Loading...
HomeMy WebLinkAbout03/26/97 AGENDABREMERTON CITY COUNCIL 239 4TH STREET BREMERTON, WA 98337 CITY COUNCIL AGENDA MARCH 26, 1997 CALL TO ORDER - 5:30 P.M. A. Pledge Of Allegiance B. Invocation CONSENT A~ENDA Items listed below have been distributed to Council members in advance for study and will be enacted by one motion· If separate discussion is desired on an item, it may be removed from the Consent Agenda and placed on the Regular Agenda at the request of a Council member. A. Minutes of Meeting - March 12, 1997 B. Minutes of Meeting - March 19, 1997 C. Bid Award To Smith Tractor & Equipment Company, Inc. for the Purchase of a John De.re 310E Backhoe for the Parks & Recreation Department #AB97-062 #ABp?-o6 J5 3. CLAIMS/CHECK REGISTERS 4. COUNCIL MEMBER REPORTS 5. MAYOR'S REPORT 6. PUBLIC RECOGNITION -- (Comments Limited to 3 Minutes) e A. Resolution #2588, Approving Preliminary Planned #AB97-057 Unit Development (PUD) for Sinclair Landing; Applicant: Howard S. Wright Construction Company; Location: Bremerton's Central Business District, Downtown RESOLUTION NO.: RESOLUTION ACCEPTING THE PRELIMINARY PLANNED UNIT DEVELOPMENT OF "SINCLAIR LANDING", LOCATED WITHIN THE AREA GENERALLY BOUNDED BY: PUGET SOUND NAVAL SHIPYARD AND PARK AVENUE (AVE.) ON THE SOUTH AND WEST; FOURTH STREET (ST.) BETWEEN PARK AVE. AND PACIFIC AVE. AND BURWELL ST. BETWEEN PACIFIC AVE. AND WASHINGTON AVE. ON THE NORTH, AND SINCLAIR INLET ON THE EAST INCLUDING WATERFRONT PARCELS TO FIFTH ST. WHEREAS, --HOWARD C.. W~,IGJ-JT ~ONSTRtJCTIC,'4 COw proponent for the proposed Sinclair Landing Planned Unit Development, comprising approximately 22.5 acres acres and located within the central business district within the City of Bremedon, has made application for approval of a Preliminary PLANNED UNIT DEVELOPMENT. and WHEREAS, an environmental checklist has been prepared and considered by the responsible official and a mitigated determination of environmental nonsignificance issued, and WHEREAS, the Planning Commission held a public meeting concerning this matter on January 21, 1997; and WHEREAS, the Planning Commission recommended to the Council that the "Sinclair Landing" Preliminary Planned Unit Development be accepted subject to certain conditions; and 2(~_ WHEREAS, the Bremerton City Council held a public hearing on March 1997, concerning the preliminary Planned Unit Development with mitigating conditions; now, therefore BE IT RESOLVED BY THE BREMERTON CITY COUNCIL That the "Sinclair Landing" Preliminary Planned Unit Development presented for approvalt~ hereby ac. cepJe,d sgl::lject to the followina conditions: 1. Earth: Implement a temporary erosion and sedimentation control plan (TESCP)as approved by the City. Minimize exposed soil during construction.; construct truck tire cleaning areas; cover dump beds as required by state/aw; cover stockpiled earth and exposed cuts; route runoff to temporary sedimentation ponds; employ best management practices to control erosion; construct a concrete truck wash-down area; periodically sweep the streets with street sweepers; and phase construction, to minimize exposed areas. 2. Air: Implement erosion control measures as approved by the City. Minimize area of exposed soil dudng construction, or demolition; hose debris during demolition; construct truck tire cleaning area; cover dump beds as required by state law; cover stockpiled earth and exposed cuts; employ best management practices; periodically wet sweep streets. Comply with Puget Sound Air Pollution Control Agency (P~APGA) Regulation 1, Section 9.15 requiring reasonable precautions to avoid dust emissions. Implement proposed Planned Unit Development (PUD) traffic, transit, and pedestrian improvements to improve circulation. 3. Surface, Ground, and Runoff Water Impacts: Locate existing surface parking areas underground and partially cover the Bremerton Transportation Center (BTC) car waiting areas. Install and maintain oil/water separators as required by City stormwater regulation. Implement: WA. ST Department of Wildlife's Hydraulic Project Approval (HPA) conditions; U.S. Army Corp of Engineer's Section 10 conditions; applicable local, state, and federal water quality guidelines. Use concrete marina f/oats; use concrete or steel pilings instead of creosote wood pilings; construct interconnecting replacement First St. bulkhead in the dry. 4. P/ants: Use landscaping p/ants or similar measures to provide replacement vegetation on the site. Incorporate street and punic space landscaping into project as proposed. 5. Wildlife: Remove existing First St. Dock and approximately 120 creosote timber pilings which covers 12, 600 square feet of intertidal area. Remove existing First St. fill which covers intertidal area. Remove 45 creosote timber pilings that support the Wheelhouse deck. Implement HPA and Corps Section l0 conditions. 6. Energy: Conform with applicable City and State energy code requirements. Create new pedestrian facilities as proposed to reduce auto energy use. Implement one- way coup/et street system, and other circulation improvements to increase transportation efficiencies and lower energy use. 7. Environmental Heath: Property or business owners to comply with applicable local, state, or federal/aw regulating the storage, handling, or use of hazardous materia~._.~.~l~, 8. Noise: Properly size and maintain equipment~rrj~/ff,/~e,r,s, engine intake silencers, ~ engine enclosures; turn off idling equipment; ~noisy operatibns from 6:30 ~ A.M. to 9:00 P.M. unless special circumstances approved by construction manager. Construct BTC as proposed which serves as noise barrier between terminal and waterfront park. ~'~'" ~/~h ~V~ ~'"' ........ ' .......... ,~,w ~rade lo reduce ' ~" no;.;c i- LI (~llll~.~ ' 9. Land, Shoreline Use, Housing: Create approximately 79 additional housing units than exist. Create new commercial and redevelop commercial space as proposed. Provide business relocation assistance as required by state/aw. 10. Land Use Planning: Incorporate uses -- retail, parking, office, entertainment, transit as permitted under zoning. Preserve views to Sinclair Inlet in conformance with Downtown Waterfront Urban Renewal Plan (DWURP). Create: Washington. Ave. plaza; open space adjacent to Waterfront Park; and linear waterfront Pathway-Park. Relocate marina as recognized in the City's DWURP Design Element. 11. Aesthetics: Create view corridors through waterfront and along Burwell St. as proposed to preserve views. Create linear waterfront pathway as proposed to view Sinclair Inlet and other natural attractions. Conform to City zoning with regards to height and bulk as applied through PUD process. Comply with City's Design Review standards required by the DWURP. Place current waterfront parking below the surface as proposed. 12. Dght and Glare: Design lights within BTC and relocated marina so as to not create off-shore glare. Obtain United States Coast Guard (USCG) approval of marina entrance marking lights. 13. Recreation: Create Second St. pedestrian walkway. Create new linear Waterfront Pathway-Park (esplanade) from Waterfront Park to Fifth St. and create lateral access points to the existing Waterfront Park and new Pathway-Park. Create a new public plaza at Washington. Ave. and Second St. and expand Waterfront Park. Provide alternative siting for Wycoff Park as approved by Puget Sound naval Shipyard (PSNS) and City Parks Dept. 14. Cultural and Archeologicah Notify State Historic Preservation Office (SHPO) if archeological resources are identified during construction. Provide Public Art in compliance with DWURP requirements. ~ 5. Transportation: Separate pedestrian, transit, and auto traffic as proposed to enhance traffic safety. I Convert Bun/v~Pa~ A vel~le it~;e rsec~ "NX -..,.-~.------ u . - -.,/vi, il,,,. J~.m~a~c$ tc, p,'~;'~d~ ado'ib'u,~i u~pacity a,~d improve operations to an acceptal)~e ~,vc; c,f $~,-~;~,e. i-Coordinate BTC construction staging plan with WA ST Department Qf Transportation, City, Port of Bremerton, and Kitsap Transit. Coordinate construction traffic routing plan with City and Kitsap Transit. Vacate and dedicate rights of-way as described in rights of-way vacation application. Compensate the City as required by State and City laws for vacated rights of-way. 16. Public Services: Provide fire protection systems for buildings according to Uniform Fire Code requirements. Upgrade existing stormwater and water lines serving the project site as required by City's Public Works Director. Coordinate replacement of utility services with Puget Power, WA Natural Gas, US West, and City to minimize disruptions. 17. Scope of approval: This approval recognizes the preliminary, conceptual and phased nature of the project. As allowed by the zoning ordinance: a) The ultimate development with specific uses and sites may change at the time of the Final PUD application(s); b) Final PUD approval(s) shall be subject to the Final PUD approval criteria of the zoning ordinance. Final PUD application(s) shall require signature(s) from all affected property owners signifying their acceptance of the plan and application(s). This preliminary PUD approval does not mandate participation by COMPRE1TENSIVE PLAN DESIGNATION: The portion of the Master Plan located south of First Street is designated Transportation Facilities (T) and the portion of the Master Plan located north of First Street is designated Central Business District (CBD). The Downtown Waterfront Urban Renewal Plan, a sub-plan of the Comprehensive Plan assigns the following designations to property within the PUD: · the area south of Fkst Avenue as Ferry Terminal fiT); · the area noah of First Street and east of Washington Avenue as Mixed Commercial/Residential/Tourist (CRT); · the area approximately 10 feet wide measured from the top of the bluffline along the shoreline as Linear Park Pathway (LP/P); · the area bounded between the existing First Street pier on the south, the Turner Joy on the north, the ordinary high water mark on the west, and the outer harbor line on the east as Marina South (MS); and · the area west of Washington Avenue that includes buildings fronting on the west side of Washington Avenue as Waterfront/CBD Transition Area (TA). ZONING DESIGNATION: The Bremeaon Zoning Code designates the area east of Washington Avenue and south of First Street as Urban Renewal District (URD) and the area west of Washington Avenue and noah of First Street as Business Core CBC). The Puget Sound Naval Shipyard portion of the project c~Z°n~is °r°p°sed t° berez°ned General ~dust~(IG)'/t~~ a..4 ~4..c04 '.. ~.a.~ fPUlO, '~/~~a~/' The Sinclair Landing PUD is intended to be a phased PUD approval with the following uses constructed according to a phased two year schedule keyed offofthe City's Preliminary PUD approval date: Phase 1:1997 through 1999 -- Buildings 1, 2, 3,4, and 5; / ff'- (3t~' / (a C~ [ ~ Phase 2:1999 through 2001 -- Buildings 8, 9, 10, 11, 20 and 23; Phase 3:2001 through 2003 -- Remainder of the PUD elements. , . , '~ite ~ Q_2~:~ o~~lA,,a,u,~_~ ~e upl~d portion of the project site exclud~g Ci~ fi~ts-of-way is appro~ately 22.5 acres. ~e m~e poffion is appro~mately 15.5 acres. Paring: any or all property owners within the boundaries of the PUD, allowing any or all property owners to utilize their property in conformance with zoning regulations. Property in the City limits of Bremerton included in this Preliminary Planned Unit Development is described as follows: LEGAL DESCRIPTIONS: Lots 9 to 14 Block 1; Lots 1 to 9 Block 2; Lots 1 to 19 Block 3; Lots 1 to 8 Block 4; Lots 1 to 29 Block 7; Lots 1 to 34 Block 8; Lots 1 to 26 Block 9; Lots 1 to 9 Block 10; Lots 1 to 50 Block 14, Town of Bremerton plat as recorded in volume 2, page 30 of the plat records of Kitsap COunty and the following waterfront tax lots: 242401-2-009-2006; 132401-3-015-2009; 132401-3-033-2007; 242401-2-011-2004; 24201-2-010-2003; 242401-2-055-2000; 242401-2-006-2009; 132401-3-014-2000; 132401-3-199-2007; 242401-2-004-2001; 3718-001-009-0006 PASSED by the City Council this day of March, 1997. APPROVED this ATTEST: LYNN HORTON, Mayor KATHLEEN L. McCLUSKEY, City Clerk 1. SUBJECT: AGENDA BILL BREMERTON CITY COUNCIL MINUTES - MARCH 12, 1997 3-26-97 FOR AGEND~ OF: ORIGINATING DEPT: City Council ORIGINATOR: David Farr, pvesident DATE SUBMITTED: 3-19-20 2. CLEA3LANCES: (comment on back if necessary) EXHIBITS: ENDORSEMENT INFORMATION MAYOR __ A-oPROVED BY COLfNCIL ~~~SUBMITTAL: COUNCIL PRESIDENT' 4. SUNNY STATE~fENT AND REQUIREMENT FOR'COUNCIL ACTION: 8. RECOM}4ENDATION: 9. RESPONSIBLE OFFICI~: ENFORCEMENT OFFICIAL: EXPIRATION DATE:- REVIEW DATE: PULLED TABLED COUNCIL DIRECTIVE: 10. NOTICE OF ACTION APPROVED DISAPPROVED ~MENDED DATE: CITY COUNCIL MEETING MINUTES MARCH 12t 1997 #0041 #0062 The regular meeting of the City Council of the City of Bremerton was called to order in the City Council Chambers, 239 4th Street, Bremerton, Washington, Wednesday, March 12, 1997, at 5:30 P.M., with Council Vice President Richard Neville presiding. Council members present were Bob Winters, Carlos Montgomery, Lon Overson, John Law, Cecil McConnell, and A1 Colvin. Council members David Farr and Sherril Huff-Menees were absent. Also present were City Attorney Ian Sievers and Deputy City Clerk Paula Johnston. The meeting opened with the Pledge of Allegiance led by Council President Farr and Invocation given by Councilman A1 Colvin. Vice President Neville made the following announcement: (1) City Council will hold a Study Session on March 17, starting at 5:30 P.M., to discuss: Projects Update, Forestry Projects Update, and Fluoridation. Paula Johnston, Deputy City Clerk, announced Agenda Item 10A - Planning Unit Development For Sinclair Landing Project had been pulled off the Agenda. CONSENT AGENDA A. Minutes of Meeting -- February 26, 1997 #AB97-051 M/S/C/U(Colvin/McConnell) presented. to approve the Consent Agenda as CLAIMS/CHECK REGISTERS Vouchers audited and certified by the auditing officer as required by RCW 42.24.080, and those expense reimbursement claims certified as required by RCW 42.24.090, have been recorded on a listing that had been made available to the Council. M/S/C/U(Colvin/Overson) on March 12, 1997, the Council does approve for payment those vouchers included and further described as follows: 206629, 206651 through 206867 in the amount of $494,766.89. COUNCIL MEMBER REPORTS Mr. Winters extended congratulations to the citizens of Bremerton and City Council on being named as Reader's Digest's #4 Best City To Raise A Family out of 50 cities. Mr. Montgomery pointed out the City of Spokane garnered the #8 Best City to Raise A Family. Mr. Law announced the next District #3 Neighborhood Meeting will be TAPE #1447 City Council Reg. Mtg. Minutes March 12, 1997 Page 2 of 23 held on March 18, 7:00 P.M., at the Senior Center. Police Chief Paul Du Fresne will be the guest speaker at that meeting. Mr. Colvin extended a "thank you" to Andy ParypA for his input on parking issues at the District #1 Neighborhood Meeting. Since that meeting, he has received comments that the citizens understand the Mayor's approach to beautifying the City and approve of that, but some senior citizens believe they will be inconvenienced. One of the suggestions he received was the possibility of grandfathering in some of the parking spaces on some of the streets for the senior citizens. His response to that suggestion was a citizens committee has been formed to take that issue under consideration and make recommendations to the City Council. He was told that somewhere people are given incentives for keeping their property in good repair and taxed higher if it is in disrepair. MAYOR'S REPORT Mayor Lynn Horton commented on the Reader's Digest selection of the 50 best places to raise a family and the fact the City of Bremerton was selected as #4, which was something many local people already knew. She extended a special "thank you" to Terrie O'Neill, Municipal Services Coordinator, for the time she spent escorting the Reader Digest reporter around showing him the things we think are the reason we are a good place to live. Mayor Horton reported she and Council President Farr recently traveled to Washington D. C., along with Kitsap Transit officials, where they learned Intermodel Surface Transportation Enhancement Act ((ISTE) was initiated in 1991, with the proviso that all of the regions in every state was to prioritize their transportation need for that time frame, and based on the prioritized list the Federal Government would pass federal dollars to help pay for the projects. The good news is Washington State has done very well by that process, especially Kitsap County. However, many states did not do as well and now are trying to change the way the ISTE works so that they go back to line item appropriations or what some people call "pork barreling". It appears that the current prioritized method would continue. They also heard that President Clinton will present his proposal for the ISTE funding. For some reason ferries across the country have been omitted from being qualified for ISTE funds. She urged Council and members of the public to write letter or speak with their Congress members about making ferry priorities eligible for ISTE funding. The primary event they attended was the American Public Transit Association Conference, as well as having an opportunity to talk Congress members about the importance of public transit to all of our community and what public transit means as far as the Sinclair Landing project and the fact the second passenger only boat is important to Transit and Sinclair Land. She believes all of the legislators are very supportive of TAPE #1447 City Council Reg. Mtg. Minutes March 12, 1997 Page 3 of 23 the efforts in the development of Sinclair Landing. She felt the trip to Washington D. C., was worth the effort to highlight to the Congress members why our projects are important and that the boat dollars will be put to good use. Mayor Horton read a proclamation recognizing MARCH 20, 1997, to be the First Annual ABSOLUTELY INCREDIBLE KIDS DAY and declare the children of Bremerton as ABSOLUTELY INCREDIBLE KIDS. The Proclamation was accepted by three Camp Fire Boys and Girls -Ashley Robinson, Beth Hanson, Brandon Hanson. PUBLIC RECOGNITION John Thomas, Bremerton resident, reported a situation where the Bremerton Fire Department answered a 911 call for medical assistance and not only took care of the patient's medical emergency but also made sure she had her coat, gloves, purse and house keys. After the ambulance left with the patient, the Engine company crew put away the person's perishable groceries, which she been carrying into her home, turned off the lights and made sure the house was locked. He views that kind of action as excellence in customer service. Del Knauss, Bremerton resident, referenced a recent newspaper article titled "SLA Up and running alive and well", and questioned why City officials were not quoted instead of Mary McClure? He asked how much of the information provided in the article was known by the Council and the Mayor? He expects to be told how much money is going down of public funds, do we really have a deal or are we just getting a ferry terminal. Since he did not get answers to the questions he raised at the previous Council meeting, he filled out Public disclosure Request (PDC) forms posing the same questions along with a couple others and expects the City to respond within five days as designated on the PDC form. Bill Camp, Bremerton resident, pointed out under the Open Meetings Act requiring names and address is an illegal act and strictly voluntary. Vice Presi4ent Neville emphasized Council did not require that information, just requested it. Mr. Camp expressed concern that some people are coming before Council with personal vendettas against City officials and any time Council allows that to go on unabated and unchecked they are actually taking an action against an individual, who is being attacked from the podium. He was also concerned when members of the Council or business people commercialize and promote their own businesses from the podium during Public Recognition, which he views as violations of council's own rule #5. In his opinion, KITZ was the prime offender and should be asked to stop using Public Recognition to promote their business. TAPE #1447 City Council Reg. Mtg. Minutes March 12, 1997 Page 4 of 23 7A - MEMBERSHIP IN THE KITSAP REGIONAL COORDINATING COUNCIL AND RELATED BUDGET ADJUSTMENTt ~AB97-052 The Council is requested to approve the City's membership in the Kitsap Regional Coordinating Council. The cost of membership in 1997 will be $12,792. A budget adjustment to provide for this expenditure is attached. The administration believes that membership is in the best interests of the City. Mayor Lynn Horton stated normally the Administration includes this kind of cost in the budget for the coming year, but because of the flux in the Regional Coordinating Council, they were unable to provide clear direction as to their future organization. This issue will need to be a mid-year budget adjustment to provide funding for the organization. Several Council members have served on the Council and understand the value of the Coordinating Council to bring cities, County and Tribes together to talk about issues that affect all of the governments. The Regional Coordinating Council deals with transportation and planning issues and in the past worked together administering Block Grant funding and continues to work with Kitsap County for the distribution of Federal dollars through the HOME Program, which helps fund new construction in our communities. In the past, this group was a only a planning organization, but now has a broader mission. She also sees this forum as a good place to discuss pubic access because it impacts the entire county, such as water and sewer issues, etc. She believes the $12,792 is a good expenditure for having a forum to deal with issues that cross all of the jurisdictions; therefore, she urged Council to approve the budget adjustment and authorize the expenditure as presented. Public comment - none. Mr. Overson stated it was his understanding this organization also works with emergency management and health issues for the county. Mayor Horton stated yes, emergency management is worked through CENCOM, which is one of the boards that meets monthly under the Coordinating Council's Agenda, and the Health District addresses health issues county-wide. Mr. Overson asked if the budgeted amount was new? Mayor Horton stated yes, prior years were funded out of State dollars under Growth Management. Now that the State funding is no longer available, it was felt the function had not gone away and the scope was broadened. Mr. Overson asked if all members were paying the same amount or was it prorated? Mayor Horton explained the fee is prorated based on assessed valuation and population. Mr. Colvin questioned the value the City would receive from the requested funding. Mayor Horton pointed out over the majority of the past year the Coordinating Council had no staffing and limped #0899 #0925 TAPE #1447 City Council Reg. Mtg. Minutes March 12, 1997 Page 5 of 23 along with the help of Councilman Huff-Menees and some help from the County's Block Grant funds and support staff, but it was not an adequate way to staff an important function. Mr. Law stated having served on that committee, he could appreciate its need and found it was one of the only places at times to make the various cities and county come together and discuss issues. Mr. McConnell questioned the disbursement of the money collected? Ma~or Horton explained it would be used primarily for staffing, postage and several tasks that had been identified. One of the outstanding tasks deals with Urban Area Agreements. M/S/C/U(Montgomery/Colvin) to approve the proposed membership in the Kitsap Regional Coordinating Council. M/S/C/U(Montgomery/Colvin) to approve Budget Adjustment Request No. 97-4. 