in City areas. This has not been the TAPE #893 City Council Reg. Mtg. Minutes February 27, 1991 Page 20 of 2~ case in Kitsap County as they have allowed "sprawl" to continue. If the City Council follows SHB2929 guidelines they are charged with figuring out ways for projects such as this to happen. Given the SHB2929 guidelines that if a quality project comes along and it meets urban design standards (including proper parks, open space, buffering, playgrounds, sidewalks, good trash collection and recycling facilities, safe and proper traffic flow, etc.), then he could support such a proposal. However, he was not comfortable with the amount of information as to design and mitigation of other concerns identified with this project. At this point, he would not support higher density than 15-units per acre for this project. To consider a high density project he would require site plan approval or a PUD process. He questioned when would the developer take title to the property and when would the project be completed? Mr. Hanoook stated the way the transaction was structured the title to the property would be transferred within 60-90 days of approval of the rezone, if approved. The completion date of the project would be the function of when it would be started. It was recognized there is more work to complete, such as site study, before starting such a project. Mr. Johnson noted his concern that he had approved a number of projects that never materialized and he felt strongly about getting a commitment for a start/complete date for this project. Mr. Hancock stated the people proposing to develop this project were anxious to get started as soon as possible, i.e., meeting all requirements to obtain a Building Permit. Unfortunately, financing for a project of this size takes time and giving a specific time table of construction would be difficult at this time. Mr. Johnson questioned what assurance did the Council have that the amenities, such as the gymnasium, would not be less than desired? Mr. Hanoook stated he supposed Council could go to the extent of making something like that a condition of the approval, although he had never seen design to that degree be a condition of approval. Requirements are set out so that the developer can develop the minimum of those requirements and if they were not adequate, then maybe Council should consider a change to increase. the level of requirement. If Council desires to change the Zoning Ordinance to require larger buffers, then that action should take place. However, if there is a Zoning Ordinance that requires minimums, then when those minimums are met they should be accepted. Mr. Johnson stated he believed this project would change the character of the neighborhood and also understood the need for additional housing in the area. Mr. Waibel questioned the validity of the statement in the Staff Report that states "Riddell Road is in fair condition". TAPE #894 City Council Reg. Mtg. Minutes February 27, 1991 Page 21 of 2~ From his personal experience driving that route each day, he was not of the same opinion. He expressed concern for the residents in that area needing some assurance that the roads affected would be upgraded, sidewalks would be installed, transit and school bus pull outs would be provided, if the rezone was approved. Mr. Hough stated they were still in the SEPA process and this concern was one of the three items that still needed to be addressed with further study documentation. He noted that details within the Staff Report on street conditions was provided by the Engineering Department. Effort is also being made to work with the County on upgrading Riddell Road as a part of their new construction projects in that same area, as well as a portion of Almira Drive. Mr. Waibel questioned how could the City get the project off the ground and still get the guarantees to the neighborhood that they will have a very good development in that area. He stressed Bremerton needs more housing and must increase the density and are in favor of good development. Mr. Hough stressed that the City had no guarantees and did not have design review as to quality other than what meets the minimum requirements in the uniformBuilding Code. Mr. Waibel pointed out SHB2929 talks about impact fees and questioned when would TAPE #894 the City have the requirement for impact fees? Mr. Pratt stated SHB2929 did authorize the Cities to have impact fees after going through a public process and identifying what the cost of current level of service is and what the cost of roads andy degradation of that service by new development. It was the decision of the City, other cities in Kitsap County and Kitsap County, to employ a consultant, who would recommend an impact fee formula. Until the City had adopted and gone through the process adopting an impact fee formula, it would not be legal for the City to try and extract impact fees from a developer. Secondly, when