HomeMy WebLinkAbout07/08/92CITY COUNCIL MEETING MINUTES
JUL
JULY 8, 1992
The regular meeting of the City Council of the City of
Bremerton was called to order in the City Council Chambers,
239 4TH Street, Bremerton, Washington, Wednesday, July 8,
1992, at 5:30 p.m., with Council President Lynn Horton
presiding. Council members present: Lon Overson, Hank Waibel,
Morrie Dawkins, Russ Johnson, and C.R. "Tiny" Collins.
Council members A1 Colvin, Eileen Fitz and Richard Neville
were absent. Also present were City Attorney Ian Sievers and
Acting City Clerk Rich Hanna.
The meeting opened with the Pledge of Allegiance led by
Council President Horton and Invocation given by Councilman
Russ Johnson.
CONSENT AGENUA - NONE
#0023
CLAIMS/WARRANT REGISTER8
Vouchers audited and certified by the auditing officer as
required by RCW 42.24.080, and those expense reimbursement
claims certified as required by RCW 42.24.090, have been
recorded on a listing that had been made available to the
council.
M/S/C/U(Waibel/Dawkins) on July 8, 1992, the Council does
approve for payment those vouchers included and further
described as follows: 153128 through 153217 in the total
amount of $268,730.88; and Regular Payroll for the period
ending June 30, 1992 in the total amount of $603,000.41.
COUNCIL MEMBER REPORTS
Mr. Overson reported he spent the 4th of July in eastern
Washington and he believed that section of the State could
also meet the "most liveable City" criteria. He was pleased
with the cooling wet weather over the 4th, which was
appropriate weather for the dangerous conditions. His
neighborhood experienced lots of noise from fireworks being
discharged about 1:30 AM July 5th and a quick call to 911
brought City Police, who quickly resolved the problem. He
complimented the City's police for following the Ordinance as
written and doing a good job of enforcement.
Mr. Waibel reported he spent July 4th in Medford, Oregon and
experienced rainy weather there as well.
Mr. Johnson viewed this year's fireworks restrictions as an
TAPE #1037
City Council Reg. Mtg. Minutes
July 8, 1992
Page 2 of 16
improvement, however, he did have burning debris from
discharged fireworks falling on his home and yard.
Fortunately, he did not have any damage to his home and he was
able to resolve the situation without assistance from the
police. He was emphatic that there needed to be stronger
controls over fireworks that pose a treat to homes when
discharged.
Mr. Dawkins stated he believed everyone noticed a difference,
for the better, of less fireworks being discharged. Possibly,
the grand old 4th celebration with fireworks will be scaled
down and restricted to professional displays. He noted this
would probably hurt some organizations, but there are other
ways of raising money.
Mr. Collins pointed out people can change .... in years past
people thought they had to have candles on their Christmas
tree, however, today there are very few people who still
follow that practice. He thanked the TCI Cable Access group
for their dedication to televising City Council meetings and
other community programs and events. He also thanked them for
the fun picnic they sponsored on Tuesday, July 7.
Mrs. Horton echoed Mr. Collin's sentiments about the Cable
Access Program and believed this program was good due to a lot
of effort by a number of volunteers. Statistics reveal
because of the volunteer effort on public access, the City has
in excess of $15,000 donated in camera and programming time.
She believed this community owed all Cable Access Program
volunteers a debt of "thanks". She also attended and enjoyed
the picnic. Mr. Johnson noted at the last minute he had to
miss the picnic, however, he extended a special thanks to the
Cable Access crew and TCI for sponsoring that event. He urged
people to tune into TCI Channel 29 or Olympic Cablevision
Channel 39 and view some of the programming - they are
bringing new productions to the viewers. Mrs. Horton thanked
the residents of Bremerton for doing their part in adhering to
the Fireworks Ordinance.
Mayor Mentor reported he also enjoyed the Cable Access Crew's
picnic. That same evening he planned to attend the Concert In
The Park at Evergreen Park, however, due to the cooler weather
it had been canceled. Approximately 30 people were not aware
the concert had been canceled as well as a tuba player who
came from Bellingham. In spite of the cancellation, the tuba
player gave an impromptu concert for the people who had
already shownup at the park. The Mayor reminded everyone of
the Concert On The Dock scheduled for Thursday, July 9, 6:00 -
7:00 P.M. A small version of the Farmer's Market will also
TAPE #1037
City Council Reg. Mtg. Minutes
July 8, 1992
Page 3 of 16
be set up along with that event and open for business from
4:00 -8:00 P.M. Over the weekend he attended the Sinclair
Baptist Church sponsored "Community Reunion". Up coming
event:
July 10, 1:00 - 3:00 PM, at the Westhills Elementary School -
Bike Rodeo, sponsored by the Bremerton Police Department.
