Loading...
HomeMy WebLinkAbout03/24/04 TAP E # 1942 t~ilt~ ~ ~ CITY COUNCIL MEETING MINUTES APR ]~ Wednesday, March 24, 2004 The weekly meeting of the City Council of the City of Bremedon was called to order in the City Council Chambers, 239 4m Street, Bremedon, Washington, Wednesday, March 24, 2004, at 5:30 P.M., with Council President Daren Nygren presiding. Council members present were Mike Short, Will Maupin, Carol Arends, Dianne Robinson, Mike Shepherd, Wendy Priest, Cecil McConnell and Brad Gehring. Aisc present were City Attorney Roger Lubovich; Interim City Clerk Paula Johnston; and Legislative Assistant Lori Smith. The meeting opened with the Pledge of Allegiance led by Council Member Cecil McConnell, followed by the invocation provided by Youth Associate Pastor Jonathan Olesen of Sylvan Way Baptist Church. President Ny,qren made the following announcements: 1. The Pre-Council session was held in the Council Conference Room from 5:00 to 5:30 PM. 2. Patience would be appreciated due to technical difficulties with the BKAT cameras. CONSENT AGENDA A. Minutes of Meeting - March 10, 2004 (#AB04-042) B. 2004 Final CDBG Recommendations (#AB04-043) C. Change Order No. 3 for "Casad Dam Intake Tower Upgrades" Project (#AB04-044) #0025 MISICIU (PriestJArends) Move to approve Consent Agenda as presented. CLAIMS & CHECK REGISTERS Vouchers audited and certified by the auditing officer as required by RCW 42.24.080, and those expense reimbursement claims certified as required by RCW 42.24.090 have been recorded on a listing that had been made available to the Council. #0045 M/S/C/U (McConnell/Short) On March 24, 2004, the Counci~ approved payment of Check numbers 289096 through 289111; and EFT-8097 through EFT-8103 in the amount of $1,255,218.11 on the Master Check Register; and Regular Payroll for the pay period ending March 15, 2004 in the amount of $904,460.71. MAYOR'S REPORT - There was no MAYOR'S REPORT this evening. 6A - SUPPLEMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT WITH EXELTECH CONSULTINGT INC. FOR PERMITTING AND DESIGN OF TRUNK STORM SEWER FOR CSt) REDUCTION IMPROVEMENTS IN THE PACIFIC AVENUE BASIN (#AB04-045): Tom Knucke¥, Engineering, stated that the City is required to complete Combined Sewer Overflow (CSO) Reduction Improvements in the Pacific Avenue Basin by 2007. A major component of the work is installation of a large trunk sewer to convey stormwater from the western half of the basin to the existing outfali at the Ferry Terminal. This Supplemental Agreement No. 1 adds scope and budget to the Professional Services Agreement with EXELTECH CONSULTING, INC. to allow integration of the permitting and design of the trunk storm sewer and other appurtenant system modifications into the "Downtown Pedestdan/BTC Access Improvements Project". There were no comments from the public. Mr. Shepherd expressed his concern at the loans already outstanding, and therefore questioned how much of the $4,270,977.99 funding was from the EPA Grant, and how much of the funding was from the Public Works Trust Fund loan. Mr. Knuckey responded that $1.9 million is from the grant, and the remaining is from the loan. Michael Wilson, Finance Director, added that the Rate Study is TAPE #1942 City Council Reg. Mtg. Minutes March 24, 2004 Page 2 of 5 currently in process, and is expected to be completed in approx. 30 days. He indicated that the Capital component of the Sewer & Utility Budget shows the amount being paid out for debt this year is 50% of the Operating Budget, however, one of the current bonds is about to retire, which will reduce the amount the 'City is paying out for debt by $2.4 million. #0370 MISICIU (Arends/McConnell) Move to approve Supplemental Agreement No. 1 to the existing Professional Services Agreement with EXELTECH CONSULTING, INC; and authorize the Mayor to finalize and execute the necessary contract documents for the agreement. 6B - LOCAL AGENCY STANDARD CONSULTANT AGREEMENT WITH SAMPLEY CONSULTIN~ FOR THE "DOWNTOWN PEDESTRIAN/BTC ACCESS IMPROVEMENT PROJECT" (#AB04-046): Gary Sexton, Economic Development Director, said that the City requires project management assistance for the "Downtown Pedestrian/BTC Access Improvement Project", and retaining the services of W. Eugene Sampley dba SAMPLEY CONSULTING to manage the project will provide the expertise necessary to maintain project continuity, scope, and schedule. A Local Agency Standard Consultant Agreement for federally funded projects has been negotiated with SAMPLEY CONSULTING for the "Downtown Pedestrian/BTC Access Improvement Project" for a total authorized amount not to exceed $50,000, it is therefore recommended that City Council approve the attached Local Agency Standard Consulting Agreement with SAMPLEY CONSULTING. There were no comments from the public. Mr. McConnell commented that for this particular project, Gene Sampley would be the most