HomeMy WebLinkAbout05/21/03TAPE #1894 ~
JUN 112803
CITY COUNCIL MEETING MINUTES
May 21, 2003
The weekly meeting of the City Council of the City of Bremerton was called to order in the City
Council Chambers, 239 4th Street, Bremerton, Washington, Wednesday, May 21, 2003, at 5:30
P.M., with Council President Carol Arends presiding. Council members presenti were Mike
Short, Mike Shepherd, Ed Rollman, Daren Nygren, Cecil McConnell, and Wayne Olsen.
Council members Eric Younger and Will Maupin were absent. Also present were City Attorney
Roger Lubovich; Deputy City Clerk Paula Johnston; and Legislative Assistant Lori Smith.
The meeting opened with the Pledge of Allegiance led by Council Member Cecil McConnell,
followed by the invocation provided by Reverend G.T. Johnson of the Brownsville United
Methodist Church.
President Arende made the following announcements:
1. A Pre-Council session was held in the Council Conference Room to discuss updates to the
meeting agenda.
CONSENT AGENDA
A. Cooperative Purchasing Agreement with the City of Lynnwood for Mobile Computers
(#AB03-088)
B. Professional Services Agreement with Measurement Research Corporation for the
"2003 Pavement Condition Survey" (#AB03-089)
#0025 M/S/C/U (McConnell/Olsen) Move to approve Consent Agenda as presented.
CLAIMS & CHECK REGISTERS
Vouchers audited and certified by the auditing officer as required by RCW 42.24.080, and those
expense reimbursement claims certified as required by RCW 42.24.090 have been recorded on
a listing that had been made available to the Council.
#0045 M/S/C/U (McConnell/Rollman) On May 21, 2003, the Council approved payment for
Check Numbers 281051 through 281247; P7666C; EFT7668; and EFT7671 through EFT7677
in the total amount of $957,186.78.
COUNCIL MEMBERS
Wayne Olsen was impressed that a marching band from the City of Sultan was performing in
the Armed Forces Day Parade.
Damn Nvaren congratulated Greg Meakin on the opening of the ice arena; and announced that
representatives from the BREMERTON ICE ARENA, as well as CHAFFEY HOMES would be available
at the next District 3 Manette Neighborhood meeting to provide an "Update on the Development
of Eastparl(' on Tuesday, May 27 from 7:00 to 8:00 P.M. at the Manette Senior Center.
Ed Rollman thanked Greg Meakin and the Haselwood's for their efforts in opening the ice
arena; was pleased with the turnout at the Armed Forces Day events; told the public to call the
State Patrol if anyone spots a bear since the State Patrol would be responsible for dispatching
a Fish and Game Warden to investigate; noted the presence of the cranes in the downtown
area; and announced that the next District 4 Meeting would be held tomorrow at the
Washington Mutual Bank building located at 5th and Pacific Avenues from 7:00 to 8:30 P.M. to
hear a residential parking proposal.
TAPE #1894
City Council Reg. Mtg. Minutes
May 21, 2003
Page 2 of 5
Mike Shepherd commented on last week's district meeting which included discussion on
parking issues; and announced that the Memorial Day Ceremony would be held at the Ivy
Green Ceremony located at the corner of 13th & Naval Avenue on Monday, May 26~h starting at
1:00 P.M.
Mike Short reported on the District 8 and 9 meeting held last Thursday, and thanked all the
citizens who attended.
Carol Arende mentioned the Armed Forces Day Parade, and thanked Pat & Susan Wright and
all of the volunteers who participated. She also discussed a KRCC Countywide Planning
Policies meeting to be held tomorrow at the Presidents' Hall at the Fairgrounds from 7:00 to
9:00 P.M.; and announced that the next District 6 & 7 meeting would be held on Thursday, May
29th starting at 6:30 P.M. to be held at the Public Works Facilities Building located at 100 Oyster
Bay Avenue. The discussion would include review of the parking committee findings.
MAYOR'S REPORT - Mayor Bozeman ... · Invited the public to sign up for a passenger ferry demonstration by Kitsap Transit on
Saturday, May 24th
· Thanked Charleen Burnette of BKAT for televising the Armed Forces Day Parade
· Complimented Michael Wilson, Finance Director and his staff for the quarterly finance
report that was recently produced
· Thanked Greg Meakin, the Haselwood's, and City Attorney Roger Lubovich for their
involvement in bringing the ice arena project forward
· Stated that he will continue to work with the legislature to acquire more funding for
downtown improvements for the capital budget, and indicated stated that funding has
been secured for a naval museum
· Informed Council that an annexation project will be presented in the next few weeks
· Expressed a commitment to consider funding sources for a new skateboard park
· Proclaimed the Week of May 18~ through May 24~ as "Emergency Medical
Services Week", which was accepted by Fire Chief Al Duke
PUB~.IC RECOGNITION
Pat Wriuht thanked the many people who offered their assistance in the very successful 55th
Annual Armed Forces Day parade.
