HomeMy WebLinkAbout11/10/93 )
TAPE #1149 UNAPPROVED DRAFT
CITY COUNCIL MEETING MINUTES
NOVEMBER 10, 1993
The regular meeting of the City Council of the City of
Bremerton was called to order in the City Council Chambers,
239 4th Street, Bremerton, Washington, Wednesday, November 10,
1993, at 5:30 P.M., with Council President Eileen Fitz
presiding. Council members present were Richard Neville, Lynn
Horton, C.R. "Tiny" Collins, Morrie Dawkins, Russ Johnson, Lon
Overson, and Al Colvin. Councilman Hank Waibel was absent.
Also present were Assistant City Attorney Jim McNamara and
Acting City Clerk Rich Hanna.
The meeting opened with the Pledge of Allegiance led by
Council President Fitz and Invocation given by Bonnie
McCullough of Abundant Life Foursquare Church.
CONSENT AGENDA
A. Minutes of Meeting -- October 20, 1993 #AB93-215
#0041
M/S/C/U(Neville/Horton) to approve the Consent Agenda as
presented.
CLAIMS/WARRANT REGISTERS
Vouchers audited and certified by the auditing officer as
required by RCW 42.24,080, and those expense reimbursement
claims certified as required by RCW 42.24.090, have been
recorded on a listing that had been made available to the
Council.
#0041
M/S/C/U(Colvin/Dawkins) November 10, 1993, the Council does
approve for payment those vouchers included and further
described as follows: 170675, 170676, 170733, 170739 through
170988 in the amount of $745,953.57.
COUNCIL MEMBER REPORTS
Mrs. Horton extended a sincere "Get Well" wish to the City's
Purchasing Agent Gil Johnson.
Mr. Colvin announced Mayor-Elect Lynn Horton and the newly
elected Council members have been invited to speak at District
# 1's Coalition meeting on January 20. He understands the
Mayor-Elect has a challenge for District # 1 and she will share
that information at the January 20 meeting. He acknowledged
TAPE #1149
UNAPPROVED DRAFT
the presence of an individual, known as the "Oprah Winfrey of
Kitsap County" in the Council Chambers, and he expected her to
speak during Public Recognition time.
Mr. Johnson stated he hoped people would take a few minutes on
November 11th to remember the veterans and their sacrifices.
Mrs. Fitz welcomed her mother, who resides in Albuquerque, New
Mexico, to Bremerton and was pleased that we've had sunny
weather during her visit.
PUBLIC RECOGNITION
Mayor Louis Mentor reported on November 5th he attended the
dedication of a new commissary at Puget Sound Naval Shipyard.
This new facility will be of benefit to the many active and
retired military personnel who reside in the Bremerton/Kitsap
County area. The Flea Market held on November 6 at the
Sheridan Park Recreation Center was well attended. He
reminded everyone that Thursday, November ll is a holiday and
City offices will not be open for business that day. The
ribbon cutting ceremony opening the 4th Street project will be
held Tuesday, November 16, 4:00 P.M. Mayor Mentor shared a
letter of thanks received from a group from a Village Assembly
in Japan, who visited Bremerton approximately two weeks ago.
Gordy Byrd, P.O. Box 930, reported as of this date he had
collected $14,480.76 for his shelter for the homeless. He
urged anyone who has a concern or question to come before the
City Council and share that information with the City Council.
Karen Williams announced she is a featured guest host on
KITZ's Consider What I Say program (Sundays at 5:00 P.M.) for
two weeks. This week her guest will be Seattle author, Mr.
Lon Elmer, who wrote a book entitled "Why Her, Why Now", which
deals with a situation of a man whose wife is dying and how
men handle grief. Her guests for the November 21 broadcast
will be two people who have experienced near death
experiences. She anticipated both shows to prove to be very
interesting.
Beverly Woods, Executive Director of the Bremerton Area
Chamber of Commerce, announced the Chamber will be sponsoring
the following workshops in November and December in
preparation for the holiday season: November 16, 7:30 AM to
9:00 AM, at the Community Room of Washington Mutual
Savings..."Tis The Season For Bad Checks, Shoplifting and
Holiday Fraud" (mainly for retail and service businesses).
This workshop will be conducted by Police Officer Jon Johnson
of the Bremerton Police Department. Cost for this workshop is
$5.00 per person. Reservations for the workshop are being
taken through the Chamber's office 479-3579. The second
workshop they are putting on is something they have wanted to
TAPE #1149
City Council Reg. Mtg. Minutes
November 10, 1993
Page 3 of 26
do for awhile and that is getting ready for the Chamber to
kick off a "shop Bremerton" year-long promotion. They want
the residents of Bremerton to know that there are lots of
places to shop, and things to buy in Bremerton, and that they
don't have to go outside of Kitsap County. In order to do
that, they must make sure that we have the best customer
service oriented sales people in the state. Therefore, the
Chamber is sponsoring a workshop for sales people and they are
encouraging businesses and their employees to take advantage
of this opportunity, especially if they have seasonal workers.
The workshop is titled "I'll Never Go Back There Again Or They
Have The Best Service In The County" presented by Bill Hope on
December 2, 7:00AM- 10:00AM, at the Kitsap Vocational Skill
Center multi-purpose room. Reservations for that workshop can
be made by calling the Chamber Office. President Fitz stated
we too would like everyone to "shop Bremerton".
Don Atkinson, Bremerton Main Street Association, announced the
upcoming special events during the Christmas season: first
ever Christmas market will be held downtown on the weekends
leading up to Christmas in the Weir's building on 4th Street.
Some vendors will be in under cover in the parking area next
to the Weir building. Dates for the Market are December 4, 5,
11, 12, 18, and 19. Another event that will be new this year
will be Santa's arrival on a Bremerton fire truck on the
evening of December 4 at 5:00 P.M. and lighting of a Christmas
tree outside of City Hall. The second annual Hospice tree
lighting on the boardwalk will take place on the evening of
December 3, at 6:00 P.M., followed by a candlelight procession
up to Yesterdays, Today's and Tomorrow's for a social event
with the Puget Sounders performing. He noted there is another
new attraction around Bremerton and that is an open air horse
drawn carriage that will be taking people for rides in the
downtown area periodically throughout the holiday season.
Earl Smith, Executive Director of the Economic Development
Council, reported he brings good news. The EDC received an
Office Of Economic Adjustment grant in the amount of $100,000,
which was submitted for EDC by Kitsap County. Also, the EDC
got the State to put $50,000 into matching funds for
diversification for Kitsap County to accompany that grant.
