Loading...
HomeMy WebLinkAbout06/17/92TAPE #1033 UNAPPROVED DRAFT JLIL ,i, CITY COUNCIL MEETING MINUTES #0041 #0061 JUNE 17 1992 The regular meeting of the City Council of the City of Bremerton was called to order in the City Council Chambers, 239 4TH Street, Bremerton, Washington, Wednesday, June 17, 1992, at 5:30 p.m., with Council President Lynn Horton presiding. Council members present: Lon Overson, Richard Neville, Eileen Fitz Hank Waibel, C. R. "Tiny"Collins. Councilmen Morrie Dawkins, A1 Colvin and Russ Johnson were absent. Also present were City Attorney Ian Sievers and City Clerk, Kathleen L. McCluskey. The meeting opened with the Pledge of Allegiance led by Council President Horton and Invocation given by Reverend John Eichmann of the Bremerton Servicemen's Center. President Horton announce Item 6A - Amendment To Portico Contract was pulled off Agenda for one week CONSENT AGENDA A. Bid Award Recommendation - Janitorial Services Awarded to American Building Maintenance Company In The Amount Of $5,925.00 Plus Tax Per Month, #AB92-154 Bid Award Recommendation - WWTP Solids Dewatering System Installation - Awarded To Pease Construction In The Amount Of $215,793.00 Plus Tax M/S/C/U(Waibel/Fitz) to approve Consent Agend~ as presented. CLAIMS/WARRANT REGISTERS Vouchers audited and certified by the auditing officer as required by RCW 42.24,080, and those expense reimbursement claims certified as required by RCW 42.24.090, have been recorded on a listing that had been made available to the council. M/S/C/U(Waibel/Overson) on June 17, 1992, Council does approve for payment those vouchers included and further described as follows: 151506, 151562 through 151742 in the total amount of $496,575.30. COUNCIL MEMBER REPORTS Mr. Overson reported his mother, who is visiting from Florida, would be viewing the City Council meeting via cable access channel. He was pleased to note the recent demolition of TAPE #1033 City Council Reg. Mtg. Minutes June 17, 1992 Page 2 of 11 several buildings at the corner of Chester and BuNell. He anticipated the possibility of a parking lot and tri-plex being built on those sites. He announced Council will hold a "Goals & Objective" Retreat on Monday and Tuesday, 6:00 - 9:00 P.M., at the Senior Center on Nipsic Avenue. This meeting is open to the public and he encouraged constituents to contact their Councilman and let them know what goals and objectives they would like addressed relative to the future of the city. Mrs. Fit= reported last weekend she had the opportunity to visit the Overwater Park along with many citizens who were touring the park and viewing the statuary and Ship propeller. Mr. Waibel stated he also spent some time over the weekend at the Overwater Park and Farmer's Market. He hoped the Farmer's Market could be moved to the boardwalk area soon in order to take advantage of the larger crowds. As chairman of the CenCom Board, he received a complaint from a constituent, who listens to scanners regularly. Apparently, one of the dispatches last week was to dispatch Medic 1 to a lady who had a "headache". He did not believe that type of complaint would qualify as an emergency situation, however, the City would be charged as if it was an emergency situation. He requested President Horton to look into that particular incident and if it did happen, to correct the situation so it does not become a common event. Mrs. Hotton stated in reference to CenCom call costs, she expects Council will be reviewing CenCom costs very soon and she would investigate Mr. Waibel's concern. She announced a Parks Department event - a Bizarre Bazaar on Saturday, June 20, 11:00 AM -3:00 PM, at the Sheridan Parks and Recreation Center. This event is a teenager street fair where all youth will have products or services to sell. Mrs. Horton viewed this type of event as a very positive way to channel youth activity and she urged everyone to support their efforts. PUBLIC RECOGNITION - None 6B - INTERLOCAL AGREEMENT FOR WASTEWATER TREATMENT SERVICES BETWEEN KITSAP COIrMTY 8EWER DISTRICT #lAND CITY OF BREMERTON, #AB92-156 The contract between the City of Bremerton and Kitsap County Sewer District #1 expired on September 30, 1986. The original contract provided for treatment of the District's wastewater by the City at its Charleston Beach Wastewater Treatment Plant. TAPE #1033 City Council Reg. Mtg. Minutes June 17, 1992 Page 3 of 11 The District has indicated their preference for a new wholesale contract which provides for the treatment of the District's wastewater and allocation of a portion of the capacity of the City's Wastewater Treatment Plant for use by the District. The agreement between the City and Kitsap County Sewer District #1 allocates 0.40 MGD of the Treatment Plant capacity for use by the District and establishes a service rate for the treatment of the District's wastewater. The agreement additionally provides a clarification of responsibilities between the City of Bremerton and the District with respect to collection, conveyance, treatment and disposal of the District's wastewater. Rich Hanna, City Treasurer, stated he and the City Attorney would addressed this issue in the absence of Bill Duffy, Utilities Director. The subject contract is an attempt on the part of the City and Sewer District to clarify issues of ownership of assets in this area, accurately define