Loading...
HomeMy WebLinkAbout05/06/92TAPE #1020 UNAPPROVED DRAFT CITY COUNCIL MEETING MINUTES #0030 #0046 MAY 6, 1992 The regular meeting of the City Council of the City of Bremerton was called to order in the City Council Chambers, 239 4TH Street, Bremerton, Washington, Wednesday, May 6, 1992, at 5:30 p.m., with Council President Lynn Horton presiding. Council members present: Lon Overson, Richard Neville, Eileen Fitz, Hank Waibel, Morrie Dawkins, Russ Johnson, A1 Colvin and C.R. "Tiny" Collins. Also present were City Attorney Ian Sievers and Kathleen L. McCluskey, City Clerk. The meeting opened with the Pledge of Allegiance led by Council President Horton and Invocation given by Chaplain Ken Morita of Jackson Park. President Hotton announced following this meeting Council will be adjourning to a continued Study Session to discuss a portion of the overwater park mitigation. CONSENT AGENDA A. Minutes Of Meeting - April 15, 1992 #AB92-121 M/S/C/U(Waibel/Fitz) to approve Consent Agenda as presented. CLAIMS/WARRANT REGISTERS Vouchers audited and certified by the auditing officer as required by RCW 42.24,080, and those expense reimbursement claims certified as required by RCW 42.24.090, have been recorded on a listing that had been made available to the council. M/S/C/U(Colvin/Dawkins) on May 6, 1992, the Council does approve for payment those vouchers included and further described as follows: 149104 through 149259 in the total amount of $214,826.98; and Regular Payroll for the period ending April 30, 1992, in the amount of $587,224.33 COUNCIL MEMBER REPORTS Mr. Colvin reported he was invited to a meeting held Saturday by Council Councilman Ron Simms and several other Seattle civic leaders. At that meeting he met the former Governor of New Mexico and the topic of discussion was the recent riots in Los Angeles. The conclusion from that meeting was "two wrongs don't make a right" - they felt the verdict was wrong as was the looting wrong. Personally, he felt everyone needed to get involved in helping to improve relations within our communities. He believes too much emphasis is given on things TAPE #1020 UNAPPROVED DRAFT that "divide" and not enough emphasis on things that unit us as Americans. He received a call from one of his constituents saying that some of the rioters and looters were taking the stolen merchandize back to the owners. He verified that fact by calling his sister-in-law in the Los Angeles area. One of the reasons they were returning the merchandise was because of their Block Watch Program. He noted there is a group of Ministers in the Bremerton area who are doing something about improving relations in Bremerton. He invited Council President Horton to attend the next scheduled meeting of this Ministerial group. Mr. Dawkins reported on Thursday evening he attended Bremerton Main Street's meeting at the Roxie Theater. He was pleased with recent renovation efforts of that facility. Mr. Overson complimented the City's Police Department and Shore Patrol for standing ready to respond to any riotous type activity over the weekend. He emphasized the Block Watch Program is an excellent program and his wife works closely with it in their neighborhood. Mr. Waibel reported the Bremerton Sunday Farmer's Market opened on May 3 and is currently locating on 4th Street. He also visited the newly renovated Roxie Theater and was pleased with the project and applauded private industry for doing such a good job. President Hotton reported on Sunday she attended the Armed Forces Pageant Tea, which was held at the Shipyard Commander's residence. She noted there are some very lovely young women vying for the title this year and felt it would be a difficult choice for the judges. The Armed Forces Pageant will be held May 11. PUBLIC RECOGNITION MaYor Louis Mentor read the following Proclamation: 1. May 9, 1992, as United States Professional Association's Across America Tennis Day. Tennis Mayor Mentor reported on some of his activities this past week: Change of Command USS Sacramento Roxie Theater Cafe Party Going Away Party For City Employee Shirley Van Hoover, who was employed with the City for 16 years. Rally - sponsored by the Emmanuel Apostolic Church Coronation Of Miss Maria Clara Harrison Hospital Charity Ball Armed Forces Pageant Tea 40 - Years Recognition Celebration for Reverend Bill Wambsgamss, of Westside Baptist Church Funeral - Phyllis Kahn TAPE #1020 City Council Reg. Mtg. Minutes May 6, 1992 Page 3 of 17 Mayor Mentor commended the Police Department and their cooperation with other law enforcement agencies in the County in putting on a good presence in the City over the weekend in response to the general unrest that resulted from the happenings in Los Angeles. He complimented Bremerton Schools for their sensitivity in handling several "hot spots" as a result of the riots in Los Angeles. Betsy Harris, Animal Control Officer, presented the "Pet Of The Week" - "Amber", a five year old spayed female dog, who was available for adoption. Debbie Goodell, Animal Control Supervisor, announced May 3 - 9, 1992, is BE KIND TO ANIMALSWEEK. A Canine Competition and Games will be held May 17, at the Farmers Market 12:00 (noon). As part of this event there will be