the legislature authorized cities to use impact fees, they specifically told cities to stop using the SEPA Check List to extract impact fees from people. What they are saying is "get on with cities" and do it the right way and don't do it on a case-by-case basis by trying to take fees from developers on the SEPA Check List. There are a number of cities, however, that continue to do that and he personally would not recommend such action and would advise Council against that. However, if that schedule is in place, and it is entirely possible to have it in place before the Building Permit would be applied for, this developer would be liable for any impact fees that were adopted. He would recommend collecting impact fees at the point the Building Permit was taken out and a payment schedule set up for receiving such funds. Mr. Waibel stated he personally wanted more of a guarantee and if the applicant were to agree with some conditions rather than have them imposed, movement could TAPE #894 City Council Reg. Mtg. Minutes February 27, 1991 Page 22 of 29 be made over the transition period. Mr. Pratt stated if the applicant willingly volunteers to participate in something like that, it would be different than the City establishing a criteria. There is currently a payment or revenue production method in place to fix the roads and the City may be finding it inadequate in the General Fund and Street Funds, but that was why the legislature said you can't go to specialty items because there currently is a process in place to pay for roads. Mr. Johnson pointed out the applicant already stated he would pay the SHB2929 impact fees in his opening statement to Council. Mr. Waibel questioned how could the Council make sure it was in place? Mr. Hancock stated in his opening remarks he did say this development would pay its share of impact fees that were in place at the time that it was developed. Mr. Johnson noted, from his notes, that Mr. Hancock stated that the developer would be subject to those impact fees discussed in SHB2929. Mr. Hancock stated that was correct, but he did say those that were in place. He was not saying that impact fees were something that could not be dealt with and dealt with prior to the submittal for the Building Permit. He did not believe it was appropriate to try and negotiate those fees at this time, but he offered to enter into discussions with the School District to see what kind of impact fees that they felt were necessary and see if they are manageable. Mr. Johnson noted he had concern of impacts on the Parks Department and Fire Department. Mr. Overson noted that area had other ills brought on by years of neglect or abuse and this one developer was not going to be able to do away with allthose problems. Mr. Horning noted Mr. Hancock's reputation did proceed him and he was considered to be a good developer. In his opinion, one of the biggest problems to be addressed at this time was the roads and felt the developer could make a positive impact on the neighborhood by improving the roads and putting in sidewalks. He strongly suggested that the developer commit to improving the roads and if he volunteered to do so there would be a more favorable response from the Council. He also understood that people do not always welcome change, however, if the Council did not take the initiative for higher densities, the State, through SHB2929, will step in and dictate density limits. Mr. Hancock stated he certainly recognized that especially Riddell Road was in dire need of attention and he anticipated and offered that they would make improvements to the portion of Riddell Road adjacent to the subject property, bringing it up to standards commensurate with current and projected traffic in that area. If that means rewidening, resurfacing, sidewalks, etc., that would be totally reasonable. He also anticipated that they would probably be putting sidewalks all along Almira Drive as well. TAPE #894 City Council Reg. Mtg. Minutes February 27, 1991 Page 23 of 29 That was not suggested as a condition, but it could be one. Those types of things are to be expected and he wanted to look back on this project and point to it with pride. Mr. Hornin~ suggested concluding this hearing in 2-3 weeks, and request that something be brought back that would help determine conditions. Mr. Pratt suggested there were other ways to accomplish this, such as if the rezone was approved conditioned with a PUD or some other kind of site plan review there would be conditions built into that design that will be brought to light. He could not condone the use of impact fees without having gone through the legal process. Mr. Hornin~ stated he did not want to force the developer to go back through a PUD process and extend the proposal for years. It would not help the City's reputation in the development community and State, action needed to be taken to get on with the project. He did feel that a site plan