CITY COUNCIL MEETING MINUTES
JUNE 12, 1996
#0010
#0020
The regular meeting of the City Council of the City of Bremerton
was called to order in the City Council Chambers, 239 4th Street,
Bremerton, Washington, Wednesday, June 12, 1996, at 5:30 P.M., with
Council President John Law presiding. Council members present were
Carlos Montgomery, Sherril Huff-Menees, David Farr, and Richard
Neville. Council members Bob Winters, A1 Colvin, Cecil McConnell,
and Lon Overson were absent due to their attending the Annual AWC
Conference. Also present were City Attorney Ian Sievers and City
Clerk Kathleen McCluskey.
The meeting opened with the Pledge of Allegiance led by Council
President Law and Invocation given by Pastor David Snapper of the
Anchor of Hope Christian Reformed Church.
CONSENT AGENDA
A. Minutes - May 22, 1996
#AB96-120
M/S/C/U(Farr/Neville) to approve Consent Agenda as presented.
CLAIMS/CHECK REGISTERS
Vouchers audited and certified by the auditing officer as required
by RCW 42.24.080, and those expense reimbursement claims certified
as required by RCW 42.24.090, have been recorded on a listing that
had been made available to the Council.
M/S/C/U(Huff-Menees/Montgomery) on June 12, 1996, the Council does
approve for payment those vouchers included and further described
as follows: 198546 through 198714 in the amount of $514,074.89.
President Law noted four Council members were absent due to their
attending the Annual Association Of Washington Cities Conference,
which is being held in Pasco, WA.
COUNCIL MEMBER REPORTS
Mrs. Huff-Menees congratulated all of the graduating High School
seniors in Kitsap County and cautioned them in their celebrations
and wished them God speed in their future plans.
Mr. Farr commented on The Sun's newspaper article about the
Sinclair Landing Project and urged members of the public to take a
good look at that article and become familiar with the project.
He felt it was about time Bremerton saw some redevelopment activity
similar to what has been happening in other parts of the County.
TAPE #1385
City Council Reg. Mtg. Minutes
June 12, 1996
Page 2 of 15
Mr. Meville reminded everyone of the meeting on June 18, 6:00 -
8:00 P.M., at the Bremerton High School, in the Career Center
room, to discuss removing parking on planting strips, which will
initially affect the neighborhoods north of llth Street going down
Naval Avenue to the water and down llth Street to Chester Avenue to
the water as well as Park Avenue. This meeting is open to the
general public. He extended congratulations to all the youth who
graduated from the Vocational Centers in Kitsap County. He was
quite impressed that 477 students graduated from the Skill Center,
which means they are getting a step ahead with their vocational
plans stepping into the future. He was especially proud of his son
being one of those that graduated.
Mr. Law reminded everyone of the closure of llth Street from
Chester Avenue to Warren Avenue for renovation work. Today's "Sun"
newspaper contained an insert that has a valuable section on
entertaining children during the summer months. The next District
#2 Neighborhood Meeting will be held June 18, 7:00 P.M., at the
Senior Center. The subject for that meeting will be whatever the
attendees wish to discuss.
MAYOR'S REPORT
Mayor Lynn Eorton gave special recognition to Richard Goetz, who
was leaving the Planning Commission, after serving several years,
due to his moving out of the City. She presented Mr. Goetz with a
plaque and thanked him for the many hours of dedicated service he
gave to the City, especially during development of the new
Comprehensive Plan, revisions to the Zoning Ordinance and
Development Ordinance. Richard Goetz stated it was his pleasure
serving on the Planning Commission over the past four years.
However, he felt strongly that it was a job that could not be done
without the excellent help emanating from the Planning Department
and its very talented staff.
Mayor Morton read the following Proclamation: (1) JUNE 14, 1996,
as FLAG DAY, which was accepted by Bob Sauter. Mr. Sauter
announced a Flag Day ceremony will be held on June 14, 3:00 P.M.,
on the boardwalk. Mayor Morton reported she recently had the
opportunity to visit the City of Boston and while there she walked
along the "freedom walk" and viewed the meeting halls where the
beginnings of the Revolutionary War took place, Paul Revere's
house, and many other historic sites. That experience made her
pause and think about the history of our country and acknowledging
Flag Day is an extension of that history.