What comes with that $100,000 is $50,000 to complete the
incubator program, one of which will happen in downtown
Bremerton. The other $50,000 will go to the City of Bremerton
to hire the Leland Group again for the second phase of their
study. He emphasized the "real plus" for having funding for
that second phase study was not having to go out to County
people and again ask for private donations. The State's
matching $50,000 paid for the first half of the incubator
TAPE #1149
City Council Reg. Mtg. Minutes
November 10, 1993
Page 4 of 26
study and it also allowed him to hire a full time person to do
diversification in Kitsap County. He referenced the two
million dollar grant that will be administered by Employment
Security and the fact that the EDC was one of the
participants. He raised the question what is EDC getting out
of that grant...EDC will receive $215,000 and $25,000 will be
used for a full time person to implement the incubator
program. He felt one of the best results of those grant funds
is getting 10 additional people who are classified as paid
volunteers. The definition of a paid volunteer is a person
who will work for the EDC for 10 months, who has been laid off
by the Department of Defense, the Navy, from a defense
contractor, or who just does not have a job. Paid volunteers
will receive $620.00 per month and will work for 10 months and
at the end of that period they will have gained $2,500 toward
some kind of higher education at either Olympic College or
vocational training. Of the ten workers, two will work on the
Admiral Theater project, at no cost to the project; two will
work on the Turner Joy; two will work at Keyport so that
Keyport can continue doing the things relating to
diversification, dual use, transfer of technology and create
some jobs; and six people will. be assigned to oversee
thirteen committees that have been created in the EDC, such as
finance, land use, etc. These committees will make sure that
what was said at the diversification conference can and will
happen. He is very happy about what is happening because it
will help diversify Kitsap County and revitalize the downtown
area. He assured the Council that the Turner Joy is alive and
well and yes, there will be some financial concerns surviving
the winter months, but they have already figured out how to
raise funds to carry them through. Efforts must be put forth
to move people inland to the Admiral Theater and other
businesses located in the inner-core of the City.
Shannon Cook, 256 Burwell Apt. 202, stated the 4th Street
project was looking very nice and she was pleased to be living
one street over from such a nice area.
6A - INTERLOCAL AGREEMENT DESIGNATING KITSAP TRANSIT AS LEAD
AGENCY TO ADMINISTER COMMUTE TRIP REDUCTION PLANS AND
ORDINANCES, #AB93-216
Kitsap County and all Cities within the County have adopted a
common Commute Trip Reduction (CTR) ordinance. The CTR
ordinances authorize Kitsap Transit to administer the CTR Plan
and Ordinances for each jurisdiction. This Interlocal
Agreement reaffirms the ordinances, provides for Kitsap
Transit to receive CTR funds, and adopts a statement of work.
John Clauson, Service Development Manager for Kitsap Transit,
TAPE #1149
City Council Reg. Mtg. Minutes
November 10, 1993
Page 5 of 26
introduced Bob Ferguson, Transportation Demand Management
(TDM) Planner, who provided a brief update on what they have
been doing since their last appearance before the Council.
Bob Ferguson, TDM Planner for Kitsap Transit, stated this past
year Kitsap Transit trained all the Employee Transportation
Coordinators for the major employers of the area. Currently,
they are in the process of reviewing the major employer's
Commute Trip Reduction (CTR) programs. They have already
reviewed all of the County's, and so far every program has
passed. They have been working on Kitsap Transit's Registered
Car Pool/Van Pool Program. The major employers in the County,
including PSNS, are picking preferential parking spaces at
their work site and posting "car pool only" signs. The
employees parking in those spaces register through Kitsap
Transit and in return they send the employer the registration
information as well as the employee the car pool passes.
Presently, they are working with local merchants throughout
all of Kitsap County where the merchants will be able to offer
discounts to those individuals who are car pooling/van pooling
in the County. This program was "kicked off" just two weeks
ago, and at Bangor there are already approximately 250 ride
share members.
The purpose of the Commute Trip Reduction Law is to reduce air
pollution and traffic congestion in our communities.
Implementation of this program is moving "full speed ahead"
with monthly meetings with major employers providing
assistance in reducing the number of single occupancy vehicles
coming into the City and County.
Mr. Dawkins questioned the number of employees and number of
major employers in this area? Mr. Ferguson stated there are
approximately 33 major employers within the County,
representing approximately 20,000 employees. They are hoping,
with the involvement of PSNS, to have 5,000 registered car
pools/van pools in the County. President Fitz questioned if
Kitsap Transit vehicles would be used in this program or are
they privately owned vehicles? Mr. Ferguson stated both kinds
of vehicles will be used. Most of the registered car pools
are private, two-person car pools. However, Kitsap Transit
purchased 40 new vans that they are lending out to the public.
To qualify for a van there needs to be a driver and six
additional members. The new vans are being placed
strategically throughout the work sites of the major employers
and they are filling those vans rapidly.
Mr. Overson pointed out the Statement of Work for the trip
reduction program included 23 separate elements and questioned
TAPE #1149
City Council Reg. Mtg. Minutes
November 10, 1993
Page 6 of 26
through what vehicle will he be working to implement the
identified elements? Mr. Ferguson explained the cities and
counties, except Bainbridge Island, have an Employee
Transportation Coordinator that they work with. The City of
Bremerton's CTR program is due November 13 and should be
implemented in June of 1994. Mr. Overson questioned if the
City's program is on track? Mr. Ferguson stated yes, the City
is completely on track. Mr. Overson stated the original
program started off with some status reports and questioned if
the Council would receive further updates? Mr. Ferguson
stated yes, everyyear a survey will be conducted to determine
where the major employers are as to the single occupant
vehicle rate.
Mrs. Horton questioned how well the City was doing in
complying with required tasks up to this point? Mr. Ferguson
explained the process is slow and continuing. The cities and
County need to be reviewing their Parking Ordinances and how
those ordinances relate to the Commute Trip Reduction law.
Through the CTR law, the question needs to be asked: "Do we
need this much parking, and in having this much parking do we
encourage the use of the single occupant vehicle?" Mr.
Clauson stated, as Mr. Ferguson mentioned, that it is a long
and tedious process. The review of City ordinances is
critical to the long term success of this program and what
they are proposing to do is to take the lions share of the
funds that are coming available through the State and part of
those funds will be used to hire a person who will serve two
purposes: (1) to work with the community, cities and the
County in the development phase of these large projects that
come along, i.e., large apartment complex, short plats, etc.
Emphasis will be placed on encouraging some other form of
transportation than the single occupant vehicle, be it
pedestrian amenities, bicycle paths, etc.; and (2) working
with the various jurisdictions to assist in that review
process of ordinances, be it the Zoning Ordinance, Parking
Ordinance, etc. During that review process, suggestions and
recommendations will be made as to how changes could be made
to better address the CTR law. There will be time required
from City staff to carry out this review process. He
explained there is a group called Partners For Smart Commuting
that encompasses counties in both Washington and Oregon and
collectively through the money they have put together have
developed some public service ad campaigns focused on getting
people out of their individual vehicles. Some of those ads
have been running in the Seattle area and some have been aired
on local radio stations. Print media has been provided
through local newspapers at no charge.
TAPE #1149
City Council Reg. Mtg. Minutes
November 10, 1993
Page 7 of 26
Mr. Colvin noted at one time perimeter parking was advocated
that would include van pooling into the City. He questioned
if that was still a viable option? Mr. Clauson stated it was
still in their goals and plans, however, it is a long term
process to acquire property and develop parking lots. Their
first preference is to pick up an individual before they get
into their vehicle and that was why they had such an expansive
worker/driver program and van pool programs. For those people
we can't pick up, then the park-and-ride system strategically
laid out throughout the County is the direction they are
heading. They have expanded co-op lots where they contracted
with churches where they have contributed some to the
development in exchange for the use of their lot Monday
through Friday during the commute day. This plan has worked
out quite well. An example of that program is a church in the
South Kitsap area near the Southworth Ferry terminal where
they are currently using about 150 spaces in their lot. A
piece of property adjacent to the church became available,
which Kitsap Transit purchased, with the intent to turn it
into a park-and-ride lot contiguous to the church property.