service areas involved by the respective jurisdictions/responsibility for different elements of wastewater service and to formalize an allocation of Wastewater Treatment Plant capacity among the respective service areas. A question was raised relating to identifying the service area, which is as follows: Sewer District No. i is the unincorporated island commonly known as Navy Yard City east of the freeway. The unincorporated area west of the freeway is defined as part of the City's service area. Mr. Waibel expressed concern over the lopsided termination clause favoring the Sewer District and questioned the reason behind it? Ian Sievers, City Attorney, stated the reason being the Sewer District actually has a property interest in the City's wastewater treatment plant. The wastewater treatment plant was funded partially with a capital contribution from the Sewer District. It would be very difficult for the City to terminate services absolutely and this contract sets up a fair formula for allocating their share of the capital costs and operation/maintenance costs, billing them at a wholesale rate. Mr. Waibel noted then the City would be committed to this contract for 10 years unless Sewer District #1 built a treatment plant and decided not to continue using City facilities. Mr. Sievers stated that was correct or if the County picked up their sewage and took it elsewhere. Mr. Waibel stressed that even if the City's treatment plant was at capacity, such service to that District would have to continue. Mr. 8ievers stated yes. Mr. Waibel raised the question if the City Charter would be violated if TAPE ~1033 City Council Reg. Mtg. Minutes June 17, 1992 Page 4 of 11 the following statement was left in the contract: Secton 2, last sentence..."Nothing stated herein shall prevent renewal or extension of this agreement beyond 10 years upon approval and agreement of both parties"? He felt this would violate the City charter considering the fact the City has other documents that require not having a contract over a 10 year period. He questioned the purpose of that statement? Mr- slevers stated he agreed that statement was superfluous and he was not sure why it was included. Previously, Mr. Waibel interpreted a section in the Charter to mean having to go to a new contractor once a 10 year period had expired. Mr. Sievers interprets the Charter to mean that you simply cannot have an agreement that extends beyond 10 years. If a new agreement is renegotiated, it can be with the same person. He was not sure if, in this case, the intent of making such a statement was interpretation of the Charter. Mr Waibel stated he wanted to have the ability in 10 years to terminate service, if applicable. He was not part of the negotiations on this point, however, he supported eliminating that statement from the contract. He questioned if he understood correctly that the City installed a $121,000 meter? Mr. 8ievers stated yes, flow meters were installed for this District. Mr. Waibel questioned if the flow meters were installed only because there is a District boundary line that the City is trying to monitor or is there some other City function reason for having them? Mr. Hanna stated to his understanding the reason for those master meters is to switch to a wholesale billing to the District itself rather than to individual customers. President Hotton pointed out that was a precursor to the proposed contract. Mr. Waibel questioned who paid for the meters and their installation? Mr. Hanna stated the City. Mr. Waibel expressed concern that in eight months the City will only recoup the cost of the meters. Therefore, initially the Utility would not be receiving any payment for the operation. Mr. Hanna stated all of the City's investment in the capital assets that are allowing fulfillment of requirements of this contract have varying lives but are significantly longer than that time period. There was a very long and involved cost accounting process used in determining the numbers in the contract. Mr. Walbel stated in terms of the $121,000 capitalization that the City was required to do in order to make this contract work, he felt both the City and Sewer District should have contributed to that cost rather than the City assuming the entire cost. He questioned if the contract was correct indicting the meters would be operating only one day per month? Mr. Hanna stated no, the meter will be read once per month but the metering is done continuously. Mr. Waibel questioned why doesn't the City use a full month rather than a daily rate? Mr. Overson questioned what could TAPE #1033 City Council Reg. Mtg. Minutes June 17, 1992 Page 5 of 11 a daily rate be based on? ME. Hanna stated he was not prepared to answer that question. In general terms, what was looked for with the daily flows was to minimize the affect of peak loadings on the City's system as a result of the District's flows. That was the reason for looking at a shorter time frame than the full month. Mr. Waibel stated he did not see how taking a full month and dividing it by 30 or 31 shows the peak rates. Mr. Hanna stated initially it will not. Mr. Overson pointed out the contract states the City will periodically test the strength of the sewage. Mr. Sievers stated there are penalty formulas built in for both excessive strength and for excessive volume over the estimated initial