Loading...
HomeMy WebLinkAbout09/29/99 AGENDACITY COUNCIL AGENDA SEPTEMBER 29, 1999 4. 5. 6. 7. 8. 9. 10. 11. PRE-COUNCIL SESSION: 5:00 - 5:30 P.M. · General Council Business CALL TO ORDER: 5:30 P.M. · Pledge of Allegiance · Invocation CONSENT AGENDA - No items this week. CLAIMS/CHECK REGISTERS COUNCIL MEMBER REPORTS MAYOR'S REPORT LEGISLATIVE REPORT PUBLIC RECOGNITION -- (Comments Limited to 3 Minutes) NEW BUSINESS A. Confirmation of Carol S. Conley as the Human Resources Manager B. Bid Award for Timber Sale 99-4 Professional Services Agreement with Parametrix, Inc. For Evergreen Park Phase I! Remediation and Park Construction Engineering Services Manette Play Field Renovation IAC-YAF (Youth Athletic Facilities) Grant Agreement ORDINANCES A. Ordinance No. 4666 (Second Reading) Amending Chapter 2.04.010 of the Bremerton Municipal Code Ordinance (First Reading) Amending Chapter 10.11.010(I) of the Bremerton Municipal Code RESOLUTION A. Resolution No. 2725 Proposing to set a Hearing Date of October 20, 1999 for the Vacation of a Portion of Marine Drive Resolution No. 2726, 2000-2005 Six-Year Transportation Improvement Plan #AB99-196 I #AB99-197 ~ #AB99-198 #AB99-199 4~ #AB99-200 70 #AB99-202 78 12. ADJOURNMENT OF MEETING AGENDA BILL BREMERTON CITY COUNCIL SUBJECT: Employment Contract Human Resources Manager Carol Conley ORIGINATING DPT. Executive OIGINATOR: Mayor Horton 2. CLV. ARANCES: (comment on back if necessary) Fiscal & Budg.~t~ ~ ~Z~~/ Operations /~'~-~/.~_/~/~-~-~ZZ 3. EXHIBITS: Contract ~,~o..~~ >~o~~ ~o~ ~ co~c~, ~.s~.~ ~o~ s~~~. / 4. SUMMARY STATEMENT AND REQUIREMENT FOR COUNCIL ACTION: Carol S. Conley has been the Human Resources Director for the City of Coconut Creek, Florida. She comes to the City of Bremerton highly recommended by the mayor, her peers and employees of Coconut Creek. RECOMMENDATION: Mo%ion to ~confirm the appointment of Carol S. Conley as Human Resources Manaoer. 9. RESPONSIBLE OFFICIAL: Mayor ENFORCEMENT OFFICIAL: Mayor EXPIRATION DATE: n/a REVIEW DATE: n/a PULLED T.~BLED COUNCIL DIRECTIVE: 10. APPROVED NCTICE OF ACTION DISAPPROVED DATE: ~MENDED AGENDA BILL NO: CLEARANCE COMMENTS (cont.): ~. SUMMB~Y STATEMENT (cont.): 5. IMPACT ON NON-PASSAGE: There will continue to be vacancy 6. IMPACT ON STAFFING, BUDGETS, FACiLiTiES, EQUIPMENT OR OTHER RESOURCES $5,431 monthly included in existing budgen 7. RESEARCH SOURCES: PAGE 3604785200 ADHiN SER,5ICES EMPLOYMENT CONTRACT HUMAN RESOURCES MANAGER This Employment Contract is entered into this ,~.~ ~'day of,~a~___, 1999 by and 13etween the City of Bremerton, a c~artarad first ctass municipal corporation orgarfized under the laws of the State of Washington, (hereinafter referred to as "City~), and Carol S. Conley, (hereinafter referred to as "Human Resources Manager'). In consideration of the mutual benefits and promises herein contained, the parties agree as follows: 1. DESCRIPTION OF SERVICES: The Human Resources Manager agrees to furnish fuit time professional services as defined in the job description for Human Resources Manager which is attached and hereby incoq3oratecl as a part of this Agreement, wflich may be amended by the City upon tl3irty (30) days notice to the Humor1 Resources Manager. 2. SUPS: The parties understand and agree that the Human Resources Manager ts an individual skilled in administration and management and can perform independent functions and responsibilities in the exercise of tier field of expertise. In the perfornlance of these duties the Human Resources Manager shall work under the direction of the Mayor. 3. TERM: The Huma~ Resources Manager si'tall serve at the pleasure of lhe Mayor commencing Septem~3er 13, 1999, and continuing until termination or removat by terms of this Agreement infra. 4. COMPENSATION: The Human Resour",,es Manager and City agree that compensation for services rendered uncter this agreement shall begin at band 6, rate 7, Two Thousar, C Seven Hundred Fifteen and 26/100 Dollars ($2,715.26) per semi-monthly I~ay period with a mon~ly rate cf approximately Five Thousand Four Hundred Thirty-one and No/100 Dollars ($5,431.00). The salary for the Humor, Resources Manager shall be adjusted to rate 8 upon completion of six (~5) montl~s employment and a satisfactory performance evaluation and in confcrmance with the provisions of the Management and Professional Staff Compensation Program (BMC 2.50) al3olicable tc the position of Human Resources Manager. Said salary shall be paid on the City's regular payroll system. It is exprassly understood by and between We patties that the Human Resources Manager shall be expected to work at least forty (40) hours Der week, inclusive of approvect leave. 5. BENEFITS; All benefits shall be afforded as provided in the Management and Professional Staff Compensation Program (BMC 2.50) and as provided under the laws of the State cf Washington for the position of Human Resources Manager. Vacation is set at twenty (20) days per year. Within thirty (30) days of employment, the Human Res~3urces Manager shall be reimbursed up to One Thousand and No/100 Dollars ($1,000.00) for moving expenses. The Human EMPLO'~-MENT CONTRACT - 1 - 3 Resources Manager agrees that if she leaves the City's employment in less than two years she will reimburse the City for moving expenses. 6. PERFORMANCE REVIEWS: Performance reviews shall be conducted in compliance with applicable Human Resources Policies, and the Mayor shall utilize review standards and forms approved by the Human Resources Department. 7. EXCLUSION FROM COLLECTIVE BARGAINING AND CIVIL SERVICE: The Human Resources Manager acknowledges, understands and a~ees that the position she is accepting with the City. is not included in the City's Civil Service system, and is exempt from Union Membership. 8. TERMINATION OF SERVICES: The Human Resources Manager is an "at will" employee and the City' may terminate her without cause, at any time, with thirty (30) days notice required. In the event that the Human Resources Manager shall terminate employment with the City, she agrees that she shall provide the City not less than thirty (30) days pdor notice of the effective date of said termination in order to afford the City a reasonable opportunity to find a replacement. The parties further agree that in the event a replacement is found who is able to commence employment pdor to the expiration of thirty (30) days notice, that they may, in good faith, negotiate an earlier termination date. This Agreement may be terminated for cause, without notice, and no severance pay shall be paid. "Cause" is defined as any reason for which a regular employee may be dismissed under the Bremerton Civil Service Rules. 9. MEMBERSHIP/SUPPLIES: Memberships to professional organizations approved by the Mayor shall be in the name of the City, to the extent allowed by law, and paid for by the City. All supplies, equipment and materials purchased for use of the Human Resources Manager by the Ciby.,,~'-~.~,, be!cng to the City. 10. GENERAL PROVISIONS: A. This Agreement constitutes the entire agreement between the parties and both parties acknowledge that there are no other agreements, written or oral, that have not been fully set forth in the text of this Agreement. B. The parties hereby further agree that this Agreement cannot be amended or modified without the written concurrence of both parties. C. Any notices required to be given shall be in writing and delivered to the following parties at the following addresses: Human Resources Department 239 Fourth Street Bremerton, WA 98337 EMPLOYMENT CONTIL,-kCT-2- Carol S. Conley Human Resources Manager c/o City Hall 239 4th Street Bremerton, WA. 98337 D. This Agreement shall be construed and interpreted in accordance with the laws of the State of Washington. In the event of a dispute, such dispute shall be litigated in the Superior Court of Kitsap County, Washington. E. The invalidity or unenforceability of any provision hereof shall, in no way, affect the validity or enforceability of any other provision. F. Failure to insist upon stdct compliance with any terms, covenants, or conditions of this Agreement shall not be deemed a waiver of such, nor shall any waiver or relinquishment of such right or power at any time be taken to be a waiver of any other breach. IN WITNESS WHEREOF, the parties have caused this Agreement to be executed the day and year first above wdtten. CAROL S. CONLEY /~// CITY OF BREMERTON: \',,~--~ ~ BY: ~ %' ~ ~ ~ ~.,~..,,.,,..,.,...~ LYNN HORTON, Mayor Human Resources Manager Received for Filing: KATHLEEN McCLUSKEY City Clerk APPROVED AS TO FORM~ GLENI~A MALANCA, City Attorney EMPLOYMENT CONTRACT-3- 5 1. SUBJECT: TIMBER SALE 99-4 BID AWARD AGENDA BH~L BREMERTON CITY COUNCIL FOR AGENDA OF: Sept. 29, 1999 ORIGINATING DEPT: Public Works/Util. ORIGINATOR: Forestry Manager DATE SUBl~l.l'l'l'l~l~. 9/17/99 2. CLEARANCES (comment on ~~e~sa~): &EXHIBITS: Director PW&U l/.~v/td~'~_ '7~ ~/ Z~ A~ Timber S~e ~osp~ Ci~ ~o~ey ' ./Y~ ~~~ B. Bid ma~lafi~ Ci~ T~er '~ ' ~ C. C~ ~AVAI LABLE ~ONDAY ~ Fiscal & Budget Committee ENDORSEMENT X INFO~TION WILL BE /.~ r',, ~ SEPTEMBER ~7, 1999.i ArrRovr~ BY cotrncm ,Rr_.sm~rr ~_~t s~~ 4. S~Y STATEMENT AND REQUIREMENT FOR COUNCIL ACTION: The above timber sale was planned and prepared within the guidelines of the Water Utility's Forest Management Plan and the Washington State Forest Practices regulations. A forest practices pesmit has been obtained for this harvest operation. This proposed harvest will be an even-age cut on 58 acres. Total estimated volume is 1,135 MBF. Advertisement for bids was prepared according to administrative procedures and bids received on SepLeviber ~7, 1999; summary, is attached as Exhibit B. lt is recommended that the Citv Council award the timber sale to . ~-~ }"~(r~l-~__ /.-oqOi~t,q¢! for the amount of s 627, 75a c c; ' o o- 3 8. RECOM3~IENDATION Motion to approve and authorize the Mayor to execute the attached Bill.of Sale and Contract to Pay for and Remove Forest Productsfrom~ City Lands for Timber Sale 99-4, with C~- ~'~;rq~~-- L-~ ~i ~-v~G[ in the amount of $ ' ~'-~ I -7 ~O, (-)~ in accordance with established administrative pol~ies an~ procedures. RESPONSIBLE OFFICIAL: Director of Public Works & Utilities ENFORCEMENT OFFICIAL: Forestry Manager EXPIRATION DATE: December 31, 2000 REVIEW DATE: N/A PULLED TABLED COUNCIL DIRECTIVE: 10. NOTICE OF ACTION APPROVED DISAPPROVED AMENDED DATE: 11. AGENDA BILI~ NO: q~l~__ 2. CLEARANCE COMMENTS: 5. IMPACT ON NON-PASSAGE: Loss of anticipatedrevenue to the Water Utility 6. IMPACT ON STAFFING, BUDGETS, FACII JTIES, EQUIPMENT AND OTHER RESOURCES: Staffing: N/A Budget: Receive revenue tn the am~x~nt of 7. RESEARCH SOURCES: 1996 Land Management Plan, Forestry Manager 7 DATE OPENED: CITY OF BREMERTON BID TABULATION TIME OPENED: ~:oo OPENED aY -"~; I[ E l~.~ I RECORDED BY BIDDER I RECTO I SUMMARY 1111~ LGW IIIDIX~ ITEM 1 ITEM 2 TOTAL BID ITEM 3 ITEM 4 ITEM 5 NET BID TAX COMMENTS TOTAL q2~. Titular Sale Contract 1 9/13/99 CITY OF BREMERTON Depaxtment of Public Works and Utilities BILL OF SALE AND CONTRACT TO PAY FOR AND REMOVE FOREST PRODUCTS FROM CITY LANDS SALE #: 99-4 CONTRACT # SALE NAME: DODGE EXPORT STATUS: Export Restricted THE PARTIES to this Bill of Sale and Contract for the Removal of Forest Products are the CITY OF BREMERTON, a Washington municipal corporation, situated in the County of Kitsap, State of Washington, the address ofwhich is 239 - 4th Street, Bremerton~ Washington 98337, hereinafter referred to as the -CiTY-, and, ~',. ~,(xaffZ-- C.x::'~ 0;v'X c~ whose mailing address is ~ ~,,¢ [~ ~ c ~ , hereinafter referred to as the "PURCHASER". 1.0 GENERAL TERMS 1.1 Title Conveyed: The sale of forest products described herein has been authorized and ordered by the City Council of Bremerton, the Purchaser having made the highest qualified bid for the forest products described below, and that bid having been accepted by the City on the City hereby sells and conveys to the Purchaser title to the forest products described below. 1.2 Products Sold: The forest products conveyed to the Purchaser are described as follows: all timber, except marked wildlife trees and desi~maated understory trees, bounded by property, lines. timber sale boundary tags. powertine right-of-ways, roads, and plantations, comprising approximately 950 MBF of Douglas fir, 153 MBF of hemlock, and 32 MBF of alder. 1.2-1 Volume Estimates: Amounts of forest products sold under this contract or described in the prospectus are estimates only. The City., making such estimates, neither warrants nor limits the volume of forest products sold under this contract, it being agreed that each party, has had full opportunity to investigate the volumes on the sale area. and relies solely upon its own observations and estimates. 1.3 Sale Area: The sale area consists of 58 acres, more or less, situated in Kitsap County, State of Washington, and described as: part of the Wl/2 NE1/4 and part of the NWl/4 SE1/4 Section 29, Township 24 North, Range 1 East, W.M.; Sale area is more fully depicted on map marked "Timber Sale Contract Unit Map" attached to this contract and made a part of said contract by this reference. 1.4 Operating Authority: Purchaser is hereby granted permission to enter upon City lands and remove the forest products itemized in Clause 1.2 upon execution of this contract by the CiW and its 8 'r'nnber Sale Contract 2 9/13/99 authorized representatives and upon payment as set forth in Clause 2.0. Purchaser hereby agjees to complete all contract requirements by December 31. :1000 1.5 Representatives: 1.5-1 City.: The fights and duties of the City under this contract will be exercised by the City's Public Works and Utilities Director or such officer as may be otherwise designated by the Director. 1.5-2 Purchaser: Purchaser agrees, prior to commencement of operations, to notify the City in writing of the name, address and telephone number of a person who will be readily available at all reasonable times during the construction and logging operations, and who shall be authorized to receive on behalf of the Purchaser, any instruction or notice given by the City in regard to performance under this contract, or breach thereof. 1.6 Time Extensions: An extension of operating authority time as established in Section 1.4 may be granted by the City upon written request received thirty (30) days prior to the expiration date of the contract, and upon such additional terms and conditions as specified by the City in authorizing the extension. At a minimum, an extension fee of $1.000 plus the interest on the unpaid balance of the bid price will be required. 1.7 Insurance: Purchaser shall, before commencing operations, provide the City. with a certificate of insurance evidencing commercial general liability coverage of at least $1,000.000 per occurrence including logging broad form property, damage. The City of Bremerton shall be named an additional insured, and the policy shall be kept in full force during the lifetime of this agreement. 1.8 Business License: Prior to commencement of operations, the Purchaser shall obtain a City of Bremerton business license. 1.9 Taxes: Purchaser has sole responsibilib' for payment of timber excise tax as well as any other taxes levied by any government agency having authority thereof, 1.10 Export Restrictions: Timber conveyed under this contract is restricted from export under WAC 240-15 and is subject to all laws applicable under this chapter. 1.10-1 Purchaser Certificate: Purchaser shall complete a Purchaser Certificate included with this contract and return to the City prior to the commencement of logging operations. 1.10-2 Log Marking: All logs shall be branded at both ends with a registered log brand and painted at both ends with durable red paint. Purchaser is responsible for providing the brand and paint at his expense. Timber Sale Contract 3 9/13/99 2.0 PAYMENT 2.1 Forest Products.: Purchaser agxees to pay for the forest products herein before/B,: conveyed on the basis of the accepted bid price, said bid price being in the amount of $ 3~4 · Bid price to be paid according to the following sche~tule: a deposit often (10) percent of the bid p~ce due upon award of contract,, the balance due prior to commencement of timber falling operations, or on an installment basis as approved by the City Treasurer, provided the value of timber to be felled within the installment period will be paid for in advance of cutting, exclusive of the initial deposit. The initial deposit to be applied, as final payment (to equal the lump sum bid). 2.2 ScalinR Information: Purchaser agrees to furnish the City with scaling information showing the scale, count and measure of forest products removed. The scaling information shall be furnished to the City within sixty (60) days after completion of logging operations. 3.0 DEPOSITS AND BONDS 3.1 Deposit: Purchaser, having heretofore deposited $ q~7. 7 7 ~ O O. hereinafter called the initial deposit is required to maintain this amount with the ~it3j'. Said deposit is partial payment of the total bid price. 3.2 Noncompliance: The payment of the Purchaser of any damages to the City. resulting from noncompliance with any rule. regulation, or law of the City. or other governing agency, is hereby made a condition of this contract the performance of which is secured by the required cash deposits and/or surety bond. 3.3 Performance Bond: As a guarantee of the faithful performance of the provisions of this contract,, including not only the sums due to the City. hereunder, but all damages accrued to the City. by reason of the operations of this contract, the Purchaser delivers herewith, a performance bond in the sum of $20,000.00 in a form acceptable to the City.. 4.0 LOGGING 4.1 Plan of Operations/Preconstruction and Pre-LoRRin2 Meetino: The Purchaser shall, before starting operations within the sale area, submit to the City Representative, a plan of logging operations, including a summary of methods to be utilized, the sequence to be followed, times to be maintained, and such other information as may reasonably be required by the Public Works and Utilities Director, or his appointee. Upon approval by the City., the Purchaser shall carry out its operation under this contract in compliance with and pursuant to the plan. /O Timber Sale Contract 4 9/13/99 Purchaser shall arrange to meet with the City. Representative before commencing any operations on City land. 4~2 Forest Practices and Other Applicable Laws: Purchaser shall fully comply with all provisions of the Forest Practices Act of the State of Washington as now existing or as subsequently amended, and all other applicable laws, rules and regulations and shall hold the City harmless from any obligation or liability arising thereunder. 4.3 Fallin~: The Pumhaser shall fall all timber into the sale area whenever reasonably ptssible. The tops, limbs and trees felled into adjacent areas shall be removed concurrently with the logging operation. Directional failing is required along streams or stream courses, lakes, ponds, reservoirs, etc. 4.4 Stump Height: All trees shall be cut as close to the ground as practicable. 4.5 Equipment: Forest products sold under this Contract shall be removed bv rubber-tired skidder or tractor. Equipment used shall be sized and operated so as not to cause damage to soils or residual stand. 4.6 Tops: If not otherwise treated, non-merchantable tops and limbs shall be lopped and scattered within the sale area. All woody debris generated within a right-of-way area shall be disposed of in a manner acceptable to the City. 4.7 Stream Protection: Yarding equipment and any other equipment shall be set back from any stream bank so that the act of yarding, storing or operation will not damage or encroach upon the flowing stream in violation of any statute, rule, re~malation or agreement in relation thereto. No timber shall be felled across, or into, and no yarding shall be permitted in or through such stream courses, lakes, or ponds, as designated by the City., or by any agency of the State having jurisdiction thereof, unless permission to do so is granted in writing by the City and~or the appropriate State agency. 