7B - BID AWARD FOR CALLOW AVENUE BASIN PRIORITYt PHASE 2 STORM DRAINAGE SEPARATION, ~AB97-053 Bids were opened for Callow Avenue Basin Priority 1, Phase 2 Storm Drainage Separation Project on March 6, 1997. Six bids for this project were received. The low bid from Thomco Construction, Inc. was $4,814,505. The engineer's estimate for this project was $4,650,000. The action before the City Council is approval of a contract with Thomco Construction, Inc. for Callow Avenue Basin Priority 1, Phase 2 Storm Drainage Separation Project. Tim Richard, Senior Engineer, stated this is the next project continuing the water/sewer separation program. The first phase of this project was the construction of the main trunk line portion through the PSNS expansion area. Phase 2 will complete that project to provide a main trunk storm sewer for the Callow Avenue basis and includes two sites: (1) south site is the area from the Missouri light were an outfall will be constructed - SR304, Cambrian and approximately Callow Avenue and Farrigut Avenue. (2) The north site is Montgomery Avenue from 1st Street up to 6th Street and will include a section in Burwell Street from Callow Avenue to Montgomery. This will complete Priority 1 and from there the project will move on to the separation of the smaller parts of the basin. Six bids were received with Thomco construction, Inc., being the low bidder at 4.8 million. The budget for this project is 5.344 million and is funded through low interest and no interest loans through the State Centennial Clean Water Fund and Public Works Trust Fund. The City has not worked with this contractor previously; however 10 references were checked and all of them were #1198 TAPE #1447 City Council Reg. Mtg. Minutes March 12, 1997 Page 6 of 23 very favorable on the quality of the contractor's work and that they were good to work with. It was noted the contractor had limited amounts of large pipe experience and the references were asked if they felt Thomco Construction Inc., could handle the larger pipes and there response was yes. The only concern expressed by some of the references was in Thomco's scheduling and completing projects on time. Mr. Richard pointed out there are limited working days in the contract with liquidated damages available and they were required to provide a Performance Bond to insure that the project is completed. John Thomas, Bremerton resident, asked if the contractor is required to pay prevailing wages for this area? Mr. Richar4 states yes, this contract, as with all public works contracts, requires contractors to pay prevailing wages and file their intent to pay prevailing wages at the beginning of construction and to submit that data for all sub-contractors. At the close out of the project, the contractor is required to provide an Affidavit of Wages Paid, which is submit by them to the Department Of Labor And Industries to verify that fact prior to the project being closed out by the City and their retainage released. Mr. Winters asked if the city had received the Performance Bond and Insurance items? Mr. Richar~ stated no, the contractor is not required to submit those documents until the contract is awarded to them by the city Council. Following 'award of the bid, the contractor has 10 days to submit the signed contracts, show payment for a performance Bond, and provide a Certificate of Insurance to the City. Mr. Winters questioned the strengths and weaknesses of this particular contractor? Mr. Richard stated all of the references contacted indicated the contractor provided high quality work, were easy to work with, and the weakness noted was problems with scheduling the work. Mr. Overson noted this contractor will be dealing with the largest business in the city, Puget Sound Naval Shipyard, and he was sensitive that this contractor overcome some their challenge with scheduling and completion. He wanted to make sure PSNS was kept happy through non-interference of this project. He asked if the City would be managing this project? Mr. Richar~ stated yes, the day-to-day project management would be handled by Bob Earl and Mr. Richard would be the over all manager. He noted City staff has worked with PSNS personnel during the construction of Phase 1 and during the design of Phase 2 to coordinate all of the sensitive issues. M/S/C/U(Montgomery/Winters) to approve a contract for $4,814,505 with Thomco Construction, Inc. for Callow Avenue Basin Priority 1, Phase 2 Storm Drainage Separation Project, and authorize the Mayor TAPE #1447 City Council Reg. Mtg. Minutes March 12, 1997 Page 7 of 23 to execute the same. 7C - BID AWARD TO OLSEN'S LAND DEVELOPMENT, INC. FOR PUMP STATION CE-1 SANITARY SEWER MAIN REPLACEMENT, #AB97-054 Bids were opened for Pump Station CE-1 Sanitary Sewer Main Replacement Project on February 13, 1997. One bid for this project was received. The bid from Olsen's Land Development, Inc. was $42,602.21. The engineer's estimate for this project was $29,950. Replacement of this sanitary sewer main will remove a restriction that has contributed to combined sewer overflows at this site. The action before the City Council is approval of a contract with Olsen's Land Development, Inc. for Pump Station CE-1 Sanitary Sewer Main Replacement Project. Tim Richard, Senior Engineer, stated this project is to replace a section of sewer main just outside of the main pump station CE-i, which carries all of the eastside sanitary flows as well as the entire Warren Avenue basin. A problem was found where a pipe was restricting the flow into the pump station from the Warren Avenue basin and creating overflows at the CSO site that should not be occurring. The pipe is both improper in size and in grade. This project will involve digging out and replacing that pipe, which is a difficult project and will require the to contractor core through the wall (about 2-feet thick) of the pump station from inside the wetwell. Workers will be required to work in an area with chemical piping and vaults and they will actually have to dig under the stairwells of the pump station. There is also an emergency overflow pipe above the subject pipe that needs to be replaced. Bids were solicited from five different contractors through the City's Small Work Roster and only one was submitted. An error in the Engineer's estimate was discovered after the bid was opened and should have been approximately $35,000 instead of $30,000. The contractor's price for doing the work is higher than anticipated and he believed it had a lot to do with the difficulty in working in that very confined area and the risk involved for the contractor. Funding for this project will come out of the City's Substandard Sewer Main Fund, which is used annually for projects that need immediate attention and has a balance of $220,000. The contractor has been used on a number of other City projects and they have always performed very well in their quality of work and coordination. Public comment - none. Mr. Winters expressed concern that only one bid was received and #1518 TAPE #1447 City Council Reg. Mtg. Minutes March 12, 1997 Page 8 of 23 asked if the City received a response from the other four contractors as to why they didn't bid? Mr. Richar4 stated no one responded in such a manner. He believed it may have been the difficulty of the job that kept them from submitting a proposal. Mr. Colvin asked in the event of a cost overrun is there a percentage basis to fall back on? Mr. Richar4 explained this project is for a lump sum bid. Mr. Colvln asked if that meant there would not be the possibility of amendments to the contract later into the project? Mr. Richard stated there is no possibility of running any quantities and the only reason a change order would be required is if they found some unknown condition underground that was unknown to the City. Mr. Neville questioned since this project does take place in his District and is close to his home, will there be any risk to the residents, such as odor or chemicals? Mr. Richard stated no, the risk to the contractor is damaging some of the structures or piping. The City will secure the piping during construction so that a break does not occur or chemicals spilled. The chemicals he referenced are used in the odor control facility and the only possibility might if the odor control has to be shut down there offensive odors might be emitted. He is hopeful the work can be completed within the next couple of months since that is the time when odors are minimal from that location. Mr. Neville questioned why this problem was not recognized when the extensive work was done in the Warren Avenue basin? Mr. Richar4 explained the engineers that designed that project, both preliminary and final design, picked up on it. Mr. Neville asked if this "fix" will take us well into the next century? Mr. Richard stated yes, he does not anticipate any more work for the Warren Avenue basin. Mr. Montgomery stated he was very familiar with the subject pump station and could appreciate why no one wanted to bid on the project. He asked if the City's Safety Officer will be present during the construction work? Mr. Richar4 stated the Safety Officer tries to visit the sites; however, he does not have that responsibility on this project. The contractor is responsible for the trench safety and all other safety. M/S/C/U(Montgomery/Colvin) to approve a contract for $42,602.21 with Olsen's Land Development, Inc. for Pump Station CE-1 Sanitary Sewer Main Replacement Project, and authorize the Mayor to execute the same. 8A - RESOLUTION NO. 2589t AUTHORIZING THE ESTABLISHMENT OF A HEALTH CARE REIMBURSEMENT ACCOUNT AND A DEPENDENT CARE REIMBURSEMENT ACCOUNT, #AB97-055 Under IRS regulations, an employer may establish a "Reimbursement TAPE #1447 City Council Reg. Mtg. Minutes March 12, 1997 Page 9 of 23 Account" program. This allows an employee to set aside, through payroll deduction, a portion of his or her salary on a pre-tax basis, that can be used to reimburse certain dependent care and/or health care expenses. he Insurance Benefits Committee is recommending this as part of a package of voluntary plans to be made available to employees. These plans will be paid for by the employee participating. Jim Meith, Human resources Manager, stated the Insurance Benefit Committee was formed about 1 1/2 years ago and is comprised of all represented Unions, non-represented Management/Professional group, Mayor's representative, Human Resources Department representative and Administrative Services representative. That committee undertook a complete look at all the City's insurance programs and what might be desirable in the future. The process was two phases: the first phase was basically those programs that the City funds, dental and medical programs, which resulted in the RFP's going out in the summer of 1996, and in turn resulted in a competitive process that actually contributed to a reduction in the city's insurance premium for 1997. The second phase was dealing with some concerns and interest employees had brought to the committee through their representative or directly to the Human Resources Department, which included voluntary programs. That package is now being considered and part of it is the Reimbursement Accounts. The Committee is also studying the possibility of offering voluntary Life Insurance to employees and will be implementing the voluntary Disability Insurance Program in a few months. All of these programs are paid for by the employees and the only involvement of the City is through payroll deduction. The Internal Revenue Service provisions provide for a 125-plan that allows employees to set aside some of their money for specifically health purposes or for dependent care. The employees interested in the health care program are interested mostly for orthodontics treatment for themselves or their children, and the purchase of eye glasses. Basically, the employees determines how much money they want to set aside in this account and the plan year for this account is April 1, 1997 through March 31, 1998. Information meetings on this proposal are scheduled throughout the month of March and it will be made clear to the employees that the plans are voluntary and under the IRS regulations if an employee does not use the amount they designate for that year, that amount is forfeited. Employees will be encouraged to be conservative the first year of their involvement so that they can get a feel for what their needs will be over the period of a year. There are provisions, under the regulations, where changes can be made for what are called "life style changes" i.e., divorce, death in the family, birth or adoption of a child, loss of employment, where money can be taken #1842 TAPE #1447 City Council Reg. Mtg. Minutes March 12, 1997 Page 10 of 23 back out of the account or to increase the amount depending on the circumstances. Pubic comment - none. Mr. M¢Connell asked if the employees have been informed that this proposal will be coming up? Mr. Meith stated yes. Mr. M¢Connell asked where will the money go if forfeited by the employees? Mr. Meith explained forfeited funds would go back into the Employee Medical Reserve Fund. It was the feeling of the Insurance Benefits Committee that would keep it in the area of employee benefits and available for employee use. Mr. McConnell asked if the IRS suggested where forfeited funds should go? Mr. Meith stated no, just that it can not go back to the client. Mr. Montgomez7 asked if the employees would be required to sign a statement acknowledging they understand the forfeiture requirement? Mr. Meith explained the enrollment form contains a statement that any unused amounts remaining in the reimbursement account(s) at the end of the plan year will be forfeited. M/S/C/U(Montgomery/Colvin) to adopt Resolution No. 2589, authorizing the establishment of a Health Care Reimbursement Account and a Dependent Care Reimbursement Account in accordance with applicable Internal Revenue Code requirements. 8B - RESOLUTION ~2590 ENDORSING THE HOME PORTING OF A THIRD NIMITZ- CLASS CARRIER AT PUGET SOUND NAVAL SHIPYARD, #AB97-056 The administration is seeking the City Council's endorsement of the Department of the navy proposal to place a third Nimitz-class carrier at the Puget Sound Naval Shipyard. Mayor Lynn Horton stated the Department of Navy is reviewing where they will place the third Nimitz-class carrier. At this point, it is in Everett, but there is discussion that could mean the USS Lincoln could be homeported in the City of Bremerton. She, Council President Fart and Councilman Law met with Navy officials for approximately two hours to discuss issues of interest to the City and the Navy. She believes this goes beyond the Environmental Impact Statement issues and is whether or not we, as the community, support homeporting of the third aircraft carrier. She believes the positives out weigh the negatives and things that impact the community can be minimized and the positives can be maximized. She urged Council to adopt the Resolution. Bert Gegner, Bremerton resident and Board member of the Puget Sound Naval Base Association (PSNBA), stated the PSNBA's mission since the mid 1940s has been to provide support to the Naval bases of Kitsap County. He then gave a brief rundown of the membership of the PSNBA. In the past, PSNBA has taken on tough issues such as 50- 40 split of the depot maintenance and privatization of depots, base TAPE #1447 City Council Reg. Mtg. Minutes March 12, 1997 Page 11 of 23 closure commission issues, and worked with Congressman Norm Dicks on successfully resolving the issues relating to the spent fuel in Idaho. Now, we are facing a potential threat not only to the continued operations of the Naval bases in the area, but also a threat to the economic stability of the community. This relates to the homeporting decisions the Navy has to make regarding nuclear carriers. Our community has had an opportunity in the past to address and testify to the Navy officials on the impact of homeporting of the USS Abraham Lincoln at PSNS. He read the letter that PSNBA submitted on behalf and in support of the community to homeport the aircraft carrier in Bremerton. The PSNBA supports the proposed resolution and the homeporting of the USS Abraham Lincoln. Jim Adrian, Bremerton resident and representing IAPT Local 12 (local labor organization that represents 1,500 white collar workers at PSNS) read a letter that the IAPT Local 12 submitted in support of the homeporting of the USS Abraham Lincoln in Bremerton. He pointed out this does not only have to do with re-homeporting the Lincoln today or within the next couple of years, but the whole scope of the hearing deals with where the Navy will ultimately base five nuclear carriers through the year 2004. It is a good possibility that 1, 2 or 3 carriers could be located in San Diego. The Navy is currently developing a nuclear repair facilities in San Diego and as the Navy continues to downside across the country, competition for these ships, the families and the incomes they provide to the community is intense. He believes it makes sense that the Lincoln and another carrier come to Bremerton; however, these decisions become politically charged, i.e. Congressmen get involved, jobs are at stake, public protests are staged. The Senator from Hawaii is very powerful and making a bid for the Lincoln, but it does not make business sense for that carrier to be based in Hawaii. However, if there is a political decision made as opposed to a business decision, we could be "high and dry". We can't assume it is a done deal and we need to continue aggressively proactively engaging the Navy at every opportunity through such organizations as Navy League, PSNBA, Unions, City Officials, Congressional members, etc. He did not see the homeporting of the Lincoln creating new jobs, but if it slows down the rate of jobs being lost and there aren't any more riffs or early outs, that is progress. Bill Camp, Bremerton resident, reminded Council that a homeported ship in Bremerton does not carry a guaranty that the repair work for that ship will be performed in PSNS and in many instances is performed by a private contractor. He noted when a private contractor performs the work it does not always mean an economic boom for this area. He had an opportunity to sit in with the Rental Owners Association meeting where Mayor Horton was promoting the criminal background check ordinance, which was passed by the TAPE #1447 City Council Reg. Mtg. Minutes March 12, 1997 Page 12 of 23 City Council, and part of her thrust was that the military had a policy and order the sailors to not rent, buy or lease property in the City of Bremerton on the basis that the crime was so bad. He emphasized before considering homeporting another carrier in Bremerton, he wanted to know if the Navy had changed its posture and issued a declaration of change of Dolicy to allow sailors to rent, lease, buy property in the City. Secondly, when you bring in several thousand sailors, considering the vast amount of legislation Council has passed in the past couple of months, it would be incumbent upon the Commanding Officer of that vessel to pass along to the sailors that criminal background checks could be made for any sailors that may wish to live in the city and if there is any problem with the law they will be evicted. He also believed they should be apprised of the City's legislation that addresses "tall grass". Roy McInnls, Bremerton resident, stated being retired military he would not whole heartily say he was against anything that is being proposed; however, he was concerned about bringing a third carrier into Bremerton. He echoed some of Mr. Camp's comments. He asked is this something we just look at as far as having economic income or is it something that has been thought out on what the impact would be if the third carrier was homeported in Bremerton? He asked if the City though about what would happen if there was a big build up of military in this area and then five years later the Navy changed its mind to send the Lincoln back to Everett? He is not concerned for himself, but is concerned about his children and grandchildren and the affect it will have on the Bremerton community in future years. He was not comfortable about integrating more people coming from varying backgrounds into this community. Mr. Adrian stated for clarification that if you read the scoping statement relative to the environmental assessment we are not talking about a third carrier coming and no one leaving. We are talking about three non-nuclear ships - Rainier, Camden and one other that may go to Everett. We are talking about a net increase of population in Bremerton of 400-700 people. The carrier contingent that typically comes is about 3,000-3,400 people. The scenario would be that the three other ships would go to Everett. PSNS does not do repair work on non-nuclear ships, which is performed by Todd Shipyard. PSNS is the only shipyard on the west coast that does nuclear repair work, so it is logical that the nuclear ship be based in Bremerton. Mr. Overson questioned the potential for work load growth? Mr. A4rlan stated it was hard to say. Mr. Overson stated he did not believe PSNS would hire a lot of people with the potential of that going away some day. Mr. ~drian agreed with Mr. Overson and TAPE #1447 City Council Reg. Mtg. Minutes March 12, 1997 Page 13 of 23 pointed out the Navy made a decision to strategically locate in Puget Sound, San Diego and Pearl Harbor areas. The conventional wisdom is that will be in place for 20-30 years. Mayor Horton stated the City has drafted input into the Environmental Impact Statement and that mission was not taken lightly. Police Chief Paul Du Fresne reviewed crime statistics and correlated those statistics with ships in port. That review revealed there was no correlation, we cannot show that crime statistic increase when a ship comes into port. She believes the perception of a lot of people is the Navy in the 1997 era is the same as it was in 1947, and the fact is it is light years from the 1940's Navy. Today's Navy is highly skilled, trained and many of them have degrees and advanced degrees; and they become part of our community as homeowners, volunteers, youth sport coaches, etc. To clarify the statement made by Mr. Camps regarding "housing", she did follow up on a comment having to do with the availability of a house for rent in Bremerton and the issues was not crime, but rather the cost of living. In talking to the head of Navy housing at Bangor, because they have thousands and thousands of homes that are on the housing listing for Navy personnel, they ask the person seeking housing what area they are interested in locating and then provide them with the pertinent data. The Housing Manager felt that particular circumstance could have been miscommunications and that she would talk with her staff so that would not be the case in the future. Currently, there is adequate infrastructure in PSNS as well in the City that easily accommodates ships going in and out. Clearly, there are things that the City feels is important just by the Navy presence, but we can't say that because of a new ship coming in it will cause heartburn in any one direction, it is a broader issue of Navy impact totally in the community. On a recent trip to Washington D.C., Mayor Horton and County Commissioner Chris Endresen talked with Congressmen and their staff about transportation needs. Commissioner Endresen pointed out, during those discussions, that because of the Lincoln going to Everett the ferry system is experiencing about a 160 vehicle back up on the Kingston Ferry. Based on that fact, Mayor Horton believes that situation will not go away even if the Lincoln continues to be homeported in Everett because more affordable housing is available in Kitsap County than anywhere along the I-5 corridor. When looking at this issue, the city did not just say yes, it is good for economics. The City has to provide services to the community whether or not there is a ship in port; therefore close analysis was made as to the impact, which was articulated clearly to the Navy. There is no one issue that stands out that has a huge impact on our community, if a carrier is brought into TAPE #1447 City Council Reg. Mtg. Minutes March 12, 1997 Page 14 of 23 the community and in the aggregate there is nothing to cause any alarm to say we should not be doing this. She believe very firmly that the positives far out weigh the negative fact that may come as a result of this, i.e. jobs, economic input into the community and in terms of having people in our community and schools. TAPE #1448 Mr. Law stated he was amazed that there would be any negative comments on this issue. He recalled not too many years ago San Franciso voted to not homeport the USS Missouri and as his grandmother always said "you never go where you are not wanted". The Navy is a reflection of our own society and sailors come from our communities throughout the nation and reflect that society. We in Kitsap County have been lucky because we seem to get the best of the Navy. He could not see why we shouldn't be happy to have the opportunity to tell the Navy we want them in Bremerton. Mr. Overson complimented the author of the resolution on its being well articulated. Mayor Horton stated the compliment goes to Terrie O'Neill, Municipal Services Coordinator. Mr. Montqomery stated he spent 26 years in the Navy, was in 5 shipyards and 20+ years ago worked on this same problem. One of the things about putting a nuclear aircraft carrier close to an overhaul facility is that it saves the taxpayers lots of money rather than bringing it and all the dependents long distances to the new location. He believes everyone benefits when aircraft carriers are placed in Bremerton. However, no matter how economically sound, we still have to contend with the politicians in Washington, D.C., and they don't always look at the savings to the military. He emphasized if three aircraft carriers are homeported in PSNS not all three would be in port at the same time because one is always deployed, one working up and one maybe in overhaul or coming down. However, the dependents would remain in the local area. He agreed with Mayor Horton that military personnel bring a wealth of skills and knowledge to this area. Mr. Winters stated he never served in the military, but he is proud to be from a miliary town. His father worked 30+ years in PSNS and served the shipyard from the shore as a boilermaker. From the outside looking in, his father is disappointed, in his years of retirement, that what Mr. Camp stated is very true and what Mr. Adrian stated is very true, the contracting of labor has decreased the number of jobs for local employees. We have to deal with change, but we have to welcome with open arms any source of economic development i.e., military, telecommunications, improvements, uses of the Port, etc.. We have a projection of 20,000 more people into the City by the year 2002. Some people TAPE #1448 City Council Reg. Mtg. Minutes March 12, 1997 Page 15 of 23 #0293 support lower density, he supports higher density and he also believes housing should be improved. He pointed out in 1990 the city was named "The Most Liveable City in America", which brought a lot of people to this area. As of today, there are 5,000 properties for sale in Kitsap County and 130 vacant properties under $90,000. Based on that data, he believes this community can handle another ship and influx of population. Mr. McConnell stated he served 21 years in the Navy in the Oakland area and a tour of duty in Bremerton. On behalf of the crew of the third carrier, he will support this resolution. M/S/C/U(Colvin/McConnell) to pass Resolution #2590 endorsing the home porting of a third NIMITZ-CLASS aircraft carrier in the Puget Sound Naval shipyard (P.S.N.S.) of Bremerton, Washington. 