volume. Mr. Waibel pointed out that would be on a monthly average, but did not address the peaks, which he assumed was the reason for obtaining the daily rate. Since the meters can be read every day, he questioned why weren't they read every day? Mr. Hanna stated as he recalled, that was part of the process of negotiation... they were looking for a longer period to average out the flows. There are two issues to figure in: (1) plant capacity necessary to address peak flows; (2) by taking a longer average the City is getting a better measure of the District's actually utilization of plant capacity. In that way, when there are demand spikes coming from the flows generated by the District, they would not be triggering the penalty clause unless they are happening over a protracted period of time. As a practical matter, all of the flows coming from the District that ultimately end up in the treatment plant pass through District owned and operated, at the conclusion of this contract, pump stations which are the limit on the instantaneous flows that can be delivered to the treatment plant. Severe demand spikes of short duration resulting in combined sewer overflows do not result in spikes on the loading of the treatment plan simply because the pump stations are unable to delivery those kinds of qualities to the plant. The short and sharp spikes in demand flows are not of great concern. What is looked at here, is over a longer period of time where the District flows, whether because of customer demand or something in the system, are generating baseline flows that consistently exceed the .4MGD that was allocated to them. Mr. Waibel stated he had the feeling the "monthly" was too long to worry about a spike. Mr. Hanna stated he was aware that representatives of the District and Mr. Duffy engaged in a long series of negotiations and felt this was a reasonable compromise. Mr. Waibel stated the City was short sighted on the termination clause, peak clause and in terms of the fact that the City does not get paid for the excess for the first two years of the contract. He felt in most instances the City was TAPE #1033 City Council Reg. Mtg. Minutes June 17, 1992 Page 6 of 11 coming out on the "short end" on this contract. President Hotton stated the contract talks about sewage strengths and if the District's sewage strength exceeds "domestic sewage strength" the City reserves the right to reopen this contract on the issue of whether there should be a surcharge for excess sewage strength. She felt, environmentally, if they exceed the domestic sewage strength, the City should be concerned with more than just a financial recoupment, i.e. how do we get the problem under control environmentally to make sure the City's permits are not adversely affected. Mr. Sievers stated there is a policy addressing that issue with Puget Sound Naval Shipyard and when the City was accepting leachate from the landfill. President Hotton stated she wanted something included in the contract other than just saying "maybe we'll look into charging the District more". Definitive steps need to be taken to find out where the problem originates and fix it rather than just allow it to happen and then the City breech permit status with the State or Federal government. Mr. Sievers suggested having an enforcement or policing authority to go into the District to find the source and bill them for cost of location to address that point. President Hotton emphasized and to take swift and effective remedy to get the situation under control. Mr. Hanna stated there may be some level of misunderstanding - the supposition is reasonable, because of the residential nature of Sewer District #1's service area, that there are low strength flows in the wastewater based primarily on residential with a small amount of commercial. The supposition is it would not be likely that this clause would come to bear. In the event that it does, through the process of sampling, the City would discover, for whatever reason, if the strength of the flow exceeds what is acceptable as residential flow. It is not necessarily indicative that the flows being generated by the Sewer District are any way driving the City out of compliance for operation of the treatment plant and or destructing the biological processes. It simply means that the loadings are greater than what was expected and the City reserves the right to go back and increase the billing because it places more biological demand on our plant. From the direction of the early discussion, he was getting the feeling Council had concern that toxic wastes or nasty type things would be doing something horrible to the treatment plant. That would be very unlikely even if the strengths were exceeding normal residential strengths. It would more of a case that there is a larger commercial component to the service area than previously supposed. President Hotton stated she was not making a supposition of where it maybe coming from, but it could be residential areas TAPE #1033 City Council Reg. Mtg. Minutes June 17, 1992 Page 7 of 11 where people dumped paint, oil, etc., down into the sewer and the City would be responsible for taking care of it as it came through the treatment plant. Mr. Overson noted this proposal is for a long term contract and no one knows what might be coming into that service area. We, as the City, cannot