Alex Hesse Sie~ert, Executive Director of POSITIVE SOLUTIONS BENEFITS RESOURCE CENTER,
submitted a letter into the record expressing his concerns with the CDBG funding process.
Police Chief Rob Forbes invited the public to attend the Law Enforcement Memorial Service
on Fdday, May 23 at 1:00 P.M. at the Rotary Evergreen Park.
Gordy Byrd commented that he was happy to be here tonight.
8A - EA~TPARK PHASE ! - DESIGN DEVELOPMENT AGREEMENT BETWEEN THE CITY
OF BREMERTON AND THE CHAFFEY CORPORATION (#AB03-090): Gary Sexton,
Economic Development Director, summarized that the Phase ! Development Agreement
between the City of Bremerton and CHAFFEY CORPORATION sets forth the agreement for
CHAFFEY to perform a market study, create a critical path for design development coordination
with the City's Department of Community Development, development of a concept site plan,
TAPE #1894
City Council Reg. Mtg. Minutes
May 21, 2003
Page 3 of 5
architectural review, and study for proposed housing types and mixture. The agreement
includes payment of a fee in the event of termination, and an option to purchase upon approval
of design and other conditions. Herb Chaffey was in attendance to answer any questions.
There were no comments from the public.
Mr, Nvuren asked for clarification on the process that Chaffey would go through to reach the
development phase of the project. Mr. Sexton explained that a market study would be
conducted to come up with housing alternatives to meet the needs of the City and community,
and emphasized there would be meetings held to incorporate public comments. An appraisal
would be done and a sale price would be set. Once the parcel is sold then construction could
begin.
#1600 MISICIU (Nygren/McConnell) Move to approve and authorize the Mayor to finalize and
execute the Eastpark Phase I Agreement between the City of Bremerton and the CHAFFEY
CORPORATION in substantially the same terms and conditions as contained in the proposed
agreement, as amended.
8B -PUBLIC WQRKS AGREEMENT WITH STIRNCO STEEL STRUCTURES, INC. FOR FIRF
STO~AGE AND BUILDING [PUBLIC SAFETY BOND ISSUE] (#AB03-091): Kathleen
McCluekey, Administrative Services Director, stated that the contractor will provide an approx.
50 by 66 foot pre-engineered metal building, including concrete foundation and floor slab to be
located adjacent to the Olympus Avenue Fire Station No. 3. This building is a replacement
building for the current Fire Department warehouse which houses the antique fire truck, back
up fire pumper, and bunker gear. An additive bid was received for a wash bay of approximately
50 by 25 feet. Fire Chief Al Duke provided comments in support of this agreement.
There were no comments from the public.
#1927 M/SICIU (McConnell/Olsen) Move to approve contract with STIRNCO STEEL STRUCTURES,
INC. for replacement building and wash bay, and authorize the Mayor to finalize and execute the
same in substantially the same form as attached.
8C - PURCHAS~ AND SALE AGREEMENT WITH US BANK NATIONAL ASSOCIATION FOR
POLICE AND MUNICIPAL COURT BUILDING [PUBLIC SAFETY BOND ISSUE] (#AB03-
092): Kathleen McCluekey, Administrative Services Director, reminded Council that the City
made an offer on the US Bank Building last year. it was determined at that time that the
location across from the new Government Center and in the downtown core was ideal for a
Public Safety Facility housing both Police and Court. The lot size is approximately 52,090
square feet. The three story building, built in 1977, is approximately 20,500 square feet. There
are 68 parking spaces on site. The Bank accepted our offer and has been in the process of
finalizing their agreement for a new location. The attached purchase and sale agreement
provides for a due diligence period of 60 days for the City to obtain clear title, perform
environmental assessments, and obtain an appraiser's confirmation of property value. The
City has obtained sufficient information from the current owners of the building, and property to
be confident that we can complete our review in the 60 day period.
There were no comments from the public.
#2227 MlSlClU (Shepherd/Rollman) Move to approve the Pumhase and Sale Agreement with
US BANK NATIONAL ASSOCIATION in the amount of $1,000,000; and authorize the Mayor to
finalize and execute the same in substantially the same form as attached.