9A - ORDINANCE NO. 4590 (SECOND READING) PROHIBITING BROADCAST FEEDING OF BIRDS AND ANIMALS~ #AB97-043 Deputy City Clerk Paula Johnston read the following letters into the record: "I am the past President of Kitsap Audubon Society and like many of the 700 members of that organization, I feed wild birds in my yard. An ordinance prohibiting the feeding of birds or other wildlife in such a way as to create a public nuisance is needed and would receive my support. Some examples of the kind of feeding that creates problems are the broadcasting or feeding on open platform feeders stale bread, popcorn, seed mixtures and the like, which attract mob feeding by European Rock Doves (city pigeons), crows, gulls, and a few other birds. They land on surrounding buildings, wires, trees, and the like and defecate. The droppings can be unpleasant, damaging to structures, vehicles, and plants and even pose a health hazard to people. Some may also create unwanted noise and the uneaten food can attract rats. Responsible bird feeders go to great lengths to prevent such problems by screening feeders with wire netting to allow song birds to feed while keeping out larger birds such as pigeons and crows. The use of catch trays under feeders keep food off the ground. Ground feeding is useful for some song birds, but must be done out of view of nuisance birds. It should be noted that not every gathering of birds is a negative or artificial event. European Starlings on your lawn are eating the larvae of European Crane flies that can damage lawns. The large number of widgeon (a kind of duck) that gather on the grass at Lions Field and elsewhere eat only grass, do not respond to feeding and are here only in the winter, so, they mow and fertilize the grass at a time when it is little used by humans! I have discussed the above information with John McDonald the current President of Kitsap Audubon Society and we are in agreement as to its validity. P.S. I would be willing to do a bird feeding class if there is enough interest. Signed TAPE #1448 city Council Reg. Mtg. Minutes March 12, 1997 Page 16 of 23 Ivan A. Summers, 3019 Sanders Avenue, Bremerton, WA 98310." "As I was scanning channels on Thursday afternoon I stopped on Channel 12 to listen in on Wednesday evening's City Council meeting. To my surprise, my neighbor Fannie Begleau, 1523 6th Street, was speaking on the subject of pigeons and the feeding of these other critters. I can count on the sea gulls, pigeons, crows and starlings descending on the neighborhood every morning. I have lived here since February of 1991 and Fannie has been ever so faithful in the feeding of birds, stray cats, stray dogs and any other critter that wanders into her yard - my cat included, she even allows stray cats into her home during the day to "visit" and is upset when they won't go away at night. She, by the way has two cats of her own. I believe she stated that she is ever so meticulous about cleaning her yard and outside her home so there is no debris from her feeding of animals and birds. What she does not say is that the sidewalk in front of our homes shows the stains of bird droppings where they sit on the overhead lines, the bread that covers her yard and is scattered by the birds when they fight over the food. Then there is the sound of sea gulls tromping across the roof trying to take flight or eat what they just took from the yard. There are days when you cannot see Fannie's yard for the birds that have landed to eat. Her lot is small and it does not take long for the birds to spill over into the adjoining yards. Then there are the days she puts out extra food and it lays there for hours before it is cleaned up by whatever passes through. She doesn't think about the unwanted guests (i.e. rats, mice and insects) that appear in the night to eat the food she kindly sets out for that particular car or dog she considers a stray. Springtime brings an abundance of mice that have nested close by. The free food is more than they can turn down. My cat brings me little mice with such pride! I'm getting to be quite a mouser myself because he brings them in live so he can share with me and we can play together. Star of the Sea School is being erected adjacent to my property. The roof of the new school building was alive with sea gulls and pigeons this winter just waiting for Fannie to appear with their morning feast. There may be no mess in her yard but there is in ours. There are days when she broadcasts up to three loaves of bread to feed all the birds and that's a lot for the birds to digest and dispose of. There is not a day gone by that we have not had to wash bird droppings from our porches and cars. Can you tell how tired I am of the mess and noise? With a school's paved playground a stone's throw away from the pigeons and other birds I would think there is also a health issue involved. Putting out bird feeders to attract and feed small birds is one thing, covering your yard with bread and bird seed is overkill. I own a cat so I don't feed the birds. It's too tempting and he is a real hunter. If Fannie and others like her want to feed their TAPE #1448 City Council Reg. Mtg. Minutes March 12, 1997 Page 17 of 23 dear little friends, let then do so in a more conservative fashion with a feeder that restricts the size, number and type of animals that are attracted. I support any ordinance that would limit the broadcasting of feed. Not only will it help cut back on the overwhelming gatherings of birds, but it will also discourage unwelcome "guests" I mentioned earlier, signed Sylvia M. Wilson, 1521 6th Street, Bremerton, WA 98337." Mayor Horton stated the input given on this issue, at the time of first reading of the ordinance, was taken into consideration and turned the focus of the ordinance on the public nuisance created by volumes of birds/animals and not those people that want to feed birds using small feeders or putting out food when there is snow on the ground and they cannot find food themselves. Also included were any domestic or wild animals, as well as birds, because it was pointed out stray cats were also a problem. Another point of clarification was that it constituted a civil infraction, not a criminal infraction. Over the past two weeks numerous calls were received by her Office stating that they too had experienced the same kind of problems in various neighborhoods. She urged Council's support of the ordinance on second reading. Bill Camp, Bremerton resident, expressed concern about how far the City can reach in and direct lives of property owners. Previously, comments were made that large flocks of birds are a problem in other cities across the country as well as in Puget Sound Naval shipyard (PSNS). Based on his information, PSNS does not have a problem because they have kill pigeons over the past five years. He agreed with Mr. Dickerson, a previous speaker on this issue, that it is more appropriate for the Courts to settle disputes arising from neighborhood disputes. In his opinion, this action looked like election year politics. Andy Par~q~a, Bremerton resident, made the following prepared statement: "It is my opinion, as stated in my response to the Mayor, that passing ordinances and the codification of such costs the taxpayers money, for that reason, since this, if passed, will require recodification, the entire original B.M.C. 7.08 should be cleaned up. This version has an added amendment that extends beyond bird feeding, therefore, it is legitimate to speak to subjects that tie into Section 1. Amendment. Subsection (h), in part states "Violation of this section shall be a misdemeanor." The word "section" is incorrect as (h) is a subsection the word "secton" should read subsection. By the proposed amendment, all subsections of 7.08.100 are civil infractions except for subsection (h). I have a problem with TAPE #1448 City Council Reg. Mtg. Minutes March 12, 1997 Page 18 of 23 subsection (b) Diseased Animals and (g) Threateninq Pedestrians. In my opinion, to own an animal with an infectious or contagious disease and to allow that animal to run at large, come into contact with other animals or to drink at any public or common watering trough or steam should be a misdemeanor. (Humans can be infected by such animals). Even though the infected animal is being treated by a veterinarian, until it is declared contagious free, it should not be allowed to run at large, subsection (g) is also questionable to be classified a civil infraction. It reads: "To cause, permit, or allow any animal to snap at, jump upon, or otherwise threaten persons using the public sidewalks, streets, alleys or other public ways." Causing an animal to jump on, or snap at a person could very well be a danger to the dogs life. Section 7.08.010 and 7.08.050 have requirements, but are not classified as to what the results are if disregarded. That is not specified until Section 7.08.100 by the proposal and refers only to Following Acts, not Preceding Acts. There are sections that refer to misdemeanors or civil infractions. Where in the B.M.C. does it indicate the penalty for the violation? As an example, look at Chapter 6.28, UNIFORM LITTER CONTROL CODE. Note 6.28.170 PENALTIES. Regarding the addition of (m)(2): If a person attends a function in Aberdeen and will be gone for 12 hours, must he return within four hours to assure all the food has been eaten and again return to the family function in Aberdeen? Councilman Colvin, you were correct, it was "for the birds" last week and adding (m) (2) puts it into a category I will not describe in public. Feeding of stray cats and dogs should not be allowed. Instead of feeding them, Animal Control should be called. How does the person know if they are infected or have a contagious disease?" Ian Sievers, City Attorney, stated Mr. Parypa focuses on the criminal penalties, which was a question raised at the first reading of the ordinance. As Mr. Parypa pointed out, most of the B.M.C. chapters have a penalty section that applies to that chapter; however, when he checked the Animal Control Chapter he found it was not typical and some sections called for infractions and other called for misdemeanors. The particular chapter where he proposed to insert the subject ordinance was silent on the penalty, but did list a lot of nuisances that were prohibited. With the exception of Section 8, which said that will be a misdemeanor, clearly that is the worst offense among the list of nuisances, i.e. biting, chasing, attacking, as a misdemeanor. It was his interpretation that probably the intent was to make the rest lesser TAPE #1448 City Council Reg. Mtg. Minutes March 12, 1997 Page 19 of 23 offenses and infractions since those other chapters under Animal Control call for infractions. Therefore, the change he made today was a necessary change to the ordinance, he couldn't come back and tell Council want it was, but he had to create some penalties for this bird ordinance. At the same time, he clarified penalties for the rest of those sections. Mr. Parypa's point is that he believes there are some other sections that need clarifying and that the penalties should be misdemeanors rather than infractions. There is a general provision in the B.M.C. declaring what penalties are when an infraction or misdemeanor is called out. In his opinion, that penalty schedule did not have to be repeated every time a penalty was included in an ordinance. He met with Deborah Goodell, Animal Control Supervisor, on the redraft of this ordinance, particularly on the subject of how she felt the penalty scheme should be for this one section. He indicated to her he was making them all an infraction, except for the one that is already called out as a misdemeanor, which is allowed to continue under the language of the ordinance, and she did not have any problem with that scheme. In regard to Mr. Parypa's point on excess food remaining on the property, exposed and allowing access to it, he selected the 4-hour time frame and Ms. Goodell supported his recommendation. Larry Dickerson, Bremerton resident, stated as Mr. Overson pointed out this is no longer an issue of broadcast feeding. He conducted some experiments placing bird feed in various size pans, which drew just as many sea gulls, starlings, and crows as if it had been broadcast. He questioned how many separate complaints from separate people had the City received regarding this issue? Mayor ~orton stated about a dozen people had contacted her office. Mr. Dickerson questioned the appropriateness of creating an ordinance on 12 complaints? Six months ago a group of ladies came before the City council from the 1000 block of 4th and 5th Streets asking the City to correct the crime in their neighborhood. What resulted was their taking charge of the situation by organizing a Block Watch program and did it for themselves. He also agreed that neighborhood disputes could be resolved through the Courts or Dispute Resolution Service. He urged the Council to vote no. Elizabeth Buell, Bremerton resident, asked if the ordinance would prevent her from tearing up bread and throwing it on her front lawn for the birds to eat? Diane Killam, Bremerton resident, stated her concern is with the congestion of birds over her property. Because of her neighbor's practice of feeding birds, she has bird droppings all over her property, which increases the chance for disease. Lawns and plants cannot be washed off like slabs of cement and she faces an on going problem. The City has other ordinances for people that are there TAPE #1448 City Council Reg. Mtg. Minutes March 12, 1997 Page 20 of 23 because they have abused the system, they have rights and they let them go. Mr. Paryp& stated he was not against the subject ordinance in general, but when we're going to clean it up, lets clean it all up at once. Mr. Sievers stated the definition of an infraction and misdemeanor was listed in the Administrative section of the B.M.C.. He asked how does the average person know to look up Section 1.2 when the issue is identified in Section 7.08. Mr. Sievers stated the practice of not repeating those penalty sections where it is a standard penalty has been the way the code has been handled. In the chapter dealing with Animal Control there aren't sections outlining the penalty, but rather calls out if it is a misdemeanor or infraction. Mr. Parypa also raised the issue about cleaning up the whole chapter because of the cost of codification. As of now, the City has the B.M.C. on computer disk, which allows the City to make changes at a very low cost. The City is not doing codification more frequently than quarterly. Also, Ms. Goodell indicated she had some other changes she would like to see made to the Animal Control chapter. Mr. Colvin expressed concern that initially the ordinance addressed the feeding of birds and now wild animals were included. Mr. Sievers stated it is in a sense a new topic in that criminal penalties are being assigned to the other nuisances in the section that was amended. This bird nuisance would have a penalty. Mr. Colvin asked Mr. Sievers if he would advise cleaning up the chapter as suggested by Mr. Parypa? Mr. Sievers stated he did not believe there was a need to go into entirely new sections of the ordinance since Ms. Goodell wants to address additional changes at a later time. Mr. Overson stated he agreed with people who are concerned that government should stay out of houses and not be encroaching on people's lives. He also agrees that some thing is needed to address the concerns identified and the proposed ordinance does that without getting into people's lives and appears to be enforceable. He did not want to make other changes other than what is proposed in the ordinance. Mr. McConnell questioned how does one prevent starlings from coming down into yards to eat the larvae, worms, etc.? He questioned what is meant by "such times" as it is stated: "to feed outdoor at such times"? And, what numbers create a nuisance and who determines what is unreasonable? He views this ordinance as being one that would be thrown out of Court by a Judge due to its being ambiguous. He also raised a point about a conflict between the 4-hour limit leaving food in the yard and the proper caring for pets when left TAPE #1448 City Council Reg. Mtg. Minutes March 12, 1997 Page 21 of 23 outside. Mr. Sievers stated what has been done is to move away from a prohibition of a specific kind of behavior. Some of the suggestions for changes, at first reading of the ordinance, were don't unduly restrict what a person is doing, only restrict the impact on the neighbors. The focus is now on the performance standard and that performance being you can't do it in a manner or at a time or in such quantities that it creates an impact. That is a more vague standard and very similar to the City's nuisance noise standard, which reads almost the same way. It has been found to not be unconstitutional, so it is a reasonable person standard. The way it would be enforce is also similar to that section of the Noise Ordinance. If a person does not know that a large gathering of birds are making a noise that disturbs the surrounding property owner, they would probably just be warned, but if they persist in the routine of feeding at the same time each day so that it attracts large numbers of birds that create noise and produce droppings, they will be cited for an infraction. Mr. McConnell expressed concerned that the proposed ordinance would put him in violation since he has bird feeders that trickle down as the birds eat the food. He needed clarification about food remaining uneaten for a specific period of time. He could not support the ordinance as written. Mr. Sievers stated he doubted the Animal Control people wanted large bird feeders filled with a week's supply of food left out because it does attract the strays and rodents. Mr. Law reported he received 11 telephone calls from concerned citizens citing specific areas within District #3 that are problem areas and at least six constituents stopped him in stores and on the street to encourage him to support stricter regulations on bird feeding. Mr. Winters reported several constituents also contacted him and the most interesting one was from Jack Lefcoski, who feels people should be restricted from feeding ducks at Kitsap Lake. Mr. Lefcoski was most concerned about the ducks defecating in the lake which impacts the weed problem. In reference to the section stating it would be a violation if food is left out and uneaten for four hours or more, he felt he would be in violation when his two cherry trees, two plum tress and an apple tree were bearing fruit, because he did not pick up the fallen fruit every day. #2039 M/S/C(Montgomery/Overson) to pass Ordinance No. 4590, on second reading, prohibiting outdoor feeding of birds or animals, and amending BMC 7.08.100. Mr. Overson pointed part 2 seems to be different interpretations and asked if some legal terminology should be inserted? Mr. TAPE #1448 City Council Reg. Mtg. Minutes March 12, 1997 Page 22 of 23 Slevers stated he did not interpret that "feed" referred to growing produce, particularly when reading the legislative history in the WHEREAS where it states "or otherwise allowing access to feed or edible waste". He had a problem saying if feed scattered on the ground or other surface remains uneaten for four hours because even though it may be in a large container we do not want it to sit there for days or weeks unattended. He believes there is a core behavior that the proposed ordinance addresses and there is almost no way to write a law that someone can't find some exception or circumstance that seems unfair. Mr. Overson suggested adding the words "contributes to a nuisance by remaining uneaten for more than 4 hours". Mr. Colvin stated he did not believe Mr. Winter's analogy applied in this instance and could not be accused of broadcasting fruit. Mr. Winters stated he could be accused by the neighbors for excessive noise created by the birds prior to their feeding on his fruit in the early morning. Mayor Horton noted she has received calls from people expressing concern that fruit is left on the ground and bees have become a problem. In those circumstances, the City did contact the property owner and asked them to clean up the excess fruit. The intent of this legislation is to have an ordinance that gives the City the tools to deal with the large neighborhood problems. She assured everyone that the intent is not to go after people that place small feeders in their yard to feed birds, or monitor how people are handling the rotting fruit or bird feed that slipped to the ground. If the proposed ordinance is approved and at a later time Council members receive complaints about the City's enforcement policy, the issue can be readdressed. Mr. McConnell asked what kind of a complaint will cause the city to respond with an investigation? Mayor Horton explained generally the City tries to deal with the situation over the telephone; however if it appears the problem is not one that can be resolved simply, then a'staff member is dispatched to the site to look at the problem. If the situation warrants enforcement, a letter is written to the adjoining property owner explaining complaints have been received and ask them to resolve the problem. In most instances, the offending neighbor takes the appropriate action in response to the complaints. Mr. M¢Connell noted the civil Courts provided a process to handle such disputes. Vote on motion: Motion carried. In favor: Montgomery, Overson, Law, Colvin, Neville Opposed:McConnell, Winters TAPE #1448 City Council Reg. Mtg. Minutes March 12, 1997 Page 23 of 23 Vice President Neville thanked the TV camera crew for their services: Rob Rupe, James Noble Jr., and Jamie Campbell. With no further business meeting adjourned at 8:12 P.M. KATHLEEN L. McCLUSKEY, City Clerk DAVID D. FARR, Council President City of Bremerton KLM/DDF/me cc: Normal Distribution File/Vault 1. SUBJECT: AGENDA BILL BREMERTON CITY COUNCIL MINUTES - MARCH 19, 1997 FOR AGEND~ OF: MARCH 26, 1997 ORIGINATING DEPT: City Council ORIGINATOR: David Farr, President DATE SUBMITTED: 3-21-97 2. C__L_~.NCES: (com~uent on back if necessary) EXHIBITS.: 4. $UM}4A~Y STATEh~ENT AND REOUIREMENT FOR'COUNCiL.ACtION: 8. RECO~ENDATION: 9. RESPONSIBLE OFFICIAL: ENFORCEMENT OFFICIAL: EXPIRATION DATE:- REVIEW DATE: PULLED TABLED COUNCIL DIRECTIVE: 10. NOTICE OF ACTION APPROVED DISAPPROVED DAT] ~MENDED TAPE #1449 UNAPPROVED DRAFT CITY COUNCIL MEETING MINUTES MARCH 19t 1997 The regular meeting of the City Council of the City of Bremerton was called to order in the City Council Chambers, 239 4th Street, Bremerton, Washington, Wednesday, March 19, 1997, at 5:30 P.M., with Council President David Farr presiding. Council members present were Bob Winters, Carlos Montgomery, Richard Neville, Lon Overson, John Law, Cecil McConnell, and A1 Colvin. Councilman Sherril Huff-Menees was absent. Also present was Acting City Clerk Rich Hanna. The meeting opened with the Pledge of Allegiance led by Council President Farr and Invocation given by Reverend Scott Huff of St. Luke's United Methodist Church. #0042 #0060 President Fart made the following announcements: (1) A City Council Study Session will be held immediately following the Council meeting to discuss "Planning Commission issues". (2) A City Council Study Session will be held March 24, 1997, starting at 5:30 P.M., in the City Council Chambers, and the topic of discussion is: "Further Discussion On Sinclair Landing Association Update Report". CONSENT AGENDA A. Minutes of Meeting -- March 5, 1997 #AB97-058 M/S/C/U(Neville/Montgomery) to approve the Consent Agenda as presented. CLAIMS/CHECK REGISTERS Vouchers audited and certified by the auditing officer as required by RCW 42.24.080, and those expense reimbursement claims certified as required by RCW 42.24.090, have been recorded on a listing that had been made available to the Council. M/S/C/U(Colvin/Montgomery) on March 19, 1997, the Council does approve for payment those vouchers included and further described as follows: 206895 through 207128 in the amount of $300,651.51. COUNCIL MEMBER REPORTS Mr. Colvin stated he appreciated Del Knauss's questions, which were raised at the previous Council meeting and encouraged all citizens to ask questions. TAPE #1449 City Council Reg. Mtg. Minutes March 19, 1997 Page 2 of 8 Mr. McConnell announced the next District #2 Neighborhood Meeting will be held April 3, 1997, 6:30 P.M., at Fire Station #3, on E. 31st Street and Olympus Drive. Mr. Law reported Police Chief Paul DuFresne made a very good presentation at the District #3 Neighborhood meeting on Tuesday evening. Based on that presentation, Mr. Law felt comfortable with the evaluation requirements for the performance of Police Officers. Mr. Overson stated he supports the Police Department's efforts to reduce some problems having to do with illegal activities in the City. Mr. Montqomez7 reported today he attended a Water Protection Teleconference where the importance of protecting water resources was discussed. He did