control what happens in that District area. Mr. Hanna pointed out the City would have more assurance of being able to look into concerns expressed by President Horton through a formal contract between the City and the Sewer District. Should something show up through the sampling process, then it is the responsibility of the District, as the operator of that collection system, to find and remedy that sort of situation. In the absence of a contract, which has been the case for a long period of time, those responsibilities are not nearly as well defined as what is hoped to accomplish with this contract. Mr. Waibel stated another thing this contract would do is allow time to try and look at those particular peak occurrences and determine how they can be remedied without having to use the legal process of termination. Mr. Hanna again referenced the paragraph on the top of Page 12 of the contract that reserves the City's rights to reopen negotiations. President Hotton pointed out that paragraph only addresses whether or not there should be a surcharge for excess sewage strength. It did not address "fixing" those situations and she supported having something including in the contract addressing that point. Mr. Hanna stated it was his understanding that the District has responsibilities as a Municipal entity and operator of a sewer system, which includes monitoring sewage strength under State law and aggressively looking for illegal discharges and activities of that nature. Mr. Sievers stated the District does have planning and maintenance obligations. He was not sure if they had their own NPDS permit or if they were relying on the City's. Mr. Waibel stated it may be the District's requirement to only get rid of it safely and that would be to the City. Mr. Waibel questioned the percentage of the City's capacity as impacted by the .4 mgd per day? He was concerned about that capacity possibly being the difference between the City having to expand the treatment plant capacity. Mr. Hanna stated the Sewer District was similar to the Navy in context in that they participated financially in the construction of the treatment plant and the level of their participation was that same ratio. The Sewer District and Navy have also paid through the rates since the initial construction of the plant. Mr. Waibel questioned if the District doubles their usage through demand on their system, is the City receiving enough funds to capitalize? Mr. Hanna stated yes. Mr. Waibel TAPE #1033 City Council Reg. Mtg. Minutes June 17, 1992 Page 8 of 11 questioned if the following statement would stop annexation: "City agrees not to extend service to any resident within the District's service area .... "? And, if any of those areas are annexed into the City would residents still be serviced by the District? Mr. Sievers stated it was definitely possible to have another District providing utility services within the City. The current state of the District's boundaries have been an impediment to the Cityts annexation efforts because there have been co-mingled mains. That issue is clarified by the proposed agreement. Mr. Walbel stated he would like to see more paralleling of utility boundaries with municipality boundariest and he believed this proposal made it harder than easier. Mr. Overson pointed out Section 10 - Regulatory Compliance, answered concerns regarding testing, etc. President Hotton questioned what happens if the District reneges on their agreement? Mr. Sievers stated it wouldn't lead to a material breech that would cause the City to discontinue service to the District. More likely, the City would seek a remedy for specific performance of that provision and cause a disconnect and a City provided sewer to that residence. The City would enforce that provision and not let the District provide services within City boundaries. Mr. Collins noted Sewer District #1 has had management problems for years. He questioned if the contract was assignable if someone else took over management of that District? Mr. Waibel pointed out the contract does state the City has the right to look at that but would probably not interfere with it. President Horton stated she believed if something happened to Sewer District #1, Kitsap County would take it over. Mr. Sievers stated it is contemplated that Kitsap County would take over management of the district some time in the future. President Horton noted the County becomes a "safety net" under all of these Districts. Mr. Sievers stated in response to Mr. Collins' question, the City does anticipate agreeing to that type of assignment by signing the proposed agreement. Mr. Hanna stated he believed it was Mr. Duffy's, Mr. Sievers' and his opinion that the provisions of this contract are not a situation where City staff is lying down or going out of its way to be overly accommodating of another district. It is felt the proposed contract is a favorable contract and the collective provisions will serve the City very well. Mr. Collins questioned what did the City receive? Mr. Hanna stated the City would have a clearer definition of the responsibilities of the Sewer District, which was not the case in the past. President Hotton stated she believed this agreement should be discussed in a Study Session of the full Council. She has TAPE #1033 City Council Reg. Mtg. Minutes June 17, 1992 Page 9 of 