CITY COUNCIL MEETING MINUTES
FEBRUARY 1, 1995
The regular meeting of the City Council of the City of Bremerton
was called to order in the City Council Chambers, 239 4th Street,
Bremerton, Washington, Wednesday, February 1, 1995, at 5:30 P.M.,
with Council President Sherril Huff-Menees presiding. Council
members present were Morrie Dawkins, John Law, David Farr, Carlos
Montgomery, Bob Winters, Lon Overson, and Richard Neville.
Councilman A1 Colvin was absent. Also present was City Clerk
Kathleen McCluskey.
The meeting opened with the Pledge of Allegiance led by Council
President Huff-Menees and Invocation given by Reverend Jim Hill of
the Neighborhood Christian Center.
CONSENT AGENDA - NONE
#0028
CLAIMS/CHECK REGISTERS
Vouchers audited and certified by the auditing officer as required
by RCW 42.24.080, and those expense reimbursement claims certified
as required by RCW 42.24.090, have been recorded on a listing that
had been made available to the Council.
M/S/C/U(Colvin/Dawkins) on February 1, 1995, the Council does
approve for payment those vouchers included and further described
as follows: 181856, 181874 through 181974 in the total amount of
$359,677.46.
President Huff-Menees made the following announcements:
(1) Following this Council meeting, Council will hold an Executive
Session, in the Council Conference Room - topic of discussion
"potential litigation".
(2) Study Session on February 6, 1995, 6:00 - 9:00 P.M., in the
Council Conference. Discussion topics at that meeting are those
listed on the published Study Session notice .
(3) Joint Study Session with the Bremerton Planning Commission on
Monday, February 13, 1995, 6:00 - 9:00 P.M., at the Public Works
Facility at 100 Oyster Bay Avenue. Topics to be discussed at that
meeting are: Comprehensive Plan Elements - Land Use, Transportation
and Capital Facilities.
COUNCIL MEMBER REPORTS
Mr. Overson announced the relocation of L.A. Connection to 119
Pacific Avenue and under a new name "Pier 8 Imports". Also, Amy
TAPE #1261
City Council Reg. Mtg. Minutes
February 1, 1995
Page 2 of 14
Burnett Gallery is holding a grand opening expansion celebration
this weekend, February 3, 4 and 5th. He encouraged everyone to
come down and look at the newly expanded gallery.
Mr. Neville announced on February 6, 6:30 - 8:30 P.M., the public
is invited to give their input into what they would like to see
included in a Master Plan for the expansion of Evergreen Park.
This meeting will be held at the old Smith School gymnasium at 1201
Park Avenue. He voiced a pet peeve...he recently observed that
some political candidate signs still displayed around the City and
the County, which he found to be unsightly.
Mr. Farr reminded residents of the combined District #6, #7 and #8
neighborhood meeting to be held on Thursday, February2, 7:00 P.M.,
at the Bremerton School District Office on Montgomery Avenue.
Guest speakers at that meeting will be Mayor Horton, the City's new
Police Chief Paul Du Fresne.
Mr. Law announced the next District #3 neighborhood meeting is
scheduled for February 21, 7:00 P.M., at the Senior Center. The
subject of that meeting will be "Emergency Preparation And
Available Emergency Services".
Mr. Montgomery echoed Mr. Farr's comments about the combined
District #6, #7 and #8 neighborhood meeting on February 1, 1995.
He emphasized "we can't help you if you don't show up"!
Mr. Dawkins stated he hoped people did not get to startled by the
recent earthquake. His observation on the TV coverage of the
earthquake was that it was the TV event of the year.
Mr. Colvln thanked Dan Eisses, Senior Engineer, for consideration
of a citizen's parking concern, and his very courteous and
professional manner in which he responded. He felt Mayor Horton
deserved some credit for that response as well because of her
briefing City employees on ways to treat the public. He
acknowledged a letter received from Amy Burnett and encouraged
citizens of District #1 to make a special effort to visit the Amy
Burnett Gallery. He announced the free Income Tax Preparation
program sponsored by the National Association Of Retired Federal
Employees (NARF) is underway.
