HomeMy WebLinkAbout04/07/93TAPE #1098
UNAPPROVED DRAFT
CITY COUNCIL MEETING MINUTES
#0032
#0052
~PRIL 7, 1993
The regular meeting of the City Council of the City of
Bremerton was called to order in the City Council Chambers,
239 4th Street, Bremerton, Washington, Wednesday, April 7,
1993, at 5:30 p.m., with Council President Eileen Fitz
presiding. Council members present were Lynn Horton, Hank
Waibel, C. R. "Tiny" Collins, Morrie Dawkins, A1 Colvin and
Russ Johnson. Councilmen Richard Neville and Lon Overson were
absent. Also present were City Attorney Ian Sievers and City
Clerk Kathleen McCluskey.
The meeting opened with the Pledge of Allegiance led by
Council President Fitz and Invocation given by Councilman A1
Colvin.
President Fits announced Council would hold an Executive
Session on "potential litigation" and a Study Session on
"request for elimination of Entertainment Tax" immediately
following the Council meeting.
CONSENT
A. Minutes of Meeting - March 10, 1993, #AB93-059
B. Minutes of Meeting - March 17, 1993, #AB93-060
C. Minutes of Meeting - March 24, 1993, #AB93-061
Bid Award Recommendations - Water Main
Repair (Under Warren Avenue Bridge)- Awarded
To Quigg Brothers McDonald In The Amount Of
$29,400.00 Plus Tax, #AB93-062
M/S/C/U(Collins/Colvin)
presented.
to approve Consent Agenda as
CLAIMS/WARRANT RE~ISTERS
Vouchers audited and certified by the auditing officer as
required by RCW 42.24.080, and those expense reimbursement
claims certified as required by RCW 42.24.090, have been
recorded on a listing that had been made available to the
council.
M/S/C/U(Horton/Colvin) April 7, 1993, the Council does approve
for payment those vouchers included with the exception of
Total Furnishings Inc. (delaying payment for one week), and
TAPE #1098
City Council Reg. Mtg. Minutes
April 7, 1993
Page 2 of 11
further described as follows: 165254, 165255, 165257, 165259
through 165415 in the total amount of $381,770.50; and Regular
Payroll for the period ending 3-31-93, in the total amount of
$700,790.08.
COUNCIL MEMBER REPORTS
Mrs. Hotton reported today she attended the Kitsap Regional
Council meeting. The hottest topic discussed at that meeting
was a proposed resolution on ban of fire works, which did
pass. The intent of the resolution was to ask local
jurisdictions to each look at holding a public hearing on fire
works. She suspects sometime well ahead of July 4th President
Fitz will be scheduling a public hearing on that issue.
Mr. Colvin commended the Civil Service Officer for his
comments in a recent news article in The Sun, which he found
to be very appropriate. He reported today former Governor
Dixie Lee Ray was the quest speaker at the Bremerton Central
Lions Club's luncheon meeting. He found her presentation to
be very interesting, informative and entertaining. He
reminded everyone of District #1's Neighborhood Coalition
meeting scheduled for April 15, 7:00 P.M., at the Sheridan
Park And Recreation Center.
Mr. Johnson thanked City Public Works staff and
representatives from Kitsap/Bremerton Health District for
making a nice presentation to the residents on the west side
of Kitsap Way regarding their request for sewer extension.
Residents in that area had hoped to receive some grant funding
to extend the sewer line and were disappointed when they were
not selected to receive grant funds. In spite of their
disappointment, they are still determined to upgrade their
area with improved sewer service. He reported within the next
couple of weeks the Council and public will hear a report from
the Ad Hoc Advisory Committee on their review of City
government and Charter.
Mrs. Fitz reported the Ad Hoc Advisory Committee will be
presenting their report as an "Information Item" on April 14
and a Public Hearing on that same issue will be held April
28th. Anyone wishing to obtain a copy of the Ad Hoc Committee
Report may pick one up at the City Council office. She also
attend the Kitsap Regional Council meeting where they received
a presentation on the Sinclair Inlet Water Study. She was
proud to say that sediment testing in the areas of the City's
sewer treatment plant and on the east side of the Shipyard
were clean and did not show contamination found in other areas
of Sinclair Inlet.
TAPE #1098
City Council Reg. Mtg. Minutes
April 7, 1993
Page 3 of 11
PUBLIC RECOGNITION
Mayor Louis Mentor introduced Randy Witt, the newly appointed
City Engineer, who was the #1 choice of the interview panel.
He noted Randy comes with not only Traffic Engineering
experience but also sewer and water engineering expertise.