11 additional questions as they relate to Growth Management and wonders how this agreement fits into that "puzzle". Mr. Overson stated the Operations Committee did review some of the concerns on this proposal, however, they did not have the benefit of extensive study or other Council members points of view. He also has additional questions but senses Mr. Duffy has a sense of urgency to move this item forward. President Hotton stated no one had apprised her of any urgency of this document. She did not feel comfortable rushing this item through at this point. Mr. Waibel stated he agreed with Mr. Hanna in that the proposed contract is much better than what the City has experience over the last six years. What he is seeing through this document is the District cleaning up its act and doing what it was suppose to do with the City picking up all the costs and tieing into those costs for a 10-year period. Mr. Overson stated his biggest concern is with Section 11 (b). #1455 M/S/C/U(Collins/Waibel) to table this item until it can be brought before Council at a Study session. 7A - ORDINANCE (FIRST READING) AMENDING THE OFFICIAL ZONING MAP OF THE CITY OF BREMERTON {MITCHELL REZONE) #AB92-157 Following its public hearing on June 3, 1992, the City Council approved a rezone to add the "Limited Parking Overlay (LPO)" zone to two vacant lots immediately north of Olympic Plaza near the intersection of Seventh Street and Rainier Avenue. The necessary ordinance has been prepared, with conditions, for the City Council's consideration. The findings of fact and conclusions on which this decision was based are incorporated in the ordinance as Exhibit "C". Ron Hough, Planning Manager, noted prior to the Council meeting he had provided documentation showing the correct proposal for 10 parking spaces in place of the previous material provided depicting 18 parking places. He noted there are four conditions attached to the Ordinance: (A) The approved parking lot is to be developed to the minimum standards for Class "A" parking lots, as specified in Chapter VII of the Bremerton Zoning Ordinance. (B) A solid view-obstructing wood or masonry fence or wall at least five feet in height (adjusted to meet front setback requirement) be installed to separate the parking lot from the remainder of the vacant residential lot to the north. TAPE #1033 City Council Reg. Mtg. Minutes June 17, 1992 Page 10 of 11 (C) The applicant is encouraged to modify the parking space configuration illustrated in Exhibit "A" to achieve a more functional design within Lots 14 and 15 and eliminate the ingress or egress through the alley. (D) This accessory parking lots is to provide for off-street parking needs of lots 16 through 20, of Voltens AK First Addition, Section 14, Township 24, Range 1 East Block 001, and shall be used only for that purpose; provided, however, there is no requirement that this parking lot continue indefinitely and the owners of lots 14 and 15 retain all development options available in the underlying "Duplex Residential (DR)" zone for possible future residential development. Mr. Overson noted previously a concern was voiced about the alleyway and questioned if it would be designated "one-way"? Mr. Hough stated no, the City Engineering Department and Planning Commission reviewed the alley and determined there was a dangerous situation where it meets 6Th Street. Making the alleyway one-way going north was not desired because of the number of residents to the north and adversely impacting those properties. What is proposed by the applicant is to close off the alley access from the proposed area and use only the Rainier Avenue access. Mr. Waibel pointed out the conditions stipulate the applicant will provide a design that will eliminate the need for an access to the alley. President Hotton suggesting modifying Condition (C) to reflect that the alley access from the propose site would be eliminated. Debbie Franklin stated the property owners support the ordinance as presented. She questioned if wording should be included in the ordinance limiting the number of parking spaces to not more than 12 spaces to meeting zoning requirements? President Hotton explained the action taken by Council did not link the parking on lots 14 and 15 with required parking for the Olympic Plaza building. Mr. Waibel questioned if the Class "A" parking space size allowed placement of 12 spaces on the subject site? Mr. Hough stated the parking lot shown in the site plan attached to the ordinance is based on City standards of 8 1/2 ft. wide and 18 ft. deep. It may be possible to squeeze in one or two more spaces, but that would not allow keeping all the spaces along the north size of the building. #1809 M/S/C/U(Overson/Waibel) to approve Ordinance, on first reading, amending the Official Zoning Map of the City of Bremerton for property located southwest of the intersection of Rainier Avenue and Seventh Street (Mitchell Rezone), TAPE #1033 City Council Reg. Mtg. Minutes June 17, 1992 Page 11 of 11 including the change to Condition (C). Mr. Waibel stated this process did focus attention on the Limited Parking Overlays and felt Council has a clearer understanding of how they can be used in the future. With no further business meeting adjourned at 6:32 p.m. ~' ~ President LY~~HORTON, Council City of Bremerton KLM/LH/me cc: Normal Distribution File/Vault