HomeMy WebLinkAbout11/24/98 AGENDABREMERTON CITY COUNCIL
239 4TH STREET
BREMERTON, WA 98337
CITY COUNCIL AGENDA
TUESDAY, NOVEMBER 24, 1998
CITY COUNCIL STUDY SESSION: 5:00 - 5:30 P.M.
A. General Council Business
CALL TO ORDER: 5:30 P.M.
A. Pledge Of Allegiance
B. Invocation
CONSENT AGENDA
Items listed below have been distributed to Council members in advance for study
and will be enacted by one motion. If separate discussion is desired on an item, it
may be removed from the Consent Agenda and placed on the Regular Agenda at
the request of a Council member.
A. Purchase of Process Control System Equipment for #AB98-262
Wastewater Treatment Plant
B. Interlocal Agreement (Renewal) for City of pOrt Orchard #AB98-263
Traffic Signal Maintenance
4. CLAIMS/CHECK REGISTERS
5. COUNCIL MEMBER REPORTS
6. MAYOR'S REPORT
7. PUBLIC RECOGNITION - (Comments Limited to 3 Minutes)
NEW BUSINESS
A. Budget Adjustment for the Equipment Rental Reserve
Fund and Street Fund
#AB98-264
(CONTINUED ON BACK)
ORDINANCES
A. Ordinance (First Reading) Setting Water and
Wastewater Rates
#AB98-265
Ordinance (First Reading) Reducing the Business &
Occupation (B&O) Tax on Garbage and Refuse Business
#AB98-266
10.
PUBLIC HEARING - (TO BEGIN AT 6:00 P.M. OR LATER)
A. Public Hearing and Resolution No. 2680, Appealing
of a Shoreline Variance -- Appellant: Paul Scheyer;
Location: 922 Shoreline Drive, Bremerton
#AB98-267
AGENDA BILL -
BREMERTON CITY COUNCIL
1. SUBJECT:
PURCHASE OF PROCESS CONTROL SYSTEM
EQUIPMENT FOR WASTEWATER TREATMENT
PLANT
FOR AGENDA OF:
ORIGINATING DEPT:
ORIGINATOR:
DATE SUBMITTED:
November 24, 1998
Public Works and Utilities
John Poppe, WW Manager~
November 9, 1998
t
2. CLEARANCES: (comment on back/~~ 3. EXHIBITS
Director, Public Works/Utilities ~ j,~ _ Equipment list with costs.
City Attorney ,J,,,/~'. ~ ~x ~~emorandum from John Poppe
City Treasurer -
Council Budget & Finance Committe~t~7~'
Operations Committee ~-~ ct
Purchasing Supervisor
ENDORSEMENT K- ~RMATION APPROVED BY COUNCIL PJkESIDENT~ SUBMITTAL:
4. SUMMARY STATEMENT AND REQUIREMENT FOR COUNCIL ACTION:
The Department of Public Works and Utilities seeks approval for the sole source purchase of SCADA control
system equipment for the Wastewater Facility. The equipment purchase from Cascade Controls totals $35,723.81,
including tax. The purchase and installation of the equipment will increase ability to meet effluent water quality
standards for the Wastewater Facility.
8. RECOMMENDATION:
That the City Council approves the sole source purchase of SCADA equipment from Cascade Controls for
$35,723.81, including tax.
9. RESPONSIBLE OFFICIAL:
ENFORCEMENT OFFICIAL:
EXPIRATION DATE:
REVIEW DATE:
Wastewater Manager
Wastewater Manager
10. NOTICE OF ACTION
PULLED
TABLED
APPROVED
DISAPPROVED
AMENDED
COUNCIL DIRECTIVE
DATE:
11. AGENDA BILL NO: (~ B- a(,,~.
2. CLEARANCE COMMENTS:
5. IMPACT ON NON-PASSAGE:
Decrease reliability of treatment plant process control.
Increase liability of City should WWTP discharge to Puget Sound and violate water quality standards.
Increase employee safety hazards.
Violation of NPDES Permit.
6. IMPACT ON STAFFING, BUDGETS, FACILITIES, EQUIPMENT OR OTHER RESOURCES:
STAFFING:
BUDGET:
EQUIPMENT:
The improved automation will reduce operations & maintenance time.
The 1998 Wastewater Budget includes this hardware purchase.
This will improve optimization of process equipment increasing the reliability of meeting
water quality standards from the WWTP.
7. RESEARCH SOURCES
AGENDABL
g.
PUBLIC WORKS AND UTILITIES
3027 Olympus Drive ° Bremerton. WA 98310-4799 · (360) 478-5318 · FAX (360) 478-5018
November 9, 1998
TO'
Gene Sampley, Director of Public Works and Utilities
FROM:
SUBJECT:
John Poppe, Wastewater Manager~:?x
SCADA Hardware Purchase
The Bremerton Wastewater Facility is upgrading the Supervisory Control and
Data Administration (SCADA) system. The original 1984 facility design for process
control was based on the Texas Instrument (TI) format. The TI format included
programmable logic controllers, supporting hardware, and control software.
WWTP staff have reviewed the new TI format and have concluded that the City
standardize with TI control sYstems by keeping the existing TI SCADA format, and
replace components that are no longer supported by TI. This standardization will
increase control system reliability allowing the treatment plant to meet discharge water
quality standards.
Please fmd attached the quotation from the manufacturer's representative
detailing the costs for the TI hardware described above. Within the written descriptions,
you will note the "SEIMENS" name prefacing the text. Seimens purchased TI in the
early 1990's, but maintained the manufacture of TI-based SCADA hardware.
Therefore, I am seeking approval to purchase the Siemens/TI hardware to upgrade
the SCADA system at the Bremerton Wastewater Facility totaling $35,723.81 (including
tax). The purchase and installation will increase our ability to meet effluent water quality
standards for the Wastewater Facility.
C:
Pat Coxon, WWTP Manager
File
Attachment
Equal Opportunity Employer
CITY OF BREMERTON
PURCHASE REQUISITION
R 81382
THIS IS NOT A PURCHASE ORDER
REQUISITIONING /_ - -- ~,
DEPARTMENT ........................... ~ .....~......~....~.. ............................................................... MARK FOR .................... .~. ,~. ~,~-/~......,,'~Z. A./~.~ ..........
0NOIVlDUAL)
(LOCAT:)
................................................................................................................. DATE .........// /~//?~// '"-'~'"'--'""-'~"-1 --*'-""'"'--~'-'"" ...............................................................................
AUTHORIZED
BY
(DEPARTMENT HEAD)
QUAN
ITEM UNITS ORDERED DESCRIPTION INTENDED USE UNIT PRICE TOTAL PRICE
....... t........~:~ ............................... / ................ ~/.'~..~..~r ................. £.~..~ : ·; F c ,~,,~ ..................... r~.~.~f.,....~ ~..r~....'~ .......
............................................................................ ~._~....._/.~..~....~ ............ ~..~.: ~
_~ ......... ~..~. ........................ ~ .......... ~.~.~.~.~r ............ .~..~..~.~....2 ~ ~...~x ........ r..~...~ ....................... q..~_....~ ......... ~.tq .............
................................................................ ~...~..~__..;~_~//~..'Z .2.~?:_~ ~.~.~
Z_.. ...~ ....................... ~ .................. r..~.~..~..~ ............. ~....~...~.~,i_ ....... / .~_ ..r~ ..... ~c ~.,.~ ...... r~ ~... : .... ~ ~... ~
..... ~......~'~ ...................... g ................. ~...~.~..~.. . ~z~.i ..... /..~ x~.~
............................................................................ ~..~ ~....~..~_..._z~:~z...~_~ _: P~._ ~...~.~z~ ..... : 5.c ~ ,. ~ ........ ~ 7 ~.......~ ..... ~ ~.~...::
,9_ .~ ......................... .~ .................... ~. ~.~..~.._..~.~.~. ~.~ ....... zx...~.~ ~ ..............
............................................................................ (~.~...?~.e__.~.:~:....~,:.P~:....~ . ~~ ~ /f .~ . ~
./.~ .......
..~_ .... ~ .................. ~ ............. :~.~.~.~......:~..~.~.~ ........
............................................................................. ~.~_...~_.~.,.~ ~..:.. ~o;~. ..~ o~..~ .............. r~. ~ ........ ~./.~_. Z ..... ~ ~ ~:
;:~';:~:: BARS;~CGDE'/:: '::'AMOUNT:: SUGGESTED VENDOR ::=.T~A~ [ ~ ~ OO
................................................................................................................. ~~ ~ ~ . Co ~ ~ ~ . ::m~.~:~:~,~ _
................................................... : ..................................................................................................................................... ~ ~. :~..c ~_:.. .. ff~ ~_...... ~ ~...~ ............................
........................................................................................................................................................................ ~~_; [.: g ~..~.. ~ ~F.E~ ~tC.q .............
PURCHASING
DEPARTMENT ........................................................................................................................................................................... DATE ...............................................................................................................................................
PURCHASING - WHITE COPY ~ DEPARTMENT - YELLOW COPY
CITY OF BREMERTON
PURCHASE REQUISITION
THIS IS NOT A PURCHASE ORDER
REQUISITIONING ,_ .
DEPARTMENT
................ ~.~..~ MARK FOR ~/~/~ Y......L~/~..~.~ ..........
__ (LOCATION) (INDIVIDUAL)
AUTHORIZED BY ................................................................................................................... DATE ._~.~..l./.._ .¢...//....~._ _~....~ ...................................................................................
(DEPARTMENT HEAD)
QUAN
ITEM UNITS ORDERED DESCRIPTION INTENDED USE UNIT PRICE TOTAL PRICE
PURCHASING
DEPARTMENT ................................................................................................................................................. DATE
PURCHASING - WHITE COPY ~ DEPARTMENT - YELLOW COPY
CITY OF BREMERTON
PURCHASE REQUISITION
THIS IS NOT A PURCHASE ORDER
REQUISITIONING i/~.......~...%( .............................................................
DEPARTMENT _ MARK FOR ...... ~ X.,~ Y '~( ~.~d ............
(LOCATION) ,'INDIVIDUAL)
/ )
AUTHORIZED BY .............................................................................................................................................. DATE _ / ~ ./...~./..~.~..~.~ ................................................................................
(D~ENT H~D)
~.o. ~ ~_.~._~_~ ..........................
(ASSI6N~ BY PU~OHASIN6 DEPT.)
QUAN
ITEM UNITS ORDERED DESCRIPTION INTENDED USE UNIT PRICE TOTAL PRICE
.l.~ ........~ .................... ~. ................ ~../~.~....:../...~ ................ <~..~_.~ ..... :7~ ?~....c. .:...~ f: C. ~ ~ ............. /...P.~..~,. ...~.~ .... ~l~........<.~.,
........................................................................ ~...:~.~.~..~..~ .............. .~..~ ~.~... ..~..~Z~ ~
~ ~... ...~_ .................... ~. ................... ~..~.~..~ .............. ~.~. .
. . . ~ ~ Y~-
~Z~.~...~:_,.~..~ ................ ~.:.X.?c .................................. ~ c~.~ ~ ....................... /.~ ..: ....... : ...... ~ ................