Randy Witt
thanked Mayor Mentor and the City Council for giving him this
opportunity.
Mayor Mentor reported he also attended the Kitsap Regional
Planning Council meeting this date. He announced Christmas In
April is coming up on April 17 and five homes wills be
renovated through that program. The Home Builders Of Kitsap
County are spearheading this program along with lots of
service organizations throughout the community. If anyone
wants to volunteer to participate in this event, they can
contact his office for more information. He reported he also
enjoyed Dixie Lee Ray*s presentation at the Bremerton Central
Lions Club luncheon. On a sad note, he reported the passings
of Art Anderson, long time resident of Bremerton and founder
of Art Anderson & Associates engineering firm; Carson Clark,
long time Bremerton resident who contributed to sports
activities; Phil Meyer, 60-year member of the Bremerton
Central Lions Club and actively involved in community
projects; Frank Keezer, long time Bremerton resident who
contributed immensely to the community. He expressed concern
that so many community leaders are passing away and hopes
younger people within the community will step up and take
their places in leadership. He reported Ralph Taylor and
Tacoma Rose Society have scheduled a "save the CityIs rose
buds" work party on April 10th at Evergreen Park. He
questioned the existence of a Kitsap County Rose Society? He
reminded everyone of a benefit concert scheduled April 10,
8;00 P.M., at Bremerton High School for Jenica Goetz, who
needs a bone marrow transplant.
Mayor Mentor read a Proclamation whereby he proclaimed the
week of April 11-17, 1993, as Arbor Week and April 14th as
Arbor Day. Michele Windsor, Naturalist, accepted the
Proclamation and stated Arbor Week is taking on more
significance every year, especially in light of the recent
Forest Conference. Trees are not only important to our
livelihoods and economy of many western Washington towns, but
equally important is habitat for owls, salmon and a multitude
of ancient forest inhabitants. Forests are enjoyed by hikers,
campers, bikers, fishermen and even tourists rushing by on
freeways. Washington StateIs identity is tied up in trees and
is a resource that seemingly has no end to its uses. The
Bremerton Parks and Recreation Department invites everyone to
TAPE #1098
City Council Reg. Mtg. Minutes
April 7, 1993
Page 4 of 11
join them in celebrating Arbor Week through the following
events:
1. Tree Trivia Contest On KITZ
2. Seminar - How To Choose The Perfect Tree
3. Naturalist Hike To Evergreen Park
Mayor Mentor emphasized it is as important to save a tree as
it is to plant a tree.
Terrie Rottler, Project Family, announced an upcoming fund
raising event for Project Family on April 17, 7:00 P.M.,
Silverdale By The Bay Hotel. The Kitsap Home Builders
Association have constructed several "play houses", which will
be auctioned off at the April 17th event, along with other
items. Admission to this event is $10.00 per person.
Gil Johnson, 3035 Whisper Drive NW, briefly outlined the
Selective Swim Program, a Kitsap Family YMCA free to learn
swim program for handicapped and disabled children from the
Bremerton School District. This program is staff with
volunteers and is conducted at the City's Municipal Pool every
Friday morning. This program offers children, who are blind,
deaf, learning disabled and otherwise mentally or physically
challenged, an opportunity to participate to their maximum
potential. This program gives these children an experience in
the water that many of us take for granted. This years
financial support is primarily by private contributions and to
continue serving these deserving young people, the YMCA must
raise funds from the community to pay for insurance, bus
transportation and pool rental fees. All administration and
instruction of this program are provided by volunteers. The
community's financial assistance is essential to keep this
program operating. Additional information may be obtained by
contacting the YMCA 377-3741. IF anyone would like to
participate as a volunteer in the Selective Swim Program, that
help would be appreciated. Another point of contract for this
program is Coordinator Marge Thorn 692-9482.
Vicki Vanneman, Director of Parks and Recreation Department,
referenced the Mayor's comments about Ralph Taylor's efforts
to assist with the City's rose garden at Evergreen Park. She
noted it is conceivable that Mr. Taylor was part of a work
party on April 3, made up of a large group of Rosarians, lead
by Bremerton resident Dick Cline. For the past two months Mr.
Cline has been working with Parks Department staff to renovate
and refurbish the City's rose beds. The City purchased 100
new rose bushes, which have been planted. The City also
received a donation of 32 rose plants from a Bremerton
resident, that were planted as infill at Evergreen Park. She
#0916
TAPE #1098
City Council Reg. Mtg. Minutes
April 7, 1993
Page 5 of 11
will call Mr. Taylor and ask him to reschedule his planned
event until later on in the season.
