Loading...
HomeMy WebLinkAbout12/16/03 AGENDA FILE 239 4th Street · Brernerton, WA 98337 · Phone (360) 478-5280 ° Fax (360) 478-5251 CITY COUNCIL MEETING AGENDA TUESDAY - DECEMBER 16, 2003 1. PRE-COUNCIL STUDY SESSION: 5:00 - 5:30 P.M. in Council Conference Room A. General Council Business 2. CALL TO ORDER: 5:30 P.M. in Council Chambers A. Pledge of Allegiance B. Invocation .~_, 3. CONSENT AGENDA A. Contract Award to MACHINISTS, INC. for Howell Bunger Valve Repair Project (#AB03-232) J 4. CLAIMS/CHECK REGISTERS 5. COUNCIL MEMBER REPORTS 6. MAYOR'S REPORT 7. PUBLIC RECOGNITION - Comments limited to 3-minutes 8. NEW BUSINESS 3 A. Professional Service Agreement with URs CORPORATION for West 580 Pressure Zone Upgrades (#AB03-233) 9. PUBLIC HEARINGS - ORDINANCES & RESOLUTIONS ,A. Resolution No. 2913, ratifying Countywide Planning Policies as adopted by the Kitsap ~) O County Board of Commissioners (#AB03-234)  . Ordinance [First Reading] adopting the 2004 Annual Budget; repealing BMC Chapters 3.10 ~ [ and 3.38; and amending BMC Chapter 3.36 (#AB03-227) · Ordinance [First Reading] updating BMC Chapter 3.01 Rate & Fees (#AB03-228) ~:~ C) Ordinance [First Reading] amending BMC Chapter 3.50 Utility Taxes (#AB03-229) ~ O Ordinance [First Reading] amending BMC Chapter 3.82 Commercial Parking Tax (#AB03-230) c~ q Ordinance [First Reading] setting Rates and Fees for Water, Wastewater, and Storm Water ~ '7 Utilities and Amending BMC Chapter 15.06 (#AB03-231) 10. EXECUTIVE SESSION A. A 20-minute Executive Session will be held to "REVIEW LABOR NEGOTIATIONS" per RCW 42.30.140(4)(b) 11. ADJOURNMENT OF CITY COUNCIL BUSINESS MEETING E-mail: citycouncil@ci.bremerton.wo.us · Web: www.ci.bremerton.wa.us DATE SUBMITTED: November 20, 2003 AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Award Contract for the Howell Committee Meeting Date: 12/9/03 Bunger Valve Repair Project COUNCIL MEETING Date: 12/1~03 Department: PW&U Engineering. Presenter: Michael Mecham Phone: 360-473-5288 SUMMARY: Sealed bids for the Howell Bunger Valve Repair Project were opened on November 13, 2003. One proposal was received for this project. Machinists Inc. was the lowest responsive, responsible bidder with a bid of $20,267.80 (including sales tax). ATTACHMENTS: 1) Bid Tabulation FISCAL IMPACTS (Include Budgeted Amount): The project is funded by a $127,500 DWSRF loan and is included in the 2003 budget. APPROVALS: DEPARTMENT DIRECTOR: .~.-~ /-~ ......... CITY ATTORNEY: FINANCE DI1LECTOR: OPERATIONS: COUNCIL PRESIDENT: RECOMMENDED MOTION: Move to award a contract In the amount of $20,267.80 with Machinists Inc. for construction of the project titled "Howell Bunger Valve Repair" and authorize the Mayor to finalize and execute the necessary contact documents. COUNCIL ACTION: [] Approve [] Deny [] Table [] Continue [] No Action ab, Agenda Bills 2003, Contract Award }lB Valve Repair, 12-03 I 0z D::O 1 LU -..I Z n,' *'-~ ,,, fl.. r~ -- w ~ ~ DATE SUBMITTED: BILL AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: West 580 Pressure Zone Committee Meeting Date: 12/9/03 Upgrades - Professional Services Agreement COUNCIL MEETING Date: 12/1~/03 for URS Corporation Department: PW&U Engineering Presenter: Michael Mecham Phone: 360-473-5288 SUMMARY: Based on an evaluation of qualified consultants, the City has selected URS Corporation to provide consulting engineering services for the West 580 Pressure Zone Upgrades. The project includes construction of a new pump station to serve the new West 580 Pressure Zone and construction of a water transmisssion main between the new pump station location and Old Clifton Road. The not-to-exceed mount of the agreement is $190,459.00. ATTACHMENTS: Professional Services Agreement FISCAL IMpACTs (Include Budgeted Amount): The project is included in the 2003 capital budget. APPROVALS: ~/~,~~ DEPARTMENT DIRECTOR: . CITY ATTORNEY: _~~___.~-~----~ FINANCE DIRECTOR: ' ~._k~ ~. '" FISCAL/BUDGET: ['~'~' ~~ CONSENT AGENDA [-] OPERATIONS: ~---~0-~ - COUNCIL PRESIDENT: RECOMMENDED MOTION: Move to approve a professional services agreement with URS Corporation to provide consulting engineering services for the West 580 Pressure Zone Upgrades project, in an amount not to exceed $190,459.00, and authorize the Mayor to finalize and execute the necessary contract documents for the agreement. COUNCIL ACTION: [] Approve [] Deny [] Table [] Continue [] No Action ab, Agenda Bills 2003, PSA U'KS - W580 Pressure Zone Upgrades, 12-03 3 From: Gene Sampley To: City Council Date: 12/16/03 4:43PM Subject: West 580 Zone Development Tonight City Coundl w~ll consider the pmfess~)nal se;vices agreement wP.h URS Consulting for completion of the design of the West 580 Pressure Zone for the Water Utility. When this item was p~sented to Council Committees, i~ wa~ suggested by one or more Council members thai the City should not develop the West 580 Ixessure zone; that it was a waste of money. Roger Lubov~ch suggested that I mee~ with Nm and Chds Hugo and provide bac~mund information on this matter, I met w~th both Roger and Chris on this matter. The attached provides such background infommtion regarding the zone development and va~ous ag~ements that previously have been approved by the Council on this matte~. I will be available to address any questions you may have. CC: Chds Hugo; Roger Lubovich WEST 580 ZONE DEVELOPMENT OVERVIEW The following provides an overview of the planning and various agreements associated with development of the West 580 Pressure Zone for the Bremerton Water Utility. Although there is much information relative to annexation and zoning of properties in this service area, the following is primarily for the water system. · Development of the West 540 (now 580) Water Pressure Zone was included in the 1993 Water System Comprehensive Plan. · City Council approved a professional services agreement with KCM, Inc. related to design and construction of the West 540 (580) Zone in February 1997. Al~er completion of the Engineering report, work was suspended and the contract was terminated. · Development of the West 540 (580) Water Pressure Zone is included in the 1999 Water System Comprehensive Plan. · The Northwest Corporate Campus (NWCC) Development Agreement was approved by City Council November 5, 1999 and subsequently filed with the Kitsap County Auditor. · On June 5, 2003 NWCC was notified that it was in default and given thirty days to cure pursuant to paragraph 9.12.2 of the development agreement for not complying with paragraph 6.4 of the agreement requiring NWCC to submit a report to City Council every three years outlining its progress, infi'astructure improvements completed during the preceding three years, and general conditions at the Project. NWCC responded by letter dated July 2, 2003, followed by telephone conversation on July 22; the default was considered cured and was confirmed by letter dated July 24, 2003 by the City Attorney. · In August 2000, the City Council approved a second professional services agreement with KCM, Inc. to complete design and construction of the West 540 (580) Zone. · An agreement between Northwest Corporate Campus and the City regarding construction of water transmission and distribution system improvements was approved by City Council May 16, 2001. · A Letter of Intent for Bremerton and Port Orchard Water System Improvements was approved by the Bremerton City Council September 26, 2001 and approved by Port Orchard City Council in October of that year. · An Interlocal Agreement for Cooperative Water System Development in the Port Orchard 580 ZonegBremerton 580 Zone was approved by Bremerton City Council December 26, 2001. Note: City Administration was praised by City Council for working out an agreement that provided mutual benefit to the parties saving each substantial initial investment. · In September 2002, KCM terminated with thirty days notice the professional ~ervice~contract for design and construction of the West 580 Zone Water System · After several attempts to negotiate a settlement with KCM, in May 2003, City Council approved initiation ora lawsuit against KCM for recovery of damages suffered by the City as a result of the termination of the professional services agreement. · On June 2, 2003 the City filed a summons and complaint against KCM for recovery of damages for its breach of contract for completion of design services of the West 580 and West 650 Zones. In summary, the West 580 Zone is in the service area of the City's Water Utility. Portions of this zone are within the City of Bremerton, and Development of this zone is in the City's comprehensive plan, the Water System Comprehensive Plan, the Capital Improvement Plan, and the adopted budgets since 1997. This matter has been before the Council in various forms mentioned above and on numerous other occasions since Micron Technologies of Boise, Idaho proposed a facility for this area in 1994. Comprehensive plans for the City of Bremerton, City of Port Orchard, and Kitsap County have been developed with Bremerton's commitment to provide water to this area. pROFESSIONAL SERVICES AGREEMENT URS - West 580 Pressure Zone Upgrades / 487 The City of Bremerton ("City") and URS Corporation America ("Consultant"), referred to collectively as the "Parties," enter into the following Agreement for professional services: I. Scope: The Consultant agrees to perform the services more specifically described in the Scope of Work, dated November 24, 2003, including any attachments thereto, attached hereto as Exhibit A, which is incorporated by reference herein. The Scope of Work may be modified only pursuant to Section VII.H. of this Agreement. If the Scope of Work provides for unspecified additional services such services shall only be performed upon the express written request of the City. Consultant further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices in effect at the time such services are performed. II. Term: The City and the Consultant agree that work will begin on the tasks described in Exhibit A immediately upon execution of this Agreement. The parties agree that the work is to be completed as provided for in the work schedule included in Exhibit A; provided however, that additional time shall be granted by the City for excusable delays or extra work as provided for in section IX (A) of this agreement. III. Compensation: In consideration of the services provided pursuant to this Agreement, the City shall pay Consultant in an mount not to exceed One Hundred Ninety Thousand Four Hundred Fifty Nine dollars ($190,459.00). Consultant's charges and bills shall conform to the fee schedule attached hereto as Exhibit B and incorporated herein by this reference. The Consultant shall submit regular billing statements detailing work performed and amount charged on each task or portion thereof. The descriptions shall conform to and fall within the categories set out in the Scope of Work and/or Fee Schedule. Upon receipt of a conforming billing statement, the City shall promptly process payment. PROVIDED, HOWEVER, the City reserves the right to prioritize scoped work and accelerate and/or delay work tasks under the time frame set forth in Section II herein. The Consultant's labor rates and billing fees shall be as delineated in Exhibit B. Consultant shall not perform work beyond the Scope of Work, nor shall be compensated for such work, unless the Scope of Work or amount of compensation is modified pursuant to this Agreement. Consultant shall only be compensated for additional services if requested pursuant to Section I and, if not otherwise provided, such compensation shall be in accordance with Exhibit B. If a billing statement does not conform to this Agreement, the City may withhold payment until the statement is brought into compliance. Such withholding does not relieve Consultant of its obligations under this Agreement. Bremerton/URS West 580 Pressure Zone Upgrades Page 1 of 7 IV. Relationship of Parties: Consultant represents that it is skilled in the matters addressed in the Scope of Work and is performing independent functions and responsibilities within its field of expertise. Consultant and its personnel are independent Consultants and not employees of the City. Consultant and its personnel have no authority to bind the City or to control the City's employees and other Consultants. None of the benefits provided by the City to its employees, including, but not limited to, compensation, insurance, and unemployment insurance are available from the City to the employees, agents, representatives, or sub-Consultants of the Consultant. Consultant will be solely and entirely responsible for its acts and for the acts of Consultant's agents, employees, representatives and sub-Consultants during the performance of this Agreement. The City may, during the term of this Agreement, engage other independent Consultants to perform the same or similar work. As an independent Consultant, Consultant is responsible for its own management. The City's administration and enforcement of this Agreement shall not be deemed an exercise of managerial control over Consultant or its personnel. As an independent Consultant, Consultant is responsible for payment of all taxes and licensing fees necessary to perform its obligations under this Agreement. These taxes and fees include but are not limited to State industrial insurance, Business & Occupation, State professional licensing, and City business licensing. If any taxes or fees due the City have been declared delinquent, the City may withhold the delinquent amount, plus any additional charges arising from the delinquency, fi:om any payments due Consultant. V. Indemnification: Consultant shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the performance of this Agreement to the extent of Consultant's negligence or other legal liability and, except for that portion of the injuries and damages caused by the City's sole negligence. The City's review or acceptance of any of the work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, agents and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this Agreement. Bremerton/URS West 580 Pressure Zone Upgrades Page 2 of 7 VI. Insurance: The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, employees, sub-consultants or sub-Consultants. Before beginning work on the project described in this Agreement, the Consultant shall provide a Certificate of Insurance evidencing: 1. Automobile Liability insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and 2. Commercial General Liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and general aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form property damage; explosion, collapse and underground (XCU) if applicable; and employer's liability; and 3. Excess Liability insurance with limits not less than 1,000,000 limit per occurrence and aggregate. 