HomeMy WebLinkAbout06/14/95TAPE #1293
UNAPPROVED DRAFT
CITY COUNCIL MEETING MINUTES
COUNCIL
APPROVED
JUL .._ 5 1995
JUNE 14, 1995
#0017
#0029
The regular meeting of the City Council of the City of Bremerton
was called to order in the City Council Chambers, 239 4th Street,
Bremerton, Washington, Wednesday, June 14, 1995, at 5:30 P.M., with
Council President Sherril Huff-Menees presiding. Council members
present were Bob Winters, A1 Colvin, Morrie Dawkins, Carlos
Montgomery, John Law, Richard Neville, Lon Overson, and David Farr.
Also present were City Attorney Ian Sievers and City Clerk Kathleen
McCluskey.
The meeting opened with the Pledge of Allegiance led by Council
President Huff-Menees and Invocation given by Reverend David Welch
of Chico Alliance Church.
Kathleen McCluskeV, City Clerk, announced Item 7A-l, Proposal For
Repairing The Fire Rescue Boat, was added to the Agenda.
CONSENT AGENDA
A. Minutes of Meeting - May 31, 1995
#AB95-120
M/S/C/U(Farr/Colvin) to approve the Consent Agenda as presented.
CLAIMS/CHECK REGISTERS
Vouchers audited and certified by the auditing officer as required
by RCW 42.24.080, and those expense reimbursement claims certified
as required by RCW 42.24.090, have been recorded on a listing that
had been made available to the Council.
M/S/C/U(Colvin/Dawkins) on June 14, 1995, the Council does approve
for payment those vouchers included and further described as
follows: 185354, 185355, 185376 through 185355 in the amount of
$895,215.09.
President Huff-Menees make the following announcement:
(1) City Council Study Session - Monday, June 19, 5:30 P.M., in the
Council Conference Room. Topics of discussion are:
Budgeted Land Acquisition; Old Belfair Highway Trees; Wastewater
Treatment Plant Odor Control Project Update; Corrosion Control
Study Conclusions; Wellhead Protection Update.
(2) City Council Executive Session, June 21, 1995, immediately
following the City Council meeting. The issue to be discussed is
"potential litigation".
COUNCIL MEMBER REPORTS
Mr. Overson reported on the Neighborhood Information Network
TAPE #1293
City Council Reg. Mtg. Minutes
June 14, 1995
Page 2 of 24
meeting held June 13, and the opportunity to talk with the downtown
"beat" police Officers.
Mr. Law reminded everyone the next District #3 Neighborhood Meeting
is scheduled for Tuesday, June 20, 1995, 7:00 P.M., at the Senior
Center. Senator Betti Sheldon will be the guest speaker and will
give a Legislative Wrap Up report and be available to answer
questions. The District #3 "beat" Police Officer as well as a
representative from the Fire Department are expected at that
meeting.
Mr. Montgomery announced on June 15 the Parks Department will start
closing down several streets in Forest Ridge Park.
Mr. Dawkins reported he had the opportunity to visit Port Townsend
and was amazed with the amount of growth on the other side of Hood
Canal.
Mr. Colvin reported he attended Graduation Ceremonies at Central
Kitsap High School and was very impressed with the ceremony and
behavior of the graduating seniors. At that event, he met the
school principal, Emma Walker. He extended congratulations to all
graduates throughout Kitsap County. He recognized some
championship ball players in the audience, who would be introduced
during Public Recognition. On the issue of Scotch broom, it has
been said it is not the City's business, however, he believes when
something affects the citizens adversely it is the City's business.
He was pleased to report Councilman David Farr had also volunteered
him time as well as a plant towards a project to replace the Scotch
broom. He referenced a recent newspaper article about Scotch broom
in which it stated Scotch broom does not cause any odors, however,
he has heard differently from lots of people who have called him.
The newspaper article contained a phone number that can be called
to make a comment on Scotch broom, even a sneeze will do. Mr. Law
stated for clarification only Mr. Farr offered to plant donated
plants. Lastly, Councilman Colvin announced Chuck Laubach has been
elected King Lion of the Bremerton Central Lions Club.
Mr. Winters reported on his recent tour of the USS Missouri and
encouraged anyone hosting out-of-town guests this summer to be sure
and include a trip to see the Missouri. He extended special
"congratulations" to his nephew Kevin Winters, a graduating Olympic
High School senior. On Tuesday evening the Westgate PeeWee "C"
Team lost in the semi finals, however, he congratulated all the
parents for supporting their kids. He commended all the "C" Team
players for their hard work in winning eight games during the
season. The KitsapLake Neighborhood Association will meet on June
27, 1995, 6:30 P.M., at the Cascade Natural Gas Building. The sole
topic of discussion at that meeting will be "traffic on Kitsap
TAPE #1293
City Council Reg. Mtg. Minutes
June 14, 1995
Page 3 of 24
Lake".
Mrs. Huff-Menees extended her congratulations to all graduating
seniors from all Kitsap County High Schools. She also extended a
heartfelt request to exercise caution in their celebrations.
MAYOR'8 REPORT
Mayor Lynn Hotton reported the Anderson Cove area clean up was very
successful. Brem-Air provided three large dumpsters to assist in
the clean up effort, and volunteers from the USS Nimitz worked
along side Anderson Cove residents. She publicly thanked everyone
who participated and supported the clean up project.
Following a citizen's request, the City is now placing Automobile
Accident Report forms in City Hall where they could be picked up if
the Police Department was closed for the day, but City Hall
building was still accessible. Those forms are now being made
available in the Information Center, which is directly across from
the Police Department counter.
On the issue of Scotch broom, she would like everyone to understand
that it is not as easy to remedy as one may think. She
acknowledged many people have severe allegeries to Scotch broom,
but it does provide for soil retention and it is green and provides
landscaping. The issue is not just tearing out the plants and
replacing them with other kinds of plants, such as rhododendrons,
because there could be a maintenance issue. She has asked the
City's Urban Forester Kevin McFarland, to do some research to see
whether or not the Scotch broom can be either sprayed or pruned so
it does not flower. In lieu of that, she will look at some other
plantings along with a ground cover for soil retention and weed
control.
Passenger only ferry service - at this point Bremerton is very
close to securing two boats that will resolve the "ferry wake
issue". In order to make sure passenger only service would become
a reality for Bremerton, the City exchanged funding from the Gorst-
Connector project (3 million dollars) for a passenger only boat.
We are very close to finalizing the amount of money needed for the
two boats and from that point she is hopeful there will be 30-40
minute crossings. When the point is reached to address the three
million dollar shortfall in the Gorst-Connector project, she will
probably be knocking on some people's doors, such as Congressman
Dicks, asking for some assistance. It is felt passenger only ferry
service is a regional issue and one that is a preservation issue in
thatit replaces existing infrastructure. Kitsap Transit was very
instrumental in helping the City work through this issue along with
Washington State Ferries personnel and City Engineer Randy Witt.