a "barking contest" and a "howling contest" for the people. Pet licenses for the City and County will be available at that time. Bremerton Animal Control hopes to have some type of activity planned at least once a month at the Farmers Market. On June 14, a Low Cost Pet Vaccination Clinic (4:00 - 5:30 P.M.) is scheduled. John Phillips, concerned citizen, stated he had been dealing with kids, rental property and displaced people all of his life. He brought with him a child, who has Downs Syndrome, who is being evicted, along with his mother, from a rental complex in Bremerton because of the fact she cannot find ample places for child care/activities. Mr. Phillips volunteered to help care for this young child and asked management of their apartment complex if this family would be allowed to stay as a result of his involvement - their response was NO. He expressed concern that there are several apartment complexes in Bremerton, with out-of-town owners, who continually raise rents and make it very difficult for people to remain in those complexes due to the high cost. He questioned why will some rental owners rent to "Section 8" recipients and other not? He hoped he could get some kind of input at a later date so that he would know how to help people like the family he brought with him. Kevin Bowling, Air Force Recruiter for Kitsap Peninsula, presented a Certificate Of Appreciation to the City Clerk, Kathleen McCluskey, for the use of the Cable Access TV "Character Generator" in placing recruiting announcements on Channel 29. As a result of posting a notice on Channel 29 that they are continuing to recruit, they have received several responses. Glenn Jarstad, 2823 Hefner, related community action and TAPE #1020 City Council Reg. Mtg. Minutes May 6, 1992 Page 4 of 17 involvement during a time of "racial unrest" in 1964, when he was Mayor of Bremerton, involved the City and a group of black ministers. They worked out a process whereby whenever someone from the black community was arrested one of the ministers would be called and asked to witness the "booking" procedure. This help dispel some of the problems that were being experienced. He hoped the City's current elected officials would take the time to visit their area churches and seek out their help in making our community a better place to live. He commended the Council for their courage on their recent vote on the boardwalk. He was disappointed that there was not a unanimous vote after having worked through the process of understanding what was needed to get the job done. He was not pleased to read in a news article that some Council members supported the idea that the County Sheriff's department provide police services in Bremerton. For years it has been known that the Bremerton Police Department has been the strong law enforcement agency in the County - they are today. He emphasized Counties are not given the same funding resource as cities. He pays the same amount of money to the County's Sheriff's department from his home and rentals in Bremerton as he does for his property located in County areas. He has raised the question why doesn't the County assign the amount of officers to areas according to the amount of taxes being paid. He requested the City set up a study session to discuss the possibility of the State coming forth with a Bond Levy to fund acquiring properties surrounding Olympic College, and give Roosevelt Field back to the City. He could not see voting his properties in the City of Bremerton for acreage on Bainbridge Island or South Kitsap. He had other suggestions of open space projects. He questioned what are we going to do to unite the people of Bremerton? 6A - CONTRACT FOR 0VERWATER PARK HABITAT IMPACT STUDY, #AB92- 117 The City of Bremerton is nearing completion of an overwater park along the downtown waterfront between First Street and the moorage of the Turner Joy. The City is required to mitigate habitat impacted by this project under its U.S. Army Corps of Engineers Permit. The first contract to be awarded to complete mitigation will include study of physical and biological characteristics of habitat impacted and recommend various approaches to mitigation. TAPE #1020 City Council Reg. Mtg. Minutes May 6, 1992 Page 5 of 17 Ian Sievers, City Attorney, requested the following wording to Item #3 COMPENSATION: "Consultant shall bill for its services on a time and materials basis at the rates set forth in the Estimate Of Professional Services, included in Exhibit "A" not to exceed $68.863.72 including tax". Dave Baker, City Engineer, stated requests for proposals were sent out to four local area firms and two of those firms responded. The proposal were reviewed by a Committee of five and a decision was made to recommend that FishPro Inc., be awarded this contract for the mitigation process. FishPro is experienced in this type of work as well as experience in the early stages of the Boardwalk permitting process. Mr. Johnson stated Fiscal and Budget Committee reviewed this proposal and their concern was the City still did not know what it is that is to be mitigated so the objective and target of the study is a little hazy. Hopefully, the baseline information to be collected will help