Kitsap Transit would use the church parking lot and the newly
acquired lot during the weekdays and the church would then use
their parking lot and Kitsap Transit's lot during the weekend.
Today, Kitsap Transit representatives met with the Suquamish
Tribe about taking advantage of their parking available at the
Suquamish Bingo Parlor.
Gordy Byrd, P.O. Box 930, expressed concern that vehicles were
being parked in the bus loading zone in front of Woolworths on
Pacific Avenue. He questioned if people parking in the
loading zone could be ticketed? President Fitz stated she
would contact Parking Supervisor Ms. Goddell and provide him
with a response by next week.
Mr. Johnson stated he supports the trip reduction program,
however, he felt reviewing the Parking Ordinances would be a
waste of City staff time on a non-problem. He has never heard
that there is excess parking in Bremerton any where,
especially since the waterfront was developed. He does not
believe the City's parking arrangement encourages going
against CTR. What he sees happening if changes were made to
the Zoning Ordinance, is multi-family facilities being built
that provide inadequate parking, such as some multi-family
complexes that exist now in East Bremerton. Until there is a
problem where there is so much excess parking that we start
encouraging people to use their own vehicle, he felt that
would be "kind of crazy". He also believes most people feel
there is inadequate parking spaces and in development the last
thing Council wants to do is build something with inadequate
TAPE #1149
City Council Reg. Mtg. Minutes
November 10, 1993
Page 8 of 26
parking spaces.
Mr. Collins stated he had been working with Kitsap Transit
personnel to develop a system whereby commuter parking would
be forced out of the neighborhoods, which is what the City
wanted to do and in line with the CTR program. Now, they are
almost back into the same problem that existed before where
people are not participating in the initiated program and
vehicles are again being parked all over the hillside in
District # 7.
Mrs. Horton stated she concurred with Mr. Collins and what
this proposal is addressing is commute trip and what Council
has heard over and over is that there is a problem with
residential parking and with people who want to come to
Bremerton to shop. If City policies and ordinances are
reviewed in accordance with CTR she believed it promoted both
neighborhood parking and commercial parking where it is
appropriate. She wholeheartedly concurred in this agreement
and felt strongly that the City needed to promote transit
pooling, bicycle riding, etc., to get people out of their
single occupancy vehicle for commute trips. Mr. Johnson
stated he felt the City had already taken those steps through
the Residential Parking Zones, increased fines for parking
infractions, etc. He emphasized there are some major City
projects that need staff time and he would put commute trip
parking at the bottom of the priority list.
Mr. Dawkins emphasized parking is an on going problem in every
City and he felt Bremerton was fortunate having someone handle
the coordination of the CTR program. He agreed that
implementation of the program will not happen overnight,
however, it will work in time.
Mr. Overson noted Mr. Johnson had a good point in diminishing
returns. He believed there was already a very good rate of
eliminating single occupancy vehicles (SOV) and that it would
be hard to improve on that rate.
#1558
M/S/C/U(Horton/Collins) to approve Interlocal Agreement
administering CTR Plans and Ordinances.
6B - 245 4TH STREET BUILDING (PUBLIC WORKS CONTRACT #3349)
CHANGE ORDER # 1, #AB93-217
In October 1991, the City entered into a contract with Puget
Sound Masonry & Restoration, Inc. in the amount of $42,396.00
to clean seal and paint the exterior surfaces of the 245 4th
Street Building. Before work started, it was discovered that
the existing exterior building coating contained asbestos, and
TAPE #1149
City Council Reg. Mtg. Minutes
November 10, 1993
Page 9 of 26
work was stopped. Recently, the City has pursued removal of
the asbestos exterior so the building can be sealed and
painted. The attached change order to the contract with Puget
Sound Masonry & Restoration, Inc. in the amount of $29,973.00
addresses removal of the loose exterior building coating which
contains asbestos.
A summary of the project costs including the change order are
as follows:
Original Contract Amount $42,365.00
Change Order #1 29,973.00
Revised Contract Amount $72,338.00
8.1% WSST 5.859.38
TOTAL COST $78,197.38
Section 2.76.100 of the Bremerton Municipal Code requires that
change orders in excess of 20% of the contract price, or
$30,000, whichever is less, be approved by the City Council.
Up to this limit, the Mayor has the authority to authorize
change orders. With approval of the attached change order,
the contract will exceed the change order authority of the
Mayor and require City Council approval for all future change
orders. As the contract work has not yet started, staff
requests that the change order authority be given to the Mayor
for a revised contract amount of $78,197.38 (the contract plus
change order # 1). This will allow timely reaction to any
changes which may occur and require quick action by the staff.
Randy Witt, City Engineer, explained when he started with the
City one of the first things pointed out to him was getting
the exterior of the 4th Street Building sealed and taking care
of any asbestos. There were three ways of getting the
asbestos off contractually and after reviewing all three
options it was felt this proposal was the best, which is a
change order to the existing contract. The other two options
were to have the City contract the asbestos removal itself
independent of the existing contract and then have the
painting contract come in later. If the City had opted to go
in that direction, there was the possibility that paint might
peel off and the painting contractor and asbestos contractor
could blame each other. By rolling both the asbestos removal
and painting into one contract, it puts the responsibility on
the contractor to make sure the asbestos removal is
satisfactory for painting. Another way the City could have
approached this work would have been to reject the contract
with the painting contractor and readvertise the proposal.
The reason they chose not to do that had to do with the time
involved. If the dry weather holds, there is the possibility
TAPE #1149
City Council Reg. Mtg. Minutes
November 10, 1993
Page 10 of 26
of getting the work accomplished this winter, which would
allow the building to be sealed for the winter. Water damage
that has already occurred to the building is evident and can
be observed on the 5th floor. In the schedule of things that
need to be done to the building, sealing the exterior of the
building is probably one of the highest priorities.
Mr. Johnson stated he was concerned with staff's second
recommended moton that authorizes the Mayor to approve future
change orders. He referenced the fact that change order rules
are listed in the Bremerton Municipal Code as a result of an
ordinance passed by the City Council. He questioned if there
was a provision in that ordinance allowing Council to waive
their approving authority? Jim McNamara, Assistant City
Attorney, stated he did not believe Council can waive that
authority. The language in Section 2.76.100 states that
changes must be approved by the City Council. He felt that
language was included as protection for the City Council in
having oversight for change orders. Mr. Johnson stated
something might be considered some day adding a section in the
Bremerton Municipal Code that said the provisions of this
restriction could be waived by the Council with a super
majority vote. Mr. McNamara stated the Code could be amended,
however, at this time there is no provision to waive that
Council authority.
Mr. Dawkins questioned the length of time needed to
accomplish this work? Mr. Witt explained given the time of
year, the contractor was not given a certain end date,
however, the contractor envisions the work to be completed in
4-6 weeks. Mr. Dawkins questioned once the work is completed
can the tenants move in? Mr. Witt stated this work is
independent of tenants moving in and will benefit the tenants
that are already in the building.