TAPE #1894
City Council Reg. Mtg. Minutes
May 21, 2003
Page 4 of 5
8D - PROFESSIONAL SERVICES CONTRACT WITH ARAIIJACKSON ARCHITECT &
PLANNERS FOR POLICE AND MUNICIPAL COURT BUILDING [PUBLIC SAFETY BOND
IssuE] (#AB03-093): Kathleen McCluskey, Administrative Services Director, pointed out that
the City issued an RFQ for architect services in February, and 12 responses were received.
The project team selected four firms for interview, which were held in March. The interview
team evaluated each firm based upon the following criteria: a) strength of the proposed team;
b) demonstrated flexibility in design concepts; c) experience in designing Police/Court Facilities;
d) compatibility/responsiveness to owner team; and e) location of key personnel. The architect
firm of ARA#JACKSON ARCHITECT & PLANNERS was selected. Municipal Judge James Docter
provided his comments in support of the selection of this firm.
There were no comments from the public.
#2570 M/S/C/U (Shepherd/Rollman) Move to approve professional services contract with
ARA#JACKSON ARCHITECT & PLANNERS for design of the Police and Court Facility.
9A - PUBLIC HEARING AND ORDINANCE NO. 4854 (SECOND READING) VACATING A
PORTION OF THE ALLEY BETWEEN 5TM 8, 6TM STREETS~ AND PACIFIC & WASHINGTON
AVENUES (#ABI;)3-085): First reading of the ordinance was heard on May 14, 2003. Mike
Mecham, City Engineer, was available to answer any questions.
There were no comments from the public.
#2791 M/S/C/U (Rollman/McConnell) Move to pass Ordinance No. 4854 on second reading,
vacating a portion of the alley located between 5th & 6th Streets, and Pacific & Washington
Avenues.
9B - PUBLIC HEARING AND ORDINANCE {FIRST READING) APPROVING SWC
PARTNERSHIP REZONE FROM SINGLE FAMILY 3 (SF- 3) TO TO GENERAL BUSINESR
IGB) 1~B03-054): Ro~ler Lubovich, City Attorney, explained that at the Closed Record
Hearing on May 14, 2003, the City Council accepted the findings of the Hearing Examiner, who
recommended approval of the SWC Partnership Rezone from Single Family 3 (SF- 3) to
General Business (GB). The proposed ordinance accomplishes the rezone.
There were no comments from the public.
#29t5 M/S/C/U (McConnell/Rollman) Move to approve the proposed ordinance on first reading.
9C - PUBLIC HEARING AND ORDINANCE (FIRST READING) RELATING TO
TRANSPORTATION DEVELOPMENT AND IMPROVEMENT (#AB03-095): Mike Mecham,
City Engineer, mentioned that City staff have prepared a new Transportation Development
Code Ordinance that defines the responsibility of development with regard to transportation
improvements. The new ordinance repeals existing BMC Chapter 15.01.100 entitled "SYSTEM
DEVELOPMENT AND CONSTRUCTION STANDARDS" and replaces it with a new chapter 15.01.100,
amends Chapter 11.08 and Chapter 11.10 relating to sidewalk construction and maintenance,
adds a new Chapter 11.12 entitled "TRANSPORTATION DEVELOPMENT CODE" and amends Section
13.10.080. Attached is a summary of the major features of the Transportation Development
Code Ordinance.
There were no comments from the public.
#3375 M/S/C/U (McConnell/Nygren) Move to approve the proposed ordinance relating to
transportation development and improvement on first reading, as amended.
TAPE #1894
City Council Reg. Mtg. Minutes
May 21, 2003
Page 5 of 5
9D - PUBLIC H~[ARING AND ORDINANCE (FIRST READING) AMENDING BMC CHAPTER
11.03 RELATING TO LONG TERM RIGHT-OF-WAY PERMITS (#AB03-096): Mike Mecham,
City Engineer, said that the current criteria in Chapter 11.02 of the Bremerton Municipal Code
provides for long-term use of City right-of-ways up to five years. The proposed ordinance
provides for extended long-term right-of-way use permits up to 10 years under certain
circumstances. These circumstances may include structures, facilities, and uses that involve
capital expenditures and long-term commitment of use for private development.
There were no comments from the public.
#3520 MISICIU (Short/Olsen) Move to approve the proposed ordinance on first reading.
With no further business, the regular meeting of the City Council was adjourned at 7:10 P.M.
Prel~red and >~,~nitted,~y:
I~)1;~1' gMITH v
Attest:~ /,~~/_~_ Legislative Assistant
PAt~I~uA J(~NST,~,'Dep~ty City Clerk
/
CAROL ARENDS, City Council President
City of Bremerton
CA/PJ/Is/cge