[.~_ ....... ~ ..................... ~ .............. ~ ~~/x :/~ ~/~<
~.~.~..~..~4.~..:~ ......... ~ ~ x ~ ~.F~ x.~./ ........ : c ~ ~ ~ ~ ~ ~ ¢ ~ ./ ~ .......
..................................................................................... ~.~ ........... %~?~..~.~.~._ ~ ................ ~/:~ ~D~ . ~. ~ ~
::~:::: :{:; '::'~'~¢:;'~:'~: ":~ :'::"; SUGGESTED VENDOR SUB~-
AMOUNT TOTAL. I!~ t Z
...................................................................................................................................................................................................... :: .:~1;~: ~; . ........................... :. ........
........................................................................................................................................................................................ .............................
................................................................................................................................................................................. :.: ~..:... ~..Z..> :......~:O.~. ..................
.......................... '. ::::::::::::::::::::: :.
PURCHAS,NG ///:/: ¢¢? .........
DEPARTMENT .......................................................................................................................................................................... DATE
PURCHASING - WHITE COPY ¢ DEPARTMENT - YELLOW COPY
AGENDA BILL
BREMERTON CITY COUNCIL
1. SUBJECT: FOR AGENDA OF: November 24, 1998
INTERLOCAL AGREEMENT (RENEWAL): ORIGINATING DEPT: Public Works & Utilities
CITY OF PORT ORCHARD TRAFFIC SIGNAL ORIGINATOR: Bob Tulp, PW Opms M~
MAINTENANCE DATE SUBMITTED: November 10, 1998
1/7
2. CLEARANCES: (comment on back J~/~i~ 3. EXHIBITS
Director, Public Works/Utilities ,~,_~ff' ~ ,,~ Interlocal Agreement with the City of Port
City Attorney ~ ~/~ Orchard
City Treasurer ~ .,~ _..
Council Budget & Finance Comm/~.'~::~__~~
Operations Committee
ENDORSEMENT k' ~2RaMATION__ APPROVED BY COUNCIL P,~SIDJ~NT F(~ SUBMI~TTAL~
MAYO~ .xf- COUNCIL PRESIDEN~-'.~ ~U,~~---.-~
4. SUMMARY STATEMENT AND REQUIREMENT FOR COUNCIL ACTION:
The proposed contract is for the City of Bremerton Public Works Operations/Electronics Division to maintain
traffic signals in and for the City of Port Orchard. Electronics has been maintaining these signals for several years
now. The City of Port Orchard has four signalized intersections.
8. RECOMMENDATION:
That the City Council approve the attached inteflocal agreement with the City of Port Orchard and authorize the
Mayor to sign the agreement subject to City Administrative Policies and Procedures.
9. RESPONSIBLE OFFICIAL:
ENFORCEMENT OFFICIAL:
EXPIRATION DATE:
REVIEW DATE:
Public Works & Utilities Director
Public Works Operations Manager
10. NOTICE OF ACTION
PULLED
TABLED
APPROVED
DISAPPROVED
AMENDED
COUNCIL DIRECTIVE
DATE:
11. AGENDA BILL NO: qB-
2. CLEARANCE COMMENTS:
5. IMPACT ON NON-PASSAGE:
Loss of revenue.
6. IMPACT ON STAFFING, BUDGETS, FACILITIES. EQUIPMENT OR OTHER RESOURCES:
Required stafftime is approximately 100 to 125 hours.
No impact on facilities, equipment or other resources.
7. RESEARCH SOURCES
We have been maintaining their system for several years. We are comfortable with its current
condition and the working relationship with the City. of Port Orchard Public Works Director with
regard to improvements and the like.
AGENDABL
[h--I'ERL O CAL AGREEMENT
WHEREAS, the City of Pert Orchard owns and operates Traffic Comrol Signals situated at
the intersections of Sidney Avenue & Tremont Street. I~-emont Street & Pottery Avenue and Sidney
Avenue and Sedgwick in the Port Orchard City limits: and
WHEREAS, the City of Bremerton has perso~l skilled in maintaining traffic control
equipment and is desirous ofproviiing maintenance ser~.izes to the traffic control equipmem owned
and operated by Port Orchard:
NOW, THEREFORE,
IN CONSIDERATION OF IHE MUTUAL COVENANTS CONTAINED HEREIN, IT IS
HEREBY AGREED AS FOLLOW;S:
Section 1: Parties: This A~_ eement is by and hetween the City of Bremerton, hereinafter
referred to as "Bremerton" and the City of Port Orchard. hereinafter referred to as "Port Orchard".
Section 2: Term: This .~?eement shall become ~',ffective on January 1, 1999 for up to one
year, and ending on December 31. 1999. This Agreement shall automatically be renewed on a
calendar year basis unless wrillen notice of termination is given by either party by the preceding
October 1 of any such year. FmTl~e of either party to notify the other of such termination on or
before October 1 of any such 3~n' shall cause this ~A_.~eement to automatically be renewed for the
next ensuing calendar year.
Section 3: Payment: In consideration for the ~rvices provided, Port Orchard shall pay
Bremerton Two Hundred Sevetteea and 11/100 Dollars (5~217.11) per month, per signal for the first
year of this agreement, due to 13nm~a'ton in quarterly i~adlments thirty (30) days after receipt,
INTERLOCAL AGREEMENT ~l-
Port O~hard. Agt - Nlq Agmts 1 - 3/18/98
beginning on January 1, 1999. In the event that Port Orchard adds traffic control signals requiring
maintenance, Port Orchard shall pay the sum of Two Hundred Seventeen and 11/100 Dollars
($217.11) per month, per signal for each signal added, which will be paid quarterly thirty (30) days
at~er receipt and pro-rated to the date to activation of the traffic control signals. At the beginning of
each successive year thereafter, all charges shall automatically be adjusted by the percentage change
in the "All Items" category of the Consumer Price Index for All Urban Consumers (CPI-U) as
published by the Bureau of Labor Statistics of the U.S. Department of Labor for the Seattle-Tacoma
metropolitan statistical area (1982-84= 100), as published for the month of June.
If at any time during the term of the contract the practice of computing the Index for the City
of Seattle shall be abandoned or altered by the U.S. Department of Labor, and not assumed by some
other federal or state governmental agency, then there shall be substituted therefor in Bremerton's
sole discretion the then most nearly comparable cost of living index.
Section 4: Service Provided:
(a) Bremerton shall provide electronic, electrical repairs, electrical inspection and preventative
maintenance as requested or directed by the Port Orchard City Engineer. Provided, Bremerton shall
not be required to perform major electrical repairs as determined by the Port Orchard City Engineer
and Bremerton's Electronic's Supervisor, and, Provided, further, Bremerton shall not be required to
perform electrical repairs where labor costs exceed Five Hundred and 00/100 Dollars ($500.00) per
occurrence.
(b) Bremerton shall provide repair parts which shall include, but are not limited to, transistors,
integrated circuit chips, resistors, diodes, capacitors, tubes, wire, and modules; Provided, Bremerton
INTERLOCAL AGREEMENT -2-
Po~ Oreha~Agt - NN Asn~ 1 - 3/18/98
shall not be required to proxS/e major componems ancL/or assemblies; and Provided, further, the
determination of what const/v, nes a major component and/or assembly shall be made by the Port
Orchard City Engineer and Br~merton's Electronics Supervisor.
Bremerton shall not be required to provide repair components assemblies in excess of Five
Hundred Dollars ($500.00) in xalue.
(c) Bremerton shall pro,,ide labor and materials to repair luminaries not to exceed Five
Hundred Dollars ($500.00) per calendar year.
(d) Bremerton shall pro-,Scle annual lamp changes for all indications as required. All yellow
lamps and the 3M heads will be mlamped once every ~'e (5) years. Bremerton will replace all lamps,
L.E.D. indicators and heads, as needed, upon breakage or bum-om. Port Orchard to provide red
L.E.D. indicators to replace red lamps at Port Orchard's cost. Bremerton will provide labor at no
extra cost while performing annual lamp change to ~ L.E.D. indicators.
(e) Bremerton shall proxite labor and materials for the repair of defective traffic signal loops.
Bremerton shall not be responsffie for saw cutting and sealing of traffic signal loops, replacement
of loops due to damage created by contractors, or additional loops necessary for intersection upgrade
or design change.
(f) In the performance of the services set forth in (a) through (e) above, Bremerton shall be
responsible for and shall provide and pay all wages, salaries, tools, vehicle usage, training, utilities,
postage, fi.eight, telephones, o~erhead costs, and all other direct or indirect costs or expenses
incurred.
INTERLOCAL AGREEMENT-3-
Port (;nOaa~t- NN Agn~s 1-3/18,98
Section 5: Equipment: Bremerton shaH provide services described in Section 4, for the
traffic control equipment located within Port Orc~rd. The equipment includes and is limited to:
a. Traffic s'~zgrml controller equipment:
b. Traffic s'Kgr~l indicator lead switches;
c. Traffic s'Kgnal detection equipment;
d. Traffic s'~zgnal conflict monitor units:
e. Traffic s'~zgn,al pre-emption equipment (OPTICOM);
f. Traffic si~m:~l auxiliary cabinet w-king;
g. Traffic s'Kgnal loops;
h. Street ~ at traffic signal locations, including control, ballast, photo cells,
igniters, and lamps;
Section 6: Time of Service: The services set forth in Section 4 shall be available Monday
through Friday during ~mgular business hours. After regular business hours and during weekends, and
holidays, Bremerton shall have available for Port Orchard, those same services as it provided for its
own needs. Provided, during weekends, holidays or after regular hours, if Port Orchard is unable to
secure services from Bren~on listed in this Agreement, then Port Orchard may secure such services
elsewhere and deduct the cost thereof from any amounts owning or to be owed to Bremerton under
the contract. Bremerton shall make available to Port Orchard telephone numbers through which
services can be obtained.
Section 7: Hold Harmless: Port Orchard agrees to defend, indemnify and save harmless
Bremerton, its appointed and elected officers and employees, fi:om and against any and all liability,
INTERLOCAL AGREEMENT -4-
Po~t O~:ha~Agt - Nlq Agmts 1 - 3/18/9g
loss, costs, damage and expense, including costs and attorney fees in defense thereof because of
actions, claims or lawsuits for damages resulting from personal or bodily injury, including death at
any time resuking therefrom, sustained or alleged to have been sustained by any person or persons
and on account of damage to property, arising or alleged to have arisen directly or indirectly out of
or in consequence of Port Orchard's performance of this Agreement, whether such injuries to persons
or damage to property is due to the negligence of Port Orchard, its subcontractors, agents, successors
or assigns. This provision shall be inapplicable to the extent such damage or injury is judicial found
to be cause by the sole negligence of Bremerton.