6A - CHANGE ORDER #2 (FINAL) CONTRACT NO. 3405 -- IMCO GENERAL
CONSTRUCTION. INC./McKENNA FALLS IMPROVEMENT, ~AB93-063
Attached for City Council's consideration is Change Order #2
for Contract No. 3405 - IMCO General Construction, Inc., for
the work and time extension required to complete the project,
for a total cost of $20,135.00 as indicated below. With this
Change Order, the final contract value is $1,013,508.35
(excluding tax). The original contract value was $952,489.50
(excluding tax) - an increase of approximately 6%.
President Fits questioned the original date of the contract?
Bill McKinney, Utility Department, stated the termination date
of the contract was January 4th and the Change Order extended
it to March 11. He was not sure of the date the contract was
entered into, but work began in August of 1992. He noted
original start time was to have been April, but due to permit
delays from the Corp of Engineers work did not commence until
August.
Public comment - none.
Mr. Dawkinsquestioned location of this project? Mr. McKinnev
explained this project was at the McKenna Falls intake for
improvements of the water intake, chlorination facility and
for monitoring. It also included refurbishing a house for lab
facilities and what will eventually be a watchman's home.
Mr. Colvinquestioned the total cost of the Change Order?
McKinney explained this Change Order amounts to $20,135 and
would increase the total contract amount, excluding tax, to
$1,013,000. This cost also includes engineering provided by
Parametrix Inc.. The actual cost for the entire project is
$1,409,814.00. He noted the original engineer's estimate for
this project was $1,631,000, so it did come in under the
original estimate.
M/S/C/U(Collins/Colvin) to approve Change Order #2
(Final)/Contract No. 3405 - IMCO General Construction, Inc.
for the construction of improvements to the McKenna Falls
facility and accept the project as complete and authorize the
Mayor to execute the same subject to City Administrative
Policies and Procedures.
6B - AMENDMENT #3 (FINAL) CONTRACT NO. 3279, PROFESSIONAL
SERVICES AGREEMENT -- PARAMETRIX INC./MCKENNA FALLS SURFACE
SUPPLY FACILITY, #AB93-064
#1013
1
TAPE #1098
City Council Reg. Mtg. Minutes
April 7, 1993
Page 6 of 11
Attached for City Council's consideration is Amendment #3 to
Professional Services Agreement No. 3279 for Parametrix, Inc.
for additional design, Corps of Engineers permitting, and
additional field inspection for a total cost of $34,200.00 as
indicated below. With this Amendment, the final agreement
value is $348,127.00. The previous value of the agreement was
$313,927.00 -- an increase of approximately 10%.
Bill MoKinney, Utility Department, stated this amendment
covered additional engineering cost for both the problems the
City had in the delay of the Corps Permit and additional
engineering work that was caused through some of the Change
Order work under IMCO's contract -additional excavation,
spring water problems on site, disposal of unsuitable
materials. Even though some of these costs were incurred
earlier, Parametrix was asked to delay submittal of their
Amendment until IMCO's Change Order was brought forward.
M/S/C/U(Horton/Collins) to approve Amendment #3
(Final)/Professional Services -Agreement No. 3279 for
Parametrix, Inc. for the McKenna Falls Surface Supply Facility
and authorize the Mayor to execute the same subject to City
Administrative Policies and Procedures.
7A - ORDINANCE NO. 4409 (SECONDREADING) DISSOLUTION OF JENSEN
ADDITION WATER DISTRICT, #AB93-057
RUSS Johnson questioned if the need for a unanimous vote of
the Council on this issue was driven by State law? Ian
Sievers, City Attorney, stated on this particular issue
Council is required by R.C.W. to cast a unanimous vote.
Councilman Hank Waibel joined the meeting at 6:10 P.M.
Mr. Colvinquestioned if an unanimous vote meant those present
or the full Council? Mr. Sievers explained it meant only
those present.
Mr. Collins questioned if he should step down from this issue
because he was not present at the time of first reading of the
ordinance? Mr. Sievers stated this is not a public hearing or
quasi-judicial matter, but purely legislative and a Council
member may vote on a second reading without having voted on
first reading.
Public comment- none.
Mr. Waibel stated for clarification that even though he was
absent at the time of first reading of the ordinance, he had
viewed Council action on this item. And, he was very much
#1108
t
TAPE #1098
City Council Reg. Mtg. Minutes
April 7, 1993
Page 7 of 11
involved six years ago when the annexation was first put
together and supports the proposal as presented.
M/S/C/U(Johnson/Collins) to pass unanimously Ordinance No.