Mr. Colvin questioned what would happen if the proposed work
is not done? Mr. Witt stated if the City does not move
forward with the proposed work the building will continue to
deteriorate due to water coming through the walls. Mr. Colvin
questioned if delaying the repair at this time would cost the
City more at a later date? Mr. Witt explained the more damage
there is the high cost of repair. Mr. Colvin questioned what
was Mr. Witt's recommendation to solve that problem? Mr. Witt
stated he is recommending approval of the proposal as
presented. Mr. Colvin questioned if such action was legal?
Mr. McNamara stated yes, however, his earlier concern had to
do with the fact that because of an ordinance, Council cannot
waive its authority for approving future change orders. He
pointed out this change order is before Council for approval
TAPE #1149
City Council Reg. Mtg. Minutes
November 10, 1993
Page 11 of 26
and there is no legal problem with that action. Mr. Witt
noted motion # 2 has been withdrawn.
Mr. Neville questioned if Mr. Witt actually had a schedule of
maintenance for the 4th Street building and if not, will there
be one forthcoming? Mr. Witt stated earlier he used the word
schedule, however, a better word would be "shopping list". He
was not aware of a specific schedule/shopping list developed
for the 4th Street building, however, he did not have all the
pieces "in his court". Mr. Meville pointed out there is a
certain amount of dollars set aside for this building project,
and now the City is going into it for an extra $30,000. He
questioned how far will this money go and what will it cover?
Mr. Witt stated in response to Mr. Neville's question will the
whole amount of money fix everything on the "shopping list",
he did not have an answer and was something the Mayor had been
deliberating over. He recalled an earlier "shopping list"
that included a 6-year renovation at approximately $300,000
and we've come in with something 10% of that figure. As they
get into renovating the building, he hoped the trend of
reduced costs can be maintained. He offered to take Council's
concern back to staff members who are working on the 4th
Street building project.
Mrs. Horton stated she was concerned that the City entered
into this contract without knowing there was asbestos in the
paint. She questioned if in the future there was some way to
guarantee that things like that will be taken into
consideration so that Council will be fully apprised when
going into projects such as this? Mr. Witt stated without
being there at the time this particular project was initiated,
he did not know what the assumptions were. The intent is to
always go into a project knowing what the full. costs are,
however, he could not guarantee they won't run into surprises.
There is an Asbestos Report on the 4th Street building and
they are using it. Mrs. Horton stated when the City
undertakes future projects, we will be more aware that
problems such as this could exist, and she urged that they be
analyzed ahead of time. Mr. Witt explained they do learn from
mistakes.
Mr. Overson noted Councilman Waibel, who is not present at
this meeting, has voiced concerns about growth of a contract
through these kinds of vehicles. He questioned if he
understood correctly that the City would be given a 10-year
guarantee on the completed work? Mr. Witt stated that was his
understanding. Mr. Overson stated it surprised him that the
painting contractor gave an estimate for painting the exterior
of the building and did not notice that there was an existing
TAPE #1149
City Council Reg. Mtg. Minutes
November 10, 1993
Page 12 of 26
asbestos problem. Mr. Collins stated it is not all that
common to find asbestos in a coating like that found on the
4th Street building. He believes it was an incident where no
one was aware of the asbestos problem until the paint scraping
started and it become evident that a problem existed.
Public comment - none.
#2172
M/S/C(Dawkins/Colvin) to authorize and direct the Mayor to
execute the attached change order #1 to P.W. Contract #3349
with Puget Sound Masonry & Restoration, Inc. in the amount of
$29,973.00 for removal of the loose building coating which
contains asbestos on the 245 4th Street Building. The revised
contract amount is $72,338.00.
Vote on motion: In Favor: Dawkins, Colvin, Johnson, Overson,
Fitz, Collins
Opposed: Neville, Horton
Motion carried.
7A - ORDINANCE NO. 4437 (SECOND READING) FOR THE ANNEXATION OF
THE KITSAP/CORBET AREA INTO THE JURISDICTION OF THE CITY OF
BREMERTON, #AB93-214
Public comment - none.
#2256
M/S/C/U(Johnson/Colvin) to pass Ordinance No. 4437, on second
reading annexing approximately 20.18 acres known as the Kitsap
Way Annexation Area, located north of Kitsap Way, east of
Marine Drive and west of Corbet Drive along Kitsap Way, into
the City of Bremerton and fixing the effective date of
annexation.
8A - PUBLIC HEARING: WEST KITSAP LAKE ROAD SEWER UTILITY LOCAL
IMPROVEMENT DISTRICT (U.L.I.D.), #AB93-218
The City Engineer has received a petition signed by a majority
of the property owners within the West Kitsap Lake Road Sewer
Utility Local Improvement District (ULID) boundary requesting
sewer improvements. Section 35.43,125 RCW requires a public
hearing be held on the creation of a proposed ULID that is
initiated by petition. The City Council meeting is the public
hearing.
The total estimated project cost is $625.000. In working with
the property owners supporting this project, it was apparent
that they understood the City would provide $300,000 toward
the project completion. This was evidenced by handouts
distributed at public meetings. A search of the record shows
no formal City Council authorization to provide the funding.
The estimated cost per lot with the City contribution is
TAPE #1149
City Council Reg. Mtg. Minutes
November 10, 1993
Page 13 of 26
$4,200, while the estimated cost per lot without the City
contribution is $8,000.
Pursuant to the petition, the City Council is requested to
take action on initiating the ULID and to provide a City
contribution toward the project. The options available to the
City Council are:
1. Direct the City Engineer to proceed with formation of
the West Kitsap Lake Road Sewer ULID and authorize a City
contribution in the amount of $300,000 toward the
project. Possible funding sources are the Wastewater
Utility Fund and the General Fund.
2. Reject the petitions to proceed with formation of the
West Kitsap Lake Sewer ULID because a City contribution
of $300,000 is not authorized by Council, yet was assumed
by the signing property owners. The petition should be
recirculated with the understanding that the City will
not contribute $300,000.
3. Proceed with formation of the West Kitsap Lake Road
Sewer ULID and not approve the City contribution.
However, this is not fair to the property owners who
signed the petition assuming the contribution, and should
not be considered.
The Public Works and Utilities Department staff recommend
Option Number 2 above. An impression was made that the City
would contribute $300,000 toward the project, yet it was not
formally approved by the City Council. With the current City
commitment to reducing the combined storm overflows, reducing
odors at the Wastewater Treatment Plant, and maintaining and
operating the existing system, Wastewater Utility Funds are
not available to provide $300,000 to this project. Likewise,
the City's General Fund is not able to support a $300,000 City
contribution toward the project.
Staff supports this project, but cannot support a $300,000
City contribution. Therefore, the petition should be re-
circulated reflecting the lack of City contribution.
Randv Witt, City Engineer, explained the City received
petitions signed by a majority of property owners (61%) in the
west Kitsap Lake area to provide sewers in that area. The
project involves putting sewers in west Kitsap Lake Road and
on Northlake Way within the boundaries of the district. There
are two questions before Council at this time: (1) first
hearing to accept or reject the petition; and (2) the City's
TAPE #1149
City Council Reg. Mtg. Minutes
November 10, 1993
Page 14 of 26
contribution of $300,000 to the project. During the petition
process, people supporting the petition and obtaining
signatures at the various meetings were left with the
impression that the City would contribute $300,000 to the
project. Even he, during his participation at meetings,
contributed to that process with impressions he picked up from
City administration. However, as the petitions were being
processed what they did not find was a Council resolution
approving the $300,000 for that project. Therefore, Council
must decide: (1) does the City want to make a $300,000
contribution to the project; (2) does the City want to go
forward with the project as a ULID? Council can either
approve the funding and approve the project or reject the
money and not accept the petitions because they were put
together with the assumption of the City's contributing
$300,000. Another option is to accept the petitions and not
approve funding, which he was not recommending. If Council
wanted to force forming a ULID, there is another process that
could be used.