not agree with THE SUN's interpretation of the Police Department's performance standards. For those getting tickets, he cautioned learn to live within the law. Mr. Winters announced the AD Hoc Citizens Committee on Telecommunications' first meeting will be March 31, 1997, 6:30 P.M., in the Council Conference Room. He announced Mayor Horton will comment, during her report, on THE SUN's reporting the city had agreed to a year extension of the TCI franchise prior to any Council action. He asked that Del Knauss be provided data identifying what the City paid Ben Pollock for his services. Mr. Fart reported a residence in his neighborhood experienced damage from a mud slide and the owner, Mrs. Ruth Smith, is taking refuge with a neighbor, Mr. & Mrs. Bill Garland. On the bright side, it shows what the Bremerton community is like with neighbors helping neighbors. The Anderson Cove area will hold a meeting on "traffic calming devices" at the Bremerton High School, Room 206, a date and time to be announced. MAYOR,S REPORT stated a request to extend the TCI Franchise agreement for one year will be brought to Council in the very near future. In order to allow the system to continue forward and allow the City to collect taxation from the system, the extension is needed. She will be setting up some public hearings to talk about cable T.V. service delivery and there is a delineated process to follow since the City is at impasse with TCI. The newspaper article indicated the extension was a "done deal", which is not the case. Mayor Horton supports the Police Department and the Police Chief's efforts in trying to measure standards for Police performance. THE SUN has chosen to use "quota system", which are performance TAPE #1449 City Council Reg. Mtg. Minutes March 19, 1997 Page 3 of 8 standards, and stated they are new to the community. Performance standards are not new, have been in place for a very long time, and is a way to measure the officers performance in the line of duty. She is hearing positive comments from residents from practically every neighborhood that they are seeing and experiencing more safe conditions within their neighborhoods. She is also receiving positive feedback from residents along Park Avenue over the installation of the traffic circle. Other areas are being considered for installation of traffic calming devises, such as lower, more gentle speed bumps and/or bulbing out curbs at intersections. People are telling her they want more enforcement in neighborhoods rather than less. Mayor Horton agreed that Ben Pollock's contract costs should have been included in the information given to Del Knauss and she would see that he received that information. Four properties within the City have been posted as "Unsafe TO Occupy" (Lafayette, Phinney Bay, Wheaton Way and Anderson Street),due to mud slides. City crews are watching sites on Campbell Way and Daniels Street for potential slides. Since the storm event in December 1996, the City engaged a geologist to evaluate some of the steep slopes in order to get a better understanding of potential hazards. An area along North Lake Way experienced erosion, which is the county's responsiblity; however, the City has a water line to protecting in that area. A canyon area along old Wheaton Way also is experiencing mud slides. Casad Dam is experiencing a record high water capacity, but not in any danger. PUBLIC RECOGNITION Carol Atkinson, Bremerton Main Street Association and Marilyn Mantzke, West Sound Arts Council, talked about the Arts Walk and Arts Party that will be held on April 26, starting at 11:00 AM and concluding with a Bremerton Symphony Pops Concert at 8:00 P.M., at the Admiral Theater. Garland Freymann, Bremerton resident, expressed his concern that Harlow Drive is used as a raceway by vehicles, making it unsafe for children walking along the shoulder of the roadway to and from school. His family experienced the loss of a family pet to a hit and run driver in front of.their home on Harlow Drive. Del Knauss, Bremerton resident, stated he was opposed to the City setting up speed traps for motorist along main arterials instead of their paroling neighborhoods. The response he received from the Police Chief on traffic tickets issued was different than what was reported in THE SUN's article. He acknowledged Mayor Horton responded to his previous questions. He asked the City to provide him with the data as to how much money, over the last four years, TAPE #1449 City Council Reg. Mtg. Minutes March 19, 1997 Page 4 of 8 had the Water Department loaned the Wastewater Department and how much has been paid back so far? Charlie Brown, Bremerton resident, stated he was still waiting for a response to a prior question that related to a court case, which the city lost, involving the Noise Ordinance. He was one of the motorist that contributed to the Police Department's quota. Roy McInnis, Bremerton resident, complimented the Wastewater Utility Department for their assistance in resolving a utility problem experienced by the Sinclair Missionary Church. The problem involved a broken pipe in an easement across the former Burley property, which was repaired by the new owner Parr Ford. Shannon Bell Bremerton resident, announced Bremerton took first place at the Special Olympics event at Cheney, Washington. Harrison Hospital will hold a Blood Drive on April 7, 11:00 AM - 1:00 PM and 1:45 P.M. - 5:00 P.M. 7A - APPOINTMENT OF DAVID VANNEST TO THE DISABILITY ACTION #1360 COMMITTEEt ~AB97-059 There is a vacancy of the Disability Action Committee. recommended that vacancy be filled by Mr. David Vannest. It is Mayor Horton described Mr. Vannest's involvement in helping to resolve gang and drug activity in the Callow Avenue/Montgomery Avenue neighborhood. Mr. Vannest is disabled, but able to make contributions to the community and would be a good advocate on this committee. Public comment - none. Mr. McConnell asked if this appointment would fill out the Committee? Mayor Horton stated she believed one additional position was vacant. M/S/C/U(Montgomery/Colvin) to confirm the appointment of Mr. David Vannest to the Disability Action Committee. 8A - RESOLUTION NO. 2591t ESTABLISHING ABATEMENT PROCESS FEESt ~AB97-060 Ordinance No. 4586 established the City's authority to assess "administrative costs incidental to abatement as set by Council Resolution". Resolution No. 2591 establishes the administrative fee allowed by the ordinance. This fee represents 75% of the abatement administrative costs as estimated by staff. Don Pratt, Director Of Community Development, explained the City's current Abatement process and how it impacts the General Fund when TAPE #1449 City Council Reg. Mtg. Minutes March 19, 1997 Page 5 of 8 buildings are either repaired or demolished by the City. Physical costs of an abatement are recoverable through a lien process against a property, if the owner does not reimburse the City. However, Administrative costs associated with those kinds of actions are not recoverable under that process and a significant amount of staff work is involved. The estimated average administrative costs for an abatement is $775.00 per abatement. Approximately one abatement is performed per month and without being able to recover administrative or indirect cost of the abatements, the General Fund is covering that expense. The administration strongly recommends the recovery of at least 75% or $600.00, for every property that goes through the abatement process in addition to construction or demolition costs. Once the fee is established, it will stay in affect and increase or decrease annually based on the previous year's Cost Of Living Index (CPI). Charlie Brown, Bremerton resident, asked if the city only collected money from a lien when the property was sold and does the City collect interest? Rich Hanna, Acting City Clerk, explained liens are recorded by the City Treasurer's office with the County Treasurer and then placed on the property tax rolls and subject to the same interest rates for delinquent Property Taxes (12% per year) and subject to foreclosure under the same terms as Property Taxes (3-years delinquent is subject to foreclosure). President Fart stated his support of this proposal, but was concerned about the repeat offenders getting a financial break, if the City only charged 75% of the cost. He supported future action to implement an escalating fee for repeat offenders. Mr. Montgomery stated his support for 100% recovery of administrative costs and questioned why should the rest of the citizens pay for someone else's refusal to maintain their property in a reasonable manner? Mr. Colvln asked Mr. Pratt how he arrived at the 75% figure? Mr. Pratt stated an argument can be made that this is a function of general government, as a whole, and general government revenue should be expended to support part of the abatement effort. He came down more heavily in favor of being reimbursed full recovery at 75%, but he would not argue if Council felt 100% recovery of the average cost ($775.50) was appropriate. Mr. Colvin questioned if tax dollars paid for the remaining 25% of the cost? Mr. Pratt stated yes. Mr. Colvin expressed his support to recover 100% of the cost. Mr. Neville stated he supported the 75% recovery based on the fact that to recover 100% of the cost would require tracking every hour put into the process, which could create burdensome accounting #1770 #1779 TAPE #1449 city Council Reg. Mtg. Minutes March 19, 1997 Page 6 of 8 responsibilities. Mr. Winters supported 100% recovery of costs and that should be the responsiblity of the person creating the mess. Mr. Overson complimented Mr. Pratt and his staff on coming up with a supportable figure. M/S/C/U(Overson/Neville) to adopt Resolution No. 2591, regarding establishment of fees for the abatement process within the Dangerous Building Code; including the amendment to include 100% of the average cost ($775.50) M/S/C(Law/Winters) an amendment to the motion to 100% of the average cost ($775.50). Mr. Montgomery pointed out abatements, such as the Burley property, cost the City an excessive amount and $600.00 is a small figure compared to what actually was expended. Mr. Pratt stated an earlier proposal included a $200.00 administrative fee for abatements that the City undertake but are completed by the owner. That fee was dropped from the proposed resolution due to a legal question and it is his intention to bring that issue back in the form of a Resolution that would meet legal requirements. His department's statistics show that 1/3 or more of the abatement actions started are actually finished by the property owner. Mr. Montqomer¥ questioned if it was feasible for the City to collect 100% of the administrative cost? Mr. Pratt stated it is feasible and it was considered, but he would argue against it. The administrative overhead time frequently comes in little pieces, i.e, 5 - 10- 15 minute periods, and it would take an administrative cost to keep track of all of those pieces of time. The City Attorney feels it would be difficult to defend in Court unless documentation was provided showing the incremental periods and how that time was spent. With a flat fee, all the City has to do is demonstrate some relevance to the average cost. Vote on the amended motion: Motion carried. In Favor: Law, McConnell, Colvin, Winters, Montgomery, Farr Opposed: Neville, Overson Vote on original motion: Unanimous 8B - RESOLUTION NO. 2592, TO ADOPT THE 1996 UTILITY LAND MANAGEMENT PLAN, ~AB97-061 TAPE #1449 City Council Reg. Mtg. Minutes March 19, 1997 Page 7 of 8 The December 1996 Utility Land Management Plan updates the existing 1986 Land Management Plan. As with the 1986 Plan, the update addresses maintaining the Union River surface water supply in compliance with Department of Health regulations for unfiltered sources under the Surface Water Treatment Rule (SWTR). Volume II of the 1996 Plan includes a timber inventory summary from the computer data base developed within the project scope; a computer based geographic information system (GIS) was developed for all Water Utility forest lands; forest health issues are addressed also in Volume II. The Utility Land Management Plan will provide a rational long term approach for land and forest management policies and practices within the constraints of water quality. An Advisory Committee assisted in the Plan development process. This project was brought to the October 21, 1996 Council Study Session. Bill McKinne¥, Forestry Manager, stated both the original 1986 Plan and the update Plan set forth established policies to protect water quality and meet criteria for an unfiltered source. What is at issue is maintaining water quality to meet Federal and State standards so that the City does not have to go to a filtration plant. Current estimates on capital outlay costs for such a plant would be $12-15 million and an annual operation cost of approximately $1.3 million. In the area of forestry management, the 1996 Update Plan provides tools that were not included with the original plan, i.e. timber inventory that is based on extensive field data and establishes annual cuts, values and is integrated with a Geographic Information System (GIS) specific to the natural features of the Bremerton Water Utility lands. Also included in the 1996 Update plan, but not in the 1986 Plan, was specifically addressing forest health issues to maintain future productivity of the forest. Currently, the City does have specific forest health disease problems that are being addressed. He emphasized that condition is not unique to Bremerton, it is being experienced in other western Washington forests. The GIS allows the scanning of aerial photos and provides best management practices for mitigation of those specific forest diseases. Upon adoption of the resolution, the Plan will be submitted to the State Department Of Health, which is part of the criteria for maintaining a filtration exempt system. Public comment - none. Mr. Neville questioned the shelf life of the Plan? Mr. McKinne¥ stated 10-years. Mr. Neville asked if this means the City will not have to worry about filtration for 10 years? Mr. McKinne¥ stated #2648 TAPE #1449 City Council Reg. Mtg. Minutes March 19, 1997 Page 8 of 8 the original rules provided that if you exceeded some of the water quality criteria, it could automatically trigger a decision by the Department of Health to require filtration. Those rules have been modified somewhat and decisions may be made on a case-by-case basis. Mr. Neville asked if the new Plan greatly enhanced Mr. McKinney's ability to manage the City's forest lands and would that mean increased harvests? Mr. McKinne¥ explained the inventory provides a more scientific basis of the standing volume, the value and how fast the forest is growing. From those figures, a sustainable yield can be determined. Mr. Montqomery asked if he understood correctly that the harvest of trees excluded the diseased areas? Mr. McKinne¥ stated for 1996 the harvest of diseased timber made up the bulk of the harvest volume. The positive side of that is instead of harvesting other areas, at risk timber and is not lost. Revenue projection goals for 1996 were achieved based on this program and under the allowable volume cut. Mr. Colvin questioned the value of an annual harvest? Mr. McKinne¥ stated $1.2 - 1.3 million. M/S/C/U(Montgomery/Neville) to adopt Resolution No. 2592, adopting documents entitled "Utility Land Management Plan" and Forest Management Plan" as policies of the City of Bremerton and as an addendum to the City's Water Supply Plan required by WAC 246-290- 100 and authorizing the City's Director of Public Works & Utilities to take the necessary steps to implement the two Plans. President Fart thanked the TV camera crew for their services: Rupe, Jamie Noble Jr., and Patricia Mathis. With no further business meeting adjourned at 6:53 P.M. Rob KATHLEEN L. McCLUSKEY, City Clerk DAVID D. FARR, Council President city of Bremerton KLM/DDF/me cc: Normal Distribution File/Vault AGENDA BILL BREMERTON CITY COUNCIL SUBJECT: BID AWARD RECOM/~ENDATION - JOHN DEERE 310E BACKHOE FOR PARKS AND RECREATION DEPARTMENT FOR AGENDA OF: March 26, 1997 ORIGINATING DEPT: Public Works & Utilities ORIGINATOR: J. Orton, Transp Manaqer DATE SUBMITTED: March 17, 1997 2. CLEARANCES: (Comment on back 3. EXHIBITS: if necessgry) ~ Director, PW & Utils ~'i./~z~' . Bid Tabulation Director, Parks & Rec~~-~ Technical Specifications City Treasurer----~ --~_~C~ City Attorney ~ __ Purchasing Supr ~.._ _ . f~ _/~y/ ,~.~/~ .~ ~ i~r~ t ~e ~ o~m~~~-/~~ ENDORSEMENT~ INFO~TION [] APPROVED BY COUNCIL PRESIDENT ~SUBMITTAL: 4. SUMMARY STATEMENT AND REQUIREMENT FOR COUNCIL ACTION: Call for Bids was prepared and two bids were received in accordance with established Call for Bids procedures for one (1) industrial wheel backhoe loader for the Parks and Recreation Department. The call for bids included trade-in of existing equipment with backhoe attachment and accessories (Continuation on Page 2) RECOMMENDATION: The City Council approve the bid award and authorize the purchase of One (1) industrial wheel backhoe loader (John Deere 310E) from Smith Tractor Equipment Co., Inc. of Tacoma, Washington, in the amount of subject to City Administrative Policies and Procedures. RESPONSIBLE OFFICIAL: ENFORCEMENT OFFICIAL: Transportation Manaqer EXPIRATION DATE: REVIEW DATE: PULLED [] TABLED [] COUNCIL DIRECTIVE: 10. NOTICE OF ACTION APPROVED [] DISAPPROVED [] AMENDED [] 11. AGENDA BILL NO.: 2. CLEARANCE COMMENTS: SUMMARY STATEMENT AND REQUIREMENT FOR COUNCIL ACTION - Continuation for the new equipment. The responsive low bidder, Smith Tractor & Equipment, Co., Inc., submitted a bid for a John Deere 310E in the net amount of $33,443.99. IMPACT ON NON-PASSAGE: The existing backhoe of the Parks and Recreation Department is no longer suited for many of the projects it is being used for. The Department would have to rely on borrowing from another department or renting one at a cost of $2,070.00 per month. IMPACT ON STAFFING, BUDGETS, FACILITIES, EQUIPMENT AND OTHER RESOURCES: The jobs would be accomplished more efficiently with a new backhoe and would bring a positive impact on operations. Sufficient funds are in reserve and budgeted through the 1997 Capital Improvement Program, Equipment Rental Reserve Fund. RESEARCH SOURCES: See Attachment. *Lift capacities are over-end values in Ill. Ikg~ according to SAI:. J31. Figures listed are 87% of tile nlaximum lift force available. ?,ase veh cle ncludes counterweight 310E BACKHOE WFI'H 310E I~ACKtlOE WITH 3-Fl'. 6-1N. (1.07 M) 310E BACKHOE WITH 3-FI'. 6-IN. {1.07 MJ STANDARD DII)I'ERSTICK EXTENDABLE DIPPERSTICK, RETllACTED EXTENDABLE DIPPERSTICK, EXTENDEI) 4,859 SWING pIVOT > FEET METERS 4~ 3,232 (1466) I. _74.,__?_!,~/ ,, . . 2,236 11014) /2,223 (1008) 4 8 ~ 16 16 5 4 12 4,,13 1 0 SWING ~1¥01> '1 '2 '3 '4 FEET METERS D13~ 2,867(1300) l ~'~'~ ~. T ~ 2,2~7 .136 (9691 ~ 1,g~ [900)  1,931 (876) ~ L9~4 (868) 4 S 12 16 3) 16 5 4 12 3 1 0 '1 '2 '3 '4 2,841 (12~ 1,986 ~~ I ~~'"'. .~... ~ 1,~g (716) ~ l~e(7~)  1,5~5 {T14) FEET 4 8 16 .5 ,4 ~2 3 2 1 1 '3 °4 · ROPS and cab With Standard Backhoe Loading height, truck loading position ............. ~.~ ........................... Reach from center of swing pivot ........................................................ Reach from center of rear axle ............................................................. Maximum digging depth ..................................................................... Digging depth (5AE): (1) 2-ft. (610 mm) flat bottom ............................................................. (2) 8alt. (2440 mm) flat bottom ...........................................................13 Ground clearance, minimum ............................................................... 12 in. ~305 mm~ Bncket rotation ..................................................................................... Transport height ................................................................................... II ft. 3 in. (3.43 Overall length, transport ...................................................................... 23 ft. 3 Stabilizer width - transport with ROI'S ................................................ 7 Stabilizer spread -operating ................................................................ Stabilizer overall width - operating ..................................................... I I ft. 7 in. (3.53 Width over tires .................................................................................... 81.7 in. (2.07 m) *Backhoe specifications are with 24 in. x 6.5 cu. ft. (610 mm x 0.18 m~} bucket. DIMENSIONS With Extemlable Dipperstick' Retracted Extended 11 ft. 1 in. 13.38 m) 13 ft. II in. 14.24 18 ft. I in. t$.51 mi 21 ft. 5 in. 16.:,:~ i.~ 21 I't. 7 itl. {6.fi8 m) 24 ft. ] I in. 17.59 14 ft. S in. (4.39 m) 17 ft. 11 in. ~5.46 14 ft. 4 in. (4.37 ml 17 ft. lO in. (5.44 I3 ft. 4 in. (4.06 m) 17 ft. (,5.15 m~ 12 in. (305 mm~ 12 in. (305 mm~ 190 degrees 190 degrees 11 ft. 2 in. (::I.40 m) l l ft. 2 in. (3.40 m~ 23 ft. 3 in. (7.09 m) 23 ft. 3 in. (7.09 m~ 7 ft. 2 in. {2.18 m) 7 ft. 2 in. 12.18 ml 10 ft. 2 in. (3.10 m) 10 ft. 2 in. (3.10 m~ 11 ft. 7 in. (3.53 ml 11 ft. 7 in. (3.53 m~ 81.7 in. 12.07 m) 81.7 in. (2.07 m, LOADER PERFORMANCE WITH BUCKET OPTIONs 0 0 0 0 0 0 1.00 cu. )'ti. t0.76 m~) lh'avy- Duty Long Lip (~pe~'ator control ................................ ii ................................................ single lever Breakout force ...................................................................................... 8,100 lb. 136.0 kN) Lifting capacity, full height .................................................................. 5,800 lb. (2631 kg/ Height to bucket hinge pin, maximum ............................................... I 1 ft. I in. 13.38 m) Dump clearance, bucket at 45 degrees ................................................. 8 ft. I0 in. (2.69 m~ Bucket dump angle, maximum ............................................................ 45 degrees Reach at full height, bucket at 45 degrees ........................................... 30.9 in. 1785 Rollback angle at ground level ............................................................. 40 degrees Digging depth below ground, bucket level .......................................... 6.3 in. II 60 mini Raising time to full height ................................................................... 5.2 sec. Bucket dump time ................................................................................ I. I sec. Bucket lowering time (power down) .................................................... 1.9 sec. 1.12 cu. yd. 1.00 cu. yd. 10.86 m9 Ileavy- (0.76 m~) D_t~ty L_otzg L_ip _y½dt_ipurpose. .. single lever single lever 7,950 lb. (35.4 kN) 7,125 lb. (31.7 5,600 lb. (2540 kg) S,100 lb. (2313 kg) 11 ft. 1 in. (3.38 m) 11 ft. 1 in. (3.38 8 ft. 10 in. (2.69 m) 8 ft. 6 in. (2.59 ml 45 degrees 45 degrees 30.2 in. (767 mm) 32.2 in. (818 mm~ 40 degrees 40 degrees 6.9 in. (175 mml 7.8 in. (197 5.2 sec. 5.2 sec. 1.l sec. 1.1 sec, 1.9 sec. 1.9 sec. t BID TITLE: BIDDER LOW BIDOER SUMMARY TIME OPENED: T,,.-~_.~..- ),.~ ITEM 1 ITEM 2 C¥~'.o~ /~ ZOO. CITY OF BREMERTON BID TABULATION ITEM 3 OPENED BY RECORDED BY _~ ITEM 4 ITEM 5 NET BID I °¢'lf/° ' TAX I TOTAL COMMENTS TOTAL BID ;5~O C, Cost Breakdown for John Deere 310E Total Cost Per Bid Addendum Item (4WD) Total: Less Trade In (1988 2355 John Deere Tractor with Attachments) Add Two Accessory Items 8.1% Sales Tax Purchase Total: 41,303.00 4,635.00 45,938.00 (15,000.00) 530.90 2,548.98 Budgeted through Equipment Rental Reserve for replacement of 1988 John Deere 2355 - $51,000.00. Needed Accessories Suspension Seat Reversible Stabilizer Pads Total: Cost 240.90 290.00 $530.90 DATE: FEBRUARY 26, 1997 TO THE CITY COUNCIL AND CITY CLERK, CITY OF BREMERTON: In accordance with your advertisement, plans and specifications on file in the office of the City Clerk the undersigned hereby agree(s) to provide: One (1) INDUSTRIAL WHEEL BACKHOE LOADER For A Total Cost of: $ 41,303.00 Sales Tax: 8.0% 3,304.24 TOTAL PRICE BID: $44~607.24 FORTY FOUR THOUSAND SIX HUNDRED SEVEN DOLLARS ANB T~ENTY FOUR CENTS TOTAL COST WRITTEN Above Price Does Not include Trade-In. Bidder offers trade-in value for one (1) Johne Deere 2355 with Backhoe attachment in the amount of $ 15,000.00 . If this bid is accepted, Bid Total Cost above will be reduced by trade-in amount. BID BOND ENCLOSED X Performance Will Be Exhibits Required Enclosed X Contractor' ',/, '".~-x.4,¢¢,.~ ~ ~ Firm Name Address (60) Days After Receipt of Notice To Proceed. Signature SMITH TRACTOR & EQUIPMENT CO., INC. PO BOX 2990 TACOI~A, WA 98401-2990 All Proposals Must Be In Ink or Typewritten. No Erasures Permitted Telephone Number 206-922-8718 F/tX, Number Signature of Preparer: "-~' ~ Z' ~ 206-922-3562 Bremerton Business License # IRS TIN/SS # 91-1702638 Washington State Contractor # AGENDA BILL - BREMERTON CITY COUNCIL I. SUBJECT: Public Hearing/Resolution FOR AGENDA OF: March 26, 1997 ORIGINATING DEPT.: DCD Planning PRELIMINARY PUD for Sinclair Landing, ~~ - ORIGINATOR: Jack Allingham, Sr. Plann LOCATION: Bremerton's Central Business District, downtoxvn DATE SUBMITTED: February 27, 1997 2. CLEARANCE~S: Director of DCD: Operations Corem: Public Works City Attorney:,.._~(..'"~~ 3. EXHIBIT "A": Synopsis, Opinion and Consensus of the Bremerton Planning Commission regarding Sinclair Landing. PUD "B": Planning Comm. Minutes 1/21/97 "C": Planning Corem Meeting Notes 2/4/97 "D": Resolution No. oQ.