Section 8: General Conditions:
a. Entire Agreement - This Agreement constitutes the entire agreement between the parties
and both parties acknowledge that there are no other agreements, written or oral, that have not been
fully set forth in the text of this Agreement.
b. Amendments - The parties hereby further agree that this Agreement cannot be amended
or modified without the written concurrence of both parties.
c. Notices - Any notices required to be given by Bremerton to Port Orchard, or by Port
Orchard to Bremerton shall be in writing and delivered to the following parties at the following
addresses:
Bremerton City Clerk
239 Fourth Street
Bremerton, WA 98337
Port Orchard City Clerk
736 Prospect
Port Orchard, WA 98366
d. Waiver - Failure to insist upon strict compliance with any terms, covenants or conditions
of this Agreement shall not be deemed a waiver of such, nor shall any waiver or relinquishment of
INTERLOCAL AGREEMENT -5-
Port O~chnrd. Agt - NN Agmts 1-3/18/98
such right or power at any time be taken to be a waiver of any other breach.
e. Compliance with State, Local and Federal Laws - Parties agree to comply with all
applicable local, state and federal laws in performance of all services under this Agreement.
f. Applicable Law; Venue - This Agreemem shall be construed and interpreted in accordance
with the laws of the State of Washington and, in the event of dispute, the venue of any action brought
hereunder shall be in Kitsap County Superior Court.
Section 9: Nondiscrimination: Bremerton shall not discriminate in employment or services
provided on the basis of race, color, national origin, sex, religion, age, marital status or disability in
employment or the provision of services unless an employment action based on a bona fide
occupational qualification.
Section 10: Termination: This Agreement may be terminated by either party, without
cause, upon six (6) months written notice to the other party, or for cause if either party fails
substantially to perform through no fault of the other and does not commence correction within five
(5) days of written notice and diligently completes the correction thereafter.
IN WITNESS WHEREOF the parties hereto have executed this Agreement the dates and
year written below.
CITY OF PORT ORCHARD
CITY OF BREMERTON
BY: BY:
DATE:
LYNN S. HORTON, Mayor
DATE:
INTERLOCAL AGREEMENT -6-
Port ~- NN Agmts 1- 3/18/9g
APPROVED AS TO FORM:
APPROVED AS TO FORM:
GLENNA MALANCA, City Attorney
Received for filing:
Kathleen McCluskey, City Clerk
INTERLOCAL AGREEMENT -7-
Port O~hanl. Agt - NN Agmta 1 - 3/18/98
APPENDIX "A"
The following is a list of the traffic signals that are covered by the Agreement and is
hereby appended to the contract:
Tremont Street & Sidney Avenue
Tremont Street & Pottery Street
Tremont Street & South Kitsap Boulevard
Sidney Road & Sedgewick Road
AGENDA BILL
BREMERTON CITY COUNCIL
1, SUBJECT: BUDGET ADJUSTMENT
For the EQUIPMENT RENTAL RESERVE FUND and STREET
FUND
FOR AGENDA OF:
ORIGINATING DEPT:
ORIGINATOR:
DATE SUBMITTED:
Treasurer
Rich Hanna
Nov. 9, 1998
2. CLEARANCES: Comment of back if necessary) 3. EXHIBITS: -
Dir. Admin. Serv. i--~"-'~ Budget Adjustment Request No. 98-32
I1,~' / ...-~
Dir. Public Works
Public Works Op. Mgr'7--~~
.,.ca, · .u..e,
ENDORSEMENTS ~ INFORMATION APPP,~)VED BY-C'OUNCIL PRESIDENT FOR SUBMITTAL:
4. SUMMARY STATEMENT AND REQUIREMENT FOR COUNCIL ACTION:
This adjustment will correct the budget for the acquisition of computers from the Equipment Rental Reserve Fund for
use in traffic signal maintenance. The original budget anticipated the computers to be a capital acquisition however
pdces on the equipment have decreased to the point that the computers do not exceed the City's $2,500 threshold for
capitalization.
8. RECOMMENDATION:
Motion to approve Budget Adjustment Request No. 98-32.
9. RESPONSIBLE OFFICIAL:
ENFORCEMENT OFFICIAL:
EXPIRATION DATE:
REVIEW DATE:
Treasurer
Mayor
12/31/98
N/A
PULLED TABLED
COUNCIL DIRECTIVE:
10. NOTICE OF ACTION
APPROVED DISAPPROVED
AMENDED
11. AGENDA BILL NO:
2. CLEARANCE COMMENTS:
5. IMPACT ON NON-PASSAGE:
The computers will not be purchased.
6. IMPACT ON STAFFING~ BUDGETS~ FAClLIT1ES~ EQUIPMENT OR OTHER RESOURCES:
Included in the current budget, but in the wrong expenditure category.
7. RESEARCH SOURCES:
Current City budget, Equipment Rental Reserv~ Fund.
CITY OF BREMERTON
BUDGET ADJUSTMENT REQUEST
Requesting Department: STREET / EQUIP. RENTAL Adjustment Number:
98-32
Approval Authority Required:
r']Treasurer
SOURCE OF FUNDS:
Description
EQUIPMENT RENTAL FUND:
DECREASE:
Capital
STREET FUND:
INCREASE:
Transfer from Equipment Re
'-]Mayor F
Amount
4,000
4,000
Fiscal & Bud~tet
[-~Council
USE OF FUNDS:
DescriDtion Amount
INCREASE:
Transfer to Street 4,000
INCREASE:
Computer Purchase 4,000
NARRATIVE:
This adjustment will allow the transfer of money from the Equipment Rental Reserve Fund to the Street Fund
and for the expenditure of that money by the Street Fund for the purchase of two lap-top computers. The
computers will be used in the maintenance of traffic signals and telephone equipment.
~ Recommended ~ Not Recommended
" Treasurer's Signature '
Mayor Comments:
r~_ Recommended [~-] Not Recommended ~, /~'
[--"-] Approved ~ Denied M~~ ~-~ Jl/5~ f~
ayor's Signature
Fiscal & Budget Committee Comments:
Date
~,4 OF Bk.-,
CITY OF BREMERTON
PURCHASE REQUISITION
RS18&1
THIS IS NOTA PURCHASE ORDER
{ASSIGNED BY PURCHASING DEPT.)
MARK FOR
(LOCATION) (INDIVIDUAL)
DATE· tO-- ~..':~
QUAN DESCRIPTION INTENDED USE UNIT PRICE TOTAL PRICE
ITEM UNITS ORDERED
SUB-
BARS CODE SUGGESTED VENDOR TOTAL ..~,~
AMOUNT ·
OTHER
PURCHASING
DEPARTMENT .... DATE
PURCHASING - WHITE COPY 2...,O DEPARTMENT - YELLOW COPY
1. SUBJECT: ORDINANCE NO.
Setting Water and Wastewater Rates
AGENDA BILL
BREMERTON CITY COUNCIL
FOR AGENDA OF:
ORIGINATING DEPT:
ORIGINATOR:
DATE SUBMITTED:
Dc~c. 2, I
Treasurer
Rich Hanna
Nov. 12,1998
2_ CLEARANCES~.' ~~f~ck if n ecessa ry) 3. EXHIBITS:
Dir. Public~.x/~_~r~~~/~.-~/.J/'~' J .~ ~ /~/ _ ~' Proposed Ordinance
Operations Corn
ENDORSEMENTS ~ INFORMATION APPROVED BY COUNCIL PRESIDENT FOR SUBMITTAL:
,/' '"-,.J
4. SUMMARY STATEMENT AND REQUIREMENT FOR COUNCIL ACTION:
The proposed ordinance will increase the City's retail water and wastewater rates by an average of three percent
effective January 1, 1999. Staff analysis indicates that this increase is necessary to allow the utility to meet the costs
of current operations and to implement the capital improvements which are mandated to meet environmental and.
water quality regulations.
RECOMMENDATION:
Motion to approve on first reading Ordinance No.
Motion to pass on second reading Ordinance No. __
setting utility rates.
setting utility rates.
9. RESPONSIBLE OFFICIAL:
ENFORCEMENT OFFICIAL:
EXPIRATION DATE:
REVIEW DATE:
Treasurer
Mayor
N/A
PULLED TABLED
COUNCIL DIRECTIVE:
10. NOTICE OF ACTION
APPROVED DISAPPROVED
AMENDED
11. AGENDA BILL NO: (~-
2. CLEARANCE COMMENTS:
5. IMPACT ON NON-PASSAGE:
Current water and wastewater rates will remain in effect. This will result in a shortage of revenues to the utilities.
6. IMPACT ON STAFFING~ B ,UDGETS~ FACILITIES, EQUIPMENT OR OTHER RESOURCES:
Included in the 1999 - 2000 preliminary budget. The rate adjustment will increase the operating revenue of the Water
Utility by approximately $90,000 and of the Wastewater Utility by approximately $215,000.
7. RESEARCH SOURCES:
Capital Improvement Plan. Rate analysis by staff.
ORDINANCE
AN ORDINANCE amending rates and charges for municipal water and wastewater
services commencing January 1, 1999; and amending Ordinance No. 4618.
THE CITY OF BREMERTON DOES HEREBY ORDAIN:
Amendment. Sections I and II of Ordinance No. 4618 are amended as
Section 1.
follows:
PURPOSE. This ordinance establishes assessments, rates and charges for municipal
water, wastewater and stormwater services effective for billings subsequent to January 1, 1999.
Except as expressly provided herein, nothing in this ordinance shall affect the application of
annual adjustments of General Facility Fees, or Connection Fees as set forth in BMC 15.06.020.
I. WATER.
(A) ASSESSMENTS: The fees stated herein are those set by Ordinance No. 4309 and do not
reflect CPI adjustments as authorized by BMC 15.06.020.
(1) General Facility Fee.
(a) Within City limits $150.00/ERU
Co) Outside City limits $225.00/ERU
(2) Front Footage Fee.
(a) Within City limits
(b) Outside City limits
$8.00 per foot
$12.00 per foot
(3) Connection Fee.
Rate Per Connection
Size Within City Limits Outside City Limits
3/4" $ 733.00 $1099.00
1" 788.00 1182.00
1 1/2" 1408.00 2112.00
2" 1579.00 2368.00
Greater than 2" Time & Materials 150% of Time & Materials
(4) Pavement Restoration. *
Asphalt
Concrete
$300.00
$300.00
* Refundable, if assessed and not required.
(5) County Road Permit N/A
$450.0O
$450.00
Cost
(B) RATES:
(1) Retail Water Service Rates.
Monthly Service Charge
Meter Size
5/8 & 3/4 inches
1 inch
1-1/2 inch
WASTEWTR. ORD
Within City Limits
2
Outside City Limits
2 inch
3 inch
4 inch
.............
6 inch
8 inch 259.S0
10 inch 92S.95
12 inch
Commodity Ch~ge $0.75/H.C.F. $1.125/H.C.F.
(2) Fire Protection Service.
Monthly Service Charge
Service Size Within City Limits
2 inch $ 10.05
3 inch i i. 1O
4 inch 12.19
6 inch ' ~ ' ~
8 inch "" '~
10 inch 2E.15
12 inch 40-2-5
Outside City Limits
(3) Low-Income Senior Citizen and Low-Income Disabled Citizen Rates.
Monthly Service Charge
WASTEWTR. ORD 3
Meter Size 5/8 X 3/4"
Base Charge
Within City Limits
s2.35
Outside City Limits
$3.50 ~i~/Acct
Commodity Charge
0 - 1000 CF/Billing
Over 1000 CF/Billing
No charge
$0.75/H.C.F.
No charge
$1.125/H.C.F.
(4) Temporary/Construction Meter.
