HomeMy WebLinkAbout02/26/92 TAPE #998 UNAPPROVED DRAFT
CITY COUNCIL MEETING MINUTES
FEBRUARY 26t 1992
The regular meeting of the City Council of the City of
Bremerton was called to order in the City Council Chambers,
239 4TH Street, Bremerton, Washington, Wednesday, February 26,
1992, at 5:30 p.m., with Council President Lynn Horton
presiding. Council members present: Lon Overson, Wayne Estes,
Eileen Fitz, Hank Waibel, Morrie Dawkins, Russ Johnson, A1
Colvin and C.R. "Tiny" Collins. Also present were City
Attorney Ian Sievers and Kathleen L. McCluskey, City Clerk.
The meeting opened with the Pledge of Allegiance led by
Council President Horton and Invocation given by Reverend Gary
Fogelquist of the Seventh Day Adventist Church.
CONSENT AGENDA
A. Minutes Of Meeting - February 19, 1992 #AB92-056
#0021 M/S/C/U(Waibel/Dawkins) to approve Consent Agenda as
presented.
CLAIMS/WARRANT REGISTERS
Vouchers audited and certified by the auditing officer as
required by RCW 42.24.080, and those expense reimbursement
claims certified as required by RCW 42.24.090, have been
recorded on a listing that had been made available to the
council.
#0034 M/S/C/U(Colvin/Fitz) on February 26, 1992, the Council does
approve for payment those vouchers included and further
described as follows: 144743, 144744, 144745, 144791 through
145046 in the total amount of $916,284.14.
COUNCIL MEMBER REPORTS
Mr. Overson reported his District is concerned with current
crime conditions and they had seen some adverse situations
that needed to be addressed.
Mr. Estes reported he attended the Roundtable meeting, this
date, where Wes Pruitt announced he anticipated receiving the
new Cross-Sound Bridge Study sometime today. It is
anticipated that within two weeks there should be a report to
the public on that study. Next week's Roundtable guest
speaker will be Representative Peggy Johnson. At the
Roundtable meeting, Bremerton Port Commissioner Fred Schoneman
announced Bremerton National Airport will not be considered as
a satelite airport for SeaTac. Mr. Estes noted about two
TAPE #998
City Council Reg. Mtg. Minutes
February 26, 1992
Page 2 of 35
years ago he had invited his fellow Council members to spend
an evening riding with him in a patrol car - he believes the
crime conditions are even more dangerous now. In order to
curb the rising rate of crime, both citizen and government
involvement is needed.
Mr. Waibel reported he and his family have worked diligently
to reduce their weekly garbage to fit into a "mini can", but
he was not sure they could do that forever.
Mr. Johnson stated maybe he should start giving a "Tip-A-Week"
on how to make the 20-gallong mini can work. He has received
several "garbage" related calls , some with ideas, complaints
and suggestions. As the new solid waste collection program is
implemented, he recommended those who have concerns or
questions contact the City or Brem-Air to try and work out
their particular problem. One question that keeps coming up
is "do I have to turn in my Duracan?" The answer to that
question is "you'll probably want to, but no, you do not have
to". If someone wants to keep the Duracan size container,
they will pay the 2-can rate. He anticipated most of the
Duracan recepticals will be used for multi-family complexes.
There have been 221 Duracans returned to Brem-Air and 717
people have ~alled in to change from the 30-gallon can usage
to the new 20-gallong mini can. In regard to the "Tag-A-Bag"
program, Brem-Air will be expanding their sales outlet via the
Red Apple Market at the Perry Avenue Mall. He was not sure
when that new service would be available to the public. He
passed on the idea to get rid of junk mail by returning it in
the prepaid envelope.
Mr. Colvin stated he appreciated Mr. Johnson giving an update
on the new garbage contact and how it is being impelemented.
He wanted to clarify that even though someone does not fill up
a regular, 30 gallon, garbage can they will be charged for a
full can upon pick up and those who want to reduce their cost
of garbage service can do so by reducing their waste and using
a 20-gallong mini can. Mr. Johnson noted if a second can or
extra garbage bag is set out it will not be picked up unless
it has a "tag" on it. If a garbage can is set out for pick up
with a "tag" on it, the whole can will be removed and disposed
of. Mr. Colvin questioned where can the "tags" be obtained
over the weekend? Mr. Johnson stated currently they are only
available through Brem-Air. President Horton stated in order
to address some of the concerns and questions about the new
garbage contract, she has tentatively scheduled, on March 18,
an Information Item Only on the Council Agenda and at that
time the public will be allowed to give input. She did not
view this as a time to "rehash" the contract, but rather help
TAPE #998
City Council Reg. Mtg. Minutes
February 26, 1992
Page 3 of 35
the implementation phase. She recommended if anyone in the
public has questions or comments they want specifically
addressed at that time, they should forward them to Ms.
McCluskey so that she would know what kind of material to have
available for that meeting. Mr. Johnson stated such concerns
should also be passed on to the Customer Representative at
Brem-Air. Mr. Colvin noted the manager of KITZ Radio
indicated they would announce garbage collection information
over the air. Mr. Colvin questioned if all Council members
received a report relating to Dyles Inlet/Clear Creek
Watershed Action Plan. A statement in that report related
that a response from Don Pratt, Director of Community
Development for the City of Bremerton, was due by January 14,
1992, however, that response had not been received. Mr.
Colvin felt Mr. Pratt must have a good reason for not
responding to that request. He reminded everyone of the free
"Income Tax Preparation Program" sponsored by NARF, which is
being carried out at the Sheridan Park Recreation Center. He
announced the recent Bremerton Central Lions Club Radio-Thon
was very successful in raising approximately $7,000.
Mr. Dawkins announced the State will hold a public meeting on
Monday, March 2, 6:30 P.M. at John Sedgewick Junior High
School/South Kitsap area, to resport on a recent Cross Sound
Bridge and Transportation Plan. The public will have an
opportunity to ask questions from 6:30 P.M. to 7:00 and then
a formal presentation on the Study will be made. He hoped
interested citizens would attend to voice their opinion.
Mr. Collins stated there are a significant number of streets
in the "old Charleston" area that have been posted 2-hour
parking, but there are side streets that do not have house
numbers and are impacted by Shipyard commuters. He is working
with several citizens, who live in his neighborhood,
canvassing the entire neighborhood between Preble, First and
Callow to Constitution Street to get resident input on how and
what needs to be done about parking. He urged anyone
interested in this project or had input on this issue to
please call him. In reference to the Cross-Sound Study
meeting, he urged people to take the time and attend one of
the public meetings and let the State know how they feel about
the possiblity of Bremerton being left in the middle without
any ferry transportation.
Mrs. Horton announced because several members of the City
Council wish to attend the Cross Sound - Bridge Study meeting,
Council will change its Study Session from Monday, March 2 to
Tuesday, March 3. As part of Council's 1992 Statement Of
Legislative Intent, Council had discussed coming up with a Law
TAPE #998
City Council Reg. Mtg. Minutes
February 26, 1992
Page 4 of 35
Enforcement Policy. In order to start the process to develop
such a policy Council, will hold a hearing on March 11, after
the regular Council meeting. Representatives from various
segements of the community have been invited to give testimony
at that hearing. There will be no other testimony taken from
the general public at that time, however, she felt it would be
very informative and it will be televised on Channel 29.
Mayor Mentor has proposed a levy to raise 1/2 million dollars
in support of further law enforcement capabilities, however,
she believes the first step is to develop a policy of
direction. As a wrap up to her Council member report, she
requested Kathleen McCluskey, City Clerk, to give a report on
the status of some Legislative issues.
Kathleen McCluske¥, City Clerk, reported the information she
will be providing deals with some key bills the City had been
working on with the lobbyist and the Association Of Washington
Cities and what there status is as of this date:
1. Senate Bill 6450, a bill appropriating $210,000,0000 for
the ferry system, is in the Senate Transportaion Committee and
needs to be voted out by Monday to make it to the floor.
Letters to Bremerton's represenatives in the Senate on that
bill to get it out of committee by Monday would be important.
2. HB 2674 Child Care Zoning - defeated. The intent of this
bill would have removed the ability to "permit" day care
centers and the City was opposed to that because currently the
City does permit them and places conditions on them.
3. HB 2717 Notice And Standing - defeated. This would have
provided for someone standing to contest land use action and
there were conditions for the ability to do that In
Bremerton, there is not conditions for contesting land use.
4. HB 2499 declares public entities liable for tortious acts
and omissions of volunteers. If passed this would be very
detrimental to the City because of the large number of
volunteers the City relies on, which expands the City's
liability. It could put cities in the position where they
start limiting their volunteer efforts. This bill is
currently in Senate Rules Committee, which means it will reach
the floor.
5. Economic Diversification - a plan has been developed for
defense dependent communities, however, both the Senate and
House have cut funding so there is nothing left to implement
the plan. The Senate did put a proviso that they want the
State Department Of Community Development to proceed with
TAPE #998
City Council Reg. Mtg. Minutes
February 26, 1992
Page 5 of 35
implementation, but they did not fund that action. After
talking with the City's lobbyist, Ms. McCluskey stated there
are meetings set up, over the next two weeks, to discuss this
issue with the Governor. Some of the pilot funding for this
project was marked for the Kitsap County Economic Development
Council program.