4.8 Rub Trees: Rub stumps or trees shall be left on main skid trails, to protect leave trees. Rub trees may be removed at the end of logging operations. 4.9 Spur Roads/Skid Roads: whenever practical, existing spur roads and skid roads shall be utilized. Additional spur roads shall be approved by the City. prior to construction. No skidding on existing main roads unless authorized in writing by the City Representative. 4.10 Landings: shall not be located on Representative. Wherever practical, existing openings shall be used for landings. Landings main access roads. Landing location shall be approved by the City Provided: That all main access roads shall not be blocked during logging operations and shall be kept open at all times. /! 'I-uuber Sale Contract ~ 9/1.3/99 4.11 Additional Timber:. The City may designate additional timber within the sale area boundaries or within adjacent areas to be cut. The Purchaser must remove all merchantable timber so designated, prior to the expiration date of the operating authority as defined in Clause 1.4 herein. All merchantable timber so designated shall be paid for at the bid rate or at an appraised value as determined by the City and agreed to by the Purchaser. Such payment shall be made at the same time and in the same manner as provided for other forest products conveyed under the terms of this contract. 4.12 Undesignated Trees: Any trees, standing or down, not designated for removal that must be removed in the construction of landings, skid roads, truck roads, firebreaks or other author/zed construction, shall be marked by the Purchaser, and the Purchaser shall pay for such trees at the rate bid for similar products or at an appraised value determined by the City. 4.13 Water Bars: Prior to termination of this contract or cessation of use, whichever is sooner, the Purchaser shall construct water bars across hauling and yarding roads and fire Wails in locations desi~tmated by the City if deemed necessary by the City Representative. 4.14 Log~ine Release: Purchaser shall obtain a written logging release from the City where there has been satis£acto~ compliance with all contractual requirements, including but not limited to, all slash disposal work. The receipt of such logging release and/or acceptance does not relieve the Purchaser of compliance with any slash disposal requirements that are listed within the contract or additional fire hazard reduction measures as may be provided herein. Upon issuance of said release, however, all cutting fights revert to the City. 4.15 Powerlines: Purchaser shall observe all pertinent requirements specified in "Exhibit A" when working in proximity to powerlines. 5.0 DAMAGES 5.1 General: All operations of the Purchaser under this agreement, including any construction, whether of roads or otherwise, and cutting and removal of timber, shall be so conducted as to minimize, so far as is reasonably practicable, danger to adjacent City timber, or reserve trees within the sale area or within any area within which Purchaser carries on activities, whether transportation or otherwise, as well as to any stream course, stream side, reservoir, lake or pond within such areas, and to all other properties affected thereby. 5.2 Stream Courses: Reservoirs, stream courses, stream sides, lakes and ponds in or adjacent to the sale area shall be cleared of logs, chunk and other debris deposited therein, as a result of operations under this contract. Such material shall be removed and deposited in such a manner as is satisfactory to the City. Use of machinery in such waters is prohibited unless provision for such is granted in writing by the City and approved by all appropriate agencies having jurisdiction thereof. /2. Timber Sale Contract 6 9/13/99 5_3 Erosion and Damaee to Soil: During operations under this agreement, including the construction of roads and landings, Purchaser shall take such precautions as are necessary to minimize erosion and damage to the soil, and make certain that no governmental laws, rules or regulations or laws are violated through such erosion, or as a result of its operations. Purchaser shall exercise every necessary means to prevent contamination and pollution of the waters or any reservoir, stream course, lake or pond as a result of any operation by Purchaser during the performance of this contract. 5.4 Damaee to Trees: Any trees damaged in the course of normal logging operations through the utilization of reasonable methods may be marked by the City and the Purchaser shall pay for such trees at the amount bid for similar products or at such appraised values as may be reasonably' d~termined by the City. Purchaser shall have the fight'to remove the products so marked after payment. _ 5.5 Payment for Forest Products Destroyed or Damaged: In the event any forest products included in this contract are destroyed or damaged from any cause not otherwise covered herein, the same shall be paid for by the Purchaser on demand by the City, at rates contained in Section 2-0 or, if no rate is therein fixed for a particular forest product, at appraised value as determined by the City. Purchaser shall have the right to remove forest products remaining on the sale area upon payment therefore. 5.6 Deleterious Material: All possible care shall be taken by the Purchaser to prevent fuel. oil, grease or other harmful materials from entering the waters of any reservoir, lake. stream course or pond as a result of any operation of Purchaser. Refuse resulting from Purchaser's use. servicing, repair or betterment of its equipment shall be immediately removed from City. property. 5.7 Other Damaees: Any damages to fences, gates, culverts, bridges, and/or other structures caused by the Purchaser's operations shall be repaired in a timely manner at the Purchaser's sole expense. 6.0 SURVEYS AND MARKERS 6.1 City Marks: The City has located and marked or otherwise designated all sale boundaries. Purchaser has gone over the boundary, lines on the ground, knows where they are and a~ees to confine his or its cutting to the forest products contained within the boundaries and to be responsible for any violation of this requirement. 6.2 Preservation of Markers: Any land. subdivision, survey, comers, witness objects or survey markers of any type are to be preserved. If such are destroyed or disturbed the Purchaser shall re-establish them by a licensed land surveyor in accordance with United States General Land Office Standards at Purchaser's own and sole expense. Comers and/or witness objects that must necessarily be disturbed or destroyed in the process of road construction must be adequately referenced and such reference approved by the Utilities Director prior to the removal of said comers and/or witness objects. Timber Sale Contract 7 9113199 7.0 SLASH DISPOSAL - FIRE PREVENTION AND CONTROL 7.1 Slash Defined: The term "slash", as that term is utilized for the purposes of this contract, shall mean all debris of whatsoever type created on the sale area and right-of-way thereto by logging, milling, and other related operations of Purchaser, or by windstorm. 7.2 Slash Disposal/Fire Fla~,ard Reduction Plan: A slash disposal/f'we hazard reduction plan, if required, will be part of this contract by attachment and will become part of the contract therein. 7.3 Waiver of Slash Disposal Treatment. The City reserves the right to waive any requirement relating to slash disposal or fire prevention, so long as such waiver is made in writing by the City a_e~erPurchaser has been provided alternative methods for disposal and fire prevention, which have been approved by the City: Provided: That such waiver shall be subject to revocation in the event of any failure of the Purchaser to comply with such alternative methods. 7.4 Men and Equipment: The Purchaser agrees to provide persons and equipment at its own expense to fulfill any requirement that may be established by law, whether State or Federal, whether such persons or equipment are to be utilized for slash removal or fire prevention and suppression. 7.5 Clean Firebreaks: The Purchaser shall, upon completion of logging and at such other periodic times as may be stated in writing by the City.. clean out all fire trails and skid roads designated by the City as fire breaks, leaving them free of debris for suitable fire breaks. When designated by the City, water bars and cross ditches are to be installed on trails to prevent erosion. 7.6 Fire Responsibility: Purchaser shall reimburse the City, its agents or employees, for all costs and/or liability of whatsoever nature incurred as a result of negligence of the Purchaser in the creation, spreading or escape of fire, whether such liability, is incurred by the City through an&'or to private parties or governmental agencies. 7.7 Operating Equipment Durin~ Closed Season: The Purchaser agrees: Not to operate any equipment powered by a spark-emitting engine between April 15 and October 15 of each year for logging, milling, fire suppression or road construction and maintenance or any activity whatsoever within the sale area unless it is equipped with spark arrestor of a type approved by the State of Washington for utilization within its lands. Nor shall it operate any power saw or power equipment in any condition, which is known or can reasonably be known to start fires. The City reserves the right during periods of dangerous weather as designated by the City, to prohibit the operation of any or all such spark emitting engines within the sale area. 7.8 Fire Hazard Reduction: In the event the City furnishes a fire hazard reduction plan to provisions relating to but not limited to slash disposal and reduction of fire dangers, the Purchaser agrees to carry forth the measures at such time as may be established within the plan, but no later than the completion of logging in an area or at such other time as may be directed by the City. Timber Sale Contract 8 9/13/99 7.9 Fire Extinguishers, Fire Tools: Every internal combustion motor, yarder or vehicle shall be equipped with a chemical fn'e extinguisher and shall comply with all State established regulations relating to such equipment. Purchaser further agrees during the period of April 15 to October 15 to maintain on his operation toolboxes and other fire equipment as required by Washington State law. 7.10 Charge for Slash Disposal Work Not Completed: In the event that the Purchaser fails to carry forth the slash disposal preparation work or reasonable measures to prevent fires from starting or spreading from or within the timber sale area by the date that is designated by the City in any hazard reduction plan set forth or within this contract, the City. shall have the fight to complete such work or preparation and the Purchaser agrees to pay to the City the sum of monies reasonably expended by the ' City in such work. The Purchaser further agrees to pay all costs and liabilities incurred by the City as a result of the failure of Purchaser to either complete the slash disposal preparation work, fire reduction measures, or to make available the men and equipment as required by the terms of this contract. 7.11 Weather Instruments: During the period from April 15 to October 15, the Purchaser shall provide and maintain such weather instruments which will at all times measure the relative humidity and temperature of the air, and make the reports therefrom available to the City. upon request. Observations shall not be required on any day that rain is falling. At such time as the relative humidity is 30% or less, operation of any and all spark emitting machine~, with the exception of automobiles, must voluntarily cease, unless permission to continue is given in writing by the appropriate officials of the Ci~. 7.12 Watchperson: During the period April I 5 to October 15 and such other times as may be designated by the City., Purchaser shall have a watch person on duty for at least two hours after the closure of operations for the day, or any part thereof in which operations occur: Provided: That with the written permission of the City. this requirement may be waived or modified. All watch persons shall be competent and trained in fire detection and suppression activities. 7.13 Open Fires: Purchaser shall not set or allow to be set or maintained by his employees or subcontractors any open fire at any time of the year without first having obtained permission in writing fi'om the City. 7.14 Fire Lines: Purchaser shall construct a £tre lane or firebreak along the outer boundaries of the logging area or areas if required by a slash disposal/fire hazard reduction plan attached to this contract. Such fire lanes or breaks shall be located and constructed to the satisfaction of the City. On or adjacent to the fire lane or break, all dead trees shall be felled and all flammable materials, including slash, reproduction and debris, shall be pushed or otherwise moved into the area to be logged. The cleared width ordinarily may not be required to exceed that of the bulldozer blade used in construction, but additional width may be required if considered reasonably necessary for safety by the City or Purchaser. When deemed necessary in the judgment of the City, a continuous lane cut to mineral earth shall be provided on the exterior edge of the cleared area. Timber Sale Contx~ct 9 9113/99 8.0 ROADS 8.1 Authorization: Purchaser is authorized to construct and maintain on the CiW lands all necessary roads, bridges and other transportation facilities needed for the cutting and removal of the timber included in this contract. When utilized throug, ahout this contract, the term, "construct", shall include the term, "reconstruction", or "reconstruct". 8.2 Road Construction: All construction, reconstruction, and betterment of roads covered under this contract shall be located and constructed as approved by the City and/or will be in accordance with a plan provided by the City and made a part of this contract by attachment, if required. 8_3 Location, Design. and Construction: Such roads and other facilities shall be located and maintained in accordance with the provisions and specifications set forth in this contract or the attachments thereto and shall at all times remain the property of the City. Any existing road or facilities utilized by the Purchaser in the performance of its a___e~_ ities under this contract shall be maintained and left by Purchaser, in as good or better cond'_m_'_on than found at the date of Purchaser's inith~ use. The relocation, design and construction techniques of all such roads and facilities shall be approved by the City before construction is commenced by the Purchaser. Purchaser agrees that any transportation facility needed for operation under this contract shall be located, constructecL operated, and maintained in a satisfactory, manner. The City. shall further have the right to utilize and allow the utilization of any road construction by the Purchaser under this contract for any and all purposes in connection with the protection, administration and utilization of the area here in question: Provided: That as to any non-public road constructed by the Purchaser any such utilization shall not materially interfere with the operations of the Purchaser. 8.4 Liabilitw for Damage: Any required payment or maintenance carried out by the Purchaser shall not relieve the Purchaser from liability, to the City. for repair or damage to the roads, including bridges and culverts, due to overloading tracks, carelessness or negligence on the part of the Purchaser, its employees, subcontractors and their employees, or any other parry utilizing the roads with permission of Purchaser. 8.5 Reservations: The City shall have the right to use, without charge, all existing roads and/or any road constructed or reconstructed on City. lands by the Purchaser under this contract for any and all purposes deemed necessary, or desirable in connection with the control, management, harvest and administration of City-owned land or the resources thereof and the City may extend such rights and privileges to others, provided such use by others shall be controlled so it will not, in the opinion of the Public Works and Utilities Director, interfere unduly with the use of the road by the Purchaser. 8.6 Required Maintenance/Construction/Betterment: Roads utilized by Purchaser shall be maintained and left in a condition as good or better than found at the date of Purchaser's initial use. Approximately 2 stations of new construction and 15 stations of betterment (to consist of grading, T'maber Sale Contrac~ 10 9/13/99 ditching, realignment, and surfacing as necessary) are required on the 1100 road. Rock is available from a private pit within one-half mile of the timber sale. 9.0 BUll,DINGS AND IMPROVEMENTS 9.1 Buildings and Improvements: Purchaser may construct on City. lands, when authorized to do so by the City, such buildings or other improvements as may be reasonably necessary for logging the timber included in this agreement. All such buildings or improvements shall be located to prevent pollution of the water in streams or lakes and shall in no event violate any applicable City, State or Federal law, rule or regulation. When such improvements are to be moved or abandoned, the Purchaser shall dispose of the improvement in such a manner as is acceptable to the City. The authorization granted hereunder to build or maintain improvements upon the City lands terminates with the termination of this agreement. 92. Abandoned Property: Any improvement, whether a building or otherwise, constructed upon the property, of the City may, with the consent of the City, be left upon the property from the termination of this contract: Provided: That upon any such action, title thereof shall pass to the City.. 10.0 OTI:t-F~R CONDITIONS 10.1 Notice: All notices to be given by either party, to this contract in relation to this agreement shall be in writing and may be served personally upon the parties at the addresses noted below or by certified mail, return receipt requested, addressed to the party, to be served at the address hereinafter set forth. Any notice to be given by certified mail shall be deemed to have been received four days after the posting thereof in the United State Postal Service, postage prepaid. 10.2 Breach of Contract: In the event the Purchaser violates or breaches any term of this agreement or any requirement hereunder, the City shall have the right to suspend operations of the Purchaser hereunder by the giving of written notice, specifying the breach alleged. If such breach is not remedied within thirty. (30) days after the giving of the notice, the City may terminate this agreement and the Purchaser shall have no further rights under this Bill of Sale and Contract. Upon such termination, the City shall notify the Purchaser of a Breach of Contract and the deposit made in connection herewith may be forfeited upon order of the City Council and action may be taken to recover damages from the Purchaser and surety. 10-3 City's Right to Remedy Breach of Contract: In the event the Purchaser has violated or breached any term of this agreement and has failed to remedy the breach thereof, the City shall have the option to remedy of any such breach if, after the giving of notice of breach required hereby, the Purchaser shows no indication of attempting to remedy the breach, or if there is an apparent inability of t7 Timber Sale Contract 1 1 9/13/99 Purchaser to remedy the breach as such absence of attempt or inability may be reasonably determined by the City, the City may, in its discretion, immediately enter upon the property and commence attempts to remedy the breach. Any expense so incurred by the City shall be charged against the Purchaser and be paid to the City by the Purchaser within thirty (30) days after receipt of the billing for the expense. Purchaser shall, in addition to the cost of the attempt to remedy the breach, be responsible to the City. for any such losses or liabilities as may be incurred by the City, as a result of the breach, such losses to be paid to the City by Purchaser within thirty (30) days of notice of the mount in question. 