Within City Limits
Size Deposit
3/4" & 1" $ 75.00
Hydrant meter 300.00
Commodity Charge
Base Fee
r'~ '~r ~i}g~/mo
$0.75/H.C.F.
Outside City Limits
Base Fee
..,,,. ~,.., mo
· ~,.ov ...................... mo
$1.125/H.C.F.
(5) Water Inspection Fees.
Main Extensions
Pump Stations
Miscellaneous
Within City Limits
$0.75/ft. but
not less than
$300.00
$500.00
$40.00/Hr.
Outside City Limits
$1.125/ft. but
not less than
$450.00
$750.00
$60.O0/Hr.
WASTEW'rR. ORD
4
II. WASTEWATER
(A) ASSESSMENTS: The fees stated herein are those set bv Ordinance No. 4309 and 4565 and
do not reflect CPI adjustments as authorized by BMC 15.06.020.
(1) General Facility Fee.
(a) Within City limits
Co) Outside City limits
(2) Front Footage Fee.
(a) Within City limits
(b) Outside City limits
(c) Properties not included in ULID
~27 fronting the sewer main in
Northlake Way installed as part
of the Kitsap Lake Sewer Extension
(3)
(ULID #327) Project.
Inspection Fee.
Lateral connection at P/L
Lateral connection at main
Conveyance Facility Ext.
Pump Station
Within City Limits
$ 40.0O
$250.00
$1.25/Ft.
but not
less than
$300.00
$500.00
$150.00/ERU
$225.00/ERU
$ 8.00 per foot
$12.00 per foot
$64.30 per foot
Outside City Limits
$60.00
$375.00
$1.90/Ft.
but not
less than
$450.00
$750.00
WAS~.ORD
Miscellaneous
$40.00/Hr.
$60.00/Hr.
(B) RATES:
(1) Retail Wastewater Service Rates.
Monthly Service Charge
Single Family
Base Charge
Commodity Charge
Within City Limits
$6:40 ~i~/Acct
3.70/H.C.F.
Outside City Limits
Duplex on 1 Meter or 2 Bldgs.
on 1 Meter or Single Parcel
Base Charge
Commodity Charge
$ ....~i~/Umt
3.70/H.C.F.
~:~ o~ ~/Unit
4.25/H.C.F.
Multiple Family
Base Charge
Commodity Charge
$5. I0 ~i}~/Unit
3.70/H.C.F.
$5.°,5 ~$/Unit
4.25/H.C.F.
Commercial I
Base Charge
Commodity Charge
$:/-:4-5 ~i~/Acct
3.70/H.C.F.
$°,?,.55 ~$i~/Acct
4.25/H.C.F.
WASTEWTR. ORD
6
Commercial II
Base Charge
Commodity Charge
$¢:45 ~!~/Acct
5.80/H.C.F.
q:o cz ~8~/Acct
6.67/H.C.F.
(2) Low-Income Senior Citizen and Low-Income Disabled Citizen Rates.
Monthly Service Charge
Single Family Account Class
Base Charge
Commodity Charge
0-1000 CF/Billing
Over 1000 CF/Billing
(3) Septage Disposal
$0.10/gal of tank capacity.
Within City Limits
$4-:40 ~li.~/Acct
Outside City Limits
Sl.S0 ~!.~/^cct
No charge No charge
3.70/H.C.F. 4.25/H.C.F.
III. MISCELLANEOUS CHARGES.
(A) METER TEST FEE SCHEDULE:
Size
3/4" & 1"
1 1/2 & 2"
3" or greater
(B) OFFICE SERVICES:
WASTEWTR.ORD
Utility Customers
Others
$72.00 $ 72.00
$88.00 $ 88.00
$105.00 (W/Test Port) $105.00
Time and Materials (WO/Test Port)
Within City Limits
Outside City Limits
7
Account Maintenance
Delinquency Notice (Mailer)
A.C.H. Per Service
Lien Recovery Charge
Duplicate Bill Charge
(per billing period)
(C) FIELD SERVICES:
Wet tapping (water main only)
Fire Hydrant Installation
Water Meter Removal Charge
Cross-Connection Control
Device Test/Inspection
Water Service Turn-off/Turn-on -
(Customer Request)
Regular Hours
After Hours
Delinquency Notice (Door Knocker)
Water Service Turn-off/Turn-on -
(Delinquent Accounts)
Regular Hours
After Hours
Flow and Pressure Test (Uncertified)
3/4" & 1" meters only
Utility Plant Locates
Regular Hours
After Hours
Emergency
5.00
2.50
< 1.00>
50.00
1.00
2179.00
3153.00
40.00
30.00
N/C
80.00
10.00
30.00
80.00
30.00
N/C
80.00
N/C
2.50
< 1.00>
50.00
1.00
3268.00
4729.00
40.00
30.00
N/C
80.00
10.00
30.00
80.00
30.00
N/C
80.00
N/C
30
Within City Limits
Outside City Limits
(D) UTILITY PLANT INSPECTIONS:
(Miscellaneous)
30.00
(E) PARK RESERVATION FEE:
(non-refundable)
25.00
(F) PLAN CHECK:
(1) Water:
(a) Main Extensions
(Includes hydrants
and appurtenances and
connection to water system)
Co)Pump Stations
(c) Fireline Extensions
(d) Irrigation Systems
(e) System Connections
(f) Miscellaneous
$54.00
$0.10/ft but not
less than $100.00.
$500.00
$54.00
$54.00
$27.00/Hr
IV.
(2) Wastewater:
(a) Conveyance Facility Extensions $0.10/ft but not
(Includes manholes and less than $100.00.
appurtenances and
connection to wastewater system)
Co) Pump Stations $500.00
(c) System Connections $ 54.00
(d) Miscellaneous
STORMWATER
WASTEWTR. ORD
$ 27.00/Hr
9
30.00
25.00
(A) ASSESSMENTS:The fees stated herein are those set by Ordinance No. 4529 and do not
reflect CPI adjustments as authorized by BMC 15.06.020.
(1) Storm Drainage Plan Review Fees**
Preliminary Drainage Plans
Residential Development
Non-Residential Development
Within City Limits
(2) Final Detailed Drainage Plans
(a) Residential Development
0-20 Lots
21-50 Lots
51-100 Lots
100+ Lots
Minimum Charge
Non-Residential
Development
Minimum Charge
(b) Resubmittal Fees
First Resubmittal
Subsequent Resubmittal
(3) Storm Drainage Inspection Fees**
Residential Development
WASTEWTR. ORD
10
$325.00 N/A
$225.00 + N/A
$10.00/ISU N/A
$35.00/Lot N/A
$25.00/Lot N/A
$22.50/Lot N/A
$20.00/Lot N/A
$250.00 N/A
$10.00/ISU N/A
$150.00 N/A
No Charge N/A
$250.00 N/A
$15.00/Lot N/A
Outside City Limits
32.
Non-Residential Development
Minimum Charge
Conveyance Fac. Ext.
Unscheduled Inspections
$10.00/IS U
N/A
$100.00
N/A
$ .75/Ft with
a minimum of
$300.00
N/A
$40.00/Site Visit N/A
(Unscheduled inspections shall be tracked through the course of project and
billed after the final site inspection. Fees for unscheduled inspections shall be
paid prior to final occupancy approval)
**Storm drainage plan review and inspection fees do not apply to single family residence or
duplex construction on an existing established lot. Fees payable at time of submittal.
(B) RATES:
(1) Retail Stormwater Service Rates.
Monthly Service Charge
Single Family
Base Charge
Low Income Senior
Citizen and Low Income
Disabled Citizen Rate
Exception: Duplex
W/2 Meters
Multiple Family
Base Charge
Within City Limits
Outside City Limits
$4.00/Acct N/A
$2.50/Acct N/A
$2.00/Acct N/A
$4.00/ISU N/A
Commercial
WASTEWTR. ORD
11
33
Base Charge $4.00/ISU N/A
Public School Districts
$4.00/Acct* N/A
*Parcels owned or leased by public school districts which provide
activities which directly benefit the surface and stormwater
management program. The activities may include: curriculum
specific to the issues and problems of surface and stormwater
management and student activities in the community to expose
students to the efforts required to restore, monitor, or enhance the
surface and stormwater management system. Pursuant to RCW
35.92.021, the amount of the service charge shall be determined by
the Director, based upon the cost of the activities to the school
district, but not to exceed the value of the activity to the stormwater
management program. Determination of which activities qualify for
the stormwater management service charge reduction will be made
by the Director. Reductions in Stormwater Management service
charges will only be granted to school districts which provide
programs that have been evaluated by the Director. The service
charge adjustment for the school activity may be applied to any
parcel in the service area which is owned or operated by the school
district.
Retail Stormwater Rate Adjustment
Multiple Family & Commercial
Within City Limits
Outside City Limits
Water Quality
Water Quantity
$.50/ISU
$1.50/ISU
N/A
N/A
Stormwater Penalty
for new Multiple
Family & Commercial
development without
on-site detention
(BMC 15.06.050Co))
$.50/ISU
N/A
WASTEWTR. ORD
12
(2) Implementation Schedule for Annexed Properties. When annexed to the Ci~, all
multiple family and commercial properties with two or more ISU's will receive the credits
in b.(1)(v) above per ISU for 2 years from the date of annexation; Provided, the property
owner submits engineering plans and specifications for on-site stormwater quantity and
quality improvements for their property within 9 months of annexation, and said plans are
approved by the Department according to System Development and Construction
Standards. Failure to comply with any of the aforementioned provisions will result in these
accounts being charged at the rate of $4.00/ISU/Month beginning 1 year from annexation.
V. REBATE.
A rebate of the portion of the front footage and facilities fees in excess of the fees charged City
residents shall be made to any owner(s) whose property becomes annexed into the City of
Bremerton within twelve (12) months from the date of payment of such fees.
Section 2. Effective Date. This ordinance shall become effective ten days after its
publication as provided by Section 15 of the City Charter.
APPROVED by the City Council of the City of Bremerton this
,1998.
PASSED by the City Council of the City of Bremerton this
,1998.
day of
day of
DAVID FARR, Council President
WASTEWTR. ORD
13
35-
APPROVED this
day of
,1998.
LYNN HORTON, Mayor
ATTEST:
KATHLEEN McCLUSKEY, City Clerk
WASTEWTR.ORD
14
AGENDA BILL
BREMERTON CITY COUNCIL
1. SUBJECT: ORDINANCE NO.
Reducing the B & O Tax on Garbage and Refuse Business
FOR AGENDA OF:
ORIGINATING DEPT:
ORIGINATOR:
DATE SUBMITTED:
Treasurer~
Rich Hanha~
Nov. 5, 1998 '
2. CLEARANCES: Comment of back if necessary) 3. EXHIBITS:
Dir. Admin. Services ,~ .__~__~/ Proposed Ordinance
DeputyCity~~ ~.~ _
City Attorney ~ ~~'--~ '~ .//J _ . _
Fiscal&BudgetComm.~~/ ~ ' ~ ~~ O/~~
ENDORSEMENTS ~ INFORMATION ~PROVED BY CO~IL PRESIDENT FOR~BMI~AL:
4. SUMMARY STATEMENT AND REQUIREMENT FOR COUNCIL ACTION:
This ordinance will continue the process, begun in January of 1995, of gradually reducing the B & O Tax on garbage
and refuse businesses within the City to a level consistent with other utility tax rates. The intention is to reduce the
tax rate by one percent each year until the rate is reduced to six percent.
