HomeMy WebLinkAbout09/08/04 AGENDA FILE
239 4th Street · Bremerton, WA 98337 · Phone (360) 478-5280 · Fax (360) 478-5251
SEPTEMBER 8, 2004
CITY COUNCIL MEETING AGENDA
1. PRE-COUNCIL STUDY SESSION: 5:00 - 5:30 P.M. in Council Conference Room
A. General Council Business
2. CALL TO ORDER: 5:30 P.M. in Council Chambers
A. Pledge of Allegiance
B. Invocation ~
3. CONSENT AGENDA
A. Claims & Check Register (#AB04-182)
4. PUBLIC HEARINGS - ORDINANCES AND RESOLUTIONS
A. Ordinance No. 4908 [Second Reading] Amending Chapter 3.01, "Rate Table C" of the
Bramerton Municipal Code relating to Community Development Fees (#AB04-180) 1
5. ADJOURNMENT OF CITY COUNCIL BUSINESS MEETING
CITY COUNCIL STUDY SESSION
Immediately following the City Council Meeting, the Council Members will convene in the Council
Conference Room for a LEGISLA TIrE REVIEW COMMITTEF to hear presentations on the following proposed
items. Please note that no action will be taken, and the content of these items are subject to change.
1. Contract Award to PEASE AND SONS, INC. for EB-6 Pump Station Modifications - Michael
Mecham, City Engineer
2. Appointment of Judy Friedberg-Nerf to the Planning Commission - Mayor Cary Bozeman
3. Resolution regarding submission of proposed amendments to the Bremerton Charter to the
qualified voters of the City of Bremerton - Roger Lubovich, City Attorney
4. Resolution regarding submission of proposed ban on fireworks to qualified voters of the City of
Bremerton - Fire Chief Al Duke
E-mail: citycouncil@ci.bremerton.wa.us · Web: w~,'w,ci.bremerton.wa.us
DATE SUBMITTED: BILL
AGENDA BILL
CITY OF BREMERTON
CITY COL~NCIL
SUBJECT: Approval of Claims and Checks Committee Meeting Date:
Register COUNCIL MEETING Date: 'a~--~>-O y'
Department: Financial Services
Presenter: Cathy Johnson
Phone: 473-5296
SUMMARY: Consent agenda item. Approval of payroll, checks and electronic fund transfers.
ATTACHMENTS:
FISCAL IMPACTS (Include Budgeted Amount):.
APPROVALS:
DEPARTMENT DIRECTOR:
CITY ATTORNEY:
FINANCE DIRECTOR:
MAYOR:
FISCAL/BUDGET:
OPERATIONS: CONSENT AGENDA []
COUNCIL PRESIDENT:
RECOMMENDED MOTION: Move to Approve:
l) Check#'s ~35""(e ~ through~_~_~andEFT's
in the mount of $
2) Regular Payroll for the pay period ending
3) Retiree Payroll for the pay period ending in the amount of $_
COUNCIL ACTION: A[~pprove [] Deny [] Table [] Continue [] No Action
DATE SUBMITTED: August 17, 2004 BILL # Oq- [ 90
AGENDA BILL
SUBJECT: Public Hearing on Ordinance Committee Meeting Date: August 25, 2004
amending BMC 3.01 Rate Table C COUNCIL MEETING Date: September 1 &
September ~, 2004
{)rd~ t'rl a m ~ e /o' 0~ ~t q o ~q) Department: ~ City Attorney's Office
Presenter: Brett C. Vinson
~e-~'"7"'~ Phone: 473-2345
SUMMARY: The current provisions of BMC 3.01 Rate Table C relating to Community
Development Fees need clarification and updating. The proposed ordinance repeals and replaces Rate
Table C.
ATTACHMENTS: Proposed ordinance
FISCAL IMPACTS (Include Budgeted Amount):
APPROVALS:
DEPARTMENT DIRECTOR:
CITY ATTORNEY: ~
MAYoR:FINANCE DIRECTOR: ~~
FISCAL/BUDGET: ~~
OPERATIONS: ~ . _ CONSENT AGENDA
COUNCIL PRESIDENT:
RECOMMENDED MOTION:
1. t-meve2c~appro,~ th~ pr~aa~d ,~rdi,,anc~¢ ~n ~rst rea~ing rcpcali~ ,md replacing BMC~o.Ol ~
TaLI:-,-C.
2. I move to pass Ordinance No. ~ ~ 0 ,¢ on second reading repealing and replacing BMC 3.0
Rate Table C.