10.4 Assignment: The Purchaser shall not assign any rights hereunder without the consent of the City in writing,'signed by the Mayor of the City of Bremerton. No purported assignment of any such right shall be effective without the consent herein anticipated. 10.5 Purchaser Complaints in Writing: Complaints by the Purchaser as to any action taken, or any action not taken by the City, in respect to this contract, shall not be considered unless made in writing to the City within thirty (30) days of any such action or non-action. 10.6 Compliance with Laws: Purchaser, its employees, subcontractors and their employees shall conduct their activities in a safe and workmanlike manner to comply with all appropriate City., State and Federal laws, rules and regulations in relation to such activities, and shall cooperate fully in making it possible for the City's officers to inspect the cutting, logging, construction and other activities of the Purchaser under this contract, and to conduct their official duties on the sale area and its vicinity.. 10.7 City Held Harmless: The Purchaser shall hold the City, its agents, officers and employees harmless from any liability, of any sort whatsoever, whether for injury to persons or property. or otherwise arising out of any cause whatsoever related to Purchaser's operations or performance, action or inaction of this contract. Purchaser shall further, upon the tender of any such claim, assume the defense of any claim filed or brought against the Ci~ arising out of Purchaser's performance of this contract. In the event Purchaser fails to comply with the provisions of this paragraph, it shall pay to the City any and all expenses and monies reasonably expended in the processing, defense and settlement of any such claim, with the payment to be made within thirty. (30) days of the tender of a statement therefor. 10.8 City's Rieht to Close Operations: If. for any reasons, including but not limited to danger of fire determined to be excessive by the City.. and any reasonable perceived threat to persons, property, or the environment, the City exercises its right to order the closure of operations under this contract, (said right being hereby recognized, established, and acknowledged) the time of completion of this contract shall be extended by the number of days or portion thereof contained within said closure, so long as the closure is not as a result of actions of Purchaser or any person or entity acting upon Purchaser's behalf which are actions in breach of this contract. The extensions of time shall be Purchaser's sole remedy under this contract for any such closures and shall be in lieu of any other right,. whether at law or at equity, including but no,t limited to monetary damages. If the closure is as a result of Purchaser's breach of this contract or is a breach of the contract any person or entity acting on Purchaser's behalf, there shall be no right to the extension provided for hereunder. T'anber Sale Contract 12 9/13/99 10.9 Venue: Any litigation commenced between the parties to this contract arising out of this contract shall be filed in the Superior Court of the State of Washington, in and for the County of Kitsap, which shall be the court having proper venue thereof. ~ 10.10 Settlement: In addition to any other relief granted to one party against the other, the parties agree that the non-prevailing party in any such litigation shall pay to the prevailing party, in addition to any such other relief, the sum determined by the court to constitute reasonable attorneys fees. il.0 EQUAL OPPORTUNITY 11.1 During the performance of this contract, the Contractor agrees as follows: (a) The Contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex or national origin. Such action shall include but not be limited to the following: employment, upgrading, demotion, or transfer, recruitment or recruitment advertising; layoff or termination, rates of pay or other forms of compensation: and selection for training, including apprenticeship. (b) The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex or national origin. 12.0 SPECIAL PROVISIONS 12.1 Sanitary Regulations: Sanitary regulations by the Washington State Department of Health shall be observed. Sani-Can type restroom facilities shall be provided by the Purchaser. 12.2 Firearms: No firearms shall be permitted on any properties covered by this a~eement or Bremerton Watershed lands. 13.0 MISCELLANEOUS 13.1 Entire Agreement: This agreement constitutes the entire agreement between the parties. There shall be no oral modification of this agreement. 13.2 Law Applicable: The laws of the State of Washington shall be applied in construing this agreement. Tnni~n- Sa]c Conuact 13 9/13/99 13_3 Time: Time is of the essence in performance of this agreement. EXECUTED this ~day of .1999. PURCHASER: CITY OF BREMERTON: By By Title Lynn S. Horton, Mayor DEPARTMENTAL APPROVAL: W. Eugene Sampley Director of Public Works and Utilities APPROVED AS TO FORM: Glenna Malanc& City. Attorney ATTEST: Kathleen L. McCluskey, City Clerk ,20 TIMBER SALE CONTRACT UNIT MAP Sale Name/Number: [Init # SCAI.E: /"=1ooo e/so/e~ LEGEND: 21 Considerations for Working Near Power Line~ Washington Administrative Code 0NAC) requires that cranes or other equipment be kept a minimum distance in ali directions of approximately 12 feet from energized 115 kV conductors (wires) of the type that run through the proposed area to be cut. If it is necessary to work closer than this, then the lines must be de-energized and a clearance issued by our system operator. Outages must be scheduled at least one w~rking day in advance. These can be arranged through our outage desk between @:00 a.m. and 3:00 p.m. on normal working days at (425) 882-4640. Please be advised, that it may not a{ways be possible to get outages because of heavy system toads or because of unusual ~nditions involving our systam and those of other utilities. The more lead time we have, the better chance the outage can be scheduled as desired. It is not necessary to contact our system operator for normal day to day operations but, be advised that the lines are energized at 115,000 votts and will trip and mclose (re-energize) automatically multiple times if contact is made. At these voltage levels, trees contacting the line must be considered t~ be energized until the line has been taken out of service and we have given notification that it is safe to proceed. Changing the grade under the lines to any great extend is prohibited. The addition of a few inches of gravel on top of the existing roadway to improve traction is allowed but extensive fill can bring ground clearance down below minimum required tevels. Digging within 10 feet of existing poles or the guys and anchors which support them is not recommended, if such is deemed necessary, please contact Tom Foumier at (206) 521-5198. It will be necessary to evaluate exceptions on a case by case basis. Again. advanced notice will provide the best chanced to eliminate delays. Logs must not be stacked under the lines or in such a manner as to block the access roads. All parts of the lines must be accessible at all times. Slash piles must not be placed under the lines or near the supporting structures. If such piles are to be burned, they must be a minimum of 50 feet away from the line (further is better.) Where trees are left for wildlife or other purposes, it is desired that they be far enough away that they cannot fall into the lines if blown over by high winds, CITY OF BR~ 'ERTON Public Works & Utilities ~3orestry Division TIMBER S3J~g PRDSPEu-£uS SALE NO: 99-4 SALE N~A~E: Dodge Hill ~-x-ORT STATUS: Restricted u~ ~ 240-15 or as reused BID OPENING: 2:00 P.M.~ Monda~ , Se~ .tether 27~ 19,99 , Purchasing Division, Office of City Clerk, City Hall, 239 - 4th St., Bremerton, WA 98337. Sale area located within Bremerton Water Utility forest land. LEGAL DESC~IPTION: all tiafoer, except mamk~ wildlife trees and c~esignated ur~erstoz~ trees, bounded by property lines, timber sale boundary tags, powerline right-of-way, road~, and plantations located on part W1/2 NE1/4 and part NWl/4 SE1/4 Section 29, Township 24 North, Range 1 East, W.M., containing fifty-eight (58} acres, more or less, and comprising: Species Volume (MBF) Douglas Fir 950 Hemlock 153 A~der 32 Quality/Percent 2S 41%, 3S 36%, stud 19%, pulp 4% 2S 30%, 3S 35%, stud 20%, pulp 15% 3S 22%, 4S 31%, pulp 47% Total 1,135 I~II~ql~MBID: $400t000.00 installment plan basis. Tin~ber will be sold on a cash or BID DEPOSIT: Ten (10) ~rcent of total bid price. Upon award of contract this becomes the initial deposit to be maintained with the City for timber payment. Bid deposit must be in the form of a cashier's check, cash, or other form acceptable to the City. PEP~O~4ANCE BOND: $20,000.00 security in a form acceptable to the City upon execution of contract. EXCISE TAX: Forest excise uax 5o be paid by Purchaser. ~I~TION DATE: Ail contrac5 requirements must be completed by Dece_~foer 31, 2000. TI~4BER T~PE/L(~GING CONDITIONS: Good quality second growth Douglas fir. Rubber-tired or tracked skidder year round. Equipment shall be sized to minimize damage to soils. Landing locations to be pre-approved by City representative. SI2%SH DISPOS4tL: Lin~bs and non-merchantable tops to be lopped and scattered within sale area. Slash at landings to be bunched and fire trailed as directed by City Representative. No burn piles within PSE powerline right-of-way. ROADS: Maintenance by Purchaser. Approximately 2 stations of new construction and 15 stations of betterment required per contract specifications. BIDDING INS~UCTIONS: Prospective bidders are urged to make their own independent study of the sale area and other conditions. Contact the Forestry Manager at (360) 478-5354 to arrange to view sale area, between the hours of 7:30 a.m. and 4:00 p.m., Monday - Friday. NOTE: SALE AREA BEBi-~TD I~DCKED ~S - %r~CINITY ~ IS FOR FOP. ESTRI OFFICE AT 4398 WEST BEZ~AIR ~?.TmX ROAD. If no answer, call the Water Operations Center at 478-5920, to page Forestry personnel. Volumes of timber described in this prospectus are estimates only. The City neither warrants, nor limits the volume. If any conflict exists between this prospectus and the contract, the contract shall prevail. Bids must be submitted on attached Prolmosal Sheet. Clearly mark on bid envelop: "TI~4BER SA/~E 99-4 BID". Bids must be received by the time and date specified above. Highest qualified bid subject to confirmation by the City Council of Bremerton. (OVER) S~cifications~d contract documents may-.~ reviewed at the City Clerk's Office (239 - 4th Street, Bremerton/478-5290); Public Works & Utilities Administration (3027 Olympus Drive, Bremerton/478-5318); or the Forestry Division Office (4398 West Belfair Valley Road/478-5354). Contract documents will be sent to prospective bidders upon request. / ":/000 . CITY OF BREMERTON PURCHASING DEPARTMENT 239 4TIt STREET * BREMERTON WA 98337 * (360) 478-5293 PROPOSAl, Project: 99-4~ Dodge Hill Timber Sale Date: TO THE CITY COUNCIL AND CITY CI.ERK, CITY OF BREMERTON: In accordance with your advertisement, plans and specifications on file in the office of the City Clerk, the undersigned hereby certifies that personally examined the location of the proposed sale as outlined in the prospectus, and has read and thoroughly understands the provisions of the contract and methods of payment which shall be made and hereby proposes to remove timber in accordance with said contract. All timber to be removed and contract provisions completed prior to December 31~ 2000 TOTAL LUMP SUM BID: $ (Total lump sum bid written on line above) Herewith find our Bid Deposit for: $ Purchaser: (Bid deposit is ten percent of the total bid price) Signature Firm Name: Address: Telephone Number: ALL PROPOSALS MUST BE IN INK OR TYPEWRITTEN. NO ERASURES PERMITTED. PROPOSALS SHALL BE SUBMITTED IN A SEALED ENVELOPE, CLEARLY MARKED ON THE OUTSIDE: "TIMBER ,.YALE 99-4 BID" AGENDA BILL BREMERTON CITY COUNCIL SUBJECT: Professional Services Agreement with Parametrix, ~ for Evergreen Park Phase H Remediafion and Park Construction Engineering FOR AGENDA OF: September 29, 1999 ORIGINATING DEPT: Parks & Recreation ORIGINATOR: JoArme Wroblewski, Ass't Director DATE SUBM1TYED: Sept. 21~ 1999 2. CI,F~ARANCES: 3. (Comment on back if necessary) Parks & Recreation Director: /".~~.~~"~ * Parametrix, Inc. Professional Services Director PW & Utilities City Treasurer: ~ ~k~,~l.sl ~ * Cost Estimate (Exhibit B) Fiscal & Budget Commiuee: ~ t~/~Project Schedule (Exhibit C) ENDORSEMENT 4. SUMMARY STATEMENT AND REQUIREMENT FOR COUNCIL ACTION: A request for Statements of Qualifications (S.O.Q.) for professional engineering services was solicited and received on June 11, 1999. Three (3) fa'ms responded to the SOQ whereby Parametfix, Inc. was selected as most qualified, knowledgeable and sensitive in the areas of brownfield remediation to perform this service. Parametrix, Inc. will perform Site Remediation - Phase I as outlined and specified in the Department of Ecology Agreed Order. In summary, Phase I shall include demolition of site structures and the engineering studies necessary to develop design criteria for remediation and park design. Phase II will include the remaining remedial actions as specified in the Agreed Order and park design. The Phase II scope of services and costs will be presented to City Council upon completion of Phase I elements. The cost of Phase I Scope of Services is $172,186.00. 8. RECOMMENDATION: Motion: To authorize the Mayor to enter into a Professional Services Agreement with Parametrix, Inc. for engineering services relating to the Evergreen Park Site Remediation-Phase 1 as outlined and specified in the Department of Ecology Agreed Order. RESPONSIBLE OFFICIAL: Cris Gears ENFORCEMENT OFFICIAL: Cris Gears EXPIRATION DATE: REVIEW DATE: PULLED TABLED COUNCIL DIRECTIVE: 10. NOTICE OF ACTION APPROVED DISAPPROVED AMENDED DATE: 11. AGENDA BILL #: 2(o 2. CLEARANCE COMMENTS: 5. IMPACT OF NON-PASSAGE: The Evergreen Park Remediation will not go forward. IMPACT ON STAFFING~ BUDGETS~ FACILITIES~ EQUIPMENT OR OTHER RESOURCES: This agreement is the engineering aspect that will develop the plans for the remediation of the industrial brownfield and lay the foundation for the Evergreen Park expansion project. This will enhance the Evergreen Campus neighborhood by preparing a site for future development of approximately four (4) acres of parkland and other amenities for the recreational activities of the citizens of Bremerton. The remediation efforts at Evergreen Park will not add significantly to the workload of the Parks & Recreation Department's maintenance staff and equipmem. The remediation efforts will be funded by a grant fi.om the Departmem of Ecology and matched by the City for a total project cost ors 2.2 million. The City's portion to be provided from the Roosevelt Trust Fund and Real Estate Excise Taxes. This project is idemified in the City's 1999 Biennial Budget and the City's Capital Improvements Plan. 7. RESEARCH SOURCES: Agreed Order, Departmem of Ecology, authorized by Bremerton City Council on Sept. 8, 1999. PROFESSIONAL SERVICES AGREEMENT PARAMETRIX~ INC. TI~IS AGREEMENT is between the City ofBremerton, a nnmLqtml corporation (h~ referred to as "City") and Parametrix, Inc. (hereinafter referred to as "Consultant"). WI TNE S S E TH: 1. SCOPE: The Consultant agrees to provide professional services to perform Site Remediation and Schematic Design Services for the Evergreen Park Expansion as further descn~xt in the Scope of Work, attached hereto and incorporated herein by this reference as Extfibit "A". The project involves preparing the final design for soil remediation and park development. As specified in the Agreed Order, the project will be completed in two Phases (refer to Attachment "E" of the Agreed Order). To accommodate the Agreed Order, the Consultant's scope of work is presented in two phases. Phase I will include demolition of the site smtctures and the completion of engineering studies necessary to develop design criteria for remediation and park construction. Phase II will include remedial actions as specified in the Agreed Order and park design. 2. TERM: Contract shall commence on the date of this agreement and will terminate on January 16, 2000, unless otherwise extended by the City. 3. COMPENSATION: City shall pay the Consultant compensation as follows: Total fees under this Phase I Agreement shall not exceed One Hundred and Seventy Two Thousand One Hundred and eighty-six_Dollars ($172,186.00). Charges for services shall conform to the fee schedule attached hereto and incorporated as Exhibit "B". The Consultant shall submit regular statements describing the services rendered with a breakdown for work completed as authorized under this Agreement. The City, upon receipt of the completed statement, shall promptly process said claim for payrnent. If the description of services on the Proposal designates additional services which may be requested by the City, said additional services will be paid for by the City at the rate set forth in the Proposal, which sum may exceed the Amount to exceed amount set forth above. However, said services will only be performed, and compensated by the City after the City has directed such performance in writing. 4. RELATIONSHIP OF PARTIES: The parties understand and agree that the Consultant is a firm skilled in matters pertaining to Civil Engineering and will perform independent functions and PROFESSIONAL SERVICES AGREEMENT --1-- Pro-$erv. Agt - 5/6/99 responsibilities in the area of its particular field of expertise. The Consultant_ and its personnel shall act as independent contractors and not employees ofthe City. As such they have no authority to bind neither the City or control employees of the City, contractors, or other entities. Within the performance of these duties, The Consuilant shall work under the direction of the Director of Parks & Recreatio~ 5. INDUSTRIAL INSURANCE: The Consultant agrees to provide for State industrial insurance coverage for its personnel as required by State law. 6. LICENSE AND TAXES: The Consultant shall possess a current Bremerton Business License and any regulatory license required to fulfill the Consultant's obligations under this Agreemem. B & O taxes shall be paid when due and the Consultant, by this Agreemem, assigns any payments due under this Agreement to the City Clerk for payment of such taxes which have been declared delinquent. 