4. Professional Liability. insurance with limits no less than $1,000,000 limit per occurrence/claim. Any payment of deductible or self insured retention shall be the sole responsibility of the Consultant. All required policies shall be provided on an "occurrence" basis except professional liability insurance (if required), which may be provided on a "claims-made" basis. The City shall be named as an additional insured on the Commercial General Liability insurance policy, as respects work performed by or on behalf of the Consultant and a copy of an endorsement that is acceptable to the City, which names the City as an additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all the required insurance policies and endorsements. The City further reserves the right to reject any unacceptable policies and/or endorsements. The Consultant's Commercial General Liability insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. The Consultant's insurance shall be primary insurance as respects the City and the City shall be given thirty (30) days prior written notice by certified mail, return receipt requested, of any cancellation, suspension or material change in coverage. VII. General Conditions: BremertorffURS West 580 Pressure Zone Upgrades Page 3 of 7 A. Reports and Information: When requested by the City, Consultant shall furnish periodic reports and documents on matters covered by this Agreement. The reports and documents shall be furnished in the time and form requested. Consultant shall maintain accounting records in accordance with Generally Accepted Accounting Principles (GAAP) to substantiate all billed amounts. B. Ownership and Use of Records and Documents: Original documents, drawings, designs and reports, including those in electronic format, developed under this Agreement are the property of the City. All written information submitted by the City to the Consultant in connection with the services performed by the Consultant under this Agreement will be safeguarded by the Consultant to at least the same extent as the Consultant safeguards like information relating to its own business. If such information is publicly available or is already in Consultant's possession or known to it, or is rightfully obtained by the Consultant from third parties, Consultant shall bear no responsibility for its disclosure, inadvertent or otherwise. All data, documents and files created by Consultant under this Agreement may be stored at Consultant's office in Seattle, Washington. Consultant shall make such data, documents, and files available to the City upon its request at all reasonable times for the purpose of editing, modifying and updating as necessary until such time as the City is capable of storing such information in the City's offices. Duplicate copies of this information shall be provided to the City upon its request, and at reasonable cost. All original documents, including all reports, drawings, specifications, computer software or other items prepared or furnished by Consultant pursuant to this Agreement, are instruments of service with respect to the project and are the property of the City. Any reuse by the City for other than the specific purpose intended will be at City's sole risk. C. Consultant to Maintain Records to Support Independent Consultant Status: On the effective date of this Agreement (or shortly thereafter), Consultant shall: 1. File a schedule of expenses with the Internal Revenue Service for the type of business Consultant conducts; 2. Establish an account with the Washington State Department of Revenue and other necessary state agencies for the payment of all state taxes normally paid by employers, register to receive a unified business identifier number from the State of Washington; and 3. Maintain a separate set of books and records that reflect all items of income and expenses of Consultant's business, all as described in the Revised Code of Washington (RCW) Section 51.08.195, as required to show that the services performed by Consultant under this Agreement shall not give rise to an employer- employee relationship between the parties which is subject to RCW Title 51, Industrial Insurance. D. Work Performed at Consultant's Risk: Consultant shall take alt precautions necessary and shall be responsible for the safety of its employees, agents, and sub consultants in the performance of the work hereunder and shall utilize all protection necessary for that purpose. BremertorffURS West 580 Pressure Zone Upgrades Page 4 of 7 All work shall be done at Consultant's own risk, and Consultant shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the E. Place of Work: The Consultant shall perform the work authorized under this Agreement at its offices in Seattle, Washington. Meetings with the City staff as described in Exhibit A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed upon by the parties. F. Entire Agreement: This Agreement and its Exhibits constitutes the entire agreement between the Parties, and the Parties acknowledge that there are no other agreements, written or oral, that have not been set forth in the text of this Agreement. G. Severabilit¥: Should any part of this Agreement be found void, the balance of the Agreement shall remain in full force and effect. H. Modification: This Agreement may only be modified by written instrument signed by both Parties. I. Written Notices: All communications regarding this Agreement shall be sent to the parties at the addresses listed below by registered or 1st class mail, or by personal service, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. City Address Consultant Address W. Eugene Sampley, Director Mike Rosenfeld, Vice President Department of Public Works and Utilities URS Corporation 3027 Olympus Drive 1501 Fourth Avenue, Suite 1400 Bremerton, WA 98310 Seattle, WA 98101-1616 J. Waiver: Failure to enforce any provision of this Agreement shall not be deemed a waiver of that provision. Waiver of any right or power arising out of this Agreement shall not be deemed waiver of any other right or power. K. Non-Waiver of Breach: The failure of the City to insist upon strict performance of any of the covenants and agreements contained herein, or to exercise any option herein confen'ed in one or more instances shall not be construed to be a waiver or relinquishment of said covenants, agreements or options, and the same shall be and remain in full force and effect. L. Compliance with Laws: Consultant shall comply with all applicable Federal, State, and local laws in performing its obligations under this Agreement. M. Choice of Law and Venue: This Agreement shall be interpreted according to the taws of the State of Washington. Any judicial action to resolve disputes arising out of this Agreement shall be brought in Kitsap County Superior Court. Bremerton/URS West 580 Pressure Zone Upgrades Page 5 of 7 ~ N. Attorneys' Fees: In the event of litigation to enforce any of the terms or provisions herein, each party shall pay all its own costs and attorney's fees. O. Assignment: Any assignment of this agreement by the Contractor without the written consent of the City shall be void. VIII. Nondiscrimination: Consultant shall not discriminate in employment or services to the public on the basis of race, color, national origin, sex, religion, age, marital status, or disability, except for employment actions based on bona fide occupational qualification. IX. Termination: This Agreement may be terminated, at will, by either Party upon sixty (60) days notice to the other Party. This Agreement may be immediately terminated for cause by a Party if the other Party substantially fails to perform through no fault of the terminating Party, and the non-performing Party does not commence correction of the failure of performance within thirty (30) days of the terminating Party's sending notice to the non-performing Party. Notice by Consultant shall include a report showing the status of all items listed in the Scope of Work current through the termination date. If the City receives reimbursement by any federal, state, or other source for work described in Section I herein, and that funding is withdrawn, reduced or limited in any way, or the project is cancelled or substantially reduced after the execution date of this Agreement and prior to the completion of the work, the City may summarily terminate this Agreement. Termination shall be effective ten calendar days after Consultant's receipt of the written notice by certified mail. A. Excusable Delays: The right of Consultant to proceed shall not be terminated nor shall Consultant be charged with liquidated damages for any delays in the completion of the work due to: 1) any acts of the federal government in controlling, restricting, or requisitioning materials, equipment, tools, or labor by reason of war, national defense, or other national emergency; 2) any acts of the City, its consultants, or other public agencies causing such delay; and 3) causes not reasonably foreseeable by the parties at the time of the execution of the Agreement that are beyond the control and without the fault or negligence of the Consultant, including, but not restricted to, acts of God, fires, floods, strikes, or weather of unusual severity. PROVIDED, HOWEVER, that the Consultant must promptly notify the City within ten (10) calendar days in writing of the cause of the delay. If, on the basis of the facts and the terms of this Agreement, the delay is properly excusable, the City shall, in writing, extend the time for completing the work for a period of time commensurate with the period of excusable delay. B. Rights Upon Termination: In the event of termination, the City shall pay for all services performed by the Consultant to the effective date of termination, as described on a final invoice submitted to the City. After termination, the City may take possession of all records and data within the Consultant's possession pertaining to this project which may be used by the City without restriction. Any such use not related to the project which Consultant was contracted to perform shall be without liability or legal exposure to the Consultant. Bremerton/LrRS West 580 Pressure Zone Upgrades Page 6 of 7 CITY OF BREMERTON CONSULTANT By: Cary Bozeman By: its: Mayor its: Date: Date: Approved as to form: Attest: Bremerton City Attorney City Clerk ab, Agenda Bills 2003, PSA UPS - W580 Pressure Zone Upgrades, 12-03, PSA Bremerton/URS West 580 Pressure Zone Upgrades Page 7 of 7 CITY OF BREMERTON Design and Construction Management Services West 580 Pressure Zone Upgrades Scope of Services 1.0 INTRODUCTION The purpose of this contract is to provide project management services, review and finalize design and construction documents, review supporting assumptions, documentation and calculations, and provide limited construction phase services for the planned West 580 Pressure Zone for the City of Bremerton. The contract includes performing the following projects: · Task 100: Project Management · Task 200: Data collection and review of existing documents and calculations · Task 300: Completion of the West 580 Pressure Zone Pre-Design Report · Task 400: Completion of the Department of Health Project Approval Report · Task 500: Pump Station No. ?.A- Design and Construction Services · Task 600: Transmission Water Main - Design and Construction Services · Task 700: Intertie & Meter Connection between City of Port Orchard and City of Bremerton · Task 800: Additional services Owner Contacts: City of Bremerton 3027 Olympus Drive Bremerton, WA 98310 Michael C. Mecham, PE, City Engineer Ned Lever, PE, Managing Engineer Phone (360) 473-5288 Phone (360) 473-2398 Fax (360) 473-5398 Fax (360) 473-5398 2.0 SCOPE OF SERVICES URS proposes to provide the scope of services detailed herein to perform the required professional services. We propose to include the following tasks as discussed with the City on October 14, 2003, and in follow-up phone and e-mail correspondence. Assumptions used in the preparation of this scope of services are presented in Section 3.0. TASK 100: PROJECT MANAGEMENT A. URS Responsibilities: 1. URS proposes to include an overall project management task to include preliminary review and project coordination, management of the subtasks, kick-off workshop, coordination of consultants, and contract management. City of Bremerton Page 2 West 580 Pressure Zone - Scope of Services November 24 2003 2. Invoicing Requirements a. Provide invoices for professional services to City at least monthly, with charges under this authorization itemized separately and organized by project task. b. Provide a brief, narrative status report that addresses each project task and percent complete, to the City with each invoice. Each invoice will show the dollar amount previously billed, amount being billed for that period, and total billed to date. c. Correspond on a regular basis with the City's project manager by telephone, e- mail, or in person until all work is completed and accepted by the City. 3. Completion Schedule a. The City and URS will agree upon a milestone completion schedule for all work herein authorized after completing detailed review of the existing design documents. b. See Section 4.0 for proposed project deliverable schedule B. Deliverable Products: 1. Monthly invoices for professional services. 