8. RECOMMENDATION:
Motion to approve on first reading the Ordinance reducing B & O tax on garbage and refuse businesses.
Motion to pass on second reading the Ordinance No. __ reducing B & O tax on garbage and refuse businesses.
9. RESPONSIBLE OFFICIAL:
ENFORCEMENT OFFICIAL:
EXPIRATION DATE:
REVIEW DATE:
Treasurer
Mayor
N/A
November 1999
PULLED TABLED
COUNCIL DIRECTIVE:
10. NOTICE OF ACTION
APPROVED DISAPPROVED
AMENDED
'11. AGENDA BILL NO:
2. CLEARANCE COMMENTS:
5. IMPACT ON NON-PASSAGE:
The tax rate on garbage and refuse businesses will remain at the current level.
6. IMPACT ON STAFFING, BUDGETS, FACILITIES, EQUIPMENT OR OTHER RESOURCES:
This change is included in the revenue assumptions of the 1999 - 2000 Preliminary Budget. This creates a reduction
of General Fund revenues of approximately $47,500 compared to the prior tax rate.
7. RESEARCH SOURCES:
BMC 5.02.070(p)
ORDINANCE
AN ORDINANCE relating to occupation tax for the garbage/refuse business, and
amending Chapter 5.02 of the Bremerton Municipal Code.
THE CITY OF BREMERTON DOES HEREBY ORDAIN:
Section 1. Amendment. Section 5.02.070 of the Bremerton Municipal Code is amended to read as
follows:
5.02.070 OCCUPATION TAX - RATES - WHO MUST PAY - UTILITIES. There is hereby levied upon
and there shall be collected from every person as hereinafter provided for the act or privilege of engaging in
business activities within the City, whether his office or place of business be within and/or without the City, an
occupation tax, sometimes herein referred to as the "tax", in amounts to be determined by application of the
rates given against the value of products, including byproducts, gross proceeds of sales or gross income of the
business, as the case may be, as follows:
(p) Upon every person, firm, or corporation engaged in the business of collecting garbage, refuse,
hazardous materials or other waste within the corporate limits of the City an annual tax of six't'een ~[!~?~ percent
(--1-6%) ~Z~ of the total gross income rendered within the City, effective January 1, -1-998 ~i~g
Section 2. Effective Date. This ordinance shall become effective ten (10) days from passage and
publication.
APPROVED by the City Council of the City of Bremerton this day of ,1998.
PASSED by the City Council of the City of Bremerton this ~ day of ,1998.
APPROVED this __ day of
DAVID FARR, Council President
,1998.
ATTEST:
LYNN HORTON, Mayor
KATHLEEN McCLUSKEY, City Clerk
AGENDA BILL
BREMERTON CITY COUNCIL
1. SUBJECT:
PUBLIC HEARING/RESOLUTION # ~0
ACTION: Appeal of a shoreline variance
a reduction in setback from 25 feet
to 15 feet.
APPELLANT: Paul Scheyer
LOCATION: 922 Shore Drive
FOR AGENDA OF: November 24, 1998
DEPT. OF ORIGIN: DECD 7,Planning
ORIGINATOR: Jon Holan,~,~,
DATE SUBMITTED: Noven%ber 17, 1998
2. CLEARANCES: (Comment, on back if necessary) 3. EXHIBITS:
DECD Director : ~_~~
City Attorney:/ /4
ENDO~E~NT/><' INFORMA. TION APPRO~D BY COUNCIL P~SIDENT FOR SUBMITTJ~I~:
4. S~Y STATE~NT ~ ~QUI~NT FOR CO~CIL ACTION:
CC Resolution No.~O
Staff Analysis
Public Notice of Appeal.
Appeal Application and
Arguments in Support.
PC Minutes (10/20/98).
PC Resolution No #98-06.
PC Findings of Fact,
Conclusion & Decision.
Coutts Shoreline Variance
Application.
Council must decide if the appellant's arguments for denial of the Coutts
Shoreline Variance SLV 98-0002 justify rescinding the Planning Commission's
decision of approval of October 20, 1998.
5. RECOMMENDATION:
~ ~se~o~ No.
.......... ~ ................... affirming the Planning Commission's decision.
~X~I~TION
~VIEW DATE:
7. NOTICE OF ACTION
PULLED TABLED
COUNCIL DIRECTIVE:
APPROVED
DISAPPROVED AMENDED
DATE:
CLEARANCE COMMENTS:
Appeal (APL 98-0016) application fee of S65.00 was paid on October 30,
1998.
10.
IMPACT OF NON-PASSAGE:
If the shoreline variance is denied, the applicant's options for
development of the proper~y will be si~ificantly reduced.
11.
IMPACT ON STAFFING~ BUDGETS, FACILITIES, EQUIPMENT OR OTHER RESOURCES:
Additional staff resources will be required to review final plans and
permits·
12. RESEARCH SOURCES:
Zoning Ordinance
File
Site Visits
Shoreline Master Program
Relevant State Laws
RESOLUTION NO.
A RESOLUTION AFFIRMING Tlt-E COUTTS APPLICATION
FOR A SHORELINE SETBACK VARIANCE (SLV 98-0002)
WltEREAS, Gary and Heather Coutts requested a variance of a shoreline setback for a
new residence at 922 Shore Drive; and
WItEREAS, the Bremerton Planning Commission conducted an open record public
hearing on October 20, 1998, during which it received oral and written comments pertaining to
the subject application; and
WItEREAS, the Planning Commission approved application SLV 98-0002; and
WHEREAS, Paul Scheyer has requested a review of that decision by the Bremerton City
Council (APL 98-0016) and that review was heard in a closed record public hearing on November
24, 1998;
NOW, BE IT RESOLVED, that the Bremerton City Council makes the following
findings:
Staff and the Planning Commission have unanimously agreed that the applicant has
shown sufficient hardship to justify the approved shoreline variance.
o
The appellant has not provided any evidence, based on the record, that this
hardship is not warranted.
The consolidation of permits is not germane to the issuance of the shoreline variance
since such consolidation is not required.
NOW TItEREFORE, the Bremerton City Council hereby affirms the Planning
Commission's approval of the Coutts Shoreline Variance SLV 98-0002.
PASSED by 5a~ ~r~ 5ouncil of the C~ _-~erton this
,1998.
day of
~I~xVID FARR, President
-~emenon City Council
APPROVED
day of
,1998.
ATTEST:
~-.~x3_'N S. ItORTON, Mayor
Er~~ of Bremerton
PAULA JOHNSTO~N, ~ City Clerk
APPEAL OF A SHORELINE VARIANCE BEFORE THE CITY COUNCIL
November 24, 1998
1. Appellant:
Paul Scheyer
2111 Madrona Point Drive
Bremerton, WA 98312
File Number: APL98-0016
2. Request:
REVIEW OF SHORELINE VARIANCE FILE NO. VAR98-0002
3. Attached Documents:
· Appeal Application dated October 30, 1998.
· Public Notice of Appeal.
· Appellant arguments in support of his appeal received November 12, 1998.
· Planning Commission Meeting Minutes from October 20, 1998 pertaining to appeal.
· Planning Commission Resolution No. 98-06.
· Findings of Fact, Conclusion & Decision of the Planning Commission.
· Coutts Application for Shoreline Variance No. SLV 98-0002.
4. Background:
The appellant is appealing the Planning Commission's decision of approval dated October
20, 1998 of Gary and Heather Coutts' request for a shoreline variance for a setback
reduction from 25 feet to 15 feet for a residence, as described in the attached staff report
prepared for the Planning Commission Public Hearing.
The Planning Commission held an Open Record Public Hearing on October 20, 1998.
The Notice of Decision approving the shoreline variance was issued on October 21, 1998
and required a 14 day appeal period which closed on November 4, 1998.
The appellant submitted an appeal (APL98-0016) on October 30, 1998, within the appeal
period and with payment of the appropriate fee.
The October 30, 1998 appeal included the application, a letter from the applicant
addressing the shoreline variance, and a prior staffletter dated August 11, 1998 addressed
to the appellant discussing a separate building permit application the appellant had with
the City.
The Coutts Shoreline Variance request was subject to the Review Criteria A through F, as
set forth in WAC 173-27-170.
5. Summary of Appeal:
The appellant alleges that proper procedural requirements of the Bremerton Shoreline
Master Program (SMP) were not followed and the shoreline variance application was
incomplete because all required permits for future residential building projects were not
filed simultaneously. He further alleges that no extraordinary hardship has been shown
that would justify this shoreline variance and that approval of this shoreline variance
shows selective enforcement.
The appellant feels that the SIMP requires a consolidated permit process. He asserts that
the Coutts' application was incomplete because it did not include a request for a
Conditional Use Permit for potential view corridor issues, or an additional variance for
possibly exceeding allowable lot coverage. Both of these issues are potentially related to
an anticipated building permit for future development on the property which has yet to be
designed or submitted.
The appellant also alleges a lack of enforcement of the Growth Management Act, but does
not give any specific reference.
6. Staff Analysis:
The following is a staff discussion of the relevant issues based on the record and applicable
laws:
Open Record vs. Closed Record Public Hearing:
Although not part of Appellant's arguments, there is an apparent conflict between the
Bremerton Municipal Code (BMC) and state law as to whether the review of an appeal on
a shoreline variance is conducted by an open or dosed record public hearing.
BMC 21.02.860(c) states that the Planning Commission decides shoreline variances after
holding open public hearing. Further, BMC 21.02.860 (d) states that an appeal of
shoreline variance is an open record hearing to City Council.
However, RCW 36.70B.060 (3) stipulates that the permit review process shall provide for
not more than one open record hearing and one closed record appeal. If an open record
pre-decision hearing is provided prior to the decision on a project permit, the process shall
not allow a subsequent open public record appeal hearing.
The City Attorney's Office has reviewed the matter and concluded that Washington State
law supersedes and overrules our local code concerning this issue of shoreline variance
appeals. As a result, the matter is before the City Council as a closed record appeal.
Complete Application / Consolidated Permit Process:
The appellant contends that the Coutts Shoreline Variance application was incomplete
because it was not a consolidated permit application containing all anticipated
development applications for a future residence.
KCW 36.70B.060 outlines provisions for local governments establishing integrated and
consolidated project permit process, Subsection (3) of this rule indicates that the
consolidated project permit review process as "optional." In addition, RCW 36.70B.120
outlines the permit review process, Subsection (1) states in part, "If an applicant elects
the consolidated permit review process, ..." [emphasis added]. No language in the BMC
requires an applicant to file for a consolidated permit review process. It can then be
concluded that the consolidated permit review process is clearly intended to be an optional
and not mandatory permit review process. Thus, the applicant is not required to file for
any other permits at this time.
Further, a building permit is not required in requesting a shoreline variance and a building
permit has not been submitted or requested to date by the Coutts. As a result, it cannot be
determined whether a zoning variance for lot coverage or a shoreline conditional use
permit for reduction in the view corridor, as mentioned by the appellant, is required.