TAPE #1293
City Council Reg. Mtg. Minutes
June 14, 1995
Page 4 of 24
Mayor Horton read the following Proclamation:
(1) JUNE 14, 1995, - FLAG DAY in the City of Bremerton.
Mayor Hotton introduced John Clauson, Service Development Manager
for Kitsap Transit, Bob Ferguson, Kitsap Transit Coordinator of the
Commute Reduction Program and Mark Souza, Commute Trip Reduction
Coordinator for the City of Bremerton. Mr. Clauson stated part of
his responsiblity is to deal with the Commute Trip Reduction law
for all cites and the County in Kitsap County. In 1992 the State
Legislature passed a law requiring all major employers to develop
a program that would help reduce the number of single occupancy
vehicles (SOY) coming to their work site. In addition to those
employers, it also required jurisdictions within those boundaries
to also develop a program to reduce their SOV's. He was please to
announce in 1995 all of the employers and jurisdictions did conduct
a survey to determine their SOV rate and 14 out 30 that were
required achieved the 1995 goals. The City of Bremerton is one of
those jurisdictions and Kitsap Transit acknowledged the
outstanding, with management's support, commute trip reduction
effort, along with Mark Souza, Employee Transportation Coordinator
and his assistant Rhonda Wallace. The goal for 1995 for these
employers was to reduce down to 72%; the City of Bremerton reached
a 67% SOY rate. Mr. Clauson presented the City with a plaque that
read: "The 1995 Commute Trip Reduction Goal Achievement Award in
recognition for outstanding efforts to reduce air pollution and
traffic congestion by reducing the number of single occupant
vehicle employee trips presented to the City of Bremerton by the
Kitsap Transit board Of Commissioners". Mayor Hotton stated even
though the award is given to the City, she presented it to Mark
Souza to hang in an appropriate location since he was the person
instrumental on staff to help the city achieve its goal. She
believes the result of his hard work is of benefit to the City and
without his efforts we would not have been able to achieve our
goal.
Mayor Horton introduced Randy Witt, City Engineer, and Bob Tulp,
Public Works Operational Manager, and announced the City received
the 1994 Master Builders Award for the Public Works and Utilities
Operations complex and Vehicle Maintenance facility. The facility
was selected as best of metal government buildings built in 1994.
The award will be hung in the Public Works complex and all those
involved with the project are to be congratulations for a job very
well done. Ranfly Witt, City Engineer, expressed his thanks and
explained this award also goes to Dave Fergus, who designed the
facility and the builder Tom Snyder as well as Dan Miller, Project
Manager for the City.
Mayor Horton announced a presentation would be made by Senator
Betti Sheldon and representatives from the State of Washington
TAPE #1293
City Council Reg. Mtg. Minutes
June 14, 1995
Page 5 of 24
Public Works Trust Fund in which the City of Bremerton will receive
a check in the amount of $3.5 million dollars (a low interest
loan), to be used on the Wastewater Treatment Plant Odor Control
Project.
7B - WASTEWATER TREATMENT PLANT ODOR CONTROL PROJECT (V4215
V4217) PUBLIC WORKS TRUST FUND LOAN APPROVAL, #AB95-122
Last year, City staff applied to the Public Works Trust Fund (PWTF)
for a $3.5 million low interest loan for the Wastewater Treatment
Plant Odor Control and Dechlorination improvements. The
application ranked highly in the selection process, was recommended
for funding by PWTF, and was recently approved for funding by the
State Legislature.
The Loan Agreement has a face value of $3.5 million dollars, an
interest rate of 1%, and is payable over 20 years. Matching funds
are provided in the approved 1995 budget. Staff recommends
approval of the loan agreement.
Randy Witt, City Engineer, stated this is the City's second
successful application for State Public Works Trust Fund monies.
In 1994, the City received a $3.5 million dollar loan for the
Warren Avenue project. He referenced a Cost Of Funds Comparison
PWTF Loan vs Revenue Bonds Table in the Agenda packet, which showed
the City will save $1.67 million dollars to the Wastewater
Treatment fund and ratepayers of Bremerton. An application has
been submitted to PWTF for the Callow Avenue CSO Reduction project
as well.
Senator Betti Sheldon expressed her delight to have the opportunity
to make a presentation to the City and represent the State of
Washington and the Public Works Trust Fund. This is the very best
of government lending a helping hand to government that helps
communities and citizens in those communities. The Public Works
Trust Fund was created by the State Legislature in 1985, and since
that time the they have loaned two communities over $300 million
dollars at low interest rates. Kitsap County has received over
$9.7 million dollars and the $3.5 million dollars that is going to
the City of Bremerton is part of that $9.7 million. She
acknowledged Mr. Travis Reed, who serves on the Public Works Trust
Board and represents Kitsap County. Senator Sheldon presented a
check in the amount of $3.5 million dollars to the City of
Bremerton to be used for improvements at the Wastewater Treatment
Plant, which will benefit all of the citizens of Bremerton and the
County of Kitsap.
Public comment - none.
#0899 M/S/C/U(Montgomery/Winters) to authorize and direct the Mayor to
TAPE #1293
City Council Reg. Mtg. Minutes
June 14, 1995
Page 6 of 24
enter into the loan agreement with the Public Works Trust Fund in
the amount of $3.5 million for the Wastewater Treatment Plant Odor
Control project.
PUBLIC RECOGNITION
David Davenport introduced the Kitsap County Braves, a group of
women athletes 16 years old and under. This team recorded a 65 win
and 16 loss record bringing home a First Place trophy in five out
of 10 tournaments. The team finished 33 out of the nation at the
National Softball Tournament in Illinois out of 6,000 teams. So
far this year, in their first 18 and under year, they have amassed
a season record of 16 and one, winning two out of three
tournaments. These athletes give up their entire summer practicing
at least three times each week and playing tournaments every
weekend until the middle of August. The players come from middle
class, blue collar families and they hone their skills in hopes to
use fast pitch as means to acquire a college education. Their team
has not been able to secure a sponsorship on any level, and they
and their families are responsible for all team expenses. They are
committed, hard working and dedicated role models. After the team
won the Don Trig Memorial Tournament this past weekend, their head
coach Tom Davenport was heard to say "there isn't a coach alive
that would not love to be in my shoes and coach these girls".
Liz Bomengen, Mountain View Middle School PTA President, stated
throughout this school year they have been honored to meet with and
form partnerships with the City of Bremerton. At their PTA
meetings, Cynthia Engelgau from the Parks Department gave updates
on Parks activities and programs; and Mayor Horton shared concerns
over the passage of the Bremerton School District's levy. A
partnership with the G.R.E.A.T. and D.A.R.E. Officers, Jon Johnson,
Gerald Fitzpatrick and Parks employee Cynthia Engelgau has led them
to have two wonderful activity nights for youth in Bremerton at the
Middle School building. They also had a great night of skating at
Skateland in their partnership with them. These partnership have
been fun, informative and very valuable, and they are looking
forward to working together in the future. Ms. Bomengen presented
the City a check from the Mountain View Middle School PTA to the
Bremerton D.A.R.E. Officers and the D.A.R.E. Program.