2. Monthly reports. 3. Milestone Completion Schedule, when authorized. TASK 200: DATA COLLECTION AND REVIEW OF EXISTING DOCUMENTS AND CALCULATIONS A. URS Responsibilities: 1. Review documents identified in Attachment 1 and prepare a memo to the City of Bremerton identifying any additional information needed and any additional work needed to be able to proceed with design outlined in the following tasks. 2. Perform Site visit to verify current Pump Station 2A site conditions and ascertain existing conditions for the transmission line alignment. 3. Conduct necessary interviews with key agency personnel or agency representatives associated with the interlocal agreement, such as, engineering design firms, McCormick Woods, City of Port Orchard, South Kitsap School District, etc. B. Deliverable Products: 1. Data collection and review memo identifying data gaps and any additional resources needed to proceed with the design. TASK 300: COMPLETION OF THE WEST 580 PRESSURE ZONE PRE-DESIGN REPORT A. URS Responsibilities: 1. Complete and finalize the Pre-Design Report. The draft final Pre-Design Report was developed by URS under a separate contract. Finalizing the report will include incorporating applicable City comments from the draft final Pre-Design Report review. 2. The Pre-Designed Report will include the requirements of the interlocal agreement and cooperative plan (Phases t-5). The report will focus on two conditions, the West 580 pressure zone under a built-out scenario and work being addressed under this initial phase. The report will concentrate on the agreement and not on presenting alternatives and inter-zone scenarios. A transient analysis, using Surge2000 by KY Pipe, will be conducted on the transmission main and the results included in the report. City of Bremerton Page 3 West 580 Pressure Zone - Scope of Services November 24 2003 B. City of Bremerton Responsibilities 1, The City has completed preliminary hydraulic modeling to the Port Orchard reservoir using WaterCad. The City shall update and validate the hydraulic model as required for the projects. 2.URS and the City will establish modeling scenarios and parameters. C. Deliverable Products: 1. Six bound and an electronic (Microsoft Word) copy of the Final Pre-Design report. TASK 400: COMPLETION OF THE DEPARTMENT OF HEALTH PROJECT APPROVAL REPORT A. URS Responsibilities: 1. Complete and finalize the Department of Health Project Approval Report. The draft final Project Approval Report was developed by URS under a separate contract. Finalizing the report will include incorporating applicable City comments from the draft final Project Approval Report review. This report will be based on information provided by the City of Bremerton and the Pre-design Report. The report will include the three design components (Pump Station 2A, transmission main, and the intertie at Clifton Road and Northwest Campus Parkway) under the initial construction phase. B. Deliverable Products: 1. Three stapled copies and an electronic (Microsoft Word) copy of the Final Project Approval Report. TASK 500: PUMP STATION No, 2A - DESIGN AND CONSTRUCTION SERVICES Task 510: Desiqn Completion A. URS Responsibilities: 1. Accept full responsibility as the professional Engineer of Record for final bidding & construction documents for Pump Station No. 2A, excluding instrumentation and controls. 2. Incorporate the information obtained in Task 200 Data collection and review of project requirements including design assumptions, documentation and calculations prepared by other firms for this project. URS will use the existing engineering design, including preliminary construction documents, supporting calculations and documentation prepared by Tetra Tech/KCM, Inc. as of April 2002. 3. Validate, adjust, and complete existing building & foundation structure, pump selection, piping and electrical designs to a final state of completion. 4. Revise Drawings and Specifications as required by jurisdictional authorities to obtain building and electrical construction permits. Preparation of surface water Technical Information Report (TLR) is not included; however, storm water from the pump station site will be addressed as per the City of Bremerton's direction. 5. Prepare specifications for Pump Station 2A in CSI format. 6. Coordinate its electrical power, lighting and grounding designs, and validation of existing designs with Technical Systems, Incorporated (TSI), which shall be the Engineer of Record for instrumentation and controls. City of Bremerton Page 4 West 580 Pressure Zone - Scope of Services November 24 2003 B. City of Bremerton Responsibilities: 1. Provide Survey and topographic information for the pump station site and pipe line alignment to the connection to the existing system and to the connection with the transmission line (see task 600 below). 2. Provide the most recent versions electronic versions of existing preliminary construction documents (drawings and specifications) for Pump Station 2A. C. Deliverable Products: 1. 90% Design & Construction Drawings for review and 100% Design & Construction Drawings in a final state of completion. URS will provide four half size drawing sets for the 90% submittal. URS will provide one full size and one half size reproducible set of drawings at 100% complete. At the final submittal URS will also provide an electronic (AutoCAD) copy on CD of the final Construction Drawings. 2. 90% Construction Project Manual (project specifications) for review and 100% specifications in a final state of completion. URS will provide four specification copies at 90% review and one unbound copy of the project manual at 100% complete. At the final submittal URS will also provide an electronic (Microsoft Word) copy on CD of the Construction Specifications. 3. Design calculations, notes and supporting materials as may be necessary, or requested by the City for issuance of permits and approvals for construction. 4. Engineers Construction Cost Estimate at the 90% and 100% submittals. Task 520: Biddinq Assistance A. URS Responsibilities: 1. Provide assistance to the City during the bid period for addenda issues, preparation for and attendance at pre-bid meeting, responding to bidders questions, review and evaluation of bidders proposal, and assistance with contract award processing, as requested by the City. B. Deliverable Products: 1. Addendum preparation, as needed. Task 530: Construction Support A. URS Responsibilities: 1. Attend pre-construction conference and up to 5 job progress meetings with the Contractor and City of Bremerton representatives. 2. Conduct up to 5 site visits, when requested by the City. Provide copies of field reports to the City. 3. Review selected Contractor submittals and shop drawings as requested by the City for quality and compliance with design intent. The City will track all submittals that are reviewed, and will maintain a log of submittals to i. nclude dates received. 4. Review and respond in writing to Contractor's Requests for Information (RFI), as requested by the City. To the extent feasible, RFI responses will be provided within 48 hours of receipt. 5. Assist with the preparation of contract change orders as requested by the City. 6. Assist with commissioning activities during project acceptance. Conduct final inspection with City staff to establish final punch list. Verify submittal of specified City of Bremerton Page 5 West 580 Pressure Zone - Scope of Services November 24 2003 warranties and coordinate warranty issues with the Contractor until transfer of this task to operations staff. B. Deliverable Products: 1. Field Repods - 1 copy for each site visit conducted. 2. RFI Reponses - 1 copy. TASK 600: TRANSMISSION WATER MAIN - DESIGN AND CONSTRUCTION SERVICES Task 610: Desi.qn Completion A. URS Responsibilities: 1. Accept full responsibility, as the professional Engineer of Record for final bidding & construction documents for West 580 Pressure Zone Improvements - Transmission Mains. 2. Incorporate the information obtained in Task 200 Data collection and review of project requirements including design assumptions, documentation and calculations prepared by other firms for this project. URS will use the existing engineering design, including preliminary construction documents, supporting calculations and documentation prepared by Tetra Tech/KCM, Inc., as of April 2002. 3. Validate, adjust, and complete existing transmission piping to a final state of completion. 4. Prepare specifications for the transmission line in APWA/WSDOT format. 5. Include maintenance road over the pipeline route designed to grade from Pump Station 2A to Campus Parkway, approximately Station 33+00. B. City of Bremerton Responsibilities: 1. Provide the most recent versions electronic versions of the existing preliminary construction documents (drawings and specifications) for the Transmission Line. 2. Provide Survey and topographic information for the pipeline alignment to the connection with the pump station piping (see task 500 above). City will conduct a centerline grade survey along the transmission main. 3. Provide Northwest Corporate Campus roadway drawings prepared by APEX Engineering showing existing surface alignment and natural ground topography for the transmission line along Campus Parkway to Campus Lane. 4. Provide the design for the section of water line from Old Clifton Road along Campus Parkway to Campus Lane (by others). C. Deliverable Products: 1. 90% Design & Construction Drawings for review and 100% Design & Construction Drawings in a final state of completion. URS will provide four half size drawing sets for the 90% submittal. URS will provide one full size and one half size reproducible set of drawings at 100% complete. At the final submittal URS will also provide an electronic (AutoCAD) copy on CD of the final Construction Drawings. 2. 90% Construction Project Manual (project specifications) for review and 100% specifications in a final state of completion. URS will provide four specification copies at 90% review and one unbound copy of the project manual at 100% complete. At the final submittal URS will also provide an electronic (Microsoft Word) copy on CD of the Construction Specifications. 15' City of Bremerton Page 6 West 580 Pressure Zone o Scope of Services November 24 2003 3. Design calculations, notes and supporting materials as may be necessary, or requested by the City for issuance of permits and approvals for construction. 4. Engineers Construction Cost Estimate at the 90% and 100% submittals. Task 620: Biddin.q Assistance A. URS Responsibilities: 1. Provide assistance to the City during the bid period for addenda issues, preparation for and attendance at pre-bid meeting, responding to bidders questions, review and evaluation of bidders, and assistance with contract award processing, as requested by the City. B. Deliverable Products; 1. Addendum preparation, as needed. Task 630: Construction Support A. URS Responsibilities: 1. Attend pre-construction conference and up to 3 job progress meetings with the Contractor and City of Bremerton representatives. 2. Conduct up to 3 site visits, when requested by the City. Provide copies of field reports to the City. 3. Review selected Contractor submittals and shop drawings as requested by the City for quality and compliance with design intent. The City will track all submittals that are reviewed, and will maintain a log of submittals to include dates received. 4. Review and respond in wdting to Contractor's Requests for Information (RFI), as requested by the City. To the extent feasible, RFI responses will be provided within 48 hours of receipt. 5. Assist with the preparation of contract change orders as requested by the City. 6. Assist with commissioning activities during project acceptance. Conduct final inspection with City staff to establish final punch list. Verify submittal of specified warranties and coordinate warranty issues with the Contractor until transfer of this task to operations staff. B. Deliverable Products: 1. Field Reports - 1 copy for each site visit conducted. 2. RFI Reponses- 1 copy. TASK 700: INTERTIE & METER CONNECTIONS BETWEEN PORT ORCHARD AND CITY OF BREMERTON - DESIGN AND CONSTRUCTION SERVICES Task 7'10: Desi.qn Completion A. URS Responsibilities: 1. Accept full responsibility as the professional Engineer of Record, for final bidding & construction documents for the Intertie and Meter, excluding instrumentation and City of Bremerton Page 7 West 580 Pressure Zone - Scope of Services November 24 2003 controls. The intertie and meter connection will be incorporated into the Task 610 construction documents. 2. Incorporate the information obtained in Task 200 Data collection and review of project requirements including design assumptions, documentation and calculations prepared by other firms for this project. 3. Coordinate its electrical power and grounding designs, and validation of existing designs with Technical Systems, Incorporated (TSl), which shall be the Engineer of Record for instrumentation and controls. B. City of Bremerton Responsibilities: 1. Provide Transmission Line design for section along Campus Parkway from Campus Lane to Old Clifton Road (by others). This will be used to coordinate connection on the City of Bremerton side of the Intertie. 2. Provide survey of the connection location for the intertie at Old Clifton Road and at Campus Parkway. The survey shall include location of the City of Port Orchard existing water line including size, material, and elevation. 3. Locate and provide pole number for the nearest power source for the intertie and meter. C. Deliverable Products: 1. Incidental to Task 610. Task 720: Biddin.q Assistance A. URS Responsibilities: 1. Incidental to Task 620. B. Deliverable Products: 1. Incidental to Task 620. Task 730: Construction Support A. URS Responsibilities: 1. Incidental to Task 630. B. Deliverable Products: 1. Incidental to Task 630. TASK 800: ADDITIONAL SERVICES This task will be used if additional design or construction services are required that are not described in Tasks 500, 600, and 700 above. 