PUBLIC RECOGNITION
Bob Sauter reported several weeks ago he brought a concern to the
Council regarding the transit system not having "EMERGENCY EXIT
SIGNS" posted on some buses. He received a response from Kitsap
#0505
TAPE #1385
City Council Reg. Mtg. Minutes
June 12, 1996
Page 3 of 15
Transit telling him they were rectifying that situation; however,
while riding the bus he observed that notification was posted on
the back of the drivers seat, which is not visible to the public.
Kathleen MoCluskev, City Clerk, announced an item has been added to
NEW BUSINESS, Item "7D" Bremerton/Kitsap County DUI Task Force
Agreement.
7A - BID AWARD RECOMMENDATION FOR TIMBER SALE 96-1 TO CASCADE POLE,
#AB96-121
Per the Public Works & Utilities Sustained Yield Forest Management
Program, the above timber sale was prepared and bids called for.
Bid tabulation is attached.
This sale is a selective harvest of approximately 108 MBF of pole
quality timber on approximately 35 acres.
Bill McKinney, Forester, stated he would standby for any questions.
Public comment - none.
Mr. Neville asked Mr. McKinney to explain the purpose of this
action? Mr. MoKinney explained this particular timber sale is part
of the ongoing revenue program for the Water Utility. The City
undertakes an annual cut and the revenue generated from that is put
back into the Water Utility to support capital projects and the
operations of the Utilities. This is one timber sale that was put
together and offered for bid under existing guidelines; and is a
selected harvest cut, which means only 10-15 trees will be removed
per acre.
Mr. Montgomery asked who selected the trees to be removed? Mr.
McKinney stated the trees are selected on the basis they are a pole
grade tree and have been premarked under his direction.
M/S/C/U(Farr/Montgomery) to approve the high bid submitted by
Cascade Pole for $76,103.00, and authorize the Mayor to execute the
contract per City administrative policies and procedures.
7B - PROFESSIONAL SERVICES AGREEMENT WITH WASHINGTON TIMBERLAND
MANAGEMENT, INC. FOR LAMINATED ROOT DISEASE MITIGATION, #AB96-122
Identification of laminated root disease pockets on Water Utility
forest lands has been accomplished under an existing Professional
Services Agreement for updating the Utility Land Management Plan.
Extensive areas throughout the Utility forest have been identified
as disease centers. To maintain forest health and recover timber
value requires implementing specific silvicultural practices to
mitigate the disease and salvage merchantable timber. Washington
Timberland Management has extensive experience in this field and it
is the opinion of the Forestry Manager that their assistance will
TAPE #1385
City Council Reg. Mtg. Minutes
June 12, 1996
Page 4 of 15
expedite developing an ongoing program to mitigate this disease as
well as provide training for Forestry Division staff.
Washington Timberland Management will be compensated by receiving
a percentage (10%) of the delivered log price on salvaged timber.
Bill McKinney, Forester, stated for clarification the Land
Management Plan should be completed by October of 1996. The
mitigation for root rot is an off shoot from the Utility Land
Management project. He emphasized this action has been discussed
with the Advisory Committee and they have given their approval on
moving forward to mitigate the disease. It is important that the
City address this problem as soon as possible because it can spread
to healthy trees from dead timber both standing and on the ground.
This time of year is very prone for infestations of insects and
when that happens it downgrades wood. If the City does not address
some of these priority areas with some of the higher value wood and
it sets another season, we'll probably lose a lot of what would
have been merchantable timber and is an asset that would not be
recovered.
Public comment - none.
Mr. Meville asked if just infested logs would be removed? Mr.
McKinney explained the majority of the trees will be what is
already mortality. In order to fully clean up the pockets of
disease, which comprises one half acre to three acre small blocks,
part of the mitigation will be to clear out the dead trees as well
as the closest healthy tree to those infected. Mr. Meville asked
if Mr. McKinney was providing training to select personnel? Mr.
McKinneV stated he will have a City employee working with the
contractor and it is his plan to rotate several people through that
process. He also expects to have the Washington State Pathologist
inspect the site. He noted the subject firm has extensive
experience in working with soil cultural aspects mitigating for the
disease. Mr. Neville asked if all of this will fit into the
forestry management computer program? Mr. McKinney stated yes.
