HomeMy WebLinkAbout01/17/01 COUNCIL
APPROVED
TAPE #1747 UNAPPROVED DRAFT
CITY COUNCIL MEETING MINUTES
January 17, 2001
The weekly meeting of the City Council of the City of Bremerton was called to order in the City
Council Chambers, 239 4th Street, Bremerton, Washington, Wednesday, January 17, 2001, at 5:30
P.M., with Council President John Law presiding. Council members present were Jim Reed, Conrad
Esser, Carol Arends, David Farr, Mike Shepherd, Ed Rollman, and Wayne Olsen. Council member
Cecil McConnell was absent due to illness. Also present were Deputy City Clerk Paula Johnston;
Special Counsel Glenna Malanca; and Legislative Assistant Lori Smith.
The meeting opened with the Pledge of Allegiance led by Council Member Wayne Olsen. followed by
the invocation given by Princ(oal Nick Sweeney of Kings West School.
Precdent Law made the following announcements:
(1) Council held a Pre-Council Session in the Council Conference Room to discuss general Council
business; followed by a 15-Minute Study Session to discuss "HOME Fund Allocations".
Jim Reed stepped out of the meeting at approximately 5:32 P.M. and was not present for the
fo/lowing two votes:
CONSENT AGENDA
A. Minutes of Meeting - January 10, 2001 (#AB01-014)
#0024 M/S/C/U (Olsen/Arends) Move to approve Consent Agenda as presented.
CLAIMS/CHECK REGISTERS
Vouchers audited and certified by the auditing officer as required by RCW 42.24.080, and those
expense reimbursement claims certified as required by RCW 42.24.090 have been recorded on a
listing that had been made available to the Council.
#0044 M/S/C/U (Arends/Farr) On January 17, 2001, the Council does approve for payment those
vouchers included and further described as follows: Checks 248424 through 248625 in the amount of
$537,710.84.
Jim Reed returned to the meeting at approximately 5:36 P.M.
COUNCIL MEMBER REPORTS
Carol Arends enjoyed the opera at the Bremerton Community Theater on Friday night; and noted
that the Bremerton Gateway Project was coming along nicely.
David Fart reported that all was well in District 6.
Mike She_oherd announced the next District 5 meeting would be held Thursday, January 18, 2001
beginning at 6:30 P.M. at the Memorial Lutheran Church located at 10th and Veneta, to discuss the
"Proposed Bremerton/Kitsap County Regional Government Cente¢' with Norm S. McLoughlin of the
Kitsap County Consolidated Housing Authority (KCCHA).
Ed Rollman was pleased to see the long lines for the "Dr. John" performance at the Admiral Theater.
Wayne Olsen provided a brief update on the construction project on Lebo Bird, which should be
completed soon.
President Law reported on the annual Martin Luther King, Jr. Memorial Scholarship Foundation
luncheon held on Saturday, January 13, 2001; and the District 3 Neighborhood Meeting held
Tuesday, January 16, 2001 at the Senior Center. He thanked Chief Al Duke for his presentation on
the proposed "Merger of Fire Districts", and encouraged other Council members to consider this topic
for their District meetings.
TAPE #1747
City Council Reg. Mtg. Minutes
January 17, 2001
Page 2 of 5
MAYOR'S REPORT - There was no report this evening.
LEGISLATIVE REPORT - There was no report this evening.
PUBL. IC RECOGNITION
Ed Wolfe. President of the Bremerton Area Chamber of Commerce, offered positive comments on
the proposed Bremerton/Kitsap County Regional Government Center.
Gordy Byrd asked that anyone interested in volunteering for the new Crisis Hotline to call 377-7292.
Harold F. Schulz provided a letter to the Council voicing his concerns over the $5.00 user-fee for the
Bremerton Senior Center that was implemented on January 1, 2001.
9A - AGREEMENT BETWEEN HARRISON HOSPITAL AND THE CITY OF BREMERTON TO
PROVIDE AMBULANCE SUPPORT (#AB01-015): Fire Chief Al Duke emphasized that this is an
agreement between the City of Bremerton and Harrison Hospital to provide ALS and back-up BLS
transports between Harrison Hospital & Bremerton, and Harrison Hospital & Silverdale. On July 10,
2000, Harrison Hospital opened their Silverdale campus for OB/GYN and pediatrics then approached
the City of Bremerton to meet the need of transporting patients between campuses. It was clarified
that Bremerton would remain the lead agency for transports requiring paramedic services; and only
provide back-up as needed to Olympic Ambulance for BLS calls (approximately 10 calls per month).
