The regular meeting of the City Council of the City of Bremerton
was called to order in the City Council Chambers, 239 4th Street,
Bremerton, Washington, Wednesday, January 10, 1996, at 5:30 P.M.,
with Council President John Law presiding. Council members present
were Bob Winters, A1 Colvin, Cecil McConnell, Carlos Montgomery,
Sherril Huff-Menees, David Farr, Richard Neville, and Lon Overson.
Also present were City Attorney Ian Sievers and Deputy City Clerk
Gil Johnson
The meeting opened with the Pledge of Allegiance led by Council
President Law and Invocation given by Reverend Calvin Fann of
Emmanuel Apostolic Church.
ELECTION OF CITY COUNCIL OFFICERS
President Huff-Menees opened nominations for the position of City
Council President: Mr. Farr nominated Sherril-Huff Menees
Mr. Winters nominated John Law
M/S/C/U(Neville/Montgomery) that nominations be closed.
Results of balloted vote: John E. Law, City Council President
President John Law was seated as City Council President and thanked
Sherril for having worked so hard to make sure the Council was well
organized and he looked forward to as good a years as she created
this past year.
President Law opened nominations for the position of City council
Vice President: Mr. Neville nominated David Farr
Mr. Overson nominated Carlos Montgomery
Mr. Winters nominated Richard Neville
M/S/C/U(Overson/Montgomery) that nominations be closed.
Results of balloted vote: Richard Neville as City Council Vice
President.
President Law opened nominations for the position of Mayor Protem:
Mr. Overson nominated David Farr
President Law nominated Bob Winters
M/S/C/U(Overson/Montgomery) that nominations be closed.
Results of balloted vote: David Farr as Mayor Protem
CONSENT AGENDA
A. Minutes -- December 6, 1995
#AB96-003
B. Minutes -- December 13, 1995 #AB96-004
0289
#0327
#0352
TAPE #1349
City Council Reg. Mtg. Minutes
January 10, 1996
Page 2 of 13
M/S/C(Neville/Montgomery) to approve the Minutes of December 6,
1995 with the following corrections: deleting the name "Richard"
from those attending the City Council meeting (page. 1); and on
page 11 under John Thomas' testimony correcting a misspelled word
in the middle of the paragraph: "No firefighter will enter a
burning building...", not billing".
Vote on motion:
Motion carried.
In Favor:
Abstain:
Overson, Neville, Farr, Huff-Menees,
Montgomery, Colvin, Law
McConnell, Winters
M/S/C(Neville/Farr) to approve the Minutes Of December 13, 1995,
with the correction of stating Mr. Neville's full name - Richard
Neville in the section showing those in attendance.
Vote on motion;
Motion carried.
In Favor: Overson, Neville, Farr, Huff-Menees
Montgomery, Colvin, Law, Winters
Abstain: McConnell
CLAIMS/CHECK REGISTERS
Vouchers audited and certified by the auditing officer as required
by RCW 42.24.080, and those expense reimbursement claims certified
as required by RCW 42.24.090, have been recorded on a listing that
had been made available to the Council.
M/S/C/U(Colvin/Montgomery) on January 10, 1996, the Council does
approve for payment those vouchers included and further described
as follows: 183857 through 183864, 183881 through 194209 in the
amount of $698,854.15; and Regular Payroll for the period ending
12-31-95, in the total amount of $621,208.36.
President Law made the following announcement:
(1) City Council Study Session on January 22, 1996, starting at
5:30 P.M., in the Council Conference Room. Topics of discussion
(1) Construction Project Update; (2) Telemetry Demonstration; (3)
Concession Support/Parks & Recreation Department.
(2) City Council Executive Session, immediately following this
Council meeting to discuss "Review Of Personnel Performance".
(3) City Council Study Session on January 24, 1996, 5:00- 5:25
P.M., in the Council Conference Room. Topic to be discussed:
"City's Wellness Program".