The Mayor was also very glad to see the rain come in and cool
down the fire danger over the 4th of July weekend.
PUBLIC RECOGNITION
Bob Sauter, member of VFW Post 3694, stated he is spearheading
a campaign to get a Navy ship named after the late Captain Don
Ross, Medal Of Honor recipient. He requested City Council's
participation in his endeavor and encouraged them to write to
their Legislators in Washington, D.C., urging them to support
such a proposal. He reported on a recent field trip of 40
students from Naval Avenue School students to Ivy Green
Cemetery. He provided Council with a group of letters written
by the students expressing their thoughts and opinion of the
cemetery and the individuals it represented.
Richard Chrtsinger, outgoing Commander VFW Post 3694, reported
his Post has done exceptionally well recycling products as a
fund raising effort. However, there are pranksters in the
community who are abusing the system either by dropping their
cat litter, garbage, etc., into the recycling containers.
Recently, someone set fire a newspaper container belonging to
Bremerton Central Lions Club. This morning he checked one of
his collection containers and found evidence of someone
attempting to set it on fire. He emphasized the recycling
paper containers are for the public use, not abuse.
Walt Connelly, Phinney Bay Place, representing the E. Phinney
Bay Place Citizens' Coalition, handed out pictures depicting
problems that have existed for ten years, through three
administrations of the Mayor and many different changes on the
City Council. They are concerned over the City's easement on
26th Street that has a storm sewer line running through it to
the bay. Eight years ago this sewer line ruptured and has
resulted in washing out dirt and anything in its way. He has
repeatedly requested the City respond with some kind of
corrective action, however, to no avail. Over ten years, it
has not only washed out the City's bulkhead at the bottom of
26th Street but has started to wash out bulkheads on both
sides of the easement. He personally does not have property
affected, but people who are affected are senior citizens
whose property values continue to climbwhile they have no use
of their waterfront due to this bulkhead erosion. The
bulkheads are now sitting at an angle of 45-60 degrees out to
TAPE #1037
City Council Reg. Mtg. Minutes
July 8, 1992
Page 4 of 16
the bay and are unusable. His intent at this time is to put
on the record that there is a problem and the residents cannot
get a response from the City Engineers, Risk Manager, etc.
There was a City crew out in August of 1991 to correct the
problem. At that time they dug out the hole that measured 12
ft. by 12 ft. by 8 ft. deep...filled it and placed barriers
around it. The photos handed out showed that the barrier has
fallen down. He has two small children who play on that
easement and he is concerned that someone will fall into one
of the holes or behind one of the bulkheads and become trapped
when the tide comes in. He requested that someone in the City
take on the responsibility of correcting this situation. Just
prior to this meeting, he was informed the bulkhead at the end
of 25th Street had also collapsed due to a storm sewer line.
President Hotton requested the City Attorney respond to Mr.
Connelly by the end of the week.
Wade Lieseke voiced his objection to the City contracting for
an outside Attorney to represent the City in a law suit
related to odor problems from the City's wastewater treatment
plant and nearby residents. He strongly objected to using
Utility Department funds to fund this legal service due to the
fact that such funding is derived from rates collected ...paid
for by the residents of Bremerton. He emphasized the residents
near the sewer treatment plant are sick and tired of the
impact of odor from the plant. He also objected to the City
receiving sewage from the City of Port Townsend and the
disposing of the resulting sludge at Olympic Landfill. He did
not believe it was in the best interest of citizens of
Bremerton to take in any outside contracts for process of
sewage waste through the City's wastewater treatment plant.
Richard Chrisinger stated he echoed Mr. Lieseke's remarks
regarding the problems related to odor from the City's
wastewater treatment plant. His rental property in that area
was recently reassessed by the County resulting in a
significant increase in his property tax. He has challenged
the County over that increase and hopes to have his property
tax lowered.