review would be acceptable to Council. Mr. Pratt stated the way to implement that would be to approve the rezone conditioned on a site plan review and indicating what conditions would be included in that review and authorizing the Planning Director to approve the site plan on the basis of those conditions. Mr. Homing stressed the need for the issue to come back before the Council for final approval. Mr. Pratt explained there was a site plan process in place, a PUD Ordinance. Mr. Homing did not feel this was fair to the developer. He pointed out the Planning Commission recommended a density of 15 units per acre and felt that something in that range would be acceptable, but if it were pared down and expensive conditions placed on it, it would probably not be built. Mr. Colvln stated he did not believed high density was synonymous with quality of life. He questioned if the 15 units per acre density was acceptable to the developer? Mr. Hancook stated 15 unites per acre would not be economically feasible and the project would probably not be built. Mr. Dawkins discussed the merits of developing a project of 140 single family homes on the subject site, which would not provide the amenities that a multi-family complex would provide. Mr. Johnson stated coming into this hearing and based on the information provided he felt favorable to the project, but also felt there would be some assurances to urban design criteria. However, what he is finding is that all Council is getting is a "trust me" and he did not feel he could support that. President Hotton noted if Council got final site plan review, not an administrative site plan review, then she felt TAPE #894 City Council Reg. Mtg. Minutes February 27, 1991 Page 24 of 29 this Council would be willing to approve the rezone. Mr. Johnson stated he was not looking to rule on what color the project would be painted but rather with roads, sidewalks, layout of facilities, trees, etc. Mr. Hancock noted that there had been some discussion on delays, some of them being self-imposed and some due to uncontrollable elements; and delays can be very costly. Before getting into the public hearing process, they were in a period of time with the seller where they had the time to determined if the project was preliminarily feasible. Once the project went into the public hearing process, the "free" time disappeared and now it costs the developer about $30,000 per month for every month this transaction did not close. It would be their desire to channel those dollars toward design rather than delays. Therefore, they are looking for approval of the rezone so they can get on with the project. As a potential solution, rather than suggest that the site plan review happen at the final stage, which could cost between $150-400,000, he suggested that the site plan review be done at the preliminary stage. This could be done at substantially less cost and provide an opportunity for additional input from the Council to be incorporated into a final construction design. He would also like to be empowered to have some input on how this project is developed during that review process. Mr. Homing stated he believed this Council was not prepared to approve the MF zone unless they had site plan review and he agreed it needed to be preliminary and if a vote was to be taken to support that position, then the developer needed to set out what should be brought back at the site plan review. The issues, as he saw them, are: streets and sidewalks are a must, concerns about transit access and turn outs, open space and setbacks. Mr. Johnson stated he wanted to see access onto streets, play grounds and recreation facilities on site, besides setbacks the type of buffering, lighting and how it would be arranged, trash facilities and how it would be structured into the design, school children facilities (walk areas) as well as transit. Mr. Collins stated he was concerned that the public have the opportunity for input. Mr. Horning assured Mr. Collins that the public would have an opportunity to give input during the preliminary site plan review. Mr. Colvin stated once the higher density was approved, the developer could sell the site to the highest bidder. President Hotton pointed out to Mr. Colvin that there would be a preliminary site review plan approved by Council and would be held as a public hearing. She encouraged the developer to work with the neighborhoods and get their input as to what they would like to see included. Mr. Collins expressed concern that Council was authorizing the full maximum number of units per acre. He felt Mr. Hancock could tie the City up in court for some time TAPE #894 City Council Reg. Mtg. Minutes February 27, 1991 Page 25 of 29 and felt Council needed to stipulate what density would be allowed. Mr. Hornin~ stated it was his intent to grant the MF zoning, granting the higher density. He felt Council should be more concerned with the quality. Mr. Colvin