Members of the City Administration have worked quite some time
on this project and they cannot, at this time, recommend
funding for the project for the following two reasons: (1)
with the recent settlement of the lawsuits, consent orders
from Department Of Ecology and wastewater projects the City
must construct, funding is not available in the Wastewater
Utility; and (2) a contribution of $300,000 for this project,
which is a $625,000 project, is about a 50% contribution,
which could be setting a precedent that the City is willing to
do that for all ULID projects. The Administration is aware of
others who are interested in forming ULID's to fill in gaps in
the system and areas that have not been developed. It is
their recommendation that funding not be approved and the
petitions be recirculated with the understanding that the
funding is not approved. The administration supports the
project and it is only the funding that they cannot support.
President Fitz asked the "Appearance of Fairness/Conflict Of
Interest" question with all Council members present, except
Morrie Dawkins, being seated.
Jack Lefcoski, Kitsap Lake, stated he was speaking on behalf
of 78 parcel owners, who signed the petition and he asked that
the Acting Clerk read into the record a letter submitted to
the City by the W. Kitsap Lake Sewer Project Committee, dated
November 8, 1993: To: Bremerton City Council Members -
Homeowners in the W. Kitsap Lake Sewers Improvement area have
struggled to improve the City's lake and prevent contamination
i
TAPE #1149
City Council Reg. Mtg. Minutes
November 10, 1993
Page-15 of 26
of the lake. In this process, property owners have suffered
setbacks; re-organized to develop more agreeable and
affordable results; only to face setbacks again. Property
owners in this area have witnessed a rapid growth of users on
the lake since its extension includes the park developed by
the City. The entire City has only one fresh water lake for
its people to enjoy and thereby adding contaminates to the
lake. The Ecology Department is currently testing salt water
bodies and is projected to start testing on fresh water bodies
within ten years. We as concerned property owners must act
NOW to preserve the lake, and preserve our City's investments
in the addition of the park for all citizens of the City, as
well as protecting the wildlife reserve adjoining the City's
park.
Improvements in this area for sewers would be adding value as
well. We currently have at least twelve (12) possible
building sites in our seventy-eight (78) lot site area to
increase the City's infill. Many are waiting for the sewer
improvement in the area before finalizing construction. With
the City of Bremerton paying the consulting engineers $60,000
from the 1993 budget for the engineering completed thus far,
showing the City's intent to continue the project, we are
asking the balance of $240,000 to be included in the 1994 and
1995 budgets and the City Council to proceed with the sale of
bonds to finance the ULID. Over 60% of the property owners
have requested and are willing to pay their fair share for the
project as indicated in the City Engineer's letter dated
August 2, 1993.
In the past, property owners in the W. Kitsap Lake area, at
that time, donated about one mile of good quality, usable
water pipe and five fire hydrants to the City to provide the
City low-connection costs (due to the existing pipelines) for
uncontaminated water to the citizens in the area. The
exchange for this donation was annexation to the City of
Bremerton. Improvements have helped the City to become more
livable. W. Kitsap Lake sewers will make the lake area and
the lake more healthy and more desirable for the entire City.
Acting NOW will save costs, help with City infill, and
preserve the environment for long term enjoyment for the
entire City of Bremerton. Property owners may never again be
in mutual agreement on this project without acting NOW.
Signed: Committee members Judy Butler, Ron and Billie Ralston,
Shella Scatena, Hal Reume, Sam Moritz, Jack Lefcoski.
Mr. Lefcoski requested Council members to note the highlighted
portion of the attachment (page 2) to the letter. He provided
the following history of the lake: It is five miles around
TAPE #1149
City Council Reg. Mtg. Minutes
November 10, 1993
Page 16 of 26
and up until about three years ago, it was half City and half
County owned. On the City portion, which is the east side, a
sewer system was installed approximately 12-15 years ago.
That system was obviously installed because the citizens,
City, and Utility Department recognized the problem on the
lake, and at that time, the City had no authority to work on
the west side of the lake. In May of 1983 the City asked
Parametrix Inc., the same firmthat designed the new W. Kitsap
Lake project, to prepare a study of the west side of lake. He
was not sure what that study cost the City, but he was sure it
amounted to a significant sum. In that study, the bottom line
was that in 1983 the west side of Kitsap Lake should have
sewer systems and two or three types were cited along with
different cost estimates. He discovered that the City could
not find its copy of the 1983 study, so he provided them a
copy. In March of 1993, the W. Kitsap Lake property owners
asked the Health Department to take water samples. He read
into the record four finds made by the Health Department:
"Sample results indicates presents of E-coli forms in the
water taken from the lake and the inflow of the lake near
shorelines west and north. E-coli form analysis is the method
.used by the State as an indicator for evaluating a micro
biological stability of recreational waters. The presence of
E-coli is indicated from human and animal waste". He also
wanted Council to be aware that surface drain field run-off
into the lake is much more prevalent during and after a week
of rain and the testing done by the Health Department was done
on a nice, dry day. The 78 property owners like to think
Kitsap Lake is not theirs to own, just the property to the
meander line. He emphasized'all City residents own the lake.
He also views the lake as a City park and evidence of that is
the fairly new City park that was built on the southeast
corner of the lake. What that new park did to them as
residents around the lake, was to quadruple the boat traffic
on the lake...increased number of skiers, boats, swimmers,
etc. The south end of the lake is totally infested with
weeds, which precludes fishing, no jet boating, etc. What is
happening is that the boats are going around the lake
depositing plant life all over the north end of the lake,
which is also becoming infested with plant life.
When the W. Kitsap Lake area was annexed approximately three
years ago, he was the last deciding vote because he did not
want to be annexed. He was very content being in the County,
however, there was a problem of getting water and they came to
the City of Bremerton and asked if the City could sell them
water. The City responded yes, they could provide water but
it would have a 50% surcharge cost. The community's response
was not positive, so the result of negotiations was for the
TAPE #1149
City Council Reg. Mtg. Minutes
November 10, 1993
Page 17 of 26
area to annex in exchange for City water service. The City
was given a mile of 8 inch water line as part of the annexing
transaction. When the City took over water service, they
immediately installed water meters at each residence. Many of
the residents expressed their opinion that if they were "going
City" then they would go the whole nine yards...they want
sewers. After about a year, Mr. Lefcoski approached Bill
Duffy, City Utilities Director, and told him the residents in
the W. Kitsap Lake area wanted sewers on the lake. Mr.
Duffy's response to him was sure, but it would cost the
residents. At that time, Mr. Lefcoski's response was to give
us the numbers of what it would cost. Mr. Duffy then told him
that he would go talk with the City Council and see what could
be done for them. Mr. Lefcoski was not sure how many City
Council members remember that meeting with Mr. Duffy, but Mr.