Chuck Laubach, 215 6th Street, announced he and his wife, as
residents of Bremerton, will be traveling to the International
Lions Convention in Seoul Korea on June 30. At the end of the
conference they will travel to Kure, Japan, where they will be
meeting with the Mayor of Kure and exchanging greetings and gifts
from the City of Bremerton in conjunction with the City's Sister
City program.
Greg Davis, 1521 Arvon Street, stated for whatever reason residents
TAPE #1293
City Council Reg. Mtg. Minutes
June 14, 1995
Page 7 of 24
in his neighborhood have been placed in the Anderson Cove area,
however neither he nor his neighbors consider themselves part of
that neighborhood. It concerned him that the City recently
acquired and started to develop a piece of land on their street
into a park without any consulting with the residents in that area.
He and his neighbors are opposed to placing a park within their
neighborhood intended for use by people living in another
neighborhood. He is concerned the area will become a haven for
drug dealers and attract other problems. During the next few
weeks, Council will be receiving petitions from their neighborhood
in opposition to the development of a park/playground in their
area. He did not feel that this was an appropriate manner to
acquire and develop park land. He does recognize the need for a
playground in the Anderson Cove area, however, he did not want to
see one placed in his neighborhood. On a more positive note, he
thanked RandyWitt and City engineers for their efforts to keep his
sewer bill down. He is aware of the great deal of effort they have
worked toward making the sewer treatment plant function better as
well as the separation of stormwater and helping to make those
services more affordable. Mr. Farr stated for clarification the
lot referenced by Mr. Davis was donated to the City by a church
organization, after being contacted by Mary Sump, with the
stipulation that it be used for a playground or a park. The City
does not have any firm plans as to how it is to be developed, but
there is a fund established for donations. Mr. Davis asked why did
the City start clearing the land? Mr. Farr explained the land was
cleared during the Anderson Cove neighborhood clean up this past
weekend by volunteers. He doubted many of the residents miss the
blackberry bushes that were removed. Mr. Davis stated he believes
there is a great deal of opposition to the development of a park by
the neighbors.
Jack Lefooski, President Kitsap Lake Neighborhood Association
(KLNA), stated there is a very ugly rumor out that the people and
residents on Kitsap Lake are trying to restrict and control boat
traffic on the lake, which is totally not true. There are problems
on the lake that involve boats, water skiers, jet skiers and
swimmers. The KLNA's next Neighborhood Meeting is scheduled for
June 27, 6:30 P.M., at the Cascade Natural Gas Company. The main
topic for that meeting will be use of Kitsap Lake and how those
uses are controlled or monitored.
Peter M. Myers, 4317-D Oyster Bay Road, expressed his concern that
his neighborhood is being run down, pockmarked and bombed with
houses being boarded up once they are purchased by the City. It
concerned him that he and his neighbors' properties were being
devalued by what is happening with the sale of properties to the
City. He referenced a newspaper article in which Mayor Horton
supported the buy out of homes near the sewer treatment plant as a
TAPE #1293
City Council Reg. Mtg. Minutes
June 14, 1995
Page 8 of 24
precaution against future lawsuits, if the improvements to the
sewer treatment plant do not eliminate the offensive smell. He
sees any future action of condemnation by the City as land grabbing
without little regard to residents that have made that area their
home for many years. He has lived in his home for 29 years and
reminded the public that in the 1950's and 1960's negroes could not
buy or rent everywhere- that is what's behind this neighborhood
being mostly settled by black people. And, most of those still
residing there do not want to move and if they are forced to sell
their properties there is no guarantee they can find other sites
that can be purchased for what they are being offered by the City.
He pointed out most of the people involved in the Westhills Lawsuit
live east of the freeway and the City cannot stop them from filing
another lawsuit if the smell from the sewer treatment plant is not
eliminated. If the odor is gone after the improvements have been
made to the treatment plant, why would the Council want to make
long time senior residents homeless? He provided a copy of a
newspaper article about the resettlement of residents at the
Norseland Mobile Home Park and asked that residents of his
neighborhood be treated in as fair and respectful way as the
Norseland residents are being treated by Kitsap County and the Port
Of Bremerton. Lastly, he pointed out the State is spraying some
kind of pesticide on the Scotch broom plants along both sides of
Highway 16. Mr. Colvin stated he was not aware of the City
offering residents near the wastewater treatment plant anything.
Mr. Myers stated some people have received offers for their
homes...some in the $40,000 range and he heard about one offer of
$70,000.
Stacy Rose stated once again he can't believe Bremerton knowing
good and well that they were going to condemn this neighborhood
allowed him to purchase his home and use all of life savings just
so they could take it away from him. As he has stated previously,
most of the people are either elderly or on a fixed income, such as
he, and would not be able to purchase another home. He hoped
Council could sleep at night if they support the condemnation
proposal knowing these people will be out on the street. You might
sleep better if the City buys them all new homes. He has heard it
said that the City Attorney and Mayor's idea to condemn the
neighborhood was a "hair brained idea". He and everyone else he
has talked with agrees with that statement. If the City condemns
their property and then sells it as commercial, all profits from
such sales should be given to the people who live there.
He believes the residents of Bremerton would feel ashamed if this
moneywas put back into the sewage treatment plant and not given to
the people displaced from their homes.
Betty Bue11 stated people should not believe everything they read
in "The Sun". She supports the idea of getting rid of the Scotch
TAPE #1293
City Council Reg. Mtg. Minutes
June 14, 1995
Page 9 of 24
broom in Bremerton at the north end of Warren Avenue Bridge. She
believes there are a lot of people in Bremerton that would help
with the cost to get rid of the Scotch broom and replant the area
with something that is less offensive. Recently, she visited with
some residents of a nursing home near the bridge and since they are
confined they asked what could they do to help in getting rid of
the noxious plants?
David johnson, member of the Oyster Bay Counsel, stated a lot of
what he wanted to say today about the possible condemnation of
property near the sewer treatment plant has already been covered.