3.0 PROJECT ASSUMPTIONS The following assumptions are incorporated into the scope of services as presented by the City of Bremerton in our discussed with the City on October 14, 2003, and in follow-up phone and e-mail correspondence. 1, The term "final state of completion", used in relation to completion of designs and final bidding and construction documents, shall mean: A state of completion acceptable to City of Bremerton Page 8 West 580 Pressure Zone - Scope of Services November 24 2003 the City, sealed and signed by a professional engineer registered in the State of Washington, suitable for project approval by the Washington State Department of Health, and suitable for bidding and construction as a public work. 2. The City shall provide all available existing engineering drawings to URS in both digital and plotted formats; all other available documentation and calculations shall be provided to URS in the form currently available. 3. URS shall accept and use as-is the following documents that have been completed, sealed and signed by other professional engineers: a. Geotechnical Report, West 580 Pressure Zone, Bremerton Water System, Bremerton, Washinqton, HWA Proiect 97102, as Revised October 3, 2002; HWA Geosciences, Inc. b. West 580 Pressure Zone Improvements, Pump Station 8, Structural Calculations, October 2001, Tetra Tech/KCM, Inc. c. West 580 Pressure Zone Improvements Final Route and Site Recommendation, January 1999, Tetra Tech/KCM, Inc. d. Such other directly related work products as may be provided by the City, which have been completed and certified by other professional engineers or land surveyors. 4. The City has completed the SEPA process and has received a Determination of Non- significance for all three components of this project. 5. A surface water Technical Information Report (TLR) is not included in the scope of work. We understand a TlR is not required by the City of Bremerton for these projects. URS will include storm water provisions in the pump station design as per the City of Bremerton's direction. URS shall prepare Temporary Erosion and Sedimentation Control (TESC) drawings and specifications for Pump Station 2A and the Transmission Line. 6. Construction staking and surveying will be provided by the City. 7. Special inspections including but not limited to geotechnical testing, soils compaction, concrete and asphalt testing, and structural testing including weld inspections are not included in this proposal. 8. This Scope does not include temporary or permanent easement descriptions or acquisitions. 9. URS shall prepare separate project manuals for Pump Station 2A and the Transmission Main Projects. The City of Bremerton shall provide Divisions 0 and 1 information including necessary documents, standard forms, and special provisions for bidding purposes. 10. Existing transmission main plan/profile drawings from Pump Station 2A to the proposed West 580 reservoir will be used in the Pre-Design Report. The drawings will come from the KCM draft final Pre-Design Report, KCM's Transmission Main drawing file and Apex Engineering's plan/profile's for the Corporate Campus Parkway transmission main installation. City of Bremerton Page 9 West 580 Pressure Zone - Scope of Services November 24 2003 11. Water demand to the West 580 Pressure Zone will be supplied by the City of Port Orchard during the initial zone development. Pump Station 2A will only provide supplemental water (350 gpm) to the City of Port Orchard. 12. The meters at the intertie will be a radio read meter and not part of a SCADA system. 4.0 PROJECT SCHEDULE The design schedule for water improvements in the West 580 Pressure Zone is presented below. The dates shown are delivery dates to the City by close of business. · Final West 580 Pressure Zone Pre-design Report and D.O.H. Project Approval Report- Submit on January 23, 2004. Submittal date is based on URS receiving all draft final comments no later than January 7, 2004. · Transmission Main and Intertie/Meter - 90% Review Set (Drawings and Specifications): Submit on March 4, 2004. This date assumes the hydraulic analysis, can be completed by this date. Bid-Ready 100% complete drawings and specifications will be submitted on April 1, 2004. · Pump Station 2A- 90% Review Set (Drawings and Specifications): Submit on March 18, 2004. Bid-Ready 100% complete drawings and specifications will be submitted on April 16, 2004. Attachment 1 List of documents provided to URS Corporation by the City of Bremerton · 50% Engineers Cost Estimate, West Pressure Zone improvements, Pump Station No. 2, Aug, 31,2001 · City of Bremerton, Department of Community Development, Determination of Nonsignificance, July 30, 2002. · Contract Document for West 540 Pressure Zone Improvements SW Clifton Road Transmission and Distribution Mains, Project R6235102. 1. Biological Assessment for West 580 Pressure Zone Improvements, Tetra Tech/KCM, Inc., July 12, 2002. 2. Biological Assessment for West 580 Pressure Zone Improvements, Tetra Tech/KCM, Inc., July 5, 2002. RCE review comments included. 3. West 580 Pressure Zone Improvements Transmission Main - P.S. 2A to Campus Lane, 90% submittal Contract Documents, Tetra Tech/KCM, Inc. April 2002. 4. West 580 Pressure Zone Improvements Transmission Main - P.S. 2A, 90% submittal Contract Documents - Div. 16 & 17 Only, Tetra Tech/KCM, Inc., January 2002 5. West 580 Pressure Zone Improvements Pump Station 2A, 90% submittal Contract Documents, Tetra Tech/KCM, Inc., December 2002. 6. West 580 Pressure Zone Predesign Report and Final Route and Site Recommendation Final Draft Report, Tetra Tech/KCM, inc., inc., December 2002. 7. Geotechnical Report West 580 Pressure Zone, Bremerton, Water System, HWA Geosciences, Inc. Feb. 9, 2001. City of Bremerton Page 10 West 580 Pressure Zone - Scope of Services November 24 2003 8. City of Bremerton 1999 Water System Plan Update, Economic & Engineering Services, Inc., Feb. 15, 2001. 9. Interlocal Agreement for Cooperative water system Development in the Port Orchard 580 Zone/Bremerton 580 Zone and Plan, January 30, 2002. 12. West 580 Pressure Zone Improvements Pump Station 2A, Structural Calculations, Tetra Tech/KCM, Inc., October 2001. 13. West 580 Pump Station 2A, Heat Loss, Ventilation & Pump Station Headloss Calculations, Tetra Tech/KCM, Inc., June 2001. 14. Tech Memo, Electrical Assumptions, No Author, No date. 15. Cla-Val Pressure Relief & Surge Anticipator Valve cut sheet. 16. Apco Swing Check Valve cut sheet. 17. LUH Horizontal Blower Heater cut sheet. 18. Greenheck Sidewall Propeller Fan cut sheet. 19. Electrical Panel, Conduit, equipment cut sheets. 20. Campus Parkway Vault notes. 21. Cla-Val Pressure Reducing Valve cut sheet. 22. Fantech FX' series Fan cut sheet. 23. Electrical Panel, Conduit, equipment cut sheets. 24. Memo, QA review - West 580 Pressure Zone - Pump Station 2A, Allen Bellew, Tetra Tech/KCM, Inc., February 18, 2002. 25. West 580 Pump Station 2A, Heat Loss, Ventilation & Pump Station Headloss Calculations, Tetra Tech/KCM, Inc., June 2001. 26. Memo, QA review - West 580 Pressure Zone - Pump Station 2A, Chris Schumacher, Tetra Tech/KCM, Inc., February 5, 2002. 27. Chromalox LUH Horizontal Blower Heater Quote & cut sheet. 28. US Pipe & Foundry, Ductile Iron Pipe & Fittings estimating prices, July 11, 2001. 29. GO systems, Inc., Cla-Val estimating prices & cut sheets. 30. GA Industries, Inc., Surge Anticipation Valve, estimate, to KCM, June 12, 1998. 31. Flow serve Corporation, Byron Jackson pump estimate & cut sheet, Jan. 13, 1998. 34. Site Map of PS 2 38. Meeting Minutes, Design Criteria Meeting, 540 & 650 Pump Station Layout & Piping, City of Bremerton & KCM, Dec. 18, 1997. 39. Memo, Pump Station Description, Alien Bellew, KCM, Jan. 21, 1998. 40. Memo, Pump Station Questions, Allen Bellew, KCM, Jan. 7, 1998. 41. Water Specialties Corp., Water meter Quotes, Jan. 15, 1998. 42. Notes on Tetra Tech Engr. Pad, Tetra Tech/KCM, Inc., Dec. 13, 2000. 43. Electric Motor Heat Gain Table, 26.10, 1993 Fundamentals Handbook. 44. Memo, Pump Station Description, Allen Bellew, KCM, Jan. 21, 1998. 45. Memo, Pump Station Changes, Allen Bellew, KCM, Nov. 3, 1998. 46. Water Specialties, Model ML-04 cut sheets, May 5, 1999. 47. Water Specialties, Model ML-08 cut sheets, May 5, 1999. 48. Byron Jackson Pump Outline Dimensions cut sheet. 49. Water Specialties, Water meter spec sheets, May 20, 1999. 50. West 540 Pump Curves for Byron Jackson Pumps, Jan. 7, 1998. 51. Cla-Val Sizing Guide, Air & Vac. Release Valve. 52. Cla-Val Pressure Relief & Surge Anticipation Valve cut sheet. 53. Memo, Pump Station Description, Allen Bellew, KCM, Jan. 21, 1998. City of Bremerton Page 11 West 580 Pressure Zone - Scope of Services November 24 2003 55. KCM 60% design drawings (4) 650 Pressure Zone. 56. BW/IP International, Inc., Type MQ Deepwell Bowl Assemblies. 57. BW/IP International, Inc., 12 MQL Vert. Pump Curves. 58. Water Specialties Corporation, Estimate 150 psi Option, Jan. 15, 1998 59. KCM, Pump Cooling Ventilation Air Calculation, Jan. 13, 1998 60. KCM, Heating Calculation, Jan. 21, 1998 61. 609.8 Low Pressure Cutoff Required Booster Pumps for Water Distribution System 62. Flowserve Corporation, Pump Information, Jan. 13, 1998 63. Memo, Pump Station Description, Allen Bellew, KCM, Jan. 21, 1998. 64. Construction Cost Estimate, Jan. 12, 1999 65. KCM, West 650 Pressure Zone Development, Pump Station No. 8, Pump Cost Estimate, Jan 11,1998. 66. GC Systems, Inc., Valve Cut Sheets, Jan. 23,1998 67. Memo, Bremerton 540 and 650 Pump Station Changes, Allen Bellew, KCM, Nov. 3, 1998. 68. BW/IP International, Inc., 11"-Type MQ "L" Pump Curve 69. Equipment Table 1, Ventilation. 70. Info Memm on Pump Station Flowmetering and Soft Start, Tom Baker, Dec. 22, 1997 71. KCM Telephone Conversation Record, Mike D, 650 and 540 Zone 72. Technical Systems Incorporated, Propeller Meter Info Sheets, Jan. 14, 1998 73. KCM, 650 zone Booster Pump Station Plan (2) copies. 74. KCM Budget pricing, Jan, 22, 1998, Jarett. 75. KCM Budget pricing, Jan, 22, 1998, Allen Bellows. 76. KCM Telephone Conversation Record, Jack Boyde of GE Systems, 8" PVC, Allan B. 77. KCM, 540 zone Booster Pump Station Plan. 78. Water Specialties Corporation, Estimate 300 psi Version of Quote for the City of Bremerton, Jan. 15, 1998. 79. Memo, Pump Station Questions, Allen Bellew, KCM, Jan. 07, 1998. 80. Meeting Minutes, Meeting on Design Criteria - Pump Station Layout and Piping, Dec. 18, 1997. 81. Montgomery Watson, Corrosion Control and Fluorination Facility, Oct. 1997. 82. Meeting Minutes: Design Criteria Meeting, Instrumentation Controls, City of Bremerton, KCM & EISI, Dec. 11, 1997 83. Engineered Fluids, Inc., Past Projects and References. 84. Engineered Fluids, Inc., Water Booster Pump Station & Below Ground Controlled Environment Vaults cut sheet. 85. ANSI-ISO-IEC Catalog, May 26, 1999. 86. Sketch of booster pump system, Jan. 16, 1998. 87. Part of Chapter 7 of a Preliminary Design Report on Pump Station. 88. ASME/ANSl B16.1-1989, Cast Iron Pipe Flanges and Flanged Fittings. 89. CLA-Val, Flange Dimensions and End Details, Jun. 1, 1999. 90. KCM Telephone Conversation Record with GC System, May 27, 1999. 91. U.S. Pipe and Foundry Company, Information on Flange Ratings, May 26, 1999. 92. KCM Telephone Conversation Record with U.S. Pipe and Foundry Company, May 26, 1999. 93. Flowserve, Model 11 MQL Vert cut sheet, May 24, 1999. 94. Flowserve, Commercial VLT Outline Dimensions Style SH & Type MQ Deepwell Bowl Assemblies cut sheet, May 24, 1999. 95. ANSI/AWWA C151/A21.51-91, Ductile-Iron Pipe, Centrifugally Cast, for Water or other Liquids, ANSI/AWWA C153/A21.53-94, Ductile-Iron Compact Fittings 3 in. through 24 in. (76 mm. through 610 mm.) and 54 in. through 64 in. (1400 mm. Through 1600 mm.), for Water Service, ANSI/AVVVVA Cl15/A21.15-94, Flange Ductile-Iron Pipe with Ductile-Iron or Gray- City of Bremerton Page 12 West 580 Pressure Zone - Scope of Services November 24 2003 Iron Threaded Flanges, ANSI/AWW Cl10/A21.10-93, Ductile Iron and Gray-Iron Fittings, 3 in. through 48 in. (75 mm. through 1200 mm.), for Water and Other Liquids. 96. U.S. Pipe and Foundry Company, B16.1 vs B16.42 Flanges, May 26, 1999. 97. FIowserve, Model 11 MQL Vert cut sheet, Commercial VLT Outline Dimensions Style SH & Type MQ Deepwell Bowl Assemblies cut sheet, May 24, 1999. 98. BW/IP International, Inc, Vertical Process Pumps brochure. 99. GC Systems Incorporated, True Pre-Assembled Pre-Tested Packaged Systems brochure. 100. Record of Conversation with U.S. Pipe and Foundry Company, Class 125 price change. City of Bremerton COST SUMMARY West 580 Pressure Zone Upgrades Design and Construction Management Services Total Direct Labor Total Other Total Task Description Hours Labor Multiplier Labor Direct Cost Cost Preliminary Review and Project Management 80 $ 3,040 2.8 $ 8,512 $ 90 $ 8,602 TOTAL TASK100 80 $ 3,040 $ 8,512 $ 90 $ 8,602 Data Collection and Review 80 $ 2,140 2.8 $ 5,992 $ $ 5,992 TOTAL TASK200 80 $ 2,140 $ 5,992 $ $ 5,992 Report Completion 110 $ 3,620 2.8 $ 10,136 $ 200 $ 10,336 TOTAL TASK 300 110 $ 3,620 $ 10,136 $ 200 $ 10,336 Report Completion 31 $ 1,112 2.8 $ 3,114 $ 100 $ 3,214 TOTAL TASK 400 31 $ 1,112 $ 3,114 $ 100 $ 3,214 510 Design Completion 756 $ 23,918 2.8 $ 66,970 $ 200 $ 67,170 520 Bidding Assistance 30 $ 1,104 2.8 $ 3,091 $ 30 $ 3,121 530 Construction Support 242 $ 8,678 2.8 $ 24,298 $ 400 $ 24,698 TOTAL TASK S00 1028 $ 33,700 $ 94,360 $ 630 $ 94,990 610 Design Completion 234 $ 7,320 2.8 $ 20,496 $ 200 $ 20,696 620 Bidding Assistance 22 $ 800 2.8 $ 2,240 $ 30 $ 2,270 630 Construction Support 136 $ 5,148 2.8 $ 14,414 $ 210 $ 14,624 TOTAL TASK 600 392 $ 13,268 $ 37,150 $ 440 $ 37,590 710 Design Completion 150 $ 5,216 2.8 $ 14,605 $ 130 $ 14,735 720 Bidding Assistance 730 Construction support TOTAL TASK 700 150 $ 5,216 $ 14,605 $ 130 $ 14,735 Additional Services $ 15,000 TOTAL TASK 800 $ 15,000 12/2/2003 ~,,_~ URS CORPORATION !SUMMARY Total Direct Labor Total Other Total Task Description Hours Labor Multiplier Labor Direct Cost Cost Task 100 PROJECT MANAGEMENT 80 $ 3,040 2.8 $ 8,512 $ 90 $ 8,602 Tack200 DATA COLLECTION AND REVIEW 80 $ 2,140 2.8 $ 5,992 $ $ 5,992 OF PROJECT CALCS AND DOCUMENTS Task300 COMPLETtON OF THE WEST 580 110 $ 3,620 2.8 $ 10,136 $ 200 $ 10,336 PRESSURE ZONE PRE-DESIGN REPORT Task400 COMPLETION OF THE 31 $ 1,112 2.8 $ 3,114 $ 100 $ 3,214 DEPARTMENT OF HEALTH PROJECT APPROVAL REPORT Task 500 PUMP STATION No. 2A* DESIGN 1028 $ 33,700 2.8 $ 94,360 $ 630 $ 94,990 AND CONSTRUCTION SERVICES Task 600 TRANSMISSION WATER MAIN - 392 $ 13,268 2.8 $ 37,150 $ 440 $ 37,590 DESIGN AND CONSTRUCTION SERVICES Task 700 INTERTIE & MASTER METER 150 $ 5,216 2.8 $ 14,605 $ 130 $ 14,735 BETWEEN PORT ORCHARD AND CITY OF BREMERTON Task 800 ADDITIONALSERVlCES - $ 15,000 TOTAL 1871 $ 62,096 $ 173,869 $ 1,590 $ 190,459 PM Total $ 8,602 Tasks 200/300/400 $ 19,542 Design Total $ 102,601 Bidding Total $ 5,391 Construction Total $ 39,323 Additional Services $ 15,000 TOTAL $ 190,459 12/2/2003 ~ URS COF:PORATION City of Bremerton TASKS 100, 200, 300 & 400 West 580 Pressure Zone Upgrades Completion of Pre-Design and DOH Project Approval Reports ~ ~ ~ w w -~ -~-~ ° w .