COUNCIL MEMBER REPORTS
Mr. Overson complimented Mrs. Huff-Menees on the excellent job she
did as City Council President, especially during some very
TAPE #1349
City Council Reg. Mtg. Minutes
January 10, 1996
Page 3 of 13
difficult Council sessions, by always maintaining her composure,
patients and professional demeanor. He believes she was the most
active of the Council members in and out of the Council and her
knowledge of County government has been beneficial to the City. He
strongly encouraged her to continue her involvement on Kitsap
Regional Planning Council as well as the Sinclair Landing project.
Mr. Farr referenced a newspaper article in The Sun detailing the
health problems of Donald Pratt, Director of Community Development,
who had undergone recent cancer surgery. He was pleased to report
Mr. Pratt came through the surgery and was recovering perhaps a
little better than anticipated. Mr. Pratt anticipates being in the
hospital for about nine days and he wanted to thank everyone who
had though of him and offered their prayers for his recovery.
Mrs. Huff-Menees congratulated Mr. Law on his being elected as
Council President and offered any support and assistance he might
need from her. She thanked all of the Council members for their
support and assistance during her term as City Council President.
She also wished Mr. Pratt well as well as his family members. She
requested that any citizens interested in being on a Citizens
Advisory Committee for the purpose of discussing the Gorst-
Bremerton Connector project, and specifically the gateway into
Bremerton, please contact the City Council Office 478-5280. Since
that project has been approved and is moving ahead through the
process, the intent is to stay ahead of the game in terms of what
it actually might look like and have citizens participation in that
development. The intent is to have a wide-spread citizen
representation on that committee, so there is no restriction that
one must live in a particular district. Anyone interested in this
committee may also contact her directly at 373-1241.
Mr. Montgome~ announced Districts #6, #7 and #8 will hold a
Combined District Meeting on February 1, 1996, 7:00 P.M., at the
Bremerton School District Administration Building on Montgomery
Avenue and Burwell Street. The main topic for that meeting will be
the Sinclair Landing Association presentation.
Mr. McConnell reported on Tuesday, January 9, District #2 held its
first District meeting, and those attending that meeting were
enthusiastic. He came away from the meeting with the impression
that District #2 is going to have a very productive future.
Mr. Colvim thanked his wife Hazel for her continued loving care
chauffeuring him so that he could attend to City business. He also
complimented Mrs. Huff-Menees on the wonderful job she did as
Council President and that he enjoyed serving under her leadership.
He congratulated Mr. Law on his being voted Council President and
thanked Mr. Winters for his year of service as Mayor Protem.
TAPE #1349
City Council Reg. Mtg. Minutes
January 10, 1996
Page 4 of 13
Mr. Winters congratulated Mr. Law on his being seated as Council
President and thanked Mrs. Huff-Menees for her service as out-going
Council President. He extended congratulations to Councilman Farr
for his election as Mayor Protem. He noted Councilman Neville will
again serve as Council Vice President and congratulated him on his
retaining that position. He referenced a letter he received from
Mel Wortman in which he indicated that he agreed with Mr. Winters
on several recent decisions, the Anderson Creek issue and the
condemnation issue, and Mr. Winters thanked him for that. Mr.
Winters offered his apology for not responding in a more timely
manner to Mr. Wortman's concerns; however, he did want him to be
aware that Councilman Montgomery is Mr. Wortman's Council
representative, not Mr. Winters.
Mr. Law expressed his thanks to his fellow Council members for
electing him President. He announced the next District #3
Neighborhood Meeting will be held January 16, 1996, 7:00 P.M., at
the Senior Center. The subject for that meeting will be the
downtown development plan and as representative of District #3, is
interested in concerns and questions residents may have.
PUBLIC RECOGNITION
Police Chief Paul DuFrense introduced Lt. Ron Mox, who was unable
to attend the earlier swearing in of Lieutenants and would now be
sworn in by Municipal Court Judge Bruce Martin. Judge Martin
administered the Oath Of Office to Lt. Mox.