Mr. Winters stated he looks forward to representing the City as
Mayor Pro Tem on Saturday, February 4, in welcoming the NAACP at
Olympic College. He will be encouraging all those attending that
event to "vote" on Tuesday. He also wanted to welcome those who
will be attending the Army Burnett Gallery expansion event this
next week and the opening of Pier 8.
TAPE #1261
City Council Reg. Mtg. Minutes
February 1, 1995
Page 3 of 14
Mrs. Huff-Menees also encouraged the public to attend the joint
meeting of Districts #6, #7 and #8 on February 1. She extended her
congratulations to Army Burnett on the expansion of her gallery.
MAYOR'8 REPORT
Mayor Lynn Hotton stated in response to Mr. Soriano's complaint
about the concrete being stacked at the corner of BuNell and
Chester Avenue, she was pleased to report those concrete materials
will be removed this week. The City Engineer informed her that it
is a common practice by construction companies to stock pile
materials used in their project as well as rubble and debris that
comes up from the street. He pointed out to her that if the City
wants the rubble and debris routinely taken away and not allowed to
be stock piled, then additional funds need to be added to the
contract. On Saturday, January 25, she attended the Community
Unity Banquet, held at the Kitsap Pavilion, and she along with many
others experienced the earthquake that hit this area that evening.
Even though the earthquake did cause some shaking of structures,
there has been no reports of much damage, if any. The issue of
earthquakes is being taken very seriously and in April the
Department of Emergency Management will be helping the City go
through a trial run on emergency preparedness. The City is in the
process of completing an Emergency Preparedness Manual and working
towards getting City employees and their families prepared so that
the employee could leave their family and assist the community.
She is also looking at expanding the K-Prep Program into all
neighborhoods because it is important that everyone take
responsiblity for themselves due to the fact the City may not be
able to guarantee that people could be reached up to 72 hours after
a major earthquake hits.
Roy McInnis reported he has returned from his visit to Tennessee
and in the process of soliciting ads from the Bremerton area for a
booklet to be used at a National Baptist Convention that will be
held in Seattle in April. He sees this event presenting a great
opportunity for people from all parts of the United States coming
to visit Bremerton while they attend the convention. He announced
as part of the Black History Month celebration, an event titled
"Rejoice in the Spirit of God, A Spiritual Jubilee" will be held
at the Sub Base Bangor Chapel on February 11, 1995, at 7:30 P.M.
Several black/American choirs, including the Sinclair Men's Choir,
from the Puget Sound area will be represented at that event.
Anyone wanting more information on this event can contact him by
calling 377-9217.
Elizabeth Buell asked who was responsible for replacing burned out
lights on the Warren Avenue Bridge?
7A - PROFESSIONAL SERVICES AGREEMENT WITH PARAMETRIX, INC. -
#0613
TAPE #1261
City Council Reg. Mtg. Minutes
February 1, 1995
Page 4 of 14
INTERIM MANAGEMENT OF PUBLIC WORKS AND UTILITIES. #AB95-013
Approval of a Professional Services Agreement with Parametrix,
Inc., is requested for management consulting services for interim
management of the Department Of Public Works and Utilities.
Kathleen McCluskey, City Clerk, stated Council asked that a Scope
Of Responsibilities And Duties be attached, which is identified as
EXHIBIT A, and that Section 4 - Relationship Of Parties be changed
to specifically list Gene Sampley.
Ian Sievers, City Attorney, noted a sentence was added to Section
3 - Compensation: "No other services shall be provided or expenses
incurred by consultant unless specified in this agreement". This
was added to clarify that just Mr. Sampley's services were being
provided under this contract.
Public comment - none.