define what the actual mitigation will be. The contractor appeared to have proper credentials. The Committee felt the consult should be looking to provide other alternatives in the report, including such things as the waterfront development when it originally started with the first phase as the separation of storm and sanitary sewers and elimination of pump stations that had major overflow problems in that area. That effort improved the water quality and contributed to clean up of Sinclair Inlet. Also, the City's work on Lions Field beach and the separation of sewers in the Park Avenue area will directly affect the quality of Sinclair Inlet. The Committee also felt the report should include some information of similar projects done in other areas of Puget Sound which could be applicable in Bremerton. In regard to funding, the Fiscal and Budget Committee recommends no additional funds be appropriated to the project until the funding is stabilized and it is known what kind of dollars are needed, which may make a difference as to what they might recommend. There should be sufficient cash within the project to actually pay the bills when they come in. Mr. Johnson pointed out the following statement in the agreement: "As an alternative to the City's Scope Of Work, we have proposed the preferred alternative of forgoing environmental data collection this year and are proceeding direction into design development at the Evergreen Park Site. Our approach would be based on desiqn criteria ..... ". He questioned how did we get to the preferred Evergreen Park site when the proposed study was a Epibenthic baseline study? He could not recall that Council had voted that Evergreen Park was the preferred alternative. He also raised the question about things growing better under a pier than along the TAPE #1020 City Council Reg. Mtg. Minutes May 6, 1992 Page 6 of 17 shoreline? Wayne Wright, Environmental Manger of FishPro, Inc., stated when their firmreceived the request for proposal they had only a couple of days to put the proposal together. The project they were previously involved in was developing a Mitigation Plan for the overwater park with the Planning Department. They successfully negotiated a mitigation approach and plan without any drawings except for some engineering sketches on the back of a matchbook and the City was granted all permits for the project. That was a rare occurrence and was predicated on the fact that the City was a municipality and the promises were made that certain things would be accomplished within a certain time frame. After that point, the Evergreen Park proposal came and new request for proposals were sent out - their firm was unsuccessful in receiving that award and their involvement stopped. His firm was not familiar with what had happened since, but when they received the recent request for proposals they called several agencies they had worked with before, National Fisheries Service, USEPA and Department Of Fisheries. All three agencies were still very interested in seeing what was originally proposed at Evergreen Park. It dovetailed with other data they were using in developing their proposal for baseline Epibenthic information. Such baseline information is suppose to be collected in March/April/May not May/June. As stated in their proposal, given the contracting, negotiations and the fact that the agencies have to approve whatever sampling plan is developed, it is doubtful the City would get a very good baseline set this year. The question arose at FishPro that maybe there will be a way to save the City time and money - that would involve going back to the original plan at Evergreen Park and getting into some design development and getting the agencies back onto the same road map as previously identified, which was let's get this mitigation taken care of by a shoreline that is already in dire need of work and dovetail two good projects. All three agencies he talked with, when setting up his proposal, agreed it would be a good approach. FishPro can develop design criteria from other projects. That approach was a little different than what was requested. His preferred alternative approach, in his personal judgement without knowledge of what had already happened, was to set an open end contract with the City and work directly with the agencies on task order basis and jump right into design at Evergreen Park. Next year, after construction of the Evergreen Park project, they would pick a reference site, which would be similar to the overwater park or could even be the overwater park behind the area that will be moved off shore 60 feet, and monitor both the mitigation and a reference site at the same time and compare the two numbers. Because of the riprap beach, there is a good TAPE #1020 City Council Reg. Mtg. Minutes May 6, 1992 Page 7 of 17 possibility that the numbers could come out in the City's favor. If it does not, then negotiations have to occur and some other adjustment may need to be made. Mr. Wright noted there is a Corps of Engineers submittal date of August. To do baseline collection, they would not have the data analyzed until the end of July and to write the kind of report and develop some kind of conceptual design