7. INSURANCE AND HOLD HARMLESS: The Consultant shall provide professional liability or errors and omissions insurance and comprehensive general liability insurance, including bodily injury and property damage, of at least $500,000.00 per occurrence. The City shall be named an additional insured on the comprehensive general liability insurance policy. The Consultant shall, at all times, be solely responsible for the acts or failures to act of its personnel which occur or arise in any way om of the performance of this agreement. The Consultant agrees to defend and indernnil~, and hold harmless the City, its appointed and elected officers and employees, fi:om and against any and all liability, loss, costs, damage, and expense, including costs and attomey fees in defense thereof; because of actions, claims or lawsuits for damages resulting fi:om personal or bodily injury, including death at any time resulting therefrom, sustained or alleged to have been sustained by any person or persons, and on account of damage to property, arising or alleged to have risen directly or indirectly out of or in consequence of the negligent performance of tiffs Agreement, whether such injuries to persons or damage to property is due to the negligence of the Consultant, its subcontractors, its agents or assigns. This provision shall be inapplicable to the extent such damage or injury is judicially found to be caused by the sole negligence of the City. 8. GENERAL CONDITIONS: a. Reports and Information - The Consultant, at such times and in such forms as the Ciw may require, shall furnish the City such reasonable periodic reports and documents as k may request pertaining to the work or services undertaken pursuant to this Agreement, the costs and obligations incurred or to be incurred in connection therewith, and any other matters covered by this Agreement. the Consultant will maintain accounting records in accordance with generally accepted accounting principles and practices to substantiate all invoiced amounts. PROFESSIONAL SERVICES AGREEMENT -2- Pro-Serv. Agt - 5/6/99 b. Entire Agreement - This Agreement constitutes the entire agreement between the parties and both parties acknowledge that there are no other agreements, written or oral, that have not been fully set forth in the text of this Agreement. There are attached hereto and incorporated by reference as part of this Agreement Exl~'bits "A", "B" and "C". c. Amendments - The parties hereby further agree that this Agreement cannot be amended or modified without the written concurrence of both parties. d. Notices - Any notices required to be given by the City to the Consultam or the Consultant to the City shall be in writing and delivered to the parties at the following addresses: City Clerk 239 Fourth St. Bremerton, WA 98337 Parametrix, Inc. 5700 Kitsap Way, Suite 202 Bremerton, WA 98312 e. Waiver - Failure to insist upon strict compliance with any terms, covenants or conditions of this Agreemem shall not be deemed a waiver of such, nor shall any waiver or relinquishment of such fight or power at any time be taken to be a waiver of any other breach. f. Compliance with State, Local and Federal Laws - The Consultant agrees to comply with applicable local, state and federal laws in performance of all services under this Agreement. g. Applicable Law; Venue - This Agreement shall be construed and interpreted in accordance with the laws ofthe State of Washington an& in the event ofdispute, the venue of any action brought hereunder shall be in Kitsap County Superior Court. h. Attorney Fees - The substantially prevailing party in any litigation arising hereunder shall be entitled to its reasonable attorney's fees and court costs, including appeals, if any. 9. NONDISCRIMINATION: The Consultant shall not discriminate in employrnent or services to the public on the basis of race, color, national origin,, sex, religion, age, marital stares or disability, except employment actions based on a bona fide occupational qualification. 10. TERMINATION: This Agreement may be terminated by either party, for convenience upon thirty (30) days' written notice to the other party, or for cause if either party fails substantially to perform through no fault of the other and does not commence correction within five (5) days of written notice and diligently completes the correction thereafter. Upon such termination, City will be entitled to reports showing the stares of all matters upon which the Consultant is advising the City as of the effective date of termination. PROFESSIONAL SERVICES AGREEMENT -3- Pro-Serv. Agt - 5/6/99 3o IN WITNESS WHEREOF the parties hereto have executed this Agreement the date and year indicated. Date: BY: PARAMETRIX, Inc. Date: CITY OF BREMERTON BY: LYNN S. HORTON, Mayor DEPARTMENTAL APPROVAL: CRIS GEARS, Director of Parks and Recreation APPROVED AS TO FORM: GLENNA MALANCA, City Attorney RECEIVED FOR FILING: KATHLEEN L. McCLUSKEY, CITY CLERK PROFESSIONAL SERVICES AGREEMENT -4- Pro-Serv. Agt - 5/6/99 EXHIBIT A SCOPE OF WORK EVERGREEN PARK EXPANSION PROJECT SITE REMEDIATION AND SCHEMATIC DESIGN SERVICES Parametrix will perform Design Services and Site Remediation for the Evergreen Park Expansion. The project involves preparing the final design for soil remediation and park development. The remedial actions are being performed under an Agreed Order with the Department of Ecology, while the park design and construction elements are being performed under a grant f~om IAC and local contributions. T"nis scope of work was prepared to meet the requirements and objectives of the Agreed Order and the IAC contract for grant fimding. As specified in the Agreed Order, the project will be completed in two Phases (refer to Attachmem E of the Agreed Order). To accommodate the Agreed Order, Parametrix' scope of work is presented in two Phases. Phase I will include demolition of site structures and the completion of engineering studies necessary to develop design criteria for remediation and park construction. Phase 11 will include remedial actions as specified in the Agreed Order and park design. Performance and compliance monitoring, which are also specified in the Agreed Order will commence following construction of the park. The Phase I Scope of Services is organized into five Elements of Work: PROJECT ADMINISTRATION PERMIT COORDINATION/MEETINGS DEVELOPMENT OF SCHEMATIC PARK DESIGN DEMOLITION/REMEDIATION PLANNING ENGINEERING DESIGN REPORT Each is discussed in detail in the following pages. Phase 11 work elements are expected to include: DESIGN OF INTERIM REMEDIAL ACTIONS DESIGN OF INSTITUTIONAL CONTROLS UST/SOIL/LNAPL REMEDIATION GROUNDWATER STUDIES SUPPLEMENTAL SURVEY AND MAPPING PS&E FOR PARK EXPANSION CONSTRUCTION SERVICES The Phase 11 scope of services will be prepared at the completion of Phase I work elements. Performance and Compliance Monitoring will commence following Phase 11. The Phase I schedule is provided as Exhibit C. City of Bremerton Evergreen Site Remediation draft scope of work rev 4. doc PMX #83- 1896-25 (W2 J_ August 1999 39.- PROJECT ADMINISTRATION This element of work provides for level of effort and expenses associated with Project Management functions. Specific components of this work element will include resource allocation, contract management, cost control, schedule maintenance, project planning and documentation, quality control, subcontracting and subconsultant management and financial tracking and reporting. Parametfix has established the following Tasks for this Element of Work: TASK IA: WORK PLAN DEVELOPMENT Parametrix will prepare a project-planning document that identifies the requirements and responsibilities for this project. The planning document will identify specific roles and responsibilities for execution of each element of work. It will present project lines of communication and reporting responsibilities and will discuss the engineering methods and standards and the' applicable, relevant, and appropriate requirements for remedial action tasks. The project-planning document will present detailed processes for the control and review of project quality and establish a project-specific quality assurance program. The planning document will present Standard Operating Procedures for the review of documents and the delivery of plans, specifications, and estimates. Assumptions: The work plan will be prepared during the first two weeks following notice to proceed. Work Product(s): Project Work Plan. Cost: $3,494 TASK lB: PROJECT MANAGEMENT AND COORDINATION Parametrix Project Manager will provide direct access to the City of Bremerton for specific consultation regarding the project scope, budget and schedule. This task will also provide for the necessaD: management functions related to resource allocation, staff management, cost control, routine project status reports, invoicing, record keeping, schedule maintenance and other related functions necessary, to deliver this project and achieve project milestones. Under this task, Parametrix will develop line-item invoicing to support the City's requests for allocation of grant funds. Parametrix will require several subcontractors to complete specific project activities and meet the City's goal for disadvantaged minoriW business participation. Subconsuitants are anticipated for safety, and health monitoring, asbestos/lead-based paint assessment and abatement monitoring, and remedial construction cost estimating. Additional subconsultants may be necessary based on progress of work and conditions encountered during data gathering and remedial actions. Parametrix will require level of effort and expense budget to implement subconsultant agreements, monitor subconsultant performance, process subconsultant invoices and manage increased risk associated with subconsultant performance. Assumptions: Ci(y of Bremerton Evergreen Site Remediation draft scope of work rev 4. doc Time for Parametrix' Project Manager to manage and coordinate the project. Effort for clerical, graphics and word processing support. 352 PMX #83-/896-250V2) August 1999 Work Product(s): Cost: · $8,595 Parametrix assumes six (5) subconsultant agreements will be necessary. during Phase I. The Project Management scope of work may be modified after Phase I. Routine telephone communications. Client-requested documentation. Subconsultant agreements Invoices and monthly reports Project scope, budget and schedule maintenance TASK lC: PROJECT SCOPING Parametrix will prepare, as requested by the City supplemental scopes of work for completing Phase II or other work. This supplemental scoping effort is necessary to develop accurate scope elements and cost estimates for design, remedial action, and construction assistance tasks. The supplemental scoping effort will also provide for the reassessment of Project Administration tasks. Assumptions: The prelimina~ engineering report is complete and the conceptual park plan has been accepted by the City. Project scoping will include one meeting ~vith the City, to review scope elements and project expectations. Work Product(si: · Draft and Final Scope of Work for Phase II. Phase II budget estimate. · Phase II schedule. Cost: $2.327 PERMIT C OORDNIATION/MEETINGS This element of work provides for project meetings with the City and stakeholders; review and coordination of project permits, and biological and archeological studies. TASK 2A: MEETINGS Parametrix will conduct bi-weekly meetings with the City and project stakeholders to discuss project status, review schedule and budget concerns, and develop consensus for decisions required for design and implementation of work elements. Meetings will be attended by Parametrix Project Manager and key design team personnel including, QA/QC managers, Project Principal, Engineer of Record, and technical staff as appropriate for agenda topics. City of Bremerton Evergreen Site Remediation ~a~ ~a 3 draft scope of work rev 4.doc PMX #83-1896-25(W2) August 1999 Parametrix will also support and attend, as requested by the City, commissioner meetings, council sessions, Depa,unent of Ecology consultations, and special meetings held to communicate project activities to the public or special interest groups. Assumptions: Parametrix will conduct bi-weekly meetings during Phase I. For costing purposes, we assume 8 meetings. Parametdx assumes an average of three (3) project staffwill attend meetings. Parametfix will attend two (2) meetings involving city council, Park Commissioners, the Department of Ecology, or special interest groups. Parametrix will prepare and present graphics and informational packages for these meetings. We assume two (2) project stuff will attend these meetings and that all meetings will occur in Kitsap County. Meeting effort includes preparation, meeting-attendance and responding to action items. Work Product(s): · Meeting agendas. · Meeting minutes. · Graphics. Informational handouts. Cost: $6,828 TASK 2B: PERMIT REVIEW/BIOLOGICAL ASSESSMENT Parametrix will review permit requirements related to Park construction and prepare recommendations regarding necessary permit applications. We will provide assistance to the City in coordinating substantive requirements with the Department of Ecology or other regulatory authorities. Parametrix will perform this work to meet the substantive requirements as specified in the Agreed Order. This will assisting the City in determining additional permitting requirements not specified in the Order and consult with Ecology regarding additional requirements. Parametrix will also prepare a Biological Assessment to meet requirements for the Endangered Species Act. The Biological Assessment will utilize information contained in the SEPA Checklist and Engineering Design Report. Parametrix will initiate informal consultation with the U.S. Fish and Wildlife Service (FWS) and the National Marine Fisheries Service (NMSF). Updated lists of threatened, endangered, proposed and candidate species occurring in the area will be compiled from this consultation. Parametrix shall also request Priority Habitats and Species database information from the Washington Department of Fish and Wildlife (WDFW), and Washington State Department of Natural Resources (DNR), in particular, any recent activity involving bald eagle nesting in the area. The Biological Assessment will address those species listed in the EIS and several fish species which were recently listed in the Endangered Species Act including, but not limited to Coho salmon, Chinook salmon, chum salmon, sea-run cutthroat, and bull trout. The Biological Assessment will conclude with a report that identifies potential impacts to listed species and provides alternatives for mitigation of the identified impacts. City of Bremerton Evergreen Site Remediation draft scope of work rev 4.doc 4 PMX g83-1896-25~2) August 1999 Assumptions: · Grading and site development permits will be deferred to the constmction/remediation contractors. · The SEPA process has resulted in a determination of non-significance. · Two (2) meetings with regulators to discuss applicability of shoreline, HPA, DNR, or other potentially applicable permits. Required permit applications will be prepared under Phase II. Work Product(s): · Up to two technical memoranda and associated graphics as necessary to support permit agency requirements. Biological Assessment for the project area. Cost: $12,506 TASK 2C: ARCHEOLOGICAI_~ANTHROPOLOGICAL SURVEY Because of recent findings of artifacts in Evergreen Park Phase I, Parametrix will coordinate and direct, as needed, an Archeological Survey of artifacts or features encountered during intrusive activities at the site. Survey activity will be coordinated with local tribal representatives and performed by an experienced subconsultant. Assumptions: Archeological services will be provided by a subconsultant. Work Product(s): To be determined in supplemental scope of work based on need for archeological services. Cost: $5,000 SCHEMATIC PARK DESIGN This element of work provides for the development of the conceptual park setting, inte~ation with the grading, drainage and utilities team to develop preliminary or schematic designs for the park. The scope of work presented below provides for effort through the completion of the preliminary design described in Task 5C. The scope and cost for interim and final design sets, construction documents, estimates, and construction support services will be identified in a supplemental scope of work. TASK 3A: PROGRAM REVIEW AND DEVELOPMENT Parametrix will review master plan documents, and meet with City staff to confirm and clari~ the existing program. As appropriate, we will modify, and/or add to program elements. Parametrix will then synthesize existing and new information into a pro,am summary with options and early priorities. Assumptions: Work will include review of readily available documents, and a half-day workshop with City staff. City of Brernerton Evergreen Site Remediation draft scope of work rev 4.doc PMX ~3-1896-25(W2) August 1999 Work Product(s): · Program memorandum incorporating design history and updated project needs. Technical memorandum identifying approximate square foot costs for generic program elements Cost: $1,443 TASK 3B: SITE INVENTORY AND ANALYSIS Parametrix will identify site opportunities and constraints including views, access, parking, off-site land uses, existing vegetation, site history, and expected site constraints related to mitigation requirements. We will synthesize this information and develop an opportunities and constraints analysis. This analysis will determine the site's capability for locating identified program elements. Assumptions: · Preliminary site analysis will focus on aboveground features. Future information developed with continuing site investigation for Mitigation design may alter inventory and analysis f'mdings. Base mapping is prepared under Task 3A. Work Product(s): · Summary opportunity, and constraint diagram. Summary. opportunity and constraint memorandum. Cost: $1.680 TASK 3C: SCHEMATIC DESIGN ALTERNATIVES Parametrix will prepare up to three schematic design alternatives in response to site capabilities and program needs. Schematic designs will include general layout of site features, rough grading concepts and surface treatments, and section and elevation drawings to communicate the general "look and feel" of project elements. Each alternative will also include preliminary opinions of probable cost. A schematic design report will be prepared describing alternative rationales, and evaluating the benefits/concerns of each alternative. The schematic design report will also include preliminary opinions of probable cost and an outline specification to begin describing the materials and construction methods for the project. Assumptions: · Schematic designs will be presented to City staff in one, half-day workshop Following a period of review by City staff, a separate half-day workshop will be conducted during which a consensus-preferred alternative will be chosen, or one of the schematic designs will be modified Schematic designs will provide the basis for the preliminary engineering plans to be developed under Task 3D. Work Product(s): Technical Memorandum identifying design criteria that will be incorporated into the preliminary engineering plans developed under Task 3D. Cost: city of Bremerton Evergreen Site Remediation draft scope of work rev 4. doc $4,304 PMX #83-1896-25(W2) 6 August 1999 TASK 3D: PREFERRED SCHEMATIC DESIGN Parametrix will formalize the schematic design chosen in the half-day workshop with City staff. We will develop a set of scaled graphics that accurately describe the concept and give a sense of the schematic design's overall character. The grading concept will be developed to include all landforms, basic drainage concepts and areas with ADA access. Site structures, paved areas, walkways and parking areas will be located, and we will also begin to note the nature and locations of site furnishings. We will begin to indicate specific planting areas. Additionally, we will coordinate with the project wetland biologist regarding appropriate planting for areas along the Smith Cove shoreline. Assumptions: · Schematic design drawing set, including plans, sections and election drawings. Final schematic design report describing the selected alternative, as well as the original alternatives developed for selection. Updated preliminary opinion of probable cost and an outline tailored to the selected schematic alternative. Work Product(s): Drawings for the preferred schematic design will be color renderings suitable for public meetings or promotional activities. Cost: $4,620 DEMOLITION/REMEDIATION PLANNING This element of work provides for data gathering and preparation of plans for removal of structures (above ground and below ground. TASK 4A: HEALTH AND SAFETY ADDENDA Parametrix and required subconsultants will conduct a review of existing site conditions and proposed work elements to identify, safety, and health risks associated with project activities involving Parametrix and subconsultant personnel. Parametrix and subconsultants will prepare addenda to the existing RI/IrS health and safety, plan prepared by Exponent. The addenda will identify, task specific work practices involving potential hazardous conditions. Assumptions: · Health and safety addenda will apply solely to Parametrix and subconsultant personnel. The addenda will not specify, safety and health requirements for contractors, City personnel, and other project stakeholders. An independent health and