The disease pockets were identified through a process of scanning
aerial photographs through a computer program that was developed
for the City's Utility Land Management Plan. It has also
identified potential disease pockets. They did check a certain
percentage of the areas that were designated on the computer
generated map, which turned out to be almost 100% accurate.
Mr. Farr asked the total number of acres of forest land? Mr.
M~Kinney stated the Water Utility owns approximately 8,500 acres.
In one section of 640 acres, they identified 50 potential disease
centers. In looking at the rest of the ownership that has been
scanned through this system, that is probably fairly average of
#0872
TAPE #1385
City Council Reg. Mtg. Minutes
June 12, 1996
Page 5 of 15
what will be found throughout the entire ownership. Mr. Farr asked
how did he become aware that the City had a potential problem? Mr.
McKinney stated a forester should know if his forest is sick and
this disease is quite noticeable through casual observation. It
was known that disease pockets existed, but what they did was to
try and systematically identify them. There are several issues
involved and generating revenues is probably the last on the list.
The first step will be to mitigate for the disease by removing the
infected trees. He emphasized if the areas are not treated, it
precludes growing Douglas Fir back on those sites. One of the
components of the agreement is to reforest those pockets with a
resistant Conifer species.
Mr. Montgomery asked if Douglas Fir was the only species
susceptible to the disease? Mr. McKinneV stated it is the most
susceptible and probably 90-95% of the City's forest lands are
Douglas Fir, which is fairly typical of the northwest. There are
other trees that have varying degrees of susceptibility.
Fortunately, there are valuable Conifer species that can be
replanted into these area that are either resistant or immune to
the disease.
M/S/C/U(Montgomery/Neville) to authorize and direct the Mayor to
execute a Professional Services Agreement with Washington
Timberland Management for mitigation of laminated root disease
pockets and salvage of merchantable timber.
7C - PROFESSIONAL SERVICES AGREEMENT WITH HDR ENGINEERING &
INTERLOCAL AGREEMENT WITH THE TRACYTON WATER DISTRICT, #AB96-123
The Tracyton Water District is a separate water system for which
the City provides water, operation, and maintenance through a
contract. The District is responsible for capital planning which
has been neglected for many years. They must now complete a Water
System Plan in accordance with Department of Health regulations.
Since the City provides sources and has much of the documentation
for the infrastructure of the Tracyton System, it is practical for
the same consultant that wrote the City's plan to performthis task
for Tracyton and for the City to coordinate this activity. This
ensures the format is compatible with the City's Water
Comprehensive Plan. Payment for the consultant will be by Tracyton
Water District as outlined in the interlocal agreement.
Kathleen Cahall, Water Resources Manager, reported the Tracyton
Water District serves approximately 2,000 customers and as
mentioned the City of Bremerton has provided operations and
maintenance through a contract since the late 1960's. However, the
City does not do any capital improvements for the District. The
Water District has been required by the Health Department to
develop a Water System Plan, which will outline what improvements
#1009
TAPE #1385
City Council Reg. Mtg. Minutes
June 12, 1996
Page 6 of 15
are needed to bring their system up to standards. The City wants
to assist them with this task because the poor condition of the
system makes it difficult for the City to do a good job with
operations and maintenance. Much of the information needed for the
plan was gathered in the City's Comprehensive Plan, which was
adopted in 1992. There have been some minor changes to the
consultant agreement since the draft agreement was published. The
start date has been changed to a later date and some liability
language was included, which was agreed to by the consultant and
the City.
Public comment - none.
Mr. Neville asked by moving the start date to a later time will it
also move the completion time? Ms. Cahall stated yes, it would
move by approximately one month. She noted the July 1 date is the
correct start time.
Mrs. Huff-Menees questioned the time commitment by City staff that
will be required in the development of this plan? Ms. Cahall
stated it would be minimal.
M/S/C/U(Montgomery/Farr) to approve the contract for professional
services; approve the interlocal agreement for Tracyton to pay for
these services; and authorize the Mayor to sign, subject to City
administrative policies and procedures.
7D - BREMERTON/KITSAP COUNTY DUI TASK FORCE, #AB96-126
By accepting this continuation of the project agreement from WTSC,
the Bremerton/Kitsap County DUI Task Force will continue to
function in its present capacity. This program provides additional
support to the City by means of law enforcement, revenue, and
education.