Larr~ Sawyer, "L" Street resident, stated he was opposed to
the City taking money out of the Utility Fund to fund outside
Attorneys to handle the lawsuit between the City and residents
near the wastewater treatment plant over the odor issue. Not
only do the residents end up putting up with the odor but now
they will be paying for attorney fees to fight against them.
He emphasized it was not the citizens fault that the City's
sewer treatment plant is totally unfit. Their area is well
known throughout the County as "the place that smells" and
TAPE #1037
City Council Reg. Mtg. Minutes
July 8, 1992
Page 5 of 16
does not project a positive image for their community.
Henz~Bakley, 4142 "D" Street, stated his residence is located
directly above the City's wastewater treatment plant. He
expressed his concern that at times his home is almost
unlivable due to the sewage plant odor. He felt this
situation had gone on a long time. Originally, he was opposed
to the citizens of the area obtaining an attorney to represent
them over this issue and believed the interested parties could
sit down and discuss the issue and determine how to resolve
the problem. He cited several areas with secondary treatment
plants that do not experience odor type problems and
questioned why the City could not come up with a solution to
correct the City's odor problem. Some areas even have
attractive picnic areas adjacent to a sewage treatment
plant...being only a few feet away from the actual sewage
treatment process. He strongly objected to the City hiring
outside Attorneys to fight this case using funds provided by
the citizens through payment of sewer rates. He was amazed
that the City is not holding someone accountable for the
problem that exists through the operation of the sewage
treatment plant.
6A - OVERWATER PARK PROJECT UPDATE REPORT, #AB92-170
Dave Baker, City Engineer, stated hopefully this would be near
the last update that he would be providing for the overwater
park. He has made application for the last of the funds
available from EDA. The project is starting to wind down -
the concrete topping has been poured completely out to the
north end (Turner Joy end), the foundation for the gift shop
is completed and the extension to the boardwalk that will hold
the gangway is due sometime this week. This will allow
workers to have walk-on- access to the Turner Joy rather than
to access by boat. Landscaping will be the last thing to be
completed and presently the utilities are being hung on the
boardwalk. Long lead time items include: street lights, small
dome lights and sewage pump that will handle the flow from the
gift shop. In general, the boardwalk will be complete and
useable within the next couple of weeks. Contractor feels
certain that August i is a good date for allowing total use of
the boardwalk.
Mr. Johnson stated he did not think the boardwalk project was
anywhere near complete. Council has not heard one word about
what is going to happen for mitigation of that project and
there are hundreds of thousands of dollars out there and Mr.
Baker was still the project manager. Mr. Baker stated he
would be addressing Council for a number of months but it
would not be reporting on the boardwalk. Mr. Johnson
TAPE #1037
City Council Reg. Mtg. Minutes
July 8, 1992
Page 6 of 16
emphasized it was still the "boardwalk project" and he did not
want to lose site of that fact.
Mr. Overson questioned if Mr. Baker, as Project Manager,
considered the mitigation to be part of the overwater park?
Mr. Baker stated yes he did. What he is reporting on today is
the construction Quigg Brother's portions of the boardwalk and
it does not include the mitigation nor does it include
anything that would result from that mitigation. The City and
FishPro have a meeting scheduled with the Corps of Engineers
and agencies involved on July 15. At that meeting, the City
is suppose to get some direction as to which way to go and up
to this point, it has been mainly gathering information. Mr.
Johnson noted he had heard that there were several meetings
over the past few weeks, however, the Corps did not make those
meeting. Mr. Baker stated yes, there have been meetings over
the past few weeks and there was one instances where the Corps
arrived at a different time or place than City representation.
However, there have been meetings since then where all
interested parties were present. Mr. Johnson stated he still
did not feel like he knew what was going on? Mr. Baker stated
neither does anyone else. Mr. Johnson stated he did not find
that acceptable. Mr. Baker invited Mr. Johnson to join City
staff at those meetings. Mr. Johnson stated he would accept
that invitation if he is informed of where and when those
meetings are held. Mr. Baker restated the next meeting will
be July 15 and he would provide the time and place as soon as
it was confirmed. President Hotton stressed the importance of
moving along the mitigation portion of the boardwalk project.
She felt the City was in an uncomfortable situation and needs
to get a response from the Corps. She requested the City
Attorney assist in that effort in order to bring the
mitigation portion to conclusion.