qualified. Mr. Short added that the City is fortunate to retain the services of Mr. Sampley for this important project. #0535 MISICIU (Arends/Short) Move to approve the Local Agency Standard Consultant Agreement with SAMPLEY CONSULTING for the "Downtown Pedestrian/BTC Access Improvement Project" in the amount not to exceed $50,000; and authorize the Mayor to finalize and execute the same. 6C - PROFESSIONAL SERVICES AGREEMENT WITH SAMPLEY CONSULTING FOR PROJECT OVERSIGHT OF THE PUBLIC SAFETY BUILDING AND FIRE STATION NO. 1 (#AB04-047): Gary Sexton, Economic Development Director, commented that the City requires assistance in implementation of the public safety measures approved by the public. The Director of Economic Development has negotiated a Professional Services Agreement with SAMPLEY CONSULTING to per[orm project oversight and coordination of project administration, oversight and coordination for design and construction of the Pubtic Safety Building and new Fire Station No. 1 and provide other assistance as request by the City. It is recommended that City Council approve the attached PSA with SAMPLEY CONSULTING In an amount not to exceed $80,000. There were no comments from the public. Mr. McConnell believes that the City already has a current employee who can fulfill this role at a cost of $55 per hour vs. this contract for $110 per hour. Mr. Short pointed out that the Council previously made a commitment to Mr. Sexton to support any request for additional help, and that a current employee may earn $55 per hour, but that figure does not include the cost for benefits also received by this employee. Mr. Maupin provided his comments in support of this contract for a Project Manager, but asked if a Project Administrator would also be required. Mr. Sexton responded that it was not expected. Mr. Shepherd provided comments in support of this contract, but encouraged the use of Public Works staff whenever possible. Mrs. Arends also provided comments in support of this contract. TAPE #1942 City Council Reg. Mtg. Minutes March 24, 2004 Page 3 of 5 Mr. Gehrin,q stated that although he recognizes that Mr. Sampley is a strong asset, he recalled that during budget negotiations, the Council agreed not to exceed the salary paid to Ms. McCluskey. #0955 M/S/C (Short/Maupin) Move to approve the Professional Services Agreement with SAMPLEY CONSULTING in the amount not to exceed $80,000; and authorize the Mayor to finalize and execute the same. Voted in favor of Motion: Shepherd, Robinson, Arends, Maupin, Short, Priest, Nygren Voted opposed to Motion: Gehring, McConneil Motion carried: 7-Yes; 2-No 6D - BUDGET ADJUSTMENT AUTHORIZING AN APPROPRIATION OF $20~000 TO THF CONTINENCY RESERVE FUND FOR APPRAISAL FEES RELATED TO THE SALE OF CITY PROPERTY (#AB04-048): Gary Sexton, Director of Economic Development, anticipated that several City properties will be offered for sale and sold in the near future. As preparation for this it is necessary to obtain appraisals on each property. The 2004 budget did not anticipate these expenditures. It is requested that an increase to Contingency Reserve appropriations be approved to allow these appraisals to be performed. Proceeds from the sale of these properties will be deposited to this fund as they are sold. There were no comments from the public. Mr. Ny.qren reminded the Administration to pay attention to the time-line when it is decided that an appraisal will be done; and because the Council has an interest in the properties that are suplused, he asked that the Council be involved when future discussions of surplusing properties take place. #1080 M/S/C/U (McConnell/Gehring) Move to approve the 2004 Budget Adjustment authorizing the appropriation of $20,000 in the Contingency Reserve Fund for appraisals. 7A - ORDINANCE NO. 4890 [SECOND READING] APPROVING AMENDMENT NO. I TO PORT BLAKELY TREE FARMS INITIAL DEVELOPMENT AGREEMENT (#AB04-041): First reading of this ordinance was heard on March 17, 2004. Roger Lubovich, City Attorney, was available for questions. There were no comments from the public. #1135 M/S/C/U (McConnell/Arends) Move to pass Ordinance No. 4890 on second reading approving Amendment No. 1 to the PORT BLAKELY TREE FARMS Initial Development Agreement. 