~'~;}~' M ITTAL:~_-~ 4. SUMMARY STATEMENT AND REQUIREMENT FOR COUNCIL ACTION: The Sinclair Landing Planned Unit Development will redevelop a significant portion of Bremerton's central business district. It includes the construction of 18 new buildings housing offices, retail stores, cinemas, residential/hotel units, a museum, parking garages. The plan also proposes a new ferry terminal referred to as the Bremerton Transportation Center (BTC). In order to accomplish the plan, the City Council is being requested to approve the following: Planned Unit Development (PUD), Shoreline Substantial Development Permit, Shoreline Conditional Use, Site Plan Review, Right of Way Vacation, Zoning Map Amendment (Zone portion of PSNS for Bremerton Transportation Center. These proposals were presented and discussed at the Planning Commission public meeting on January 21, 1997. The Planning Commission recommends City Council APPROVAL of the Preliminary PUD and accompanying applications subject to the conditions contained in the Synopsis, Opinion ond Consensus of the Bremerton Planning Commission ('Exhibit A). 5. RECOMMENDATION: Approval of Resolution No.: ~ 5 ~ , approving (with conditions) the Preliminary PUD for "Sinclair Landing ". Requested Motion: I move to adopt the Synopsis, Opinion and Consensus of the Bremerton Planning Commission as Fmding of Fact and Conclusions of Law and approve Resolution No.: ,~t~¢ , approving the Preliminary PUD for "Sinclair Landing" subject to the conditions contained therein. 6. RESPONSIBLE OFFICIAL: Donald L. Pratt ENFORCEMENT O F FICIAL:,.Qa~;t-Ne~eofl PULLED 7. NOTICE OF ACTION TABLED APPROVED DISAPPROVED COUNCIL DIRECTIVE: 8. AGENDA BILL NO.: AMENDED DATE: BREMERTON CITY COUNCIL AGENDA BILL (CONT.) CLEARANCE COMMENTS: 10. IMPACT OF NON-PASSAGE: Applicant: Approval of the Preliminary PUD will be denied. City: Future development will not occur. Re-application would be required. 11. IMPACT ON STAFFING, BUDGETS, FACILITIES, EQUIPMENT OR OTHER RESOURCES: · Additional staff time will be required to process and review the Final PUD approvals Right of Way Vacation Ordinances and Rezone Ordinances. · Future development will require building permits. 12. RESEARCH SOURCES: · ·File #'s: PUD96-002 · Zoning Ordinance · Site visits RESOLUTION NO.: RESOLUTION ACCEPTING THE PRELIMINARY PLANNED UNIT DEVELOPMENT OF "SINCLAIR LANDING", LOCATED WITHIN THE AREA GENERALLY BOUNDED BY: PUGET SOUND NAVAL SHIPYARD AND PARK AVENUE (AVE.) ON THE SOUTH AND WEST; FOURTH STREET (ST.) BETWEEN PARK AVE. AND PACIFIC AVE. AND BURWELL ST. BETWEEN PACIFIC AVE. AND WASHINGTON AVE. ON THE NORTH, AND SINCLAIR INLET ON THE EAST INCLUDING WATERFRONT PARCELS TO FIFTH ST. O, ViAlOn I vv,,u, ,~vv, ,v,~ ~, proponem for the proposed Sinclair Landing Planned Unit Development, comprising approximately 22.5 acres acres and located within the central business disHct within the Ci~ of Bremedon, has made application for approval of ~ Prelimina~ PLANNED UNIT DEVELOPMENT. and WHEREAS, an environmental checRlist has been prepared and considered by the responsible official and ~ mitigated determination of environmental nonsignificance issued, and WHEREAS, the Planning Commission held ~ public meeting concerning this matter on Janua~ 21, 1997; and WHEREAS, the Planning Commission recommended fo the Council that the "Sinclair Landing" Prelimina~ Planned Unit Development be accepted subject to certain conditions; and WHEREAS, the Bremedon City Council held a public hearing on March 12, 1997, concerning the prelimina~ Planned Unit Development with mitigating conditions; now, therefore BE IT RESOLVED BY THE BREMERTON Cl~ COUNCIL That the "Sinclair Landing" Prelimina~ Planned Unit Development presented for approval is hereby accepted subject to the following conditions: 1. Eaflh: Implement a tempora~ erosion and sedimentation control plan (TESCP)as approved by the City. Minimize exposed soft during construction.; construct truck tire cleaning areas; cover dump beds as required by state/aw; cover stockpiled earth and exposed cuts; route runoff to temporary sedimentation ponds; employ best management practices to control erosion; construct a concrete truck wash-down area; periodically sweep the streets with street sweepers; and phase construction, to minimize exposed areas. 2. Air: Implement erosion control measures as approved by the City. Minimize area of exposed soil during construction, or demolition; hose debris during derno/ition; construct truck tire cleaning area; cover dump beds as required by state/aw; cover stockpiled earth and exposed cuts; ernp/oy best management practices; periodically wet sweep streets. Comply with Puget Sound Air Pollution Control Agency (PSAPCA) Regulation 1, Section 9.15 requiring reasonable precautions to avoid dust emissions. Implement proposed Planned L/nit Development (PUD) trafficj transit, and pedestrian improvements to improve circulation. 3. Surface, Ground, and Runoff Water/rnpacts: Locate existing surface parking areas underground and partially cover the Brernerton Transportation Center (BTC) car waiting areas. Install and maintain oil/water separators as required by City stormwater regulation. Imp/ernenh WA. ST Department of Wi/d/ife's /-/ydrau/ic Project Approval (/-/PA) conditions; U.S. Army Corp of Engineer's Section 10 conditions; applicable local, state, and federal water quality guidelines. L/se concrete marina f/oats; use concrete or steel pilings instead of creosote wood pilings; construct interconnecting replacement First St. bulkhead in the dry. 4. P/ants: Use landscaping p/ants or sirni/ar measures to provide replacement vegetation on the site. Incorporate street and public space landscaping into project as proposed. 5. Wildlife: Remove existing First St. Dock and approximately ~ 20 creosote timber pilings which covers 12, 600 square feet of intertidal area. Remove existing First St. fi//which covers intertidal area. Remove 45 creosote timber pilings that support the Wheelhouse deck. Implement/-/PA and Corps Section 10 conditions. 6. Energy: Conform with applicable City and State energy code requirements. Create new pedestrian facilities as proposed to reduce auto energy use. Irnp/ement one- way coup/et street system, and other circulation improvements to increase transportation efficiencies and lower energy use. 7. Environmental Heath: Property or business owners to comply with applicable local, state, or federal/aw regulating the storage, handling, or use of hazardous rnateria/s. 8. Noise: Properly size and maintain equipment muff/ers, engine intake silencers, engine enclosures; turn off idling equipment; restrict noisy operations from 6:30 A.M. to 9:00 P.M. un/ess special circumstances approved by construction manager. Construct BTC as proposed which serves as noise barrier between terminal and waterfront park. P/ace Wash. Ave. be/ow grade to reduce traffic noise in Washington Ave. pedestrian plaza. 9. Land, Shoreline Use, Housing: Create approximately 79 additional housing units than exist. Create new commercial and redevelop commercial space as proposed. Provide business relocation assistance as required by state/aw. 10. Land Use Planning: Incorporate uses -- retail, parking, office, entertainment, transit as permitted under zoning. Preserve views to Sinclair Inlet in conformance with Downtown Waterfront Urban Renewal Plan (DWURP). Create: Washington. Ave. plaza; open space adjacent to Waterfront Park; and linear waterfront Pathway-Park. Relocate marina as recognized in the City's DWURP Design Element. 11. Aesthetics: Create view corridors through waterfront and along Burwell St. as proposed to preserve views. Create linear waterfront pathway as proposed to view Sinclair Inlet and other natural attractions. Conform to City zoning with regards to height and bulk as applied through PUD process. Comply with City's Design Review standards required by the DWURP. Place current waterfront parking below the surface as proposed. 12. Light and Glare: Design lights within BTC and relocated marina so as to not create off-shore glare. Obtain United States Coast Guard (USCG) approval of marina entrance marking lights. 13. Recreation: Create Second St. pedestrian walkway. Create new linear Waterfront Pathway-Park (esplanade) from Waterfront Park to Fifth St. and create lateral access points to the existing Waterfront Park and new Pathway-Park. Create a new public plaza at Washington. Ave. and Second St. and expand Waterfront Park. Provide alternative siting for Wycoff Park as approved by Puget Sound naval Shipyard (PSNS) and City Parks Dept. 14. Cultural and Archeologicah Notify State Historic Preservation Office (SHPO) if archeological resources are identified during construction. Provide Public Art in compliance with DWURP requirements. 15. Transportation: Separate pedestrian, transit, and auto traffic as proposed to enhance traffic safety. Convert Burwell St./Pacific Avenue intersection eastbound and westbound combined through/left turn lanes to left turn turn-only lanes and convert eastbound and westbound right turn only lanes to combined through/right turn lanes to provide additional capacity and improve operations to an acceptable level of service. Coordinate BTC construction staging plan with WA ST Department Of Transportation, City, Port of Bremerton, and Kitsap Transit. Coordinate construction traffic routing plan with City and Kitsap Transit. Vacate and dedicate rights of-way as described in rights of-way vacation application. Compensate the City as required by State and City laws for vacated rights of-way. 16. Public Services: Provide fire protection systems for buildings according to Uniform Fire Code requirements. Upgrade existing stormwater and water lines serving the project site as required by City's Public Works Director. Coordinate replacement of utility services with Puget Power, WA Natural Gas, US West, and City to minimize disruptions. 17. Scope of approvah This approval recognizes the preliminary, conceptual and phased nature of the project. As allowed by the zoning ordinance: a) The ultimate development with specific uses and sites may change at the time of the Final PUD application(s); b) Final PUD approval(s) shall be subject to the Final PUD approval cdteda of the zoning ordinance. Final PUD application(s) shall require signature(s) from all affected property owners signifying their acceptance of the plan and application(s). This preliminary PUD approval does not mandate participation by any or afl property owners within the boundaries of the PUD, allowing any or all property owners to utilize their property in conformance with zoning regulations. Property in the City limits of Bremerton included in this Preliminary Planned Unit Development is described as follows: LEGAL DESCRIPTIONS: Lots 9 to 14 Block 1; Lots 1 to 9 Block 2; Lots 1 to 19 Block 3; Lots 1 to 8 Block 4; Lots 1 to 29 Block 7; Lots 1 to 34 Block 8; Lots 1 to 26 Block 9; Lots 1 to 9 Block 10; Lots 1 to 50 Block 14, Town of Bremerton plat as recorded in volume 2, page 30 of the plat records of Kitsap County and the following waterfront tax lots: 242401-2-009-2006; 132401-3-015-2009; 132401-3-033-2007; 242401-2-011-2004; 24201-2-010-2003; 242401-2-055-2000; 242401-2-006-2009; 132401-3-014-2000; 132401-3-19%2007; 242401-2-004-2001; 3718-001-009-0006 PASSED by the City Council this day of March, 1997. APPROVED this DAVID FARR President, City Council day of September, 1995. ATTEST: LYNN HORTON, Mayor KATHLEEN L. McCLUSKEY, City Clerk CITY of BREMERTON Synopsis, opinion and Consensus of the Bremerton Planning Commission Regarding: "SINCLAIR LANDING" PUD (File #: PUD96-0002,) PLANNING COM?v£SSION MEETING DA TE: PREPARED BY: Jack Allingham, Senior Planner January 2I,, 1997 SUMMARY APPLICATIONS FOR PERMITS - City of Bremerton: Planned Unit Development (PUD) Shoreline Substantial Development Permit Shoreline Conditional Use Site Plan Review Right of Way Vacation Zoning Map Amendment (Zone portion of PSNS for Bremerton Transportation Center) APPLICANT: Howard S. Wright Construction Co. 425 Pontius Avenue North, Suite 100 P.O. Box 3764 Seattle, WA 98124-2264 CONTACT PERSON: Craig Norsen, Vice President ATTACI~I~ENTS: 1. Master Plan of Planned Unit Development - MI.01 2. Master Plan building Information - MI.02 3. Revised Shoreline Development Plan (JARPA) 4. Plaza Perspective Looking N - M3.01 5. Plaza Perspective Looking SE - M3.02 6. WFT Perspective looking SE - M3.03 7. Existing building and Marina Site Plan - Gl.01 8. Right of Way Property Modification - C3.01 9. Property Rezoning - C3.02 10. DWURP Land/Water Use Plan - Ex. D 11. DWLrRP Design Concepts - Ex. E FINDINGS for: PRELIMINARY PUD and ASSOCIATED APPLICATIONS BACKGROUND 1. Procedural Back~round: PROJECT DESCRIPTION: The Sinclair Landing Planned Unit Development will redevelop a significant portion of Bremerton's central business district. It includes the construction of 18 new buildings housing offices, retail stores, cinemas, residential/hotel units, a museum, parking garages. The plan also proposes a new ferry terminal referred to as the Bremerton Transportation Center (BTC). This portion includes: Terminal Building BTC Commuter Retail Building; Passenger-Only Ferry Terminal; Passenger Waiting Area -- Kalakala or similar waiting facility; Washington State Ferry and private passenger-only ferry float. These developments will have a combined total of 2,611,679 gross square feet. There will be 552,810 square feet of retail; 58,450 square feet of restaurant, and 249,874 square feet of office space. The projects will provide 99 hotel rooms, 142 residential units and parking for 2,930 vehicles. In addition, the plan proposes a floating historic ship, public plazas, waterfront esplanade, and reconfiguration of the existing marina. Other approvals necessary to undertake the plan include the vacation of portions of First Street, 2nd Street, Washington Avenues with re-dedications for right of way realignments. Also, a portion of PSNS which is currently not zoned will be zoned as "General Industry" for the Bremerton Transportation Center. The upland portion of the project site excluding City fights-of-way is approximately 22.5 acres. The marine portion is approximately 15.5 acres. For the most detailed description, please refer to the Project Manual and Plan Sheets for the Sinclair Landing Planned Unit Development & Transportation Center available for review at the Department of Community Development and the City Council's office and the attachments to this report. LOCATION OF THE PROPOSAL:. Sections 13 and 24 Township 24 North Range 1 East, Willamette Meridian The PUD is generally bounded by: Puget Sound Naval Shipyard and Park Avenue on the south and west; Fourth Street (St.) between Park and Pacific and Burwell St. between Pacific and Washington CC/ash.) on the north, and Sinclair Inlet on the east including wateneront parcels to Fifth St. PLANNED UNIT DEVELOPMENT AND SITE PLAN REVIEW PUD PROCESS A PUD application is reviewed by the City in a two-part process; review of a preliminary plan, followed by review of a final plan. The purpose of this process is to minimize development costs prior to a city determination of the acceptability of the preliminary plan, and to allow greater public involvement. The steps involved in the preliminary review outlined in Chapter VI of the Zoning Ordinance are: 2. 3. 4. 5. Conceptual review Neighborhood meeting (optional) Preliminary PUD application City departmental review Public meeting by Planning Commission The steps involved in the Final Plan are: Final PUD application City review and administrative decision Record with County Auditor Location of Project: The Sinclair Landing project is located within these general boundaries: 3 beginning from a point on the outer harbor line (at a point where the south margin of Fifth Street as extended intersects the outer harbor line); · southward along the outer harbor line to a point where the Puget Sound Naval Shipyard (PSNS) property line extends to the outer harbor line; · northwesterly along the PSNS property line as extended to the outer harbor line to the southem fight-of-way line of First Street; · westerly along the southern right-of-way line of First Street to the PSNS property line; · northerly along the PSNS property line and northerly along the lot line separating lots 22 and 23, block 13, the Town of Bremerton plat as recorded in Volume 2 ofptats, page 30 of the records of Kitsap County to the northwest comer of lot 23, block 13 of said plat; · easterly along the southern right-of-way line of Burwell Street to the southwest comer of Burwell Street and Pacific Avenue; · northerly to the northwest comer of Burwell Street and Pacific Avenue; · westerly along the northern right-of-way line of Burwell Street to the easterly right-of-way line of Park Avenue; · northerly along the easterly right-of-way line of Park Avenue to the southerly right-of-way line of Fourth Street; · easterly along the southerly right-of-way line of Fourth Street and easterly across Pacific Avenue to the eastern right-of-way line of Pacific Avenue; · southerly along the eastern right-of-way line of Pacific Avenue to the northwest comer of lot 1, block 7, of said plat; · easterly to along the northern lot lines of lots 1 through 10, block 7 of said plat to the northeast comer of lot 10, block 7 of said plat; · north along the lot line separating lots 29 and 30, block 7 of said plat to the southern right- of-way line of Fourth Street; · easterly along the southern right-of-way line of Fourth Street to the southwest comer of Fourth Street and Washington Avenue; · northerly along the western right-of-way line of Washington Avenue to the southwest comer of Fifth Street and Washington Avenue; · easterly across Washington Avenue and easterly along the lot line separating lots 8 and 9, block 4 of said plat as extended to the point of beginning at the outer harbor line. Legal Description: Lots 9 to 14 Block 1; Lots 1 to 9 Block 2; Lots 1 to 19 Block 3; Lots 1 to 8 Block 4; Lots 1 to 29 Block 7; Lots 1 to 34 Block 8; Lots 1 to 26 Block 9; Lots 1 to 9 Block 10; Lots 1 to 50 Block 14, Town of Bremerton plat as recorded in volume 2, page 30 of the plat records of Kitsap County and the following waterfront tax lots: 242401-2-00%2006; 132401-3-015- 2009; 132401-3-033-2007; 242401-2-01 t-2004; 24201-2-010-2003; 242401-2-055-2000; 242401-2-006-2009; 132401-3-014-2000; 132401-3-199-2007; 242401-2-004-2001; 3718- 001-009-0006 4 COMPREFI-ENSIVE PLAN DESIGNATION: The portion of the Master Plan located south of First Street is designated Transportation Facilities (T) and the portion of the Master Plan located north of First Street is designated Central Business District (CBD). The Downtown Waterfront Urban Renewal Plan, a sub-plan of the Comprehensive Plan assigns the following designations to property within the PUD: · the area south of First Avenue as Ferry Terminal (FT); · the area north of First Street and east of Washington Avenue as Mixed Commercial/Residential/Tourist (CRT); · the area approximately 10 feet wide measured from the top of the bluffline along the shoreline as Linear Park Pathway (LP/P); · the area bounded between the existing First Street pier on the south, the Turner Joy on the north, the ordinary high water mark on the west, and the outer harbor line on the east as Marina South (MS); and · the area west of Washington Avenue that includes buildings fronting on the west side of Washington Avenue as Waterfi-ont/CBD Transition Area (TA). ZONING DESIGNATION: The Bremerton Zoning Code designates the area east of Washington Avenue and south of First Street as Urban Renewal District (URD) and the area west of Washington Avenue and north of First Street as Business Core (BC). The Puget Sound Naval Shipyard portion of the project is not zoned, but is proposed to be rezone d General Industry (IG). PUD Phasing: The Sinclair Landing PUD is intended to be a phased PUD approval with the following uses constructed according to a phased two year schedule keyed offofthe City's Preliminary PUD approval date: Phase 1:1997 through 1999 -- Buildings 1, 2, 3,4, and 5; Phase 2:1999 through 2001 -- Buildings 8, 9, 10, 11, 20 and 23; Phase 3:2001 through 2003 -- Remainder of the PUD elements. Site area (in acres): The upland portion of the project site excluding City rights-of-way is approximately 22.5 acres. The marine portion is approximately 15.5 acres. Parking: 5 Number of existing and proposed spaces: Within the PUD boundary, there are approximately 1,500 existing spaces which will be removed. Most of these spaces are provided within substandard commercial parking lots which line the water-fi-ont. The PUD proposes to create 2,930 parking spaces in the locations and numbers as set forth in Plan Sheet M1.02. The project will develop parking spaces to meet the standard parking lot space requirements pursuant to Chapter VII, Parking Provisions, of the Zoning Code. Parking Lot Type: The proposed parking lots are a Type B which are only allowed within the CBD. Their modified development requirements take into consideration the limited space, lack of building setbacks, and other features unique to the CBD area. They will be used primarily to support Master Plan retail, office, and visitor parking requirements. Pursuant to the Parking Provisions of the Zoning Code and Figure VII-5, off-street parking is not required within the CBD-designated portion of the Master Plan that is located outside of the DWURP. Within the DWURP portion of the Master Plan, the number of parking spaces provided shall be equal to no less than 30% of the parking required in the Zoning Ordinance for areas outside the Central Business District. Other than within the DWURP area, parking is not required within the CBD. The following parking ratios and spaces required reflect the DWURP 30°,4 rule. Both the underlying zoning standards and DWURP 30 % standards are provided in the parking calculation table below. The 30% rule does not apply to parking standards associated with the BTC requirements which are specifically cited in the DWURP and provided in the table below. PARKING CALCULATION TABLE Bldg Building Use Gross Zoning DWLrRp Spaces Required Comments Sq. Ft. Ratio Ratio / Std. 1 BTC - car N/A N/A 206 206 232 spaces provided holdin~ arcs 1 BTC - transit N/A N/A 10 buses 10 buses 21 bus spaces provided deck 1 BTC - ferry N/A N/A 50 kiss/fide; 50; spaces provided in terminal 160 pass; 160; building 2 50 overflo~v; 50; and 5% of 260 for 13 employees 1 BTC -Retail 23,170 1/300 sq. ft. .31300 sq. ft. 23 1 BTC - Parking N/A N/A N/A none 14 parking spaces provided in this bldg. 2 Museum 18,650 1/400 sq. ft. .3/400 sq. ft. 14 2 Una~ed 8,196 1/300 sq. ft. .3/300 sq. ft. 8 2 Parking N/A N/A N/A none 68 kiss/ride and 714 total spaces provided 6 3 Restaurant 12,400 1/300 sq. fL .3/300 sq. ft. 12 3 Retail 37,900 1/300 sq. fl. .3/300 sq. fl. 37 3 Office 47,200 1/300 sq, ft. .3/3,00 sq. ft. 47 4 Restaurant 11,700 20+1/100 7 + .3/100 sq. ft. 42 SCl. ff.. 4 Retail 45,000 1/300 sq. l:t .3/300 scl.. fl. 45 4 Office 94,900 1/300 scl. fL .3/300 scI. ft. 95 5 Restaurant 24,900 20 + 1/100 7 + .3/100 sq. ft. 82 5 Retail 18.900 1/300 scl.lc .3/300 ~. ft. 19 5 Hotel 99 rooms 1/2 rooms + .3/2 rooms + 15 1/200 sq. ft. .3/200 sq. ft. 5 Health Club 10,717 10/1,000 3.3/1,000 sq.ft. 35 sq.ft. 6 Housing 50 2.0/d.u. .7/d.u. 35 7 Housing 70 2.0/d.u .7/d.u. 49 These uses are located within the CBD zone where off-street parkin{l is not required. 8 Retail 67,!00 N/A (C .BD) none 8 Museum 35,100 N/A (CBD) none 9 Restaurant 20,400 N/A (CBD) none 9 Retail 20,400 N/A (CBD) none 10 Retail 238,100 N/A (CBD) none 11 Retail 13,400 N/A (CBD) none 11 Cinema 37,700 N/A (CBD) none 12 Retail 38,000 N/A (CBD) none 12 Museum 22,200 N/A (CBD) none 13 Retail 52,950 N/A (CBD) none 14 Retail 64,200 N/A (CBD) none 14 Co--op/Daycare 50,100 N/A (CBD) none 14 Office 104,000 N/A (CBD) none 14 Parking N/A N/A (CBD) none 55 spaces provided 15 Waterfront Park none N/A (CBD) none 16 Waterfront none N/A (CBD) none Esplanade The marina and Historic Ship are within the DWURP Project Area and are subject to the, .30 parking r~quirement nde. 1'7 Marina 50 trans. 1/20 trans; .3/20 transient 61 up to 200 1/1 perm. .3/1 perm. 18 Historic Ship up to 1/4.00 sq. ft. .3/400 sq. ft. 38 50,000 These uses are located within the CBD zone where off-street parking is not required. 