safety plan is not required for the project. Work Product(s): · Three (3) Health and Safety Plan addenda. Cost: $2,275 City of Bremerton Evergreen Site Remediation draft scope of work rev 4. doc 7 PMX ~83-1896-25 August 1999 TASK 4B: SAMPLING AND ANALYSIS PLANS Parametrix will prepare a task-specific addendum to the RI/FS sampling and analysis plan prepared by Exponent. The addenda will identify sampling objectives, measurement criteria, and sample collection and analysis methods and requirements. The addenda will be applicable to UST assessment and demolition activities. Assumptions: Parametrix will prepare two (2) addenda. Addenda will be submitted to the City for approval. Work Product(s): Two (2) Sampling and Analysis Plan addenda. Cost: $2,03 8 TASK 4C: ASBESTOS/LEAD-BASED PAINT Parametrix will provide for the identification and quantification of asbestos containing material (ACM) within the five buildings scheduled for demolition. The surveys will be compliant with 40 CFR 763.86, Regulation III, Article 4, of the Puget Sound Air Pollution Control Agency (PSAPCA) and WAC 296-62- 077.21. All survey work shall be completed by an AHERA Building Inspector with current certification. Inspections shall include bulk sampling and analysis of suspect ACM, as well as, visual assessments to quantify materials previously tested and presumed to be ACM. Parametrix will conduct destructive testing of representative building materials for lead using TCLP protocols. Should building materials exceed lead disposal thresholds (5 mg/kg), Parametrix will provide lead-based paint testing in accordance with Housing and Urban Development (HUD) regulations to identify and quantify lead-based paint in each structure. This work will provide information necessary to complete lead abatement prior to removal and disposal of building materials. Parametrix will assist the City in the review of abatement contractor submittals and abatement contractor performance, including conducting abatemem clearance inspections. Assumptions: Asbestos surveys will require forty-eight (48) samples per structure for five structures. · No lead-based paint abatement will be required for this project. The City will provide ready access to the buildings for the purpose of conducting survey and abatement activities. Abatement work will be conducted following a performance-based specification. Plan sheets will not be required. Work Product(s): * Asbestos survey reports that identify the type and location of ACM identified in each structure. The survey reports will also contain quantity estimates and an estimate of probable abatement costs. Asbestos abatement specifications for inclusion in Demolition Bid package. City of Brernerton Evergreen Site Rernediation draft scope of work rev 4. doc 3q P,V~Y i~3-1896-25 (W2) 8 August 1999 · Technical memoranda summarizing the review of contractor submittals and the results of clearance inspections. Cost: $17,436. TASK 4D: BUIlJBING DEMOLITION Parametfix will prepare plans, specifications, and estimates for the demolition, removal, and disposal of buildings and above grade features including the former tank stand and fuel pier. Parametrix will also prepare a temporary erosion and sediment control plan for demolition activities. Parametrix will provide bidding assistance and engineering support during demolition as requested by the City. Assumptions: * Demolition will require 8 plan sheets and specifications. · A temporary erosion and sediment control plan will be required. · The City will competitively procure a demolition contractor. · Demolition will occur in a single mobilization and single bidding process. WorkProduct(s): · 90% bid package including PS&E and TESC for City review. · Final bid package with PS&E and TESC. · Field notes from demolition support activities. · Up to four (4) technical memoranda discussing the adequacy of contractor submittals and/or contractor change order requests. · Twenty-four (24) total labor hours for demolition support and bidding assistance. Cost: $17,565. TASK 4E: UST REMOVAL PLANS Parametrix will directly contract for the completion of a ground-penetrating radar (GPR) survey to map the location and approximate configuration of USTs and associated appurtenances. The information gathered during the GPR survey will provide the basis for developing sampling approaches and removal specifications and identify the location of subgrade features to be considered during utility and drainage design. As necessary to support preliminary engineering activities, the GPR survey may be extended to locate subgrade utilities. Parametrix will conduct sampling and assessment of UST contents. Samples of liquid, sludge, or solid material will be collected from each tank for chemical analysis. Tank content analysis is necessary to properly characterize the contents for disposal and to validate health and safety requirements for removal. Parametrix will prepare plans for removing USTs. Draft plans will be submitted to the City for review and final plans will be included in the Engineering Design Report. Final plans will provide the basis for bidding documents for UST removal contractors. City of Bremerton PM,'(g83-1896-25(W2) Evergreen Site Remediation 9 August 1999 draftscopeofworkrev4.doc 40 Assumptions: Work Product(s): · Cost: $22,527 The GPR Survey will require 3 days in the field to complete. One additional day has been budgeted to support utility mapping. The GPR Survey will map only the location of the 8 USTs identified in the Interim Action Work Plan and Engineering Design Report, the submarine, and the submarine tender. Additional tanks are not accounted for in this effort. Locations identified during the GPR Survey will be located by a surveyor and added to the base map prepared under Task SA. Parametrix will collect one sample per UST for waste characterization. UST contents can be sampled through existing tank access ports with hand held equipment. Removal of asphalt and concrete surfaces or cutting of the UST is not required. GPR Survey report describing the methods and findings, including estimated tank volumes, orientation, piping connections, and depth. Updated base map containing surveyed tank locations. A data report presenting the findings of sampling and analysis of tank contents. Draft and final UST removal plan. ENGINEERING DESIGN REPORT This element of work includes engineering study and design services necessary, to support remedial actions and develop design criteria for grading (including cap construction), drainage, and utilities. The work described in this element is considered directly related to remedial actions at the site. The scope and cost for interim and final designs and PS&E will be identified in a supplemental scope of work. TASK SA: SURVEY AND BASE MAP DEVELOPMENT Parametrix will map the Bream-Air, Lofthus and Puget Power Sites and add to the existing mapping of the Evergreen Park and City Depot sites. Recent improvements at these two sites will be incorporated into the existing mapping from as-built plans or design plans. Mapping would extend approximately 25 feet beyond the 'Limits of Expansion' line shown in the "Interim Action Work Plan and Engineering Design Report" to allow for sufficient overlap for design considerations. Parametrix will complete base mapping prior to demolition. Additional survey work is described and included in the cost of other specific subtasks. Parametrix' base map will include: City of Bremerton Evergreen Site Remediation 4 I draft scope of work rev 4. doc PM~ #83-1896-25(W2) 10 August 1999 · topography. · outline of vegetated areas. · manmade features - buildings, roads, sidewalks, etc. · surface utility features - valves, telephone risers, etc. · painted underground locate marks - locates to be arranged by others prior to survey. · underground utility lines as determined from as-built plans, GPR survey and field survey. · invert measurements for manholes and catch basins. · property, boundary · easements of record · apparent low and high tide lines Parametrix will also develop a boundary determination for the recently acquired properties. We will use research documentation provided by the City or County Recorder that includes: · recorded surveys · GIS graphics · right-of-way maps · plat maps · title reports · field-tie street monuments · calculate boundary · draft onto base map · plot easements Assumptions: · Ci~' to clear and cut heavy, vegetation prior to survey. Title reports to be provided by the City. Under~ound utilitw locates provided by a private locator Rights of Entry arranged by the City.. No boundam, comers will be set or recorded under this scope. Work Product(sd: AutoCAD Version 14 base map in electronic and hard copy with a 2 foot contour interval at a scale of 1"=50'. Cost: $14,3 2 9 TASK 5B: ENGINEERING DESIGN REPORT Parametrix will investigate site conditions relative to grading, drainage and utilities and prepare an Engineering Design Report. The report will document engineering requirements and design criteria for development of the cap, shoreline controls, and the park. The report will provide the basis for the final design that will meet or exceed minimum requirements for utilities and other infrastructure improvements. Information obtained during the building demolition and tank removal will be supplemented with a Geotechnical investigation of soil/fill properties. Parametrix will contact local utility providers to coordinate utility locations and disconnects. This will include meeting with utility representatives to coordinate any relocation or new utility construction requirements. City of Bremerton Evergreen Site Remediation draft scope of work rev 4.doc PMX #83-1896-25 (W2) August 1999 Parametrix will perform a detailed site drainage analysis (predevelopment condition and post development conditions) that will include an evaluation of the existing stormwater system along Sheldon Boulevard. The report will identify the stormwater facilities needed for the new park, including new permanent BMP's, to be accommodated in the cap design and general site improvement. The report will outline specific requirements for improvements adhering to the Bremerton Municipal Code (BMC), standard specifications and details, shoreline master plan, UBC, UFC, and UDCS. The design alternatives and criteria identified in the report will be used by the landscape architect in coordination with the engineer for schematic park design. Assumptions: The City will provide existing information on utilities including as-builts, previous studies and reports (i.e. Soil reports, investigations, site assessments, etc). Parametrix will prepare one edition of Design Report for City review. City review comments will be incorporated into the preliminary design prepared under Task 5C. The City will provide copies of all applicable City. codes and permit requirements for design and construction. The CRv will establish the limits and extent of the improvements. Geotechnical assessments of six proposed construction locations. Work Product(sd: Parametrix will provide 5 copies of the draft Engineering Design Report to the Ci~'. Parametrix will provide t 0 copies of the final report. Cost: $32,248 TASK 5C: PRELIMINARY GRADING, DRAINAGE, and UTILITY PLANS This effort will present a level of detail that will allow the City. to review the plans for general civil improvements such as cap design, utili¢' layout, curb and gutter, parking lots, site entrances, site grading. retaining walls, stormwater facilities, amphitheater, restrooms, and general park improvements. Parametrix will prepare a preliminary plan set that will incorporate the schematic park design elements prepared in Task 3D. Assumptions: Preliminary. plans will consist of six (6) sheets. Preliminary. plans will incorporate comments from the City and Depmxment of Ecology on the Engineering Design Report. Work Product(s): 10 copies of the preliminary plans presented on 24x36-inch plots. Cost: $12,973 City of Breraerton Evergreen Site Remediation 4 3 draft scope of work rev 4. doc 12 P3£¥ t483-1896-25(W2) August 1999 EXHIBIT B COST ESTIMATE PROJECT ADMINISTRATION Task lA: Work Plan Development $ 3,494 $ Task lB: Project Management $ 8,595 $ Task lC: Project Scoping $ 2,327 $ TOTAL FOR PROJECT ADMINISTRATION $ 14,416 $ 3,318 $ - $ 176 8,330 $ - $ 265 2,316 $ - $ 11 13,964 $ $ 452 PERMIT COORDINATION/MEETINGS Task 2A: Meetings $ 6,828 $ Task 2B: Permit Coordination/Biological Assessment $ 12,506 $ Task 2C: Archeological/Anthropological Survey $ 5,000 $ TOTAL FOR PERMIT COORDINATION/MEETINGS $ 24,334 $ 6,498 $ $ 33O 12,405 $ $ 101 500 $ 4,500 $ 19,403 $ 4,500 $ 431 DEVELOPMENT OF SCHEMATIC PARK DESIGN Task 3A: Program Review and Development $ 1,443 $ Task 3B: Site Inventory and Analysis $ 1,680 $ Task 3C: Schematic Design Altematives $ 4,304 $ Task 3D: Preferred Schematic Park Design $ 4,620 $ TOTAL FOR TASK4 $ 12,046 $ 1,331 $ $ 112 1,568 $ $ 112 4,265 $ $ 39 4,543 $ $ 77 11,707 $ $ 339 DEMOLITIONIREMEDIATION PLANNING Task 4A: Health and Safety Planning Task 4B: Sampling and Analysis Plans Task 4C: Asbestos/Lead-Based Paint Task 4D: Building Demolition Task 4E: UST Removal Plans $ 2,275 $ 1,450 $ 792 $ 33 $ 2,038 $ 2,027 $ $ 11 $ 17,436 $ 4,553 $ 11,201 $ 1,683 $ 17,565 $ 16,932 $ $ 633 $ 22,527 $ 10,463 $ 6,930 $ 5,134 TOTAL FOR DEMOLITION/REMEDIATION $ 61,840 $ 35,424 $ 18,923 $ 7,494 ENGINEERING DESIGN REPORT Task 5A: Survey and Base Map Development $ 14,329 $ Task 5B: Engineering Design Report $ 32,248 $ Task 5C: Schematic Engineering Design $ 12,973 $ TOTAL FOR ENGINEERING DESIGN REPORT $ 59,551 $ 13,088 $ 1,100 $ 141 24,537 $ 7,425 $ 286 12,506 $ $ 468 50,131 $ 8,525 $ 895 TOTAL $ 172,186 $ 130,627 $ 31,948 $ 9,611 City of Bremerton Evergreen Park Comprehensive scope of work rev 2. xlsTask Totals PMX #83-1896-25(W2) August 11, 1999 AGENDA BILL BREMERTON CITY COUNCIL SUBJE~: Manette Hayfield Renovation IAC-YAF Grant Agreement FOR AGENDA OF: September 29, 1999 ORIGINATING DEPT: Parks & Recreation ORIGINATOR: JoAnne Wroblewski, Ass't Director DATE SUBMITTED: Sept. 21, 1999 4. SUMMARY STATEMENT AND REQUIREMENT FOR COUNCIL ACTION: The City has been awarded a $62,500 grant from the Interagency Committee for Outdoor Recreation (Youth Athletic Facilities). In order to receive the funding the Mayor must enter into a standard Project Agreement with the IAC. This funding is being matched by a C.D.B.G. gram of $62,500 for a total project expenditure of $125,000 to renovate Manette Hayfield. The renovation includes grading, installing a drainage system and an irrigation system, and installing turf. This is a project that has been long awaited by area residents, the PeeWee sports organization, and many soccer players. This is one of the Ciw's few lighted fields and is used heavily, in spite of its poor condition. 8. RECOMMENDATION: Motion: To authorize the Mayor to sign the 1AC Project Agreement for the Manette Pla,~eld Renovation Grant. RESPONSIBLE OFFICIAL: Cris Gears ENFORCEMENT OFFICIAL: Cris Gears EXPIRATION DATE: REVIEW DATE: PULLED TABLED COUNCIL DIRECTIVE: 10. NOTICE OF ACTION APPROVED DISAPPROVED DATE: AMENDED 11. AGENDA BILL #: 2. CLEARANCE COMMENTS: IMPACT OF NON-PASSAGE: The City will not be able to accept the IAC grant and will be unable to complete the project. This could also jeopardize the Community Developmem Block Grant funding, and future IAC funding for the Warren Avenue Renovation Project. IMPACT ON STAFFING~ BUDGETS~ FACILITIES~ EQUIPMENT OR OTHER RESOURCES: This renovation will not significantly impact staffing, maintenance and operations activities. There will be an increase in water usage and mowing. However, the Department can absorb these costs within its current budget. 7. RESEARCH SOURCES: YAF Project Agreement Youth Athletic Facility Grant Account Project Sponsor: Project Title: Bremerton Parks & Rec Dept Manette Playfield Renovation Project Number: 99-1205D lAC Approval Date: 7/16/1999 Ao PARTIES OF THE AGREEMENT This project Grant Agreement (Agreement) is entered into between the Interagency Committee for Outdoor Recreation (lAC), P.O. Box 40917, Olympia, Washington 98504-0917 and Bremerton Parks & Rec Dept, 680 Lebo Blvd, Bremerton, WA 98310 (Project Sponsor) and shall be binding upon the agents and all persons acting by or through the parties. B. PURPOSE OF AGREEMENT This Agreement sets out the terms and conditions by which a grant is made from the Youth Athletic Facility Grant Account of the State of Washington's General Fund. The grant is made by the Interagency Committee for Outdoor Recreation to the Project Sponsor, for the project named above. C. DESCRIPTION OF PROJECT The subject project is described on the attached Project Summary. D. TERMS OF AGREEMENT The Project Sponsor must insure that the facility developed, improved, and/or maintained through the Youth Athletic Facilities Account funding identified in the Project Agreement is made available for public youth and/or community athletics for a minimum of twenty (20) years from the date of project completion. E. PERIOD OF PERFORMANCE The Project reimbursement period shall begin on September 1, 1999 and end on December 10, 1 999. No expenditure made before or after this period is eligible for reimbursement unless incorporated by wdtten amendment into this Agreement. F. PROJECT FUNDING The total grant award provided by lAC for this project shall not exceed $62,500. lAC shall not pay any amount beyond that approved for funding of the project. The Project Sponsor shall be responsible for all total project costs that exceed this amount. The contnbution by the Project Sponsor toward work on this project at a minimum shall be as indicated below: Percentage lAC - YAF - MAINT 50% Project Sponsor 50% Total Project Cost 100% Dollar Amount $62,500 $62,5OO $125,000 RIGHTS AND OBLIGATIONS All rights and obligations of the parties to this Agreement are subject to this Agreement and its attachments, including the Sponsor's Application, Project Summary, Eligible Reimbursement Activities Report, and the General Provisions. Except as provided herein, no alteration of any of the terms or conditions of this Agreement will be effective unless provided in writing. All such alterations, except those concerning the period of performance, must be signed by both parties. Period of performance extensions need only be signed by IAC's Director. The Project Sponsor has read, fully understands and agrees to be bound by allterms and conditions as set forth in these documents. YAF Project Agreement Chapter 43.51 RCW, Chapter 286 WAC PROJAGR1 .RPT Youth Athletic Facility Grant Account Page 1 of 2 COMPLIANCE WITH APPL,.,...