COUNCIL ACTION: [] Approve [] Deny [] Table [] Continue [] No Action
I
Office of the City Attorney
Roger A. Lubovich, City Attorney
Memorandum
TO.' City Council
Fl~nl.. Brett C. Vinson ~/
116: Amendment to BMC 3.01 Rate Table C
DIt6: August 26, 2004
The proposed ordinance is a housekeeping matter due to the recent adoption by the City of the
International Building Code. The proposed ordinance does the following:
1. Recodifies Plan Review Fees (Item No. 8) and Grading Plan Review Fees and Grading
Permit Fees (Exhibit 4) that were previously contained in the UBC,
2. Makes technical corrections and electronically formats all Exhibits.
It does not add to or change any fees.
ORD N t CE NO. _q 06
AN ORDINANCE of the City Council of the City of
Bremerton, Washington, amending Bremerton Municipal Code
3.01 Rate Table C by clarifying and establishing certain fees.
WHEREAS, the current provisions of 3.01 Rate Table C of the Bremerton
Municipal Code relating to Community Development Fees needs clarification and updating;
WHEREAS, the City Council desires to amend the provisions of Rate Table C
relating to Community Development Fees in order to provide clarity; NOW THEREFORE,
THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON,
DOES HEREBY ORDAiN AS FOLLOWS:
SECTIONL Rate Table C of Capter 3.01 of the Bremerton Municipal Code
entitled "Community Development - Rate Table C" is hereby repealed in its entirety and a new
Community Development - Rate Table C is hereby created to read as set forth in Exhibit A of
this Ordinance.
SECTION2. Severabilim If any one or more sections, subsections, or
sentences of this ordinance are held to be unconstitutional or invalid, such decision shall not
affect the validity of the remaining portion of this ordinance and the same shall remain in full
force and effect.
SECTION3. Effective Date. This ordinance shall take effect and be in force ten
(10) days from and after its passage, approval and publication as provided by law.
APPROVED by the City Council the day of ,2004
PASSED by the City Council the day of ., 2004
DAREN NYGREN, Council President
Approved this day of ,2004
CARY BOZEMAN, Mayor
Rate Table C
ATTEST: APPROVED AS TO FORM:
PAULA JOHNSTON, City Clerk ROGER A. LLrBOVICH, City Attorney
PUBLISHED the day of ,2004
EFFECTIVE the day of ,2004
ORDINANCE NO.
R:\LEGAL\Ordinances\Community Development~Rate Table C-2004.doc
2
~ Rate TableC
COMMUNITY DEVELOPMENT - RATE TABLE C
All Rates Listed are "Not To Exceed" Fees
C. DEPARTMENT OF COMMUNITY DEVELOPMENT
1. SUBDIVISIONS RATE.
Short $1000 +
$150 per lot
Long Plat $2500 +
$150 per lot
Final Plat $315
2. SHORELINE MASTER PROGRAM
Substantial Development Permit $650
Conditional Use Permit $1750
Shoreline Variance $1750
Permit Revision $325
Shoreline Exemption $200
3. STATE ENVIRONMENTAL POLICY ACT
(SEPA)
Checklist $320
Environmental Impact Statement $650 +
Review/Adoption additional
cost of
expertise
4. SITE PLAN REVIEW
Four or Less Residential Units $250
Others $500
5. APPEAL
To Hearing Examiner $175
6. ABATEMENTS
Dangerous Building $900 +
Direct
Service and
Supply Cost
Garbage & Weed $640 +
Direct
Service and
Supply Cost
7. BUILDING PERMIT FEES -Refer to Exhibit 1
8. PLAN REVIEW FEE 65% of the
building
permit fee as
set forth in
Exhibit 1
9. MECHANICAL PERMIT FEES -Refer to Exhibit 2
~ 3.0I -C1
COMMUNITY DEVELOPMENT- RATE TABLE C
All Rates Listed are "Not To Exceed" Fees
RATE
10. PLUMBING PERMIT FEES -Refer to Exhibit 3
11. GRADING PERMIT AND PLAN REVIEW FEES - Refer to Exhibit 4
12. ZONING ORDINANCE
Ordinance Amendments
Text $740
Rezone (Map Amendment) $740
Variance
Administrative $325
Public Hearing/Single Family $500
Public Hearing/Other $1750
Planned Unit Development
Residential Only $1500 +
$100/DU
Industrial, Commercial, Mixed Use or $2500 +
Other $100/DU +
$100/acre
Development Agreements $1600
Special Use Permit
Administrative (No public hearing) $350
Hearing Examiner/SF Residential $500
Hearing Examiner/Other $1750
Non-Conforming Use Determination $275
Director's Code Interpretation $175
Zoning Verification Letter $125
13. COMPREHENSIVE PLAN
Text or Map Amendment $1500
Combined Text and Map Amendment $2500
3.01 - C2
7
COMMUNITY DEVELOPMENT- RATE TABLE C
All Rates Listed are "Not To Exceed" Fees
EXHIBIT 2
MECHANICAL PERMIT FEES
Permit Issuance and Heaters
1. For the issuance of each mechanical permit $23.50