Mr. Colvin asked if anyone will audit to see what the City gets in
return for the $95.00 per hour cost? Ms. McCluskev explained in
this case it will be determined by the Mayor since she will be
working closely with Mr. Sampley while he is directing all of the
divisions of Utilities and Public Works.
President Huff-Menees stated additionally the Mayor and Mr. Sampley
will come before Council to give reports, on a monthly basis, in
terms of where they are on projects and decisions being made. Mr.
Sievers pointed out the consultant is to submit a monthly statement
breaking out the work accomplished in the prior month before he
receives payment on the contract.
M/S/C/U(Overson/Colvin) that Council approve'the proposed contract.
7B - BLUEBERRY PARK MASTER PLAN PROJECT APPROVAL OF PROFESSIONAL
SERVICE8 AGREEMENT WITH JOHN FORREST BARKER LANDSCAPE ARCHITECTS,
P.S., #AB95-014
Blueberry Park was acquired using IAC grant funding in 1979. The
park property has remained undeveloped for sixteen years. The
recently completed Comprehensive Plan identified a community need
for open athletic fields and play areas. Development of Blueberry
Park would move towards meeting identified needs. In December, a
panel interviewed four consultants for Evergreen Park and Blueberry
Park master planning. John Forrest Barker Landscape Architects
were the first choice for master planning Blueberry Park. The City
entered into negotiations on the project scope, schedule and cost.
The Professional Services Agreement is the result of these
negotiations. Parks and Recreation staff intend to apply for IAC
grant funding for Blueberry Park. A current master plan is an IAC
grant application requirement. The action before the City Council
TAPE #1261
City Council Reg. Mtg. Minutes
February 1, 1995
Page 5 of 14
is approval of the professional agreement.
Pat Harris, Parks and Recreation Director, described the size of
the park and its current functions as the City's Pea Patch, which
is a valuable asset and involves a number of City residents. The
site is a level piece of property and cleared of trees, so is ready
for any future development with less anticipated development costs.
The new Parks Comprehensive Plan identified several things that the
public considered as high priority and that is the development and
acquisition of children play areas, open space, acquiring and
developing more picnic tables and picnic areas, and also walking
trails. Through surveys taken during the completion of the
Comprehensive Plan, people identified those elements as very
important and he could envision Blueberry Park as providing those
functions within that neighborhood. Application will be made for
an Inter-Agency Committee (IAC) matching grant through a letter of
intent to IAC dated March 1, 1995. He has asked the consultant,
John Forrest Barker, to complete his work by the end of April 1995.
It is a fairly aggressive time schedule, however, they will not
lessen the public process. One of the reasons why this consulting
firm was selected by the Interview Committee was a very innovative
process that involves the public, including children. Mr. Barker
has extensive experience in Master Planning and providing assistant
for IAC grant applications, which the City also viewed as critical.
Mr. Harris emphasized Mr. Barker's firm is a small firm, but offers
some very innovative ideas and he believes the City will see some
of that innovation coming to light. There is an elementary school
adjacent to Blueberry Park and he plans on getting the school
children involved with the process.
John Forrest Barker announced a meeting is scheduled for February
9, 6:30 - 8:00 P.M., at the Kitsap Regional Library, and everyone
that uses Blueberry Park is invited to help design it. That
process lays out the ground rules for designing a site and lays out
the game board and game pieces (elements) of the park thereby
allowing everyone involved becoming a designer of the park. If
enough people come out to that meeting, they will be divided into
teams of 5-10 people and will have the opportunity to develop
several designs of the park that then can be evaluated by the Parks
staff, Parks Commission and the group of people attending the
workshop. This process has been used many times at other sites and
once people become involved in developing a park from the design
phase, they become park supporters and in some instances may even
get involved in the actual building of the park, which can reduce
the cost of the project and building a real spirit of ownership
about that community facility.
Public comment - none.