6. ESH 2876 Open Public Meeting Bill - if approved, this
would require Executive Sessions be taped. This item is in
committee and alive but it must be out of committee by Friday.
This bill is being strongly opposed by cities and the AWC.
7. SSB 5771 Utility Leans - this would make cities responsibe
for requiring utility deposits from tenants to ensure that
unpaid or delinquent utility bills for water and sewer are
paid. Currently, it is the landlords responsiblity, which is
where it belongs. The City opposes that bill, which is in the
Senate Rule Committee and it will make it to the floor.
8. SB6408 Real Estate Excise Tax - this would restrict both
the first and second quarter of excise tax to fund only
streets, bridges, water and sewer facilities rather than the
far broader allowed uses, such as parks. The City has already
"earmarked" some of those funds for parks projects, i.e.,
waterfront project. This would throw a wrench into the City's
capital Improvement Plan. Unfortunately, this bill is
currently in the the House Local Government Committe, but is
subject to the Friday cutoff.
9. Growth Mangement issues will be resolved during budget
deliberatons and will be alive throughout the session. What
is happening now is the Legislature is proposing to cut
funding for growth mangement implementation. That would again
directly affect the City because those anticipated funds were
included in the 1992 budget.
PUBLIC RECOGNITION
Mayor Louis Mentor reported on Saturday evening he attended
the Bremerton Police Reserve banquet. The Police Department
has 26 reserve officers, which amounts to about one-half the
number of uniformed police officers. The City does rely on
reserve officers and their efforts are appreciated. He agreed
with concerns expressed by others who raised the issue of
gangs, crime and law enforcement in the city. Bremerton does
have drug, gang and crime problems, but fortunate in that we
are somewhat isolated from other areas and smaller than other
cities. He encouraged speaking out on such issues so that the
public can become more aware of the problems that do exist and
it is not only a Bremerton concern but one that affects cities
TAPE ~998
city Council Reg. Mtg. Minutes
February 26, 1992
Page 6 of 35
nation-wide. He recently proposed developing a special unit
that would deal with drugs and gangs, which are the biggest
problems in the City. He has asked for volunteers to call his
office at 478-5266.
MaYor Mentor announced there will be a "Retirement - going
away party" for Dave Siliven, who has served as the Parks and
Recreation Park Foreman for 22 years for a total of 25 years,
on Friday, February 28, 3-5 PM at the Sheridan Park Center.
Vicki Vanneman stated there are many things this City does
well but she believed there needed to be improvement in the
area of employee recognition and that was her mission at this
time. She believed it was rather rare for an employee to
begin and end their career with the same agency or company.
Among the several hundred City employees, only a handfull have
served 25 years or more. Tonight, the Parks Department staff
want to take a moment to recognize such an employee - Dave
Siliven. Ms. Vanneman gave a brief review of Dave's service
to the City and presented him with a Certificate of
Appreciation for 25 years of service. She emphasized the
Parks Department has valued Dave's service and everyone will
miss him. Dave Siliven thanked the City for the years he has
been employed. He felt it was time for him to "move on" and
give the job opportunity to someone else. He hoped who ever
takes over his position will have as much success in it as he
had.
Mr. Colvin thanked Dave for his congenality and cooperation
with all the requests he had made of him. In reference to the
Police Reserve, he felt they should also receive more credit
for their service to the City. He suggested The Sun print a
story about Bremerton's reserve officers.
Don Larson, 135 Rainier Avenue, discussed the idea of an
underwater park in Bremerton by utilizing a surplus Navy ship
and the impact of increased tourism if such a facility were
built. He reminded everyone about the Sinclair Inlet Clean Up
scheduled for April 18.
6A - AMENDMENT NO. 4, CONTRACT #2921/PROFESSIONAL SERVICES
CONTRACT BETWEEN CITY OF BREMERTON AND CH2M HILL, #AB92-051
The Utility, in response to W.A.C. 173-245, requiring the
elimination of combined sewer overflow, and the failure of the
sewer collection system infrastructure on Park Avenue, has a
requirement for professional services for design and
construction management associated with the Warren Avenue
Basin Wastewater System.
Attached for City Council consideration is Amendment No. 4 to
TAPE ~998
City Council Reg. Mtg. Minutes
February 26, 1992
Page 7 of 35
Contract #2921, a professional services agreement between the
City of Bremerton and CH2M Hill Northwest, Inc.
Services include Step II & III - Design and Construction
Management & Services for Separation and Replacement of
Combined Sewer in the Warren Avenue and Park Avenue Drainage
Basin.
The estimated cost for the professional services is as noted
below:
Step II Desiqn Services - Drainaqe Basin Planning $ 445,055
Step III Construction Manaqement Services 521,982
Miscellaneous Services 103,000
TOTAL $1,070,037
Bill Duff¥, Utilities Director, stated several years ago the
Utility received a number of complaints regard to odor
problems in the Park Avenue area. Following that, they
carried out an investigation which included cleaning out the
sewers and viewed internal areas via T.V. At that time they
discovered much of the infrastructure had deteriorated and in
several cases the pipes had completely collapsed. This is
also an area where there are a lot of combined sewers wherein
there is a mixing of storm water in with sanitary; and there
is an overflow problem at the end of Park Avenue, which is
causing the City some problem. The State has mandated that
the City begin to reduce the combined sewer overflows.
The proposed contract would begin the second phase of the
project, which is for design. The first phase, which was
presented about 3-4 months ago, was a pre-design report that
looked at the alternatives for fixing problems and
deficiencies in the combined system. The second phase is
actually the design of the project to go to bid, which would
include further field investigations with regard to making
corrections and geo-tech works and design, permitting and
services during construction. It also includes a new element
this year, a Public Involvement/Public Notification Plan so
that citizens could be better informed as to what is being
done. He emphasized this is a substantial project, beginning
in the Gregory Way/High Avenue Area and flows down to the
north east and eventually discharged into Pump Station CE1 at
the north end of Park Avenue. There are several elements to
the project that are included in a schedule of events, which
had slipped 6-8 months. Initially he had hoped to move into
design phase by September of 1991, however, that was delayed
TAPE #998
City Council Reg. Mtg. Minutes
February 26, 1992
Page 8 of 35
due to having the pre-design report reviewed by the Department
Of Ecology and several other permitting agencies.
There are two project involved, the major project being the
Park Avenue/Warren Avenue sewer rehabilitation, with a project
cost of about 3.7 million dollars. There is another optional
project, which, depending on funding with regard to grants and
other participatory agencies, would abandon the beach line
running between Pump Station CE1, located at the north end of
Park Avenue, and CE3, which is located on the south side of
Smith Cove. They will be taking a look at that as the project
progresses as part of some of the field investigations and if
a funding source can be found he will recommend that the
second phase also be undertaken.
Public comment - none.
Mr. Estes questioned when the project would begin? Mr. Dully
explained the design phase will take from 6-9 months followed
by a permitting process, which can be extensive. He hopes to
have the design completed in 1992, and to look at the
Centennial funding cycle early in 1993. If he is successful
in obtaining grant funds, notification should be received July
or August with construction starting in the fall of 1993. Mr.
Estes questioned if the current practice of chemical addition
was helping the odor problem. Mr. Dully stated yes, he is
installing more chemical injection systems and had noticed
some substantial results. They did switch the type of
chemicals and he felt it has been a successful program.
Something they did, in addition to the chemical injection last
summer, was to flush out the storm sewers and sanitary sewer
several times to get rid of the septic conditions.
Mr. Overson stated looking at the breakdown provided for this
contract, over 50% of the money would be going toward project
management that included office services, etc. He questioned
if the organization was moving its staff or setting up an all
new office? Mr. Duff¥ stated it will be an extensive project
and a lot of the work the firm will be doing will be
coordinating with the regulatory agencies, drawing reviews,
the geo-techs as well as insuring the City gets what it pays
for. There will be an on-site staff resident throughout the
project to insure the City is well protected. And, because of
the nature of the area being an older part of the City, it
does help to have someone on site.
Mr. Collins stated he remembered the original contract with
CH2M Hill covered the preliminary phase and questioned why a
Personal Services Contract for the follow- on work was being
TAPE ~998
City Council Reg. Mtg. Minutes
February 26, 1992
Page 9 of 35
presented rather than a new contract? Mr. Duff¥ stated
normally he uses a Personal Services Contract in any new
project. Once a project is started, and CH2M Hill has done a
lot of field work in preparation for the design, it is very
difficult to change contractors or engineers in the middle of
a project. They have, in essence, completed about 20% of the
design in the pre-design report. Mr. Collins questioned
wasn't CH2M Hill asked to provide a definition scoping and not
do 20% of the design work? Mr. Dully explained the Department
of Ecology, through the regulatory process, requires three
steps: (1) Engineering Report, which is set forth in the
Washington Administrative Code (WAC); (2) Design, which is the
next 80%; (3) construction and associated construction
management. All three steps are all driven by Washington
Administrative Code. Mr. Collins expressed concern over the
fact that the could have gone out for bids on the design and
construction management. He felt the City was remiss on doing
some honest contract work. Mr. Dully posed the question as
one gets into a project, how much do you break it down and how
much does that facilitate cost savings? They did do that in
the beginning and do it on all projects through the
professional services selection process. Mr. Collins
expressed concern that the City was letting CH2M Hill "low-
ball" in because they know they'll receive it on the out-end
and questioned if he was correct? Mr. Dully stated he didn't
know if the city let them "low-ball"... he was hiring
professional services. Mr. Overson pointed out the City does
not bid these kinds of contracts for low bidder but rather
qualification. Mr. Duffy stated that was correct. Generally,
when a contractor is selected under a Professional Services
Agreement you do look at the qualifications and their ability
to complete the work. Some local engineers are used on some
of the smaller project. A project of this scope and technical
work involved, i.e., hydraulics modeling to regulatory
knowledge, is quite complex and accordingly they select those
firms that are qualified to handle such a project. Mr.