2. For issuing each supplemental permit for which the original permit has not
expired, been canceled or finaled $7.25
Unit Fee Schedule (Note: The following do not include permit-issuing fee)
1. Furnaces
For the installation or relocation of each forced-air or gravity-type furnace or
burner, including ducts and vents attached to such appliance, up to and including
100,000 Btu/h (29.3 kW) $14.80
For the installation or relocation of each forced-air or gravity-type furnace or
burner, including ducts and vents attached to such appliance over 100,000 Btu/h
(29.3 kW) $18.20
For the installation or relocation of each floor furnace, including vent $14.80
For the installation or relocation of each suspended heater, recessed wall heater or
floor-mounted unit heater $14.80
2. Appliance Vents
For the installation, relocation or replacement of each appliance vent installed and
not included in an appliance permit $7.25
3. Repairs or Additions
For the repair of, alteration of, or addition to each heating appliance, refrigeration
unit, cooling unit, absorption unit, or each heating, cooling, absorption or
evaporative cooling system, including installation of controls regulated by the
Mechanical Code $13.70
4. Boilers, Compressors and Absorption Systems
For the installation or relocation of each boiler or compressor to and including 3
horsepower (10.6 kW), or each absorption system to and including 100,000 Btu/h
(29.3 kW) $14.70
For the installation or relocation of each boiler or compressor over three
horsepower (10.6 kW) to and including 15 horsepower (52.7 kW), or each
absorption system over 100,000 Btu/h (29.3 kW) to and including 500,000 Btu/h
(146.6 kW) $27.15
For the installation or relocation of each boiler or compressor over 15 horsepower
(52.7 kW) to and including 30 horsepower (105.5 kW), or each absorption system
over 500,000 Btu/h (146.6 kW) to and including 1,000,000 Btu/h (293.1 kW) $37.20
For the installation or relocation of each boiler or compressor over 30 horsepower
(105.5 kW) to and including 50 horsepower (176 kW), or each absorption system
over 1,000,000 Btu/h (293.1 kW) to and including 1,750,000 Btu/h (512.9 kW) $55.45
For the installation or relocation of each boiler or compressor over 50 horsepower
(176 kW), or each absorption system over 1,750,000 Btu/h (512.9 kW) $92.65
5. Air Handlers
For each air-handling unit to and including 10,000 cubic feet per minute (cfm)
(4719 L/s), including ducts attached thereto
Note: This fee does not apply to an air-handling unit which is a portion of a
factory-assembled appliance, cooling unit, evaporative cooler or absorption unit
for which a permit is required elsewhere in the Mechanical Code $10.65
For each air-handling unit over 10,000 cfm (4719 :s) $18.10
3.01 - C4
COMMUNITY DEVELOPMENT - RATE TABLE C
All Rates Listed are "Not To Exceed" Fees
6. Evaporative Coolers
For each evaporative cooler other than portable type $10.65
7. Ventilation and Exhaust
For each ventilation fan connected to a single duct $7.25
For each ventilation system which is not a portion of any heating or air-
conditioning system authorized by a permit $10.65
For the installation of each hood which is served by mechanical exhaust,
including the ducts for such hood $10.65
8. Incinerators
For the installation or relocation of each domestic-type incinerator $18.20
For the installation or relocation of each commercial or industrial-type incinerator $14.50
9. Miscellaneous
For each appliance or piece of equipment regulated by the Mechanical Code but
not classed in other appliance categories, or for which no other fee is listed in the
table $10.65
For each gas piping system of 1 - 5 outlets $6.25
For each additional gas piping system outlet, per outlet $1.25
Other Inspections and Fees
Inspections outside of normal business hours, per hour (minimum charge - two
hours $49.50I
Reinspection fees assessed under provisions of this chapter shall be as follows
(per inspection): $49.504
Inspections for which no fee is specifically indicated, per hour (minimum charge
- one-half hour) $49.504
Additional plan review required by changes, additions or revisions to plans or to
plans for which an initial review has been completed (minimum charge - one-half
hour) $49.504
~Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead,
equipment, hourly wages and fringe benefits of the employees involved.