There were no comments from the public
#0673 M/S/C/U (Arends/Rollman) Move to authorize the Mayor to sign and enter into the Agreement
between Harrison Hospital and the City of Bremerton to provide ambulance transports.
9B - PROPOSAL TO PURCHASE A 2001 AMBULANCE FROM BRAUN NORTHWEST (#AB01-
016): Fire Chief Al Duke stated that there are currently 3 Braun ambulances in the fleet, and the
requested ambulance to be purchased would replace the 1988 ambulance that was surplused earlier
in the year. It was also stated that the City of Bremerton has an Intergovernmental Cooperative
Purchasing Agreement signed in 1994 which allows the City to purchase off the Central Kitsap Fire &
Rescue bid.
There were no comments from the public.
#0750 M/S/C/U (Farr/Arends) Move to authorize the Mayor to sign and enter into the contract
proposal with Braun Northwest, Inc. for the purchase of a 2001 ambulance.
9C - PROFESSIONAL SERVICES AGREEMENT AMENDMENT WITH GORDON. THOMAS. &
HONEYWELL f#AB01-017): Assistant City Attorney David St. Pierre reported that on occasion a
firm is asked to extend their services for additional time or compensation. Currently, the City is being
represented by Gordon Thomas Honeywell in the Burlington and Mincey lawsuit. As of November 30,
2000, the City has received bills in excess of $9,900 of the current contract, and the requested
contract amendment would include these additional expenses incurred by the firm. More expenses
are expected, and once an estimate for Year 2001 is completed, another contract will be provided.
There were no comments from the public.
TAPE #1747
City Council Reg. Mtg. Minutes
January 17, 2001
Page 3 of 5
#0825 M/S/C/U (Farr/Arends) Move to approve the amendment to professional services agreement
with Gordon Thomas Honeywell increasing compensation not to exceed an additional $9,900 to cover
invoices received to date, for a total contract amount of $24,900.
9D - PHASE 1! PROJECT AGREEMENT FOR THE BREMERTON/KITSAP COUNTY REGIONAl
GOVERNMENT CENTER (#AEI01-018): Mayor Lynn Horton reported that the goal of this project is
to provide consolidated facilities for city, county, state, and federal government departments and
agencies that will provide for more efficient and productive services for Kitsap County citizens.
Representatives of all involved parties have met for more than a year to develop a downtown
revitalization strategy which includes 1) development of the Government Center; 2) establishment of
appropriate zoning and new design standards to ensure private investment in the downtown; and 3)
development of housing. The proposed design standards have been developed into a set of
proposed downtown Bremerton policies and Land Use Codes, which have been presented to the
Bremerton Planning Commission for consideration. The Phase I! Agreement indicates that the
Phase ! analysis is complete and the project is now ready to enter Phase !I. Under this phase,. LMN
Architects will complete the schematic design for the Building, and the Housing Authority will
undertake such other pre-development tasks as reasonably necessary to enable the parties to
commit to construction of the Building. This may include, but is not limited to, economic development
analysis and engineering services. This agreement also authorizes the acquisition of land for the
building as well as adjacent property necessary or convenient for the Building. It was also reiterated
that although this project is one strategy that is believed to bring economic development to the
downtown, other positive aspects for this concept were discussed, including the need for a new
Bremerton City Hall facility and needed expansion-room for the County. Norm McLougtllin,
Executive Director of the Kitsap County Consolidated Housing Authority ("Housing Authority") was
introduced to provide additional details on the proposed Building.
Glenna Malanca, Special Counsel to the Council, provided a staff report to cover changes discussed
with Council and the Kitsap County Prosecuting Attorney's Office. These changes are provided in a
new version of the Phase !! Agreement, and include: 1) an added Attachment 1; 2) pa'ragraph one
indicates the City of Bremerton as a "municipal corporation", acting by and through its legislative body
unless otherwise specifically provided; 3) paragraph 14 notes that the Council president shall be
added for the purpose of notice to the City of Bremerton; and 4) paragraph 16 provides that in the
event the Housing Authority enters into an agreement with Kitsap County regarding Phase I! Project
Agreement for the development of the Building, the terms and conditions of this Agreement shall
conform to said agreement. Ms. Malanca further indicated that the County is considering the
advantages of providing for a 100% schematic design, noting that Exhibit 1 of the proposed Phase I!
Agreement provides for 75% of the schematic design component.