Therefore, the Coutts Shoreline Variance Application can be viewed as a complete
application by itself, even though the applicant elected not to submit a consolidated permit
application.
Hardship Issue:
The appellant alleges that sufficient hardship justifying this shoreline variance was not
shown. He offers no evidence in support of this allegation.
Staff analyzed the Coutts Shoreline Variance request subject to the Review Criteria A
through F, as set forth in WAC 173-27-170 and concluded and recommended that based
upon the circumstances of the parcel location, location of existing homes on adjacent
properties, the natural restrictions and standards of city codes, this shoreline variance
would not be considered a special privilege, is a minimum request, and will not affect the
public interest.
The Planning Commission made the following findings in support of the shoreline variance
request:
1. The requested shoreline variance is reasonable and complies with the existing
development pattern in the surrounding neighborhood.
2. The shoreline variance action is exempt from SEPA review.
4¢
3. The shoreline variance is consistent with the Shoreline Management Act, the
Bremerton Shoreline Master Program, and the Review Criteria for Variance Permits.
The Planning Commission passed unanimously Resolution No. 98-06 approving Shoreline
Variance Application No. SLV 98-0002.
7. Conclusions:
Staff and the Planning Commission have unanimously agreed that the applicant has shown
sufficient hardship to justify the approved shoreline variance. The appellant has not
provided any evidence based on the record that the hardship is not warranted. Further, the
consolidation of permits is not germane to the issuance of the shoreline variance since
such consolidation is not required. Thus, the appellant's arguments for denial of the
Courts Shoreline Variance No. SLV 98-0002 do not justify rescinding the Planning
Commission's approval.
CITY OF BRE~~N
· ~9 4th Street · Bremerton, WA 98337
NOTICE OF APPEAL
Bremerton City Council
The Bremerton City Council will conduct a closed record hearing on the following item
during its regular meeting on Tuesday, November 24, 1998 which will begin at 6:00 PM in
the City Council Chambers of the Bremerton City Hall, 239 4"' Street, Bremerton, WA.
APL98-0016 - Appeal of Shoreline Variance VAR98-0002 at 922 Shore Drive.
Appellant Paul Scheyer is appealing this variance decision for reason that no extraordinary
hardship has been shown by applicant.
Copies of pertinent materials can be viewed at The Department of Economic and
Community Development, located at 286 4ta St., Bremerton, WA 98337. Call il'ames
Coombes at (360) 478-5845 for additional information.
· Celebrating 50 Years of Freedom
~ ~111111
PERMIT CENTER
286 Fourth Street,
Phone: (360)478-5275
Bremerton WA 98337
Fax: (360)478-5278
Request Party:
Request for Review of Decision of Dir-eet, or,/$Z
Planning Commission ~--~o-AppcMa Cease &
Reference: Zoning Code Section 21.02. 935 & 2I. 02. 945
O/our name) -
(Your mailing address)
(Telephone Number)
Decision Being Appealed: ~/'/4- f~ ~..~ ~ ~ ~'~ 3
OCT 3 0 1998
BREMERTON
BUILDING DEPARTMENT
Please prm, idea concise statement of the specific finding(s) or conclusion(s) to be reviewed, together
with mater/al facts claimed to support your contentions. Use additional paper if necessary.
Please provide a brief statement of the relief sought and the reasons why the decision/action should bo
reversed, modified or remanded. Use additional pages if necessary.
Appellant's Signature'
Review to
Reviews will be scheduled to be heard before the Bremerton City Council as soon as possible, allowing
for adequate preparation and notice. You will receive written notification of the Council hearing date
mailed to vour address given above. The City Council decision is the final legislative decision.
Last printed 04/29/98 9:46 )uMC:XMy Documents~q. equest for Review of Decision of Director.doc
4~
OCT 3 0 1998
BREMERTON
8UILD!NG DEPARTMENT
CITY OF BREMERTON ·
239 4th Street
* Bremerton. V~[[ 98337
Department of Community Development
Building, Land Use, and Environmental Services
August 11, 1998
Paul Scheyer
2111 Madrona Point Ddve
Bremerton, WA 98312
Re: Building Permit Application 98-0439 & 98-0443.
Dear Paul:
The Bremerton Shoreline Master Program (SMP) requires provisions for a view ccnfidor for
new construction on shoreline property in the City of Bremerton or an ability to meet the
conditions of Key 2 in Table 3-2 of the SMP (see enclosure).
The proposed Phase One deck shown on your plans for Permit Appiica~cn 98-0439 appears
to encroach into your required view corridor, though the view corddor width is not shown on
your plans nor can it be determined from the information provided (percentage of view comdor
width is determined by the height of the house).
Furthermore, the Bremerton Zoning Ordinance requires 5 FT side yard setbacks in this 'SF-3'
zoning area (BMC Title 21 Appendix, Figure 130, LOT REQUIREMENTS). The site plan for
Permit Application 98-0443 indicates a setback of 3 FT at the indicated south property line for
the proposed deck. Since the indicated deck height exceeds the maximum 30 inch height
allowed for decks allowed to within 3 ~ of the side yard setback, the deck dimensions need to
conform to the 5 FT setback provision of the Zoning Ordinance.
Please contact me at this office or by phone at 478-5275 for any clarifications you need to
correct your Permit plans to meet the SMP or Zoning Ordinance.
Sincerely,
James Ccombes
Land Use & Environmental Services Division
cc: Judy Johnson
enclosure.
· Celebrating 50 Yea~ of Freedom
OCT 3 0 1998
BREMERTON
BUILDING DEPARTMENT
BUiLD!NG DEPARTMENi
The minutes of the Planning Commission meeting of October 20, 1998 were approved as
presented at the November 17, 1998 meeting.
Respectfully submitted by:
Pattie Haas, Recording Secretary
Draft Mirrutes for Approval
Planning Commission Meeting
October 20, 1998
I. Roll Call
Those present were: Chairman Robinson, Commissioners Boyd, Dingfield, Stone, Griggs,
Adams. Commissioner Wolfe had an excused absence. Quorum certified.
II. Call to Order
The meeting was called to order by Chairman Robinson at 6:00 p.m.
III. Approval of the Agenda
Motion by Commissioner Stone to approve the agenda as presented. Seconded by
Commissioner Dingfield. Agenda approved.
IV. Public Hearing
1. Shoreline Variance Application (SLV98-0002) Applicant: Gary and Heather Coutts,
922 Shore Drive (a vacant lot).
Mr. Jori Holan presented the staff report. Applicants are requesting a shoreline variance in the
setback to reduce the shore yard setback 10 feet so that a new single family residence will be in
alignment with existing structures on adjacent parcels. In reference to variance criteria there are
several requkements that have to be met. Staff supports approval of the variance. A hardship has
been created as a result of the parcel being platted in the early 1900's which created lots between
Shore Drive and the waterfront. A th/rd of this parcel is in tidelands and does not allow itself for
construction to a standard residential design. The variance request is partially based on a 4,200
square foot buildable area of the lot due to the relative nature of the beach location restriction of
the developable area, As referenced by staff research efforts, the adjacent parcel has received the
benefit for a shoreline variance in which the residence is at 15 feet from the shoreline and the City
has maintained flexibility within the shoreline and zoning codes for special exceptions to address
the limits of the Shore Drive older residences. The applicant has also indicated an impact with
regards to view limitation as a result if the strict implementation of the shoreline setback is
imposed. The applicant is obtaining a fight which has been granted to other residences in the
area. This will be aligning th~/residence with two neighboring structures on either side of the
property and the public will not suffer any substantial detrimental effect as a result of approval of
the variance. We believe the reduction in shoreline setback from 25 to 15 feet is reasonable, it is
Planning Commimon Meeting October 20, 1998 Page I of 9
based on the circumstances of the parcel location, the natural restrictions coupled w/th standards
of the City code. This is compatible with other residences in the area and will not be considered
as a special privilege, and will not effect the public interest. Staff'recommends to the Planning
Commission to concur with the request for the shoreline setback variance (SLV98-0002) and we
suggest the adoption of Resolution 98-06 to enact the approval.
Commission Griggs commented that he lives on Shore Drive and is familiar with the property.
He questioned the wording of"existing bulkhead" regarding the property. He did not believe
there was a bulkhead at this site. He also questioned reference to a retaining wall at Bachman
Park.
Mr. ltolan noted that he did not believe either of these issues had a substantive impact in terms of
the variance request.
Chairman Robinson asked if there was any written testimony concerning this application. He
asked if the applicant or their representative would like to make any comments or presentation.
Mr. ltolan noted for the record that there was no written testimony submitted.
Mr. Jeffrey Hecker (Hecker Architects, Bremerton) commented that he was representing the
applicants, Gary and Heather Courts. Mr. Hecker thanked Jori Holan for his presentation and the
Department of Economic and Community Development staff for their preparation of the
application. Mr. Hecker referred to a photograph in the application packet that the
Commissioners had received that shows an existing masonry bulkhead on the property (stacked
concrete with masonry blocks on top of it). They are requesting a reduction of the setback to a
siteline setback between the two adjoining properties. Mr. Hecker indicated that the photographs
in the packet illustrate the proposal (proposed setbacks and current requirements). If they build at
the 25 foot setback it will cause a view blockage issue because the two adjoining properties are
built closer to the bulkhead than what is currently required. Mr. Hecker also mentioned that they
have addressed all the criteria for the variance requirements from the State of Washington
Administrative Code (WAC) as follows: 1) the dimensional requirements would cause a hardship
for this particular piece of property (view blockage); 2) the project is compatible with existing
uses in the area if the requested variance is approved; 3) there have been past variances and
special exceptions granted to other neighbors because it is an older neighborhood and things have
developed in a certain manner that sometimes requires flexibility in how you plan a new project;
4) they are only requesting going to a siteline setback between the two adjoining houses which
would correct the view blockage issue; and 5) based on the development patterns used from the
surrounding areas, it should not have any substantial detrimental effect on public interest.
Mr, Heeker also asked that the Commission note that he and the applicants have met with the
Planning staff, the adjoining neighbors, and also with the Department of Ecology (DOE) to get
their opinion on this proposal. Both the neighbors on either side and above have indicated that
they have no problem with this proposal. A representative from DOE was on site and she
indicated that they would be ~pportive of this application and it was an appropriate instance for a
variance because of the view blockage problems and the existing pattern of development.
Planning Commission Meeting October 20, 1998 Page 2 of 9
Commissioner Dingfield asked if the bulkhead would be repaired.
Mr. Hecker answered yes the bulkhead would be repaired/strengthened at a future date
Chairman Robinson asked if there were any additional questions or any other public testimony
in favor or in opposition to the project.
Pubfic Comment
Mr. Paul Scheyer, a resident of Madrona Point Drive, presented a litany of his concerns
regarding other development standards for the parcel. It was his opinion that view corridor,
building height, building setbacks, spray hitting the house, and requirements were not adequately
addressed.
Mr. ltolan replied that the view corridor requirements would have been reviewed with staff and
they would not have recommended approval if there was an issue. He also reminded the Planning
Commissioners that some of the other issues that Mr. Scheyer brought up are building permit
issues and no building permit has been applied for at this time. These issues would be discussed
at the time the building permit is applied for.