However, he is not pleased with the encounters they have had with
the City regarding the appeal on the SEPA Checklist for the
Wastewater Treatment Plant Odor Control project. At the time they
were denied to be heard during the Planning Commission, they were
told the idea of condemnation was just being "tossed around" and
that his appeal was frivolous. On June 6 he received a letter from
the City stating Mayor Horton would like to move forward with the
condemnation plan within the next couple of weeks. He did not feel
this whole situation was being handled in the spirit of what SEPA
is all about, which has to do with public comment and to minimize
impacts on the environment and people within an area. He was not
saying the City Council was acting in bad faith, but rather the
Director of Community Development, the City Attorney and Mayor
Horton. When someone talks about condemning someone's property it
is a pretty serious action and there are a lot of alternatives that
could be discussed. As far as the City trying to protect itself
from liabilities, if you look at the record there are 7 or 8
families that are members of the Westhills Association that live in
the affected area. The other 90% or so live in areas that would
not be affected by the condemnation, so if the odor project doesn't
work there is still 90% liability. For those 7 or 8 people, there
are other alternatives that could be discussed as well as for other
remaining in the neighborhood rather than taking people out of
their homes. He emphasized the fact that their neighborhood is a
viable neighborhood ranging in age from senior citizens to young
children. A number of residents within the affected area are
concerned about relocating to another area that may not be as
"safe" as they believe their current neighborhood. It has been
said by some Council members that there are properties within the
subject area that need to be condemned. If they spend any time in
that neighborhood they should realize it is one of the older
neighborhoods, however, people who live there go to church, and
some are stay-at-home mothers taking care of their children rather
than working to make more money and have to pay child care costs.
On top of that, many of the residents own their homes outright and
question whether or not they could find a home somewhere in Kitsap
County for what the Mayor has proposed to offer for properties,
i.e., averaging $50,000 per property. He questioned where can you
TAPE #1293
City Council Reg. Mtg. Minutes
June 14, 1995
Page 10 of 24
go in Kitsap County and buy a house for $50,000? If one is on a
fixed income, how can they acquire a loan? He asked the City
Council to consider all these things and the alternatives that can
be discussed other than condemnation of property.
Sandra Pool, 1216 Cottman Avenue W, stated she is also a resident
in the area that may be condemned by the City. Five years ago this
week her husband passed away and because of that and other
circumstances she was forced to sell her home and acreage and move
into town. She purchased her present home knowing about the
wastewater treatment plant and the problems connected to it.
However, she thought the problems had been resolved and things
would get better, so she invested all her available funds in her
home on the supposition that the value would increase.
Condemnation was never part of that consideration. She still has
a child at home to raise and she has chosen to be a stay-at-home
mother, and they live on a fixed income. She invested everything
she had into her home so she would never be forced to sell a home
and move again. Pray God that none of the City Council members
ever have to do that. She was one of those who filled out a form
in response to the City's inquiry about selling her home. She
never received a response from the City, however, she did contact
the City again and talked with Mr. Chum, the then Director of
Public Works and Utilities. At that time Mr. Chu told her the City
was only interested in purchasing homes for about $40,000. Four
years ago she paid almost twice that amount for her home and it
upset her that now she is being asked to settle for half of what
she paid. To say that no one was interested in selling is totally
dishonest. She does not believe the City and Council members, as
representatives, have acted in good faith towards her or her
neighbors. To her a home is not home except for the people in it.
Apparently, the City wants to pay as little as possible without
regard for the people living in the homes they wish to purchase at
this time, or condemn their homes in the near future. She'll
survive because she has already survived adversity and she'll be
able to live with herself and be able to sleep nights.
Don Larson, president Washington Scuba Alliance, again reported on
the possible availability of a 136 foot by 24 ft. wooden hulled
vessel that sunk in Sinclair Inlet near a Navy mooring buoy, to be
used as an underwater park. Even though the boat was privately
owned it was originally built as a Naval Coastal Minesweeper. The
is considering raising that vessel and are looking for a location
within a jurisdiction that already had the required permits in
place to use it as an underwater park. As of this date, he has not
found any jurisdiction that meets the permit requirement and ready
to accept such a vessel. Three sites are still under
consideration, Titlow Park in Tacoma, Potlatch on Hood Canal and
Edmonds' Underwater Park. He would still like to see Bremerton
TAPE #1293
City Council Reg. Mtg. Minutes
June 14, 1995
Page ll of 24
develop an underwater park north of the Turner Joy. Again, he
asked that he be given some acknowledgement from the City that they
desire to work on developing an underwater park or pursue the
permitting process. He provided Council with copies of a couple
letters relating to the underwater park issue. The public can
contact him at 373-5367. Mr. Farr asked Mr. Larson if he would be
willing to make a more indepth presentation on the possibility of
developing an underwater park at a Council Study Session. Mr.
Larson stated yes, and he believes it would be a very popular
tourist attraction for divers. President Huff-Menees stated
Council will consult with the Parks Department and then be back in
touch with Mr. Larson.
James Galbraith stated he has a better than average knowledge of
the flora and fauna that grows in this area and the particular type
of Scotch broom that is being discussed is a hybrid and does stink.
He suggested, since it is such a nuisance, that it be eradicated as
soon as possible and replaced with native type plants. He pointed
out that this type of Scotch broom does not lose its pollen to the
wind and the flower itself has to be opened by an insect in order
for the pollen to escape. He believes most people suffer from
other pollens and grasses that are blooming at the same time the
Scotch broom flowers. He also pointed out what is planted at the
north end of Warren Avenue is cream colored, not the yellow kind.
Mr. Law stated having known and worked with Mr. Galbraith for
years, he could testify that his expertise on woods is of the
highest.
7A - ACCEPTANCE OF WASHINGTON TRAFFIC SAFETY COMMISSION GRANT,
#AB95-121
Request the approval and acceptance of the Washington Traffic
Safety Commission Grant funding for the Bremerton/Kitsap County DUI
Task Force. The grant is in the amount of $28,462. The Task Force
attempts to reduce the incidence of impaired driving through
education and enforcement. It is a joint cooperative effort with
the Washington State Patrol, Kitsap County Sheriff's Office and all
County municipal jurisdictions.
Les Pope, Manager Kitsap County DUI Task Force project, stated this
is the fourth extension of this particular contract granted by the
State. Senator Sheldon and Senator Owens were instrumental in this
project continuing not only in Kitsap County, but throughout the
State. He was pleased to announce the State allocation was $7,000
more than the previous years grant. The task force itself has
managed to stop about 5,000 people and arrest approximately 500
drunk drivers, and provide education to literally tens of thousands
of people, which is the premise of their entire project. This
project is a model for other communities throughout the state and
Kitsap County's program has received two State awards and two
#2390
TAPE #1293
City Council Reg. Mtg. Minutes
June 14, 1995
Page 12 of 24
National awards.
presented.
He urged
Council to accept the grant as
Public comment - none.
M/S/C/U(Dawkins/Montgomery) to authorize the Mayor to sign the
grant contract; to approve the Budget Adjustment request; and to
approve continuance of the program coordinators contract.
7A-1 - PROPOSAL FOR REPAIRING THE FIRE RESCUE BOAT, #AB95-131
Seeking approval to expend funds from the Fire Department Capital
Fund (307) to repair the Fire Rescue Boat. The expenditures of the
funds would bring the vessel back to a reliable, efficient vessel.
The proposed recommendation was prepared by Art Anderson &
Associates, Engineering firm, Bremerton, Washington.
Fire Chief Mick McKinley explained this item has been the topic of
discussion at several Council Study Sessions and pertinent data was
provided during those meetings. The next step in this process is
Council approval. The funds were authorized to be expended through
the 1995 budget.