questioned if Council should ignore the Planning Commission's recommendation? Mr. Homing stated Council comprised nine people too. If Council wants something good to happen in the City, then we, the Council, needs to take that control . Mr. Pratt reviewed a list of items listed under "Conceptual Review Plan (under the PUD Section of the Zoning Ordinance), and questioned if the items they wished to include as conditions was contained in that listing? Mr. Horning stated he did not feel he was going as far as the conditions just reviewed by Mr. Pratt. Mr. Pratt stated if Council had that kind of design control, they controlled the density without specifically stating a number. Mr. Homing agreed with Mr. Pratt on that point. #0838 M/S/C(Horning/Dawkins) to approve the MF zoning with the following conditions: Council had a preliminary site plan review at a public hearing and the items to be addressed specifically, although not exclusively as other items may be addressed, would be: transit access and turnouts, streets and sidewalks, open space, setbacks and types of vegetation included in those setbacks, basic lighting, concern for trash facilities, and access onto neighboring streets. Mr. Colvin stated he could not support the motion due to the residents having concerns that were not addressed at this time. President Hotton reassured Mr. Colvin that Council could withhold approving the rezone if.those concerns are not considered or met by the developer. Mr. Overson voiced concerned that Council had just rewritten the PUD process to fit immediate needs. Therefore, this developer is being told if he satisfies Council's whims at this point, maybe Council will grant approval...but don't rely on the process because that process is subject to change. This would then be the message sent out to future developers as well. Mr. Homing emphasized if Council did not take the initiative there would not be a development and the State would ultimately come in and make decisions granting even higher density requirements. Mr. Waibel noted the City was in a transition period and steps needs to be taken to get from the old SEPA Check List to the Impact Fee Plan and he felt this was the way to accomplish that. President Hotton noted Council would be looking to update the City's Comprehensive TAPE #894 City CounciI Reg. Mtg. Minutes February 27, 1991 Page 26 of 29 Plan in the near future and this would be a way to handle the transition period. Mr. Collins questioned if he was correct in understanding that a PUD process would take more time, but that it was available for a project such as this? Mr. Pratt stated yes, the process was in place and it would demand a longer process seeking approval. Mr. Johnson questioned if Council reviewed the preliminary site plan what would be needed to make that plan binding? Ian Sievers, City Attorney, stated the more detailed building permit would need to conformwith the preliminary plan on file with the Building Department. Mr. Johnson noted after moving forward through the rezone process, including the Planning staff, Planning Commission and Council, the developer made an ultimatum "MF zoning or nothing". Mr. Colvin questioned if Council approved the maximum zoning on this parcel, could they require him to not sell the property? Mr. Sievers stated no, whatever was required, either an MF zone or MF PUD process for secondary approval, that would be the zoning and it goes with the land and anyone who purchases the property would have to comply with that zoning designation. Vote: In Favor: Johnson, Horning, Horton, Waibel, Dawkins Opposed: Estes, Overson, Collins, Colvin 6A - AUTHORIZATION TO PROCEED AND GRANT FISCAL APPROVAL TO COMMIT FIRE BOND MONIES TO PURCHASE OR CALL FOR BIDS, #AB91- 041 Approval by Council by motions to expend Fire Bond money on the following projects and, if approved, to then approve an interlocal Governmental Purchasing Agreement or authorize a Call for Bid. Mick McKinley, Deputy Fire Chief, identified the following items to be purchased directly through Interlocal Governmental Purchasing Agreements and/or bid process: (1)(2) purchase PBI/Kevlar firefighting bunker pants and coats through an Interlocal Governmental Purchasing Agreement with the City of Sea-Tac; (3) call for bid for ladders, hose and equipment; (4) tO develop specifications and authorize the call for bids TAPE #894 City Council Reg. Mtg. Minutes February 27, 1991 Page 27 of 2~ on Fire Station #1 remodel; (5) to purchase Opti-Com vehicle emitters and traffic signalization equipment; ((6) Note: Action delayed on Agreement between City of Bremerton and Kitsap Transit for use of Opti-Com in City); (7)(8) purchase three fire engines through an Interlocal Agreement with the City of Enumclaw; (9) call for bids for refurbishment of ladder truck and related equipment. Public comment - none. #1423 M/S/C/U(Colvin/Dawkins) to approve all items enumerated and duly recorded by the Secretary be approved, including items 1 through 9 except item #6. 