- ~ .~ ~ = = o o o ~ c~ a. 03 03 -~ co ,-, 03 < ~ 03 o ~ Subtotals Task No. Description ;38.00 3;8.00 42.00 36.50 25.00 3t.50 23.50 45,00 38.00 45.50 36.00 25.00 16.00 DirectRate Project Management 8 8 Hours 8 0 0 0 0 0 0 0 0 0 0 0 8 Direct Labor Cos~ 304 0 0 0 0 0 0 0 0 0 0 0 $ 304 Data Collection and Ra¥iew 16 8 3 24 13 8 S0 Hours 0 t6 8 8 24 0 0 16 S 0 0 0 0 80 DirsctkaborCos~ 0 608 336 292 600 0 0 304 0 0 0 0 $ 2,140 Respond to Comments 4 S 2 14 Conduct Transient ^nalysis 40 40 Hnaliza Report Drawings 16 18 Finaliza Report {incl. aA) 4 4 24 S 40 Hour~ 4 8 32 0 0 40 0 0 0 0 16 10 110 DirectkaborCoa~ 152 304 ~344 0 0 1260 0 0 0 0 400 160 $ 3,620 O.D.C.'$ (reproduction] $ 200 Respond to Commants 4 I 5 Finalize Report 24 2 26 Hours 0 28 0 0 0 0 0 0 0 0 0 3 31 Direct Labor Cost 0 1064 0 0 0 0 0 0 0 0 0 48 $ 1,t12 O.D.C.s (reproduction) $ 100 SUMMARY Task 100 $ 304 Task 200 $ 2,140 Task 300 $ 3,620 Task 400 $ 1,112 TOTAL - DIRECT LABOR $ 7,176 TOTAL O.D.C.'S $ 300 12/2/2003 ~ URS CORPORATION City of Bremerton TASKS 100 AND 500 West 580 Pressure Zone Upgrades Design and Construction Management Services for Pump Station 2A ~ ~ ~ w w Project Management 28 28 Kick off workshop 8 Meetings at Ci~ (2 to~l) 16 18 Hours 28 24 0 0 0 0 0 0 0 0 0 0 52 Dire~LaborCosl 1064 912 0 0 0 0 0 0 0 0 0 0 $ 1,978 O.D.C.'s (traveF~ $ 90 5~0 Design Completion Drawing ~mpletion to 100% 24 56 16 32 20 52 40 48 216 504 Specifi~tions 16 4 16 8 8 16 8 40 16 13; C~t Estimate 8 4 4 8 4 2~ QNQC Review 4 4 4 4 4 4 4 2~ Prepare Final Bid Documents 24 24 16 ~ Hours 4 28 84 28 48 36 ~ ' 68 ~ ~ 240 32 75( DirectLa~r~st 152 10~ 3528 1022 1200 11~ 1410 2584 2880 2304 ~00 ~0 $ 23,918 O.D.C.'s (reproduction) $ 200 520 Bidding ~istance Attend Pre-Bid Conferen~ 8 8 Pre.re 2 Addenda 16 2 18 Bid Review/Award ~sis~n~ 4 4 Hours 0 28 0 0 0 0 0 0 0 0 0 2 30 Direct ~r Cost 0 10~ 0 0 0 0 0 0 0 0 0 40~ $ 1,104 O.D.C.'S (travel) ' $ 30 530 Construction Suppo~ Pre-Construction Conferen~ 8 8 Site Visi~ (5 ea) 8 8 8 8 8 40 Proje~ M~tings (5 ea) 40 40 Respond to RFIs (10 ea} 2 2 2 2 2 10 Submit~i/Shop Dwg. Review 24 16 16 8 ~ Change Order Assistance 16 8 8 32 Prepare Re.rd Drawings 24 24 Commissioning Support 16 8 24 Hours 0 72 10 34 8 42 0 26 26 0 24 ~ 242 Direct Labor C~t 0 2736 420 1241 200 1323 0 988 1170 0 600 C $ 8,678 O.D.C.'s (travel} $ 400 SUMMARY Task 100 $ 1,976 Task 500 $ 33,700 Sub-Task 510 $ 23,918 Sub-Task 520 $ 1,104 Sub-Task 530 $ 8,678 TOTAL - PUMP STATION NO. 2A - DIRECT LABOR $ 35,676 TOTAL O.D.C.'S $ 7:20 12,2/2003 ~ URS CORPORATION City of Bremerton TASKS 100 AND 600 West 580 Pressure Zone Upgrades Design and Construction Management Services for Transmission Water Main o~ . w w ~ ~ .- ~ ~ ~ ~ ~ [L a. co co ~ co -~ ~: ,'~ u~ o ~ Subtotals Task No. Description 38.00 38.00 42.00 36.50 25.00 31.50 23.50 38.00 45.00 36.00 25.00 20.0¢ Direct Rate Project Management 12 12 Hours 12 0 0 0 0 0 0 0 0 0 0 O! 12 Direct Labor Cost 456 0 0 0 0 0 0 0 0 0 0 01 $ 456 610 Design CompIstion Drawing completion to 100% 40 108 146 Specifications 18 24 12 62 Cost Estimate 8 8 QNQC Review 2 8 10 Prepare Final Bid Documents 8 8 16 Hours 2 8 64 0 0 0 0 0 0 32 108 20 234 Direct Labor Cost 76 304 2688 0 0 0 0 0 0 1152 2700 400 $ 7,320 O.D.C.'s (reproduction) $ 200 620 Bidding Assistance Attend Pre-Bid Conference 8 8 Prepare Two Addenda 12 2 14 Hours 0 20 0 0 0 0 0 0 0 0 0 2 22 Direct Labor Cost 0 760 0 0 0 0 0 0 0 0 0 40 $ 800 O.D.C.'s (travel) $ 30 630 Construction Support Pre-Construction Conference 8 8 Site Visits (3 ea.) 16 8 24 Project Meetings (3 ea.) 16 8 24 Respond to RFIs (10) 20 2(3 Submittal/Shop Dwg. Review 24 24 Prepare Record Drawings 20 Change Order Assistance 16 16 Hours 0 56 60 0 0 0 0 0 0 0 20 0 136 Direct Labor Cost 0 2128 2520 0 0 0 0 0 0 0 500 0 $ 5,148 O.D.C.'s (travel) $ 210 SUMMARY Task 100 $ 456 Task 600 $ 13,268 Sub-Task 610 $ 7,320 Sub-Task 620 $ 800 Sub-Task 630 $ 5,148 TOTAL - TRANSMISSION WATER MAIN - DIRECT LABOR $ 13,724 TOTAL O.D,C.'s $ 440 1 2003 uRs coRPo T O City of Bremerton TASKS 100 AND 700 West 580 Pressure Zone Upgrades Design and Construction Management Services for the Intertie and Master Meter r~ 03 W UJ = = ~ LU UJ -~ ~ ~ ~ ~ ~ ~ ~ ~ < · ~ 0 ~ Subtotals Task No, DescHption 38.00 38.00 42.00 36,50 25.00 31,50 23.50 38.00 45,00 36.00 25.00 20.0~ Direct Rate Project Management 8 8 Hours 8 0 0 0 0 0 0 0 0 0 0 0 8 Direct Labor ~sl 304 0 0 0 0 0 0 0 0 0 0 0~ $ 304 7~0 ~l~n Compl~tion ~mwin~ mmptotion to ~ 00% 32 ~ ~ ~0 ~ Og Site Visit 8 Spec~cations 4 8 8 4 24 ~st Estimate 4 4 ~QC Review 2 4 6 Prepare Final Bid Documents 0 Hours 2 4 40 0 0 0 0 0 32 8 60 4 150 Direct LaborCosl 76 152 1680 0 0 0 0 0 1440 288 1500 8~ $ 5,216 O.D.C,'s (repodu~ion and travel $ 130 720 Bidding ~slstance Included under Sub-Task 620 730 Construction SuppoA Included under Sub-Task 630 SUMMARY Task 100 $ 304 Task 700 $ 5,216 TOTAL - INTERTIE AND MASTER METER - DIRECT LABOR $ 5,520 TOTAL O.D.C. S $ 130 12/2/2003 ~¢ URS CORPORATION City of Bremerton TASK 800' West 580 Pressure Zone Upgrades Additional Services ~ ~ ~ ~ ~ ~ ~ ( · m ~ Subtotals Task No. Des~ipfion 38.00 38.00 42.00 36.50 25.00 31.50 23.~ 38.00 45.00 36.00 25.00 20.0~ Direct Rate Additional Se~ices $15,000 SUMM~Y Task 800 $ ~5,000 12/2/2003 ~)~ URS CORPORATION DATE SUBMITTED: BILL # AGENDA BILL CITY OF BREMERTON q CITY COUNCIL SUBJECT: mesotuuon to rat~Iy men&ents to Count~ide Plying CO~CIL MEET~G Date: December l~2003 Policies as adopted by the Kitsap County Dep~ment: Comm. Development Board of Commissioners Presenter: C~s Hugo Phone: 473-5243 SUMMARY: The Kitsap Co~t~ide Plying Policies (CPPs) were originally adopted and ratified by all Kitsap County local gove~ents in 1992 pursuant to RCW 36.70A.210. ~ August, 2001, the CPPs were subsequently amended according to proced~es of the Kitsap Regional Coordinating Council. The 2003 amendments were developed over the past two yems to address the remaining policy issues that were not considered in the 2001 amen~ents. This proposal is the result of considerable work of the ~CC Policy Bored and its supposing tec~ical committees. Following public he~ng, the Kitsap Co~ty Commissioners made a preliminary approval of the ~CC proposed amendments on Nov. 24, 2003, with minor revisions. Under ~CC procedures, rmification of the amendments is required of all pa~icipating jurisdictions. Representatives of the Breme~on City Council and the Mayor p~icipated in the long ~d extensive deliberations that produced these proposes amendments. ATTACHMENTS: Kitsap Count~ide Plying Policies with proposed amen~ents as fo~mded by ~CC to the Kitsap County Bo~d of Commissioners for focal adoption by ordinmce, scheduled on December 15th, 2003. FISCAL IMPACTS (Include Budgeted ~ount): The proposed men~ents to Count~ide Planning policies have no shog-te~ fiscal impacts on City operations but offer long-te~ prospects for the City's fiscal improvement APPROVALS: DEP~TMENT D~CTOR: CITY ATTO~Y: ~ ~:~~ F~ANCE DI~CTOR: FISCAL/BUDGET: /'-~ - OPE~TIONS: ~COMMENDED MOTION: Move to approve Resolution ~ ~ ~ I ~ to ratify the Kitsap Co~t~ide Plying Policies with 2003 mendments as adopted by the ~tsap County Bo~d of Commissioners on D~cemb¢r 15, 2003. COUNCIL ACTION: [] Approve [] Deny [] Table [] Continue [] No Action 3o RESOLUTION NO. A RESOLUTION of the City Council of the City of Bremerton, Washington, approving and ratifying the adoption of the 2003 proposed amendments to the Countywide Planning Policies as recommended by the Kitsap Regional Coordinating Council and adopted by the Kitsap County Board of Commissioners. WHEREAS, under provisions of the Growth Management Act of the State of Washington, specifically RCW 36.70A.210, the legislative authority of a county planning under RCW 36.70A.040 shall adopt a county-wide planning policy in cooperation with the cities located in whole or in part within the county; and WHEREAS, a "county-wide planning policy" is a written policy statement or statements used solely for establishing a county-wide framework from which county and city comprehensive plans are developed and adopted; and WHEREAS, by interlocal agreement among Kitsap County and the incorporated cities within the county, the Kitsap Regional Planning Council (KRPC) was convened for the purpose of establishing a collaborative process to provide a framework for the adoption of a county-wide planning policy pursuant to RCW 36.70A.210 (2) (a); and WHEREAS, in 1992 the Kitsap County Board of Commissioners adopted Countywide Planning Policies (CPPs) upon the recommendation of KRPC; and WHEREAS, in August, 2001, the Kitsap County Board of Commissioners adopted the first amendments to the CPPs as recommended by the Kitsap Regional Coordinating Council (KRCC); and WHEREAS, for over two years since August, 2001, the member jurisdictions of KRCC worked collaboratively to address the remaining policy issues that were not addressed in the 2001 amendments; and WHEREAS, 2003 proposed amendments to the CPPs were developed through a collaborative, multi-jurisdictional process through KRCC, including review by elected officials and staff from Kitsap County, the Cities of Bremerton, Bainbridge Island, Port Orchard and Poulsbo, the Suquamish and Port Gamble S'Klallam Tribes, the US Navy, the Port of Bremerton, and Kitsap Transit; written public comment was solicited and received by KRCC from April 8 through May 31, 2003; and KRCC held well-attended public hearings on May 6 and May 22, 2003; and WHEREAS, a set of 2003 CPP amendments were recommended through the KRCC process in a series of actions between June 3 and October 7, 2003; and Countywide Planning Policies WHEREAS, the Kitsap County Board of Commissioners with appropriate SEPA review made a preliminary adoption of the KRCC recommendations with two minor revisions on November, 24, 2003; and WHEREAS, at the KRCC meeting of December 2, 2003, the Board of County Commissioners withdrew one of the minor revisions and the Policy Board concurred with the second; and WHEREAS, on December 15, 2003, the Board of County Commissioners adopted the 2003 proposed amendments to CPPs as recommended by final action of KRCC on December 2nd; and WHEREAS, it is in the City's interest for quality urban growth to approve and ratify the 2003 amendments as adopted by the Board of Commissioners; NOW THEREFORE; THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS: SECTION1. Pursuant to RCW 36.70A.210, the City Council hereby approves and ratifies the adoption of the 2003 proposed amendments to the Countywide Planning Policies as recommended by the KRCC and adopted by the Kitsap County Board of Commissioners. SECTION2. Severabilit~. If any one or more sections, subsections, or sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Resolution and the same shall remain in full force and effect. SECTION3. Effective Date. This Resolution shall take effect and be in force immediately upon its passage. PASSED by the City Council of the City of Bremerton, Washington this __ day of ,2003. CAROL ARENDS, Council President APPROVED AS TO FORM: ATTEST: ROGER A. LUBOVICH, City Attorney KATHLEEN MCCLUSKEY, City Clerk R:\LEGALXResolutions\Countywide Planning Policies.doc 2 3~- Countywide Planning Policies Adopted Revisions to Kitsap Count3~vide Planning Policy - October 7, 2003 Attached are revisions to update the Kitsap Cotmtywide Planning Policies adopted by the Kitsap Regional Coordinating Council in a series of actions between June 3 and October 7, 2003. These revisions were adopted by the FLitsap County Board of Commissioners on November 24, 2003, and will be an ordinance December 8, 2003. These revisions are now forwarded To the City and Tribal Councils for ratification. It is also expected that six other elements will be (further) revised at the first January 2004 meeting of the KRCC Policy Board: Introduction will be amended to clarify the ratification and update processes for the Countywide Planning Policy. Element A: Urban Growth Areas may be divided into two sections: Element A: Countywide Growth Patterns Element B: Urban Growth Areas Element A, Sections 9 & 10: Master Planned Resorts and Fully Contained Communities may be combined and amended to highlight policies that are in addition to the State Growth Management Act. Element I: Economic Development may be amended to include strategies to measure the effectiveness of economic development efforts. Element F: Public Capital Facilities may be amended to clarify the types of essential capital facilities that require a formal facility siting process. Element J: Fiscal Impact may be amended to make the analysis of fiscal impact discretionary or the element may be eliminated. The chart on the following page shows the actual and anticipated dates of adoption by the KRCC with subsequent adoption and ratification by the County and Cities and Tribes (respectively). The Kitsap Countywide Plann~g Policies are the fi~amework for growth management in Kitsap CoLmty. Under the Growth Management Act, the Puget Sound Region is defined as King, Kitsap, Snohomish