Public comment - none.
Mr. Overson stated it appears what is presented is a good proposal.
He noted the Art Anderson & Associates study summarized 7-8
options, and the engine proposed scored the highest in that
evaluation. Mr. McKinley stated that was correct, the two options
seriously considered were: (1) replacing the existing gasoline
engine with the subject diesel with a jet drive propulsion system
on the back to insure swimmer safety and reliability of a diesel
engine; (2) twin outboard engines, which would obviously have props
in the water. The cost of both options were close. The twin
engines would have provided a faster response speed, but given the
lower reliability and virtually throw away system of the outboards
as early as 4-5 years, they felt the best expenditure of funds by
the City would be the diesel engine. Mr. Overson asked if that
support is also endorsed from our maintenance firm (Ryder)? Chief
McKinley stated yes. Mr. Overson asked if Fire Department
personnel had tested a boat with the same type of diesel engine?
Chief McKinle~ stated people were interviewed about the boat,
however, his staff did not have a hands-on demonstration, but they
are scheduled to see a demonstration this Friday. He further
explained the boat will not be a tunnel racing boat, but will
deliver a very reasonable and respectful speed with a great deal of
reliability and safety for both a person in the water and the crew
operating the boat. Mr. Overson asked if the fire fighting
capability will be retained and if it will be a saltwater system
that will handle the saltwater with no problem? Chief McKinley
#2855
TAPE #1293
City Council Reg. Mtg. Minutes
June 14, 1995
Page 13 of 24
stated yes, they are retaining the fire pump system, which is
designed to use saltwater. However, the engine will be fresh water
cooled.
Mr. Farr acknowledged this issue has been discussed a number of
times and he especially appreciated the data presented by Art
Anderson & Associates and respected their judgement. He believes
a wise choice has been made, however, he is concerned with the time
line for getting the boat back in operation. Chief McKinley stated
the City has been given a July i date if the proposal is approved
by the Council on this date. If the City missed this earlier
deadline with the contractor, it would push getting the boat
repaired to late August. Mr. Farr questioned if there would be a
maintenance program to make sure this asset will receive first
class and regular maintenance? Chief MoKinley stated he believed
some of the initial problems they experienced will not be present
with the diesel engine and modification of the electrical system.
In addition, the City has solicited organizations to assist in
future maintenance, one being the Bremerton Yacht Club.
Mr. Law asked if' the fire pump and accessories will be acquired
immediately or was it an option? Chief MoKinley stated the fire
pump will be installed immediately as the weight of the pump needs
to be properly distributed along with the installation of the
engine. He also felt it was important to have fire fighting
capacity in the event of residential, boat or brush fires.
M/S/C/U(Farr/Montgomery) to approve passing the needed expenditure
of funds from Capital Fund (307) to the Fire Department to repair
the Fire Rescue Boat.
Mr. Overson expressed his appreciation for Chief McKinley, A1 Duke
and Ed Swan's persistence on this issue. He felt one of the prime
motivations for retaining fire fighting capabilities above and
beyond the life safety issue is in the case of an emergency, such
as an earthquake.
President Huff-Menees thanked Art Anderson & Associates for their
work on this proposal.
7C - WASTEWATER TREATMENT PLANT ODOR CONTROL PROJECT (V4215 &
V4217) AMENDMENTS TO R. W. BECK CONTRACT FOR DESIGN ]%ND
CONSTRUCTION SERVICES, #AB95-123
As discussed at the Study Session on May 22, 1995, and Council
Committee meetings, City staff have negotiated amendments to the
existing Professional Services Agreement with R. W. Beck for
additional design services and for construction services. Design
services increased beyond the original scope of work. This is
reflected in the increased number of plan sheets required to
TAPE #1293
City Council Reg. Mtg. Minutes
June 14, 1995
Page 14 of 24
adequately show the work (73 planned, 168 actual). Construction
services provide for construction management and inspection
services for the project based upon an estimated number of hours to
perform the work. The cost of the increased design services is
$495,604, the revised not to exceed amount of the Professional
Services Agreement with R. W. Beck is $1,865,141. Adequate funds
exist for this work. The attached amendments provide a detailed
discussion of the work. Staff recommend approval of the
amendments.
Randv Witt, City Engineer, explained the design services go back to
the original scope of work and there being more work involved in
the project than previously anticipated. A listing of that work is
identified in the Agenda Bill documentation. The construction
services are for the contractor to provide an on-site inspector to
review the project at all times and to have staff in the office to
manage the materials received and the questions that will come up.
It shows the level of effort anticipated to put forward on the
construction and the amount of anticipated hours. He is
comfortable we can accomplish what is needed in those hours, but it
is an estimate.
Public comment - none.
Mr. Neville referenced item #8 on the work list (pg. 57 of the
Agenda Packet) and asked if a location had been determined for the
odor control facilities for the pumping stations? Mr. Witt stated
yes, this has to do with two sites where "scrubbers" are being
installed, particularly at the air relief valves. One site is near
the cemetery and the other is at Gregory and High Avenue. The
process took a little longer than expected since the City had to
work with people in the area to come to an agreement about
constructing a building with an underground vault. Mr. Neville
asked if the City had reached agreement with those residents
affected with this installation? Mr. Witt stated yes.
Mr. Colvin asked if there was still no guarantee that there
wouldn't be any odor? Mr. Witt stated that was true, however, the
work will include adding two charcoal filters at pump stations and
three small scrubber units, which should contribute to better
results in reducing odors.
TAPE #1294
Mr. Farr stated this item was discussed at length in the Operations
Committee and he does not have a problem with the increase in work
on the design side, but he is concerned about the timeliness since
things were added over a period of time starting late 1994. His
preference is to see the increases and get a chance to authorize
#0088
#0105
TAPE #1294
City Council Reg. Mtg. Minutes
June 14, 1995
Page 15 of 24
the additional expenditure before the work is done. He did not
want it to appear Council members act as rubber stamps and he would
rather go through the appropriate notification so they are aware of
the needs prior to the work being completed. ME. Witt stated he
agreed with that philosophy and he believed they provided that
information. Because of their assumptions that it could be done
within budget, and to be honest they are billing out about $250,000
per month, it did catch up and overrun them. He felt it should
have been brought more directly to Council and it was discussed
during a Council Study Session.
M/S/C(Overson/Montgomery) City Council authorizes and directs the
Mayor to execute Amendment #3 to the Professional Services
Agreement with R. W. Beck for design services on the WWTP Odor
Control project in the amount of $124,717.
Vote on motion:
Motion carried.
In Favor: Overson, Neville, Farr, Law,
Huff-Menees, Montgomery, Dawkins,
Colvin
Opposed: Winters
M/S/C/U(Montgomery/Neville) City Council authorizes the Mayor to
executeAmendment #4 to the Professional Services Agreement with R.
W. Beck for construction services on the WWTP Odor Control project
in the amount of $495,604.