Lynn Drake, Traffic Safety Coordinator, stated accepting these
funds will complete the second year of a 2-year program. Traffic
statistics for 1995 revealed 1,329 traffic stops with 552
citations, 129 DUI arrests with 267 drivers found to be drinking
during an emphasis patrols during that time. Currently, in 1996,
there have been 402 traffic arrests with 149 citations, 50 DUI
arrests with 98 drivers that had been drinking. So far this
program has been very successful. During the April Drug and
Alcohol Fair at the Kitsap Mall. a survey was taken and resulted in
the Kitsap County DUI Task Force being rated third in the County of
all the drug and alcohol programs in the County, ranking second to
D.A.R.E. and M.A.D.D.. The program will be extended into the high
schools providing DUI presentations and Alcohol Safety to the
Traffic Safety classes and Business Law classes. In addition, there
is a combined effort by all the law enforcement agencies in the
#1145
#1223
TAPE #1385
City Council Reg. Mtg. Minutes
June 12, 1996
Page 7 of 15
County to provide the "Grim Reaper" program at all the high
schools. As part of that program, last week they issued 170 tee
shirts to students leaving the parking lots wearing their seat
belts and they found 5-7 students not wearing their seat belts at
that time. A new program will target the younger children (pre-
schools and Head Start programs), which is called "Berry Safety"
covering bicycle education and bicycle helmet safety.
Public comment - none.
Mr. Neville raised a question as to the appropriateness of adding
this Agenda item without public notification? Ian Sievers, City
Attorney, stated this is an administrative task of the Council in
accepting the grant and is not legislation that affects the public.
M/S/C/U(Neville/Montgomery) to approve the Washington Traffic
Safety Commission Project Agreement, and request the signature of
the Mayor.
8A - ORDINANCE NO. 4558 (SECOND READING) TO ESTABLISH L.I.D. #329
FOR PORTIONS OF JENNER AVENUE, #AB96-119
Public comment - none.
M/S/C/U(Huff-Menees/Montgomery) to pass Ordinance No. 4558 on
second reading ordering the Jenner Avenue Sidewalk Improvement
Project all in accordance with Resolution No. 2545 of the City
Council, establishing Local Improvement District No. 329, ordering
the carrying out of the proposed improvement; and providing that
payment for the improvement be made by City funds and special
assessments upon the property in the District.
9A - PUBLIC HEARING AND ORDINANCE (FIRST READING) FINAL ASSESSMENT
ROLL FOR U.L.I.D. #327, KITSAP LAKE SEWER, #AB96-124
At the City Council meeting on May 15, 1996, the City Council
passed Resolution No. 2546 setting June 12, 1996 as the hearing
date for the final assessment on Utility Local Improvement District
No. 327.
Ordinance No. 4450 was passed by City Council on March 16, 1994
establishing U.L.I.D. No. 327. The improvements generally consist
of the extension of sanitary sewer on Northlake Way and Kitsap Lake
Road. The value of the Final Assessment Roll is $349,243.23.
The action before the City Council is a public hearing, during
which time the Council will sit as a Board of Equalization for the
purpose of considering the Assessment Roll. During the hearing,
the Council will consider the objections made and will revise,
raise, lower, change, or modify the Assessment Roll or any part
thereof, or set aside the Assessment Roll and order the assessment
by made my De Novo. Following the hearing, the Council shall
TAPE #1385
City Council Reg. Mtg. Minutes
June 12, 1996
Page 8 of 15
confirm the Assessment Roll by Ordinance.
All persons who desire to object to the Assessment Roll must make
their objections in writing and file them with the City Clerk at or
prior to the date fixed for the hearing.
President Law announced at the end of the staff presentation he
will request a motion from Council to continue this hearing until
June 19. Anyone present, who wishes to comment on this issue, has
the opportunity to give their testimony or they can wait until the
June 19th meeting. He asked those testifying to not make the same
presentation two weeks in a row. The Council members absent from
this meeting, which includes the District #9 Councilman, will be
requested to review the proceedings from this Council meeting in
order to seated during the discussion on this issue at the June 19
presentation. He will also ask the Council, by a motion, to accept
comments from anyone in the public even if they did not submit
written comments. President Law asked the "Appearance Of
Fairness/Conflict Of Interest" question with all Council members
present being seated.