4409 accepting the conveyance of the property and assets of
the territory annexed by Ordinance No. 4115.
7B - ORDINANCE NO. 4410 (BECONDREADING) AMENDING THE OFFICIAL
ZONING MAP OF THE CITY OF BREMERTON FOR THE PENDERGAST
REGIONAL PARK, #AB93-058
Public comment - none.
#1153
M/S/C/U(Horton/Waibel) to pass Ordinance No. 4410 amending the
Official Zoning Map of the City of Bremerton for the
Pendergast Regional Park.
.7C - RESOLUTION NO. 2428, ADOPTING THE MASTER FLOOR PLAN FOR
THE PENDERGAST REGIONAL PARK, #AR93-065
On December 18, 1991, City Council approved a Professional
Services Agreement with Bruce Dees & Associates for the design
of Pendergast Regional Park. In January of this year, a
Design Review Committee began a series of meetings with the
consultants to define and prioritize the key elements of the
Park. The result of those efforts is the Master Plan
presented at this time for Council's consideration.
Vicki Vanneman, Director Of Parks and Recreation Department,
explained Bruce Dees and Andrew Schulman from Bruce Dees &
Associates, will make a slide presentation on the proposed
project. By prior Council action at this meeting, the
finalized change in the Comprehensive Plan designation and
rezone for this particular project were made and are important
steps. At this point, Council is being asked to consider yet
another important step - the adoption of the Master Plan for
this 50 acre park that has been worked on for several years.
The park will contain ball fields, soccer fields, walking
paths, ultimately a small swimming pool, play grounds, RV
facilities and lots of green space. This Master Plan was
presented to the Kitsap County Commissioners in December of
1992, and received their strong endorsement. The delay in
bringing the Plan to Council was caused by the City's efforts
to work out a shared access road with an adjoining property
owner. Those discussions were temporarily stalled and Mayor
Mentor, staff and Bruce Dees' organization felt the project
needed to move forward. It was felt by those working on the
project, when the shared access is worked out minor
adjustments can be made in the design to accommodate that
road. She was pleased to reported that discussions on a shared
access are continuing and the next meeting is scheduled for
TAPE #1098
City Council Reg. Mtg. Minutes
April 7, 1993
Page 8 of 11
Friday, April 16.
The Master Plan was developed with the assistance of a Design
Review Committee, who met on a regular basis during the first
half of 1992. Amongst other, included on the Committee were
three members of the joint operating board - Gene Lobe,
representing Kitsap County, Brian Foreman, representing the
City and Ron Corcoran, representing the Pendergast Committee,
and five neighbors of areas that adjoin the project site. The
five neighborhood representatives actively participated in the
discussions and decision making process. During the second
half of 1992, they dealt with many issues and circumstances
that would determine how feasible was this Master Plan and
could it actually be accomplished. Those issues and processes
involved extensive surveying, geo-technical testing of the
property, looking at in-kind contributions, dealing with the
rezone and access issues. Although they do not have, at this
point, tangible evidence that this park is happening, progress
has been made and the project is moving forward.
Bruae Dees stated rather than just speak to a drawing, they
will use slides to talk about the plan as well as show
examples of what the park may ultimately look like. He
described the site as approximately 50 acres bounded on the
north by residential area, on the west and south by Pope
Resources property and on the east by State or National Guard
Armory property. The site, while it seems relatively level,
has an elevation change of 70 feet. The site was logged some
time ago and through a recent volunteer effort, small seedling
trees have been transplanted to an area so that they may be
used once the park is developed. There are existing stands of
good sized Douglas Fir trees in two corners of the site. As
previously mentioned, the designers of the plan worked closely
with the Advisory Committee that consisted of not only
organized sports but also a number of residents, who live near
the site. Input from those residents asked that the designers
address access into the site and about people trying to access
the subject site from the north side and going through their
residential neighborhood up Egan Street. It turned out the
site was developed so that access is now from the east, coming
up Lynden Street and into the property. Something else they
did to address the residents' concerns was to keep the active
areas as far away from the residential area as possible. Play
fields were developed to the west and south, with soccer
fields and parking also to the south and access coming from
the east. The property line along the north can be fenced to
discourage anyone from attempting access from that direction.
The final plan consists of six softball fields with a large
TAPE #1098
City Council Reg. Mtg. Minutes
April 7, 1993
Page 9 of 11
common space in the center. The focal point of the common
space will be the Andy Pendergast Museum and facilities to
service that complex, including children's play area and
wading pool. There will be two soccer fields with maintenance
buildings adjacent to serve both soccer and softball fields,
restroom building, children's play area and parking for five
hundred vehicles. The entrance to the park will have a
controlled area with a gate and the caretaker residence. Mr.