Collins noted he had taken "heat" from a group of people
because the City lets out a significant number of contracts
and it appears we go through a negotiation process rather than
a bid process. Mr. Duff¥ stated yes, that was correct on
Professional Services Agreements, whether it is legal,
engineering or architectural.
Mr. Waibel questioned if the approximate cost of the original
1987 agreement? Mr. Duff¥ stated approximately $100,000. Mr.
Waibel questioned the cost of the amendment to that agreement?
Mr. Duffy stated Step 2 was $445,000 and Step 3 is $521,000
and miscellaneous services $103,000 - amounting to a total of
$1,070,000. Mr. Walbel questioned the City was amending a
TAPE #998
City Council Reg. Mtg. Minutes
February 26, 1992
Page 10 of 35
$100,000 agreement by l0 times that amount and not
establishing a new agreement. Mr. Dully stated that was
correct. Mr. W&ibel stated if that doesn't look like we are
playing games what does. The original agreement provided for
a scoping and what is being proposed now amounts to another
agreement. We may go back to the same firm that provided for
the first agreement, but the City should not be amending an
agreement that is 10 times the cost. Mr. Duffy pointed out
there were three other amendments and they do build upon each
other. Mr. Waibel pointed out that even made it worse. He
questioned what was the total cost up to this point? Mr.
Collins noted the chart showed somewhere in the neighborhood
of 3.5 million. ~r. Duff¥ stated yes. Mr. W&ibel stated he
accepts going out for a Professional Agreement and he accepts
that this proposal will be done via a Professional Agreement,
but he did not support continuing to amend the agreement
ending up with a one hundred million dollar project. This is
a new proposal for a whole new set of things. Mr. D~ff¥
stated he wished Mr. Waibel had expressed his concern at the
time it was presented to Council three months ago when he
requested their direction. Mr. Waibel stated his direction at
that time was to come back and tell us what we are going to
do, but he did not direct doing it by amending the original
agreement.
President Horton questioned if this amendment is legal? .Ian
Sievers, City Attorney, stated as far as the State bid
procedures there is no problem with this proposal, however,
Council may take issue with the form of entering into this
kind of contract. But, for public work professionals, as Mr.
Duffy mentioned architects, engineers, landscape architects,
professionals that are involved in public works do not come
under a true bid process where the primary factor is price but
rather a competition based on qualification and ability to do
a particular project. Approximately three years ago there was
an Attorney General's opinion clarifying that RCW Chapter,
saying that it was illegal to consider price in selection of
those professionals. That was the same conclusion the City
came to when bidding out the sewer treatment plant operations
- switching from PSG to Metcalf & Eddy. President Horton
questioned if there was anything under State statute that
prohibits having an amendment that is in excess of 10 times
the original contract amount. Mr. Waibel stated this proposal
is entirely different than the scope of the original
agreement. Mr. Sievers stated he would need to examine the
original agreement to see what elements were included.
President Horton stated for clarification that in the City
Attorney's opinion this form is questionable? Mr. Sievgrs
stated it would depend on what the original contract stated,
TAPE #998
City Council Reg. Mtg. Minutes
February 26, 1992
Page 11 of 35
this may be inconsistent and there may be other things that
needed amending. If it is entirely outside the scope of the
original contract, but is part of the same project, this would
be adding additional parts to the project. He did not think
you could add a whole new project and then call it an
amendment. It may be misleading and may trigger those same
qualification bid procedures. President Horton questioned if
Mr. Sievers finds that this is a legal procedure, is there any
City policy that would prohibit Council approving an amendment
10 times the original contract amount? Kathleen McCluske¥,
City Clerk, stated no. President Horton stated since there is
a question of the legality of proceeding with this particular
method she asked Council to table this item, however, she
wanted to register Council's concerns in order to give Mr.
Duffy direction.
Mr. Waibel stated he was not saying this procedure was
illegal, but it certainly didn't look right. If City policy
does not preclude entering into agreement for professional
services that are in fact results of an original agreement,
the proposed projects are in fact what they asked to have
developed in the first agreement.
Mr. Colvin requested the City Attorney to state, for the
record, his opinion as to the legality of this process? Mr.
Sievers stated there really is a question as there is a
chapter that regulates bidding for this type of contract and
he would like the opportunity to review that procedure as well
as what the original contract stated. Mr. Colvin questioned if
the amendments were not foreseen at the time the original
agreement was entered into? Mr. Duff¥ stated that was
correct, when they started with the original contract it was
for some comprehensive planning for a sewer system.
Subsequent to that planning, they found problems at Park.
Avenue. They then took the next step and did the pre-design
and engineering study and one contract has built on the other
and they get progressively more expensive as it becomes more
detailed.
Mr. Johnson stated in regard to Construction Phase On-site
Services - for 1/4 million dollars it appears we get one on-
site representative who works 250 days on regular time and
approximately 50 days more for overtime (300 days) plus paying
$8,500 per diem and providing a vehicle and miscellaneous
equipment totally to $190,000. He questioned why not hire an
engineer at a bargain rate of $100,000 and build a hockey
rink? Mr, Dully explained there was more to it than "standing
in the street", there is a lot of back office work.
Johnson stated whatever skill is required, he believed the
TAPE #998
City Council Reg. Mtg. Minutes
February 26, 1992
Page 12 of 35
City could hire someone for less than $632.00 per day and the
City could purchase a vehicle. Mr. Dully stated that person
still had to commute from Bellevue and he would fund the
vehicle if that person could use it to commute. Mr. Johnson
stated if this item is tabled he believed the City should
consider hiring someone to fill the on- site inspection
position. Mr. Dully stated he could define this proposal into
two separate contracts, services during construction and
design. The design portion can be done now and forego that
position until it is needed. Mr. Johnson noted what is being
requested is a one-year man year. Mr. Dully stated there is
also staff behind that position.
Mrs. Fitz pointed out some missing language under Task WA2.
Mr. Duff¥ stated he would look into it.
Mr. Colvin stated he supported tabling this item, however, he
questioned if the City was at a point-of-no-return dealing
with the present contract? Mr. Dully stated no, Council could
go back and take any direction desired. The biggest thing he
was concerned with was making sure that by January 1993, a
grant application be submitted, which requires design work
completed or there will be an additional year delay for
resubmittal.
Mr. Collins pointed out the City has two professional
engineers on staff and questioned why couldn't the City use
this funding to hire our own professional engineering staff to
do this work? Mr. Dully stated it is a possibility and he had
approached them on several projects. He would be more than
happy if Council would give him permission to borrow Jan
Stemkoski for the duration of the project, shifting him to the
Utility. Mr. Collins stated he didn't say that - rather to
hire our own engineering staff to go into the City Engineer's
office to carry out the engineering. Mr. Dully emphasized he
had no problem hiring City staff but he would like to have
that person in his Utility Office areas where he could manage
the project rather than communicate via telephones.
Mr. Waibel pointed out the City has a lot tied up in capital
in the Utility and lots of construction needed, which will not
be over at the end of this project. Mr. Duff¥ pointed out he
has been expanding his staff in the Utility and over the next
20 years he is looking at 30-50 million dollars worth of work.
Approximately two weeks ago, he discussed with Council about
refinancing the Utility debt, including a list delineating
those projects. He is direction staffing efforts toward the
project management or services during construction, not in
design.
TAPE ~998
City Council Reg. Mtg. Minutes
February 26, 1992
Page 13 of 35
President Horton stated the City could potentially borrow
funds from the Public Works Trust Fund to do this project but
certain things must be in place, such as a Capital Facilities
Plan, prior to applying for those funds. She believed this
could save the City a lot of money, therefore, she wanted
staff to take steps in that direction to make sure the City is
eligible to apply for those funds. Mr. Dully stated they had
already looked into that source as well as the State Revolving
Fund and Centennial Fund. He will be making application to
all of them, but there are certain restrictions in certain
funds. The Centennial grant is by far the best source because
it does not need to be paid back. The Public Works Trust Fund
is a low interest loan depending on the payment schedule and
the State Revolving fund is more restrictive. He was
concerned about the survival of the Centennial and State
Revolving funds.
Mr. Duffy questioned if Council wanted him to go back through
a proposal process? President Horton pointed out first there
is a legal question to address, a policy question to
establish, and why don't we have our own engineering staff to
do the work. Mr. Johnson stated if that requires yanking this
task out of this contract, however, the law reads in State
contracting as to whether or not you rebid, renegotiate or
pull out the numbers. He requested someone take another look
at spending $230,000 when it appears the City could get by
with at least 1/2 of that amount. Mr. Waibel stated he wanted
to see separate agreements, the construction phase being
separate from the design phase. Mr. Dully requested that
Council formalize their concerns in a memo.
##2518 M/S/C/U(Dawkins/Colvin) to table this item for one month.