Randy Witt, City Engineer, stated prior to getting into the history
of this project, he felt it was important to recognize the efforts
of Jack Lefcoski for his efforts in working with the residents in
the ULID area organizing the U.L.I.D. Furthermore, Jack was their
conscious on the project, pushed them on the project and Mr. Witt
doubted the project would have become a reality without that kind
of effort.
Tim Richard, Senior Engineer, provided the following recap of the
history on this project: the hearing for formation of the ULID was
conducted March 9, 1994. Prior to that, in February 1994,
notification was sent out to the property owners within that ULID
boundary notifying them of the hearing and estimated assessment of
$4,275.00 per lot. The City Council passed Ordinance #4450 forming
the U.L.I.D. the following week after the Public Hearing. In
August of 1994, bids were opened for the ULID with the low bidder
claiming a bid error. As a result of that claim, the second low
bidder cost was used and the estimated assessment, at that time,
was $6,270 per lot. Notification was sent out to the property
owners and a public meeting was conducted where the City was
encouraged by the property owners to reject the bid and look at
some possible redesign options. The City Council did reject the
bids and the project was redesigned to eliminate a pump station and
go to gravity flow all the way into the existing system. The
project was rebid and opened on May 30, 1995. A meeting was held
with the ULID members on June 13, 1995. The residents were
provided a notice of that meeting, which also included an estimated
assessment, based on the bid, of $5,360 per lot, a decrease of
#1600
#1618
TAPE #1385
City Council Reg. Mtg. Minutes
June 12, 1996
Page 9 of 15
approximately $900 from the previous estimate. The project was
constructed and the final assessment has been determined to be
$4,517.19 per lot, which is approximately $900 less than the
estimate announced in June 1995. A meeting was held with the
property owners on June 10, 1996, to discuss the ULID and some of
the financing options available. Twenty two of the 77 lots were
represented at that meeting, and one of the major issues was
financing. He wished to correct a statement he made at that
meeting that the billing was done along with the County taxes,
which was incorrect, that billing is done on an annual basis by the
City on a special bill. The members of the ULID present at that
meeting agreed to recommend the terms of the Bond for the ULID be
a 13 year term at 8.2% per the City Treasurer.
M/S/C/U(Farr/Huff-Menees) at the end of public comment to continue
this hearing for one week.
M/S/C/U(Farr/Huff-Menees) to waive the written requirement for
speakers at this public hearing.
Kathleen MoOluskey, City Clerk, read into the record the following
letters: (1) Myrna L. Peterson, 1533 Kitsap Lake Road NW,
Bremerton, WA 98312 - "Am writing to tell you of my objections to
the assessment for the sewer. I have been assessed the amount of
$4,517.19 for the Utility Local Improvement District #327 for the
sanitary sewer on Kitsap Lake Road. Have objected to the sewer
because some of my neighbors and I felt that the sewer was
unnecessary because our septic tanks were sufficient at this time.
Paying this assessment will be a hardship for myself and my
neighbors, who like me, are on a fixed income. My total income a
year is $10,000, so paying the above amount would be almost
impossible. I will be sixty five in August and money is tight for
me.
Mr. Lefcoski pushed the sewer through because it was for his
benefit, not ours. He appears to be quite affluent but the rest of
us are not. Please advise as to other developments about this
sewer project. How can this be worked out? Thank you, Sincerely."
(2) Robert B. Griffith, 4823 N. Leber Lane, Bremerton, WA 98312-
8829 - "Being the owner of the above described property, I am
responding to the notification which I received from you on May 24,
1996. Said notification informed me of the upcoming meeting of
Wednesday, June 12, 1996, at the Council Chambers and the necessity
to file any objection I have to the assessment.
I am concerned that we are being assessed for something that we are
not adequately receiving. The sewer line, installed in 1995 on the
Kitsap Lake Rd. and on North Lake Way does not extend to our
TAPE #1385
City Council Reg. Mtg. Minutes
June 12, 1996
Page 10 of 15
property. I have enclosed here map of the area which clearly shows
that the sewer line is stubbed off at the end of a short road that
branches off from the Kitsap Lake Rd.
In order for us to connect up to this terminal would require
excavating a ditch uphill from our home and 800 feet in length and,
through adjoining neighbors property. The length of this
excavation would require a heavier pump and larger pipe line at a
much greater cost.