~BLE STATUTES, RULES, AND lAC POI_:_~E.W This Agreement is governed by, and the Sponsor shall comply with, all applicable state and federal laws and the provisions of Chapter 43.51 RCW, Chapter 286 WAC and published agency policies, which are incorporated herein by this reference as if fully set forth. ADDITIONAL PROVISIONS OR MODIFICATIONS OF THE GENERAL PROVISIONS; The Project Sponsor must insure that the facility acquired, developed, improved, and/or maintained through the Youth Athletic Facilities Account funding identified in this Project Agreement is made available for public youth and/or community athletics for a minimum of twenty (20) years from the date of project completion. Project Completion begins at IAC's issuance of final reimbursement. Jo Should the facility become unavailable for public youth and/or community athletic use during this 20 year period, except as provided for in Section 18 (e), lAC requires the project sponsor to replace all entirely or partially funded project elements within this agreement. PROJECT GRANT AGREEMENT REPRESENTATIVE All wdtten communications sent to the Sponsor under this Agreement will be addressed and delivered to: Project Sponsor Name: Jodi Wroblewski Title: Project Manager Address: 239 4th Bremerton, WA 98310 lAC Interagency Committee for Outdoor Recreation Natural Resources Building PO Box 40917 Olympia, Washington 98504-0917 www.wa.gov/iac Ko These addresses shall be effective until receipt by one party from the other of a written notice of any change. ENTIRE AGREEMENT This agreement, along with all attachments, constitutes the entire agreement of the par'des. No other understandings, oral or otherwise, regarding this Agreement shall exist or bind any of the parties. EFFECTIVE DA TE This agreement shall be effective upon signing by all parties. STATE OF WASHINGTON INTERAGE~ICY COMMITTEE FOR OUTDOOR RECREATION BY: Laura Eckert Johnson, Director PROJECT SPONSOR BY: DATE: TITLE: Pre-approved as to form by the state Assistant Attorney General YAF Project Agreement Youth Athletic Facility Grant Account Chapter 43.51 RCW, Chapter 286 WAC PROJAGR2.RPT Page 2 of 2 ~ ¢~i~ ~ ~i RECRERTION Youth Athletic Facilities Maintenance Category Post-Evaluation Project Summary TITLE: SPONSOR: Manette Playfield Renovation Bremerton Parks & Rec Dept COSTS: lAC - YAF - MAINT $62,500.00 50% Local $62,500.00 50% Total ~ 125,000.00 100% NUMBER: 99-1205D STATUS: Committee Funded EVALUATION SCORE: COMMITTEE RANKING: 46.1.429 1 of 13 SPONSOR MATCH: Federal Grant (Development) DESCRIPTION: Install a drainage system including a sand cap and sand sod surface. Install an irrigation system. Reinstall the backstop. LOCATION INFORMATION: Within Bremerton City limits in Kitsap County YAF GROUP: COUNTY: North Olympic Group Kitsap SCOPE (ELEMENTS): Architectural & Engineering Athletic Fields Landscaping Sales Tax Roads Utilities FISCAL YEAR: 2000 i DATE PRINTED: September 1, 1999 1PAPSUM2.RPT Manette Playfield Renovation Project Sponsor: Project Title: Eligible Reimbursement Activities Report Bremerton Parks & Rec Dept Manette Playfield Renovation Project Number: lAC Approval: 99-1205 D 7/16/1999 Development Project: Element Item Unit Quantity Description Architectural & Engineering AUqletic Fields Landscaping Landscaping Landscaping Landscaping Roads Sales Tax UfiliUes Utilities A & E development Multipurpose - natural turf Drainage system Irrigation - automatic for turflplayfield Soil amenities Top soil/mulch Roads - asphaltic concrete Sales Tax General service connection Water meter Lump Sum Sq Ft Lump sum Acres Lump sum Yds Linear Ft Lump Sum Lump sum Lump sum 1.00 42,500.00 1.00 170' x 250' underground perforated 4" pipe on 15' centers 42,500.00 1.00 fertilizer 1,600.00 12" sand layer for sod 1.00 restoration 1.00 1.00 for water 1.00 water meter ELIGREIM.RPT September 1, 1999 Page: I INTERAGENCY COMMITTEE FOR OUTDOOR RECREATION Agency Name Interagency Committee for Outdoor Recreation P.O. Box 4091 Olympia, WA 98504-0917 Sponsor Bremerton Parks & Rec Dept 680 Lebo Blvd Bremerton, WA 98310 FORM-A-19 State of Washington INVOICE VOUCHER Soonsor's Cerlificate. I hef~oy certify un,er penalty of perjury that the items and totals listed harem are proper changes for materials, merchandise or set,cas furnished an~or servmas furnished to the State of Washington. and that all goods fumist~ed an~or serv~cas ren0erec~ ~ave been provided w~thout discrimination because of age. sex. marital status, race. cree~. c~or. national ongin, handicaD. refigion or Vietnam or disal~led veterans s~3tus. BY (TITLE) (DATE) Project Number 99-1205 D I Invoice 7~ I Billing Pedod [This is Final a Billing? Project Name Manette Playfietd Renovation / I i From: To: lyes[] No[ ] Project Costs For This Billing CATEGORIES: Agreemen~t" Expenditure~s Donations Total Development ~ Construction A&E _ $25,000 TOTAL~ $125,000 ~ Sponsor: 50.00% $62,500 Total Billed lAC Federal: lAC Share Billed lAC: YAF- MAINT 50.00% $62,500 tAC Share Approved lAC: Advance Balance Agreement Total 100.00% $125,000 Match Owed Balance lAC Share Retained lAC Share Paid Donation Bank 5029 B550 99-1205 Di 210 818 960 ff0203 NZ 5029 1 NZ 5029 NZ 5029 Project ManageflDate Release Final Prat [ ] Division Sup~flDate Accounting/Date INVOICE1.RPT 9/1/1999 Current Funding Milestone Report By Project Project Number: Project Name: Sponsor: lAC Project Manager: 99-1205 D Manette Playfield Renovation Bremerton Parks & Rec Dept Kammie Buries Project Start 09/01/1999 A&E commenced in July 1999 Plans & Specs Reviewed by lAC 09/01/1999 submitted and approved Bid Awarded 10/20/1999 ! Construction Started 11/01/1999 Project Complete 12/10/1999 Final Docs & Billing to lAC 01/10/2000 -- Milestone Complete Critical Milestone 1MILESTO.RPT September 01, 1999 Page: I JULY 29, 1999 ~-- Gefleral Pm'msions-1 Project Agreement General Provisions Table of Contents Page Headings, Definitions, and Framework of Agreement ........................................................ 3 Performance and Requirements - General ~bilities 4. 5. 6, 7, 8. 9. Performance by Sponsor ............................................................................................... 4 Restrictions on Assignment ........................................................................................... 4 Responsibility for Project ............................................................................................... 4 Independent Capacity of the Sponsor ............................................................................. 4 Compliance with Applicable Law .................................................................................... 5 Conflict of Interest ....................................................................................................... 5 Requirements of the National Park Service ....................................................................... 5 Acknowledgments and Signs ......................................................................................... 5 Funding, Reimbursements, Records, and Inspections 10. 12. 13. 14. Project Funding ............................................................................................................ 6 Project Reimbursements ................................................................................................ 6 Non-availability of Funds ............................................................................................... 6 Records and Reports ..................................................................................................... 6 Authority to inspect/Right of Entry ................................................................................. 7 Do Acquisition and/or Development - Methods and Requirements 15. 16. 17. Provisions Applying to Acquisition Projects ...................................................................... 7 Provisions Applying to Development Projects ................................................................... 7 Hazardous Substances .................................................................................................. 8 JuLY 29,1999 General Facility Uses and Fees 18. 19. 20. 21. Restriction on Conversion of Facility to Other Uses ........................................................... 9 Construction, Operation, Use and Maintenance of Assisted Projects .................................... 9 Income, Income Use ................................................................................................... 10 Preferences for Users .................................................................................................. 10 Fo Special Provisions 22. 23. Provisions Related to Nonprofit Sponsors ....................................................................... 11 Liability Insurance Requirements for Firearm Range Sponsors ........................................... 11 Remedies and Disputes 24. 25. 26. 27. 28. 29. 30. Waiver of Default .................. .' .................................................................................... 11 Application Representations - Misrepresentations or Inaccuracy or Breach ......................... 12. Indemnity ..................................................................................................................12 Termination and Other Remedies .................................................................................. 12 Disputes .................................................................................................................... 12 Governing Law/Venue ................................................................................................. 13 Severabilit¥ ........................................................................ ~ ...................................... 13 JL,*I.Y 29, 1999 - - General pro--ions-3 Section 1: Headings, Definitions, and Framework of Agreement (A) Headings used in this Agreement are for reference purposes only and shall not be considered a substantive part of this Agreement. (B) Definitions. Acquisition ~ The gaining of rights of public ownership by purchase, negotiation, or other means, of fee or less than fee interests in real property. Agreement - The accord accePted by all parties to the present transaction; the Project Agreement, supplemental agreement, and/or intergovernmental agreement between lAC and a Sponsor. Applicant - Any agency or organization that meets the qualifying standards, including deadlines, for submission of an application soliciting a grant of funds from lAC. Application - The forms approved by IAC's board or its Director for use by applicants in soliciting project funds administered b~. lAC. Board {lAC) - The committee created under RCW 43.99.110 includes eight members. Three are agency heads: the Commissioner of Public Lands, the Director of Parks and Recreation, and the Director of Fish and Wildlife {or their designees). Five, by appointment of the Governor with the advice and consent of the Senate, 'are members of the public at large who have demonstrated interest in and a general knowledge of outdoor recreation in the state. Development - The construction of facilities to enhance outdoor recreation or habitat conservation resources. Director - IAC's Director or the Director's designee. Interagency Committee for Outdoor Recreation (lAC) - The Executive branch state agency, including a board, Director, and personnel, created by RCW 43.99.110 and 43.99.130. (C) Project - The undertaking that is the subject of this agreement and that is, or may be, funded in whole or in part with funds administered by lAC. Project Summary - One of the document formats approved by IAC's board or Director for use by applicants in soliciting project funds. Sponsor - The applicant who has been awarded a grant of funds and is bound by this executed Project Agreement; includes its officers, employees and agents. Framework of Agreement. This Agreement provides for the orderly completion of the proposal contained in the'Sponsor's application for public funds administered by lAC. In summary, it provides the following guidance: (1) Timeliness. For the Sponsor to undertake and complete the Project in a timely manner, in accordance with the approved Project proposal and applicable laws; (2) Reimbursements. For lAC to provide reimbursement to the Sponsor for eligible Project-costs. Sponsor reimbursement requests shall be made not more than more than once monthly and not less than yearly, in accordance with lAC format and policy; (3) Recognition. For the Sponsor to provide acknowledgment of IAC's funding contribution, through signs, written recognition in printed materials, and/or in dedication ceremonies; ,JULY 29, 1999 General Provi~ons~ (4) Public use & inspections. For the dedication of the area or facility to the described public use and purposes, [including a deed-of-right where applicable], and to permit regular inspection by lAC; and (5) Other obligations & remedies. Sets-forth obligations and remedies. Section 2: Performance by Sponsor The Sponsor shall undertake the Project as described in this Agreement, on the Project Summary, in the Sponsor's application, and in accordance with the Sponsor's proposed goals and objectives described in the application or documents submitted with the application, all as finally approved by lAC. All submitted documents are incorporated by this reference as if fully set forth herein. Timely completion of the Project is important. Failure to do so, as set out in this Agreement, is a material breach of the Agreement. Section 3: Restriction on Assignment The Sponsor shall not.assign thi~ Agreement, or the performance of any obligations to lAC under this Agreement, or any claim against lAC it ma~ have under this Agreement, without the express written consent of the Director. Section 4: Responsibility for Project While lAC undertakes to assist the Sponsor with the Project by providing a grant pursuant to this Agreement, the Project itself remains the sole responsibility of the Sponsor. lAC undertakes no responsibilities to the Sponsor, or to any third party, other than as is expressly set out in this Agreement. The responsibility for the design, development, construction, implementation, operation and maintenance of the Project, as those phases are applicable to this Project, is solely that of the Sponsor, as is responsibility for any claim or suit of any nature by any third party related in any way to the Project. The Sponsor shall defend at its own cost any and all claims or suits at law or in equity which may be brought against the Sponsor in connection with the Project. The Sponsor shall not look to lAC, including any of IAC's employees or agents, for any performance, assistance, or any payment or indemnity, including but' not limited to cost of defense and/or e. ttorneys' fees, in connection with any claim or lawsuit brought by any third party related in any way to the Project, including but not limited to, its design, development, construction, implementation, operation and/or maintenance. _ Section 5: Independent Capac~y Of The Sponsor The Sponsor and his or her employees or agents performing under this Agreement are not employees or agents of tAC. The Sponsor will not hold himself/herself out as nor claim to be an officer or employee of lAC or of the state of Washington by reason hereof, nor will the Sponsor make any claim of dght, privilege or benefit which would accrue to an employee under Chapter 41.06 RCW or Chapter 28B.16 RCW. The Sponsor is responsible for withholding and/or paying employment taxes, insurance, or deductions of any kind. Section 6: Compliance with Applicable Law The Sponsor will comply .with, and lAC is not responsible for determining compliance with, all applicable federal, state, and local laws, regulations, and policies, including, but not limited to: State Environmental Policy Act (under which the Sponsor shall serve as lead agency); Americans with Disabilities Act; Architectural Barriers Act. (restoration and improvement projects only); Uniform Relocation Assistance and Real Property JULY 29, 1999 -~ General Provisiom-5 Acquisition Policies Act (PL91-646, RCW 8.26.010); Uniform Standards of Professional Appraisal Practices; permits (shoreline, HPA, demolition); land use regulations (comprehensive areas ordinances, GMA); and federal and state safety and health regulations (OSHA/WISHA). The Sponsor further agrees to indemnify and hold harmless lAC from all liability, damages, and costs of any nature, including but not limited to costs of suits and attorneys' fees assessed against lAC, as a result of the failure of the Sponsor to so comply. Section 7: Conflict of Interest Prohibited lAC may, by written notice to the Sponsor terminate this Agreement if it is found after due notice and examination by lAC that there is a violation of the Ethics in Public Service Act, Chapter 42.52 RCW; or any- similar statute involving the Sponsor in the procurement of, or performance under, this Agreement. In the event this Agreement is terminated as provided above, lAC shall be entitled to pursue the same remedies against the Sponsor as it could pursue in the event of a breach of the Agreement by the Sponsor. The fights and remedies of lAC provided for in this clause shall not be exclusive and are in addition to any other rights and remedies provided by law. The existence of facts upon which !AC makes any determination under this clause shall be an issue and may be reviewed as provided in the 'Disputes" clause of this Agreement. Section 8: Requirements of the National Park Service If the Project has been approved by the National Park Service, United States Department of the Interior, for assistance from the Federal Land and Water Conservation Fund (LWCF), the Project Agreement General Provisions as contained in Section 660.3 Attachment B of the L&WCF Grants-in-Aid Manual as now existing or hereafter amended are made part of this Agreement, and the Sponsor shall also abide by these Agreement General Provisions. Further, the Sponsor agrees to provide lAC with reports or documents needed to meet the requirements of the Agreement or Section 660.3 Attachment 13 of the L& WCF Grants-in-Aid Manual Section 9: Acknowledgments and Signs (A) In Publications. The Sponsor shall include language which acknowledges the funding contribution of the program to this Project in any release or other publication developed or modified for, or referring to, the Project. (B) (C) Signs. The Sponsor also shall post signs or other appropriate media at Project entrances and other locations on the Project which acknowledge the program's funding contribution as provided by lAC policy, unless waived by the Director; Ceremonies. The SPonsor shall notify lAC no later than two weeks before a dedication ceremony for this Project. The Sponsor shall verbally acknowledge the program's funding contribution at all dedication ceremonies. Section 10: Project Funding (A) Additional Amounts. lAC shall not be obligated to pay any amount beyond IAC's dollar amount or the Project percentage, as identified in this Agreement (whichever amount is less), unless that additional amount has been approved in advance by IAC's board or Director, and incorporated by written amendment into this Agreement. (B) Before the Agreement. No expenditure made, or obligation incurred, by the Sponsor before the effective date of this Agreement shall be eligible for grant funds, in whole or in part, unless specifically approved by IAC's board or Director.. The ~lollar amounts identified in this Agreement shall be reduced as necessary to exclude any such expenditure from participation. JULY29,1999 General Pravismn,~-6 (C) After the Implementation Period. No expenditure made, or obligation incurred, following the implementation period shall be eligible, in whole or in part, for grant funds hereunder. In addition to any remedy lAC may have under this Agreement, the amounts identified in this Agreement shall be reduced to exclude any such expenditure from participation. Section 11: Project Reimbursements (A) (B) Compliance and Retainage. Disbursement of grant monies by lAC to the Sponsor under this Agreement shall be made in accord with applicable statutes, rules and lAC policies, all conditioned upon proof of compliance with the terms of this Agreement by the Sponsor. lAC reserves the right to withhold disbursement of the final ten percent (10%) of the total amount of the grant to the Sponsor until the Project has been completed and approved by the Director. A Project is considered "complete" when (1) all approved or required activities (acquisition, development, maintenance, education and enforcement, etc.) are complete, (2) on-site signs are in place (if applicable), (3) a final Project report is submitted to lAC with the Sponsor's final request for reimbursement, (4) the completed Project has been approved by lAC, and (5) fiscal transactions are complete, Compliance and Payment. The obligation of lAC to pay any amount(s) under this Agreement is expressly conditioned upon strict compliance with the terms of this Agreement by the Sponsor. (C) Invoice Frequency. Sponsor must submit at least one invoice voucher a year but should not submit more than one voucher per month. A year end voucher should account for all activity up to and including June 30, the last day of the State's fiscal year. Sponsors should submit tl~e year-end billing to lAC not later than July 15th of each year. Final reimbursement requests should be submitted to lAC within ninety (90) days of either