7D - CONTRACT AWARD - AIR RELIEF AND PUMP STATION8 ODOR CONTROL
PROJECT, #AB95-124
Bids were opened for the Air Relief and Pump Stations Odor Control
project on May 16, 1995. Three bids for this project were
received. The low bidder is Sheldrup Construction, Inc., in the
amount of $706,109.00 including sales tax. The engineer's estimate
for this project was $745,890, including sales tax. This project
is included in the 1995 budget and sufficient funds exist to do
this work. The action before the City Council is approval of a
contract for construction of this project.
RandV Witt, City Engineer, stated Sheldrup Construction Inc., was
the low bidder and the engineer's estimate fell in the middle of
the bids.
Public comment - none.
Mr. Overson noted Sheldrup Construction's bid was significantly
lower than the other bids. He asked if the City had example
projects to demonstrate they can and will meet their bids?
Witt stated they are currently building the sewer treatment plant
on Bainbridge Island.
#0261
TAPE #1294
City Council Reg. Mtg. Minutes
June 14, 1995
Page 16 of 24
M/S/C/U(Neville/Farr) the City Council approves contract for
$706,109.00 with Sheldrup Construction, Inc., for construction of
the Air Relief and Pump Station Odor Control project and authorize
the Mayor to execute the same.
7E - INCREASE ADMINISTRATIVE AUTHORITY TO APPROVE CHANGE ORDERS ON
THE WASTEWATER TREATMENT PLANT ODOR CONTROL PROJECT AND THE CALLOW
AVENUE BASIN CSO REDUCTION PROJECT, ~AB95-125
Chapter 2.76 of the Bremerton Municipal Code sets forth purchasing
and change order procedures on contracts used by the City. The
administrative change order authority of Mayor is: "20% of the
contract price or $30,000, whichever is less" - BMC 2.76.100(a)(4).
On two recently approved construction contracts, the Wastewater
Treatment Plant Odor Control Improvement project ($5.1 million),
and the Callow Avenue Basin CSO Reduction Project ($2.1 million),
the $30,000 administrative change order authority is inadequate to
assure quick timely responses to the contractor's and City's needs,
which may arise during construction. To address situations such as
this, the purchasing procedures allow the City Council to adjust
the administrative change order authority of the Mayor (BMC
2.76.500(b)(ii). Staff requests that the administrative change
order authority be increased to approximately 5% of the
construction contract amount: $250,000 for the WWTP Odor Control
project and $100,000 for the Callow Avenue Basin CSO Reduction
project. Each project budget has 10% of the construction contract
amount set aside for construction change orders. The City Council
will be kept apprised of the project status, including any change
orders, as part of the monthly update reports. Staff recommends
approval of increasing the administrative change order authority of
the Mayor for these projects.
Randy Witt, City Engineer, stated approximately six months ago the
City Council approved the ordinance that allowed this to happen and
from his prospective of two large projects he saw the need to have
this type of authorization. He noted $30,000 will not be enough
change order authority to react for the kinds of situations that
may occur. both projects are time sensitive and he needs to be
able to work quickly in the field to get problems resolved.
Roy Mclnnis, 2711 Maple Street, stated he was not speaking against
the requested change, however, he did feel the difference between
$30,000 and $120,000 was rather high.
Mr. Witt stated there are separate numbers for each of the projects
and that may be somewhat confusing. The Mayor's change order
authority is up to $30,000. The "20%" is irrelevant because we
passed the $30,000 authority on the Callow Avenue project of 2.1
million, which is a little over 1%. The wastewater treatment plant
project of 5.1 million is less than 1/2 of one percent. He does not
#0521
#0540
TAPE #1294
City Council Reg. Mtg. Minutes
June 14, 1995
Page 17 of 24
foresee nor does he have any change orders sitting in his back
pocket, but he does needs to be ready to respond quickly in the
field. Because of the higher cost of construction, any change order
will be more expensive than $30,000. He is asking Council to give
him more along the line of 5% of the project money, which is
$100,000 and $250,000 respectively for the Callow Avenue and
wastewater treatment plant projects. That is half of what was
budgeted for contingencies and Council will be kept informed of
that expenditure as part of their monthly status reports.
Mr. Law noted each project budget has 10% of the contract amount
set aside for change orders. He asked what would happen if there
was a caveat that the change orders would not exceed the total set
aside for the construction project? Mr. Witt stated his proposal
is more restrictive than Mr. Law's suggestion and he is dealing
with "accumulative" figures. If he finds that there are two change
orders in the $200,000 range, he will be back before Council
letting them know he is nearing his authority of $250,000 and needs
additional approval. Mr. Law pointed out the language in the
documentation did not state clear enough that it was an
accumulative amount. Mr. Wttt pointed out the language clarifying
that point is contained in the ordinance.
Mr. Overson stated he was also concerned about the change, however,
this is a one time change for the two contracts. Mr. Wttt stated
that was correct and it related specifically to the two contracts
identified and to the amounts specified. Mr. Overson pointed out
these two projects are specifically time sensitive, particularly
the Callow Avenue project, which will be ripping up the entry into
the shipyard for some time. He emphasized the City's engineering
and project management staff have a good reputation for keeping the
projects within budget.
Mr. Colvin noted the request for increased change order authority
was within budget and in the long run such action may save the City
money.
M/S/C(Montgomery/Overson) City Council approves increasing the
administrative change order authority to the Mayor on the WWTP Odor
Control project to $250,000.
Vote on. motion:
Motion carried.
In Favor: Overson, Neville, Farr, Law, Huff-
Menees, Montgomery, Dawkins, Colvin
Opposed: Winters
M/S/C(Montgomery/Farr) City Council approves the administrative
change order authority of the Mayor on the Callow Avenue Basin CSO
Reduction project to $100,000.
TAPE #1294
City Council Reg. Mtg. Minutes
June 14, 1995
Page 18 of 24
Vote on motion:
Motion carried.
In Favor: Overson, Neville, Farr, Law
Huff-Menees, Montgomery, Dawkins,
Colvin
Opposed: Winters
7F - BID AWARD - KITSAP LAKE SEWER EXTENSION PROJECT, #AB95-126
Bids were opened for the Kitsap Lake Road Sewer Extension project
on May 30, 1995. Four bids for this project were received. The
low bidder is Stan Palmer Construction, Inc., in the amount of
$576,491.90, including sales tax. The engineer's estimate for this
project was $576,286, including sales tax. In accordance with
Ordinance #4450 forming the L.I.D, $300,000 of this project will be
funded by Wastewater, and the balance will come from the Local
Improvement District. The property owners within the L.I.D.
boundaries have been notified of the bid amount and estimated
assessment. The project includes construction of sewer across the
frontage of Camp McKean. The Navy verbally has committed to pay
for the cost of this portion of the project. The action before
Council is approval of a contract for construction of this project.