Lefcoski was present, as was Mayor Mentor and all nine Council
members. At that time, Mr. Duffy made a presentation that
Kitsap Lake was the City's only lake, it belonged to the City,
it was loosing the fight, the City residents want sewage
service and the City is obliged to take care of them. At that
time, a Council member asked Mr. Duffy how much money he was
looking for? Mr. Duffy's response was $300,000. Mr. Lefcoski
noted not a single Council member made one negative comment
following that discussion. Following that meeting, he asked
Mr. Duffy if "that was it...is it that easy?", and Mr. Duffy's
response was "you've got your $300,000, now it is up to you to
start the petitioning process". The petitioning process
involved petitioning that street about five times using
different formulas for assessing. The contract was let out of
that $300,000 to show intent of the City, to Parametrix, Inc.,
in the amount of $60,000 to start the engineering design.
Within a month, surveyors were surveying the area and the
whole ball was rolling, based on the $300,000 City
contribution. With the expenditure of $60,000 for engineering
design, the $300,000 figure is reduced to $240,000. Parametrix
Inc., recently stated they have only about 40 hours to
complete the design drawings. He emphasized the residents
walked the street and got the petition signed based on the
City's offer of providing $300,000 towards the project. He
reflected back that Mr. Neville may be the only Council member
that was not present at the Study Session held where this item
was presented to Council.
The northwest corner of the lake is the primary corner being
addressed and is nearly all clay. They have condemned drain
fields that have taken two years in court to fix. It can cost
$6,500 to put in a new drain field and septic tank. A
resident in the subject area has a home for sale for $420,000.
At the time he purchased his home, there was an installed
TAPE #1149
City Council Reg. Mtg. Minutes
November 10, 1993
Page 18 of 26
drain field, which failed and allows water flowing over his
drive way and into the lake. That individual turned himself
into the Health Department based on his wanting to sue the
person who sold him the home and wanted evidence that his
septic system had failed. The Health Department's response
was "he was in bad shape", and they recommended installing a
sand filtration system and offered to design it for him, which
they did. Now, there is a hole large enough to bury five
vehicles, which is filled with sandtrap sand, variable
aggregate that does not pack with tile in space. That new
system cost the owner $18,000 and a week of rain comes by and
it fails. After the new system failed, he went back to the
Health District and asked them what does he do now? The
Health Department's response was that they did not know what
to do, but they agreed to let him use the system as it was
until sewer lines are put in and the day it is available-for
hookup he would be required to hook up to the sewer collection
system. Another landowner in that area was given a Building
Permit by the City to build a 2 1/2 car garage with an
apartment above it based on the "come" of the sewer line. At
this time, the City will not give that individual an Occupancy
Permit, so he has about $40,000 into a project that he can't
use, except for the garage below.
Mr. Lefcoski is a member of a Citizens Action Committee For
Growth Management and they are often studying and talking
about infill. In their 78 parcels, they found 12 potential
infill sites, which could increase the assessed value of the
area and bring in some return for the City. He emphatically
stressed the City needs the new sewer system. He pointed out
if Lions Field experienced an ecological spill the cost of
clean up would be born by the City government and City
residents. He emphasized Kitsap Lake is not much
different...just the fact it is an aqua park that is getting
contaminated. It is his feeling that Kitsap Lake is a "lit
firecracker" and the wastewater treatment plant is a "bomb",
and he sees the firecracker growing into a bomb. In
conclusion, there have been news articles about the Department
Of Ecology (DOE) being on the cases of Sinclair and Dyes
Inlet, Chico, Tracyton, Rocky Point, and Marine Drive for
polluting. He expects it will take 10-12 years for DOE to get
those areas cleaned up and when they finish with the saltwater
clean-up, they will come after the fresh water. He emphasized
10 years from now Kitsap Lake will be much worse than it is
today. He is urging the City to "buy in now" when the price
is right, and that $240,000 will not break up the City. The
proposed ULID, if approved, will personally cost him $16,400
due to his owning a double lot. He noted he has no intention
of building on the second lot, but he must pay because it is
TAPE #1149
City Council Reg. Mtg. Minutes
November 10, 1993
Page 19 of 26
a buildable lot. If the City does not contribute $240,000,
then the assessments for property owners could climbto $8,000
per lot. He could not jump from a cost of $16,400 to
approximately $30,000, nor could he ask his neighbors to pay
those costs. Randy Witt was so engrossed in this project that
he told Mr. Lefcoski the contract could be let in January/
February with construction started by summer, and have hook up
ready by November/December of 1994. He emphasized that work
schedule was also given to him by Mr. Duffy when he headed up
the Utility Department.
Jim Strait, 6530 Harlow Drive, stated this project has been
going off and on for so many years, and was looked at during
the time sewers were put in on the east side of the lake. He
agreed that Kitsap Lake is getting contaminated. He
acknowledged the effort put in by Jack Lefcoski in obtaining
the necessary signatures on the petition. If funding can be
identified, he supports proceeding with the project now
because the lake needs to be cleaned up.
Hal Reume, 1103 Kitsap Lake Road, questioned why Randy Witt
recommended disapproval on this proposal. He referenced Mr.
Witt's letter to Mr. Lefcoski, dated August 2, 1993, and
quoted the following: "I have recalculated the estimated
project costs using only City residents as participants in the
district. The revised estimated project cost is $625,000.
Reducing this by the $300,000 City contribution and spreading
it equally among the 78 City lots, gives an estimated cost per
lot of $4,200. Although this cost is higher than the
estimates you had earlier, I feel they accurately reflect the
maximum cost of the improvements. We will make every effort
to find ways to decrease costs as the design proceeds.
However, with the City's contribution to the project, this
project is a very good value especially with the payback
period an LID can offer".
TAPE
#1150
D. E. Sam Moritz, 1098 Kitsap Lake Road, stated he has lived
in that area for 33 years. He was aware of several efforts to
get an LID established, one in 1962, another effort in 1968,
and then the project formed up when Chuck Hazelwood wanted to
put in 40 units at the southeast corner of the lake. Mr.
Hazelwood's contribution was to be in order to get his 40
units sewsred he was going to build a connecting line from the
southwest corner over to the southeast corner where the City
park is located. At that time, the whole concept of
installation of a sewer line was to make a complete connection
from mid point on Northlake Way connecting to West Kitsap Lake
Road, down to the southwest corner, which would also encompass
TAPE #1149
City Council Reg. Mtg. Minutes
November 10, 1993
Page 20 of 26
Camp McKean. He noted the area from Camp McKean south were
County residents and due to the ownership of the railroad in
that area, an easement was unattainable to service the 40
units and the project was put on an "indefinite" hold. During
the annexation process, there was interest to install a water
pipe all the way around the lake and at that time they had
envisioned installation of a sewer line would complete all
aspects necessary for a nice liveable area. However, things
fell apart where now all that is being considered is from Camp
McKean north to a mid point on Northlake Way, and that
contributed to the extra effort that Mr. Lefcoski had to exert
as the project became smaller and smaller. He pointed out
Parametrix Inc., has virtually completed the design for the
sewer project as it exists now, and all that is needed is
funding.
Mr. Overson noted a copy of the petition was not included in
the Agenda Packet and questioned if Mr. Witt had a copy? Mr.
Witt stated yes, he did have the petitions in his office. Mr.