Police Chief Paul DuFrense introduced the City's newest Police
Officer Wendy Davis, who recently completed her Police Academy
training and had the distinction of being No. i overall in her
Police Academy class of 21 candidates. Officer Davis served as a
Bremerton Police Reserve Officer and placed No. 1 on the Civil
Service examination.
President Law extended congratulations to Lt. Ron Mox and welcomed
Officer Davis.
Charles Brown referenced the Sinclair Landing Association issue
that was acted upon by Council at the December 20, 1995, City
Council meeting, and raised the following concerns: (1) The City
Attorney was not present to answer questions and the Sinclair
Landing Associations' attorney was present and answered question;
(2) the possibility of a conflict of interest issue with the
following individuals serving on the SLABoard Of Directors: Kitsap
County Commissioner Phil Best, Councilman Sherril Huff-Menees, Port
Of Bremerton Commissioner Fred Schoneman, Mayor Lynn Horton. He
wanted the public to know that Commissioner Schoneman has removed
himself from any voting or discussions on the SLA. (3) He now
understands that the Memorandum Of Understanding (MOU) has been
TAPE #1349
City Council Reg. Mtg. Minutes
January 10, 1996
Page 5 of 13
revised by Kitsap County and the Port Of Bremerton. He questioned
if the City Council will vote on a revised MOU? (4) When he
attended the December 20 meeting, there were very few questions
raised about the SLA's budget. Another concern he wished to convey
to Council was the problem of a parking lot vacuum truck operating
between 2:00 AM - 3:00 AM at K-Mart on Wheaton Way. He asked if
the City had a noise ordinance in affect that would prevent such
activity since he was being impacted four blocks away at his
residence. (5) He would like to see the City provide a budget
payment plan for City sewer and water charges, such as that used by
Puget Power, which averages the total amount of his bill spread out
over 12 months.
Ed Pietras thanked his Council representative Sherril Huff-Menees
for a job well done as Council President and congratulated John Law
as the new Council President. He announced the Martin Luther King
Jr. Scholarship Fund luncheon will be held Sunday, January 14, 2:00
P.M., at the Kitsap Golf And Country Club. The cost for this event
is $15.00; the Guest Speaker is King County Councilman Ron Sims.
Peggy Adkins, 10183 W. Old Belfair Highway, Bremerton, WA 98312,
thanked the City for cleaning up the mess left after the tree
cutting along the Old Belfair Highway. However, after the recent
wind storm more tree limbs and debris have fallen on the roadway
and need to be cleaned up so people can walk or ride their bike
along the side of the road. She pointed out there is a 6-8 inch
deep rut on the right side of the road near McKenna Falls Road.
Carol Atkinson, Bremerton Main Street, invited anyone interested in
serving on the Blackberry Festival Committee to attend their first
meeting on Thursday, January 11, 1:00 P.M., in the Police Resource
Division Conference Room. Also, the first St. Patrick's Day
planning session will be held on January 24, 8:00 A.M., in the Main
Street Conference Room.
7A - WARREN AVENUE BASIN CSO REDUCTION PROJECT, CHANGE ORDER #4,
#AB96-005
Change Order #4 includes extra work items, and an increase in the
asphalt concrete pavement and reconnect existing side sewer items.
The cost for extra work is $84,194.69. A summary of the extra work
is attached to the change order. The increased cost in asphalt
concrete pavement is $173,125.00. This increase is a result of an
error in the amount included in the bid proposal. The increased
quantity of side sewer re-connection could not be anticipated and
resulted in a cost increase of $28,900.00. The total cost of
Change Order #4 is $286,219.69. This would increase the total
contract amount to $3,588,041.72. This amount is within the
project budget.
TAPE #1349
City Council Reg. Mtg. Minutes
January 10, 1996
Page 6 of 13
Tim Richard, Senior Engineer, explained the Change Order includes
the following: (1) Adjust the unit for Bid Item 40 (Asphalt
Concrete Paving, Class B) from $12.50 per square yard to $72.00 per
ton and increase the total quantity to 2,500 tons. This quantity
of asphalt was required to restore the storm/sanitary sewer
trenches in accordance with the City's standards and in accordance
with the plans for this project. The asphalt quantity estimated in
the bid proposal for this project was incorrect due to an error by
the Engineering consultant plans in their estimate of the area and
depth of the asphalt resulting in the underestimation of the
quantity in the proposal. The quantity included in the change
order is the correct quantity of asphalt for this project. The unit
bid price for the asphalt was significantly lower than what the
City has received on other recent projects.