TAPE #1261
City Council Reg. Mtg. Minutes
February 1, 1995
Page 6 of 14
Mr. Neville stated he sat on the selection committee that
recommended John Forrest Barker's firm and the committee was very
impressed by their firms innovative process for getting the public
involved in planning a park. The presentation made by the Barker
firm included using overlays showing how different elements could
work in specific areas of the park and what types of activities
would best suit certain areas as well as be compatible with various
kinds of activities. He emphasized this is a small firm, however,
they work as if they are one with nature. Blueberry Park does have
a wetland area and he sees the opportunity to involve the school
children in a unique hands-on study of wetlands and how they are
vital to the City. Emphasis is placed on keeping the Pea Patch
program a viable part of the park .
Mr. Farr encouraged members of the public to attend the meeting on
February 9. Even though parks are situated in a particular
neighborhood, they are parks for the entire City and the
participation of the people in helping with the design should not
be limited to only neighbors near the park. He has experienced
working in the Pea Patch and felt it was a good location for that
kind of activity.
Mr. Law questioned for benefit of the public if he understood
correctly that the Pea Patch program would not change and the size
of it will not be reduced? Mr. Harris stated Mr. Law was correct,
they do not anticipate removing it as an element and it may become
a central theme of the park.
President Huff-Menees asked Mr. Harris's intention if he is not
successful in getting IAC grant funding? Mr. Harris stated he has
asked Mr. Barker to design a park that can be completed in phases
and the work can be accomplished in-house rather than contracting
out to a private contractor. He emphasized the final design of
this park needs to be in character with the neighborhood, the
community and the City and something that the City feels is
appropriate in terms of a community park. Ma~or Hotton stated her
intention is to include funding in her 1996 budget for both
Evergreen Park Expansion and for development of Blueberry Park,
using Real Estate Excise Tax funds.
Mr. Dawkins asked Mr. Harris if the School District had been
contacted about a joint "wetlands" project? Mr. Harris stated
there is a wetland and forested buffer between the park land and
the elementary school property. Because of the proximity of the
school, some of the design will be influenced by the fact that
there will be school children nearby and using the park, which
would mean that a childrens' play area would also be an obvious
amenity. He will be approaching the School District as the
planning process moves forward.
TAPE #1261
City Council Reg. Mtg. Minutes
February 1, 1995
Page 7 of 14
Mr. Colvin asked if the individuals involved in the Pea Patch have
been notified of the park planning process? Mr. Harris stated a
neighborhood flyer will be sent out to all Pea Patch users prior to
the first planning meeting. Mr. Colvin asked if Mr. Harris had
pursued service clubs to help build the park along with other
citizens? Mr. Harris stated no, until the plan is developed and
known elements are identified it would be hard for him to
speculate. Mr. Colvin pointed out Lions Field was developed with
the help of the Lions Club, which included funding and hands-on
work. Mr. Harris stated he is aware that Lions Field was developed
in that manner and will be open to such assistance as the design of
Blueberry Park moves forward.
Mr. Overson pointed out Mr. Barkers' firm has done multiple park
designs in Bellevue, Kirkland, Seattle, other cities across the
nation, etc. He noted on of the firms associates, Mr. Galloway,
designed Asian tropical forests for the San Diego Zoo, the African
Savannah at the Honolulu Zoo, and the Elephant and Rhino HoUse at
the Detroit Zoo. Mr. Dawkins pointed out this firm also worked on
the Totem Lake Wetlands.
#1240
M/S/C/U(Neville/Montgomery) to authorize and direct the Mayor to
execute the Professional Service Agreement with John Forrest Barker
Landscaping Architects, P.S., to provide a master plan for
Blueberry Park, including IAC grant consultation and assistance.
8A - ORDINANCE (FIRST READING) ANNEXING CITY OWNED WATERSHED LAND8
INTO THE CITY FOR MUNICIPAL PURPOSES, #AB95-015
The City of Bremerton holds lands southwest of the City's urban
center for the purpose of sludge application and watershed
protection. Five parcels of land, recently acquired, are not
incorporated into the City limits.