Commissioner Dingfieid asked if the view corridor issue would be brought up during the
building permit process and asked if the applicants are penalized by the clear variance that was
allowed on the other side where they built their house right up to the property line. How is that
adjusted so that these people do not get penalized?
Commissioner Stone asked about proper notice being given. He believed he had read it in the
Legal Notices.
Mr. ltolan responded that yes it had been in the newspaper and showed a copy of the ad. It had
been noticed on October 5, 1998. There was also a notice placed on the property and notices
were sent to the appropriate property owners.
Commissioner Griggs noted that he had seen the bulkhead on the property but that it was blocks
and not a real blockhead. His concern was that a ferry wake could damage it. He felt the
bulkhead in place at this time was high enough that damage would not occur. He would like to
see a stronger bulkhead in place in the future. In response to the view corridor issue, this is a
dead end street, people are not cruising around there. It is a City street, there is no turn-around,
but they can and they do. A lot of people walk along there and they probably would like a view
of the water, but it's not there. The property in question is near Bachman Park and people can go
there and sit at the gazebo and be by the water and enjoy it. He saw no problem with this request
as presented.
,t'i
Planning Commission Meeting October 20, 1998 Page 3 of 9
Mr. Hecker indicated that he had discussed the scope of the project with the Planning staff,
specifically the variance issue. The view corridor issue had been addressed and they do not feel it
will be a problem. They are in compliance with the Shoreline Master Program, as indicated on the
drawing. He also noted that the property had been legally posted for quite some time and he had
seen the legal notice in the newspaper. The bulkhead will be reinforced.
Chairman Robinson asked that the Commissioners keep the comments made by Mr. Scheyer in
perspective. The issue before them tonight was simply the setback variance issue. The building
of a residence and the issues surrounding that (view corridor, height of building, the footprint in
conjunction with the lot, side setbacks, etc.) are covered under the Uniform Building Code and
zoning ordinances and are very specific on their requirements.
Commissioner Dingfield commented that she is familiar with Shore Drive and in her opinion the
plans submitted reflects the neighborhood very well and, therefore, made a motion to adopt
resolution//98-06 as outlined and presented before them. Seconded by Commissioner Boyd.
Question Called: Boyd, yes; Stone, yes; Dingfield, yes; Griggs, yes; Adams, yes; Robinson,
yes. Motion passes unanimously.
2. Presentation by Public Works Department (Mr. Gene Sampley, Director of Public
Works and Utilities) on City sewer and storm drain facilities.
Mr. Sampley discussed the storm system has some limited capacities, as it is an old system, but it
is fairly new as a utility and they are focusing on the new connections and the CSO program with
their stormwater utility. Mr. Sampley presented Exhibits A and B, maps of the City of Bremerton
service area. There are several basins. It takes a great deal of effort to get the wastewater from
East Bremerton over to West Bremerton, where the treatment plant is located. In order to do
that there are a total of 33 pump stations. There is a secondary treatment plant that has a capacity
of 10.1 million gallons a day average monthly capacity. It has a hydraulic capacity on a peaking
period of 29.1 million gallons a day. They can take in flows through the plant approaching 40
million gallons a day. There is a lot of range when you look at the average summer flow, which is
about 4.5 million gallons. This presents a lot of challenges for the City because they have a
combined sewer system which accepts storm water in most of the areas east of SR-3. All of East
Bremerton and most of West Bremerton is combined sewers. In response to the Federal Clean
Water Act in 1992 they adopted the Combined Sewer Overflow Reduction Plan. There is a total
of 17 overflows in the City. These combined sewers at peak storms will overflow and there is a
significant effort in implementation of a plan to expend approximately twenty millions dollars (in
1989 dollars) by the year 2011 to reduce the overflow throughout the City to no more than one
event per year.
Mr. Sampley went on to say that the combined sewer overflows are different than an overflow
which would occur due to a power failure at a pump station or something similar. This is strictly
a storm-related event. They are plagued by factors in storms that are almost immeasurable, i.e.,
the intensity and duration of the storm. They get information basically on how many inches of
rain did we have over a 24 ho~ period, but the real impact of a storm is how quickly it comes and
how fast it hits the system. T~fieir reliability has increased dramatically over the past couple of
years. All stations have more back-up power, more reliable equipment, and their response time is
Planning Commission Meeting October 20, 1998 Page 4 of 9
advantageous, it really isn't in certain cases. They would like to dis,courage that. It is in the
applicant's favor to take care of the planning matters first and theft/hove on to the building
permit, because that is what actually happens when the department receives them.
Terrie O'Neill, Municipal Services Coordinator, Department of Economic and Community
Development, noted that these changes are not only a mandate from the Mayor to take a look at
the zoning ordinance, it is really a mandate from the public that the City do something to
streamline the process to make development in Bremerton a real pleasure for people. You will be
hearing a lot about efficiency, economy and customer service from their department, because they
are really making a lot of positive change. Terrie also wanted to congratulate Jon Holan on all the
work he has done in the department, taking inventory of things that need to be changed, and feels
that he is making very positive changes.
IX. Old Business.
Nothing to report for subcommittee. Commissioner Stone asked what was the status of the
moratorium on docks, as the moratorium ends November 5, 1998.
Doug Fortner, City Attorney, responded that it is on the City Council agenda for November 4,
1998.
X. New Business.
Nothing to report.
,31I. Adjournment.
Meeting adjourned at 8:15 p.m.
Respectfully submitted by:
Pattie Haas, Recording Secretary
Approved by:
Bill Robinson, Chairman
Planning Commission Meeting October 20, 1998 P~ge 9 of 9
CITY OF BREMERTON
DEPARTMENT OF ECONOMIC & COMML,.-NITY DEVELOPMENT
FINDINGS OF FACT, CONCLUSION & DECISION
OF THE PLANNING CO~O. flSSION
SHORELINE VARIANCE
File No. 98 - 0002
I. SUMMARY
The applicant is requesting a Shoreline Variance to reduce the shoreyard setback from the
required 25 feet to 15 feet for the construction of =_ new single family residence.
Attachments:
A. Application
B. Site Plan
C. ViciniD- Map
D. Shoreline Environment Desigmtion Map
IL FINDINGS OF FACTS
A. Applicant: Gary & Heather Coutts
Seattle, WA
Be
Application: Shoreline Variance (setback)
Reduce the shoreyard setback I0 feet so the new single family
residence will be in alignment with the existing structures on
adjacent parcels.
C. Location:
922 Shore Drive
Within NWl/4, Section 18, Township 24, Range, 2 East
Sinclair Inlet
D. Tax Lot No.: 3923-004-010-0008, Plat of Crrand View Addition
E. Project Description: Applicant seeks a reduced shoreline setback variance to the
Bremerton Shoreline Master Program Table 3-2 Site Development Standards, Residential
Detached Dwelling Unit 25' - Shoreline setback requirement.
F. Existing Conditions: The parcel fronts 60 feet along the south side of Shore Drive, 72 feet
along the east side, 67 feet along the west side, and 60 feet alone the beach bulkhead. There are
existing residences on the neig3bofing parcels. The subject site is vacant. The site configuration
appears to indicate that a structure was formerly lecated on the Parcel. Also, a review of a old
aerial photo indicates a prior structure.
The site is adjacent to the south side of Shore Drive. On the north side of the street is a 25 foot
high cement retaining wall with Bachman Park upon the crest of the hill.
G. Surrounding Land Use and Zoning:
The surrounding area is zoned SF-3, a medium density residential neighborhood.
H. Shoreline Master Program Environment Designation Map:
The site is designated Residential along this dead-end section of Shore Drive.
I. Shoreline/Use Activity:
The Shoreline Use/Activity is Urban Residential. The construction of a new single family
residence is a permitted activity within this area, subject to applicable development standards.
J. Permit Processing Procedure:
The decision on a Shoreline Variance, a Type II process, is made by the Bremerton Planning
Commission, and may be appealed to the City Council.
K. Public Notice:
Determination of Completeness was issued on September 2, 1998
Notice of Application was published on September 8th & 15, 1998.
Notice of Application was mailed and posted on site on September 4, 1998.
Notice of Comment Period ended on October 14, 1998.
L. SEPA Review: Statement of Categorical Exemption. This project is categorical
exempt from SEPA review pursuant to WAC 197-11-800 (6)(b)
III CRITERIA FOR APPROVAL
Shoreline Master Program (SMP)
The City Shoreline Master Program setback for a detached dwelling unit in the environment
designation of Residential is required to be 25 feet (SMP Table 3-2 Site Development Standards
p. 3-26).
The City SMP further states that the requested Variance must meet the Review Criteria as
outlined in WAC 173-14-150. (NOTE: At the time of the adoption of the SMP in 1977 the WAC
reference was 173-14-150. However, the current WAC reference is 173-27-170.
The applicant's representative, Mr. Jeff Hecker has submitted his response to the WAC 173-27-
170 review criteria and photographs. (Attached as Exhibits to the Application)
The Staff concurs with Mr. Hecker's analysis and supports the notion that the request is in
keeping with the existing development pattern in this area of the shoreline.
Staff researched some of the city files of the typical land use applications associated with the
continuous development of the Shore Drive community. The effort found flexibility within the
SMP to accommodate the remodeling, renovation, expansion, and site improvements for this
older beach community south of the Manette area.
Also of note, the adjacent parcel (Brachner-924 Shore Drive) was granted in 1986 an Conditional
Use permit to expand their legal non-conforming structure and also secured a variance for a
shoreyard setback of 15 feet. (File SL-02-86)
Analysis and Conclusions of the Variance Review Criteria.
The criteria is listed below, followed by staff's analysis.
A) That the strict application of the bulk, dimensional or performance standards set forth
in the applicable master program precludes, or significantly interferes with, reasonable use
of the property;
A circumstance in this particular variance is the hardship as a result of the parcel being platted in
the early 1900's which created lots between Shore Drive and the waterfront. A third of the parcel
is tideland in nature and does not allow itself for fulfilling a standard residential design.
B) That the hardship described in (a) of this subsection is specifically related to the
property, and is the result of unique conditions such as irregular lot shape, size, or natural
features and the application of the master program, and not for example, from deed
restrictions or the applicant's own actions;
This variance request is partially based on the 4,200 square buildable area of the lot due to the
relative nature of the beach location restriction of developable area, and the restrictions associated
with the shoreline setback code. The area of the variance is the width of the residence at 46 feet
with the varied setback area of 10 feet for a total of 460 square feet of affected dwelling space.
C) That the design of the project is compatible with other authorized uses within the area
and with uses planned for the area under the comprehensive plan and shoreline master
program and will not cause adverse impacts to the shoreline environment.
As referenced by staff research efforts, the adjacent parcel received the benefit for a shoreyard
setback variance, which set the residence at 15 feet from the shoreline. The city has maintained
flexibility within its shoreline and zoning codes for special exceptions to address the limits of the
Shore Drive older residences. The consideration of the replacement of some former residence on
the site is in keeping with the general upgrade of this community.
D) That the variance will not constitute a grant of special privilege not enjoyed by the other
properties in the area;
The City files supports the variance request by the prior actions granting variances and conditional
uses along this dead-end section of Shore Drive.