Mr. Richard apologized to Council for not bringing this item to
them previously, but he did not realize the magnitude of the
consultant's underestimation of quantity of asphalt until the
paving over the past few months. He has discussed this item with
the consultant engineer and they plan a meeting on conclusion of
the project to evaluate their performance in preparation of plans
and specifications. Item is extra work in the amount of $84,194.69,
which is miscellaneous extra work encountered during construction.
The primary items are associated with the delays to the outfall
construction at Evergreen Park resulting from the delay in getting
a lease from the Department Of Natural Resources, also costs
associated with a 16-inch water line conflict with the 36-inch
storm main and the demolition of the quonset hut. There are other
items such as unmarked water services and a few problems that were
encountered. Item 3 is an increase in the coined from 40 to 108
side sewer reconnections and the amount of this increase is
$28,900. There is no real way to estimate or predict how many side
sewers will be discovered on a job like this and because it was a
large diameter storm sewer can't change the grade once you are
laying a run of pipe so it had to be relocated. The full amount of
the Change Order is $286,219.69 and it is within the project budget
and contingency established when the project was approved by the
City Council.
Roy McInnis, Maple Street, stated if he remembered correctly when
this project came before Council some time ago, a question was
asked by one of the Council members regarding the dollar figure
given for asphalt. He asked how close was this project when the
figures were given earlier? He felt the requested change was steep
in the amount it takes to complete a particular project. Mr.
Richard stated the consulting engineer that put the plans together
made an error in the estimate of the amount of asphalt for the
project. The total quantity dollar wise is $173,000. The asphalt
paving required for the job was not shown correctly in the original
TAPE #1349
City Council Reg. Mtg. Minutes
January 10, 1996
Page 7 of 13
bid proposal from the contractor because of the consultant's error.
Mr. Neville pointed out the proposal was in error by 2,500 tons at
$72.00 per ton.
Mr. Winters stated when this item was presented at the Council
Operations Committee it greatly concerned him and he thanked Mr.
McInnis for being a concerned and attentive citizen and asking the
right questions. He asked who was the consulting engineer? Mr.
Richard stated Parametrix Inc. Mr. Winters asked how much did the
City pay Parametrix for that information? Mr. Richard stated he
believed the amount for the total design and modeling for this
project was $550,000. Mr. Winters asked by how much was the
estimate off from the required amount? Mr. Richard stated
$160,000. Mr. Winters asked how does the City remedy this now and
what do we plan to do in the future to insure more accurate
engineering estimates? Mr. Richard explained the quantity he cited
is the quantity necessary to complete the project properly. They
have met with the consultant and will meet again in addition to
their being evaluated at the end of the project. Normally, the
consultants have a Q&A, which they usually double check and the
Engineering Department tries to do the same thing in-house. This
project's design was completed at the time he hired on with the
City. Parametrix's performance will be considered in future
selection processes. Mr. Winters asked if the consulting firm's
engineers change any methods in order to miscalculate? Mr. Richard
stated yes, originally they had the quantity for resurfacing broken
into three different categories, i.e, asphalt over concrete,
concrete and asphalt pavement. Typically, that category is usually
separated into two items, concrete and asphalt, and that separation
was done after they prepared the original quantity and carried the
concrete in the concrete quantity, but failed to carry the asphalt
in the asphalt quantity and that is the significant portion of the
error. The consultant's estimate for the project was approximately
five million dollars and he believes that was based on a closer
estimate than what was provided in the proposal. Mr. Winters asked
if the work is completed, and if not how close? Mr. Richard stated
the work is nearly 95% complete.