Cities may, by majority vote of the legislative body, annex
territory outside of the City limits for any municipal purpose if
the territory is owned by the City according to RCW 35A.14.300.
Review by the Boundary Review Board is not applicable to annexation
for Municipal Purposes. RCW 35A.14.220.
Interim zoning would be administratively assigned to this area
pursuant to BMC 21.02.260. This zoning shall be the City's zoning
designation most similar to the former County zoning. A Planning
Commission hearing to review provisional zoning shall be conducted
within sixty (6) days under procedures for rezone petition.
Terrie O'Neill, Municipal Services Coordinator, stated this is a
straight forward annexation of properties owned by the City of
Bremerton Water Department and is annexed for Municipal Purpose,
#1300
TAPE #1261
City Council Reg. Mtg. Minutes
February 1, 1995
Page 8 of 14
which requires only this step in the annexation process. These
properties have been acquired through trades or purchase over the
last 5-6 years since the original annexation of the entire
watershed area.
Public comment - none.
Mr. Dawkins asked if the subject area was close to the site where
the City is currently applying sludge? Mrs. O'Neill explained
there are five different parcels and one of them is located near
the sludge application area. Right now the City is also in the
process of annexing the Alpine Area, which is located in the sludge
application area (parcels #4 and #5). The other parcels have to do
with water protection for the water that is used for drinking.
M/S/C/U(Overson/Dawkins) to approve Ordinance, on first reading,
to annex certain properties to the City Of Bremerton for Municipal
Purposes.
9A - RESOLUTION #2494, APPROVING THE PARKS AND RECREATION
COMPREHENSIVE MASTER PLAN, #AB95-016
The Interagency Committee For Outdoor Recreation (IAC) requires
that municipalities update their Park and Recreation Comprehensive
Plan and Capital Improvement plan every six years. Bremerton's
current Comprehensive Plan was completed in 1989, consequently an
updated plan is required. In December 1994, the Planning
Commission recommended Council approval of the plan based on the
draft document. The public was involved with the creation of this
document via public meetings, intercept surveys and telephone
surveys.
The final draft includes a six-year plan for capital improvement
projects for the Parks and Recreation Department. The Parks and
Recreation Commission will review and update the CIP annually. The
Commissioners' recommendation will go to Council for review and
approval each year.
Pat Harris, Parks and Recreation Director, stated the Comprehensive
Plan provided to Council is a revised copy of the draft document
they received in early December 1994. The element not completed at
that time was a "public survey" portion of the Comprehensive Plan.
The Comprehensive Plan for his department and for the City serves
as a long range planning tool to see where we want to go in terms
of growth, what priorities should be for the community and the cost
associated with that type of growth and development. The
development of the Comprehensive Plan was a very public process and
involved the City Council through Study Sessions, the Park
Commission through several meetings, neighborhood forums, public
intercept survey and a telephone survey. Hopefully, this plan
#1609
TAPE #1261
City Council Reg. Mtg. Minutes
February 1, 1995
Page 9 of 14
reflects the values of not the staff, but the community at large,
which is the most important thing about this plan. It is also a
requirement that the City have a Parks Comprehensive Plan when
seeking IAC grant funding. The last plan was completed in 1989 and
the changes from 1989 to now are fairly significant in terms of
what we now have to include as documentation. The new
Comprehensive Plan includes an element of Wildlife Habitat that
which addresses how the City will protect open spaces and wildlife
within the urban growth area.
There are a number of components of the Comprehensive Plan that are
addressed: (1) overall facilities, both buildings and parks; (2)
demand - what does the public perceive valuable in terms of future
growth and development...more walking trails and bicycle trails,
more play areas and open space areas. There is a high priority
placed by the public on preservation of open space and
environmentally sensitive areas within the community and keeping
greenbelts and green space.