3.01 -C5
COMMUNITY DEVELOPMENT - RATE TABLE C
All Rates Listed are "Not To Exceed" Fees
EXHIBIT 3
PLUMBING PERMIT FEES
Permit Issuance
1. For issuing each permit $20.00
2. For issuing each supplemental permit $10.00
Unit Fee Schedule (in addition to items 1 and 2 above)
1. For each plumbing fixture on one trap or a set of fixtures on one trap (including
water, drainage piping and backflow protection therefore) $7.00
2. For each building sewer and each trailer park sewer $15.00
3. Rainwater systems - per drain (inside building) $7.00
4. For each cesspool (where permitted) $25.00
5. For each private sewage disposal system $40.00
6. For each water heater and/or vent $7.00
7. For each gas piping system of one to five outlets $5.00
8. For each additional gas piping system outlet, per outlet $1.00
9. For each industrial waste pretreatment interceptor including its trap and vent,
except kitchen-type grease interceptors functioning as fixture traps $7.00
10. For each installation, alteration or repair of water piping and/or water treating
equipment, each $7.00
11. For each repair or alteration of drainage or vent piping, each fixture $7.00
12. For each lawn sprinkler system on any one meter including backflow protection
devices therefore $7.00
13. For atmospheric-type vacuum breakers not included in item 12:
1 to 5 $5.00
Over 5, each $1.00
14. For each backflow protective device other than atmospheric type vacuum
breakers:
2 inch (51 mm) diameter and smaller $7.00
Over 2 inch (51 mare) diameter $15.00
15. For each graywater system $40.00
16. For initial installation and testing for a reclaimed water system $30.00~
17. For each annual cross-connection testing of a reclaimed water system (excluding
initial test ) $30.00~
18. For each medical gas piping system serving one to five inlet(s)/outlet(s) for a
specific gas $50.00
19. For each additional medical gas inlet(s)/outlet(s) $5.00
Other Inspections and Fees
1. Inspections outside of normal business hours $30.00~
2. Reinspection fee $30.00
3. Inspections for which no fee is specifically indicated $30.00~
4. Additional plan review required by changes, additions or revisions to approved
plans (minimum charge - one-half hour) $30.00~
tPer hour for each hour worked or the total hourly cost to the jurisdiction, whichever is greater. This cost shall include
supervision, overhead, equipment, hourly wages and fringe benefits of all the employee s involved.
3.0]
COMMUNITY DEVELOPMENT - RATE TABLE C
All Rates Listed are "Not To Exceed" Fees
EXHIBIT 4
GRADING PLAN REVIEW FEES
50 cubic yards (38.2 m3) or less No fee
51 to 100 cubic yards (40 m~ to 76.5 m~) $23.50
101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) $37.00
1,001 to 10,000 cubic yards (765.3 m3 to 7645.5 m3) $49.25
10,001 100,000 cubic yards (7646.3 m3 to 76,455 m3) - $49.25 for the first 10,000 cubic yards (7645.5 m3),
plus $24.50 for each additional 10,000 cubic yards (7645.5 m3) or fraction thereof
100,001 to 200,000 cubic yards (76,456 m~ to 152,911 m3) - $269.75 for the first 100,000 cubic yards (76,455
m3), plus $13.25 for each additional 10,000 cubic yards (7645.5 m3) or fraction thereof
200,001 cubic yards (152,912 m~) or more - $402.25 for the first 200,000 cubic yards (152,911 m3), plus
$7.25 for each additional 10,000 cubic yards (7645.5 m3) or fraction thereof
Other Fees:
Additional plan review required by changes, additions or revisions to approved plans
(minimum charge - one-half hour) $50.50 per hour~
~Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead,
equipment, hourly wages and fringe benefits of the employees involved.
GRADING PERMIT FEES~
50 cubic yards (38.2 m3) or less $23.50
51 to 100 cubic yards (40 m3 to 76.5 m3) $37.00
101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) - $37.00 for the first 100 cubic yards (76.5 m3) plus $17.50 for
each additional 100 cubic yards (76.5 m3) or fraction thereof
1,001 to 10,000 cubic yards (765.3 m3 to 7645.5 m3) - $194.50 for the first 1,000 cubic yards (764.6 m3), plus
$14.50 for each additional 1,000 cubic yards (764.6 m3) or fraction thereof
10,001 to 100,000 cubic yards (7646.3 m3 to 76,455 m3) - $325.00 for the first 10,000 cubic yards (7645.5
m3), plus $66.00 for each additional 10,000 cubic yards (7645.5 m3) or fraction thereof
100,001 cubic yards (76,456 m3) or more - $919.00 for the first 100,000 cubic yards (76,455 m3), plus $36.50
for each additional 10,000 cubic yards (7645.5 m3) or fraction thereof
Other Inspections and Fees:
1. Inspections outside of normal business hours (minimum charge - two hours) $50.50 per hour2
2. Reinspection fees assessed under provisions of this chapter shall be as follows
(per inspection): $49.50 per hour2
3. Inspections for which no fee is specifically indicated (minimum charge - one-half
hour) $50.50 per hour2
The fee for a grad ng permit authorizing addmonal work to that under a valid permit shall be the difference between the
fee paid for the original permit and the fee shown for the entire project.
20r the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead,
equipment, hourly wages and fringe benefits of the employees involved.
[[ 3.01 -C7