6B - 1992 AMBULANCE RATES APPROVAL FOR 911 BLS AID CALLS,
~AB92-052
Pursuant to the new ambulance regulatory ordinance (#AB92-030)
ambulance rates charged for 911 BLS aid calls must be approved
by Council. Each licensed ambulance company has submitted an
itemized rate schedule for 1992. Ail of these companies must
abide my Medicare rules regarding rates. The rate schedules
submitted to Council are, in fact, rates that each company
will use throughout their Kitsap County ambulance business
because Medicare stipulates that rates for the same service
must be equal regardless if it is a 911 BLS aid call charge or
a non-emergency transport charge. Also, Medicare reimburses
ambulance companies based on individual qualifications, i.e.
years in business, number of ambulances. Therefore, you will
note Peninsula Ambulance proposed rates are higher than
Olympic or Bremerton.
TAPE #998
City Council Reg. Mtg. Minutes
February 26, 1992
Page 14 of 35
paula Johnston, License Inspector, provided a composit of rate
schedules for each company, which is quite detailed because
she was unable to come with one rate for BLS transport. The
reason for that is because whatever Council adopts for 911
calls will have to suit the Ambulance companies for the entire
Kitsap County operation, otherwise they would disqualify
themselves from Medicare reimbursement. Medicare states that
you have to be consistent with your rates for every single
patient regardless of the scenario of their pick up.
Therefore, Council is being asked to approve a rate schedule
for ambulance 911 calls. She tried to present a rate schedule
that showed all of the companies and the rates they would like
adopted and they did differ...PeninsulaAmbulance has a $10.00
higher BLS Base charge than the other two companies. That
difference could be attributed to the fact that Medicare
treats Peninsula Ambulance with a different reimbursement
percentage than the other two ambulance companies in
Bremerton. Staff's recommendation is numerical values of the
rates, but asking that Council stipulate a rate structure that
just says the maximum that can be charged but not will be
charged. Such rates would allow the companies to operate up
to that maximum cap and give them the opportunity to structure
their rate schedule so that they remain competitive in Kitsap
County.
Allan Ray, Peninsula Ambulance, stated he supported the City
Council approve a range of rates as opposed to one specific
set of numbers. There is some variation between the rates
proposed by the three ambulance companies for a variety of
reasons, and those differences amount to less than 5% for the
major items. He felt there was a bigger question and that was
"trust". The City is trusting the ambulance companies to
provide services and to not gouge citizens for those services.
He noted ambulance companies are ruled and regulated at the
State and Federal level and reimbursement schedules are
difficult to understand.
Frank Berk, Olympic Ambulance, stated he appreciated all the
work Ms. Johnston did in developing this proposal. In regard
to the Medicare issue, there has recently been an increase in
Medicare allowables due to actions within Medicare based on
inherent reasonableness, which allows more to be paid for
Medicare based on rates. He pointed out, if Council decides
to change the proposed rates or cap them what they have done
with their proposed rates for 1992 is brought them up to where
they need to be in order to take advantage of the raised
Medicare allowables. If those rates are reduced, that would
mean the patient would have to take money out of their pocket
to pay the difference because they would have Medicare
TAPE 9998
City Council Reg. Mtg. Minutes
February 26, 1992
Page 15 of 35
allowables reduced as well. What is proposed is very close to
what needs to be there for those allowables and to give the
patient full advantage of the Medicare allowables.
mr. Walbel emphasized 911 dispatched basic life support is not
a free market situation and the issue is not discussing
competition among carriers. He wants to see one rate set so
that it would not change no matter what time of the year the
service was rendered. Ms. Johnston stated the companies must
post their rates and if Council approves a rate with a cap,
they can't change their rates for their own company on a
monthly or weekly basis. Mr. Wiabel pointed out those rates
could change as the carriers rotate their service. He
stressed there needed to be one rate for each item. It
appeared Ms. Johnston's proposal is to take the highest rate
in each category. Ms. Johnston stated her proposal is for
Council to declare a cap for each category. Mr. W&ibel stated
due to not enough information he did not want to set rates in
that manner. He wanted a proposal that told him the charge for
each item would be the same for all people dispatched under
911. Out of 23 proposed rates, 15 of them are different. Ms.
Johnston stated the proposed schedule represents what the
companies would like, however, Council can look at those rates
and determine which one they desire. Council does have the
authority to stipulate one BLS rate. If Council is asking for
a proposal from staff on what that rate will be, they can
bring back those figures or Council could decide to pick the
lowest rate for each item. Mr. Waibel pointed out due to the
differences in rates by picking the lowest figure for each
category would hurt everyone and by taking the highest figure
would gouge everyone - he wants something that works.
TAPE #999
President ~orton questioned if the Medicare reimbursement was
based on only the base fee or the whole bill for tht
ambulance ride? Mr. Duke stated it would be based on whatever
services are provided.
Mr. Collins questioned if he was correct in understanding that
the Medicare bill was submitted as a one-figure total? Mr.
Duke stated no, the billing is broken down item-by-item for
each item used and totalled with a bottom figure. Mr. Waibel
emphasized that was not Council's concern at this time. The
purpose of this proposal is to set rates for 911 calls.
Collins believed it was Council's concern to not set the rate
so that the companies could get their Medicare reimbursements
but end of gouging the people receiving the services. He was
concerned about someone receiving BLS services, who did not
have Medicare or any other insurance, end up paying an
TAPE #999
City Council Reg. Mtg. Minutes
February 26, 1992
Page 16 of 35
exorbitant price because he will pay "full tariff" for each
item used. He did not want anyone, under BLS, to pay more
than is appropriate.
Mr. Johnson stated he was sick and tired of this issue. There
has been nothing from the ambulance companies but arguments
and disagreements. He was disappointed in not getting a list
as requested. He supported Mr. Collins' comments and was
concerned over rising cost for medical care. He believed the
time to slow down escellating medical costs was right now.
#0133 M/ (Johnson/ ) to take the lowest figure in each category
plus they must all provide all items listed on the rate
schedule or ambulance companies do not operate on 911 rotation
schedule.
Motion died for lack of second.
Mr. Collins stated even if Council approved the lowest cost
for each item, the price was "jacked up" for Medicare. Mr.
Johnson suggested reducing them all by 25%. Mr. Waibel
cautioned against price fixing and emphasized under the City's
ordinance the administraton is responsible to provide the
Council with a set of proposed rates. He urged Council to
send this item back to the adminsitration to develop a set of
rates. Ms. Johnston reminded Council that the ALS rate is
included and because of Medicare regulations the rates
approved will be for all of their business in Kitsap County
and some do ALS work on a private basis. President Horton
stated it was her understanding Bremerton Ambulance does not
do ALS work. Ms. Johnston stated yes, that was her
understanding.
Mr. Dawkins expressed concern that there was not a great
difference between the proposed charges and couldn't see why
so much time was being spent on discussion.
President Horton recommended Council adopt the mid point on
every item that is in disparity. Mr. Johnson questioned how
would the "free" items be addressed? Ms. Johnston stated each
company configurated rates somewhat different in their cost
analysis and if there is not a dollar figure for a specific
item that means they would absorbed it as part of their
service. Mr. Collins stated Council did establish one rate
for ALS, which was proposed by the Fire Department. He
questioned why couldn't the same thing be done for BLS
service? Ms. Johnston stated if Council sets one rate for BLS
the companies that operate in Bremerton would have to use that
TAPE ~999
City Council Reg. Mtg. Minutes
February 26, 1992
Page 17 of 35
figure for every call they make. If they have a complicated
call that costs $450.00, they could not charge that amount but
rather the base rate. Mr. Collins stated he could not be
sympathetic to the rest of their problems, he was worried
about the citizens of Bremerton. Ms. Johnston emphasized if
Council makes an unrealistic proposed rate structure, there
won't be any companies that choose to participate because they
won't be able to afford to. Mr. Waibel outlined a scenario of
a "bee sting" emergency and a "heart attack" emergency would
be charged the same if Council approves one BLS rate.
President Horton pointed out the"bee sting" emergency service
would be subsidizing services for other types of emergency
needs. She felt it was appropriate to break the rates down
item-by-item. She did want Council to proceed with resolution
of this item and if the ambulance companies were not happy
with the result, so be it. She urged Council to approve a mid
point rate on each item with the proviso that is a "capped"
range. The ambulance companies can set their rates lower than
that rate, if they choose. Mr. Waibel stated he was not sure
that would work.
#0355 M/S/F(Waibel/Collins) to table this item for one week.
Vote: In Favor: Collins, Waibel, Colvin, Fitz
Opposed: Dawkins, Johnson, Overson, Estes, Horton
Motion failed.
Mr. Colvin requested Mr. Ray to speak and questioned if the
ambulance companies could work together and bring back another
proposal. Mr. Ray stated no, not legally as they would be in
violation of Federal law in terms of price fixing. Ms.