19 Ptaza none N/A (CBD) none 20 Parking Bldg. 3,025 N/A (CBD) none Retail Lobby 20 Parking N/A N/A (CBD) none 257 l~arki~g spaces provided in this bldg. 21 Parking N/A N/A (CBD) none 1592 parking spaces Building provided i.n this bldg. 22 Residential 22 N/A (CBD) none 22 Parkin{~ N/A , N/A (CBD) none 298 parking spaces 7 provided in this bldg. 23 Office 4,800 N/A (CBD) none 23 Retail 4,800 N/A (CBD) none Parking Requirements Summary_: Total parking spaces required within the PUD: 930 spaces. Total parking spaces provided within the PUD: 2,930 spaces. DWURP parking requirements for the BTC auto holding area: 206 spaces. Parking spaces provided for the BTC auto holding area: 232 spaces. Open Space: Applicable Open Space Standards: The PUD Open Space provision (BMC 21.02.500(d)) requires: (1) "There shall be a minimum of fifteen percent (15%) of the total area of a PUD dedicated as common open space, accessible to all owners or tenants of the development. Open space shall be provided for active as well as passive recreational activities, and for the preservation of existing natural site amenities whenever possible. Open space shall not include: i. Streets, alleys, and other rights-of-way. ii. Vehicular drives, parking, loading and storage areas. iii. Required buffering and landscaping for parking areas; nor iv Perimeter setback areas of the PUD project." (2)... (3) "Open space and its intended uses shall be clearly designated on the site plan. At least two-thirds of the open space area shall be suitable for active recreational purposes." The PUD provisions go on to further state: (7) "The total requirement for active open space may be reduced by no more than twenty-five percent (25%) through the provision of a recreation building, swimming pool, or similar major recreational facility that, in the opinion of the Planning Commission, will better provide for the needs of the residents without significantly detracting from the project's appearance or environmental quality." Open Space standards as applied to the Master Plan: The upland portion of the project contains approximately 22.5 acres. Applying the 15% open space standard yields a requirement for 3.38 acres of open space. Two thirds of 3.38 acres or 2.23 acres must be suitable for active recreation. The active recreation requirement may be reduced by 25% because the Master Plan will: · provide for a linear waterfront Pathway-Park, · will provide lateral access to the Pathway-Park at Fffih Street, Fourth Street and at several locations between First Street (as extended) and Fourth Street; · provide a waterfront park expansion; · provide a public water feature for children's active recreation. Summary. of required Open Space as applied to the Master Plan: Active open space requirements may be reduced to a requirement of 1.67 acres due to the construction of public recreation discussed above. Passive open space requkement totals 1.15 acres. Passive open space may be met by credits for natural features such as steep slopes or beach areas. Accounting for the 25% reduction in active open space due to providing the above-referenced public recreational facilities, 2.82 acres of open space is requked in total. Open Space provided by the Master Plan: Based on the above requirements, the Master Plan includes approximately 5.88 acres of open space which will be open to the public. The Open Space provided exceeds the required total, even if allowed deductions in active open space are not accounted. Approximately 3.76 acres of active recreational space and approximately 2.12 acres of passive recreational space will be provided. This estimate includes: the waterfront pathway/park provided by the project and the pedestrian areas located between the Second Street cul-de-sac and the existing waterfront park. Provided the existing Second Street and First Street are vacated as requested, this estimate would not include streets, alleys, and other fights-of-way as provided in the code section cked above. This estimate also includes as allowed by BMC 21.02.500, an accounting for natural areas, which in this case includes inter-tidal area to the mean lower low water elevation (0 foot). LOT DEVELOPMENT REQUIREMENTS The following tables correspond to each Downtown Waterfront Urban Renewal Plan zone and each building that is sited in a particular zone. The building numbers are the same as assigned to the buildings listed and shown on plan sheets M1.01 and M1.02. The standards cited below reflect the standards allowed under the DWURP as granted by the Design Review Board (DRB) when an addition to the Waterfront Park Pathway is included into a development proposal (The Dkector of Community Development is the acting DRB as the City Council has not established one. Design review will be undertaken at the time of building permit application when specific building designs and construction materials are known). The Sinclair Landing Master Plan will add a Park Pathway (esplanade) along the front of the development from the existing Over-water Park to Fifth Street. DWURP Ferry Terminal Area Standards as applied to: Buildinl~ 1 (BTC) , 9 STANDARD REQUIRF_aMENT PROPOSED ANALYSIS Front Yard Setback: none none N/A Rear Yard Setback: none none N/A Side Yard Setback: none none N/A Height: 50 ft. 78ft. (48 fl_ excluding Conforms (above WA Ave.) clock tower); Alloxs~ble Density: N/A N/A N/A D~velling Units: N/A N/A N/A Lot Coverage: 100% 100% Conforms Landscape Plan: Yes With Building Permits Conforms DWU-RP Commercial/Residential/Tourist Area Standards as applied to: Buildings 2, 3, 4, 5. 6, and 7 STANDARD REQUIREMENT PROPOSED ANALYSIS Front Yard Setback: none none N/A Rear Yard Setback: none none N/A Side Yard Setback: none none N/A Shoreline Setback: 25 ft from OHWM or bldgs. 45 to 60 feet from Conforms. Bluff setback subject to Geo- 10 ft. fi'om top of bluff OHWM tech. analysis. Height: S of 4th 100 fl- bldgs, fi-om 64 to 86 feet Conforms N of 4th 120 fl- above WA Ave. (above WA Ave.) Allowable Density: N/A N/A N/A I~velling Units: N/A N/A N/A Lot Coverage: 100% 100% Cbnforms Landscape Plan: Yes With Buildin~ Permits Conforms Downtown Business Core 03C) Zone as applied to: Buildings 8, 9, 10, 11, 12. 13, 14, 21 and 23. STANDARD REQUIREMENT PROPOSED ANALYSIS Front Yard Setback: none none N/A Rear Yard Setback: none none N/A Side Yard Setback: none none N/A Height: 120 ft. + if PUD 19 to 53 feet (applying Conforms BC standards) Allowable Density: N/A N/A N/A I~velling Units: N/A N/A N/A Lot Coverage: 100% 100% Conforms Landscape Plan: Yes With Buildin~ Permits Conforms PUD allows height to be varied ff PUD approval criteria met. 10 DWURP Linear Park Pathway Area Standards as applied to: the Park Pathwa,v improvements (no buildin~ proposed witl'fin the corridor) STANDARD REQUIREMENT PROPOSED ANALYSIS Front Yard Setback: none none N/A Rear Yard Setback: none none N/A Side Yard Setback: none none N/A Height: 12 ft. or per DRB no buildings proposed Conforms approval within the comdor Allowable Density: N/A N/A N/A Dwelling Units: N/A N/A N/A Lot Coverage: N/A N/A N/A Landscape Plan: Yes With Building Permits Conforms DWLrRP Marina South (MS) ~trea Standards as applied to: ' Passenger-Only Fe? Terminal, Marina Exp~ion. and Floafin~ Breakwater STANDARD REQUIREMENT PROPOSED ANALYSIS Front Yard Setlmck: N/A N/A N/A Rear Yard Setback: N/A N/A N/A Side Yard Setlmck: N/A N/A N/A Height: 25 ft. above OHWM Kalakala - (45 ft.)2 Conforms Allowable Density: N/A N/A N/A N/A Dwelling U~its: N/A N/A N/A Lot Coverage: N/A N/A N/A LandscaDe Plan: N/A N/A N/A , ,, PROPOSED SIGNAGE: Signage will be submitted in conjunction with building permits. PROPOSED LANDSCAPING: Landscaping plans w/Il be submitted in conjunction with building permits. PLANNED UNIT DEVELOPMENT REVIEW Criteria f or Action: Chapter VI, Section 15, General Development Standards of the Bremerton Zoning Ordinance states: "A PUD may be approved if it is found that the development conforms to all of the following general criteria"' PUD allows height to be varied if PUD approval criteria met. 11 The location, design, and uses of the PUD shall be consistent with the Comprehensive Plan, Bremerton Shoreline Management Program, and with other applicable plans and ordinances adopted by the City. The PUD shall be integrated with its surroundings and designed to harmonize with existing or proposed development in the neighborhood. In the case of a departure in character from the surrounding land uses, the scale, intensity and desisn shall adequately reduce the impact of the development in such a way that the project will not be detrimental to the neighborhood. The traffic generated by the PUD shall be accommodated safety without congestion on existing or planned streets. All development will be adequately served by existing or planned facilities and services. o The PUD will result in an attractive, healthful, efficient and stable environment for living, shopping, working and leisure activities. The development plan shall make adequate and appropriate provisions for the preservation of the environment, both natural and man-made, and the conservation of energy. RIGHTS-OF-WAY VACATION AND DEDICATION Request: Vacation of City of Bremerton fight-of-way a City Council initiative as allowed by RCW 35.79.010, and Acceptance by the City Council of future property dedications for City right- of-way purposes. Back ~ound: Several changes in the circulation pattern within the project will occur as follows: Pacific Avenue will be widened an additional 10 feet south of Second Street to create room for a bicycle lane and reconfigured traffic lanes, First Street will be modified to allow a grade transition from Pacific Avenue to the Washington Avenue Tunnel which will place Washington Avenue under a proposed plaza which would span the existing Washington Avenue between First and Burwell Streets. Second Street will be partially vacated and a cul-de-sac will be created off-of Pacific Avenue. Pacific Avenue, First Street, and Washington Avenue will become one-way streets to improve traffic flow, pedestrian safety, and air quality within the project area. Burwell will be realigned at the intersection with Washington Avenue and a new Burwell street end will be dedicated to the City for public access purposes. Traffic signals at the Pacific Avenue/Burwell Street and Washington Street/Burwell Street intersections will be modified to match the one-way street revisions. Additional mitigation at the Pacific Avenue./Burwell Street intersection will also be required to provide the capacity needed to serve increased traffic volumes. This added capacity will be achieved by converting the eastbound and westbound combined through/left mm lanes to left mm only lanes and converting the eastbound and westbound fight turn only lanes to combined through/fight turn lanes. To accomplish these changes, the following fights-of-way will be vacated and dedicated: Leeal description of property to be vacated: 1. First Street fight-of-way from Washington Avenue to its terminus in Sinclair Inlet: That portion of First Street lying southeasterly of the southeastern margin of Washington Avenue. 2. Washington Avenue right-of way from First Street to its terminus at the Puget Sound Naval Shipyard: That portion of Washington Avenue bounded on the north by a line between the northeast comer of Lot 6 of Block 10 and the westerly comer of Lot 1 of Block 2 of the Plat of the Town of Bremerton as filed in Volume 2 of the Plats on Page 30, Records of Kitsap County, Washington, and bounded on the west by the east line of the Puget Sound Naval Shipyard as shown on a Record of Survey filed in Volume 41 of Surveys on Page 215, Records of Kitsap County, Washington. 3. Second Street fight-of-way from Pacific Avenue to its terminus in Sinclair Inlet: That portion of Second Street lying southeasterly of the southeastern margin of Washington Avenue and that portion of Lot 1 of Block 3 of the Plat of the Town of Bremerton deeded to the City of Bremerton by deed filed under Auditor's Number 8603260082, Records of Kitsap County, Washington. ALSO That portion of Second Street between the east margin of Pacific Avenue and the northwestern margin of Washington Avenue. 4. City alley from Washington Avenue to First Street: The 14 foot wide alley in Block 10 of the Plat of the Town of Bremerton as recorded in Volume 2 of Plats on Page 30, Records of Kitsap County, Washington. 5. City alley from First Street to Second Street: The 14 foot wide alley in Block 9 of the Plat of the Town of Bremerton as recorded in Volume 2 of Plats on Page 30, Records of Kitsap County, Washington. 6. City alley abutting lots 12, 16, 17, 18, 19, 20, and 21 located between Second and Burwell Streets, Block 8: That portion of a 14 foot wide alley in Block 8 bounded on the south by the northerly limits of the previous alley vacation in said Block 8, all within the Plat of the Town of Bremerton as recorded in Volume 2 of Plats on Page 30, Records of Kitsap County, Washington. 7. City alley abutting lots 16 through 23 and lots 15 and 24, Block 7: That portion ora 14 foot wide alley in Block 7 bounded on the north by the south margin of Fourth Street and bounded on the south by the north margin of Burwell Street as shown on the Plat of the Town of Bremerton as recorded in Volume 2 of Plats on Page 30, Records of Kitsap County, Washington. 8. City alley abutting lots 11 through 15 and 24 through 29, Block 7: That portion of a 14 foot wide alley in Block 7 lying east of a line connecting the southwest comer of Lot 29 with the northwest comer of Lot 11 of said Block 7 and lying west of a line connecting the southeast comer of Lot 24 with the northeast comer of Lot 15 of said Block 7 as shown on the Plat of the Town of Bremerton as recorded in Volume 2 of Plats on Page 30, Records of Kitsap County, Washington. 9. City alley abutting Lots 22, 23, 24, and 25, Block 13 and Lot 12, Block 12: That portion of a 14 foot wide alley between Blocks 12 and 13 lying east of the west property line of said Block 12 extended north to the south line of said Block 13, all within the Plat of the Town of Bremerton as recorded in Volume 2 of Plats on Page 30, Records of Kitsap County, Washington. 10. City alley from First Street to Puget Sound Naval Shipyard: That portion ora 14 foot wide alley in Block 1 lying easterly of the east line of the Puget Sound Naval Shipyard as recorded in Volume 2 of Plats on Page 30, Records of Kitsap County, Washington 11. City alley abutting Lots 1 through 50, Block 14: A 14 foot wide alley in Block 14 of the Plat of the Town of Bremerton as filed in Volume 2 of Plats on Page 30, Records of Kitsap County, Washington; except that portion previously vacated by the City of Bremerton Ordinance No. 779. 12. West margin of Washington Avenue (within Second to Burwell Street block): Commencing at the intersection of Washington Avenue and Burwell Street; thence along the centerline of Burwell Avenue North 69° 42'58" West 35.20 feet; thence South 26° 22'22" West 30.17 feet to the northeast comer of Lot 20 of Block 8 of the Plat of the Town of Bremerton as recorded in Volume 2 of Plats on Page 30, Records of Kitsap County, and the True Point of Beginning; thence South 26° 22'22" West along the easterly line of said Block 8, a distance of 97.09 feet; thence North 29° 24'52" East 97.78 feet; thence North 69° 42'58" West 5.22 feet to the Point of Beginning. 13. East margin of Washington Avenue between First and Burwell Streets: Beginning at the intersection of Washington Avenue and Second Street; thence South 29° 24'52" West 7.00 feet; thence along a line 1.00 feet easterly of(normal to) and parallel with the centerline of Washington Avenue South 37° 37'27" West 212.22 feet to the beginning ora curve concave to the east having a radius of 89.00 feet; thence southerly along said curve an arc distance of 80.51 feet through a central angle of 51° 49'53" to the most westerly comer of Lot 1 of Block 2 of the Plat of the Town of Bremerton as filed in Volume 2 of Plats on Page 30, Records of Kitsap County, Washington; thence North 37° 37'27" East 292.57 feet along the westerly line and its extension thereof of Block 2 of said Plat; thence North 26° 22'22" East 327.59 feet along the westerly line and its extension thereof of Block 3 of said Plat; thence continuing along said westerly line of Block 3, North 12° 38'00" East 24.81 feet; thence North 88° 24'34" West 11.97 feet; thence South 29° 24'52" West 343.71 feet to the Point of Beginning. Legal description of property to be accepted for dedication: 1. Portion of Lots 16 and 17, Block 7: That portion of Lots 16 and 17 of Block 7 in the Plat of the Town of Bremerton as filed in Volume 2 of Plats on Page 30, Records of Kitsap County, Washington, lying southerly of the easterly extension of the north margin of Burwell Avenue fi-onting Lots 1 through 15 of said Block 7, from the southeast comer of said Lot 15 to the northwestern margin of Washington Avenue. 2. Second Street Cul-de-sac: All that portion of Block 9 of the Plat of the Town of Bremerton as filed in Volume 2 of Plats on Page 30, Records of Kitsap County, Washington and that portion of vacated Second Street included within the circumference of a circle having a radius of 62.50 feet, the center point of which is located as follows: Commencing at the intersection of Burwell Avenue and Pacific Avenue; thence south along the centefline of Pacific Avenue a distance of 280.02 feet to the intersection with Second Street; thence East (normal to the centerline of Pacific Avenue) a distance of 132.04 feet; thence South (parallel with Pacific Avenue) a distance of 32.60 feet to said center point. Also, all that portion of vacated Second Street lying westerly of said circumference. 3. Pacific Avenue expansion fi-om Second to First Streets: The west 8 feet of Lots 1 through 7 inclusive of Block 9 of the Plat of the Town of Bremerton as filed in Volume 2 of Plats on Page 30, Records of Kitsap County, Washington. 4. Extension of Burwell Street fi-om Washington Avenue to the mean higher high water line: That portion of Lots 11 through 14 of Btock 3, the vacated 14 foot wide alley fronting thereon and uplands and tidelands fronting thereon lying within a strip of land 60 feet in width being the easterly extension of that portion of Burwell Avenue fi'onting Lots 1 through 15 of Block 7 and Lots 21 through 34 of Block 8, all within the Plat of the Town of Bremerton as filed in Volume 2 of Plats on Page 30, Records of Kitsap County, Washington. 5. Western margin of Washington Avenue (within Second to Burwell Street block): That portion of Block 8 of the Plat of the Town of Bremerton as filed in Volume 2 of Plats on Page 30, Records of Kitsap County, Washington, described as follows: Commencing at the intersection of Washington Avenue and Second Street; thence along the centerline of Second Street, North 63 ° 37'38" West 35.00 feet; thence North 26° 22'22" East 30.00 feet to the southeast comer of Lot 15 of said Block 8 and the True Point of Beginning; thence North 26° 22'22" East along the easterly line of said Block 8 a distance of 158.93 feet; thence South 29° 24'52" West 159.16 feet to the south line of said Lot 15; thence South 63° 37'38" East 8.45 feet along said south line to the Point of Beginning. 6. Pacific Avenue expansion at comer of Pacific and First Street: That portion of Lot 1 of Block 9 of the plat of the Town of Bremerton as filed in Volume 2 of Plats on Page 30, Records of Kitsap County, Washington, described as follows: Beginning at the southeast comer of the west 8 feet of said Lot 1; thence East along the south Line of said Lot 1 a distance of 10.00 feet; thence Northwest on a straight line to a point on the east line of said west 8 feet of Lot 1, a distance of 35.00 feet North from the Point of Beginning; thence South along said east line 35.00 feet to the Point of Beginning. BASIS FOR THE REQUEST TO VACATE SURPLUS: The above requested vacations are sought in order to develop the proposed Sinclair Landing Master Plan. Vacation of public streets and alleys will serve the following purposes: · create access into the proposed Bremerton Transportation Center, create adequate area for the ultimate Ferry Terminal and adequate area for off-street Ferry Terminal auto holding area as is consistent with the Downtown Waterfront Urban Renewal Plan (requests 1, 2, 4 and 10); · create a pedestrian-oriented and auto-free Washington Avenue Plaza and create a new public waterfront underground parking lot (request 3); · vacate the remainder of a partially-vacated alley (Block 8) in order to create a consolidated development parcel (request 6); create consolidated development parcels that are currently bisected by alley ways (requests 5, 7, 8, and 9); · create a new public parking garage to be built in association with the Master Plan improvements (requests 3 and t 1); and · align Washington Avenue with the proposed Washington Avenue tunnel which will allow the development ora pedestrian plaza which links the upland portions of the project to the waterfront portions (requests 12 and 13). Dedication · of property for City rights-of-way will serve the following purposes: create a new waterfront street end (Burwell Street) to enhance public access to the waterfront which will, in conjunction with the creation of the new waterfront esplanade and new Fourth Street and Fifth Street public access, compensate for the vacation of First and Second Streets (dedication requests 1 and 4); align Washington Avenue with the proposed Washington Avenue tunnel which will allow the development ora pedestrian plaza which links the upland portions of the project to the waterfront portions (dedication request 5); allow for the creation of a new Second Street cul-de-sac which would serve the proposed Master Plan area (dedication request 2); create additional right-of-way to permit a dedicated left mm lane at Pacific and First Street (dedication requests 3 and 6). Consistency with the Comprehensive Plan, Shoreline Management Master Program, and other state and local law: Comprehensive Plan: Comprehensive Plan Economic Objectives establish the following goals: · to stabilize local economic fluctuations; · strengthen the tax base; · create new jobs. These goals can be best achieved by creating retail, office, transportation, and pedestrian improvements that attract new businesses and the public. The proposed Master Plan and its associated vacations will create parcels that optimize the development potential of private land while also optimizing public benefits such as increased public access to the waterfront and increased economic and employment benefits associated with the development of the Master Plan. The Comprehensive Plan establishes as a sub-plan the Downtown Waterfront Urban Renewal Plan (DWURP). The DWURP establishes the following policies that are relevant to the vacation request: 1. Develop the downtown Bremerton Waterfront area to its highest economic and social potential and take advantage or the site's unique public and natural resources and amenities; 2.Increase private sector employment in the Project Area; 3. Promote development of a high intensity, water-oriented, diversified environment that will be a draw to visitors, ferry users and local people. Cultural, recreational and commercial activities are encouraged. Desirable uses include office, hoteL/conference center, museum/cultural, and residential facilities; 4. Route circulation flow so as to minimize conflicts between ferry users and local traffic, and between motorized vehicles, bicycles and pedestrians; 5. Unneeded right-of-way shall be reconfigured to provide a more appealing pedestrian environment, through such features as wider sidewalks, plantings, street furniture, etc. 6. The City will vacate Washington south of first Street in order to expand the Ferry Terminal Area to the northwest; 7. The primary function of First Street east of Washington shall be to provide local access to the fishing pier, marina, pathway-park system and adjacent business. It shall also provide supplementary access to the Ferry Terminal Area; and 8. Second Street shall provide two-way vehicle access into the Project Area from Washington Avenue, with priority given to pedestrians. Vacating the requested areas satisfies the first three policies by creating an optimal development that is capable of attracting private investors, retailers, and the public. Policies four and five also support optimizing the Master Plan's economic development potential by creating an attractive pedestrian-oriented retail environment. The proposed Master Plan with its focus on pedestrian waterfront access and access to retail and other uses will help insure that the economic development policies of the DWUP, P are met. Vacating portions of Washington Avenue, portions of First Street, Second Street, and the alley between Washington and Fkst Street will create a ckculation pattern that separates vehicular and pedestrian uses and therefore creates consistency with the forth and fifth policies listed above. The separation of incompatible uses for both public safety and economic reasons support the vacation of the requested public fights-of-ways. Vacating Second Street will also achieve the pedestrian-oriented focus of the eighth policy listed. The primary purposes of the existing First Street right-of-way, establishing pedestrian access to the waterfront, will be maintained by the dedication of the extension of Burwell Street, the creation of public access at Fourth Street and Fifth Street, the establishment of the waterfront esplanade, and the maintenance of public access at the current First Street location by the proposed pedestrian hillclimb which is located immediately to the north of the Commuter Retail Building. The hillclimb will provide pedestrian access to the passenger-only ferry, to the marina, to the Pathway-Park, and to businesses located in the immediate area. Shoreline Master Prom-am: The City's Shoreline Master Program defers to the DWURP as the controlling document in most circumstances. The following Master Program policies also apply to the vacation of streets and alleys: 1. Vacation of right-of-way: The City shall vacate public right-of-way abutting a body of salt or fresh water only in compliance with RCW 35.79.035 RCW 35.79.035(1) A city or town shall not vacate a street or alley if any portion of the street or alley abuts a body of flesh or salt water unless: ... The vacation is sought to enable a city or town to implement a plan, adopted by resolution or ordinance, that provides comparable or improved public access to the same shoreline area to which the streets or alleys sought to be vacated abut, had the properties included in the plan not been vacated. The proposed vacation of First and Second Streets will serve the public use by creating developable areas that are necessary to allow the construction of an enlarged public transportation center and adjacent public garage that will serve the citizens of the City of Bremerton and the larger Kitsap