Mr. Johnsonquestioned if the administration knew how the City
would pay back the notes from the funds borrowed from the
Public Works Complex project? Mr. Hanna, City Treasurer,
stated at this time he did not have a solution. Mr. Johnson
questioned when would Mr. Hanna have a recommendation and when
did the money have to be repaid? Mr. Hanna stated he did not
know when he'd have a recommendation. The funds would need to
be repaid by November 1. Mr. Johnson questioned shouldn't
someone be giving this situation serious review now?
Mr. Waibel thanked Mr. Baker for providing a map of the
boardwalk project site.
Mr. Overson questioned when would the ramp to the Turner Joy
be operable? Mr. Baker stated the intent is to have the ramp
i
TAPE #1037
City Council Reg. Mtg. Minutes
July 8, 1992
Page 7 of 16
delivered back from Aberdeen (being refurbished) either the
end of this week or early next week. Once the ramp is in
place, foot traffic will be allowed even though some utility
work still needed to be done. Mr. Overson questioned if the
security closure for that ramp would follow next? Mr. Baker
stated the security enclosure is an addition to what he just
outlined.
President Hotton expressed concern over the need to put
together a financial package for repayment of the Public Works
Complex fund and to start working on that process soon. Mr.
Hanna stated the administration continues to hope that given
the time schedule that was provided by the Corps early on in
this process, by August i the City should have much better
grasp of what the City's financial obligation will be. It is
much easier arranging financing for the order of magnitude of
financing needed once that amount is known. It seems like
external borrowing is the only means reasonably available to
the City unless we are far luckier in terms of the overall
cost of the mitigation. Mr. Johnson stated the assumption
made by Mr. Hanna may not be a logical assumption that the
City will run out and keep borrowing this money. The debt
service next year, which has very poor revenue estimates along
with a lot of increased expenses, does not project a very
positive financial position. As of yet, he had not seen any
alternative method of financing come from the administration.
7A - CHANGE ORDER #2 TO OUIGG BROTHERS-MCDONALD CONSTRUCTION
CONTRACT FOR THE OVERWATER PARK, #AB92-171
This Change Order adds $22,377.12 (including tax) to the
existing contract and includes changes either required,
desired or requested in order to complete the Overwater Park
Project in a timely manner and to satisfy the needs of the
Harbor Master Facilities, P.S.N.S. sculpture, the Wheelhouse
Tavern and the Turner Joy. The new contract amount (including
tax) will be $1,907,818.09.
The Port of Bremerton has indicated, by letter, that they will
pay for the additional cost incurred in providing for the
Harbor Master Facilities.
Dave Baker, City Engineer, explained "Exhibit One" of Change
Order #2 is a summary of the Change Order proposals that are
included in this Change Order. There are eight items included
- two items are deletions (costing the City less than
anticipated), and the other six items are additions, the
largest being $19,748.00 for construction of the foundation
for the Harbor Master's office, which the Port of Bremerton
has indicated they will fund. Therefore, the amount of
TAPE #1037
City Council Reg. Mtg. Minutes
July 8, 1992
Page 8 of 16
contract increase as far as the City goes is approximately
$1,200.00.
Public comment - none.
#1534
M/S/C/U(Johnson/Waibel) to approve Change Order #2 to the
Quigg Brothers-McDonald Construction Contract.
7B - AGREEMENT BETWEEN CITY OF BREMERTONANDTHE CITY OF PORT
ANGELE8 FOR THE TREATMENT AND DISPOSAL OF WASTEWATER SOLIDS,
#AB92-172
The City of Port Angeles is commencing construction of a new
secondary wastewater treatment plant for service to their
community. During construction, the City has a requirement to
provide for an alternate site for the treatment and disposal
of primary wastewater solids and has petitioned the City of
Bremerton Department of Utilities for assistance.
Attached for City Council's consideration is an agreement
between the City of Bremerton and the City of Port Angeles for
treatment and disposal of primary wastewater solids.
The agreement provides for limits on the quantity and quality
of primary wastewater solids which the City of Bremerton will
accept and sets forth a rate schedule for the treatment and
disposal of these solids.
Bill DuffV, Utilities Director, explained the City of Port
Angeles is in the process of building a secondary wastewater
treatment plant, as was the City a few years ago. They
requested the City assistance in disposing of their sludge for
a period of 18-24 months during construction of their plant.