The Comprehensive Plan has a lot of flexibility - the Capital
Improvement Plan that was developed is really a glimpse based on
what our needs are now...this will change every year and Council
will have an opportunity to comment and make revisions. One of the
overriding themes of the plan is that the City will be working more
and more with Kitsap County and the School District in developing
plans where we are not replicating services and wasting taxpayers
dollars. Kitsap County has recently completed their Comprehensive
Plan and they also have recognized, as a priority, a working
relationship with the City in future planning.
The Planning Commission did review this document, which included a
SEPA review. He worked closely with Planning staff to make sure
that the information in the Parks Comprehensive Plan ties in with
the City Comprehensive Plan. The development of the plan involved
a lot of research and text writing by staff members with the
assistance of consultant Tom Beckwith to do the statistical
analysis to carry out the telephone survey portion. He views this
document as something the City and the Department will be able to
use as a reference and a planning document for the future.
Public comment - none.
M/S/C/U(Colvin/Montgomery) to pass Resolution #2494, approving the
1995-2000 Parks and Recreation Compressive Plan, including the
Capital Improvement Plan.
Mr. Law noted the proposed plan was obviously labor intensive and
asked if Mr. Harris had any plans to publish results of the study?
Mr. Harris stated he plans to have the Comprehensive Plan available
TAPE #1261
City Council Reg. Mtg. Minutes
February 1, 1995
Page 10 of 14
to the public on a permanent basis at the Sheridan Center as well
as a copy downtown in City Hall. There is the possibility they
could share those results on cable access, which was something he
would explore. Mr. Law stated his perspective after reviewing the
information is that some of the major concerns are not recognized
by the public. He encouraged Mr. Harris to work on some type of
opportunity to share that information with the public.
Mr. Colvin stated his interpretation of the resolution was that
public hearings would be held prior to the plan being adopted.
Harris explained for clarification - public hearings have been held
prior to draft, subsequent to the draft and do not anticipate
having any additional hearings specifically on the plan.
Mr. Overson acknowledged that Mr. Harris and the Assistant Parks
Department Director were very involved in developing this plan.
Mr. Harris expressed his appreciation for the team effort that
Jodie Wroblewski, the Assistant Parks and Recreation Director, gave
to this project. Mr. Overson supported the concept of modifying
this plan annually because he felt it was a very aggressive plan.
Many constituents in the 4th District have reviewed the plan and
are very interested in the direction it outlines. Mr. Harris
pointed out any changes or modification to the plan will be brought
before Council prior to the 1996 budget process.
Mr. Dawklns asked the number of people involved in the telephone
survey? Mr. Harris stated the survey involved 100 Bremerton
residents.
Vote on motion - Unanimous.
10A - PUBLIC HEARING FOR STREET VACATIONS OF MADISON AVENUE AND
PORTIONS OF ABUTTING ALLEY; APPLICANT: DAVE BARCELON, #AB95-017
David Barcelon is planning to develop a new automobile sales lot on
property recently annexed into the City in the Auto Center Way
industrial district. In order to consolidate all the property
needed for the project, Mr. Barcelon is requesting vacation of the
alley ways contained within his property and Madison Avenue, which
also pass through the site. In exchange for some of the right-of-
way, Mr. Barcelon proposes to dedicate property for public right-
of-way use.
President Huff-Menees asked the "Appearance Of Fairness/Conflict Of
Interest" question with all Council members being seated.
Jack Allingham, Current Planning, pointed out the Annexation Area
is just north of Werner Road and to the west of Kean Street.
Shortly after the annexation, the City zoned this property General
Industry (IG), which is consistent with the Comprehensive Plan, and
TAPE #1261
City Council Reg. Mtg. Minutes
February 1, 1995
Page 11 of 14
effective January 29, 1995. The area is characterized by an old
residential plat that consists of small 30 foot wide lots. Now
that it has IG Zoning, commercial zoning and commercial development
on 30 foot wide lots is difficult, so from a practical standpoint
a person needs to aggregate some of that area. The lots are only
100 feet deep and is bisected by an alley. Mr. Barcelon is
proposing to develop a vehicle sales lot, which is similar to other
lots located along Kean Street. By doing that, he wants to
aggregate enough area to develop a lot and is requesting Madison
Street area be vacated and a portion of the alley be vacated. To
maintain the circulation in that area, Mr. Barcelon proposes to
dedicate land to help maintain the access to the alley. The
Planning Commission reviewed this proposal and unanimously
recommended approval of the right-of-way vacation. To facilitate
this request, two ordinance must be approved, on first reading.