Johnston stated she supported the Council President's
suggestion to take a mid point on each rate that is different
and declare that as a cap, letting the companies build their
own rate structure beneath the cap. It that becomes
unworkable, then it would be reconsidered. Mr. Waibel
expressed concern that if such a rate structure was developed
there would be different rates for different times of the
year. Mr. Johnson pointed out the ambulance companies say if
the Bremerton sets one rate then they would have to charge
that fee throughout the County. He questioned what if those
same ambulance companies were doing the same thing in other
cities within Kitsap County - would Bremerton's rates change
every time those cities rates change? Ms. Johnston stated the
City of Bremerton's 911 rate, if the "cap" approach is taken,
would remain below the cap. No matter where the service is
rendered the ambulance companies have to charge the same rate
County-wide. President Horton questioned if the city is
first to set rates, would they be the "rate setter" County-
TAPE #999
City Council Reg. Mtg. Minutes
February 26, 1992
Page 18 of 35
wide? Ms. Johnston stated no, Bremerton chooses to regulate
911 rates. If the climate becomes impossible for the
companies to use Bremerton's rates, their only choice is to
drop out of the rotation process. President Horton stated for
clarification if the different municipalities choose different
rates than Bremerton's, then it is at the discretion of the
ambulance companies to participate in the 911 rotation. Ms.
Johnston stated they would have to keep the same rate County-
wide in order to qualify for Medicare reimbursement. Mr. Ray
explained that at the present time no other municipality in
Kitsap County set rates. If they so desired, they could set
rates and if they did the ambulance companies would either
come back to info£m Bremerton of that and asking potential
concurrence with what was happening in those other cities.
Or, they would be approaching the other cities and requesting
that they use the same rate as Bremerton. If that scenario
happened, the ambulance companies might come back to Bremerton
and request that the cities get together and work out a common
agreement.
#0534 M(Dawkins/ ) to adjust the rates at mid point.
Motion died for lack of a second.
Mr. Overson pointed out two thirds of the rates did not
represent high rates and cautioned letting 1/3 drive the
action. He thought it may be better for the constituents to
lock the rate at the lowest rate presented and the rest of
them will have to be good business people to make it work.
Mr. Collins re-emphasized his concern that someone without
insurance would be charged a higher prices than a Medicare
patient. Mr. Waibel questioned when Medicare pays its portion
who will be required to make up the difference? Mr. Duke
explained there are two ways - an assignment where a patient
signs a form and when Medicare pays for its portion the
ambulance company writes off the rest of the bill. The other
way is to bill Medicare and any remaining charges are billed
to the patient. Mr. Colvin stated if these are the posted
rates someone who does not have any insurance is going to be
charged the full rate. Mr. Duke stated that was correct. Mr.
W&ibel questioned how was it legal to charge a rate that
provides reimbursement from Medicare knowing up front that the
rest will be written off, which then allows for a lower rate?
Mr. Duke stated that was the option of the ambulance
companies. ~r. Berk stated that scenario was not what was
happening. They post rates, such as the proposed rate
schedule, which represent less than a 6% increase of what they
have been charging the last 2 1/2 years. Medicare looks at
TAPE #999
City Council Reg. Mtg. Minutes
February 26, 1992
Page 19 of 35
posted rates and pays a percentage of those rates.
#0749 M/S/C(Waibel/Fitz) to accept the weighted averages rounded to
the nearest quarter as the fixed rate for all 911 BLS aid
calls.
Vote: In Favor: Dawkins, Colvin, Overson, Estes, Fitz,
Waibel, Horton
Opposed: Collins, Johnson
Motion carried.
8A - PUBLIC HEARING--PRELIMINARY PLAT APPROVAL OF DAILY
GARDEN; APPLICANT: HANSCO CONSTRUCTION INC., AND ADOPTION OF
RESOLUTION NO. 2379, ~AB92-054
On August 20, 1992, the Planning Commission voted 5 to 0 to
recommend approval of the Daily Garden Preliminary Plat.
Title 58 RCW Boundaries and Plats empowers the City Council to
hold a public hearing in order to accept, reject, or modify
the Planning Commission's recommendation.
President Horton asked the "Appearance Of Fairness/Conflict Of
Interest" question with Councilmen Dawkins and Estes stepping
down and the remaining Council members remained seated.
Jack Allingham, Current Planning, explained the application is
a Preliminary Plat approval to subdivide four lots, which
comprise one parcel of 1.2 acres into nine single family lots.
The applicant is Hansco Construction, Inc., and the
representative is Douglas Hansen. The site is located at 1529
Pennsylvania Avenue, approximately 215 feet north of 15th
Street.
The site has a zoning of Single Family Three (SF-3) and the
Comprehensive Plan designation for the site is Residential 7-
15 dwelling units per acre. There are several requirements in
the SF-3 zoning district: (1) minimum lot size is 4,800 sq.
ft. per lot; (2) have a minimum lot width fronting on the
street of 45 ft. The proposed subdivision conforms to the
minimum lot size and minimum lot width requirements.
The Comprehensive Plan designations (7-15) dwellings per acre
this subdivision has a density of about 7.5 dwellings per acre
and is consistent with the Bremerton Comprehensive Plan. Also
listed in Council's documentation are several residential
Comprehensive Plan policies which support this subdivision.
Access to the site is from Pennsylvania Avenue and as stated
TAPE ~999
City Council Reg. Mtg. Minutes
February 26, 1992
Page 20 of 35
in the Planning Commissions' Findings And Conclusions has a
maximum width of 40 feet. The City has adopted standards for
right-of-way width for a local access street of 50 feet, which
would apply to Pennsylvania Avenue.
Utilities for the site will be essentially served by Bremerton
water and wastewater services. The site also has in the
northwest corner a detention pond to provide for the
stormwater runoff on the property.
When City Council looks at reviewing a subdivision, it looks
at the criteria as to whether the Plat is consistent with the
City's Comprehensive Plan, whether it conforms to zoning and
whether there is adequate and available public and utility
services. The Planning Commission determined that the Plat was
consistent with the Comprehensive Plan and that there are
adequate services available to service the site.
The Planning Commissions' recommendation is for approval
subject to the following conditions:
1. Riqht-of-way: The applicant/developer shall improve
Pennsylvania Avenue by placing an additional 3 ft. of pavement
along the west side adjacent to the site, constructing an
asphalt bern and constructing an 8 ft. wide gravel shoulder.
The applicant/developer shall submit plans for improvements to
Pennsylvania Avenue to the City Engineer for review and
approval.
The final plat shall show a dedication of 5 ft. of right-of-
way along the portion of the subdivision fronting on
Pennsylvania Avenue.
2. Utilities: The applicant/developer shall design and
construct underground utilities for water and sanitary sewer
subject to the review and approval of the Bremerton Utility
Director.
3. Stormwater: The applicant/developer shall design and
construct a stormwater detention facility for stormwater to be
collected from the site prior to discharge into the City's
stormwater system on Pennsylvania Avenue. The design will be
subject to approval by the City Engineer with input from the
neighborhood with Mr. Musial as the contact person.
TAPE #999
City Council Reg. Mtg. Minutes
February 26, 1992
Page 21 of 35
Frank Musial, 1559 Pennsylvania Avenue, stated he was still
concerned with the detention pond due to safety
considerations. He had talked with the Assistant City
Engineer and Wayne Hansen on this issue, however, a major
problem he foresees is the City Engineer allowing Mr. Hansen
build a detention pond that is two feet deep and 20 ft. in
circumference with no protection around it. During the recent
past rains Mr. Hansen had to pump the water up, using a 3-inch
hose, and discharging it 20 feet away from the drain near Mr.
Musial's residence. There are currently two stormwater drains
on Pennsylvania Avenue. The proposal, as presented, would
allow draining the detention pond water on the opposite side
of the street and let it "free-flow" down to the drain (on the
east side of Pennsylvania Avenue). He was not sure the drain
could handle the additional flow. The stormwater drain on his
side of the street had no problem taking the additional water.
Another concern that was pointed out during the Planning
Commission meeting was the way the Staff Report was developed
it appeared there would be pipe going into a sewer system,
which is not the case. There are several neighbors who live
on the other side of the catch basin and they are concerned
with flooding into their drive-in basements. He reminded
Council that the developer would not be living on the site
after completion but all the neighbors would have to live with
whatever developed on that site.
Mr. Johnson questioned where were the sidewalks? Mr.
Allinqham stated sidewalks usually run along the street and
this Plat does not propose a sidewalk. Mr. Johnson stated he
did not find that acceptable. He questioned if natural gas
served that area? And, if the area would have underground
cable TV and telephone lines? Wayne Hansen, applicant,
responded yes.
President Horton noted this site is in her district and she
assured Mr. Johnson that many streets in that district do not
have sidewalks. Her district is comprised primarily of senior
citizens and children, with very little in between. She felt
strongly that sidewalks are needed. The City is facing a
situation in Councilman Johnson's district where an area was
developed without sidewalks and now a new school is being
built and they are facing a situation where there are no
sidewalks for children to travel to and from school. She
understands there are people in that area who feel sidewalks
make it look urban. But, she supported having a sidewalk
along one side of the street and she felt it appropriate to
ask the residents on either end of the subject site to form an
L.I.D. to provide a sidewalk the rest of the way up and back.
She did not feel the City could allow people walking in the
TAPE ~999
City Council Reg. Mtg. Minutes
February 26, 1992
Page 22 of 35
roadways due to safety factors.