In order to take on that responsibility, an Interlocal
Agreement between the City and the City of Port Angeles is
required. He anticipates approximately one truck load of
sludge per day and the City will be reimbursed for all costs
associated with the treatment of the sludge. The sludge will
enter the system going directly to the digesters for
processing.
President Hortonquestioned if the City presently had capacity
in its sewage treatment plant to handle the additional input?
Mr. Duffy stated yes, current they are using only one of two
digesters and the plant is running about 60% of its capacity.
President Hotton questioned would the system be degraded in
any way by the additional input? Mr. Duffy stated no.
Mr. Overson questioned the amount of income the City would
derive from this agreement? Mr. DuffV stated the City would
t
TAPE #1037
City Council Reg. Mtg. Minutes
July 8, 1992
Page 9 of 16
receive approximately $6-7,000.00 per month, which is placed
back into the Utility Capital Improvement Fund. Mr. Overson
noted it was also a "good neighbor" policy as well. Mr. Dully
noted someday the City may have mechanical or equipment
failures in the treatment plant and may need to utilize some
other facilities for short periods of time.
Mr. Collins requested Mr. Duffy give a brief description of
how solid waste flows through the treatment plant. Mr. Dully
explained sludge will be loaded into a truck in Port Angeles
where they will add lime to neutralize the sludge. It will be
trucked to Bremerton, samples will be taken to insure the
percentage of solids and there will be a check for
contaminates. Following that checking, it will be introduced
to the septic holding facilities where septic is dumped from
septic haulers or RV facilities. It will then be pumped
directly into the digesters, which are fully self-contained.
It will be processed in those digesters from 12-18 days while
the biological action goes on. Then, it will be removed from
the digesters into the City's tanker truck and transported out
to the City's sludge disposal site on Utility land. Those
lands are located south of the Old Belfair Highway and west of
Gold Mountain Golf Course. The sludge will then be applied
with the City's liquid application vehicle onto forest lands
as fertilizer. M:. Collins emphasized the sludge is not
transported and deposited into the County landfill. Mr. D~ffy
stated that was correct. Currently, the City is disposing
100% of sludge on dedicated lands for forestry.
The following individuals spoke in opposition to this
proposal: Wade Lieseke, David Johnson, Navy Yard City; Roy
McInnis, 2711 Maple Street;
Following are comments made by the above listed individuals:
(2) why is it that you can drive along the road above the
sewer treatment plant and see an open vat?; (2) why is the
odor from the wastewater treatment plant permeating the
atmosphere and why can't something be done to stop such odor?
(3) will the addition of Port Angeles' solid waste increase
the odor problem? (4) From the inception of the City's
sewage plant operation and even after complaints came in about
excessive odor from the plant the City denied there was a
problem. (5) From the inception of the City's plant operation
and for 4-5 continues years, Mr. Duffy promised something
would be done about the odor problem, however, the problem
still exists. (6) Instead of fighting a legal battle over the
odor problem, why doesn't the City and citizens come together
and try to agree on a solution. (7) Question - is Mr.
Dawkins, who is a real estate agent, telling prospective
TAPE #1037
City Council Reg. Mtg. Minutes
July 8, 1992
Page 10 of 16
buyers of homes located above the plant that there is a odor
problem?
Mr. Duffy explained in response to the question about the
"open" vat...there are a number of circular chambers in the
plant and the two to the south represent ~the primary
clarifiers and the two to the north are secondary clarifiers.
The large tall facility is a biofiller and in addition to that
several aeration basins. Sludge from this contract will not
enter any of those facility and will be self contained. And,
there will be no odors from solids brought in from Port
Angeles. With regard to the rest of the questions relating to
the treatment plant, he could not address them at this time,
but did acknowledge they were being studied.
#2073
M/S/C/U(Overson/Collins) to approve the agreement between the
City of Bremerton and the City of Port Angeles for the
treatment and disposal of wastewater solids and authorize the
Mayor to execute said agreement subject to City Administrative
Policies and Procedures.
7C - INTERLOCAL AGREEMENT FOR WASTEWATER TREATMENT SERVICES
BETWEEN KITSAP COUNTY 8EWER DISTRICT NO. I AND CITY OF
BREMERTON, #AB92-156
The contract between the City of Bremerton and Kitsap County
Sewer District No. 1 expired on September 30, 1986. The
original contract provided for treatment of the District's
wastewater by the City at its Charleston Beach Wastewater
Treatment Plant.