David Fart stated that although he is enthusiastically supportive of this project, he must excuse
himself from this issue tonight due to an "appearance of conflict of interest" because his wife and
some of her former law-firm partners own a portion of the property covered in this agreement.
Carol Atkinson of Bremerton Main Street Association provided comments in support of this project.
Mr. Esser stated that a recent newspaper article referred to the purchase of waterfront property by
the Housing Authority, as an Urban Renewal Agency, at a cost of $3.6 million, and asked if the City
was involved in the transaction, and obligated financially. He clarified that the City has authorized the
TAPE #1747
City Council Reg. Mtg. Minutes
January 17, 2001
Page 4 of 5
Housing Authority to act as an Urban Renewal Agency for the sole purpose of developing the
City/County Building. He expressed concern about City liability, and referenced contamination issues
in the vicinity of the Enetai Building. Mr. Mcbou_ohlin also responded that the City had authorized the
Housing Authority to act as a Urban Renewal Agency last year, and that the Housing Authority did
purchase the Waterfront Partners' property for approximately $3.6 million for the benefit of the City,
but at no risk or liability to the City. Mayor Horton clarified that Kitsap Transit purchased the Enetai
Building with a grant, but a property swap with Kitsap Transit is anticipated in the near future. Mr.
Esser inquired as to whether the task items of Phase I were accomplished. Mr. McLou_ohlin
responded that the Housing Authority, using a line of credit had received about $157,000 in invoices,
and bills were still coming in. Mr. Esser asked if the additional land being purchased, above and
beyond the land required for the development of the building, was something the City would be
contributing toward, and whether the City would have an interest in. Mr. McLoughlin responded that
the land was being purchased for the next stage of development, and that the property would be
Housing Authority property. He also noted that the City would receive a pro rata share of any
proceeds of the sale of the land if the Building were not constructed. Mr. Esser also asked if there
was additional information regarding concerns of economic impact raised recently by the City of Port
Orchard. Mr. McLoughlin responded that he was meeting with the Port Orchard Council this
evening, and would report back the results at a future date.
Mr. Shepherd spoke enthusiastically about the project, and discussed maximizing the use of current
infrastructure. Mr. Olsen and Mr. Rollman provided supportive comments as well.
Mr. Reed discussed the completion of the schematic design, and the assumptions by the Council
regarding costs. He asked if an additional 25% were paid by the City and County, could a 100%
schematic design be completed in a timely manner. Mr. McLoughlin responded that the timeliness
would be a problem, as well as pointed out that an additional 25% in funding would not be sufficient to
pay for the 100% schematic design. He indicated that the final 25% of the schematic design would
cost at least double the $300,000 cost of the initial 75% schematic design. Mr. Reed received
confirmation that Council would be kept well informed. Mr. Law established that the Agreement was
for the Building only.
#2015 MISICIU (Rollman/Olsen) Move to approve Phase [! Project Agreement.
Mike Shepherd left the meeting at approximately 6:35 P.M. and was not available for the last two
votes.
10A - ORDINANCE NO. 4750 (SECOND READING) GRANTING ONE-YEAR FRANCHISE TO
PUGET SOUND ENERGY (#AB01-010): The first reading of the ordinance was heard at the Council
meeting on January 10, 2001.
There were no comments from the public.
#2060 M/S/C/U (Arends/Esser) Move to pass Ordinance No. 4750 on second reading, granting one-
year franchise to Puget Sound Energy.
10B - ORDINANCE (FIRST READING) AUTHORIZING THE ISSUE OF A $1.250.000 TAX
ANTICIPATION NOTE AND ACCEPTING THE PURCHASE OFFER OF BANK OF AMERICA
(#AB01-019): City Treasurer Rich Hanna indicated that the City's General Fund would operate in a
deficit cash position at certain times of the year without some form of cash flow financing. Analysis
indicates that issuance of a Tax Anticipation Note (TAN) is the most economical way of financing this
TAPE # 1747
City Council Reg. Mtg. Minutes
January 17, 2001
Page 5 of 5
cash flow need. It was also indicated that documents presented this evening were preliminary, and
that final documents would be available by second reading of the ordinance.
There were no comments from the public.
#2192 MIS/C/U (Farr/Arends) Move to approve on first reading the ordinance authorizing the issue of
a Tax Anticipation Note.
With no further business, meeting concluded at 6:39 P.M.
LF roe~la~~~~nt
Attest: /~
PAO~.,K JOHNS' ~l~]~, Dep~t~ City Clerk
~W, Ci~ CoUncil President
~'City of Bremerton
JLIP Jllslcge
c: Normal Distribution
File