Loading...
HomeMy WebLinkAbout09/22/13 Bremerton, ~,'~a~ngton, Sept. 22nd, 191;5 t{egular meeting of the Cit}? Council called to order by ~.~yor ~"e~ ner at 8:00 o'clock P.2,1. Present Oou.~eilmen ,Crawford,B~fington,;:lard,~alkins and ~oss.also City En~vineer,Oity Treasurer and ~ity A~torney. i~iinutes of >revious session read and o0rr~.t~d to show t~at Engineer had re- ported ~nounts of bids in L. I. D. ~71 ms folloWS: J. S. Kenyon Bremerton Ice & Fuel C~. ~41~0.16; ;'t. 0. Bulette $4033.28~ and that r.{r. Bulette had objected to any chm~g,~ in his bid; also to show that ~'ire,Li~t and rlater Co~mnitSee had recommended tim removal of the light from Ninth ~d I,IcKonzie to Ninth & Burton. l~,Iinutes were ~hen approved as corrected. Letter read from She Lea~e of Paoiffic l~,,i~icipalities inviting members of City Gover~nent to attend a~ual Conference to be held at Portland,Oregon,October 1st and 2nd. ~,iotion b. ',','ard and Buffington to receive ~d file, Carried. Letter read from E. ;~. George tendering resignation as City Engineer to take effect ~ fence. i,~[otio~'~by ;~lard and Buff intron to accept resignation of Oity Engineer. Carried. Letter re~d from N. B. Parwell inviti~ attention go the condition of Veneta Ave. between Sixth and Boston Streets. Referre~ to S~rme~ and Alley Com~nittee. Petition read from se~,eral property owners asking that crossings be constructed at Fourth, ~ifth and ~ixth streets on Chester Street. llotion by ~oss and '~'~ard that Street Commissioner be instructed to construct crossw,~lks at locations as requested. Carried. Clerk re,,orted that no protests had been received against assessments roll of D~ trier [)~0 and that same was ready ~or approwal. ~,[otion by Burlington and Ward go approve roll of L. I. D. 7~gO and pass Ord- inance providing for issuance of bonds. Carried. ~&~. Buffington reported that Teamster wished a supply of grain for horse feed and on motion of ;:~ard and Calkins~ ~chasing Eo~i~tee was instructed to pro- cure necessary supply. Cemetery Com~nittee reported that w~lks at Ceraetery needed clearing up and on me,ion of Ward and Crawford the Superintendent was empowered to spend :~lO.00 and have the use of Stree~ grader in doing ~he work. I,Iotion by i'~ard ~d Foss that Forth Street Bakery be granted permission to build garage on lot adjoining baker;- and also given permission to drive over sidewalk ~t same location. Carried. Complaint was made that Chas, Tessier was constructing a wooden building in fire limits and the matter was referred to City Attorney. ;;~h~inger requested that ~ stove be placed in his office and after discussion t~e ~m'tter was l~d over. Ordinance Co~maitgee submitted new building code and same was laid over for one wook.~ Engine~r '(an Epps, submlgted report or~ his work in re-check of work performed in Local Imgrovement District ~61. I.[r. Steve~son, Attorney for protestants objected to time of ;Valworth and Casa{ being charged to District. l,iotion by l~oss and ~uf~ington to ~llow ~.~0 on 'J~lworth's time and on Casad's time. Carried. The r~port of 2ir. Van Epps was then considered and he expla~ed that he had given no credit to contractor for clearing ~nd grubbing slopes or ~errmcing fills and that about ~400.00 would have been saved district if contractor had hauled dirt across lo~s. The item o.f Engineer's salary w~ discussed. I~[otio~ by ~oss ~d Calkins to ~ to credit back $~0.00 ~d charge smae to Cu~mnt Expense aoco~t. Carried. 2~Ir. Vam Epps submitted comparative statement showing final estimate as follows: Item City Engineer E.L. Van Epps Clearing & Grflbbing .~ 968.00 ~ 81g.00 Excavation g9~6. ll ~6~. 98 Concrete ~,¥alks inolud5n~ Alley Xings 6~D6.0~ 6~09. E0 L~nber includln~ headers E1~0.66 ~09~.~9 Bulkheads 28~. 91 ~8~. 91~ Overhaul 18Sl. 48 866. O0 Extra Excavations for 9 Sidewalks ~5.9E g~. 9~ Force Acoo~t & 10% IZ49.18 1349.18 Fixed Estimate 18~0.00 18~O.00 After discussion of ~he different items, motion by i~ard and Crawford Cit~ ~ittorney be instructed to bring suit, if necessary.to collect the ~ sm of $161~.98 with interest from J. S. Kenyon overpa~ents account L. I. D.~61. "~ Carried on roll call, all members vo~ing ,y ~otion by i~ard and Oalkins that this District be given credit for $434.50; that the Lund assessr~ent be adjusted so that ~orrect names will be shown on roll; that account charged to Killough be reduced $13 for sidewalk not installed; that assess- ment roll be approved as amended and that any amounts recovered ~rom contractor on account o~! overpayment, be. credited back to Dis~ript. Carrie~ on roll call all members voting Aye. Er. Stevenson too~ exception to amount of $1617.98 not being credited to Dist- rict ~t this time instead of being withheld until collected from contractor. Finance Oo~nittee submitted estimate of ~eeeipts and Disbursements for 1914 and after discussion same was referred back to Committee for one week. Clerk reported that Contractor Bulette had fi~ed his bond for District ~?l and same kael had been approved by City A~torney mhd that contract,,w was not ready to submit. Eotion by Jar~ and Craw-ford to arder warrants drawn for all bills which had been approved Ny ~inance Committee. Carried. The following bills,were approved: Frank Melzer ~lS;~rank Townsend $15;Leo Lambert $15; James Hepwor~h $15;Wm. Smith i~lS;Geo Clay ;,~lS;Frank Hanson $24;~. AA ~enton $1; Kitsap Advtg. Ce. 1.75;Brem~ ert~n Ice & Puel Co. $640.89;Bremerton I~e & Euel Co. $656. gl;Bremerton Ice & ~uel Co.~999.65;Bremerton Advtg. Service $3.50;~J. C.Adams $2?;Dan Dunlap $18;E. ~. _ 0aughie ,~21.45;Thos. Drisco,ll $18;Bremerton Ice & Fuel Co. $9.00;E. M. George ~otion by ;Yard and uf£ington to adjourn. Carried. E. J. EcOall City Clerk