Randv Witt, City Engineer, passed out a Cost Estimate sheet as
additional data. He described the Kitsap Lake L.I.D. boundaries:
from Camp McKean up to Northlake Way and Northlake Way to a
connection with another sewer line. This project has a lot of
history and he wanted to touch on what has transpired since the
L.I.D. was formed. The Cost Estimate sheet shows the cost
comparisons of the Engineer's estimate at the time the L.I.D. was
approved and was based on preliminary plans with a per lot cost of
$4,219. Bids on the project were open in August of 1994, however,
it was felt they were too high at a per lot cost of $6,267. Based
upon staff's recommendation the City Council took formal action to
reject the bids. At that time it was understood that the bid
process would be re-initiated in early 1995. Following rejection
of the bids, the engineering staff did some redesigning that
resulted in the elimination of a pump station. Mr. Witt
acknowledged Kitsap Lake resident Jack Lefcoski's input and
encouragement to consider eliminating a pump station and going to
a gravity fed line. In the redesigning phase, the pump station was
eliminated and paving was increased to match the City's new policy.
The project was rebid with a per lot cost of $5,368. He pointed
out the Cost Estimate sheet did not include the Navy's
participation although they have verbally committed to the project,
which will result in reducing the cost per lot by approximately
$200.00 per lot. Lastly, a meeting was held with approximately 12
members of the L.I.D. to go over the new proposal.
Jack Lefcoski, Kitsap Lake resident, reported the City sent out a
letter to every person affected by the L.I.D. informing them of the
TAPE #1294
City Council Reg. Mtg. Minutes
June 14, 1995
Page 19 of 24
total cost and invited them to a meeting to discuss the proposal.
There was a low turnout of Kitsap Lake residents at that meeting,
however, in his opinion there was not one negative person there.
He pointed out a $50,000 pump station was eliminated and the unit
price per lot increased by $1,100. He believed the reason why more
people from the Kitsap Lake L.I.D. were not in the audience was
that they assumed they signed on to the L.I.D. and they are ready
to have the project completed. If there was opposition among those
affected by the project, he expected they would be present to voice
their objection. He agreed that no one was overly happy about a
$1,100 increase.
Kathleen MoCluskey, City Clerk, read into the record a letter of
opposition from Larry Deck (1180 Kitsap Lake Rd. NW): I received
a letter from Tim Richard of Public Works and Utilities, informing
me that an award for the construction of the sewer project was to
go before the City Council on June 14. In the letter it was stated
that the estimated assessment per lot would be $5,350. This amount
is substantially above the original amount as quoted and sicned for
by those who agreed. I question whether it is acceptable and sound
legal practice to assume that the people agreed to a lesser amount
would still be in agreement to pay an amount approximately $30%
higher. I will be unable to attend the June 14 meeting and am
sending this letter in order to voice my opposition to the Kitsap
Lake Sewer U.L.I.D."
Mr. Montgomery stated a U.L.I.D. is suppose t be paid by the
property owners who will benefit from the U.L.I.D. He sees no
benefit to the Utility ratepayers in the City who do not live
within the U.L.I.D. boundary. All he see is the ratepayers being
directly charged $300,000 to help pay for a U.L.I.D. that only
benefits a small group of property owners along Kitsap Lake,
therefore, he could not support this proposal as presented.
Mr. Overson pointed out the health benefit to Mr. Montgomery and
all residents of Bremerton and Kitsap County, who may wish to use
the lake, as a result of this project.
Mr. Winters thanked Councilman Overson for his comments and re-
emphasized Kitsap Lake is a City park and available to all
residents of the City and Kitsap County. He views this project as
a health issue and looks forward to eliminating raw sewage from
entering the lake.
Mr. Law stated when this issue came before Council in December of
1993, he was the only opposing vote. Following that action, he
received many interesting phone calls from people objecting to his
voting against the proposal. He emphasized the majority of the
City Council did vote to make that commitment and after that
TAPE #1294
City Council Reg. Mtg. Minutes
June 14, 1995
Page 20 of 24
commitment was made the residents in turn committed to the L.I.D..
Therefore, he now recognizes the contract made by a majority of the
Council and will support the proposal as presented.
Mr. Neville noted the Construction Contingency was dropped by
approximately $39,000 from the original estimate to the present
proposal. He asked Mr. Witt if he felt firm that this contingency
will be sufficient and the engineering studies complete enough to
keep within this contingency? Mr. Witt stated yes, through the
design process a number of soil borings were done and a pump
station was eliminated. Mr. Neville stated it should be noted that
if the Contingency Fund does exceed the budget, the City is not
having to provide additional funding and the U.L.I.D. members will
absorb that cost. Mr. Witt stated Mr. Neville was correct. The
City's commitment is $300,000. The L.I.D. will pick up any excess,
conversely, if there are any cost savings
in the project, that will reflect in the L.I.D. as it is currently
set up. Mr. Neville asked Mr. Witt the amount already invested by
the City in the design phase? Mr. Witt stated the $90,000 is a mix
of Parametrix, Inc., and the City's engineering staff time.
Mr. Winters asked if Mr. Witt would explain the City's new policy
on paving? Mr. Witt stated the City has changed its policy on
paving trenches. Where trench cuts are made in wheel lanes the
paving needs to be extended to either half a lane or a full lane,
not just the width of the trench. In this case, the trench will
run down the middle of Kitsap Lake Road and takes up most of the
road, but not all of it. What is proposed is to patch the trench
and then overlay the road. Since the trenches will be to one side
of the road on Northlake Way, only one half of the roadway will be
paved with asphalt.
Mr. Dawkins noted with Bremerton's and Kitsap County's population
expanding due to the Navy's expansion there will be more building,
which could adversely affect Kitsap Lake. He believes it is
important to take the necessary steps now to protect the lake. Mr.
Witt stated Mr. Dawkins belief was projected by the people
attending their meeting with the L.I.D. members. Some residents
gave graphic descriptions of raw sewage surfacing in their yards
and are very anxious to have the sewer installed to eliminate that
health hazard.
Mr. Colvin asked the number of years the L.I.D. will run? Mr. Witt
explained the per lot assessment will be set when the construction
project is complete and all costs are known. Mr. Colvin asked if
there was a set formula to determine the cost to residents? Mr.
Witt stated no, however, the 4th Street L.I.D. was set up on a 15-
year schedule. He intends to work with the residents to go with a
longer period time, which comes out with a higher interest rate,
#1077
#1186
TAPE #1294
City Council Reg. Mtg. Minutes
June 14, 1995
Page 21 of 24
but lower annual payments.
M/S/C(Farr/Winters) to approve a contract for $576,491.90 with Stan
Palmer Construction, Inc., for construction of the KitsapLake Road
Sewer Extension project and authorize the Mayor to execute the
same.
Vote on motion:
In Favor:
Opposed:
Overson, Neville, Farr, Law,
Huff-Menees, Dawkins, Colvin,
Winters
Montgomery
Motion carried.