Mr. Colvin asked the City Attorney how much of a mistake can be
made without any recourse? Ian Sievers, City Attorney, stated it
is a considerable amount of money, except the City is actually
getting value for the amount of money being spent on the correct
amount of asphalt required for this project. If the City made the
consultant engineer pay for the shortfall, the City would be
getting a windfall. There can be some costs or consequences to the
City because of the engineering mistake and estimates, but those
would be more related to transactional costs, such as correcting
the mistake, added paperwork, additional staff time, maybe some
TAPE #1349
City Council Reg. Mtg. Minutes
January 10, 1996
Page 8 of 13
delays in the project, maybe some additional financing costs to
obtain additional funding. Toward the end of the project, he and
Mr. Richards can review the project to see if there were some of
those kinds of costs that could be passed on to Parametrix Inc.
Mr. McCcnne11 asked if it was standard procedure to complete the
additional work prior to getting Council's approval? Mr. Richard
stated normally he includes an item in the Bid Proposal for Force
Account work and unexpected things like water services, etc. There
is a formula in the contract and standard specifications in the
State of Washington that allows for that kind of situation. Mr.
McConnell stated he would prefer that Council approval be given
before the money is spent.
Mr. Winters referenced Mr. Sievers' comment about the City
receiving a windfall if the consultant engineer was required to
cover the additional costs. He questioned why is it wrong to have
a windfall? Mr. 8ievers stated you need damage before you can get
a cause of action to go to Court. The Court would rule that the
City has a project that is worth the total amount plus the
additional amount of asphalt. The only damage that would be caused
by Parametrix was in providing the information on the proper
quantity later rather than sooner at the beginning of the project,
and the City would have to show how it was injured by that late
information.
Mr. Overson stated he sees the City having two problems: (1) the
City or a representative of the City apparently obligated the City
to pay for this without full authority and now the City has to
cover that individual, which is a point of concern. But, he did
believe if it was pushed to the limit, the City could tell the
contractor you gave us the bid and that is what is paid.
Otherwise, what the City would be doing is telling the contractor
as time goes on the bid can be changed, thereby encouraging non-
professional input. Council has discussed with staff previously
the need to insure the authority is in place before a contractor's
bid is changed or before modifications like this are made and paid
for. He asked the City Attorney if the City was within its rights
to tell the contractor they would be paid based on their bid? Mr.
Sievers pointed out it was not the contractor that made the error
in his bid, but rather the information or request for bids that was
given to them. Parametrix Inc., developed the City's
specifications, which were incorrect. Mr. Overson stated then what
Mr. Sievers was saying was it really lies with City Staff that made
the decision to go ahead and finish it off and promising the
contractor they would be paid. Mr. Sievers stated he was not sure
about the timing and authority on the change order. It looked like
there should have been prior authorization.
#1876
TAPE #1349
City Council Reg. Mtg. Minutes
January 10, 1996
Page 9 of 13
Mr. Winters stated he understands the contractor did perform the
work based on the information given to him. However, does the City
have the right to go back to the engineering consultant for
recovery of this payment? Mr. Sievers explained the consulting
engineer is actually the City's side in putting out the contract
specifications and that is really what our project should have cost
and is the value received in the final analysis unless the City can
show that a delay caused by the consultant's error caused the City
some injury and additional cost.
Mr. Colvin stated in other words it would be like the "right hand
slapping the left" for something it did, its all in-house. Mr.
Sieve:s stated no, the City does have a contract, not in-house, and
the City did pay Parametrix, Inc., a substantial fee and they can
cause harm and cause a lawsuit from the City. But, it is not the
kind of injury where a consultant miss-designed something and it
recreates a sinkhole in the street causing remedial action for
waste of materials and labor. This was an error, but the City is
receiving the value for the price being paid.
Mr. Montgomery asked when a contractor bids on a project, does he
do the same work as the consultant in determining the cost of the
project, or does he just take the consultant's figures? Mr.
Richard explained the bid proposal only requests that the
contractor provide unit bid prices, which is the normal procedure.