Mrs. Fitz stated she had real concern with the water detention
issue and whether or not the storm sewer system would be able
to handle the amount of water generated. She questioned if
the "berm" would run all along all the lots and is it suppose
to help control water? ~resident Horton also wanted the issue
of liability on the water detention pond explained or
mitigation preventing anyone falling into it. Jan Stemkoski,
Assistant City Engineer, stated as far as the detention pond
and no fence - the City could not require a fence because the
City's standards state if the pond is two feet or less no
fencing is required. The way the drainage was intended to
work is the site currently drains to one corner and that is
were the detention pond is to be located. Such a pond would
be lower than the road and would require installation of a
pump so that the water could be pumped up to a catch basin on
the east side of the street, and actually runs down the
existing street for about 270 feet north of Mr. Hansen's
property. Mrs. Fitz requested explanation of the "berm". Mr.
Stemkoski explained the be£m would just be paving along the
side of the street for parking and walking and had nothing to
do with controlling the flow of the water to the catch basin.
Mrs. Fitz questioned which side of the street is lower? Mr.
Stemkoski stated the reason they requested the catch basin on
the east side was to prevent the water from flowing into the
other residents' driveways. There are some people further
north who are concerned about the catch basis not being able
to handle the added water and having it flow into their
driveways. He noted the water would have to build up over the
swail before it would go down into that area. During the
recent heavy storm, water from the detention pond area did
not go down any driveways and Mr. Hansen was pumping more than
the retention system would pump when running. Mr. Hansen was
wiling to make improvements to the driveways to prevent any
water from flowing down nearby residents' drive ways. Mrs.
Fitz pointed out nothing in the documentation indicted Mr.
Hansen's offer to do that for the residents.
Mr. Collins questioned the appropriateness of having the City
Engineer approve the stormwater plan rather than the Utilities
Director? Mr. Allinqh&m stated the City Engineer would review
the stormwater drainage plan. If Council desired that point
could be changed to include the Utilities Directors. Mr.
Collins stated he had a problem with that because the Utility
Director was not a licensed Professional Engineer and he felt
if there was engineering required then it should be the
engineer's responsibility. He was still confused over the
"berm" as outlined in the plan. Mr. Stemkoski explained the
TAPE #999
City Council Reg. Mtg. Minutes
February 26, 1992
Page 23 of 35
developer would be paving the shoulder wider in front of the
development to provide a place for people to walk and park
vehicles. It would be in lieu of a sidewalk and would be a
three inch raised edge.
Mr. Overson stated it appeared to him that the major concerns
of the residents relating to water detention have not been
adequately addressed. He questioned why the area between
Thompson Avenue and the proposed development was shown on the
wiew graph as blank - is it a standing pond? Mr. Stemskoskl
stated it was the concrete plant on that site. As to the swail
area, tere has always been an area of standing water before
the area was ever developed and the water drains to the
northwest corner. Mr. Overson noted that water is not
currently flowing out of that area. Mr. Stemkoski explained
any water will eventually go back into the ground. ~
Overson felt these were the concerns that needed to be
addressed, such as "no natural exit for excessive water build
up". Mr. Stemskoski pointed out the properties already built
to the north prevent the pond area from flowing out to the
bay. Mr. Overson questioned if Council should propose to have
that swail area filled? Mr. Stemkoski stated it could be
filled in and drained out. Even if it was filled, there would
still be a detention pond required.
Mr. Overson questioned would the sidewalk have to be put in
before the property was subdivided or after the homes were
built? Mr. Stemkoski stated in the past it had been done both
ways and typically if the driveway cuts are put in they end up
being in the wrong place and are eventually changed.
Although, like Dockside, they did not put any driveways in and
each time a new one is built they must make a cut. He
believed the developer intended to build the house as they
developed the Plat.
President Horton asked Mr. Allingham to address the new houses
built on the site. Mr. &llinqham stated the parcels as they
exist now consist of four lots and Mr. Hansen has the property
right to construct houses on those four lots and he has taken
out Building Permits to construct houses. The developer
proposes to re-subdivide the property into the proposed
configuration. President Horton questioned where were the new
houses located on the new proposed subdivision? ~
explained lot #8 has a building on it, lot #4 has the existing
house and lot #5 has a newly house constructed of it.
President Horton questioned why is Mr. Hansen subdividing now
when homes are already be built? Mr. A11ingham explained the
applicant chose to take out Building Permits for the houses
prior to the subdivision, which was a personal choice.
TAPE 9999
City Council Reg. Mtg. Minutes
February 26, 1992
Page 24 of 35
Mr. Waibel stated he assumed the new subdivision complied with
the new setback requirements. Mr. Alllnqham stated that was
correct.
Mr. Waibel questioned if this area is in a CSO problem area?
Mr. Stemkoski stated he believed it was. Mr. Waibel stated
the City not only has to have this area in as good drainage
condition as it is prior to development but it must be in
better drainage condition. By State regulations, the City
cannot have more than one incident per year for many of these
manholes and it is impossible to develop this area.
Discussions have brought out the possibility of mandating no
further development in the CSO areas until the Utility has the
sewer and stormwater separated. This proposal is proposing to
do the exact opposite. He noted the City cannot have the
development take place faster than the separation takes place.
He wished the Planning Commission had been apprised of what
those regulations mandate before they reviewed this proposal.
Mr. Johnson questioned who would own the detention pond pump
and provide maintenance on it? Mr. Stemkoski stated that
would be the responsibility of the nine property owners. Mr.
Johnson questioned who would the neighbors go to in the event
the pumping system was not working? Mr. Stemkoski stated if
the pump did not work he assumed the Engineering Department
would be called and they in turn would go to the homeowners
and inform them to repair the pump. In the meantime, the City
would probably have to do any pumping out of excess water.
Mr. Johnson questioned if Council did not approve this
proposal, would the houses being built also meet all setbacks
on current lots. Mr. Allinqham stated yes, they meet setback
requirements today and as proposed by the subdivision.
Mr. Colvin questioned if a 2-foot detention pond would pose
a safety hazard to anyone? Mr. Stemkoski stated it was hard
for him to say that there would be a hazard - obviously it is
possible to drown in two feet of water. The City's
requirements, as they are written today, do not require
fencing for a two foot deep pond. Mr. Colvin expressed
concern over not having anything to require fencing of such an
area. Mr. Overson pointed out the Port Washington Narrows is
located about two blocks away, which is significantly deeper
than the proposed detention pond.
Mrs. Fitz questioned when relating to lot #9, how many feet
are taken up by the detention pond and how could a house be
positioned on it? Mr. Hansen explained the detention area is
not filled full of water, it is a grassy dip in the area in
TAPE ~999
city Council Reg. Mtg. Minutes
February 26, 1992
Page 25 of 35
the back of the lot. When water reaches a certain height, the
sump pump would be activated and water pumped up to the
street. He believed if the pond filled up to two feet, the
home owners would notice it and contact someone to repair the
pump. Puget Power is splitting the electric bill - divided
equally among all the lots. Likewise, all of the lots have
the same responsibility for maintaining a flow line that goes
to the pond. The pond will not be filled full of water.
Mr. W&ibel stated one of the problems citizens of Bremerton
are aware of is the fact that the City cannot continue to
allow surface water to drain directly into Port Washington
Narrows. The City may end up having to treat all runoff
water. When houses are built large impervious areas are
created and will reduce by 1/3 or 1/2 the amount of the
surface area by the buildings and driveways will absorb water
directly down to the water table. He emphasized there needed
to be some way to separate and treat the stormwater and sewer.
Unless this is a system that will connect into a separated
sewer and stormwater drainage system that is not discharged
directly into the Narrows, the City would be in violation of
current State law. Mr. Hansen stated as of this week he and
Mr. Duffy had developed an alternate plan. Mr. Duffy pointed
out to him there is a catch basin at the north end of
Pennsylvania Avenue, that goes directly out into the Narrows
and does not mingle with the sewer system. He suggested using
the same subdivision proposal, however, he would block off the
catch basin that goes into the sewer and continue it down to
the Narrows, which is heading north. Mr. Waibel stated that
suggestion may work, however, that was not the proposal before
Council. He felt Council would have to request that the
developer get together with the City Engineer and Utility
Director and come up with conditions that will satisfy the new
State law for receiving Council approval. He suggested this
item be tabled until the developer had a better proposal for
water drainage.
#2146 M/S/C(Johnson/Colvin) to pass Resolution #2379, as presented
by the Planning Commission with the exception of the following
changes to Exhibit A:
Paragraph A-1 Right-Of-Way, second paragraph, second line
after Pennsylvania Avenue add the phrase "includinq a concrete
sidewalk
Paragraph A-2 Utilities, second line after water add ~
telephone, natural Gas. and cable television. And, adding
"City Engineer" after the word "Director".
TAPE ~999
City Council Reg. Mtg. Minutes
February 26, 1992
Page 26 of 35
Paragraph A-3 Stormwater, first line - add the word "fenced in
front of stormwater. And, add the following sentence: "The
stormwater system must comply with all Washinqton State laws
applicable to CSO's as of the date of this Resolution or the
date of the buildinq permit whichever comes later.
President Morton noted if sidewalks are to be required and in
theory vehicles would park on the street side of the sidewalk
in which case the $ ft. gravel shoulder would not be
necessary.
Mr. Collins questioned with the additional installation of
utilities, would it be appropriate to include the City
Engineer under A-27 Mr. Johnson stated both City Engineer and
City Utility Director could be included. Mr. Stemkoski stated
presently, the Engineering Department does not review any
thing that has to do with sanitary or water. Mr. Johnson
questioned who would review the installation of a natural gas
pipeline? Mr. Stemkoski stated the gas company does their own
pipe installation and the Engineering Department issues
permits for their gas work in City right-of-way.