that is required by the August deadline would be difficult. In light of all the information he had quickly assimilated, it was recommended that perhaps Evergreen Park be considered again. Mr. Johnson emphasized he would not vote for an "open ended" contract of any kind for this project. He expressed concern that he thought the proposal was for a baseline study to find cost effective alternatives and not take on doing some type of fantastic project at the park that may or may not keep the Corps happy. The Corps will not commit to what it is they want to mitigate. President Hortonquestioned if she was correct that the City cannot assume the data will be complete enough for the Army Corps of Engineers to say we are on the right track at that point? Mr. Wright stated that was possible. There is very solid criteria developed by USEPA for doing these kinds of studies, which specifies spring months. It is similar to a plankton bloom - the bugs grow in big burst and come mid-May late June then decrease and go to a very basic level and do not provide a good estimate of the total productivity. Information can be collected in May/June and as it states in the proposal, under the alternative that responses to your specific request, that would be your new baseline. They would tie whatever you do with wherever it is done to that baseline of May/June. There is a high level of variability year-to- year and it is likely there will be several years where the City may not meet baseline requirements simply because of the type of baseline started with. In some years you may be way over and other way behind...and such variance can be based on temperature, solar illumination, rain fall, and all things that influence the aquatic environment of Puget Sound. Generally, baseline studies are set up in March and every two weeks in March/April/May data is collected for the whole growing season. This would give a much better average estimate of productivity. Studies done in later months are more challenging and that was one of the reasons the dive survey was included. Mr. Johnson noted the objective was to get the permits from the Corps of Engineers and keep them happy. Mr. Wright stated the Corps will not issue a permit until the City has something on paper that details what will be done and where it will be done. Consideration must be TAPE #1020 City Council Reg. Mtg. Minutes May 6, 1992 Page 8 of 17 given as to the time it takes to develop that detail. In order to clarify some points, Mr. Wright noted the whole goal of the proposal was to determine what is the most cost effective and quickest way to get the overwater park project back on track and totally permitted by the Federal government. He felt there were several ways to do that, but it starts with a solid agency meeting to discuss how to get the mitigation done properly. He has a technical approach that includes everything that was requested and is ready for submittal as is. Mr. Johnson stated he was trying to separate the Evergreen Park project, which is a desirable project, however he did not want to break Bremerton's "bank" as a result. Mr. Wright felt that could be achieved. President Hotton questioned since we are missing the "window" of the growing season and the study is done with 4-6 weeks worth of data, what if the Corps comes back and states this is insufficient data, where does that leave us? Mr. Baker stated that was the reason the City needed to meet with the Corps and other agencies to find out what they will and will not accept. Mr. Collins stated he thought that had already been done. Mr. Baker stated the agencies had never said what they will accept, except for the process, which is what is getting started at this point - hiring a consultant to find the least expensive mitigation for the City. Mr. Slevers stated if the agencies find this data survey insufficient because of the time of year, the City certainly won't be held at fault like we were last time because the Corps has agreed to a schedule and they knew the time of year when they couldn't have expected the City to get an expert and start studying any sooner than we have. If they are convinced by their agencies that they need more sampling next year, he guessed they would be faced with modifying the permit again. Mr. Johnson added and "sending us the bill again". Mr. Sievers stated that was a good point too, maybe the agency is bound by the 120 days that fall from whenever the Permit was reissued and what data could be collected during that window would be what mitigation was based upon. Mr. Colvin questioned if the Corps Of Engineers had given the City specific date deadlines? Mr. Baker stated yes, in the newly issued Corps permit there are some dates at which time the City needs to be have information gathered and submit an application for permitting of the mitigation; and then there is a certain time period after that the mitigation has to be completed. Mr. Waibel pointed out next to the covered overwater park area is a similar uncovered tideland having a similar shoreline and slope. He believed some kind of comparison between those two areas could establish, veryquickly, whether or not the covered area had been adversely affected. He TAPE #1020 