completion of the Project or the termination date, whichever comes first. (D) Payment for Land Purchases. Reimbursement for real property acquisition, either fee or less than fee interests, is based on the land values established per lAC guidelines, lAC will not reimburse for partial acquisition costs or any interest payments associated with the acquisition of real property purchased on installment. Section 12: Non-availability of Funds If amounts sufficient to fund the grant made under this Agreement are not appropriated by the Washington State Legislature, or if such funds are not allocated by the Washington State Office of Financial Management (OFM) to lAC for expenditure for this Agreement in any biennial fiscal period, lAC shall not be obligated to pay any remaining unpaid portion of this grant unless and until the necessary action by the Legislature or OFM occurs. If lAC participation is suspended under this section for a continuous period of one year, IAC's obligation to provide any future funding under this Agreement shall terminate. Termination of the Agreement under this section is not subject to appeal by the Sponsor. Section 13: Records and Reports The Sponsor shall maintain books, records, documents and other evidence of accounting prOcedures and practices which sufficiently and prOpedy reflect all direct and indirect costs of any nature expended in the performance of this Agreement. These records shall be subject at all reasonable times to inspection, review, or audit by personnel duly authorized by lAC, the Office of the State Auditor, and federal officials so authorized by law, rule, regulation, or contract. The Sponsor will retain all books, records, documents, and other materials re(evant to this Agreement for six years after settlement, and make them available for inspection by persons authorized under this provision. Section 14: Authority to Inspect/Right of Entry The Sponsor shall provide dght of access to its lands and facilities to lAC, or any of its officers, or to any other authorized agent or official of the state of Washington or the federal government at ali reasonable times, in order to monitor and evaluate performance, compliance, and/or .quality assurance under this Agreement. ,JULY 29, 1999 Geflerai Pro~mns-7 Section 15: Provisions Applying to Acquisition Projects The following provisions shall be in force only if the Project described in this Agreement is for the acquisition of outdoor recreation or habitat conservation land or facilities: (A) Relocation Assistance-L&WCF. When Federal Land and Water Conservation Funds are part of this Agreement, the Sponsor agrees to comply with the terms and conditions of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, 84 Stat. 1894 (1970}~Public Law 91- 646; as amended by the Surface Transportation and Uniform Relocation Assistance Act, PL 100-17- 1987, and the applicable regulations and procedures of the Department of the Interior implementing that Act. lB) Relocation Assistance-State Funds. When state funds are included in this Project, the Sponsor, if required by law, agrees to comply with the terms and conditions of the Uniform Relocation Assistance and Real Property Acquisition Policy of the State of Washington (Chapter 240, Laws of 1971, 1st Ex. Sess., RCW 8.26.010), and Chapter 468-100 WAC. (C) (D) Housing & Relocation. In the event that housing and relocation costs, as required by federal law set out in subsection lA) above and state law set out in subsection (B) above, are involved in the execution of · this Project, the Sponsor agrees to provide any housing and relocation assistance that may be necessary, with the understanding that eligible relocation costs may be part of the total Project cost. Evidence of Land Value. Before disbursement of funds by lAC as Provided under this Agreement, the Sponsor agrees to supply evidence to lAC that the land acquisition cost has been established as per lAC procedural guidelines, which are incorporated by this reference. (E) Evidence of Title. The Sponsor agrees to show the type of ownership interest for the property that has been acquired. This shall be done before any payment of financial assistance by lAC. (F) Deed of Right to Use Land for Public Purposes. The Sponsor agrees to execute an instrument er instruments which contain (1) a legal description of the' property acquired under this Agreement, (2) a conveyance to the State of Washington of the right to use the described real property forever for outdoor recreation.or habitat conservation purposes, and (3) a promise to comply with applicable statutes, rules, and lAC policies with respect to conversion of use. Section 16: Provisions Applying to Development Projects The following provisions shall be in force only if the Project described in this Agreement is for development of outdoor recreation or habitat conservation land or facilities: lA) Construction Document Review and Approval. The Sponsor agrees to submit one copy of all construction · plans and specifications to lAC for review, Review and approval by IAC's Director will be for compliance with the terms of this Agreement, (B) Contracts for Construction. Contracts for construction shall be awarded through a process of competitive bidding if required by state law. Copies of all bids and contracts awarded shall be retained by the Sponsor and available for lAC review. Where bids are substantially in excess of Project estimates, lAC may, by notice in writing, suspend the Project for determination of appropriate action, which may include termination of the Agreement. (C) Construction Contract Change Order. Sponsors must get prior written approval for all change orders that reduce or significantly change the scope of the Project, as finally approved by IAC's board. (D) Nondiscrimination. Except where a nondiscrimination clause required by the United States Department of the Interior is used, the Sponsor shall insert the following nondiscrimination clause in each contract for construction of this Project: JULY 29, 1999 General Provisions-8 "During the performance of this contract, the contractor agrees to comply with all federal and state nondiscrimination laws, regulations and policies. Section 17: Hazardous Substances (A) Certification. The Sponsor shall inspect, investigate, and conduct an environmental audit of the proposed acquisition site for the presence of hazardous substances and certify that no hazardous substances were found on the site. (B) Responsibility. Nothing in this provision alters the Sponsor's duties and liabilities regarding hazardous substances as set forth in Chapter 70.105D RCW. (C) Definition. "Hazardous substance," as defined in RCW 70.105D.020 (7), means: '(a) Any dangerous or extremely hazardous waste as defined in RCW 70.105.010(5) and (6) , or any dangerous or extremely dangerous waste designated by rule pursuant to chapter 70.105 RCW; '{b) Any hazardous substance as defined in RCW 70.105.010(14) or any hazardous substance as defined by rule pursuant to chapter 70.105. RCW; ~(c) Any substance that, on March 1, 1989, is a hazardous substance under section 101 (14) of the federal cleanup law, 42 U.S.C. Sec. 9601(14); '(d) Petroleum or petroleum products; and '(e) Any substance or category of substances, including solid waste decomposition products, determined by the director [or director's designee of the department of ecology] by rule to present a threat to human health or the environment if released into the environment. 'The term hazardous substance does not ihctude any of the following when contained in an underground storage tank from which there is not a release: Crude oil or any fraction thereof or petroleum, if the tank is in compliance with all applicable federal, state, and local law." (D) Hold Harmless. The Sponsor will defend, protect and hold harmless lAC and any and all of its employees and/or agents, from and against any and all liability, cost (including but not limited to all costs of defense and attorneys' fees) and any and all loss of any nature from any and all claims or suits resulting from the presence of, or the release or threatened release of, hazardous substances on the property being acquired. Section 18: Restriction on Conversion of Facility to Other Uses The Sponsor shall not at any time convert any real property acquired or any facility developed pursuant to this Agreement to uses other than those purposes for which assistance was originally approved, without the approval of IAC's board or Director, in compliance with applicable statutes, rules, and lAC policies as identified . in this Agreement. It is the intent Of IAC's conversion policy that all lands acquired and all lands developed with funding assistance from lAC remain in the public domain in perpetuity unless otherwise identified in the Agreement. By lAC policy and federal law a conversion may occur under any of the following circumstances: (A) Conveyance. Property interests are conveyed for non-public outdoor recreation or habitat conservation uses; (B) Use. Non-outdoor recreation or habitat conservation uses (public or private) are made of the Proje~;t area, or portion thereof; (C) Development. Non-eligible indoor recreation facilities are developed within the Project area without prior approval of IAC's board or Director; or (D) Termination of Use/Non-Conformance. JmY29, 1999 General ProViSions-9 (1) Outdoor Recreation Projects - Public use of the property acquired or developed with lAC assistance is terminated. (2) Habitat Conservation Projects - The property acquired no longer meets or conforms to the intent of the category in which it was funded. Element Change. A major change in an element described in the Agreement. When approved by IAC's board or Director, certain elements may be deleted from the Project Agreement without invoking the requirement to replace the elements. Such deletions are allowed when IAC's board or Director determines that the elements are not needed or cannot be retained for public use due to one or more of the following conditions: · Obsolescence · Extraordinary vandalism · Acts of Nature · Designed life expectancy reached · Fire - Property or property rights lost as a result of legal action · ICC National Trails System Act reversion order (National Trails System Act 8(d), 15 U. 5. C. § 1247(d); WAC 286-27-060(2]).' Section 19: Construction, Operation, Use and Maintenance of Assisted Projects Except for habitat conservation~ areas generally closed to the public, Sponsors must ensure shat properties or facilities assisted with lAC funds, including undeveloped sites, are built, operated and maintained: (A) Appearance. To appear attractive and inviting to the public except for brief installation, construction, or maintenance periods. (B) Laws. According to applicable federal, state, and local laws and regulations, including public health standards and building codes. (C) Safety. in a reasonably safe condition for public use. (D) Maintenance. Throughout its estimated life so as to prevent undue deterioration that would discourage public use. (E) Availability. For public use at reasonable hours and times of the year, according to the type of area or facility. (F) Nondiscrimination. In compliance with ail federal and state nondiscrimination laws, regulations and policies. Section 20: Income, Income Use. ~ In this context, the words habitat conservation refer to the three programs in IAC's Habitat Conservation Account: Critical Habitat, Natural Areas, and Urban Wildlife Habitat. JULY 29, 1999 General PmWSions- 10 (A) Income. (1) Compatible source. The source of any income generated in an lAC assisted project or project area must be compatible with the element(s) defined in the Project Agreement. The way the project or project area is defined varies with the source of funds provided by lAC. That is, income generated in a project assisted with funds that originate from: (a) A state source must be consistent with the limits of the element(s) assisted by lAC (for example, within the area of an athletic field or habitat area). (b) The federal Land and Water Conservation Fund must be consistent within the boundary described in chapter 660.2.6.A. (~project area") of the L& WCF Grants-in-Aid Manual (2) Fees. User and/or other fees may be charged in connection with land acquired or facilities developed with lAC administered grants if the fees are consistent with the: (a) Value of any service(s) furnished; and (b) Value of any opportunity(les) furnished and (c) Prevailing range of public fees in the state for the activity involved. Excepted are Firearms and Archery Range Recreation Program safety classes (firearm and/or hunter) for which a facility/range fee must not be charged (RCW 77.12.72). (B) Income use. Regardless of whether income or fees in an lAC assisted area (including entrance, utility corridor permit, cattle g~azing, timber harvesting, farming, etc.) are gained during or after the reimbursement period cited in the Agreement, unless precluded by state law, the revenue may only be used to offset: (1) The Sponsor's matching funds; and/or (2) The Project's total cost, and/or (3) The expense of operation, maintenance and/or repair of the facility or program assisted by the lAC grant and/or (4) The expense of operation and maintenance of other units in the Sponsor*s park and recreation and/or habitat conservation system and/or (5) Capital expenses for similar acquisition and/or development. Section 21: Preferences for Users Sponsors shall not express a preference for users of lAC grant assisted projects on the basis of residence (including preferential reservation, membership, and/or permit systems) except that reasonable differences in admission and other fees may be maintained on the basis of residence. Even so, lAC discourages the imposition of differential fees. Fees for nonresidents must not exceed twice the fee imposed on residents. Where there is no fee for residents but a fee is charged to nonresidents, the nonresident fee shall not exceed the amount that would be imposed on residents at comparable state or local public facilities. JuLY 29, 1999 General Provisions- 11 Section 22: Provisions Related to Nonprofit Sponsors A nonprofit or not-for-profit organization sponsor shall: (A) Strive to maintain a nonprofit or not-for-profit status(including registering with the Washington Secretary of State) throughout the Sponsor's obligation to the Project as identified in this Agreement. However, should a change in status become inevitable Ifor example, due to dissolution), within 30 days the Sponsor shall name a qualified successor that will agree in writing to assume any on-going project responsibilities. A qualified successor is any party eligible to apply for funds in the subject grant program and capable of complying with the terms and conditions of this Agreement. (B) Provide for operation and maintenance of the assisted facility. Should the Sponsor fail in this obligation for any reason, the Project will be considered converted and subject to all remedies available to lAC. (C) Not discriminate on the basis of age, disability, gender, income, race, or religion. Section 23: Uability Insurance Requirements for Firearm Range Sponsors The Sponsor shall procure an endorsement, or other addition, to.liability insurance it may currently carry, or shall procure a new policy of liability insurance, in a total coverage amount the Sponsor deems adequate to ensure it will have resources to pay successful claims of persons who may be killed or injured, or suffer damage to property, while present at the range facility t° which this grant is related, or by reason of being in the vicinity of that facility; provided that the coverage shall be at least one million dollars ($1,000,000) for the death of, or injury to, each person. lA) The liability insurance policy, including any endorsement or addition, shall name Washington State and lAC as defined in this Agreement as additiona{ insureds and shall be in a form approved by IAC's board or Director. (B) The policy, endorsement or other addition, or a similar liability insurance policy meeting the requirements of this section, shall be kept in force throughout the Sponsor's obligation to the Project as identified in this Agreement. (C) The policy, as modified by any endorsement or other addition, shall provide that the issuing company shall give written notice to lAC not less than thirty (30) calendar days in advance of any cancellation of the policy by the insurer, and within ten (10) calendar days following any termination of the policy by the Sponsor. (D) The requirement of Subsection A through D above shall not apply if the Sponsor is a federal, state, or municipal' government which has established a program of self-insurance or a policy of self-insurance with respect to claims arising from its facilities or activities generally, including such facilities as firearms or archery ranges, when the applicant declares and describes that program or policy as a part of its application to lAC. (E) By this requirement, lAC does not assume any duty to any individual person with respect to death, injury, or damage to property which that person may suffer while present at, or in the vicinity of, the facility to which this grant relates, Any such person, or any other person making claims based upon such death, injury, or damage, must look to the Sponsor, or others, for any and all remedies that may be available by law. Section 24: Waiver of Default Waiver of any default shall not be deemed to be a waiver of any subsequent default. Waiver of breach of any provision of the Agreement shall not be deemed to be a waiver of any other or subsequent breach and shall not be JULY ~9, 1999 General Provisions-12 construed to be a modification of the terms of the Agreement unless stated to be such in writing, signed by the Director, or the Director's designee, and attached to the original Agreement. Section 25: . Application Representations -- Misrepresentation or Inaccuracy a Breach lAC relies upon the Sponsor's application in making its determinations as to eligibility for, selection for, and scope of, funding grants. Any misrepresentation, error or inaccuracy in any part of the application may be deemed a breach of this Agreement. Section 26: Indemnity The Sponsor shall defend, protect and hold harmless the state of Washington, lAC, or any employees thereof, from and against all claims, suits or actions adsing from the Sponsor's acts which are libelous or slanderous, which result in injury to persons or property, which violate a dght of confidentiality, or which constitute an infringement of any copyright, patent, trademark or tradename through use or reproduction of material of any kind. Section 27: Termination and Other Remedies lAC may require strict compliance by the Sponsor with the terms of this Agreement including, but not limited to, the requirements of the applicable statutes, rules and lAC policies which are incorporated into this Agreement, and with the representations of the Sponsor in its application for a grant as finally approved by IAC's board. IAC's board, or the Director, may suspend, or may terminate, IAC's obligation to provide funding to the Sponsor under this Agreement: · In the event of any breach by the Sponsor of any of the Sponsor's obligations under this Agreement; or · If the Sponsor fails to make progress satisfactory to IAC's board or Director toward completion of the Project by the completion date set out in this Agreement; or · If in the opinion of IAC's board or Director, the Sponsor fails to make progress necessary to complete any other project assisted with grant funds from lAC within the completion date set out by agreement with lAC for that project. In the event this Agreement is terminated by IAC's board or Director, under this section or any other section after any portion of the grant amount has been paid to the Sponsor under this Agreement, IAC's board or Director may require that any amount paid be repaid to lAC for redeposit into the State Account from which the funds were derived. The Sponsor