M/S/C(Farr/Huff-Menees) to approve Change Order #4 to the Warren
Avenue Basin CSO Reduction Project Contract and authorize the Mayor
to execute the same, subject to City Administrative Policies and
Procedures.
Vote on motion:
Motion carried.
In Favor:
Abstain:
Oppose:
Overson, Neville, Farr, Huff-Menees,
Law, Montgomery
Colvin
Winters, McConnell
8A - PUBLIC HEARING TO CONSIDER A COMPREHENSIVE PLANMAP CORRECTION
TO ADDAN"INDUSTRIAL PARK" DESIGNATION TO LANDS IN THE VICINITY OF
PENDERGAST REGIONAL PARK IN WEST BREMERTON; AND APPROVING
ORDINANCE, #AB96-006
A 1990 Rezone for 236 acres of Pope Resources property included a
combination of zones to be integrated into a Planned Unit
Development (PUD). Ten percent (10%) of the area was to be
"Industrial Park". The exact location would be determined later as
the master plan was developed. The City's new Comprehensive Plan
did not show the industrial designation. That oversight caused an
inconsistency between the Plan and Zoning Maps. The proposed
correction will designate approximately 25 acres "Industrial Park
TAPE #1349
City Council Reg. Mtg. Minutes
January 10, 1996
Page 10 of 13
(IP)" as originally intended.
President Law asked the "Appearance Of Fairness/Conflict Of
Interest" question with all Council members being seated.
Ron Hough, Planning Manager, stated this request is a minor map
correction and is not considered an amendment because it does not
change anything in the Comprehensive Plan. This involves a 236
acre piece of property that became Pope Resources property in 1990,
when the City made a swap of land with them to add to the
protection of the Union River Watershed. Pope Resources' plan for
the 236 acres was to design it as a Planned Unit Development (PUD
and they wanted to include a variety of densities and a small
amount of Industrial Park, so the City approved zoning of a
combination of 70% Low Density Residential, 20% Medium Multi-
Family/Residential and 10% Industrial Park with the idea it would
all be designed as a PUD and processed through a phased SEPA review
that began back in 1990. And, each stage of the development would
have a small SEPA review as part of that process. In 1995, the
City adopted a new Comprehensive Plan. Because this is one large
ownership, the City did not want to divide properties with lines
for Comprehensive Planning Zoning, so it was all placed under the
heading "LDR", which is Low Density Residential, because that was
the predominate use in the zoning categories, with the assumption
that the zoning would allow that combination and uses. David
Cunningham, of Pope Resources, pointed out to the City the possible
inconsistency between the Zoning Map and the Comprehensive plan
because the Comprehensive Plan did not include the 10% Industrial,
so when it comes time to actually develop something someone could
bring that up as an appeal issue. Planning staff agreed with Mr.
Cunningham that it probably was an inconsistency that needed to be
corrected, which was then taken to the Planning Commission, who
agreed that 10% of the area approved for zoning in 1990, could be
shown as Industrial on the Plan Map.
David Cunningham, Pope Resources, provided an aerial map of the
subject area and a letter in which they outlined previous zoning
action and how that action was not reflected in the 1995
Comprehensive Plan Map. Since the zoning action was taken, they
have worked with the City to help share the costs of the road that
goes into Pendergast Regional Park and a water line that goes
through the park and into their property, and they are prepared to
fund and construct a sewer line coming out of their property. They
have also tried to do some homework with respect to the
environmental conditions, i.e., wetlands, telegraphic studies.
When the property was logged in 1995, a City staff person was
present during the logging project helping to flag the wetland
areas and wetland buffer areas in hopes they could be delineated
early on. Recently, they have conducted some marketing studies to
TAPE #1349
City Council Reg. Mtg. Minutes
January 10, 1996
Page 11 of 13
determine the best uses for the property. The error they spotted
in 1995, was reviewed by the Planning Commission and was
unanimously recommended that it be corrected. In the next few
months he anticipates bringing to the Planning Department the
schematics for what will be a combination of small Industrial Park
campus (40-50 acres) and the remainder in residential. They see a
real opportunity to have a mixed use project that provides both
jobs and housing and in a good location close to the interchange
and Pendergast Regional Park.