Dees pointed out an area to be used for an RV camping area
that would serve not only the tournaments but also could be
used in the off-season as a potential revenue generator. A
small building that would serve as a shower/restroom facility
for the RV area is also shown on the plan. There is a
jogging/walking trail that runs around the entire perimeter of
the park.
Mr. Dees described in more detail each element of the plan and
showed slides of similar type facilities that visibly showed
what could actually be built to meet the needs identified.
Ms. Vanneman stated what Council is considering at this time
is only the Master Plan. She did want to share that the
schedule to complete grading on the site is by the end of
June. She announced, with a lot of assistance from Richard
Dunlap, of Parametrix, Inc.., a definite commitment has been
secured from Brem-Air Disposal Inc., and Ace Paving to
complete all of the grading for the project. This is a huge
contribution and far exceeds the original verbal commitment of
$80-100,000 worth of work. Mr. Dunlap has also contacted
several other firms who are in the "land clearing" business
and it will be proposed to put together a "partnership" of
those smaller firms to take care of clearing the site. During
the 2 1/2 months the clearing and grading are being
accomplished, Bruce Dees and his team will be completing all
of the design development work, contract drawings and
obtaining necessarypermits. She anticipates the project will
be ready to go out for bid July 1.
President Fits questioned could we expect to see this park
completed totally all at one time? Ms. Vanneman stated no,
the park will be developed in phases and will budget driven.
The first phase will include a significant portion of what was
shown to Council during the slide presentation. President
Fits questioned if the soccer fields would be ready by next
fall? Ms. Vanneman stated they are targeting them to be ready
by next "season".
Mr. Collins questioned what is the total cost of the project?
Ms. Vanneman stated 7.1 million dollars for everything as
t
TAPE #1098
City Council Reg. Mtg. Minutes
April 7, 1993
Page 10 of 11
shown on the Plan. President Fits noted the in-kind work
could be deducted off of that total dollar figure.
Collins questioned how long will it take to complete the
project? Ms. Vanneman stated she has not projected
construction of the entire project, but focused on what is
currently doable in phase I. The projection for construction
of phase I is to start in August and be completed by the end
of 1993. Mr. Collins questioned what would be included under
Phase I? Ms. Vanneman stated that would be budget driven, but
at this point phase I would include three softball fields, two
soccer fields, the center area and majority of the parking.
Mr. Colvin questioned how much of the 7 million dollars has
been identified? Ms. Vanneman stated they have targeted 2
million dollars for phase I construction project, with some of
the access issues needing to be funded.
Mr. Waibel questioned if Ms. Vanneman was identifying the
south three fields and would the timber be left standing until
phase II? Ms. Vanneman stated the northern three fields would
be developed first due to the grading process, and the
majority of those trees will be retained for buffer.
Mrs. Horton raised the question, understanding that 1 million
dollars will come from Kitsap County, the City's commitment of
1/2 million and 1/2 million from community, where is the other
$900,000 coming from? Ms. Vanneman stated Council was not
being asked to adopt a budget for the project at this time.
Ms. Horton's question is a hard one to answer, however, the
process of securing that funding has been difficult because
the target has been a "moving" target. Until the commitment
had been secured for "in-kind" work, the actual amount of
funds needed was not known. Ron Corcoran, member of the
Operating Committee, is standing on notice that he will lead
the charge for raising some additional funds. He was not
prepared to go after donations without a solid target, so that
effort will start immediately. President Fitz questioned in
the 2.9 million dollar figure does the in-kind work need to be
backed out or is that figure after the in-kind services have
been provided? Ms. Vanneman stated the 2.9 million dollar
figure included in-kind services.
Mr. Dawkins questioned the location of the access road? Ms.
Vanneman clarified that as of this date the "join access road"
has not been worked out. The City does have a commitment from
the National Guard Armory for the Lynden Street access.
Jack Lefcoski, 1700 KitsapLake Road, stated he fully supports
the proposed sports complex, but emphasized the importance of
#2224
TAPE #1098
City Council Reg. Mtg. Minutes
April 7, 1993
Page 11 of 11
having a minimum of two exits from the complex.
M/S/C/U(Dawkins/Colvin) to approve Resolution No. 2428
adopting the Master Plan for the Pendergast Regional Park.
With no further business meeting adjourned at 6:43 P.M.
KATH~LEEN~L. MCC~~LUSY, City
EkLEEN FITZ, ~~resident
City of Bremerton
KLM/EF/me
cc: Normal Distribution
File/Vault
Clerk