City Council Reg. Mtg. Minutes May 6, 1992 Page 9 of 17 questioned what would happen if it was found that the area covered had a greater productivity than the uncovered area? Mr. Wright stated it was a safe bet that Epibentic production will be "zero" under the boardwalk in the total shaded area. Epibentic needs sunlight to grow. In their original thoughts, prior to preparing the proposal, they did want to study the shaded area and unshaded areas - it would require a doubling of sampling effort to get a set under the shaded area and comparing it directly to the sunlight portion. In all likelihood there would be no production, or very little, under the boardwalk shaded area and a reasonable~ amount of production along the riprap shoreline outside of the beach. The agencies will hold the illuminated area as the baseline because that was what the area looked like prior to being covered by the boardwalk. Rather than sampling under the boardwalk to collect the baseline and do the substraction method, which is very reasonable to do, they cut their sampling effort in half and focus on only the illuminated portion as the baseline. That was why the Epibentic work was only on the illuminated zone - saving money and time. The Dive Survey is included in order to look at the macroalgeas because there will be some of that growing with the reduced illumination. There is a good growth of kelp along the riprap. Mr. Walbel questioned what made Mr. Wright think the agencies would not require the above described comparison? Mr. Wright stated the agencies would probably let the City do it but would not "make" you do it because it did not make any sense scientifically as far as setting the baseline. The baseline is what is being produced on that beach right now that will have to be made up somewhere else. Mr. Waibel stated with the movement of the sun there may be areas getting sunlight under the boardwalk and possibly the City would only have to make up half of the productivity lost. Mr. Wriqht stated they could make such a study, however, they took a different approach to save time and money in setting a baseline and assumed there would be close to "zero" productivity under the shaded areas. President Hotton noted since that area is one of the more contaminated areas around, she questioned what was the possibility that the baseline is virtually nile because of all the contamination? Mr. Wriqht stated he had already done a sediment sampling in an area close to First Avenue and the sampling came back fairly clean with only a few hints of metals. It was not as bad as the Sinclair Inlet Study that was conducted further off shore on the other side where the ferry comes in and out. Even in the most polluted areas Epibentics can grow and flourish quite well. TAPE #1020 City Council Reg. Mtg. Minutes May 6, 1992 Page 10 of 17 Mrs. Fits questioned if this contract was approved, how soon could Mr. Wright meet with the agencies involved? Mr. Wright stated he would call the next day and set up a meeting as soon as those agencies could come together. Fish Pro has all their equipment available and ready to start tomorrow. Mr. Johnsonquestioned if there was any type of "plant/animal" life under the dock near the Wheelhouse Restaurant? Mr. Wright stated the Epibentic productivity would be very low or close to zero. Mr. Johnson questioned if that wasn't something similar to what the City should be doing? Mr. Wright stated what the agencies want is the production of salmon food. The reason Epibentic productivity is so important is the tiny bugs the baby salmon eat. Overwater structures, piers, and pilings that cast shadows reduce that productivity. Right now the agencies are requiring that be compensated for in mitigation. It is his understanding that the Corps of Engineers has asked the City identify the baseline productivity at the impacted zone and to mitigate for that loss somewhere else. The amount of area and the amount of productivity to mitigate is still open for negotiation. Mr. Johnson stated the Corps had never committed to the City that was what they wanted. Mr. Wright stated from the original negotiations the Corps committed to the Evergreen Park mitigation concept, completely. They signed off on it 100% and expected it to go to design and construction and completed by March 1992. There was no mitigation monitoring but rather monitoring later on and not tied to a baseline productivity. That was agreed to and signed off by all the agencies and that was what he was requested to do by the City at the time of his earlier involvement. President Hortonquestioned just because the City did not meet their schedule are we now being penalized? Mr. Wright stated that was what he understood. Mr. Johnson questioned if Mr. Wright had the above mentioned information in writing? Mr. Wright stated the City had a Corps permit issued to start the overwater park, which stated specifically when the mitigation was to be completed. President Hotton stated Council had the understanding that the City never exactly knew what it was suppose to be doing. Mr. Wright stated he had an extensive file on this project. At the time they left the negations in October 1991, that was the plan. He had never heard