The District has indicated their preference for a new
wholesale contract which provides for the treatment of the
District's wastewater and allocation of a portion of the
capacity of the City's Wastewater Treatment Plant for use by
the District.
Th~ attached agreement between the City of Bremerton and
Kitsap County Sewer District No. 1 allocates 0.40 MGD of the
Treatment Plant's capacity for use by the District and
establishes a service rate for the treatment of the District's
wastewater. The agreement additionally provides a
clarification of responsibilities between the City of
Bremerton and the District with respect to collection,
conveyance, treatment and disposal of the District's
wastewater.
Bill DuffV, Utilities Director, stated the City has been
providing wastewater treatment services to Sewer District #1,
i.e. Navy Yard City since 1949. The most recent contract
#2214
#2265
TAPE #1037
City Council Reg. Mtg. Minutes
July 8, 1992
Page 11 of 16
expired in 1986, and the proposal is to continue that service
to the District.
President Hotton pointed out Council did have a Study Session
on this proposal on July 1. She acknowledge that people in
the audience are looking for an answer on the odor question.
The previous item and this item have no bearing on that odor
question and the City is in a lawsuit with the residents of
that area and upon advise of Attorney some of those questions
cannot be answered. Any questions raised regarding the odor
problem will be directed to the City Attorney.
Public comment - none.
Mr. Waibel suggested eliminating the statement that nothing in
the contract precludes itfrom being renewed.
M/S/C/(Johnson/Overson) to approve the agreement between the
City of Bremerton and Kitsap County Sewer District No. 1 and
authorize the Utility to adjust the billing rate of the
District's customers to allow for reimbursement of the cost of
service pursuant to the wholesale rates established in the
contract, subject to City of Bremerton Administrative Policies
and Procedures as amended.
M/S/C/(Waibel/Overson) to amend the motion eliminating the
last sentence in Section 2.
Vote on Amendment:
Motion carried.
In Favor: Johnson, Waibel, Collins,
Dawkins, Horton
Abstain: Overson
Mr. Waibel questioned if there was an answer why there are no
additional charges for excesses during the first two years of
the contract? Mr. Dully explained the excess discharges from
the Sewer District are fixed by the size of the meter and pump
stations...there are no excesses. Mr. Waibel stated in the
contract there is a procedure for them to pay for anything
over a certain amount, at a higher rate but is not in effect
during the first two years of the contract. Mr. Duffy
explained that was an agreement worked out. The District
wanted an opportunity to go through and review their system to
separate their storm and CSO's. Mr. Waibel stated if the
District has to pay for their excesses they will work much
quicker to correct their system. If they don't pay for the
excesses, they'll take the full two years to resolve any
problems. Mr. Duffy pointed out it has taken the District four
years to sign this agreement. Mr. Waibel continued to press
i
TAPE #1037
City Council Reg. Mtg. Minutes
July 8, 1992
Page 12 of 16
the question why the District wasn't being charged a higher
rate for excesses occurring within the first two years? And,
why does the City have to give them that opportunity at the
City's expense? Mr. Dully stated actually the City is already
a year into that. The City could wait an additional year to
sign the contract, then it would be a moot issue. The
conditions under which the City has been working with the
District are those contained in this contract, which commenced
August 1, 1991. If the contract is approved, it will be
retroactive to August 1, 1991. Mr. Waibel questioned does the
City want to agree to not charge for excesses? Mr. Overson
pointed out that condition was part of the arrangement agreed
to by the District. Mr. Waibel questioned if the City
negotiated anything in this contract in favor of the City?
Dully stated unfortunately Mr. Waibel was not present during
any of the Study Sessions held on this issue. He believes, as
well as the City Attorney and City Treasurer, that this is a
good agreement and the City is being well compensated.
President Hotton stated if Sewer District #1 is, in good
faith, trying to deal with their separation issue which
benefits the City's system as well, then the City needs to
give some latitude.
Vote on main motion:
Motion carried.
In Favor: Johnson, Overson, Collins,
Dawkins, Horton
Opposed Waibel
8A - ORDINANCE (FIRST READING) AMENDING CITY HALL OFFICE
HOURS, #AB92-173
The current ordinance states that all offices of the City will
be open for business nine hours daily. While that is true of
most offices, some of the smaller two person departments
(Civil Service, Personnel, and Mayor) may close for lunch
leaving the office open eight hours.