I have been in contact with Civil engineer who is familiar with
this system and he estimated that it would cost us approximately
$15,000 to connect to the sewer. For a couple of 80 year old kids
in their little grey home in the West, that to me is ridiculous.
The City of Bremerton is saving many thousands of dollars by using
a gravity flow system which requires no pumping station. Since we
are beyond their gravity system it appears that they are passing
some of it off on to us. Respectfully."
(3) Jack Lefcoski, 1700 Kitsap Lake Road, Bremerton, WA 98312 -
"During the petition and ULID development phase, the neighborhood
signed the petition; 65% for and 34% against. Then and now there
are 34% unhappy residents affected by the project.
These comments stem from the interest of the whole group, but
particularly from the residents who voted against the project. The
City of Bremerton Council approved the project and allotted
$300,000 as the City's share. The City's primary concern was to
protect the lake just as any other park. From the beginning to the
end many unanswered and unexplained cliches have occurred, not to
mention the unit price has increased about 6 times the original
estimates.
Items of concern:
1. The original estimate and drawing preparation include a 50K to
60K booster pump. That pump was eliminated and the system
converted to gravity. It's hard to understand why there is not a
reduction in the project price. (The pump was in the bid price.)
2. Ten (10) manholes were eliminated after the bid. (Unit
installation costs of a manhole is about $1,200 to $1,500.) That
should represent about a $12,000 reduction in the project cost.
Where is that shown?
3. On a side lane one property had to have the main line installed
twice due to an error, i.e. the customer was promised that this
property would drain by gravity but the line was installed too
shallow, requiring him to install a lift pump. The City recognized
TAPE #1385
City Council Reg. Mtg. Minutes
June 12, 1996
Page 11 of 15
the error and corrected it by removing the installed pipe and
reinstailing it lower. that was great on behalf of the City. but
it surely wasn't part of the original plan or the bid price.
Question: why should the customers have to pay for the City's
error?
4. At the west end of N. Lake Way the City made an error in
surveying prior to ditching, and an additional manhole was required
to properly install the main. This extra manhole was not in the
plan or bid. Question: why should the customers have to pay for
the extra manhole?
5. During development of the ULID, about a dozen neighborhood
meetings were held and representatives from the City utilities and
Parametrix attended several of them to explain all aspects of the
project. Of course the project required to dig up an 8' strip
generally down the middle of the road. Obviously that strip would
have to be restored and this would be part of the project cost.
After piping installation, it turned out that Kitsap Lake road was
paved curb to curb. The head Engineer and Lefcoski talked about
that and how it would be funded. He said that Lefcoski through it
was nice to resurface the whole street to finish the project. That
is true - but there was never a mention prior to the paving that
the price would be added to the project cost. The residents have
always considered the ditch restoration was in the original project
cost.
In resurfacing the street in the area north of Camp McKean, several
slumps have appeared in way of manholes and side connections.
Actually the surface is rougher now than it was before the project.
It seems the ballast is slumping beneath the blacktop.
6. In talking to the City utilities office, it was agreed to have
an ULID participants meeting to hash over the project and explain
the assessments. Instead we got an assessment letter and
notification to come to a City Council meeting for the hash-over.
Very few people can probably do this. We would prefer a
neighborhood meeting. Council may prefer that too.
7. About the $300,000, we must all realize that the money was
authorized prior to the City's lawsuit and stormwater up-date
expenses. It was authorized in good faith, acknowledging that the
lake is considered as a park and must be protected as any other
park, i.e.,everybody pays a share. (Not unlike the City buying a
new lawn mower, etc., for the City parks.)
Some people think the $300,000 was unjustified and unfair for most
citizens. Question: Aren't all city residents paying for the city
stormwater update even if the updates aren't in their
TAPE #1385
City Council Reg. Mtg. Minutes
June 12, 1996
Page 12 of 15
neighborhoods? Aren't all citizens paying for city parks even
though they don't all use them? Kitsap Lake is a city park and
available to everyone whether it is officially designated as one or
not. What else would one call it?
8. The cost of the project should be funded as a project. Not the
city will pay for this and not that. The assessment price should
be the bottom project cost minus the $300,000. The balance should
be divided by the number of units involved. Sincerely."