of another project having that kind of consideration given to it without a design mitigation beach and all the studies done up front. In his opinion, by not meeting the schedule originally set, now the City is getting the exact "by-the-book" approach, which is establish the baseline, develop the design, negotiate everything and monitor it for 7-10 years to insure the City is meeting mitigation requirements. Mr. Waibel questioned if the City had come up TAPE #1020 City Council Reg. Mtg. Minutes May 6, 1992 Page 11 of 17 with a design that said we'll pick up all the cement that was dumped and throw some gravel down that might have done it? Mr. Wright stated the Corps "bought off" on a concept that had fairly detailed sketch associated with it and the way it would look once the parking lot was dug out. President Hotton noted that concept was originally between $160 - 200,000. Mr. Wright stated not by FishPro's estimate. Mr. Colvim questioned if FishPro had given an estimate? Mr. Wright stated after their engineers visited the site, they came up with a rough estimate that was much lower than what President Horton quoted. That was what predicated his "preferred" opinion. He gave an example of a project for the Port Of Seattle..."Lunch Table" - Epibentic beach by terminal 106 - designed for $8,000 (1200 feet long and 30 feet wide) and cost $30,000 to construct. They were planning a more holistic habitat at Evergreen Park, with structures, boulders, digging out the cove, etc. How much that included and how wide it was to be was yet to be designed and negotiated as they went through the process. Mr. Waibel questioned if Mr. Wright felt that design would meet mitigation resulting from the baseline survey? Mr. Wright stated after a few discussions he had with technical individuals that are driving the mitigation, he believes there is a strong possibility the City could forego all baseline work saving $68,000 and spend that same money in design, obtain a better construction estimate, obtain agency approval and do the monitoring later at a much better scientific approach and meet all mandated schedules. President Hotton stated if the termination clause in the contract was modified to reflect the meeting that will occur with the agencies and if it appears, at that point, what we need to do is different baseline studies she would like to more forward as quickly as possible. She wanted to forego the 30-day written notice termination clause and be able to move quickly if the Corps agrees that mitigation can be done at a lesser cost. Mr. Colllns suggested using a very short Professional Services contract with Mr. Wright to find out what the City must do. Mr. Sievers stated he did not want to shorten the termination date but felt the same result could be achieved by requiring that after the completion of the task, as listed under Estimate Of Probable Cost, the Project Manager must give approval to move on to the next task. The first two tasks would be Project Orientation - to allow a meeting between FishPro and the City and Agency meetings. If the City gets a result or different conclusion, he would not have approval to move forward on any other task and that would be the end of the contract. Mr. Oversonquestioned if Mr. Wright could then come back to Council after that meeting and discuss #3056 TAPE #1020 City Council Reg. Mtg. Minutes May 6, 1992 Page 12 of 17 with Council the results of the meeting with the agencies? Mr. Sievers stated he was sure Mr. Baker would take that as a directive before he gave the OK for tasks beyond Task #2. Mr. Waibel questioned the length of monitoring in the new permit? Mr. Sievers stated the City has an obligation to provide planned monitoring and monitoring. Mr. Waibel questioned what will we monitor against? Mr. Sievers stated we would monitor the success of the mitigation project after construction, and on the original baseline studies. The City provided a cost figure for monitoring for five years. Mr. Waibel stated then the permit is based on getting the baseline information whether we can do without it or not. Mr. Sievers stated he did not believe they would abandon monitoring. Mr. Johnson emphasized the result of the meeting with the agencies should be reported directly to the City Council and Council gives the "go" or "no go" or what alternative is selected. Mr. Wright stated there are several things to keep in mind (1) cost - in the technical approach there is a statement whereby the cost may be adjusted based on final determination of mitigation requirements. What is presented at this time for a technical approach is the best guess he could do without promising anything on behalf of the City but what could be approve tomorrow. He felt the cost was high with respect to that particular procedure. His goal would be to not show them any of that information or cost, but take it in a piece at a time and negotiate it down so that the City would not have to do any unnecessary studies. With respect to doing any out-of- sequence task, that would be easy to follow due to their being flexible within their contract language. Public comment - none. M/S/C/U(Waibel/Colvin) to approve the proposed contract modifying current task #4 to task #2, moving 2 and 3 down to become 3 and 4 and before the next task is done the City Council would be apprised of the need for it and have a chance at that point to advise further tasks if necessary. Mr. Johnson questioned if it was intended that the new task #3 would not be started or any funds expended against it until the City Council gave its approval. Mr. Walbel stated that was correct. Mr. Baker stated the first two task are on an hourly basis of time used. Motion carried unanimously. TAPE #1020 City Council Reg. Mtg. Minutes May 6, 1992 Page 13 of 17 6B - REQUEST TO FILL VACANT POSITIONS - ADMINISTRATIVE SERVICES/CITY CLERK~S DIVISION, #AB92-122 Due to recent resignation of the Office Assistant Senior in the Purchasing Division and Office Assistant I in Business Tax and Licenses, I have the need to fill both positions. The OAI position primarily handles the public counter and PSNS license campaigns. These campaigns resulted in 300 new businesses over the past year equating to over $80,000 in tax revenue. The position needs to be filled with a full time OAI. The OA Sr. position primarily assists the Purchasing Agent. In light of budget concerns, I am requesting that we replace the OA Sr. position with an OAI permanent part-time (20 hours per week). This will save $7,882 in 1992 and $18,842 in 1993. The effect of this reduction will be that the Purchasing Agent and other clerical staff will assume various duties previously performed by the OA St. The part-time position will provide coverage for breaks, lunch and vacation (hours 10:00 - 2:00) and will continue to process purchase orders and perform other clerical functions as assigned. The resignation of these employees provided me with the opportunity to institute budget cuts without affecting existing employees. There is an existing OAI Civil Service register available from which to hire. The City Clerk's Department can not function effectively below this staffing level. Kathleen McCluskev, City Clerk, noted Council Fiscal and Budget Committee recommended approval of this proposal. Public comment - none. #3029 M/S/C/U(Fitz/Johnson) to approve hire of one full time Office Assistant I and one .5 Office Assistant I. TAPE #1021 6C - L.I.D. PETITION ALLEY FROM 11TH STREET TO 13TH STREET BETWEEN RAINIER AVENUE AND BLOOMINGTON AVENUE, #AB92-123 The attached L.I.D. petition was received from residents in -0 the area of the alley from llth Street to 13th Street between Rainier Avenue and Bloomington Avenue on April 24, 1992. The preparation of a preliminary assessment role requires a significant amount of Engineering work. It is City policy to determine Council interest in the L.I.D. prior to directing Engineering Department to expend time on preliminary assessment. If Council chooses to proceed, a hearing will be set by resolution at a later date, notice will be sent to all affected property owners and the hearing will commence on the preliminary role at that time. 0028 TAPE #1021 City Council Reg. Mtg. Minutes May 6, 1992 Page 14 of 17 Public comment - none. Mr. Overson questioned the cost per individual? President Horton explained Council would be setting into motion the process to determine such costs. M/S/C/U(Collins/Dawkins) motion to direct the City Engineer to prepare PreliminaryAssessment Role for the alley from llth Street to 13th Street between Rainier Avenue and Bloomington Avenue L.I.D. 7A - ORDINANCE NO. 4359 (SECOND READING) VACATION OF MARINE DRIVE OFF-RAMP, #AB92-024 On October 31, 1991, the City of Bremerton received a petition for the vacation of the Marine Drive Off-Ramp. The proposed vacation area is 9,432 square feet of the Kitsap Way and Marine Drive intersection. The proposed vacation is requested in order to facilitate a trade of real estate which is essential in redssigning the intersection for improved public safety. The City Planning Commission has held a hearing and has recommended the Council approve this request. The City ordinances require the legislative body to determine if there is a public need to retain the right-of-way; if the public interest will be served by the requested right-of-way vacation; and protection of utility easements. Kathleen McCluskey, City Clerk, stated first reading of this Ordinance took place on January 29, 1992. President Hotton reported Council did discuss the intersection of Marine Drive and Kitsap Way at a Study Session on May 4. Although this vacation and second reading of the Ordinance does not impact the construction of that intersection, Council did ask staff to come back with cost estimates of some of the features of the intersection and to meet with some of the pertinent property owners/businesses/residents and work on the design and then to come back to Council once all of that was done. Mr. Overson stated there had been concern among constituents that as a result of this action Arnold's Furniture is "getting a good deal". He questioned if it was a fair swap of property? President Horton stated no, the RCW states that for vacated property the purchaser can acquire that vacated property at half of the regular assessed value. By vacating the street and then doing the swap, the City essentially receives half of what it would get if the RCW