Charlie Brown, 1333 E. Hope Street, stated he was not for or
against the proposal. However, initially it was stated 24 acres
would be designated as Industrial and then it was stated there
would be 40-50 acres. Mr. Cunningham stated at the time of the
original zoning there were about 25 acres, 10% of the property,
allocated Industrial. There are possibly 10 or 15 more acres
situated under the power line in a place that will get sandwiched
between Industrial/power lines that would be better used for
industrial purposes. Their intent at this time is to only rectify
the inconsistency between the current zoning and the Comprehensive
Plan. When the PUD plan is brought to the City they will ask for
more area to be designated Industrial, but if that is not approved,
they will retain it as Residential. Mr. Brown stated he attends
Port Of Bremerton meetings and Ports have a requirement to develop
industrial parks. It is his opinion that there is already
sufficient sources of industrial park space and felt this project
would be competing, for that kind of industry, with the Port of
Bremerton. He also wasn't sure if someone from the City attends
Port of Bremerton meetings, but he felt the two governmental
entities should be talking with one another on the issue of
industrial parks.
Elizabeth Bue11, High Avenue, asked if an RV Park would be included
in the PUD that would be near the ball fields at Pendergast
Regional Park? Mayor Lynn Hotton stated at the moment there is no
plan for an RV Park, but she has discussed with the Parks
Department staff that as soon as the new golf course is completed
in 1996, she would like to look at the possibility of putting in an
RV facility somewhere between Pendergast Regional Park and the golf
course. A financial analysis would be required to consider such a
project. She felt the City would benefit from an RV facility and
having it located between the golf course the sports complex would
be a natural.
Mr. Hough stated in response to the comment made earlier about the
proposed industrial area competing with the Port Of Bremerton, he
did not see that as a problem. During the Comprehensive Plan
process at the County and City level, the Economic Sub-committee
looked at commercial land and industrial sites throughout the
#2628
TAPE #1349
City Council Reg. Mtg. Minutes
January 10, 1996
Page 12 of 13
County and they felt there was need for 2,000 additional acres of
commercial and industrial for the next 20 years. In their review,
they found quite a bit of the land was located in rural areas and
part of the Hearings Board decision on the County's plan was to
pull that back in and not put so much industrial and commercial use
in rural areas, but put it in urban growth areas. That is exactly
what is being proposed with this site and by providing this kind of
land in the urban growth areas, it will take the pressure off the
rural areas. These lands were included in the City's industrial
inventory since 1990.
Mr. Overson stated he appreciated Mr. Brown's observations, but
above and beyond that the City's concern is zoning relative to
private use of real estate and the private entity is responsible
for determining what they want to use their land for based on what
is going on in the rest of the area. The City's concern is whether
or not the highest and best use of the real estate concerned is as
proposed in the zoning.
Mr. Mont~omezTstated having sat on the Citizens Advisory Committee
for the Comprehensive Plan, industrial parks was a much discussed
item and he sees no reason why this proposal should not be
approved.
M/S/C/U(Montgomery/Colvin) to approve the ordinance, on first
reading, correcting a mapping error on the Comprehensive Plan.
MAYOR'S REPORT
Mayor Hotton congratulated Mr. Law on his being seated as Council
President. She just returned from Olympia where she testified for
the State funding package for the U.S.S. Missouri before the Senate
Ways and Means Committee. On Thursday she~ along with others, will
be testifying before the Transportation Committee and on Friday she
will be testifying before the Department For Community Trade And
Economics Development. Senator Betti Sheldon will introduce a bill
rather than just put it in as a line item in the budget. She felt
the Ways and Means Committee was very receptive to the testimony
given.
TAPE #1349
City Council Reg. Mtg. Minutes
January 10, 1996
Page 13 of 13
With no further business meeting adjourned at 6:48 P.M.