Ian Sievers, City Attorney, stated this ordinance had been
changed about two months ago and office hours had always been
nine hours, except for a couple departments. The City Clerk
felt that small offices were not accounted for in either
ordinances up to this point and should be indicated requiring
eight hours of office time.
Mr. Dawkins stated he felt it was logical not requiring nine
hours of open service to the public for small offices where
there may be only 2 employees.
President Hotton questioned if there was anything in
Washington State Law that states how many hours municipal
TAPE #1037
City Council Reg. Mtg. Minutes
July 8, 1992
Page 13 of 16
offices must be kept open to the public? Mr. Sievers stated
he did not believe so because there are other governmental
agencies in Kitsap County who have special open and close
hours.
Mr. Waibel stated the proposed ordinance makes it appear that
City employees receive a 1/2 hour lunch..."will be open for
eight hours" does not indicate a minimum of eight hours. Some
offices are open nine hours with cross coverage. He suggested
changing the wording to allow some longer opening hours.
Mr. Johnson expressed his displeasure over this ordinance and
did not want the citizens put in the position where they come
to City Hall during the day and see a sign hanging on the door
"Out-To-Lunch". Certainly, every offices does not have to be
open all the time, but there are enough people in City Hall to
respond to citizens needs. If the citizens want to meet with
Department Heads or elected officials, then they should set up
an appointment. He has not heard one comment about people
coming to City Hall and finding people out-to-lunch and unable
to do business until said employees returned. He will hear a
lot of comments it the citizens come down to City Hall and see
a sign stating "Quiet Time" or "Out-to-Lunch" on the front
door. Maybe the wording: "All offices will be open nine
hours" may be inappropriate. What may need to be stated is
that City Hall will be open and there will be some coverage to
assist the citizens.
Mr. Collins stated he concurred with Mr. Johnson and felt it
indicates to the citizens that we are doing a lousy job of
supervising people.
Mr. Overson stated he was caught between the need for service
to people, the need to keep the office open, especially during
times when the public can come to those offices, and the
concern that we have an ordinance that is liveable. He felt
there could be more artful wording in the ordinance to make it
more acceptable and effective. As presented, the ordinance
states that some offices will not be open certain times,
however, specific offices are not listed nor what times they
would closed.
President Hotton stated at this point in time the ordinance
contains very high minded words in light of the fact the City
is looking at another very difficult budget session. Frankly,
there are no more single bodies to "cut" and she is planning
to send a memo to Mayor Mentor asking for an immediate
response in light of the Fiscal and Budget Committee meeting
held July 7, and the fact the City's Ending Year cash is
TAPE #1037
City Council Reg. Mtg. Minutes
July 8, 1992
Page 14 of 16
virtually "0". We may be looking at shorter hours of City
Hall being open. She agreed with what was being said,
however, the words may not be right. The City does need to
provide services to the public, but lets keep in mind that if
we take the position that the doors have to be open from 7:30
AM to 5:00 PM, but find ourselves in a budget bind that won't
allow us that schedule, then maybe we need to figure out how
we man those windows and service to the public and still look
at some budgetary restrictions.
Mr. Collins stated he viewed this proposal as saying the Sign
Shop is making a sign for the front door that states "Out-To-
Lunch". Mr. Dawkins disagreed with Mr. Collins and pointed
out certain offices will simply have a sign on their door that
they will be out for a specific time for lunch and will be
open for business at a specific time.
Mr. Waibel stated there is a problem that will need to be
addressed budget-wise in the future, however, changing the
time "nine hours" to "eight hours" does not do what is
desired.
Roy McInnis, 2711 Maple Street, stated Council had spent 12
minutes on one of the dumbset things he has heard in his life.
What he is hearing from this discussion is that the Mayor has
no leadership capabilities as far as being the Chief Executive
of the City to say if he deems a person could go out of the
office at a certain time. He pointed out there is always
someone available at the City Hall "Counter". He did not
support putting a "Out-To-Lunch" sign on the front door. Mr.
Johnson pointed out that was what the Mayor was proposing to
do through this ordinance.
Mr. Waibel stated we currently have an ordinance that says
every office will be open nine hours between 7:30AM and 5:00
PM, which does not allow enough flexibility to man offices,
particularly in tight budget times. The wording needs to be
changed and just changing "nine hours" to "eight hours" does
not do it.