was not in TAPE #1021 City Council Reg. Mtg. Minutes May 6, 1992 Page 15 of 17 effect. Terrie Hartson, Municipal Services Coordinator, stated the appraisals showed that the City property being traded is worth more than what the City is receiving, but since Mr. Erickson owns property on both sides of the street, the RCW deems he is allowed to purchase that property from the City at half the market value. The City is getting a $30,000 better deal than if it was just an even trade. The reason the City's property being traded is so much more valuable than that being received is the fact it will increase Mr. Erickson's entire piece of property. The City is not entitled to the full market value. Mr. Waibel stated the City is entitled to swap land at whatever best way it can. Mr. Erickson is not required to pay the full amount, but the City is not required to vacate that land either. Mr. Colvin requested the City Attorney comment on Mr. Waibel's last comment. Ian 8ievers, City Attorney, stated there is some variability and not always one half the value if the property was acquired through eminent domain. He could not recall how the sweeping portion was originally acquired, however, his recollection was that when the Annexation Agreement was made with Arnold's the dollar values were fairly close and there were some other considerations, certainly part of the consideration was the agreement for annexation. He would have to go back and look at the acquisition record in order to say whether it should be one half or 100%. Mr. Overson noted the City was giving 18,000 sq. ft., and receiving 6,500 sq. ft. Mr. Waibel noted Mr. Erickson was increasing the value of his parcel and the City was receiving land for an intersection...that did not sound like "half" to him. Ms. Hartson stated the trade of properties was included in the Annexation Agreement, which Council approved on October 10, 1991. Mr. Johnson noted it seemed to him that you could call it an investment of $12,000 for an incredible amount of B&O Tax on commercial property over the next few years and seemed reasonable to him. He expressed concerns that during Council's Study Session individuals brought up information about a dispute over property lines along properties across the street from Arnold's. He questioned if the City was absolutely sure that the legal descriptions included in this proposal were correct? Mr. Sievers stated yes, this legal description defines pieces from the center island the City needs regardless. Technically, if the surveys on the opposite side of Marine Drive are messed up in some way that the City requires more right-of-way, then the City would have to go back and negotiate additional purchase or condemnation of more property from the island. He did not feel that the survey in #0507 TAPE #1021 City Council Reg. Mtg. Minutes May 6, 1992 Page 16 of 17 question on the opposite side of Marine Drive would adversely affect this proposal, if in deed it proved to be different than what the City currently shows. President Herton stated it was not the legal description that was in question, it was where the streets were marked by the City. Mr. Co111ns questioned if this land should be given up right now considering the concerns expressed by the property and business owners over the proposed design of the intersection; or should it be given after the final design is approved? Mr. Colvin pointed out that the discussion at this time should only address vacating the off-ramp. Mr. Johnson also pointed out an Annexation contract had been negotiated and approved by the City agreeing to vacate the off-ramp. Mr. Collins expressed concern over the possibility that the City may needed 5-6 additional feet in the island area. President Horton questioned the assessed valuation of both pieces of property. Ms. Hartson stated she did not have that information with her. In reference to the possible boundary dispute, she did not think it was going to be a big issue and the City felt confident they had marked it correctly after given it further review. The parking spaces in front of the R&H Market are in City right-of-way and the owners of that property did agree to give it back to the City when it was needed. Wanda Mosbarger, Valley Drive, reiterated her concern over the closure of Sundown Drive, making Lower Marine Drive the only access to and from the valley. Additional development of that area has been approved and she was concerned that something needed to be done about the condition of Lower Marine Drive in order for it to take on added traffic impacts. President Hotton stated Council did request staff to bring back to them the Six-year TranSportation Plan so that Lower Marine Drive could be included on it. M/S/C(Johnson/Colvin) to pass Ordinance No. 4359 on second reading, vacating a portion of Marine Drive at the intersection of Marine Drive and Kitsap Way. Vote: In Favor: Opposed: Overson, Neville, Fitz, Waibel, Horton Dawkins, Colvin, Johnson Collins Motion carried. TAPE #1021 City Council Reg. Mtg. Minutes May 6, 1992 Page 17 of 17 With no further business meeting adjourned at 7:32 p.m. ~~~T~LEENLqN~~.Mc~City Clerk L~RTO~,~cil President City of Bremerton KLM/LH/me cc: Normal Distribution File/Vault