6C - RISK MANAGEMENT POSITION SALARY, #AB91-043 The job description of the Risk Manager has been re-written to more accurately reflect the job requirements. Salary ranges or similar jobs were used to set the proposed salary of $37,215. As described more thoroughly in the background statement the position requirements have changed considerably since first instituted in the early 80's. Kathleen McCluskey, City Clerk, stated this item did go before the Council Fiscal And Budget Committee and received their favorable support to have it heard by full Council. And, when this position was originally stated it was 1/2 time and a claims processor function. At that time, the City had full coverage insurance. In recent years, that position changed dramatically and moved from a claims processor to a full Risk Management Program, without being upgraded to reflect that level of responsibility. The Risk Manager job description was rewritten in 1986 during the James Study, however, the position had continued to evolve since that time. Mayor Louis Mentor urged the Council to support this proposal. Public comment - none. Mr. Overson reported Fiscal And Budget Committee did review this issue and noted it. did not include a range for this position, but in fact a single salary change. Mr. Johnson noted his support of this proposal and agreed with #1570 #1661 TAPE #894 City Council Reg.' Mtg. Minutes February 27, 1991 Page 28 of 29 Ms. Marshall's comment, on the Agenda Bill, that the range adjustment would be made at the time all management and professional classifications were placed in Salary Bands as a group. And, that it not be treated as any type of bench mark position. M/S/C/U(Overson/Colvin) to approve the annual salary of $37,215 for the Risk Manager. 7B - RESOLUTION #2337, TREATNENT OF THE CITY'S UNION RIVER SURFACE WATER SUPPLY, #AB91-046 The Utility, in response to a request of the Washington State Department Of Health, is required to state its intention with regard to a treatment and monitoring program associated with its Union River Surface Water supply. Attached for Council approval is a Resolution setting forth a City policy with regard to a program for compliance with the Federal Safe Drinking Water Act Surface Water Treatment Rule. Bill Dully, Utilities Director, noted that regulations on the City's drinking water had changed and approximately 1/2 of City water comes from the Union River. Because of those changes, the City was at a point where decisions needed to be made as to how that water would be treated or filtered in the future. Public comment - none. Mr. Johnson noted this Resolution states the City's intention to do whatever is necessary to continue using the Union River as a source of high quality water without having to build a multi-million dollar treatment plant. M/S/C/U(Waibel/Horning) to pass Resolution #2337, setting forth a City policy for treatment of the City's Union River surface water supply. 6D - PROFESSIONAL SERVICES CONTRACT WITH PARAHETRIX, INC., TO PROVIDE ENGINEERING SERVICES FOR IMPROVEMENTS TO MCKENNA FALLS INTAKE FACILITIES, #AB91-044 The Utility, pursuant to the Surface Water Treatment Rule of the Federal Safe Drinking Water Act, has a requirement to upgrade its surface water intake facilities at McKenna Falls. These facilities currently consist of two earthen settlement basins, screening and chlorine facilities and a limited instrumentation and control system. The Utility contemplates replacement of the basin with a concrete structure which will #1753 TAPE #894 City Council Reg. Mtg. Minutes February 27, 1991 Page 29 of provide for the separation of the water sources, expansion of the chlorine facilities to provide for redundancy and emergency back-up facilities and revision of the intake structure to provide for increased flow and improvement hydraulics. Attached for Council's consideration is a professional services contract with Parametrix, Inc., for providing engineering services for improvements to the Utility's McKenna Falls Facilities. The estimated cost for this service is approximately $50,000.00. Bill Dully, Utilities Director, stated now that the decision was made to not filter, improvements need to be made to allow the City to remain that way. This would include grading the basins as well as putting in some redundant chlorination equipment and monitoring/control equipment. Public comment - none M/S/C/U(Johnson/Dawkins) to approve Professional Services Contract with Parametrix, Inc., to provide engineering services for improvements to the Utility's McKenna Falls Intake Facilities and authorize the Mayor to execute the same, subject to the City Administrative Policies and Procedures. With no further business meeting adjourned at 9:54 p.m. KATHLEEN L. McCLUSKEY, City Clerk L~~ORTON, Council President City of Bremerton KLM/LH/me cc: Normal Distribution File/Vault