Mr. Colvin questioned if the detention pond would still be
required? President Horton emphasized yes, but it would be
fenced or else there will be some other direction as per the
State mandate.
Vote on motion: In Favor: Colvin, Johnson, Overson, Fitz,
Waibel, Collins, Horton
Motion carried.
President Morton stated she believed Council needed to look at
City standards and when issues like this come up those
standards need to be readdressed. Every time a developer
comes under the guise of "affordable housing" you can almost
bet that it will come with no sidewalks and the absolute rock-
bottom minimum funding to construct. She believed Bremerton
had enough affordable housing at this point in time and the
Housing Bremerton Plan states the need to attract middle and
upper economic housing levels - that means the City needs to
start raising standards so that things like sidewalks,
undergrounding utilities, stormwater, etc., can be addressed.
Previously, Council required another developer to jump through
hoops to make sure they did it properly. She was not sure why
Council was expected to approve Mr. Hansen's proposal, which
required lesser standards than other developments. She
believed Council would be discriminatory if they did not hold
to those types of requirements for all developers. She
requested staff, maybe in conjunction with the policy issues
TAPE #999
City Council Reg. Mtg. Minutes
February 26, 1992
Page 27 of 35
Council will be looking at, to take those standards and come
up with something that conforms with not only Housing
Bremerton but also State and growth management mandates. Mr,
Johnson assured Mr. Hansen Council was not "beating up" him,
however, each Council member received action recommendations
from Dyes Inlet/ Clear Creek Watershed Action Plan Watershed
Management Committee that addresses cleaning up of stormwater.
Mr. Collins noted in a recent news article in Kitsap Business
Journal it identified "affordable housing" is $125-175,000.
Councilmen Estes and Dawkins returned to Council Chambers.
8B - PUBLIC HEARING--TO CONSIDER A REQUEST FOR AN ~MRNDMENT TO
THE COMPREHENSIVE PLAN EAST OF PERRY AVENUE MALL AND ADOPTION
OF RESOLUTION NO. 2380, ~AB92-055
The applicant for this Comprehensive Plan Amendment has
received County approval for a multi-family residential
development on unincorporated land immediately east of the
Perry Avenue Mall. The development needs City utility
services. In order to receive such services, projects must be
in conformance with the City's Comprehensive Plan. To achieve
the needed Plan consistency, the applicant is requesting that
the site be changed from iow-density residential to high-
density residential.
This request has been considered by the Planning Commission at
a public hearing on January 21, 1992 and the Commission is
recommending approval. Amendments to the Comprehensive Plan
are made by resolution and a resolution is attached for the
City Council's consideration.
President Horton asked the "Appearance Of Fairness/Conflict Of
Interest" question with all Council members being seated.
Ron Hough, Planning Manager, explained this proposal is a
Comprehensive Plan Amendment and the applicant is Son-Son
Holding Corporation. When Comprehensive Plan Amendments are
made the surrounding area is reviewed to see if there might be
some additional sites that would be suitable for amending as
well. In this case they went as far as Trenton on the east
and the general use is single family residential.
On the west side of Perry Avenue there is a business mall and
more businesses along the street. They did not find any
additional land for consideration.
Mr. Hough provided a view graph showing the present zoning map
of the area and the Shopping Center zone covers the Perry
Avenue Mall as well as some duplex residential zoning. The
proposed site is zoned Residential 5 units per acre.
TAPE #999
City Council Reg. Mtg. Minutes
February 26, 1992
Page 28 of 35
The City's Comprehensive Plan is very general for the proposed
area. Part of the applicant's proposal is to include some
commercial along the frontage of Perry, which is consistent
with the Comprehensive Plan.
The reason for the application is that the applicant has
applied to Kitsap County and received approval for a multi-
family residential development at 18 or 19 units per acre.
Since this development is not consistent with the City's
Comprehensive Plan, the only way for this project to receive
city utilities, which it needs, is to make the City's plan
consistent with that development or make the development
consistent with the City's plan. Since the project was
already approved in the County, they are now requesting an
Amendment to the City's Comprehensive Plan.
When the Planning Commission reviewed this proposal, they
looked to see if this area was suitable for high density
residential. The basic idea is that the City's planning goes
well beyond the City Limits with the expectation of
annexation. This particular area had a lot of benefits for
high density, i.e, being across the street from a major
shopping area, within walking distance of trade, public
services and entertainment type businesses, and availability
of transit. The design of the project would feed most of the
traffic back onto Perry Avenue rather than throughout the
residential neighborhood. Also, there is a creek that flows
along the back side of the proposed project, which also
further separates the project from the residential on the
east. After reviewing the criteria in the Comprehensive Plan,
the Planning Commission decided that the subject site was a
good site for high density residential for all the reasons
included in the Findings Of Fact and Conclusions Of Law. The
Planning Commission did not look at the site plan nor the
County zoning as those issues are still within the County's
jurisdiction and the City has no control over zoning or site
plan review. The Planning Commission's recommendation is for
approval of the Comprehensive Plan Amendment.
Mr. Houqh quoted the following out of BMC 15.02.040, a policy
dealing with the provision of services outside the City
limits: "Any parcel of property that is outside existing City
limits must support annexation to the City as a condition of
receiving City Utility service. Property that is outside
existing City limits shall be permitted Utility service only
upon entering into an agreement with the City providing for
annexation at such time the City may deem appropriate and
consistent with any proposed extra-territorial Comprehensive
Land Use Plan And Development Standards for the property".
TAPE #999
city Council Reg. Mtg. Minutes
February 26, 1992
Page 29 of 35
What is happening with this policy is the developer cannot
obtain City services for a project unless it is consistent
with the Plan and unless they agree to annex when that time
comes along. The developer did discuss annexation with the
City initially and they were told annexation was not a strong
possibility because of the shape of the area and the City has
had annexations turned down because of irregular boundaries.
The Boundary Review Board and State law tries to have cities
create nice square, straight line boundaries that make sense.
This particular site juts out to the east of the Perry Avenue
Mall and is the only property that would be east of Perry
Avenue and there still is some in fill that needs to be done
south of the Perry Avenue mall. Therefore, they did not feel
this was a strong annexation possibility, however, the
applicant has submitted a 10% petition to annex.
Travis Reed, Chairman Board Of Commissioners North Perry Water
District, stated he needed clarification on the statement in
the staff's report: "however, the project needs City utility
services". He pointed out Perry Avenue is the boundary
between North Perry Water District and the City. When this
project started about 1/2 year ago, the developer came to the
Water District and questioned if they could serve water needs.
A letter from the Water District was issued to the developer
stating: "yes we can and will serve water in this particular
area". He needed clarification as to whether the City would
honor the present service area boundary and allow them to
serve water in that area and the City only serving sewer,
which is not within the Water Districts Franchise. Mr. Houqh
stated his understanding was North Perry Water District would
provide water service and the City would provide the sewer
service. President Horton questioned if there was any other
area served by the Water District that is in incorporated
Bremerton? Mr. Reed stated there was one exception - on North
Perry because of the development of the City and Water
District, there are services on both sides of the street, some
by North Perry and some by the City depending on who had the
service at the time. It has been an acceptable arrangement.
There have been some preliminary discussions between Mr. Duffy
and the Water District's Manager about the possiblity of
exchanging those areas thereby cleaning up the boundary
lines. Mr. Johnson questioned if there were agreements
between the City and North Perry Water District? Mr. Reed
stated there have been boundary agreements. He believed Mr.
Johnson was thinking of Tracyton Water District. mr. Reed
stated he was happy with the clarification he requested.
Mr. Waibel stated he receives a combined water and sewer bill
each month and his sewer bill is based on water usage, he
TAPE #999
city Council Reg. Mtg. Minutes
February 26, 1992
Page 30 of 35
questioned how did the City charge for sewer when they would
not be receiving City water? Mr. Hough stated he did not know
how that worked. Mr. overson stated people who have wells but
are on City sewer do receive bills based on something..
Mr. Waibel stated in Mr. Hough's statement he noted that the
way cities grow is through annexation. This City has had a
problem growing through annexation. If you look at the City's
boundary all the way around the City we are getting high
density development and the City is providing services.
Whenever the City asks to get some of the tax money those
people pay, the City gets a hassle from the Boundary Review
Board and folks screaming "I don't want to live in the City
because it is not rural any more"! The City keeps getting
promised that the City will get the property taxes from the
areas that the City is serving all the services, such as
streets. The reason we have a policy that we will not serve
those areas unless they fit into the Comprehensive Plan is to
make sure the City gets the necessary remuneration to provide
the services the City provides. He questioned when will we
annex this area?
Mr. Colvin pointed out there are irregular boundaries all
around the City and the developer of this project wants to
come into the City. President Horton emphasized annexation
could only happen if the Boundary Review Board doesn't kick it
out. The proposal does form an irregular boundary and that is
one of the Board's favorite reason to deny annexations.
