HomeMy WebLinkAbout03-091DATE SUBMI'I-IED: 4/22/03 BILL # O 3 "-~q /
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Fire St~age Bulling C~miR~ M~ng Date: ~ ~/~l fl~
Sfim~ Stol S~es CO~C~ ~E~G ~: 5/7/03
~blic S~eW Bond Isle Dep~mt: ~mic
D~el~m~t
Pre~t~: K. McClu&ey Ph~e: 473-5234
S~Y: ~e ~ ~11 ~o~de ~ appr~mately 50 f~ ~de by ~ f~ pr~n~M
m~ buil~ng induing c~e f~dafi~ ~d fl~ slab to be l~at~ adja~nt to &e Ol~pus
Ave. Fire Smfi~ 83. ~is b&lding is a repla~mt ~il~ng f~ &e ~mt fire d~t
~eh~ ~ich h~s~ ~e ~fique fire ~ back up fire pmp~ ~d bunk~ g~. ~ additive bid
was r~eiv~ for a ~ bay of approximately 50 x 25 f~.
ATTACHMENTS: Contract with Stimco.
FISCAL IMPACTS (Include Budgeted Amount): $90,978 for the pre-engineered steel building
plus WSST. $16,944 for the Wash Bay plus WSST. Not to exceed $47,607 plus WSST for the
concrete foundation and drain system. This project is part of the Public Safety Bond Issue.
APPROVALS: ~~
DEPARTMENT DIRECTOR: ~ i Q~
CITY ATTORNEY:
MAYOR:
FISCAL/BUDGET: t4 laq !.o 3
OPERATIONS: ~hcil (~.~
COUNCIL PRESIDENT: '~j~ ~
RECOI~tENDED MOTION: Motion to approve contract with Sfimco Steel Structure~m Inc. for
replacemmt building and w~ bay and authorize the Mayor to finalize and execute the same in
substantially the same form as attached.
AGgNDA STATUS:
New Business
o~d B~sin~
~Ap O~a'-,~
COUNCIL ACTION: prove [] Deny [] Postpone [] No Action ' Resolution
Public Hearing
/