and Pierce Counties. The Puget Sound Regional Council is responsible for developing the four-county regional transportation and land use vision. The Kitsap Countywide Planning Policies tailor the Puget Sound Regional Council's regional growth management guidelines to Kitsap County and are the policy fiamework for the County's and the Cities' comprehensive plans. The Kitsap Countywide Planning Policies address 15 separate elements, ranging fiom urban growth areas to affordable housing. Countywide Planning Policies are required by the Growth Management Act and may be appealed (only) by Cities and the Governor of Washington. The policy revisions (attached) were developed through a multi- jurisdictional collaboration sponsored by KRCC among: Kitsap County, the Cities of Bremerton, Bainbridge Island, Port Orchard & Poulsbo, the Suquamish & Port Gamble S'Klallam Tribes, the Navy, the Port of Bremerton, and Kitsap Transit. Kitsap County is lead agency for its environmental review. Written public comment was solicited and received fxom April 8 through May 31, 2003. KRCC held a well- attended public hearing on May 6, continued to May 22 in the evening. Revisions to the document as presented for public comment were coordinated by KRCC. Please direct additional questions to Mary McClure, Executive Director, Kitsap Regional Coordinating Council at (360) 377-4900. Proposed Revisions: Countywide Planning Policies Proposed KRCC Proposed Revisions to Element: Revision Status: Adoption by (New) Overview On hold Kitsap County Introduction Clarify ratification process 2/03/04 CPP 5 year update cycle ~ Countywide Growth Pattern 2/03/04 A: UGA's Section 1: Process and Criteria for Establishing, Expanding & ~¢am~jn~ Adjustin~ UGA's ~ g~ ~ ~: A: UGA's Section 2: Coordinated Growth Management in UGA's A: UGA's Section 3: Poj~lation Distribution A: UGA's Section 4: Master Planned Resorts & Fully Contained 2/03/04 Communities 1 B: Centers Re-worked; designate Silverdale & SKIA ~ C: Rural Land Uses & Development Kitsap Transit reviews transit Patterns LOS; Clarify "transportation hubs" ~ ~'~ ~ D: Open Space, Resource Protection, & No change .... Critical Areas E: Contiguous & Orderly Development Add broadband for long range F: Public Capital Facilities Clarification of_~EL 2/03/04 Add safe school walking routes; G: Transportation PSRC to review transportation I~ _plans, not KRCC Add consideration of Navy H: Affordable Housing housing I: Coordination of Planning Delete entire section: redundant ~ I: Economic Development Add broadband consideration 2/03/04 t4 J: Fiscal Impact Shall -> may 2/03/04 g K: Coordinate with Tribal Condense and clarify. Governments L: Coordinate with Fed Government Added coordinated planning with , M: Roles & Resp_._~nsibilities KRCC role clarified Appendix A: Revenue Sharing [LA Adopted December, 2001 .... (New) Appendix B: UGA Management Elements of UGAMA's Agreements : 2 Element B: CENTERS OF GROWTH Cemers are intended to be compact and centralized working, shopping and/or activity areas linked to other Centers by transit. Centers and their boundaries shall be locally determined by the County and the Cities where a community-wide focal point can be provided, significant population and/or employment growth can be located, and the increased use of transit, walking and bicycling can be supported. Designated Centers define the pattern of future residential and commercial/industrial growth in Kitsap County. In decisions relating to population growth and resource allocation supi~orting growth, Centers have a high priority. 1. The Puget Sound Regional Council has defined several types of Regional Centers within Urban Growth Areas in the four-county planning region, with planning guidelines (Vision 2020, Appendix 1). In Kitsap County, the following centers are applicable: a. Regional Centers of Growth: i. Metropolitan Center: Bremerton including the Bremerton Naval complex. "Metropolitan Centers function as anchors within the region for a high density mix of business, residential, public, cultural and recreational uses, and day and night activity. They are characterized by their historic role as the central business districts of the major cities within the central Puget Sound region, providing services for and easily accessible to a population well beyond their city limits. Metro Centers may also serve national or international roles." (Vision 2020) ii. Urban Center: Silverdale Urban Core. In Kitsap County, Urban Centers are areas with the comprehensive planning to support a wide range of commercial, housing, and cultural choices. All areas of the Urban Center are serviced by transit throughout the day and much of the area is within walking or bicycling distance. Significant at in-fill opportunities exist with the highest residential, commercial, and employment densities expected. b. RegionalManufacturing/IndustrialCenters: South Kitsap industrial Area. "Regional Manufacturing/Industrial Centers are major, existing regional employment areas of intensive, concentrated manufacturing and industrial land uses which cannot be easily mixed at higher densities with other uses. To preserve land at these centers for manufacturing, industry and related uses, large retail uses or non-related offices are discouraged. Provision of adequate public facilities and services, including good access to the region's transportation system, is very important to the success of manufacturing/industrial centers." (Vision 2020) 2. The following are other types of centers within Kitsap County: a. Town or City Centers are usually the existing downtown core ora city or Urban Growth Area. There is an abundant mix of shopping, service, employment, and cultural opportunities. Multifamily housing may be intermixed and single family housing may be within walking or bicycling distance. Infill should include mixed use and higher densities surrounding the Town Center. b. Mixed Use Centers are a generic category that can be described in terms of neighborhoods or districts. The designation represents a commitment to plarming for Center development, with a planned mix of housing, commercial, and employment opportunities. Most shopping and commercial uses are within a short walking or bicycling distance of housing. There is a higher proportion of multi-family housing at relatively high densities. Navy facilities could be considered for this designation. 3 c. Activity and Employment Centers are areas of concentrated employment and are a magnet for significant numbers of people usually during daytime hours because of business and/or manufacturing activities. They may be located outside of Urban Growth Areas, consistent with the Growth Management Act. Industrial and business parks and Navy employment centers are in this category. Within Urban Growth Areas, the opportunity to include a proportional residential element should be determined on a case-by-case basis, considering the unique geography and economics of the area. d. Transportation Hubs aro locations of regional inter~modal connection that may be located outside of Urban Growth Areas. Examples are ferry terminals, the Bremerton National Airport, or certain transit stations. 3. For purposes of distributing countywide transportation funding, a process and criteria should be developed and coordinated through the Kitsap Regional Coordinating Council. The following should be incladed: Current or programmed transportation resources (including roads, transit, bicycle, pedestrian) Balance of employment opportunities with residential Proximity and connectivity among jobs, housing, retail services Types and density of residential uses Inclusion of affordable housing Provision of community gathering space, parks, and cultural opportunities Element C. RURAL LAND USES AND DEVELOPMENT PATTERNS Rural areas of Kitsap County are characterized as having a variety of parcel sizes, with a diversity of land use activities. These areas also contain significant amounts of complex natural systems. It is a high priority to preserve and enhance the rural character of these areas. Counties are responsible for designating and regulating rural areas through the comprehensive planning process. However, rural preservation is a regional issue and it is important to coordinate these planning objectives with the Cities. 1. The following policies relate to preserving rural character and enhancing the natural environment. a. Preserve the character of identified rural areas by protecting and enhancing the natural environment, open space and recreational opportunities, and scenic and historic areas; supporting small-scale farming and forestry uses; and permitting low-density residential living and cluster development maintained by rural levels of service. Support Rural Communities as locations for a mix of housing types, rural levels of service, cultural activities, and employment that serves the needs of rural areas. b. This policy is not intended to preclude the future designation of Urban Growth Areas. 2. The following policies relate to preserving rural land use and development patterns: a. Rural Communities are already-existing residential and commercial areas of more intensive rural development designated in the Kitsap County Comprehensive Plan under RCW 36.70A.070.5.In-fill is expected. Rural Communities should be serviced by transportation providers and other services consistent with the Levels_ of Service adopted by Kitsap County for roads and by Kitsap Transit for transit upon their designation as an area of more intensive rural development. b. Transportation Hubs may be located within existing areas of more intensive development. Walking, bicycling, and transit are the major forms of travel. Transportation Hubs are locations of regional intermodal connection Examples are ferry terminals and transit stations with convenience services. c. The County shall develop criteria consistent with the Growth Management Act for designating future industrial and commercial development outside of Urban Growth Areas that protect rural character while encouraging vehicle trip reduction. The criteria should allow for industrial resource-based land use and recreation and for convenience commercial that is scaled to serve the daily needs of rural residents. 3. The following policies relate to establishing and maintaining rural levels of service: a. Rural level-of-service standards shall address sewage disposal, water, transportation and other appropriate services. The standards shall be developed based upon levels of service typically delivered in rural areas consistent with RCW 36.70A.030 (16). b. For purpose of trip reduction, develop a range of alternative modes of transportation consistent with rural levels of service to connect Rural Communities with urban Centers. c. When sewers need to be extended to solve isolated health, environmental, and sanitation problems, they shall be designed for limited access so as not to increase the development potential of the surrounding rural area. 5 4. The following policies relate to conserving small-scale natural resource use in rural areas: a. Rural land use designations in the County's Comprehensive Plan should support rural uses such as fanning, forestry, mining, recreation, and other rural activities, and permit a variety of low-density residential uses which preserve rural character, and can be sustained by rural service levels. b. The County's Comprehensive Plan policies shall promote clustering residential development and other techniques to protect and enhance sigrtificant open spaces, natural resources, and critical areas for more efficient use of thc land. Clustering should not increase residential housing units in the overall area designated as rural, consistent with designated rural densities. Development clusters shall be designed, scaled and sited in a manner consistem with rural character and thc provision of rural levels of sendcc. c. The County's Comprehensive Plan policies shall support Rural Communities as locations of employnaent, a mix of housing types, and cultural activities for rural areas that primarily function as locations for service ~eeds such as grocery stores, shopping, and community services, and small-scale cottage industries for the surrounding rural area. 6 Element E. CONTIGUOUS AND ORDERLY DEVELOPMENT Upon designation of Urban Growth Areas, the County and Cities will need to develop consistent implementation measures to ensure that development occurs in an orderly and contiguous manner. The intent of the following coantywide planning policies is to minimize differences in urban development regulations and standards between the County and the Cities and to facilitate the economical provision of urban services to development. 1. The following policies relate to the encouragement of cooperative inter-jurisdictional planning by federal, tribal, state, local, and special purpose government: a. inter_jurisdictional discussion, information exchange, and coordination of proposals shall be initiated as early and expeditiously as possible by the responsible agencies. b. Initial inventories and analyses of utilities and public services information are critical to the plarming process and shall be made available as early and expeditiously as possible by the responsible agencies. c. The Kitsap Regional Coordinating Council may establish or designate on-going technical committee(s) comprised of representatives from utilities and service providers to investigate long-range regional needs for various facilities and services, including but not limited to those for transportation, sewer and storm drainage, availability and delivery of potable water, solid waste, broadband, parks and recreation, and open space. d. The Countywide Planning Policy will further the implementation of Vision 2020 and Destination 2030 as adopted by the Puget Sound Regional Council. 