7G - CALLOW AVENUE BASIN CSO REDUCTION PRO~ECT~ PRIORITY 1, PIL~SE
1 (V4214) - ANENDNENTTO PROFESSIOI~AL SERVICES AGREEMENT WITH CH2M
HILL FOR CONSTRUCTION SERVICES, #AB95-127
Staff negotiated an amendment to the existing Professional Services
Agreement with CH2M Hill to provide construction services during
the Callow Avenue Basin CSO Reduction project Priority l, Phase 1
construction. The services include construction staking and
engineering services (submittal reviews, site visits at critical
points in the construction and assist in resolving conflicts), to
assist City staff in the construction management and inspection.
The negotiated amount of the amendment is $34,338. Adequate funds
for this work exists in the 1995 budget. Staff recommends the City
Council approve the attached amendment.
Randy Witt, City Engineer, explained these services are related to
construction scheduled this summer and entails the engineer being
able to answer questions and resolve field conflicts as they come
up. The City is providing the necessary staffing, but it is felt
having this particular designer available will be beneficial to the
successful construction of the project. It also provides for the
consultants to do the bulk of the construction staking. The City's
Survey Crew will be assisting in this process in order to save
costs on smaller tasks. It also provides some quality assurance in
having CH2M Hill do the staking after designing the project so it
can be constructed in accordance with their plans. This project is
a very flat sewer and the controls and CSO structure are very
critical. Having CH2M Hill handle this responsiblity will place
some liability on them.
Public comment - none.
M/S/C/U(Farr/Montgomery) to authorize and direct the Mayor to enter
into Amendment #6 to the agreement for Professional Services for
the Callow Avenue Basin Storm Drainage Separation project in the
TAPE #1294
City Council Reg. Mtg. Minutes
June 14, 1995
Page 22 of 24
amount of $34,338.
7H - WERNER ROAD/LOXIE EGANS BLVD., TRAFFIC OPERATIONS STUDY
(E52492) PROFESSIOI~AL SERVICES AGREEMENT APPROVAL, #AB95-12S
Traffic in the Werner Road/Loxie Egans Boulevard area, from
National Avenue to Union Avenue, is increasing. Development and
business activity is strong, contributing to increased traffic.
The area was identified in the City Transportation Element for
future study and improvements to maintain the adopted level of
service. A traffic study, which provides a "blueprint" for
development of the traffic system in concert with the and use
development, needs to be performed.
City Staff have developed a scope of work and negotiated a contract
with Parametrix, Inc., in the amount of $20,530 to perform the
work. Parametrix, Inc., was selected to perform this work because
of their prior experience and performance on the Bremerton/Gorst
project and the City Transportation Element.
WSDOT and Kitsap Transit are supportive of the logical development
in the traffic system in this area and have each contributed $7,000
to the project. City funds in the amount of $9,000 from the
proceeds of street and alley vacations in 1995, are recommended for
the project. A budget adjustment is required. Additional detail
on the project and the funding is provided in the discussion paper.
Staff recommends the City Council approve the agreement and the
budget adjustment.
Randy Witt, City Engineer, explained within the Werner/Loxie Egans
area, roughly from National Avenue to Union Avenue, it is
developing quickly. The City would like to have a blue print for
what it would like it to look like so the City can work with the
developers. There is a proposed L.I.D. in that area, which would
allow for sidewalks both in the Hazelwood Development and Truck
Town Development. This plan will also be helpful when applying for
grant funds. Washington Department Of Transportation and Kitsap
Transit are supportive of this proposal and have provided some
funding. He pointed out for this particular project Street
Vacation funds being used are those generated by the Truck Town
development, at the corner of Union and Werner Road, which keeps
the money within the "neighborhood".
Public comment - none.
Mr. Mont~omel7 noted traffic in the subject area has greatly
increased, especially during peak traffic hours. Mr. Witt stated
it is also becoming increasingly difficult to exist out of the
sewer treatment plant onto Werner Road. He sees the need for the
study considering the streets are close together and traffic
i
#1345
#1445
TAPE #1294
City Council Reg. Mtg. Minutes
June 14, 1995
Page 23 of 24
intersects from all directions.
M/S/C/U(Montgomery/Colvin) City Council approves the budget
adjustment establishing a project budget of $23,000; and authorizes
and directs the Mayor to execute the Professional Services
Agreement with Parametrix, Inc., in the amount of $20,530 for the
Werner Road/Loxie Egans Boulevard Traffic Operations Study.
71 - CONTI~tCT AWARD - 1994 WATERMAIN PROJECTS, #AB95-129
Bids were opened for the 1994 Watermain Projects on May 18, 1995.
Five bids for this project were received. The low bidder is Kar-
Vel Construction, Inc., in the amount of $356,741.78, including
sales tax. The engineer's estimate prepared on completion of
design for this project was $369,702, including sales tax. This
project is included in the 1995 budget and sufficient funds exist
to perform this work. The action before the City Council is
approval of a contract for construction of this project.
Randy Witt, City Engineer, explained this involves construction of
three watermain segments: (1) extension of a Navydistribution main
on Prospect Street and Viking (continuation of Sherman Heights
project); (2) 12-inch distribution main on Halverson, which is
parallel to Olympus and serves the reservoir in that area; 12-inch
transmission main on Lebo Blvd., connecting to an existing 12-inch
transmission main currently served by a smaller line. He urged
Council approval as presented.
Public comment - none.
M/S/C/U(Winters/Montgomery) to approve a contract for $356,741.78
with Kar-Vel Construction, Inc., for construction of the 1994
Watermain Projects and authorize the Mayor to execute the same.
7J - CHANGE ORDER TO CONTRACT WITH DIAMACO FOR RESERVOIR COATING,
#AB95-130
Protective coatings improve performance and extend the life of the
Water Utility's steel tank reservoirs. Diamaco has recently
completed interior/exterior protective coating for Water Reservoir
#17. There is another 1.0 million gallon reservoir at the same
site (#20), which is next in priority for exterior coating only.
A price of $27,790 has been negotiated with Diamaco to provide the
additional outside protective coating for Reservoir #20. Replacing
the coating on Reservoir #20 at this time would provide cost
savings and expedite the Utilities' schedule for annual reservoir
rehabilitation.
Randv Witt, City Engineer, stated an inspection was made of the
interior of this reservoir and determined it does not need the
interior work that is currently being done on reservoir #17. The
#1549
TAPE #1294
City Council Reg. Mtg. Minutes
June 14, 1995
Page 24 of 24
change order essentially involves hosing down the tank with a high
pressure washer and putting on a new coat of paint.
Public comment - none.
Mr. Neville asked if the Utility has a schedule to rehabilitate all
of the City's reservoirs? Mr. Witt stated yes, one per year.
M/S/C/U(Colvin/Montgomery) the City Council authorizes and directs
the Mayor to execute the Change Order to Diamaco Reservoir
Coatings.
With no further business meeting adjourned at 8:10 P.M.
KATHLEEN L. McCLU~KEY, City Clerk