Bob Griffith, Leber Lane, passed out copies of a map showing the
location of his property in relationship to the sewer project. He
restated his opposition, as stated in his letter that was read into
the record, to being included in the ULID. He emphasized the
distance between his property and the closest connection available
for him to hook up to the sewer and the fact that he would have to
gain an easement over his neighbor's property. He felt strongly
that his neighbor would not easily grant him an easement, which
could result in further costs to him to gain that access and the
assessment would be a financial burden for he and his wife. He
urged Council to give his request serious consideration and exclude
him from the ULID.
Jack Lefcoski stated he agreed that Myrna Peterson and the
Griffiths would be adversely affected, financially, by the
assessment. Because the main sewer line is not adjacent to Mr.
Griffith's property, he would like the City Council and Mayor to
agree to do the ditch digging for him or give Mr. Lefcoski a piece
of equipment and he would personally dig the ditch. He also would
like the City to help Mr. Griffith gain an easement across his
neighbor's property. He assumed the two County property owners
that installed 6" laterals in order to connect up to the sewer
sometime in the future, would be asked to sign an outside Utility
Agreement. One of those property owners wants to annex into the
City; therefore, Mr. Lefcoski urged the City to pursue bringing
those properties within City boundaries. The assessment is based
on 77 parcels, not including the two County property owners. He
suggested the assessment should be based on 79 units, not 77.
Twenty two units attended the meeting on June 10th and there were
no strong arguments, but there was discussion on why the paving was
added to the LID. In his opinion, paving the whole street was
never in the original concept when the ULID was formed. It turns
out this is a new City policy and he was told this was the first
project for that policy to be implemented. The first thing that
comes to everyone's mind is the added paving cost was compensation
for the $300,000 - the City's share of the project. The residents
are very thankful for the $300,000, but they do not look at it as
a favor to just a few residents.
TAPE #1385
City Council Reg. Mtg. Minutes
June 12, 1996
Page 13 of 15
9B - PUBLIC HEARING AND ORDINANCE (FIRST READING) FINAL ASSESSMENT
ROLL FOR L.I.D. #328, WHEATON WAY SEWER, #AB96-125
At the City Council meeting on May 15, 1996, the City Council
passed Resolution No. 2547 setting June 12, 1996 as the hearing
date for the final assessment on Utility Local Improvement District
No. 328.
Ordinance No. 4460 was passed by City Council on May 11, 1994
establishing L.I.D. No. 328. The improvements generally consist of
the extension of sanitary sewer on Wheaton Way. The value of the
Final Assessment Roll is $109,107.90.
The action before the City Council is a public hearing, during
which time the Council will sit as a Board of Equalization for the
purpose of considering the Assessment Roll. During the hearing,
the Council will consider the objections made and will revise,
raise, lower, change, or modify the Assessment Roll or any part
thereof, or set aside the Assessment Roll and order the assessment
by made my De Novo. Following the hearing, the Council shall
confirm the Assessment Roll by Ordinance.
All persons who desire to object to the Assessment Roll must make
their objections in writing and file them with the City Clerk at or
prior to the date fixed for the hearing.
President Law asked the "Appearance Of Fairness/Conflict of
Interest" question with all Council members present being seated.
Randy Witt, City Engineer, gave recognition to Dayton Griffin for
his efforts in putting together the petition for the L.I.D.
Tim Richard, Senior Engineer, stated this L.I.D. was formed in 1994
and a meeting was held with the L.I.D. members on April 11, 1995.
prior to the public hearing. The notification of the Public
Hearing included a preliminary assessment at a rate based on a
total cost of $9,850.00, or $89.57 per front foot. The L.I.D.
formation hearing was held on May 4, 1994, and Ordinance #4460
forming the L.I.D. was passed the following week. The bid for the
project was opened on March 1995. A pre-award meeting was held
with the participants and at that time they were notified, based on
the bid, the L.I.D. cost would be $135,542 or $126.67 per front
foot. Those who participated in that meeting asked the City to
proceed with the project and the bid award was approved on April 5,
1995. The project was constructed during the summer of 1995 and
the final assessment roll for this project is $109,107.90. or
$101.97 per front foot. The total cost of the project was
$125,701.58, with the assessment roll being $109,107.90 and the
difference in cost is the City's paid share, which is approximately
13%, based on Resolution #2467 City's Participation In Local
TAPE #1385
City Council Reg. Mtg. Minutes
June 12, 1996
Page 14 of 15
#3116
Improvement Districts. A meeting was held with the members of the
L.I.D. on June 10th and those present unanimously agreed to ask for
a 13 year term at 8.2% for financing per the City Treasurer.