2. The following policies relate to inter-regional coordination of land use and transportation planning: a. The Connty and the Cities shall participate in the Puget Sound Regional Council and the Peninsula Regional Transportation Planning Organization. b. Locally-generated data shall be provided to the Puget Sound Regional Council and the Peninsula Regional Transportation Planning Organization for use in their coordination of population forecasts, land use, and transportation. c. The planning proposals of these regional organizations shall be monitored and adjustments recommended to ensure that they accurately reflect local needs and plans. 3. The following policies relate to fiscal disparities: a. It is recognized that fiscal disparities exist as a result of growth and changes in municipal boundaries. The Kitsap Regional Coordinating Council shall monitor the Revenue Sharing Inter-local Agreement among the County and Cities (shown as Appendix A) and seek additional_ways to address fiscal disparities as they relate to promoting coordinated development and the implementation of the Growth Management Act. b. The County and the Cities shall work together to insure that all fees associated with development approval are based upon the real cost of service and act to encourage development within designated Urban Growth Areas. c. The Kitsap Regional Coordinating_Council shall sponsor on-going regional discussion on revenue disparity issues. 7 Element G. TRANSPORTATION The Growth Management Act requires that transportation planning be coordinated among local and state jurisdictions. The Growth Management Act further requires that transportation planning be coordinated with the land use elements of local comprehensive plans. Coordination of land use and transportation plans will allow Kitsap County and the Kitsap Cities to meet three inter-related transportation goals: Serve Designated Centers to.reduce sprawl, conserve land and make more efficient tlse of infrastructure, o Preserve the natural environment, including water and air quality, o Provide a balanced system for the efficient, safe movement of people, goods and services among Designated Centers within Kitsap County and the larger Puget Sound region. The intent of the following policies is to define appropriate methods and strategies to achieve these goals through inter-regional and intra-regional coordination among transportation and land use planning agencies. 1. The following policies relate to strategies to optimize and manage the use of transportation facilities and services: a. The County and the Cities shall each emphasize the maintenance and preservation of their existing transportation network. b. Through an annual review of the Transportation Element of their Comprehensive Plan, the County and the Cities shall each identify and prioritize operational and safety deficits. c. The County and the Cities shall utilize Transportation System Management strategies such as right turn channelization, parking restrictions, traffic signal coordination, and non-motorized transportation facilities. d. The County and the Cities should consider access management regulations that provide standards for driveway spacing and delineation and encourage the joint use of access points where practical. e. The County and the Cities shall actively seek opportunities to share facilities, expertise, and transportation resources, such as multiple use park & ride/parking lots or shared traffic signal maintenance responsibility. 2. Since 1980, the total number of vehicle miles traveled in the Puget Sound Region has grown twice as fast as employment and four times as fast as population. While it has been fueled by a number of factors, trying to meet this escalating demand for vehicle travel would require financial resources far beyond existing funding sources, with substantial negative environmental impacts. The shift of travel trips from single occupant (SOV) to high occupant vehicles (HOV) and from vehicles to non- motorized modes will benefit air quality and the level of traffic congestion. The following policies relate to reducing the rate of growth in auto traffic, including the number of vehicle trips, the number of miles traveled, and the length of vehicle trips taken, for both commute and non-commute trips: a. The County and the Cities shall provide both infrastructure and policy incentives to increase the use of non-SOV modes of travel. 8 b. The range of infrastructure incentives to encourage the use ofnon-SOV modes of travel could include the following: i. Provide public transit, including preferential treatments for transit, such as queue by-pass lanes, traffic signal modifications (Opticom), and safe, properly designed transit stops. ii. Provide integrated transfer points to facilitate seamless trips between transit and other modes of travel, particularly at ferry terminals, including park & ride lots, carpool/vanpool .facilities, and transit advantages in ease of ingress/egress and proximity to actual connection points, and innovative transit-oriented retail service clusters. iii. Provide non-recreational bicycle and pedestrian facilities, including safe neighborhood walking and biking routes to school. iv. During the development of all state, county, and city highway capacity improvement projects, consider the market for non-SOV travel, and the addition of High Occupancy Vehicle (HOV) lanes, park & ride lots, appropriate infrastructure for both bicycling and walking, and telecommunications infrastructure. c. The range of policy incentives to encourage the use of non-SOV modes of travel could include the following: i. Increased emphasis on the Commute Trip Reduction Program already in place (including ridesharing incentives), with Kitsap Transit designated as the lead agency, including program promotion and monitoring. ii. Managed parking demand at ferry terminals, employment, and retail centers to discourage SOV use through privileged parking for HOV users, fee structure and parking space allocations. iii. Encouraging telecommuting as a viable work alternative. iv. Encouraging the shift of work and non-work trips to off-peak travel hours. v. Congestion pricing. vi. Auto-restricted zones. vii. Promotion of driver awareness through educational efforts. d. The County and the Cities shall develop standards that address appropriate bicycle and pedestrian facilities for development of new streets and reconstruction of existing streets in=Designated Centers and Rural Communities. e. Ln Designated Centers, the jurisdictions should complete missing vehicular and n°n-m°t°rized links between key arterials to accommodate pedestrian and bicycle facilities, without compromising safety standards. f. The County and the Cities shall develop coordinated bicycle and pedestrian systems or plans, which should be consistent across jurisdictional boundaries with particular consideration to providing safe routes for children to walk and to bike to school. 9 g. in cases of substantial residential or commercial development, Kitsap Transit shall review and comment on development proposals to facilitate convenient use and operation of appropriate transit services. 3. The following policies relate to the environmental impacts of transportation policies: a. Transportation improvements shall be located and constructed so as to discourage/minimize adverse impacts on water quality and other environmental features. b. The County, the Cities, and Kitsap Transit shall consider pro~amming capital improvements and transportation facilities that alleviate and mitigate impacts of land use on air quality and energy consumption, such as: high-occupancy vehicle lanes; public transit; vanpool/carpool facilities; electric and other low emission vehicles including buses; bicycle and pedestrian facilities that are designed for functional transportation. c. The County and the Cities shall ensure environmental protection, water quality, and conformance with ESA requirements through best management practices throughout the life of the transportation facilities, including: i. Facility design, and in particular collection and treatment of storm water and surface run-off, ii. Avoiding construction during the rainy season. iii. Regular and routine maintenance of systems. d. The County, the Cities, and Kitsap Transit shall provide public education about anti-pollution measures, such as turning offcar engines while waiting at ferry terminals and parking lots; voluntary emission checks. 4. Recognizing that the County and the Cities each encompass a range of development and density patterns, each jurisdiction shall designate its Centers, consistent with the criteria set forth in Element B of the Countywide Planning Policies. The following policies relate to design standards to support transit and pedestrian travel appropriate to each type of urban and rural development or re- development: a. The County and the Cities shall each develop design standards for their Designated Centers that will include specific strategies to encourage neighborhood connectivity such as residential clustering, encouraging or requiring mixed use development; use of through streets or multiple entrances; bike and pedestrian connections between neighborhoods. b. In Urban Growth Areas, design standards shall require pedestrian- and transit-oriented design that includes convenient access and safety amenities, such as lighting, landscaping, sidewalks, and ease of access for physically challenged individuals. c. Rural Communities outside Urban Growth Areas shall accommodate appropriate pedestrian/bicycle connections and transit service and facilities consistent with rural levels of service in order to minimize vehicle trips· 10 5. The following policies relate to transportation linkages between designated local and regional Centers: a. Regional corridors shall be designated for vehicle, transit, HOV facilities, rail, bicycle, and pedestrian travel between centers as part of the countywide transportation plan. b. The transportation system linking Designated Centers within urban areas and Rural Communities within the county shall be transit-oriented and pedestrian and bicycle friendly. 6. The following policies relate to freight transportation: a. Preferred routes for the movement of freight shall be identified as part of the countywide transportation plan. b. The County and the Cities shall work to ensure that compatible land uses are applied along designated freight corridors. c. The County and the Cities shall use appropriate roadway standards for designated freight corridors. 7. The following policies relate to transportation relationships with the Puget Sound Regional Council and the Peninsula Regional Transportation Planning Organization: a. The Countywide Planning Policy shall further the implementation of Vision 2020 and Destination 2030 as adopted by the Puget Sound Regional Council. b. The County and the Cities shall actively participate in the Puget Sound Regional Council and the Peninsula Regional Transportation Planning Organization (RTPO) to assure that transportation planning in the two regions is consistent and accurately reflects local needs related to identified regional system components. c. The Kitsap Regional Coordinating Council shall serve as the point of coordination to assure Puget Sound Regional Council and Peninsula RTPO planning programs are consistent and mutually beneficial to jurisdictions within Kitsap County. d. The Transportation Improvement Program (T~) for Kitsap County shall continue to be a part of the regional TI1~ adopted by the Puget Sound Regional Council. Local review, comment and recommendafion~ shall be coordinated through the Kitsap Regional Coordinating Council. 8. The following policies relate to the identification of needed transportation related facilities and services within Kitsap County: a. The Puget Sound Regional Council and the Peninsula RTPO shall identify regional system components and related improvements within Kitsap County with the concurrence of the Kitsap Regional Coordinating Council. b. A countywide transportation plan developed by the Kitsap Regional Coordinating Council shall be prepared pursuant to the Growth Management Act to identify countywide transportation facility and service needs. A technical conunittee including transit and local, regional, and state transportation providers shall be used in this process. 11 9, The following policies relate to the coordination of intra-county transportation planning efforts: a. The Puget Sound Regional Council reviews Cities' and the County's Comprehensive plans for consistency of land use and transportation elements. b. The County and the Cities shall address compatibility between land use and transportation facilities by: i. Not using new road improvements to justify land use intensification. ii. Managing access on new transportation facilities outside Urban Growth Areas; iii. Allowing phased development of improvements including acquiring right of way; iv. Using comprehensive plans and development regulations to ensure that development does not create demands exceeding the capacity of the transportation system, such as: density limits in areas outside of Urban Growth Areas; concurrency management and adequate public facility regulation; integrated multi-modal and non-motorized networks; c. The County and the Cities shall work together in a coordinated, iterative process to periodically reassess whether regional land use and transportation goals can realistically be met. If transportation adequacy and concurrency cannot be met, the following actions should be considered: i. Adjust land use and/or level of service (LOS) standards; ii. Make full use of all feasible local option transportation revenues authorized but not yet implemented; and iii. Work with Washington State Department of Transportation (including Washington State Ferries), Kitsap Transit, and the private sector to seek additional State transportation revenues, state and federal grants for infrastructure improvements, and local options to make system improvements necessary to accommodate projected population growth. d. Adjacent jurisdictions in Kitsap County shall develop consistent street classification system and street standards. e. Kitsap Regional Coordinating Council may establish a process for evaluating development impacts including those that may affect neighboring jurisdictions within the county. f. The Kitsap Regional Coordinating Council shall function to ensure that transportation planning, system management and improvements at local, regional, and state levels are coordinated, complementary, and consistent with adopted comprehensive land use plans. 