Mr. Johnson reminded everyone of the Bremerton school the
Boundary Review Board wouldn't let the City annex. He was not
going to support requests such as this proposal and pointed
out the City already had Fred Meyers, Sun Fjord, etc.. The
County is suppose to be stopping "sprawl" and the City is
suppose to be doing "high density". If the City does do high
density it has to be done with quality urban design. If
Council did approve the Comprehensive Plan with no control
over the site plan, development and zoning we would get what
we usually get in those few cases when we can annex are no
roads, cul-de-sacs, no sidewalks, not designed for urban. He
urged that first the property needed to be annexed into the
City and then design it so it is good for urban living with
high pedestrian access, usage and not take it "after the
fact".
Mr. Collins pointed out on the opposite side of town on Marion
Avenue there is the same kind of thing...Marion Avenue
Apartments directly across the street from a school. The City
had no control over that project, however, the city is
TAPE %999
City Council Reg. Mtg. Minutes
February 26, 1992
Page 31 of 35
providing water and sewer service. People living in that area
do not always know that they reside in the County and are not
serviced by City police. He did not support this proposal and
felt it was just making another "Marion Avenue Apartments".
Mr. Overson stated there is the need for growth and
development but he believed the County should be likened to
rural. He questioned the definition of R-57 Mr. Hough stated
low density residential 5 dwelling units per acre. ~r.
Overson questioned if the County spot zoned this proposal so
they could put it on the City's border? Mr. Hough stated that
was how the County processes these - it is generally a Planned
Unit Development with a rezone. Everything surrounding the
City of Bremerton is designated on the County's Comprehensive
Plan as either urban or semi-urban, allowing up to about 30
units per acre. President Horton pointed out Fred Meyers is
located in a semi-urban zone. Mr. Overson stated following
the analysis of the Boundary Review Board and what is
acceptable to them, when do we see this area potentially
meeting the Boundary Review Board requirements to annex into
the City? Hr. Hough stated once we start filling below the
site Mr. Duffy has plans to include an annexation. President
Horton noted the Kitsap County Regional Council is working on
urban growth boundaries and at that point in time she
suspected that area will be seen as not being refused by the
Boundary Review Board because it will be part of the urban
growth area. Mr. Hough stated he believed it would be within
a year or six months of having an agreement between the City
and County as seen through the Regional Policy and Urban
Growth Management Agreement between the City and County for
things including urban growth, growth areas and how
annexations proceed and how utility services are provided and
coordinated with these areas.
TAPE %1000
Mr. Hough stated the proposed site of 7+ acres, under the
current City's Comprehensive Plan, could develop with three
units per acre or about 20 unites all on septic systems. He
was not sure that was in the City best interest. President
Horton questioned if the majority of the houses surrounding
that site were on septic systems? ~r. Hough stated yes. He
noted part of the benefit of this project, if approved and
built, would be some major utility improvements such as a pump
station and major sewer lines. That would mean the homes with
failing septic systems could hook into that sewer, which would
include annexation agreements.
Mr. Waibel questioned if Mr. Hough had received a 10% petition
TAPE #1000
City Council Reg. Mtg. Minutes
February 26, 1992
Page 32 of 35
for annexation? Mr. Houqh stated he believed so.
Mr. Waibel noted if the City has a 10% annexation petition
without any utility agreements and the City goes through the
annexation process, we might make it if the people want to be
in the City.
Mr. Colvin requested Dr. Lindstrom to speak. Dr. LindstNom,
retired Dentist, stated he previously had a financial interest
in the subject site, however, he did not at this time since he
sold it to the developer. He noted the three houses on the
subject site are poverty level rentals. He believes they are
an eyesore and he viewed the development as a definite benefit
to the area. He gave his support to the developer during the
County hearing process. He emphasized the proposed project
does include sidewalks, access off Perry Avenue and a day care
center in the northern corner of the site, with the remainder
being in rental units. He felt the design was very attractive
and the developer had gone to great expense for drainage and
water runoff. He also emphasized he was not representing the
applicant, but just doing it for informational purpose. He
believed the developers to be quality conscious and have put
a lot of money and time into the project already.
90075 M/S/C/U(Waibel/Estes) to table this item until the annexation
petition is processed.
6C - ADDENDUM TO PROFESSIONAL SERVICES AGREEMENT FOR LEGA?,
SERVICES -- DAVID ARMSTRONGt ~AB92-053
This contract was approved by Council on June 26, 1991, for
calendar year 1991 with maximum fees estimated at $20,000.00.
The City did incur services billed at $14,612.00 through 1991.
The proposed Addendum covers the litigation for 1992. To
date, extensive discovery has been completed by both sides and
it is anticipated that an additional $15,000.00 in fees should
cover remaining discover, legal work, and court appearances
needed for dispositive motions. If the case continues to
trial, it is unlikely trial will be scheduled this year,
therefore trial costs are not estimated as part of this
contract extension.
The need to retain counsel due to conflicts as discussed last
year was confirmed and clarified by Court Order.
Council members Waibel, Horton and Collins stepped down from
this issue due to a conflict of interest, with Council Vice
President Dawkins taking over as Acting President.
lan Sievers stated he did include the Court Order in the
TAPE #1000
City Council Reg. Mtg. Minutes
February 26, 1992
Page 33 of 35
Agenda packet because there was some public comment, when the
contact was initially approved, questioning his determination
that a conflict attorney was needed for the case.
Public comment - none.
#0291 M/S/C/U(Johnson/Estes) approval of Addendum to Professional
Services Agreement.
Council members Waibel, Horton and Collins returned to the
Council Chambers.
7A - ORDIN~NCE NO. 4365 (SECOND READING) t ADOPTION OF
AMENDMENTS TO BREMERTON SHORELINE MASTER PROGRAMt ~AB92-048
On August 15, 1991, the City Council adopted Resolution No.
2358 - a resolution of notice of intent to adopt amendments to
the Bremerton Shoreline Master Program. The amendments
address public access, shore modification, view protection,
moorage, Kitsap Lake and Bog, and various administrative
"housekeeping" amendments. The amendments also include
Environment Designation Map amendments. The Washington
Department of Ecology (WDOE) adopted the amendments on
February 5, 1992. The City Council now needs to adopt those
amendments by Ordinance.
Councilman Fitz stepped down from this issue due to her not
having been present during prior Council action.
Public comment - none.
#0352 M/S/C/U(Colvin/Estes) to approve Ordinance No. 4365 attached
in Exhibit C.
Councilman Fitz returned to Council Chambers.
7B - ORDINANCE NO. 4366 (SECOND READING) AMENDING THE OFFICIAT,
ZONING MAP OF THE CITY OF BREMERTON TO APPLY CITY ZONING TO
THE BREMERTON HEIGHTS ]~qNEXATION AREA~ ~AB92-049
In September, 1991, the City of Bremerton completed the
annexation of an area known as Bremerton Heights, located
between Oyster Bay Avenue and Bremerton Boulevard, and
immediately south of the proposed City Public Works Complex
site. Upon annexation, "provisional" zoning was applied, with
the understanding that the Planning Commission would later
review the Comprehensive Plan and Zoning of this area and make
its recommendations to the City Council for the final
designations.
The Planning Commission conducted its required public hearing
TAPE #1000
City Council Reg. Mtg. Minutes
February 26, 1992
Page 34 of 35
and has forwarded its recommendations to the City Council.
This public hearing has been scheduled to consider those
recommendations and to accept public comments. Amendments to
the Comprehensive Plan are made by Resolution. The Zoning Map
is amended by Ordinance.
Public Comment - none.
#0386 M/S/C/U(Waibel/Estes) recommends passage of Resolution No.
2378 to amend the Comprehensive Plan, approval of Ordinance
(First Reading) to amend the Zoning Map, and passage on Second
Reading of Ordinance No. 4366 to amend the Zoning Map.
7C - ORDINANCE NO. 4367 (SECOND READING) ESTABLISHIN~
OPERATION OF AMBULANCE SERVICE WITHIN THE CITY LIMITSt ~B92-
O3O
This Ordinance is a revision of BMC Chapter 5.50. It deletes
the Chapter in its entirety and establishes an Ordinance in
line with Federal, State RCW's and WAC'S as well as local
requirements. It establishes a rotation policy for current
and future participants, eliminates a 3-ambulance requirement
and implements a performance-based criteria. The ordinance
allows the Council to approve rates for 911-initiated calls
only.
Public comment - none.
Mr. Waibel questioned, on page 11 of the ordinance, if
changing the last sentence under Section 5.50.130 to read:
"The City Clerk shall present a regional comparative rate
survey and recommended rates .... ", would change the intent of
the ordinance? Ian Sievers, City Attorney, stated no, Council
can take a recommendation from anyone and if Council feels
there is actual staff study that should go into that survey as
well as just presenting the survey, that would be acceptable.
Mr. Waibel stated based on earlier hours deliberation he
wanted to clarify exactly what Council desires from the City
Clerk by changing the last sentence of Section %5.50.130 to
read: "The City shall present a regional comparative rate
survey with recommended rates for each item to the Council for
consideration in approving 911 rates".
#0454 M/S/C/U(Waibel/Johnson) to pass Proposed Ordinance No. 4367
and passage on second reading including the change to the last
sentence in Section #5.50.130 as stated above.
With no further business meeting adjourned at 9:20 P.M.
TAPE #1000
City Council Reg. Mtg. Minutes
February 26, 1992
Page 35 of 35
KATHLEEN L. McCLUS[EY, City Clerk
IA~NN HORTON, Council President
City of Bremerton
KLM/LH/me
cc: Normal Distribution
File/Vault