County community. The Master Plan is designed to permit the construction of these public uses. In addition to creating these public uses, the Master Plan will improve public access to the shoreiine. Proposed access will occur at six linear or perpendicular access points along the shoreline including the newly dedicated Burwell Street extension and the proposed Fourth Street and Fifth Street improvements. By comparison, there are currently two existing lateral access points at First and Second Street. In addition to creating additional lateral access points to the shoreline, the Master Plan will create a new shoreline Pathway-Park from the existing over-water park to Fifth Street. All proposed access points will be fully open to the public pursuant to a development agreement with the City or by dedication to the City. The adoption of the shoreline access plan described above and incorporated into the Master Plan PUD submittal will not only create comparable public access to what now exists but will in fact, create superior public access to the shoreline. The Master Plan design which allows the creation of the proposed enhanced public access points and the public transit and garage facilities would not be possible if the existing rights-of- ways were not vacated. Public interest will be served bv this right-of-way vacation: Vacating the requested streets and alleys within the Sinclair Landing Master Plan will serve the following public interests: A new public Bremerton Transportation Center (BTC) which meets the necessary requkements for off-sWeet auto holding capacity, for Kitsap Transit bus capacity, for sheltered commuter waiting areas, and for commuter retail services will be constructed. · New public underground and above ground parking garages which will meet the parking demands associated with the Sinclair Landing proposal will be constructed. · Public access to the shoreline will be increased by vacating the existing rights-of- ways which permit the creation of a development pattern that establishes new additional waterfront access points. · Developing an optimal Master Plan design will create attractive public spaces such as the Washington Avenue Plaza (proposed), the waterfront esplanade (proposed), attractive public buildings CBTC), and private retail, office, hotel, and other uses that will attract the public and new businesses into the downtown core. · Public tax revenues from property tax and retail sales taxes will be increased by creating an Master Plan layout that optimizes public amenities and optimizes retail and other private commercial space which will be desirable to retailers, other businesses, and the general public. · Creating an optimal Master Plan layout will attract businesses and create new jobs within the Bremerton community. Easement and existing utilities that abut or cross the proposed vacation: Existing and proposed utilities are illustrated on the Utilities Improvement Sheets on the Sinclair Landing Master Plan PUD plan sheet submittal. APPLICATION FOR ZONE RECLASSIlrlCATION (REZONE) Title Holder: Puget Sound Naval Shipyard Farragut Avenue Bremerton, WA 98314-5001 Property_ Location: Address: 221 First Street General location: The property is generally located on Lots 1 through 5 of the Town of Bremerton plat as recorded in volume 2, page 30 of the plat records of Kitsap County and the former City right-of-way fronting lots 1 through 5, Block 10 and Lots 10 through 14, Block 11 of said plat. See Plan Sheet C3.02 dated 28 August 1996. Comprehensive Plan Designation: Heavy Industrial Current Zoning: The subject property is not currently zoned by the City of Bremerton. Requested Zoning: General Industry Basis for request: The area subject to this application will be used for a new access drive into the Bremerton Transportation Center (BTC). The proposed access drive will enter the BTC at the point where Pacific Avenue intersects with First Street. This access location wilt allow for direct access into the BTC auto holding area from Pacific Avenue. The proposed access route will allow for additional auto holding capacity so as to prevent autos waiting for ferry service from backing up onto City streets. The property subject to this application is proposed to be transferred from PSNS ownership and into ownership of the BTC operator. The proposed access area is currently not zoned because the property is PSNS owned and not subject to City zoning. Once the property is transferred out of PSNS ownership, some form of zoning must be applied to the property by the City. In that the current Comprehensive Plan designation is Heavy Industrial, the zoning proposed to be applied to the subject property, General Industry, is fully consistent with the Comprehensive Plan. Access drives are a permitted use within the General Industry zone. Criteria for approval: This rezone request can be approved by the Bremerton City Council only if alt of the following criteria can be met. 1. The rezone is substantially consistent with the Comprehensive Plan: 20 ¢7 The proposed General Industry designation is the zoning equivalent of the existing Comprehensive Plan Heavy Industrial designation. No other City zoning designation is more consistent with the .Comprehensive Plan designation. The proposed access drive is a permitted use under the proposed zoning. 2. The rezone is necessary because either: a. Conditions m the immediate vicinity have so markedly chc~ged that a rezone is required in the public interest; The subject property will come out of PSNS ownership which is not subject to City zoning and some form of City zoning must be applied in order to approve the proposed BTC access drive. Although the policy of not applying City zoning to PSNS property is appropriate when there is federal ownership, the current circumstances dictate the application of City zoning in that the subject property which will no longer be held by the Navy. b. The rezone will correct a zone classification or zone boundary that ,vas inappropriate when establishe& or The lack of any zone classification was appropriate when the City adopted zoning in this area. However, the change of ownership necessitates the application of the proposed zoning. See the response to 2a above. c. The rezone is to place or remove an overlay zoning designation on the Zoning Map; This element is not applicable to of the proposed zoning request. 3. The rezone would not result in adverse environmental consequences; The proposed zoning request would allow the creation of an access drive into the BTC. Previously prepared environmental assessments for the BTC indicate that the construction of the BTC will improve air quality by better integrating auto and transit service into downtown traffic patterns. Further environmental benefits associated with the zoning request and BTC project include the separation of auto, transit, and pedestrian traffic which will create a safer and more convenient use of transit and ferry services. The impacts to the environment associated with the construction of the entire BTC and other Sinclair Landing Master Plan improvements will be analyzed by the City in association with the Sinclair Landing Master Plan PUD SEPA review. The rezone bears a substantial relation to the public interest or welfare becanse there is a public need for a change of the kind m question; and that imtblic need will be best served by changing the zoning classification of the subject property; The proposed zoning will allow the construction of an access drive which is necessary to developing the proposed BTC, a public/private development project which will provide enhanced public transit and public ferry services and new commuter retail services to the commuting public. The existing transportation cemer functions poorly, lacks adequate auto storage capacity, and creates by its current configuration auto, transit, bicycle, and pedestrian safety problems and circulation conflicts. The proposed access configuration that requires the acquisition of PSNS property and that requires the zoning map amendment will correct the public safety and circulation conflict problems. The proposed access location creates a superior BTC entrance alignment off of Pacific Avenue and maximizes the auto holding capacity of the BTC which minimizes the potential of autos waiting for ferry service backing onto and blocking City streets. The proposed BTC will also enhance local and state tax revenues due to the increased property valuation of the privately owned Commuter Retail Building portion of the BTC and the retail sales associated with the commuter retail function of the BTC. Essential public facilities and services are presently available and adequate, or can be reasonably be made available; The area proposed for zoning could use public police and fire services which are present within the downtown area. Sewer, water, and electricity would be used for the operation of the auto ferry toll booths and associated office space. All utility services are present at the site. 6. b~ the case ora City-initiated area-wide rezone only: The rezone is area-wide in scope, the action directly and similarly affects a significant class of properties rather than individual parcels. This element is not applicable to the proposed zoning request. SHORELINE MANAGEMENT SUBSTANTIAL DEVELOPMENT PERMIT AND SHORELINE CONDITIONAL USE PERMIT 22 The Bremerton Shoreline Master Program defines &tbstcattial Development as: "Any development of which the total cost or fair market value, whichever is higher, exceeds two thousand five hundred dollars ($2,500), or any development which materially interferes with normal public use of the water or shorelines of the state ..... ". Also, Conditional Use Permits (CUPs) are issued for proposed substantial development activity when the activity is classified as a Conditional Use in the Shoreline Use/Activity Matrix (Table 3-1). The purpose of the Conditional Use Permit is to allow greater flexibility in the application of the Shoreline Program. Proposed Uses: The following uses are proposed for development within shoreline jurisdiction under a Substantial Development Permit: · removal of existing buildings within shoreline jurisdiction; · removal of the existing First Street pier; · removal of existing First Street pier fill and bulkhead; construction of an approximately 140 foot long bulkhead which would interconnect to existing bulkheads; the proposed new bulkhead would be constructed in the dry behind the existing bulkhead and the old bulkhead and fill that occupies the intertidal area would be removed at low tide once the new bulkhead is installed; · removal of existing piles and pile-supported deck underneath the Topside/Wheelhouse and replacement with a concrete deck and concrete pilings; · relocation (partial) of the existing marina -- no new moorage slips are proposed as part of this substantial development permit; · up-sizing of the existing storm drain outfall at the BTC from 18 inches to 36 inches; · Construction of the following: · the Bremerton Transportation Center (BTC) which includes: · Ferry/Transit Building and ticket sales structures; · Commuter Retail Building; · transit deck; · reconstruction of auto holding deck and access/egress lanes; · new passenger-only fen5, float; passenger ferry waiting area (the Kalakala or other equivalent); and access ramp to waiting area; · partial relocation of the existing 50 slip marina and relocation of the existing floating breakwater; installation of new slips to retain the pre- existing 50 slips; · mooring dolphins and access ramp to the Historic Ship; · repositioning and possible re-anchoring of Turner Joy; · underground parking garage for approximately 1,400 cars and retail/museum space; · expansion of existing waterfront park; · two mixed-use retail and office buildings; · a hotel/retail building; · two parking and residential use buildings; · waterfront esplanade and retaining wall; and · street, sidewalk, utility and other similar project improvements. The following uses are proposed for development under shoreline jurisdiction under a Shoreline Conditional Use Permit which is subject to final approval by the Department of Ecology: · relocation of the existing floating breakwater which will occur in conjunction with the relocation of the existing marina slips; and · siting a Nstoric ship, a floating maritime museum use which is designated as a conditional use under the City's Shoreline Master Program. Location of proposed project: The improvements within shoreline jurisdiction occur within Sections 13 and 24, TownsNp 24 North, Range 1 East, Willamette Meridian. The portion of the Master Plan witNn the City ofBremerton's shoreline jurisdiction occurs generally within the following boundaries: · beginning fi.om a point on the outer harbor line (at a point where the northerly lot line of Lot 8, Block 4, Town of Bremerton plat as recorded in volume 2, page 30 of the plat records of Kitsap County as extended intersects the outer harbor line); · southward along the outer harbor line to a point where the Puget Sound Naval Shipyard (PSNS) property line (which is the same as the southern lot line of Lot 9, Block 1 of said plat) extends to the outer harbor line; · northwesterly along the PSNS property line as extended to the outer harbor line to the easterly right-of-way line of Washington Avenue; · northerly along the eastern right-of-way of Washington Avenue to the northwest comer of Lot 8, Block 4 of said plat; · westerly along the northern lot line of Lot 8, Block 4 of said plat to the point of beginning. Use Location: The City of Bremerton Shoreline Master Program designates the upland portion of the site as Downtown Waterfi'ont Upland (DW/U) and the marine portion of the project as Downtown Waterfront Marine (DW/M). Chapter 3, Environment Designations and Kequkements describes the use of the Downtown Waterfront/Upland and Downtown Waterfront/Marine (overwater): Downtown Waterfront: This designation is a special Urban Commercial designation for the downtown shoreline area that is subject to the Bremerton Downtown Waterfront Urban Renewal Plan. This area is located along the west shore of the Port Washington Narrows where it meets Sinclair Inlet. It is bounded on the south by PSNS; on the west by the west side of Washington Avenue; on the north by the extension of Sixth Street; and on the east by the Outer Harbor Line. The intent of this designation is to encourage development of the downtown waterfront into a vital, attractive water-oriented area that maximizes opportunities for large numbers of people to interact passively and actively with the shoreline for leisure and enjoyment. It is characterized by m/xed water- dependent, water-related, and water-enjoyment uses. The Downtown Waterfront designation is divided into two sub-areas: Upland and Marine. Downtown Waterfront/Marine (Over-water) (DW2): This designation consists of the area waterward of the OHWM. It includes areas designated Ferry Terminal, Pathway-Park, Marina/South and Marina/North by the Urban Renewal Plan. Water access and moorage facilities including piers and docks are permitted activities identified in the Shoreline/Use Matrix (SMP, Table 3-1, page 2 of 3). The proposed development is consistent with the Goals and Policies of the SMP and complies with the regulations. ENVIRO~NT-SPEC~C REGULATIONS Downtown Waterfront Environment: 1. Downtown Waterfront Environment: Public access shall be provided in accordance with the adopted Downtown g"aterfront Urban Renewal Plan. 2. Downtown Waterfront/Upland: Permitted: Water-dependent uses; water-related uses; water-enjoyment uses, as defined herein, which may include museums, restaurants, and mixed-use commercial. 3. Downtown Waterfront/Marine Environment: Permitted: Water-dependent uses; water-related uses. Permitted subject to Conditional Use Permit: Over-water restaurants; aquariums; floating maritime museums (e.g. ships open to the public for tours); other water-enjoyment uses, as defined herein: PROVIDED, Approval of such uses is contingent upon compliance with the following criteria: 1) The use provides an opportunity for a substantial number of people to enjoy the waterfront area. For restaurants and aquariums, access to and on the seaward-side of the structure shall be provided for patrons and the public. 2) Large ships open to the public for tours should be located north of Burwell Street, to prevent degradation of views from the downtown business core. 3) Restaurants and aquariums shall not exceed seventy-five (75) feet in width, and not exceed twenty-five (25) feet in height,, measured from the Ordinary High Water Mark (OHWM). 4) Ail structures shall be designed to be attractive and unobtrusive. 5) The structures shall be built on pilings or float. Landfill waterward of the OHWM is not allowed. 6) The use is compatible with water-dependent uses of the area. Evaluation of compatibility will consider: 26 a) Demands for the site by water-dependent uses (e.g. ferry terminal, foot ferry, shipyard); b) The effect on the usefulness of adjacent areas for water- dependent uses; c) The probability of attracting additional desirable water- dependent or undesirable non-water-dependent uses; d) Subsidies or other help offered by the developer to support nearby water-dependent uses. The project is consistent with these requirements, including provisions for enhanced public recreational opportunities and physical public access to the shoreline in accordance with the adopted Downtown Waterfront Urban Renewal Plan. Criteria for Action: Approval of a Shoreline Substantial Development Permit must be based upon compliance with criteria from the following documents: The State Shoreline Management Act (SMA): The Shoreline Management Substantial Development process, including public notification and a 20-day review period, have been processed in conformity with the requirements of the State Shoreline Management Act. In general, shoreline permits are reviewed by the City using the same procedures used for zoning permit applications when a Shoreline Substantial Development Permit is required. The permit application will be reviewed and approved, approved with conditions, or denied by the Bremerton City Council with final approval for shoreline conditional use approved by the Washington State Department of Ecology. Construction of the proposed project is not authorized until twenty days have lapsed from the date of final decision by the Department of Ecology, or until any appeal procedures have been completed. Applicable Use/Activity Goals, Policies And Regulations: Development necessary to undertake and complete the PUD are subject Bremerton Shoreline Master Program's goals, policies and regulations pertaining to the following uses and activities: · Marine Bluff Review, p. 4-4 · Public Access, p.4-7 · Signs, p. 4-15 · View Protection, p. 4-21 · Commercial Development, p. 5-7 · Recreational Development, p.5-18 · Residential Development, p.5-20 Utilities, p. 5-27 · Water Access and Moorage Facilities, p. 5-29 · Shore Modification, p. 6-2 · Bulkheads and Seawalls, p. 6-17 · Grading and Drainage, p. 6-28 View protection: Proposed buildings within the PUD will exceed 35 feet above the average grade level. The buildings within the Master Plan will be designed to comply with Downtown Waterfront Urban Renewal Plan (DWURP) policies that require the maintenance of view corridors within the downtown waterfront redevelopment area. The plan provides for view corridors which are consistent with the DWURP's view corridor requirements. Conditional Use: Floating breakwaters and floating maritime museums are permitted as a Shoreline Conditional Use permit. WAC 173-14-140 Review criteria for conditional use permits states that conditional uses may be authorized provided the applicant can demonstrate all of the following: 1. That the proposed use is consistent with policies of RCW 90.58.020 and the policies of the Bremerton Shoreline Master Program; 2. That the proposed use will not interfere with the normal public use of the shorelines; 3. That the proposed use of the site and design of the project is compatible with other permitted uses within the area; 4. The proposed use will cause no unreasonable adverse effects to the shoreline environment in which it is to be located; 5. That the public interest suffers no substantial detrimental effect. In addition, when considering the application, consideration must be given to the cumulative impact of additional requests for similar actions in the area.~ aln other words, if comparable developments were permitted by CUP in the area where similar circumstances exist, the total of the developments must also be consistent with the SMA and must not produce substantial adverse effects to the shoreline environment. Relocating an existing breakwater and developing facilities for a floating maritime museum is consistent with the criteria necessary for granting a conditional use. SEPA: Compliance with the State Environmental Policy Act: A mitigated environmental threshold determination of non-significance (MDNS) was issued by the Responsible Official on December 4, 1996 for this project. The City of Bremerton determined that the project as proposed, as mitigated under City, State, and Federal laws, and as subject to the agreed upon mitigation, will not have a probable significant adverse impact on the environment. An environmental impact statement was not required under RCW 43.21C. This decision was made after the review of: an expanded environmental checklist and technical reports prepared for the PUD; the City of Bremerton Downtown Waterfront Urban Renewal Plan (DWURP) FEIS; the Bremerton Ferry Terminal FEIS; and other information on file with the City of Bremerton. The DWURP FEIS and the discussion of impacts and mitigation in the areas of soils and topography, water quality and fisheries habitat, transportation and parking, utilities, aesthetics and views, and economics were incorporated by reference into this threshold determination. Mitigation: The following were the conditions of mitigation which should be carried over to the PUD approval: 1. Earth: Implement a temporary erosion and sedimentation control plan (TESCP)as approved by the City. Minimize exposed soil during construction.; construct truck tire cleaning areas; cover dump beds as required by state law; cover stockpiled earth and exposed cuts; route runoff.to temporary sedimentation ponds; employ best management practices to control erosion; construct a concrete truck wash-down area; periodically sweep the streets with street sweepers; and phase construction, to minimize exposed areas. 2. Air: Implement erosion control measures as approved by the City. Minimize area of exposed soil during construction, or demolition; hose debris during demolition; construct truck tire cleaning area; cover dump beds as required by state law; cover stockpiled earth and exposed cuts; employ best management practices; periodically wet sweep streets. Comply with Puget Sound Air Pollution Control Agency (PSAPCA) Regulation 1, Section 9.15 requiting reasonable precautions to avoid dust emissions. Implement proposed Planned Unit Development (PUD) traffic, transit, and pedestrian improvements to improve circulation. 3. Surface, Ground, and RunoffWater Impacts: Locate existing surface parking areas underground and partially cover the Bremerton Transportation Center (BTC) car waiting areas. Install and maintain oil/water separators as required by City stormwater regulation. Implement: WA. ST Department of Wildlife's Hydraulic Project Approval (I-[PA) conditions; U.S. Army Corp of Engineer's Section 10 conditions; applicable local, state, and federal water quality guidelines. Use concrete marina floats; use concrete or steel pilings instead of'creosote wood pilings; construct interconnecting replacement First St. bulkhead in the dry. 4. Plants: Use landscaping plants or similar measures to provide replacement vegetation on the site. Incorporate street and public space landscaping into project as proposed. 5. Wildlife: Remove existing First St. Dock and approximately 120 creosote timber pilings which covers 12,600 square feet of intertidal area. Remove existing First St. fill which covers intertidal area. Remove 45 creosote timber pilings that support the Wheelhouse deck. Implement HPA and Corps Section 10 conditions. 6. Ener~: Conform with applicable City and State energy code requirements. Create new pedestrian facilities as proposed to reduce auto energy use. Implement one-way couplet street system, and other circulation improvements to increase transportation efficiencies and lower energy use. 7. Environmental Heath: Property or business owners to comply with applicable local, state, or federal law regulating the storage, handling, or use of hazardous materials. 8. Noise: Properly size and maintain equipment mufflers, engine intake silencers, engine enclosures; mm off.idling equipment; restrict noisy operations fi-om 6:30 A.M. to 9:00 P.M. unless special circumstances approved by construction manager. Construct BTC as proposed which serves as noise barrier between terminal and waterfront park. Place Wash. Ave. below grade to reduce traffic noise in Washington Ave. pedestrian plaza. 9. Land, Shoreline Use, Housing: Create approximately 79 additional housing units than exist. Create new commercial and redevelop commercial space as proposed. Provide business relocation assistance as required by state law. 10. Land Use Planning: Incorporate uses -- retail, parking, office, entertainment, transit as permitted under zoning. Preserve views to Sinclair Inlet in conformance with Downtown Waterfi'ont Urban Renewal Plan (DWURP). Create: Washington. Ave. plaza; open space adjacent to Waterfront Park; and linear water~ont Pathway-Park. Relocate marina as recognized in the City's DWURP Design Element. 