E) the variance requested is the minimum necessary to afford relief;
The applicant is not asking more then needed to align the residence with the two neighboring
structures.
F) That the public interest will suffer no substantial detrimental effect;
The public will not suffer from any substantial detrimental effect.
IV CONCLUSION
The Variance from the shoreyard set back requirement of 25 feet to 15 feet is a reasonable
request, based upon the circumstances of the parcel location; and the natural restrictions coupled
with the standards of the city codes. Also, the footprint of the floor plan is compatible with the
other residences in the area, and will not be considered as a special privilege, is a minimum
request, and will not affect the public interest.
V RECOMMENDATION
The Staff recommends to the City of Bremerton Planning Commission to concur with the request
for the shoreline setback variance for the proposed Coutts residence, File SL V 98-0002.
Staff suggest the adoption of Resolution 98-06 to enact the approval.
APPLICATION FOR SHORELINE MANAGEMENT,
SUBSTANTIAL DEVELOP, COND~ION~ USE,
REVISION TO AN EXISTING PERMIT, OR VAR/3tNCE PERMIT
TO T~TR APPLICANT: This is an application for a Substantial
Development, Conditional Use, Revision to an Existing Permit, or
Variance Permit as authorized by the Shoreline Management Act of
1971. It.is suggested that you check with appropriate local,
state, or federal officials to determine whether your pro~ec% ~alls
within any other permit systems. Additional information may be
requested from the applicant as project review proceeds.
Check applicable box:
Substantial Development
[] Conditional Use
Revision ~ Variance
1. Applicant:
Gary & Heather Courts
12711 - 37th Ave. N. E.
Address:
City: Seattle, WA 98125 zip: 98125
Day phone: , (206) 251-8700
Owner [] Purchaser [] Lessee ~ Other
Contact person: Jelirey A. Hecker / Hecker Architects
(if different than #1)
Address:
City:.
Day phone:
225 Shore Drive, WA 98310
Bremerton, WA
(360) 479-5459
zip: 98310
Property owner: (Same as above)
(If different than ;1)
Address:
City:
Day phone:
Zip:
Fair Market Value of Project
$250,000
AUG 1 3 '~,o
BR=MERTON
BUILDh"IS DEPARTMENT
General location of proposed project (please list section to
the nearest quarter section, township, and range) with street
address (if address exists):
Township. Section. and RanQ~: NW-18-24-O2-EAST
Address: 922 Shore Drive, Bremerton, WA 98210
Name of water area and/or wetlands within which development is
proposed (within 200 feet):
Sinclair Inlet (Marine)
Describe current use of the property with existing
improvements:
.. The property classilic,~iion/~'~;e is single lamily residential and is currently undeveloped lane. Structures
existing on the property are limited to a concrete and masonry (CMU) bulkhead.
'7.
Describe proposed use of the prDperty (be specific):
5i.ngle lamily residence: 2,500 square loot. three bedroom. ~vo car garage, ~n accordance with
current building codes and City ol Bremerton Department ol Community Development requirements.
NOTE:
ITEMS 8, 9 AND 10 ARE TO BE COMPLETED BY LOCAL OFFICIALS.
Nature of existing shoreline:
Type of Shoreline: Marine
(i.e. marine, strea~, lake, lagoon, marsh, bog, swamp, etc.)
Type of Marsh: how bank
(i.e. accretion, erosion, high bank, low bank, etc.)
Material ( s ): Sand & Gravel
(i.e. sand, gravel, mud, clay, rock, riprap, etc.)
Butkheading: Existing concrete and masonry (CMU)
(show extent and type, if any)
In the event any of the proposed buildings or structures will
exceed 35 feet above the average grade level, indicate the
approximate location of and number of residential units,
existing and potential, that will have an obstructed view.
Applicant's proposal will not exceed height indicated.
!0.
ll.
Zf ~he appli _ion involves a conditiona se or variance, set
for~5 in fu!l, that portion of ~%e ~'s~er proqr~m which
provides that proposed use may be a conditional use, or, in
the case of a variance, from which the variance is being
sought:
Shoreline setback requirement.
APPLICATION ATTACHMENTS:
NOTE:
USE ONLY 11" x 17" OR LARGEI~ PAPER. DRAW ALT. SITE
PLANS AND MAPS TO SCar.R, CLEARLY INDICATING SCALE ON
LOWERRIGHT-HAND CORNER. ATTACH ~LL PLANS AND MAPS
TO THE APPLICATION.
A. SITE PLAN (include the following):
1. Site boundary.
2. Property dimensions in vicinity of project.
3. Ordinary high-water mark.
Typical cross section or sections showing:
a. Existing and proposed ground elevations.
b. Height of existing and proposed structures.
Where appropriate, proposed land contours using 5'
intervals in water area and 10' intervals on areas
landward of ordinary high-water mark, if development
involves grading, cutting, filling, or other
alterations of land contours.
Show dimensions and locations of proposed structures
and of existing structures which will be maintained.
Identify source, composition, and volume of fill
material.
Identify composition and volume of any extracted
materials, and identify proposed disposal area.
Location of proposed utilities, such as sewer,
septic tanks and drainfields, water, gas, or
electricity.
10.
If the development proposes septic tanks, does the
proposed development comply with local health and
state regulations?
11. Shoreline designation according to master program.
12.
Show which areas are shorelines and which are
shorelines of state-wide significance.
B. VTCINITr MAP -
Indicate site location using natural points of
reference (roads, state highways, prominent land
marks, etc.)
If the development involves the removal of any soils
by dredging or otherwise, please identify the
proposed disposal site on the map. If the disposal
site is beyond the confines of the vicinity map,
provide another vicinity map showing the precise
location of the disposal site and its distance to
the nearest city or town.
Give a brief narrative description of the general
nature of the improvements and land use within one
thousand feet in all direction from development
site. (i.e., residential to the north, commercial
to the south, etc.).
I, , am the above named
applicant for a permit pursuant to the Shoreline Management Act of
1971, and hereby state that the foregoing statements, answers, and
information are, in all respects, true and correct to the best of
_ WAC 173-27-170
Courts - Variance Application
WAC 173-27-170 Review criteria for variance permits.
The purpose of a variance permit is strictly limited to granting relief from specific bulk, dimensional, or
performance standards set forth in the applicable master program where there are extraordinary circumstances
relating to the physical character of configuration of property such that the strict implementation of the master
program will impose unnecessary hardships on the applicant or thwart the policies set forth in RCW 90.58.020.
(1) Variance permits should be granted in circumstances where denial of the permit would result in a thwarting
of the policy enumerated in RCW 90.58.020. In all instances the applicant must demonstrate the extraordinary
circumstances shall be shown and the public interest shall suffer no substantial detrimental effect.
(2) Variance permits Ior development and/or uses that will be located landward of the ordinary high wa~er mark
(OHWM), as defined in RCW 90.58.030 (2)(b), and/or landward of any wetland as defined in RCW 90.58.030
(2)(h), may be authorized provided the applicant can demonstrate the following:
Summary - Applicant is seeking a variance to the Bremerton Shoreline Master Program (SMP) -
Table 3-2 Site Development Standards, Residential, Detached Dwelling Unit, Shoreline
setback- 25'. (See attached site plan and photographs illustrating the applicants proposal.)
(a) That the strict application ot the bulk, dimensional or performance standards set lorth in the applicable
master program precludes, or significantly interferes with, reasonable use of the property;
Strict application of the bulk, dimensional and performance standards set forth in the SMP
precludes the applicants reasonable enjoyment of water and shoreline views. Specifically,
the application of the 25' shorelines setback will impose view blockage due to the structures
built within the 25' setback on both adjoining properties thus creating "tunnel vision".
(b) That the hardship described in (a) of this subsection is specifically related to the property, and is the result
of unique conditions such as irregular lot shape, size, or natural features and the application of the master
program, and not for example, from deed restrictions or the applicants own actions;
Application of the SMP 25' setback in conjunction with the structures built within this area on
both adjoining properties creates a view blockage hardship for which the applicant is seeking
relief. (see attached site plan depicting the reduced "s/gM line" setback)
'(c) That the design of the project is compatible with other authorized uses within the area and with uses planned
Ior the area under the comprehensive plan and shoreline master program and will not cause adverse impacts ~o
the shoreline environment;
The applicant's proposal to build a single family residence is compatible with and comparable
to other existing and or planned uses / structures built within the shoreline neighborhood and
will not cause adverse impacts to the shoreline environment.
'¥AC 173-27-170
Courts - Variance Application
(d) That the variance will not constitute a grant of special privilege not enjoyed by the other properties in the area;
As indicated in (a), (b), and (c) of this subsection, the majority of the waterfront structures in
the vicinity are built inside the 25' shorelines setback. Therefore, reducing the setback for
this applicant would not constitute a grant of special privilege since this pattern of
development already exists. (see photographs of adjoining neighborhood)
(e) That the variance requested is the minimum necessary to afford re, fei;
The proposed setback reduction is the only practical means to solve the view blockage or
"tunnel vision" issue caused by the SMP in conjunction with the adjoining structures. Since
these buildings existed prior to - or - are in compliance with the SMP, the proposed variance is
the minimum necessary to afford relief.
(f) That the public interest will suffer no substantial detrimental effect.
Other than seeking a reduced setback to cure the imposed view blockage, the applicant's
proposal is in compliance with SMP requirements. The public's enjoyment of Bachmann Park,
allowing visual and physical access te the neighboring shoreline environment, will suffer no
substantial detrimental effect as a result of this proposat.
NOIIV31 ]dc:IV :IONVI~VA -
'ISV::I (]NV HIFIOS 3HI
Ol SISIX::I AV~ B::IIV~ I:]INI BIVIONIS
'S::lll~::lclOl:Icl INOI::IJI::I::IIV/~ (]NV aNYqaD JO
:I~f11XIIAI V -I0 SlSlSNO0 V::II::IV SIHL '1S:::1/~
(]NV HI~ION :IH1 011SIX3 s:1~!131or1~11s
(]NV ~lSfl ]VIIN3(]IS~]I::t A'IIINV:I ~I'IgNIS
'::]11S :IH1 -I0 1:1::t4 (]NvsnoH1 V NIHII~
:~iAIIVUUVN
NIIVd
NNV~dH:)VI!
3AI1:10 ~]WOHS gZ6
:ILLS
C~
W
I-
W
0
W
W
Z
0
W
o. I
I--
Z
0
Z
LU
D.
I
I
I
i'
(It'~NH~OIIG)
:JON:JOIS'gll J. SlXlt
I OY~H~lflB DNOS
(O~SOdOBd)
1:77NI ~tlVTONI$
~BV~4 B31VM
HglH ABYNI(3BO
03OY]d3B / O3BIVd3B 3B
~ (~?~~OI~Js ~NINIO£OVN~9
(O]$gdOBd)
_~ A l U E]
:7~10H$
I'I
,0'07
,O'OJ,
I
(INZ,LIIi'I¥~
(~,3V~ ! 9,S -S'v, ISIX :.
(1SOMNt[1.OS IHt 01 tNZUNIVS - (]NV - 1S'~HIJJON
('M'O'B 3AIWa ]BORS ~-,07 (3Nll3B§HS 9NOIV S]IWVA HldOa lC'l)