Kathleen McCluskey read into the record a letter from the law firm
of Sanches, Paulson, Mitchell and Laurie regarding the land owner
of Tax Lot Reorganized Church Of Jesus Christ Of Latter Day Saints
- Dear Mrs. McCluskey, the Reorganized Church Of Jesus Christ Of
Latter Day Saints objects to the assessment made with regard to
Wheaton Way property. It has been made clear by its filing a
lawsuit against the City, the City and the contractor that was
employed to provide the improvements did substantial damage to the
Church's land that has rendered it unusable and currently
valueless. Until such time as the City of Bremerton has resolved
the flooding of stormwater from Wheaton Way onto this lot and
adjacent property, the assessment is excessive and unwarranted.
The $12,236.40 assessment should be suspended until the lawsuit has
been resolved and a determination has to been made as to whether
this property retains any value whatsoever.,,
M/S/C/U(Huff-Menees/Farr) to waive the requirement for written
objection and allow verbal comment this evening.
Public comment - none.
Mr. Neville asked if the City had a response to the letter read
into the record? Ian Sievers, City Attorney, stated the protester
on the final assessment roll has to produce evidence that he has
not been specially benefitted to the amount of the assessment.
This letter addresses an event that caused some damage to the
property, but in his opinion he did not see that evidence was
produced that the property was unusable, non-buildable; therefore,
won't benefit from being connected to the sewer. Obviously, the
property is on a slope and subject to the Critical Lands Ordinance,
but he believes there is substantial buildable area of the lot that
remains. The City's Critical Lands Ordinance does allow building
even within the 50-ft. setback of a bluff with an engineered
design. There is no minimum lot size for the particular zoning
involved on this lot and if topography did prevent buildable lot
area they would be allowed to apply for a variance, and certainly
if there was no use for the property, they should be granted a
variance as that would constitute a "taking".
TAPE #1386
Mr. Neville referenced the part in the letter that stated the
damage to the property was caused by stormwater runoff. Mr.
Sievers stated that is an additional problem with the letter, it is
alleged in a claim against the City, which has developed into a
TAPE #1386
City Council Reg. Mtg. Minutes
June 12, 1996
Page 15 of 15
#0125
lawsuit, that there was some fault of the City, either maintenance
or design of stormwater facilities that caused some erosion to the
property. He thinks there is also an allegation that an
independent contractor of the City that was working on Wheaton Way
at the time of the storm may have contributed through his
construction activities. But for purposes of this hearing, that
was in the range of a 100 year storm. Secondly, it may have been
contributed to by these unusual circumstances of roadway
construction at the time, so for the Council to draw an assumption
based on these unusual events, that the property would continue to
be valueless because of continued erosion or stormwater intrusion
on the property is pretty speculative and remote. Mr. ~eville
stated he has heard reference where we've had five 100-year storms
already this year. Mr. Sievers stated the point here is that to
say this is a continuing problem that makes the property valueless
is difficult. Mr. ~eville asked if the project separated the
stormwater from the sanitary sewer and if new gutters were
installed? Mr. Richard stated no. Mr. Meville asked how many of
the 11 property owners affected signed the L.I.D.? Mr. Richard
stated of the 11 lots in the L.I.D. there were six in favor and one
lot was counted as neutral because it is a City owned lot. Based
on front footage, 69.2% were in favor of the L.I.D.
M/S/C/U(Montgomery/Huff-Menees) to approve ordinance on first
reading adopting and confirming the assessment roll for Local
Improvement District No. 328 providing for the improvements by
extension of sanitary sewer in Wheaton Way as described in
Ordinance 4460 providing for the levying and assessing for the
costs and expense thereof against the parcels and lots of land
within the boundaries of said improvement district; providing for
the collection thereof; creating and establishing a special fund
therefore.
President Law thanked the TV camera crew for their services this
evening: Mike Peebles, Deborah Harris and Patrick Hirsch.
With no further business meeting adjourned at 7:10 P.M.