Overson questioned the wording on the petitions and who
originated that language? Mr. Witt stated the petition
contained fairly standard language out of the Engineering
office. The City provided the petitions to Mr. Lefcoski and
they were reviewed by the City Attorney's office prior to
distribution. He quoted the following language on petitions:
"We the undersigned property owners in Bremerton, Washington,
do hereby petition the City Council to proceed with creation
of a Local Improvement District for West Kitsap Lake Drive and
Northlake Way as shown on the attached map. Said improvements
shall be for the construction of a sanitary sewer. The mode
of payment will be assessment against the property on a per
lot basis. Actual assessments may vary from the assessment
estimates so long as they do not exceed the figure equal to
the increased and fair value of the improvement to the
property. Names of petitioners should be identical form as
the same appears of recording the chain of title to the real
estate. Both husbands and wives must sign. Wives must sign
their given names." Mr. Overson questioned wherein did that
petition lead anyone to believe the cost of construction? Mr.
Witt explained the petition itself does not discuss actual
dollar amounts. The way people were lead into believing what
the cost would be were two fold: (1) Jack's synopsis of how
the district was put together and he had a clear understanding
that the City would provide a contribution; and (2) when Jack
worked with residents in the area he indicated that
understanding. Mr. Overson noted Mr. Witt's letter is dated
August 2, 1993, and questioned the date when the petitions
were circulated? Mr. Witt explained the letter was put
together to accompany the petition. As previously stated,
i
TAPE #1150
City Council Reg. Mtg. Minutes
November 10, 1993
Page 21 of 26
when he started working for the City, he did nothing to
discourage that the City would make that contribution. It was
very firmly stated to him by Mr. Lefcoski and people within
the City, who had been working on the project, that the City
would share in the cost. It was not until they got into
assessing the petitions that they found this contribution had
not been approved by the City Council. Mr. Overson stated in
his opinion he believes the City has made a promise and he
could hardly believe staff would go back on what was
essentially their word. He was surprised that a
recommendation would come back that reflected that staff's
word was nothing to rely on. He emphasized no city wants to
send that kind of signal. He questioned if all 78 property
owners would connect? Mr. Witt stated not all of the 78 lot
owners would connect nor would they be required to connect.
Some of the lots are currently undeveloped, however, everyone
would pay as part of the LID. Mr. Overson questioned if the
Navy had been given the opportunity to participate in the LID?
Mr. Witt stated this proposed project stops at Camp McKean and
it was their intention to extend it past Camp McKean, hoping
for Navy participation, however, if that is not attainable
then it would not be extended past Camp McKean. Mr. Overson
stated he thought there was quite a number of people living
beyond Camp McKean. Mr. Witt explained there are 36 potential
people beyond Camp McKean, who are currently in the County.
Those people could be included in the project, and were
invited, and effort is still underway to encourage their
participation.
Mrs. Horton stated she agreed with Mr. Overson that it appears
the City did convey the intent to contribute $300,000 toward
the project. However, rather than have Council say tonight,
when the recommendation by City staff is that there is no
funding available, she would like to make a motion to table
the issue, specifically bring up the $300,000 share during the
1994 budget discussions for the Utility Department, and then
come back and continue the public hearing knowing the source
of funding for the City's share of $240,000.
Mr. Collins stated he has a great problem with subsidizing the
LID and the reason for that being the people on the east side
of Bremerton paid the full cost when their sewer improvements
were made. He did not feel it was appropriate for people in
Manette to pay fora sewer line at Kitsap Lake. That point is
the only issue he can speak to at this time. He could not
speak to the good that it would do and all of the nice things
because that is a totally separate issue. The only thing he
could look at now is that sewer line and the LID for that
sewer line. Whether there is a lake on the other side of that
TAPE #1150
City Council Reg. Mtg. Minutes
November 10, 1993
Page 22 of 26
are was immaterial to him at this point. We are appropriating
money or we are going to come up with money to do this. He
wanted to give Mr. Lefcoski some thoughts on why there wasn't
anything said in the Study Session. He emphasized the City
Council cannot vote in a Study Session for appropriation of
money or. approving any action. Normally, issues are brought
to the Council during a Study Session where it is discussed
and may be followed up with formal Council action during an
official City Council meeting. He believes the proposed sewer
.project is a tremendous idea. He does remember discussions
about bringing this group of people into the City and that
there were significant costs in taking over their water system
due to the need to provide a "loop" in the system; and the
City did accept those costs. He emphasized the only reason
the people in the W. Kitsap Road area wanted to be annexed
into the City was because their water system was being in
essence "shut off" due to not having any filtration for
surface water. He is happy to have people from Kitsap Lake as
residents, but like any other group of people if they form an
LID they need to fund the entire project.
Mr. Neville applauded Jack Lefcoski on his efforts for this
project and because of a number of questions he would like
answered, he supported Mrs. Horton's suggestion to table this
hearing to allow for further review. He felt his questions
should be directed to Eddy Chu, Public Works Director, rather
than the City Engineer. Mr. Witt made the comment he would
not place this project high on a priority list...he raised the
following questions: (1) where would this project fall on such
a priority list? (2) If his project was funded would it place
other projects in jeopardy, and what percent of the funding
could be afforded? and (3) If 50% funding of the project was
too much, how much would he recommend without precedent
setting? Mr. Witt stated following discussion on this project
with Council committees, he did some research and found that
what appeared to be the practice on LID's was the City would
pick up the cost of design and construction inspection of a
project. In this case, the City has covered the cost of
design, which has a final cost of estimate of $60,000. The
question may be raised and probably should discussed as to
what policy does the City want for contributing to LID's. Is
what the City has done in the past a good policy? Where this
project fits on the list of projects, he would have to go
along with Mrs. Horton comment that could be best determined
during the 1994 budget review. Currently, they are working on
a lot of projects, the ones soaking up the largest amounts of
money are the ones that are mandated, which are also the
highest priority projects. There are a lot of operational
needs that are high and this system needs a good looking at
TAPE #1150
City Council Reg. Mtg. Minutes
November 10, 1993
Page 23 of 26
and Council will see that in the Public Works Budget. If this
project was fit into the budget, it would probably be below
those projects that are mandated and the ones below those are
all pretty equal as to need.
Mr. Colvin stated it appeared to him that the City encouraged
the action that led to the petitions. Also, he felt there
were extenuating circumstances in that Kitsap Lake belongs to
the City, and if it is contaminated, what is the City's
liability letting that lake continue to be contaminated? Mr.
McNamara stated he had not explored that issue fully and he
would imagine if there was a public health hazard the City
might have some obligation to take remedial measures. He did
not think at this time the City had any liability to place a
sewer line in to protect the public health. Mr. Colvin stated
the City is aware the lake is currently being contaminated.
Mr. Witt stated the Health Department has been unwilling to
say that the lake needs immediate sewering even though they
have the ability to say "you have to have sewers and have that
done". Jack Lefcoski indicated that septic fields have failed
in that area and that they are contaminating the lake. Beyond
those comments, he has nothing more to add. Mr. Colvin stated
if in fact the lake is being contaminated, he could not see
how the City could not afford to take some action. Mr.
McNamara stated at this point he could not address to what
extent the City's liability would be for contamination from
septic systems.