11. Aesthetics: Create view corridors through waterfront and along Burwell St. as proposed to preserve views. Create linear waterfront pathway as proposed to view Sinclair Inlet and other natural attractions. Conform to City zoning with regards to height and bulk as applied through PUD process. Comply with City's Design Review standards. Place current waterfront parking below the surface as proposed. 12. Light and Glare: Design lights within BTC and relocated marina so as to not create off- shore glare. Obtain United States Coast Guard (USCG) approval of marina entrance marking lights. 13. Recreation: Create Second St. pedestrian walkway. Create new linear Waterfront Pathway-Park (esplanade) from Waterfront Park to Fifth St. and create lateral access points to the existing Waterfront Park and new Pathway-Park. Create a new public plaza at Washington. Ave. and Second St. and expand Waterfront Park. Provide alternative siting for WycoffPark as approved by Puget Sound naval Shipyard (PSNS) and City Parks Dept. 30 14. Cultural and Archeoloaical: Notify State Historic Preservation Office (SHPO) if archeological resources are identified during construction. 15. Transportation: Separate pedestrian, transit, and auto traffic as proposed to enhance traffic safety. Convert Burwell St./Pacific Avenue intersection eastbound and westbound combined through/left turn lanes to left mm mm-only lanes and convert eastbound and westbound right mm only lanes to combined through/right turn lanes to provide additional capacity and improve operations to an acceptable level of service. Coordinate BTC construction staging plan with WA ST Department Of Transportation, City, Port of Bremerton, and Kitsap Transit. Coordinate construction traffic routing plan with City and Kitsap Transit. 16. Public Services: Provide fire protection systems for buildings according to Uniform Fire Code requirements. Upgrade existing stormwater and water lines serving the project site as required by City's Public Works Director. Coordinate replacement of utility services with Puget Power, WA Natural Gas, US West, and City to minimize disruptions. CONCLUSIONS Comprehensive Plan: The PUD and associated applications are consistent with the Bremerton Comprehensive Plan. Zoning/DWURP: The PUD and associated applications comply with the provisions of the Bremerton Zoning Ordinance and Downtown Waterfront Urban Renewal Plan. Shoreline: Uses and development adjacent to the shoreline are consistent with the Bremerton Shoreline Mater Program and meet the minimum criteria for granting conditional uses for a floating maritime museum/historic ship and relocation of the floating breakwater pier. Rezone: The proposed zoning of the portion of PSNS to IG to be used for development of the Bremerton Transportation Center meets the criteria for granting the zoning change. R-O-W: The proposed rights of way to be vacated along with the proposed areas for dedication meet the criteria necessary for granting the vacations RECOMMENDATION The Bremerton Planning Commission recommends APPROVAL of all applications subject to the following conditions: MODEL MOTIONS BE IT RESOLVED, it is hereby the opinion and consensus of the Bremerton Planning Commission, after considering oral and written comments, that the Planned Unit Development for "Sinclair Landing" and its associated applications should be approved by the Bremerton City Council subject to the following conditions of mitigation: Mitigation: 1. Earth: Implement a temporary erosion and sedimentation control plan (TESCP)as approved by the City. Minimize exposed soil during construction.; construct truck tire cleaning areas; cover dump beds as required by state law; cover stockpiled earth and exposed cuts; route runoff.to temporary sedimentation ponds; employ best management practices to control erosion; construct a concrete truck wash-down area; periodically sweep the streets with street sweepers; and phase construction, to minimize exposed areas. 2. Ai___r: Implement erosion control measures as approved by the City. Minimize area of exposed soil during construction, or demolition; hose debris during demolition; construct track tire cleaning area; cover dump beds as required by state law; cover stockpiled earth and exposed cuts; employ best management practices; periodically wet sweep streets. Comply with Puget Sound Air Pollution Control Agency (PSAPCA) Regulation 1, Section 9.15 requiring reasonable precautions to avoid dust emissions. Implement proposed Planned Unit Development (PUD) traffic, transit, and pedestrian improvements to improve circulation. 3. Surface, Ground, and Runoff.Water Impacts: Locate existing surface parking areas underground and partially cover the Bremerton Transportation Center (BTC) car waiting areas. Install and maintain oil/water separators as required by City stormwater regulation. Implement: WA. ST Department of Wildlife's Hydraulic Project Approval (HPA) conditions; U.S. Army Corp of Engineer's Section 10 conditions; applicable local, state, and federal water quality guidelines. Use concrete marina floats; use concrete or steel pilings instead of creosote wood pilings; construct interconnecting replacement First St. bulkhead in the dry. 4. Plants: Use landscaping plants or similar measures to provide replacement vegetation on the site. Incorporate street and public space landscaping into project as proposed. 5. Wildlife: Remove existing First St. Dock and approximately 120 creosote timber pilings which covers 12,600 square feet of intertidal area. Remove existing First St. fill which covers intertidal area. Remove 45 creosote timber pilings that support the Wheelhouse deck. Implement I-t2PA and Corps Section 10 conditions. 6. Energy: Conform with applicable City and State energy code requirements. Create new pedestrian facilities as proposed to reduce auto energy use. Implement one-way couplet street system, and other circulation improvements to increase transportation efficiencies and lower energy use. 7. Environmental Heath: Property or business owners to comply with applicable local, state, or federal law regulating the storage, handling, or use of hazardous materials. 8. Noise: Properly size and maintain equipment mufflers, engine intake silencers, engine enclosures; mm offidling equipment; restrict noisy operations from 6:30 A.M. to 9:00 P.M. unless special ckcumstances approved by construction manager. Construct BTC as proposed which serves as noise barrier between terminal and waterfront park. Place Wash. Ave. below grade to reduce traffic noise in Washington Ave. pedestrian plaza. 9. Land, Shoreline Use, Housing: Create approximately 79 additional housing units than exist. Create new commercial and redevelop commercial space as proposed. Provide business relocation assistance as required by state law. 10. Land Use Planning: Incorporate uses -- retail, parking, office, entertainment, transit as permitted under zoning. Preserve views to Sinclair Inlet in conformance with Downtown Waterfront Urban Renewal Plan (DWURP). Create: Washington. Ave. plaza; open space adjacent to Waterfront Park; and linear waterfront Pathway-Park Relocate marina as recognized in the City's DWLrR.P Design Element. 11. Aesthetics: Create view corridors through waterfront and along Burwell St. as proposed to preserve views. Create linear waterfront pathway as proposed to view Sinclair Inlet and other natural attractions. Conform to City zoning with regards to height and bulk as applied through PUD process. Comply with City's Design Review standards required by the DWURP. Place current waterfi'ont parking below the surface as proposed. 12. Li~t and Glare: Design lights within BTC and relocated marina so as to not create off- shore glare. Obtain United States Coast Guard (USCG) approval of marina entrance marking lights. 13. Recreation: Create Second St. pedestrian walkway. Create new linear Waterfront Pathway-Park (esplanade) fi.om Waterfront Park to F~h St. and create lateral access points to the existing Waterfront Park and new Pathway-Park. Create a new public plaza at Washin~on. Ave. and Second St. and expand Waterfront Park. Provide alternative siting for WycoffPark as approved by Puget Sound naval Shipyard (PSNS) and City Parks Dept. 14. Cultural and Archeolo~cal: Notify State Historic Preservation Office (SI-IPO) if archeological resources are identified during construction. Provide Public Art in compliance with DWURP requirements. 15. Transportation: Separate pedestrian, transit, and auto traffic as proposed to enhance traffic safety. Convert Burwell St./Pacific Avenue intersection eastbound and westbound combined through/left turn lanes to left turn turn-only lanes and convert eastbound and westbound right turn only lanes to combined through/fight turn lanes to provide additional capacity and improve operations to an acceptable level of service. Coordinate BTC construction staging plan with WA ST Department Of Transportation, City, Port of Bremerton, and Kitsap Transit. Coordinate construction traffic routing plan with City and Kitsap Transit. Vacate and dedicate rights of-way as described in rights of-way vacation application. Compensate the City as required by State and City laws for vacated rights of- way. 16. Public Services: Provide fire protection systems for buildings according to Uniform Fire Code requirements. Upgrade existing stormwater and water lines serving the project site as required by City's Public Works Dkector. Coordinate replacement of utility services with Puget Power, WA Natural Gas, US West, and City to minimize disruptions. 17. Scope of approval: This approval recognizes the preliminary ,conceptual and phased nature of the project. As allowed by the zoning ordinance: a) The ultimate development with specific uses and sites may change at the time of the Final PUD application(s); b) Final PUD approval(s) shall be subject to the Final PUD approval criteria of the zoning ordinance. Final PUD application(s) shall require signature(s) from all affected property owners signifying their acceptance of the plan and application(s). This preliminary PUD approval does not mandate participation by any or all property owners within the boundaries of the PUD, allowing any or all property owners to utilize their property in conformance with zoning regulations. Laurence Stone, Chairman Bremerton Planning Commission Date DONALD L. PRATT Executive Secretary PLANNING COMMISSION MEETING MINUTES UNAPPROVED DRAFT January 21, 1997 Chairman Stone announced and called the meeting to order. The Secretary called the roll: Those present were Boyd, Robinson, Olsen, Stone. Absent were: Adams, Hancock, Dingfield. Chairman Stone asked Donald Pratt to discuss the agenda. Donald Pratt stated that the Sinclair Landing Project should not be a Public Hearing and should be moved as Neighborhood Meeting under New Business. Also requested that New Business be moved to the third item of business. Commissioner Boyd moved for approval with the suggested changes. Seconded by Commissioner Olsen. Question called: Boyd, yes; Robinson, yes; Olsen, yes; Stone, yes. Motion passes. NEIGHBORHOOD MEETING-SINCLAIR LANDING Donald Pratt, asked the appearance of fairness questions. No responses. Also stated that the meeting tonight was strictly informational and not part of the formal, legal process of approving or disapproving of a permit. That decision will be made during a public hearing in front of the City Council in the future. Jack Allingham, presented the staff report. This is a Planned Unit Development Application for the Sinclair Landing project. The Applicant is the Howard S. Wright Company. Applications applied for to date of Planned Unit Development (PUD), Shoreline Substantial Development Permit, Shoreline Conditional Use, Site Plan Review, Right of Way Vacation, and Zoning Map Amendment. The project proposes approximately 18 new buildings with the proposed uses of offices, retail stores, cinemas, residential, hotel units, museum, and parking garages. The developments will have over 500,000 square feet of retail, over 58,000 square feet of restaurant use, over 249,000 square feet of office use, 99 hotel rooms, 142 residential units and parking for over 2,900 vehicles. They also propose a floating historic ship, public plaza's, waterfront esplanade and reconfiguration of the existing marina. Another strong component of the project is to redevelop the Bremerton Ferry Terminal into the Bremerton Transportation Center. It will have a commuter retail building, the terminal itself, a passenger only terminal, a passenger only waiting area, and float. The site is bordered by Sinclair inlet, PSNS on the South, Pacific Avenue out to Park Avenue on the East, and 4th Street up to 5th Street on the North. The PUD process is designed to be a multi step process, beginning with PAGE -1~ a conceptual review, progresses onto a neighborhood meeting, which was held in 1996, and tonight we are having a public meeting before the Planning Commission, and then this request will go onto the City Council. The PUD process is to get a preliminary approval prior to a final design approval. Planning Staff feels that all of the criteria have been met and recommend approval subject to the conditions listed in the staff report. Craig Norsen, Vice President of Howard S. Wright stated that they are part of the team that has been working on this project for about 1 1/2 years. The project is a Public/Private Partnership. A PUD allows for a major redevelopment in downtown Bremerton. Stated the area of the project as well as the potent/al uses. Stated this plan may be modified or changed along the process. David Hewitt, Architect from Hewitt/Isley, stated that the architecture goal was to provide an activity center were people could live, visit, shop, as well as a transportation center. Showed two sketches illustrating ideas. The goal is to build on with the existing theme of the buildings and ampi/fy what we already have. Jeff Peacock, Parametrix, stated that their goal regarding transportation was to create a seamless as possible system. Reviewed the four elements: vehicular traffic, non-motorist traffic, marine traffic, and the transit system. Mary McClure, Sinclair Landing, stated that t/tis is a very complex project and needs everyone working together--no one entity could do it alone. Reviewed the entities involved in the Sinclair Landing. The key roll of the SLA is to do coordination with all of the players as well as with the State, EDC, Schools, Neighborhood Groups, PSNS, etc. Commissioner Boyd, asked if there is a covered walkway from the parking structure to the foot ferry and was concerned about the transportation issues in downtown Seattle. Craig Norsen responded yes there would be covered walkways. David Hewitt responded that Seattle is currently working on their transportation issues. Commissioner Olsen asked for clarification on the parking numbers. Craig Norsen clarified the numbers. Commissioner Robinson had concerns regarding the length of the projected timelines. Craig Norsen responded that large elements will be moving ahead rather quickly. The Transportation Center is scheduled to begin this July. Elizabeth Burl, resident, questioned if there were provisions for the handicapped. PAGE -2- Craig Norsen responded yes. Ward Yohey, resident, stated that he was pleased and excited with the project. Connie Ray, from KITZ, concerned about the need for better and prompt terry service. Mary McClure, responded that the SLA is working very closely with the ferry system and their attitudes toward Bremerton. Lon Overson, responded that there is a meeting with regard to the Ferry System on January 27th, 1997 at 6:30PM. Charlie Brown, feels that the SLA has done a great job getting all of the entities together. Concerned about the public fmancing of the underground parking garage and if parking meters will be put back in. Donald Pratt, stated that if there were not enough parking revenues to pay back the bonds, then the County's Block Grant would be used to make the payments. There is no plan to bring back parking meters. Lou Weir, stated his concern that while we are in this planning process, the property owners still need to be able to rent their buildings and the tenants need to be informed as to what is going on with the process and how long they are going to be able to operate. Also, everyone needs to be careful about what is being said regarding the process. Mary McClttre, stated that the SLA is sensitive to the issue. Cliff Deitz, would like to see more condo's built so that there will be a bigger base of people downtown. Supports the project. Anna Laurie, feels that the Pacific Avenue traffic pattern is unnecessarily complicated, and is concerned that the project will reflect too much of the past and we should be looking more to the future. Joe Mentor, sated he has seen many projects come and go in the past. Has concerns about the project coming together because of the lack of developers. Feels the PUD should just be for a limited time so that if this project does not go, then some other developers can come in. Sated that block grant dollars are only to be used for housing. Donald Pratt, stated that the waterfront area is slum and blighted and therefore block grant dollars are eligible. The City Council has the ability to limit the "life" of the PUD. PAGE -3- Charlie Brown, asked if the PUD includes the marina. Donald Pratt, stated that the Marine configuration is not part of the application at tiffs point. Donella Wilts, concerned about how the commuters will be affected during construction. Craig Norsen, stated that during construction they intend to maintain the transportation and encourage the use of Kitsap Transit. William Jeb, concerned about the Navy expansion and the related parking that goes with the expansion. Craig Norsen, said the Navy is very interested in the revitalization of Bremerton. The Navy is taking steps to improve its parking. Connie Ray, stated that the McWilliams park-n-fide is full. If you are asking people to use these lots, they need to be expanded and improved. Craig Norsen, said that Kitsap Transit is aggressive in its long range planning and expansion of these lots. Michael Lane, asked what happens to City Hall? What is the height of the buildings? Square feet of office space? Do we have any pre-leases? Any group targeted? Status of the options team? Agree with not enough information given to tenants and landlords. What happens to my building? Craig Norsen, stated that there have been some discuss-ions regarding relocating City Hall or improving its current building. The building next door is included in the plan--no intent/on to change the building other than a remodel. The parking lot behind the building has the potential for some type of development. The square footage is approximately 150,000 square feet of office space. The height is 6 stories. There have been only informal discussions regarding leases at this point. Good interest in retail, office, and restaurant. No particular groups have been targeted. Dick Main, questioned the provisions for handicapped individuals accessing the ferry? Craig Norsen, indicated that the terminal will be handicap accessible. Commissioner Boyd questioned if the ferry system has a design for the terminal? Craig Norsen, responded that he has had input into the design. Lynn Johnson, stated his concern with safety issues in the area. PAGE -4- Camilla Dirks, had a concern about the ferry traffic back-up during the summer with construction going on. Craig Norsen, stated that the holding area for ferry traffic will be increased. The Neighborhood meeting was concluded. Approval of the December 17, 1996 minutes. Approved as presented. Director's Report Donald Pratt and the Commissioners discussed the function of the Planning Commission with regard to Rule 12. Donald Pratt reported on the storm related issues and complimented the staff under the direction of Mayor Horton on how well everyone responded. Job well dohe! Also reported that the City is in the process of setting up a studio in City Hall. This could be used for announcing new permits, etc. This would be shown 2-3 times each week on Channel 12. There will be a Planning workshop at Given's this Saturday. Next regular meeting will be February 18, 1997. Also, there may be a meeting on February 4th- -Donald Pratt will check it out and notify the Commission. Donald Pratt mentioned that both Stone and Boyd's terms expire tiffs year. Both indicated they would be interested in being reappointed. Chairman Stone pointed out that he had read that seconds to motion are not required in governmental bodies. Need to look further at this issue. Meeting Adjourned. Respectfully submitted, M/r yn W el Approved: Larry Stone, ~hairman MINUTES OF SPECIAL MEETING Bremerton Planning Co~ission FEBRUARY 4, 1997 Meeting called to order at 6:00 p.m. Roll call: Present: Boyd, Olsen, Stone, Robinson. Donna Adams arrived at 6:10. Absent: Dingfield (for reasons of appearance of fairness issues), Hancock. Call to Order. Approval of the Agenda: Remove Public Hearing as Item IV; replace with Call to the Public. Call to the Public. Review/Approval of January 2I, 1997 minutes. second. Unanimous approval. Olsen moved to approve, Boyd Old Business. None. New Business: applications. Planning Commission discussion of Sinclair Landing Project Issues: Acceptance by property owners within the PUD area: The commission recognized that the applicant Howard S. Wright, Inc. does not own all of the property within the PUD and that each property owner may or may not choose to be party to the plan. It was determined that approval of the plan did not mandate participation from all property owners, nor did it restrict the use of property to the plan. As the plan develops in phases, each property owner could develop in a manner allowed by zoning until the next phase which includes their property is proposed. The final PUD will require all affected property owners within the phase to provide written approval and acceptance of the plan prior to city approval. Phasing and timinq: The preliminary plan should have an expiration date. The zoning ordinance allow 2 years between preliminary approval and final pud approval. The two year schedule may be too rigorous to allow a realistic construction schedule for a project of this scale. Perhaps the City should utilize a development agreement to allow the flexibility necessary to set time limits for development, but allow for a realistic design and construction. Parking: The preliminary plan shows proposed uses and parking areas. It was not clear how the parking would relate to the uses, particularly the hotel. Final PUD approval needs to be reviewed for functional convenient parking. Scope of approval: Planning Staff proposed condition No. 17 which addresses the issues regarding phasing and acceptance by affected property owners. Motion: Olsen moved to adopt motion with conditions; Boyd seconded. Unanimous approval. The next regular meeting w~ll be February 18, 1997. Meeting adjourned at 7:37 p.m. Larry Stone Cha i rman Date Don Pratt Executive Secretary Date LE®ENI~ / :/ HALF SIZE EXTERIOR BUILDING MATERIALS DESCRIPTION New BuJldJl~g $ Terr~noL Retail, Restouranl, Office, Residentiol and Hotel Buildings · Brick or ~e facing ot lower rlo(xs. · Pre¢(3st concrete or c~l stone cladding al wa~s which step down to Renovol ed BuiJdingi Reloil ond Office Buildings · Restoration ol e;~ting I:x"ick. hle os, concrete cloddtng. · Pa~ted oturrlnum winG~w $ with c~' g~ at retail leveB otld tinted, r~orYre flecflve ~ at office uses. HALF SIZE I. iNNER AND OUTER HARt_.. LINES ,,R, SHOWN AS ,~DJAC~,, PROPERTY LINES SINCE THESE I~OUNOARIES DEFINE HARBOR ''-' L:.~ AREAS. * U~W=+~.S, ULLW=O.0. ~A~U- S.O.$. U~_W-0.0. 3. A'~RAGE WATER DEPTH AROUN0 ACTI~IT'F = ~x,~l~ 3. ISSUED AdO~S~ I~, 5. SEE NOTES SHEET FOR ~O_ION CONTROL TO ~E RELOCATE0 NORTH 50'~ ~E'A' FLOAT REA APPROX l l,O00 SO FT ~ NEW STEEL GANGWAY 13xlS0' ~ -- .~' STOR~ ORAIN  ~ TF~L ~'-M\ L % 73 YRS P RECONFIGUREO MHW ~% MARINA. 6 .UHHW YRS -- NEW PASSENGER - ~A~ (NO EXPANSION) FERRY TER~IN~ ~ ~ ~iE~H,~R~P,~ ~ SINCL~R INLET ~ ' --RELOCATEO BREAK~R-~33' NE ~ A~O~ STRUCTURES REUO~0. 6 ~S OLD PROPOSED SITE PLAN NCI_AIR I_ aN ENINE3 0 15o' 5oo' 450' 6oo' goo' SCALE: 1" = 300' Pag~ 4 of g SINCLAIR LANDING (~ FLETCHER WRIGHT, INC. PLANNED UNIT DEVELOP~ AND ~ ~ BREMERTON TRANSPORTATION CENTER ~~w ~. . PLANNED UNIT DEVELOPMENT AND BREMERTON TRANSPORTATION CENTER SINCLAIR LANDING PLANNED UNIT DEVELOPMENT AND BREMERTON TRANSPORTATION CENTER ?.S.m.S. HALF SIZE EXISTING BUILDING AND MARINA SITE PLAN ~;1tiI, Il, 411hill~ G1.01 NOTES; 1. FO~ E.Y~S~ PROPERTY OWHER,~erPS. SEE SHEET ~ 1,03, RIGH~ OF' WAY INFORMA ASSESSORS MA~A..~ / ! 8LOCK 8 IS DERIVED FROM CITY CARDS. UND~.RGROdJND PARKING GARAGE (~ EXST ~ O~ r,.~c~c ,e,~A~.CP n~{ ~ EECO~c~ NO'I'~S: RUGHT OF WAY ASSESSORS MAPS / / / // // // IS DERIVED FROM CITY '~UMENT CARDS. ' HALF STZE NOT FO~ d lEI Jc8.02: i DOWNTOWN WATERFRO URBAN REI PLAN · Exhibit "D" LAND/WATER USE PLAN Project Area Mixed Co~rcial/ Residential/Tourist Waterfront/CBD Transition Area Ferry Terminal Linear Park/Pathway Page 15 UUWHtUWN WATERFRONT URBAN RENEWAL PLAN ALT. 1-B L Exhibit "E" DESIGN CONCEPTS ~ Ferry Terminal Area Pathway/Linear Park ,~ Interior Parking/Service (Surface or Structure) ] Public View Platforms .~Open/Undeveloped (Bluffs) ~ Ferry. Traffic · Viewpoint (panoramic views) Page 16