7B - RESOLUTION NO. 29217 AUTHORIZING AN INTERFUND LOAN TO THE GENERAL FUNr) FROM THE CONTINGENCY RESERVE FUND (#AB04-049): Michael Wilson, Finance Director, explained that the General Fund has a history of cash flow deficiencies occurring twice each year due to property tax collection cycles. As a result, the General Fund has an immediate need for an interfund loan in order to meet cash flow needs. The Contingency Reserve Fund was established to support and protect the General Fund in the event of unforeseen and unfunded emergencies. It is proposed that the Council authorize the Director of Finance to make an interfund loan from the Contingency Reserve Fund to the General Fund in an amount not to exceed $700,000. This loan shall bear no interest rate since the Contingency Reserve Fund functions as a reserve for the General Fund. This loan shall be repaid on or before December 31, 2004. There were no comments from the public. Mr. Short asked what would be the remaining balance of the Contingency Reserve Fund after this loan. Mr. Wilson responded that the beginning balance of the Contingency Reserve Fund was TAPE #1942 City Council Reg. Mtg. Minutes March 24, 2004 Page 4 of 5 approx. $765,000, so after this interfund loan request, and the $20,000 previously approved for obtaining appraisals, approx. $45,000 will remain. It was pointed out that approx. $200,000 would be "set aside" for future cash-flow needs. There was additional discussion on finance issues by a few Council members prior to the vote... #1575 M/SIC (Short/Maupin) Move to approve Resolution No. 2921 authorizing the Director of Finance to make an interfund loan from the Contingency Reserve Fund (Fund 103) to the General Fund (Fund 001) in the amount not to exceed $700,000. Voted in favor of Motion: Maupin, Short, Gehring, McConnell, Priest, Robinson, Arends, Nygren Voted opposed to Motion: Shepherd Motion carried: 8-Yes; l-No PUBLIC RECOGNITION Ed Rollman asked the Council to consider naming Building 50 in honor of the Commander for the USS PUEBLO Commander, Capt. Pete Bucher; and requested help in addressing the lack of parking enforcement in the 600 block of Highland. Mr. Ny,qren indicated that the City is considering a policy for the naming of buildings; and Ms. Priest added that she only recently became aware of the problems with parking on Highland, and encouraged anyone who has an issue requiring her attention is welcome to leave her a message at the Council office at (360) 478-5280. Allen Shute was pleased that several Council members have agreed to meet with him to discuss several issues of interest; and at his request, RCW 46.61.582 titled "FREE PARKING BY DISABLED PERSONS" was read into the record by the Interim City Clerk. Don Larson discussed the Kitsap Water Festival held earlier today on the campus of Olympic College; announced the Sinclair Inlet Clean-up event scheduled from 11:00 AM to 2:00 PM on Saturday, April 17; and asked everyone to get involved in planting a tree in honor of "Earth Day". Wayne Godfrey of the YMCA discussed the upcoming fundraiser to provide scholarships for Iow- income families for before and after school child care. He pointed out that Paula Johnston, Daren Nygren, and Will Maupin are fundraising representatives and can assist anyone interested in donating. COUNCIL MEMBER REPORTS Brad Gehrin,cI encouraged citizens to contact legislatures to support bringing NASCAR to our area; and discussed a Conference on Tourism hosted by KITSAP INDUSTRY NETWORKS he recently attended. Cecil McConnell addressed a common misconception, clarifying that the Gold Mountain Golf Complex is not subsidized by tax dollars, but rather paid entirely by fees from the golfers. Mr. Ny.qren added that the golf course actually provides revenue. Wendy Priest discussed a positive meeting with members of the Bremerton Swing Committee and Downtown Merchant Association; and her plans to attend the American Red Cross Heroes Breakfast, her first Kitsap Community Resources Board meeting, and the KCR Annual Spring Fashion Show. Mike Shepherd encouraged citizens to spend their dollars locally; mentioned several issues to be discussed at the Evergreen Neighborhood Association meeting scheduled on Sunday, March 28 at 4:00 PM at Caf6 Destino; and asked citizens to contact the Council office if they would like to assist in Earth Day activities on April 17. TAPE #1942 City Council Reg. Mtg. Minutes March 24, 2004 Page 5 of 5 Dianne Robinson offered her help for Earth Day; discussed the Tourism workshop she attended along with Brad; and lastly, announced a District 6 meeting would be held sometime in April. Will Maupin invited citizens to attend a tree planting and dedication of the new "H.O. WHITEY DOMSTAD VIEWSCAPE" park at the east end of the Manette Bridge at 2:00 PM on Arbor Day, Wednesday, April 14 in honor of the former Mayor. Daren Ny.qren thanked County Commissioner Patty Lent for meeting with him regarding Rural interim Forest Lands, and for supporting the Downtown Library; and thanked BUGS. (Bremerton Urban Garden Society) for their efforts in planting vegetable gardens to promote gardening and to benefit the Bremerton Food Line. He also thanked all those citizens who participated in the meeting tonight. With no further business, the meeting of the City Council was adjourned at 6:51 P.M. Prepared and Submitted by: LO~I 'SMITH At t e s~..~'~ //~'~~ Legislative Assistant pA~I~E, JoHN~'f~, rn{erir:n Ciiy Clerk / DA-REN NYGREN, City Coun~l F~Zesident City of Bremerton DN/P JIIslcge