President Fitz stated, lets suppose for argument sake the City
decided to fund the $300,000, which is one-half the cost of
the project, and another group in a similar situation, such as
Marine Drive, asked for the same thing. Could the City
protect itself from a precedent? Mr. McNamara stated he did
not think participating in this project would obligate the
City in any future projects, to participate to the same degree
or to any degree. The City can make a decision on a case-by-
case basis to what extent they want to participate on any
project. Mr. Overson stated he believed there will be some
Health Department input relative to Marine Drive, which could
make that project even a higher priority. Following along
some of that reasoning, if you follow Mr. Collins' reasoning,
then we as the City should not have gotten any support for
building the sewer treatment plant because it was not the
problem of those people out there who pay taxes. And, by the
same token then only the west side of Bremerton should pay for
the Warren Avenue and Callow Avenue Basin projects because
they don't affect the east side. He did not think that
reasoning followed either.
TAPE #1150
City Council Reg. Mtg. Minutes
November 10, 1993
Page 24 of 26
Mr. Johnson questioned the whereabouts of Mr. Chu, the Public
Works and Utility Director? Mr. Witt explained Mr. Chu was
out-of-town today, and not able to return in time for the City
Council meeting. Mr. Johnson questioned if Mr. Chu always
went out-of-town on Council meeting nights? Mr. Witt stated
he did not know. Mr. Johnson questioned if the project was
approved, would it require installing a pump station and will
it be sized for 78 lots? Mr. Witt stated yes, a pump station
will be required, and it sized to extend out into the County.
Mr. Johnson pointed out then the 78 property owners would be
paying to extend the sewer service out into the County. Mr.
Witt stated he believed when County residents hook up to the
sewer system, some of those costs can be recouped. If the
City is making a contribution on the order of $300,000, he
believes he could argue that the City is paying for that
extension. It could be worked either way...if we roll it into
if the residents pay the entire ULID, then they should be
reimbursed when County residents hook up. Mr. Johnson
questioned if the Utility approved the handout that was given
to the citizens at public meetings? Mr. Witt explained he
could only assume the handouts that were passed out indicating
the City's contribution were approved by the Utility
Department. Mr. Johnson pointed out the handout did not state
that the City's share of the project was dependent upon a
grant. Mr. Witt stated that was correct. President Fitz
questioned the date of the handout referenced by Mr. Johnson?
Mr. Johnson stated it was dated Revised Cost April 29, 1993
and it has a picture drawn on it by the City of Bremerton
Municipal Utilities as well as Parametrix Inc., signature.
Mr. Johnson questioned how many ULID's for new sewer
extensions has the City had over the past ten years? Mr. Witt
stated he did not know the answer to that question. Mr.
Johnson questioned where did the cost of contribution figure
come from? Mr. Witt stated those figures were based on the
4th Street project and Lake Drive project that was completed
approximately two years ago. Mr. Johnson noted Lake Drive LID
was for paving a street. Mr. Witt stated that was true but
it was an LID. Mr. Johnson stated we are talking about the
first citizen request for a ULID for sewer extension in the
City of Bremerton that he can remember since his coming to
Bremerton. President Fitz pointed out there was an ULID for
Marine Drive requested in the 1970's, however, the City could
not get the bonding capacity to undertake the project at that
time and it died. Mr. Johnson stated his point is, why is
this ULID being treated different when the other LID's pay all
this money .... and his response to that is that there haven't
been any. Mr. Witt stated it was his understanding that about
10 years ago the use of LID's were fairly common, probably
more for road work. Mr. Johnson stated he disagreed with Mr.
TAPE #1150
City Council Reg. Mtg. Minutes
November 10, 1993
Page 25 of 26
Witt on that point due to the fact that since he has served on
the City Council for the past 10 years the use of LID's has
been very uncommon. And, if there were any, they came from
his district, except the 4th Street project. He noted that
when Fiscal and Budget Committee reviewed this item, there was
a 2-1 vote to vote down the recommendation of denial to fund
the $300,000. He questioned what other grants have been
applied for to lower cost since the City lost the grant for
the $300,000 to the Seattle folks to build the METRO plant?
Mr. Witt stated since he joined the City they have not pursued
the Department Of Ecology grant because prior to this
involvement, staff had met with DOE and it was made clear that
this project would not be eligible for funding. He did apply
for a CDBG Block Grant, as the area qualified for that
application, but it was also turned down. He has not applied
for any others, however, grant applications/notices are
received fairly often and they are evaluated against on-going
needs and none of those have fit this project. Mr. Johnson
acknowledged he represents the people who signed the petition
and he resents the way they have been treated through this
whole process. More than once they were given one price for
the sewer, which they then sought out signatures on petitions,
but when they brought them back to the City, they were told a
new cost figure had been calculated and must be taken back out
to the community for approval. He questioned why does Mr.
Witt think Bremerton gets the reputation that they always go
back on their word. To him the creditability and integrity
issue for the City of Bremerton is probably even more
important than the people who signed the petition over the
$300,000. When City staff is sent out to speak with residents
outside City limits to talk about annexation, they talk about
benefits that have not been approved by the City Council, just
like in this hearing. The message being sent is "don't
believe nothing". He believes a lot of hard work has been
expended by the City to be up front and honest with the
public. The people on Marine Drive are still complaining over
the fact they were promised sewers but still don't have
sewers. He noted the W. Kitsap Lake residents were not
promised sewers at the time they annexed, but after they came
forward with initiating the ULID we did promise them we would
contribute $300,000, and now we're being asked to tell those
residents "we really didn't mean that". He emphasized the
City needs to continue to grow and he feels the City has a
large creditability problem with County residents in many
pockets around the City. He did not mind the suggestion to
table this item for a short time. When other major sewer
projects were mentioned earlier as those taking all the
available funding, he wanted people to understand the City
doesn't have that kind of funding available and would have to
#1514
TAPE #1150
City Council Reg. Mtg. Minutes
November 10, 1993
Page 26 of 26
go out to the bond market and borrow tens of millions of
dollars to solve some major problems at the sewer treatment
plant and distribution points. He truly felt $300,000 was
literally a "drop in the bucket" when it is spread over 30
years at a cost of approximately $10,000 per year. In the
final analysis, the City Council needs an up-front policy when
citizens want to talk about an LID. He believed Mr. Duffy
knew the process, however, there was not a City Council policy
for him to follow on an action such as this. He offered to
assist in writing a policy on LID's that would assist staff
when they held annexation meetings.
Mrs. Horton stated she believes we have to show good faith and
concurred in comments made about the City's creditability.
She also happens to think that if we had a fresh water Pacific
Alliance in the community, they would come in and the City
would be looking down the barrel of another Consent Order and
the cost will probably be double or triple the $300,000
contribution. When this issue comes up to a vote, she will
support the City contributing $300,000 once the funding source
is identified.
M/S/C(Horton/Colvin) to table this item until December 8 City
Council meeting.
Vote on motion: In Favor: Neville, Herton, Fitz, Collins,
Dawkins, Colvin, Johnson
Opposed: Overson
Motion carried.
With no further business meeting adjourned at 8:12 P.M.
KATHLEEN McCLUSKEY, City Clerk
EILEEN FITZ, Council President
City of Bremerton
KLM/EF/me
cc: Normal Distribution
File/Vault