Council must make two findings when vacating the right-of-way: (1)
determine whether or not there is any public need for the right-of-
way; (2) whether or not the public interest would be served. The
Planning Commission found there was no public need to retain the
right-of-way because it was an industrial zoned area, which the
Comprehensive Plan envisions going into commercial use and public
interest would be served by vacating the right-of-way promoting
uses which are consistent with the zoning and the Comprehensive
Plan.
Jack Lefcoski asked for clarification of an "island" piece of
property that was bordered by Madison Street? Mr. Allingham
explained the triangular portion is a separate parcel, a vacant
piece of land, separated from the other properties by Madison
Street. That particular piece of property is owned by Mr.
Barcelon.
Roy McInnls asked if Council did not approve this proposal as
presented, what affect would it have on development of the site?
Mr. A11ingham stated it would maintain a parcelized and possibly
fragmented ownership pattern that would make it difficult for
commercial development.
Bill Seskoquestioned the width of the dedicated alley access? Mr.
A11ingham stated it was his understanding that it would be a
comparable width of the existing alley - 15 feet. Mr. Sesko stated
he had a discussion with Mr. Barcelon that he would like the
dedicated access to be the same width as Madison Street because he
uses that as access to his property and would like to make the turn
with commercial vehicles in the same manner as he does now off of
Madison Street.
Mr. Dawkins asked the difference of width of Madison Street and the
TAPE #1261
City Council Reg. Mtg. Minutes
February 1, 1995
Page 12 of 14
alley? Mr. A11ingham explained Madison Street is approximately
twice the width of the alley. The alley that is being vacated and
dedicated is 15 feet wide. Mr. Dawkins asked Mr. Sesko if he had
access to his property off of Werner Road? Mr. Sesko explained he
has two taxable sites, one has a driveway off of Werner Road and
the other needs access off the alley. Mr. Dawkins questioned if
Mr. Sesko could gain access off of Monroe Street. Mr. Sesko stated
he did talk with Mr. Barcelon about this proposal and agreed to
vacation of the alley up to his property as long as he would
provide suitable access.
Don Pratt, Director Of Community Development, stated Mr. Sesko
asked if the new dedicated alley would be made serviceable. First
of all, the alley that is proposed to be vacated is not developed.
Essentially, Madison Street has not been developed either and for
the most part is a dirt pad. Mr. Barcelon has agreed to a site
plan that was submitted and is going through an approval process,
which would provide for surfacing the new alley more than the
current alley. Mr. Sesko pointed out Madison Street is a paved
street and the alley was serviceable prior to the houses being
moved onto them.
Elizabeth Bus11 supported the vacation of Madison Street so that
the triangular piece of property is not isolated and can be used in
conjunction with subject parcels identified and owned by Mr.
Barcelon.
Gary Lindsey, representing Dave Barcelon, stated Kean Street and
Werner Road are both paved roads with open ditches...no curbs,
gutters or sidewalks. Monroe Street is paved about half the width
of a regular City street and has no curbs, gutters or sidewalks.