#3180
M/S/C(Waibe1/Collins) to table this item.
Vote on motion:
Motion carried.
In Favor: Overson, Waibel, Collins, Johnson
Abstain: Dawkins, Horton
TAPE #1038
8B - ORDINANCE
#AB92-174
(FIRST READING)
AMENDING THE 1992 BUDGET,
TAPE #1038
City Council Reg. Mtg. Minutes
July 8, 1992
Page 15 of 16
Actions taken by the City since passage of the 1992 budget
requires certain corrections in order that the budget
continues to accurately reflect the financial operating plan
of the City.
Rich Hanna, City Treasurer, offered his apology for the lack
of Item 92-14 and 92-12 having been through Fiscal and Budget
Committee prior to this week. Due to some scheduling problems
those item were addressed at the Fiscal and Budget meeting
held July 7.
Mr. Johnson stated it appears we are just going along with
business as usual from the Administration. It was brought out
in February and March that the City would be experiencing
shortfalls. Current City Treasurer's projection for this year,
if nothing else goes wrong, indicates the City will have
$66,000 in Ending Cash; that is not counting Interfund Loan
activities or resolution of mitigation. He believes the City
is in "deep financial trouble" and it is now nearly the end of
July and there has not been any kind of proposal from the
Mayor saying what we are to do or alternatives. At the end of
the year, Council will balance the budget one way or another,
such as: (a) transfer a portion of 1992 bills over to the next
year; (b) cut off whatever percentage is needed about November
1 across-the-board of every department. He believes now is the
time to do something that will have the lesser impact than if
we wait until later in the year. The only things that have
improved the financial situation have been windfalls, i.e.,
taxes, negotiations with some other party, etc. Those
windfalls did not happen by managing anything. All Council is
doing at this time is codifying the Budget Amendments that
have gone on during the year that Council previously approved.
By no way does this address the budget problems with the
City's General Fund. He is not satisfied with that, nor is
the Treasurer and Fiscal and Budget Committee.
President Horton stated she concurs with Mr. Johnson's
comments. She firmly believes that financial control must be
taken now. The City's "saving account" is getting smaller and
smaller and could be wiped out with one major expense. She
will be sending a memo to the Mayor requesting him to provide
a response to Council within the next two weeks. If there is
no response, she will ask Council to look at seriously opening
up the budget for negotiations the first part of August.
Mr. Overson stated under the previous Mayor the City Council
and Mayor worked together to develop approximately one million
dollar carryover. That padding is now totally gone and anyone
who thinks there is any left to carryover at the end of the
#0225
#0314
TAPE #1038
City Council Reg. Mtg. Minutes
July 8, 1992
Page 16 of 16
year is "praying" for a windfall.
hard to come up with a solution.
He hoped staff was working
Mr. Walbel stressed the proposed ordinance is just a
compilation of all the Budget Adjustment previously approved,
except for two items.
President Hotton when Council approves Budget Adjustments in
the future, she would like to see the ending dollars in the
fund that is being decreased and somewhere on the form any
budget adjustments that have been previously authorized for
that fund.
Public comment - none.
M/S/C/U(Johnson/Waibel) to approve Ordinance on first reading
amending the City's 1992 budget.
Councilman Waibel left the Council Chambers at 7:17 P.M.
8C - ORDINANCE NO. 4381 (SECONDREADING) AMENDING THE OFFICIAL
ZONINGMAP OF THE CITY OF BREMERTON FOR PROPERTY LOCATED NORTH
OF PEARL STREET AND WEST OF WHEATON WAY (8ETTERLUND REZONE),
#AB92-16974
President Hotton suggested holding over this item for one
week due to the fact the remaining Council members eligible to
vote on this issue did not constitute a quorum. Ian Sievers,
City Attorney, recommended Council continue this item due to
the appearance of fairness.
M/S/C/U(Collins/Dawkins) to continue this item for one week.
Mr. Johnson stated he previously made an incorrect financial
statement under Item 8B... actually, the City does have more
than $66,000 contingency in a 53 million dollar budget because
the Utility has a fair amount of contingency.
With no further business meeting adjourned at 7:18 P.M.
KATHLEEN L~Y, City Clerk
LYNN HORTON, Council President
City of Bremerton
KLM/LH/me
cc: Normal Distribution
File/Vault