understands and agrees that lAC may enforce this Agreement by the remedy of specific performance, which usually will mean completion of the Project as described in this Agreement. However, the remedy of specific performance shall not be the sole or exclusive remedy available to lAC. No remedy available to lAC shall be deemed exclusive, lAC may elect to exercise any, any combination, or all of the remedies available to it under this Agreement, or under any provision of law, common law, or equity. Section 28: Disputes Except as may otherwise be provided in this Agreement, when a bona fide dispute arises between IAC's board or its Director, and the Sponsor and it cannot be resolved, either party may request a dispute hearing according to the process set out in this section. Either party's request for a disputes hearing must be in writing and clearly state: (a) The disputed issues; (b) The relative positions of the parties; (c) number. The Sponsor's name, address, Project title, and lAC project JULY 29, 1999 --, Geflm'al prowsmns- 13 In order for this section to apply to the resolution of any specific dispute or disputes the other party must agree in writing that the procedure under this section shall be used to resolve those specific issues. The dispute shalt be heard by a panel of three persons consisting of one person chosen by the Sponsor, one person chosen by IAC's Director and a third person chosen by the two persons initially appointed. If a third person cannot be agreed upon, the third person shall be chosen by IAC's Chair. Any hearing under this section shall be informal, with the specific processes to be determined by the disputes panel according to the nature and complexity of the issues involved. The process may be solely based upon written material if the parties so agree. The disputes panel shall be governed by the provisions of this Agreement in deciding the disputes. The parties shall be bound by the decision of the disputes panel, unless the remedy directed by that panel shall be without the authority of either or both parties to perform, as necessary, or is otherwise unlawful. Request for a disputes hearing under this section by either party shall be delivered or mailed to the other party. The request shall be delivered or mailed within thirty (30) days of the date the requesting party has received notice of the action or position of the other party which it wishes to dispute. The written agreement to use the process under this section for resolution of those issues shall be delivered or mailed by the receiving party to the requesting party within thirty (30) days of receipt by the receiving party of the request. All costs associated with the implementation of this process shall be shared equally by the parties. Section 29: Governing Law/Venue This Agreement shall be governed by the laws of the state of Washington. In the event of a lawsuit involving this Agreement, venue shall be proper only in Thurston County. The Sponsor by executing this Agreement, acknowledges the jurisdiction of the courts of the state of Washington in this matter. Section 30: Severability If any provision of this Agreement or any provision of any document incorporated by reference shall be held invalid, such invalidity shall not affect the other provisions of this Agreement which can be given effect without the invalid provision and to this end the provisions of this Agreement are declared to be severable. -- END -- AGENDA BILL BREMERTON CITY COUNCIL Ordinance-(~Reading) Amending Chapter 2.04.010 of the Bremerton Municipal Code (B.M.C.) FOR AGENDA OF: ORIGINATING DEPT: ORIGINATOR: DATE SUBMITTED: September ~ 19~9 CITY COUNCIL Cecil McConnell September 3, 1999 2. ~: (comment on back 3. EXHIBITS: ,,~/~ if~ negessary) Lega]~~~../~ _ Ordinance No. Operations Committee ~~, ~ / ~DORS~ INFO~TION APPRO~ BY CO~CIL P~SI~NT TTAL: 4. S~Y START ~D REOUIR~ FOR CO~CIL ACTION: Council is asked to consider an ordinance defining the content items of the regular City Council business meetings. o RECOM~4ENDATION: Motion to pass Ordinance No. 4~on second reading, amending Chapter 2.04.010 of the B.M.C. o RESPONSIBLE OFFICIAL: ENFORCEMENT OFFICIAL: EXPIRATION DATE: REVIEW DATE: PULLED TABLED COUNCIL DIRECTIVE: 10. NOTICE OF ACTION APPROVED DATE: 11. AGENDA BILL NO: ORDINANCE ~ ~' ~ Q AN ORDINANCE amending Chapter 2.04 of the Bremerton Municipal Code. THE CITY OF BREMERTON DOES HEREBY ORDAIN: Section 1. Amendment. Section 2.04.010 of the Bremerton Municipal Code shall be amended to read as follows. 2.04.10 TIME AND PLACE. The time and place of the regular meeting of the City Council required by Charter shall be each Wednesday at five-thirty p.m. at the Council Chambers, Gity Hall, 13remerton, Washington, Provided, however, If such meeting day falls upon a legal holiday, upon the same day that either a primary or general election is held, or as approved by the majorfty of the Council, then such regular meeting shall be rescheduled during the same week following procedures for setting a special meeting. A regularly scheduled City Council meeting shall consist of the following items: 1. Call to Order (Flag Salute and Invocation) 2. Consent Agenda 3. Claims/Vouchers/VVarrants 4. Council Members Reports 5. Mayor's Report 6. Legislative Report 7. Public Recognition 8. Final Reading of Ordinances and vote thereon 9. Introduction and First Reading of Ordinances 10. Reading and vote upon Resolutions 11. Public Hearings and Appeal. Items 8 through 11 may be omitted if there are no scheduled items for that section. Section 2. Effective Date. This ordinance shall take effect ten (10) days from passage and publication. 1999. 1999. APPROVED by the City Council of the City of Bremerton this PASSED by the City Council of the City of Bremerton this ~ day of day of__ APPROVED this __ day of MICHAEL SHEPHERD, Council President ,1999. LYNN HORTON, Mayor ATTEST: KATHLEEN McCLUSKEY, City Clerk BREMERTON CITY COUNCIL 1. SUBJECT: Ordinance Amending Chapter 10.11 of the Bremerton Municipal Code FOR AGENDA OF: September 29, 1999 ORIGINATING DEPT: Legal _~ ORIGINATOR: Glenna Malanc City Attorney · DATE SUBMITTED: September 23, 1999 Fiscal & Budget Committee Operatiohs C6mmittee ENDORSEMENT ~ INFORMATION [ ] back if necessary) 3. EXHIBITS: Ordinance No. APPROVED BY COUNCIL PRES IDE~/~//~B~ITTAL COUNCIL PRESIDENT /./~t~.~/,/~/./ 4. SDI~4~.RX STATEMENT AND REQUIREMENT FOR COUNCIL ACTION: The attached Ordinance amends Chapter 10.!1 by providing that the reloca5ion of a conveyance or motor vehicle within five hundred (500) feet and in a public right-of-way is to be considered the same location of the parking prohibinion of seventy-two (72) hours or more in a public right-of-way. 8. RECOMMENDATION: That the City Council approve the proposed ordinance which provides that the relocation of a conveyance or motor vehicle within five hundred (500) feet and in a public right-of-way is to be considered the same location for the parking prohibition of seventy-two (72) hours or more in a public right-of-way. Record Motion: Motion to approve ordinance on 1s~ readinc: Pass Ordinance No. on 2nd reading. 9. RESPONSIBLE OFFICIAL: ENFORCEMENT OFFICIAL: EXPIRATION DATE: REVIEW DATE: 10. NOTICE OF ACTION PULLED [] TABLED [] APPROVED [] DISAPPROVED [] AMENDED [] DATE COUNCIL DIRECTIVE: 11. AGENDA BILL NO.: (OVER) 5. IMPACT OF NON-PASSAGE: Movement of inches or feet of a vehicle in violation of the seventy-two (72) hour parking prohibition in public rights-of-way will continue to defeat the intent of the prohibition. 6. IMPACT ON STAFFING, BUDGETS, FACILITIES, EQUIPMENT OR OTHER RESOURCBS: None. 7. RESEARCH SOURCES: ORDINANCE NO. AN ORDINANCE mending Chapter 10.11 of the Bremerton Municipal Code. THE CITY OF BREMERTON DOES ORDAIN: Section 1. Amendment. Section 10.11.010 of the Bremerton Municipal Code is hereby amended to read as follows: .010 ADDITIONAL VIOLATIONS. (i) (72) consecmive hours, of non-motorized conveyances or shall be unlawful Storage of Vehicles within Right-of Way. Parking in excess of seventy-twq ina Motor vehicles or non-motorized conveyances exceeding ten thousand pounds (10,000 Ibs.) gross vehicle weight or twenty-two (22) feet in length, may not repark in excess of one hundred twenty (120) hours within any consecutive thirty (30) day period. Section 2. Effective Date. This ordinance shall become effective ten (10) days from passage and publication. APPROVED by the City Council of the C~' of Bremerton this __ 1999. PASSED by the City Council of the City. of Bremerton this __ 1999. dayof day of APPROVED this __ day of MIKE SHEPHERD, Council President ., 1999. KATI41.1:?I~I McCLUSKEY, City. Cletk LYNN S. HORTON, Mayor 7.2. AGENDA BILL BREMERTON CITY COUNCIL 1. SUBJECT: RESOLUTION # PROPOSING TO SET A HEARING DATE OF OCTOBER 20, 1999, FOR THE VACATION OF A PORTION OF MARINE DRIVE. 2. CLEARANCES: (comment on baek~~.~D 3. Director, Public Works/Utilities City Attorney ~. City Treasurer ~/~ FOR AGENDA OF: ORIGINATING DEPT: ORIGINATOR: DATE SUBMITTED: September 29, 1999 PW&U Engineering Div. Randy Witt, City En~neer_~__J;~ September 17, 1999 EXItlBITS A. Proposed Resolution. B. Vicinity Map. Director, Economic and Community Development Council Budget & Finance Committee Operations Committee MAYOR~ City staffhas received a petition to vacate 1,000 square feet along the east side of Marine Drive. The Cirv Council is being requested to establish a hearing date of October 20, 1999, to consider the vacation of a portion of the rig~ht- of-way for Marine Drive. This portion of the right-of-way is undeveloped and encompasses a steep slope. A dedication of right-of-way at the northwest comer of Marine Drive and Dora Avenue is being considered as partial compensation for the vacation. Posting of the hearing notices and mailings to the adjacent property, will be completed in accordance with the Bremerton Municipal Code. Engineering staff recommends adoption of the proposed Resolution. 8. RECOMMENDATION: City Council adopt the proposed Resolution to set a date for Public heating on October 20, 1999. 9. RESPONSIBLE OFFICIAL: ENFORCEMENT OFFICIAL: EXPIRATION DATE: REVIEW DATE: City. Engineer N/A PULLED TABLED COUNCIL DIRECTIVE 10. NOTICE OFACTION APPROVED DISAPPROVED 11. 2. CLEARANCE COMMENTS: 5. IMPACT ON NON-PASSAGE: The adjacent property is currently being developed and non-passage may adversely impact both the setback requirements and the project schedule. 6. IMPACT ON STAFFING, BUDGETS. FACILITIES, EQUIPMENT OR OTHER RESOURCES: Staffing: No impact. Budget: No impact Facilities/Equipment: No impact 7. RESEARCH SOURCES BMC 11.20 Vacation of Public Rights-of- Way RCW 35. 79 Streets 99303 RESOLUTION NO. 3-7 J- 5 A RESOLUTION proposing the vacation of a portion of Marine Drive west of Dora Avenue, in conjunction with a Dedication of Right-of-Way at the northwest corner of marine Drive and Dora Avenue. BE IT RESOLVED BY THE BREMERTON CITY COUNCIL THAT: 1. A petition has been received to vacate a portion of Maxine Drive right-of-way in conjunction with a proposed right-of-way dedication. The vacated right-of-way shall revert to the abutting property. 2. A public hearing will be held on October 20, 1999, at 6:00 p.m. or later at the Bremerton City Hall, 239 Fourth Street, Bremerton, Washington, to take public comment or consider written objections to the vacation~ PASSED by the City Council of the City of Bremerton this day of ., 1999. MIKE SHEPHERD, Council President "/5 I / ~_~ "':' ,\,od:~. .,:.,".,;-- .' _._ ,. e .- W.~r, , ,, s ~t¢ .... ", (~ ~! ~_. . ~.' ~_ ~ ~ ~.. ~ t ~/ .¢ , / / '~ , .. ~ AGENDA BILL - BREMERTON CITY COUNCIL SUBJECT: Resolution No. ~ 7 ~ ~-~ 2000 - 2005 Six-Year Transportation Improvement Plan 2. CLEARANCES: (co. anent on Director, Public Works/Utilities City Attorney City Treasurer Director, Economic & Community Developmem Co~-,cil Budget & Fi~=ce Co,~m~tt~= ' Operations Committee MAYOR~ 7 /o' FORAGENDAOF: Ser)tember 29, 1999 ORIGINATING DEPT: PW&U Engineering Div. ORIGINATOR: Randy Witt, City E~e~, eptem ,er B3 EXHIBITS ~ ~o~ Resolution. a-~ =-~ · Six Year Transportation Improvement Report. APVROV~D BY COUNCm COUNCIL PRESIDENT 4. SUMMARY STATEMENT AND REQUIREMENT FOR COUNCIL ACTION: The Six-Year Transportation Improvement Plan is prepared pursuant to RCW 35.77.010 and RCW 36.81.121. The Plan is updated annually and filed with the Secretary. of Transportation, Department of Transportation, Local Programs Office. It is intended as a planning tool for the local, State and Federal transportation funding entities. The attached plan has been prepared for Ciw Council approval by Resolution and will be submitted to the Washington State Department of Transportation. 8. RECOMMENDATION: The City Council adopt the attached t~esoiution approving the City's 2000-2005 Six Year Transportation Improvement Program and direct the Mayor to forward the Resolution and Plan to the Department of Transportation, Local Programs Office· 9. RESPONSIBLE OFFICIAL: ENFORCEMENT OFFICIAL: EXPIRATION DATE: REVIEW DATE: City, Engineer N/A 10. NOTICE OF ACTION PULLED TABLED COUNCIL DIRECTIVE APPROVED DISAPPROVED 11. AGENDABII,LN0: ~~ 7O 2. CLEARANCE COMMENTS: 5. IMPACT ON NON-PASSAGE: Annual adoption of a Six-Year Transportation Improvement Plan for the City is required by State law and is a requirement to receive certain State and Federal Transportation funds. Non-passage would violate the law and jeopardize funding. 6. IMPACT ON STAFFING. BUDGETS. FACILITIES, EQUIPMENT OR OTHER RESOURCES: 7. RESEARCH SOURCES RESOLU'rIO NO. 2000 - 2005 SIX-YEAR TRANSPORTATION IMPROVEMENT PLAN WI-IEREAS, THE CITY OF BREMERTON, has reviewed the work accomplished under its Comprehensive Arterial Street Construction Pro~mmu and determined current City Street Needs; Wl:[EREAS, the City Council caused to be prepared a revised and extended Six-year Transportation Improvement Plan for the period of January 1, 2000, to December 31, 2005, and after public hearing thereon approved the same; NOW, TI:IEREFORE, BE IT RESOLVED, that the revised and extended Six-Year Transportation Improvement Plan 2000-2005 attached hereto as Exhibit A and Schedule is hereby adopted as the revised and extended Six-year Transportation Improvement Plan for the period of January 1, 2000, to December 31, 2005. PASSED by the City Council of the City of Bremerton this dav of ,1999. MIKE SHEPHERD, Council President Washington State Department of Transportation Agency Bremedon County No. 18 City No. 0115 MPO PSRC I I Project IdentifiCation A. Federal Aid No. :__~. B. Bridge No. .c~.~ C. Project Title '~ ~ o E D. Street/County Road Name or Number a_ z E. Beginning MP or road - Ending MP or road I F. Describe Work to be Done 1 i 2 3 14 1 14 2 I Phases in Project SR 303 Major Investment Study SR 303 SR 304, Bremedon to SR 3, Silverdale Address LOS on SR 303 P-STPF-TA~(~i 3 Phases in Project SR31SR304 Gorst to Bremerton T.l.P.Fer~y Terminal SR31SR304 Gorst to BremeHon Ferry Terminal HOV Improvements/Reconstruction of the SR304 Corridor 3 Phases in Project West Hills Commercial/VVerner Corridor Improvements Werner, Auto Center Blvd, Auto Cenler Way, Rogers Werner to Rogers to Auto Cfr Wy to Blvd Improvements to Street include widening, access control, 2 Phases in Project Auto Center Way Improvements Aulo Center Way Bruen Ave to SR 3 on-ramp Roadway, lighting improvements on Auto Center Way 03 04 02 06 07 01 05 12 07 05 06 07 12 3.94 0.865 .2 C S G P T W P S T S ~'~g~ ~ Six Year Transportation Improvement Program From 2000 to 2005 Hearing Date Adoption Date Resolution No, Project Costs In Thousands of Dollars I Federally Funded ; Fund Source Information I Expenditure Schedule Projects Only Federal Funding {LocalAgency) ReRuirAN d.-- = I Phase :Federall Federal I State , , 4th -~-nvir. i Date roject ; ~ State Local ~, Starl i Fund Cost by l Fund - FTuCnt;Is ~ 1st 2nd I 3rd Thru i Type ~nase mm/dd/yyyy) Code I Phase Code Funos I runos / ,~ I 6th, I 16 I 17 I 18 i9 8il 9 ii 10 i 11 j 12 i3 i i4 15 I 20 'I 21 PE i 711/99 400 i 400 i ! 8001 600 170 No TOtals 4oo 4oo 80o SOo i~0 PE I 6/1/97 STP(U) 675 RW ! 1/1/98 CN 7/1/98 STP STP 711198 211199 SIP(U) 5/t/2000 S1 P(U) 1/1/2000 1/1/2001 10260 5420 16355 20 1005 OTHER OTHER OTHER UAIA UA1 A UA1A 1273i 518i 24661 495[ 2291 6700 9625 368I 20253 22331 7137i 182i 12739 5346 i 24111 3617 18035 t068 35458 12541 4873 200 15 215J 168 17: 205 895i' 304 2204 2374i 1263 336 2624 2374 72 18 3:00 288 72 360 Totals PE RW CN Totals CN 1025 OTHER OTHER Totals 360 90 450 90 360 3617 ElS CE Yes 1/1/98 No ,~hington State Department of Transportation ,cy Bremerton Junty No. 18 City No. 0115 MPO PSRC Page 2 Six Year Transportation Improvement Program From 2000 to 2005 Hearing Date Adoption Date Resolution No. A. Federal Aid No. ! 'E Fund Source Information Expenditure Schedule Projects Only B. Bridge No. ,.~. [ (LocalAgency) C. Project Tille Federal Funding ~ I = D. Stree~County Road Name or Number ~ : ~ 3roject Phasestad ; FederaIFund CostFederal ~ Stale ~ ~ ~ 4th ~ Envir. ~ Required E. Beginning MP or road- Ending MP or road ~ ~hase{(m,,/d~yyyy); Code i Phase, Code~ J Funds Funds ~ Funds 1st 2nd 3rd Thru Type ~(M~ by~ Fund State Local i Total Date F. Describe Work to be Done 6th . 3 4 ~ 6 7 S ; 9 10 11 12 ~ 13 ,, pE ~ 1'1/2000 , OTHER, 50i 50 i 100 50i 2 Phases in Project 05 PCN 1/1/2002 '~ ~ OTHER i 622~ 118 i 740 [ 790 No i Arsenal Way/Patton Ave Improvements 07 Arsonal Way and Patton Ave 12 Lafayette Ave to Loxie Eagans Bird ~ Road malig nmen~widening/sidewalks/lig hting Totals 672 t68 840 50 790 iPI,asesinPmject~l2 p ~ ALL ~ 11112000 , 900~ 900~ 150, iSO~ 150~ 450 06 ~ I No Mis~llaneous (L~al Program Suppod) 07 City ~de N/A to N/A I Pr~ecls to improve safety and operations ~r Totals goo 9~ ~5o ~5o i5o 450 I Phases in Pmject : 01 ~ p .2 i PE! 1/1/2003 301 301 I ~ 30 ~12~ No Construct Warren Avenue Off Ramp i Warren Avenue : Sheridan Ave to Callahan Drive ~ 30 Future project for ac~ss considerations ~ ~ Totals 30 30 , ~ .... i { Grand Totals for Breme~on 17~80 20730 2592 41102 15805 5553 4557 480 Supporting Information for the STIP 2000 SR 303 Major Investment Study - WSDOT is managing the study in coordination with Bremerton, Kitsap County and Kitsap Transit. WSDOT selected a consultant (Parametrix) to do the study and they are currently working on the Statement of Work. City of Bremerton and Kitsap County share of funds provided by an allocation of Countywide TEA 21 funds. A presentation to the City Council on the scope of work is scheduled for the study session of October 6, 1999. SR3/SR304 Gorst to Bremerton Ferry Terminal - Burwell Street from Pacific Ave. to Montgomery Ave. completed in 1999. The Gate Stage Improvements, from Porter St and Cambrian Ave to Burwell St and Montgomery Ave., are expected to begin construction in 2000 and be completed in 2001. The Naval Yard Highway Stage and Ferry Terminal Stage are estimated to be completed in 2002. Design & $14,427,000 $7,195,000 $2,462,000 ROW Construction $1,386,000 $5,346,000 $2,411,000 $3,617,000 o $8,800,000 in funds is in jeopardy pending the outcome of 1-695. $7.800.000 of these funds is from WSDOT and was approved by the State Legislature as part of the Ref. 49 funds. The other $1,000,000 would come from the Central Puget Sound Public Transportation Account, which is also supported by MVET funds. Loss of these funds will not effect the Gateway Stage Improvements but would impact the completion of the other stages. West Hills Improvements - Received increased funding from Countywide TEA 21 allocation of $1.025 million. This combines with UATA. EDA and Arterial Street funds for a total project budget of $3 million. Construction planned for 2000. Auto Center Way Improvements - Bruen Ave. to SR 3 on-ramp - no changes. City will develop a preliminary, plan and cost estimate to use in obtaining funding. Arsenal Way/Patton Ave Improvements - No changes Miscellaneous (Local Program Support) - No changes. Used for arterial street overlays, signal upgrades, signage, and miscellaneous work on the arterial street system. 7. Construct Warren Avenue Off Ramp - Delayed until we can get funding.