Madison has 8-10 feet of broken up pavement and no utilities. What
Mr. Barcelon proposes per his site plan is to curb, gutter and
sidewalk Kean Street and improve it with an additional half an
extra lane, he will improve Monroe Street with curb, gutters and
sidewalk and he will take the new dedicated alley and grade and
gravel that. Also, he will extend sewer from Kean Street up Monroe
Street to the new dedicated alley. Currently, if you wanted to
serve sewer to any of the properties, someone would have to go to
the expense of going all the way down to Kean Street and extend the
sewer, which would be quite a difficult process. Mr. Barcelon will
make a provision that all the properties could extend sewer down
the newly dedicated alley. By providing curb, gutter and sidewalk
and additional pavement, Mr. Barcelon will have created a
significantly better access than what exists today. He pointed out
the subject site is part of the City's Industrial South Auto Center
Urban Renewal project, however, he does not believe there is a
final plan developed, yet in the draft the City had the foresight
to make some comments about this particular property. A comment
#2550
#2600
TAPE #1261
City Council Reg. Mtg. Minutes
February 1, 1995
Page 13 of 14
was made about the aggregation of these properties (page 8 of the
draft... "a long and triangular shaped lot at northwest corner of
Werner Road and Kean Way is currently occupied by three residential
structures. This current shape and size provide very limited
industrial development potential, however, if this lot could be
combined with properties to its immediate west, it would be a more
useful parcel"). Also, goals identified in that Urban Renewal
project are being met by the development of this site. One of the
main goals was the removal of all debris and derelict houses, which
has been done, and placement of curbs, gutters and sidewalks along
streets, which will be done. It also speaks of consolidation of
lots in order to provide for development, and that is being done.
He emphasized the access to Mr. Sesko's properties and the other
properties will be enhanced by this vacation and development from
its current state.
Jack Lefcoski stated the Kitsap Lake Neighborhood Association
supports this project and everything that has been presented during
this discussion.
Mr. Overson emphasized Council's concern, at this time, is not the
dedications, but rather the vacation. Mr. A11ingham stated Mr.
Overson is correct, the dedications were presented to Council to
show there are provisions being made to maintain access into the
alley and Monroe Street.
M/S/C/U(Dawkins/Colvin) to approve Ordinance, on first reading,
vacating the alley ways within the block bound by Werner Road,
Madison Avenue N., Monroe Street W., and Blumer Street.
M/S/C/U(Dawkins/Montgomery) to approve Ordinance, on first reading,
vacating Madison Avenue W. between Werner Road and West Monroe
Street.
Councilman Bob Winters left the City Council Chambers at 6:37 P.M.
10B - PUBLIC HEARINGAND ORDiNANCE (FIRST READING) ON 75% PETITION
FOR THE ANNEXATION OF THE ALPINE AREA (7 ACRES) INTO THE CITY
LIMITS OF BREMERTON, #AB95-018
The City of Bremerton holds lands southwest of the City's urban
center. The Alpine site, recently acquired, is not incorporated
into the City limits. According to RCW 35.13.125, upon the
presentation of a legally sufficient petition (75%) the City
legislative body must hold a hearing to listen to take comments
pertaining to the annexation. Following the hearing, the City
Council shall entertain a motion on the passage of an Ordinance to
annex the site.
The City Council accepted the areas' 10% Letter Of Intent at their
#2781
TAPE #1261
City Council Reg. Mtg. Minutes
February 1, 1995
Page 14 of 14
regular meeting on January 25, 1995. The City has also submitted
an application to the Boundary Review Board for their
consideration.
President Huff-Menees asked the "Appearance Of Fairness/Conflict Of
Interest" question with all remaining Council members being seated.
Terrie O'Neill, Municipal Services Coordinator, stated the Alpine
site is located within the Utility lands area and is being
processed under the petition method of annexation, which is the
most routinely used method of annexation. A letter has been
submitted to the Boundary Review Board asking that they consider
this intent to annex.
Public comment - none.
Mr. Dawkins questioned if the subject area was adjacent to City
property? Mrs. O'Neill stated the site is up against one of the
other properties included under Council action earlier in this
meeting and it also adjoining the Jefferson Area, which was annexed
in 1994.
M/S/C/U(Montgomery/Law) to approve Ordinance, on first reading,
annexing an area known as Alpine Area and fixing the effective date
of annexation.
With no further business meeting adjourned at 6:54 P.M.