10. The following policies relate to coordinated and consistent level of service (LOS) standards: a. The County and the Cities should develop comparable level of service standards among the County, Cities and the State of Washington for identified regional system components. b. The County and the Cities shall adopt roadway LOS standards. Urban growth management agreements shall designate level of service standards. c. The County and the Cities shall adopt transit LOS in the form of "Service Standards" adopted by the Kitsap Transit Board of Commissioners. The standards shall consider both frequency of service and bus capacity. 12 d. The County and the Cities shall coordinate with the WSDOT through the Puget Sound Regional Council and the Peninsula RTPO in setting LOS standards for highways and facilities of statewide significance, including the Washington State Ferries routes designated as such. e. For highways and facilities of regional significance, including the Southworth ferry route, the County and the Cities shall jointly set LOS with WSDOT through the Puget Sound Regional Council and the Peninsula RTPO. f. The County and the Cities shall each identify capacity deficiencies and either address them in terms of identified funding or adjust the LOS standard on a temporary basis. g. New development should not cause LOS to degrade to a level lower than the adopted standard, consistent with state law. 13 Element H. AFFORDABLE HOUSING The Growth Management Act requires cities and counties to encourage the availability of housing that is affordable for all income levels at a variety of housing densities. Local jurisdictions are also encouraged to preserve existing housing resources in their communities. 1. The following definitions relate to the Countywide Planning Policy: a. Below Market Rat~ Housing shall mean housing intended for low-to-middle income households. These income levels are further defined as follows (WAC 365.195): i. Extremely low-income shall mean those households that have incomes that are at or below 30% of the countywide median. ii. Very low-income shall mean those households that have incomes that are within the range of 31 - 50% of the countywide median. iii. Low-income shall mean those households that have incomes that are within the range of 51 - 80% of the countywide median. iv. Moderate-income shall mean those households that have incomes that are within the range 81-95% of the countywide median. v. Middle-income shall mean those households that have incomes that are within the range of 96- 120% of the countywide median. b. Market Rate Housing shall mean housing intended for households with incomes that are greater than 120% of the countywide median. 2. The following policies relate to a coordinated process among Connty, Cities, and housing agencies for determining and fulfilling housing needs, and the equitable distribution of below market rate housing in Kitsap County: a. The County and the Cities should inventory the existing housing stock consistent with the Growth Management Act following each decennial census review, and con'elate with current population and economic conditions, past trends, and ten year population and employment forecasts, to deterrnine short and long range housing needs, including rental and home ownership. Navy personnel housing policy should also be considered. b. Recognizing the percentage share of the existing and forecasted countywide population and the distribution of existing below market rate housing, the County and the Cities should develop strategies to equitably disperse projected countywide below market rate housing needs throughout Kitsap County in the Urban Growth Areas and, where they are specifically found to be appropriate in consideration of existing development patterns and densities, in designated Rural Communities. c. Local housing inventories, projections, and equitable distribution strategies should be compiled and updated under the coordination of the Kitsap Regional Coordinating Council to identify countywide conditions and projected needs. d. The County and the Cities should each identify specific policies and implementation strategies in their Comprehensive Plans and should enact implementing regulations to provide a mix of housing types and costs to achieve identified goals for both market rate and below market rate housing. 14 3. Recognizing that the market place makes adequate provision for those in the upper economic brackets, some combination of appropriately zoned land, regulatory incentives, financial subsidies, and innovative planning techniques will be necessary to make adequate provisions for the needs of middle and lower income persons. (WAC 365.195-070.6) The following policies relate to the provision of below market rate housing: a. Local comprehensive plan policies and development regulations shall encourage and not exclude below market rate housing. b. Below market rate housing strategies should include: i. preservation, rehabilitation and redevelopment of existing neighborhoods as appropriate, including programs to rehabilitate substandard housing; ii. provision for a range of housing types such as multi-family, single family, accessory dwelling units, cooperative housing, and manufactured housing on individual lots and in manufactured housing parks; iii. housing design and siting compatible with surrounding neighborhoods; iv. mechanisms to help people purchase their own housing, such as low interest loan programs, "self- help" housing, and consumer education. c. Each jurisdiction shall promote the development of below market rate housing in a dispersed pattern so as not to concentrate or geographically isolate low-income housing in a specific area or community. d. Below market rate housing should be located throughout Kitsap County in a manner to provide easy access to transportation, employment, and other services. Designated Centers should include below market rate housing. Rural self- help housing programs should be encouraged either in or outside of designated Rural Communities. e. Housing policies and programs shall address the provision of diverse housing opportunities to accommodate the homeless, the elderly, physically or mentally challenged, and other segments of the population that have special needs. f. Innovative regulatory strategies shall be developed and implemented to provide incentives for the development of below market rate housing within Designated Centers. Jur/sdictions shall develop strategies which provide a wide range of opportunities for promoting the production of below market rate housing through means such as: reducing housing cost by subsidizing utility hook-up fees and rates, impact fees, and permit processing fees; density incentives; smaller lot sizes; zero lot line designs; inclusionary zoning techniques, such as requir/ng below-market rate housing in new residential developments; transfers of development rights and/or a priority permit review and approval process. g. Policies and regulations shall encourage the production of below market rate housing. The County and the Cities shall incorporate a regular review of public health and safety regulations pertaining to housing implementation strategies to assure that protection of the public health and safety remains the primary purpose for housing standards. h. The County and the Cities shall participate with housing authorities established to facilitate the production of below market rate housing. The County and the Cities shall also recognize and support other public and private not-for-profit housing agencies. Supporting housing agencies is encouraged through public land donations, guarantees, suitable design standards, tax incentives, fee waivers, providing access to funding sources and support for funding applications, or other provisions as appropriate. 15 Element. K. COORDINATION WITH TRIBAL GOVERNMENTS The Suquamish Tribe, the Port Gamble S'Klallam Tribe, and other federally recognized Indian tribes have reservations and/or trust resources within Kitsap County, Washington. These tribes are parties to treaties with the United States Government through which certain rights and privileges both on and off reservation were articulated and remain in effect. These tribes have authorities, responsibilities, interests and treaty rights within their respective resei'vation boundaries and Usual and Accustomed Areas. Since future growth and land use decisions in Kitsap County affect all governmental entities, governmental agencies must be well informed and continuously involved in regional and local planning. 1. Meaningful and substantial opportunities for early and continuous tribal government participation shall be incorporated into regional and local planning activities. 2. Local jurisdictions should work with the tribes to develop agreements that provide for discussion on comprehensive planning issues among govern_ments and ensure that the tribes are consulted on issues within their interest. The parties will jointly determine the appropriate contents of the agreements and a schedule for completing them. 3. Tribal governments, federal agencies, and county and local govm-aments are encouraged to coordinate plans among and between governments and agencies to address substantive areas of mutual interest especially where geographical areas overlay and promote complementary and cooperative efforts. 4. City and County governments are encouraged to include Tribal governments in joint comprehensive planning and development activities for areas within the Tribes' Usual and Accustomed areas. Activities include but are not limited to the establishment and revision of urban growth boundaries, distribution of forecasted population; regional transportation, capital facility, housing and utility plans; and policies that may affect natural and/or cultural resources. 5. All County, City, and Tribal government agencies shall be included in the normal public notice and comment procedures of other agencies and kept informed of matters of interest to them. 6. The County, the Cities, and Tribal governmental agencies are encouraged to keep one another informed about matters of local and regional interest by mutually agreeable means and schedule. 16 Element L. COORDINATION WITH FEDERAL GOVERNMENT INCLUDING NAVY The federal government has unique authorities, responsibilities, interests affecting land nse and other activities. Sim the impacts of future growth and development in Kitsap County affect all governmental entities, govermmental agencies must be well informed and continuously involved in regional and local planning. 1. Meaningful and substantial opportunities for early and continuous federal government participation shall be incorporated into. regional and local planning activities. 2. It is recognized that constitutional and statutory provisions may constrain federal government agencies from entering into local agreements and processes. However, when possible, the County, the Cities, and federal governments should establish intergovernmental cooperative agreements promoting coordination and involveme in activities that are of mutual interest. 3. Federal agencies and county and local governments are encouraged to coordinate plans among and between governments and agencies to make plans as consistent and compatible as possible for properties over which they have authority or activities they authorize and the adjacent areas affected. 4. Federal government agencies are encouraged to participate in City, County, and joint comprehensive planning ax development activities that may affect them, including the establishment and revision of urban growth areas encompassing, adjacent to or within federally-owned lands; distribution of forecasted population; regional transportation, capital facility, housing and utility plans; and policies that may affect natural and/or cultural resources of interest. 5. The following policies relate to promoting coordination among the Cities, County, and the federal government including the Navy: a. All jurisdictions should promote planning that considers the impact of new growth to avoid the potential for encroachment on military readiness activities as described below when developing zoning ordinances or designating land uses affecting military facilities. Each jurisdiction and the Navy should coordinate to identil the types of development and areas of interest to the Navy, method of notice, and opportunities for comment b. "Military readiness activities" mean all of the following: i. Training, support, and operations that prepare the men and women of the military and Naval ships and submarines for combat. ii. Operation, maintenance, and security of any military installation. iii. Testing of military equipment, vehicles, weapons, and sensors for proper operation or suitability fo~ combat use. c. "Impacts" include but are not limited to: i. Aircraft, boat, and rail traffic. ii. Incompatible adjacent land uses. d. Through the Kitsap Regional Coordinating Council, jurisdictions should monitor issues that arise in implementing these policies, and should identify areas for improved coordination. 6. All County, City, and federal goverrm~ental agencies shall be included in the normal public notice and comment procedures of other agencies and kept informed of matters of interest to them. 7. The County, the Cities, and federal governmental agencies are encouraged to keep one another informed of matters of local and regional interest by mutually agreeable means and schedule. Element M. ROLES AND RESPONSIBILITIES The County, Cities, Tribal governments, and special districts are all involved/n planning activities related to their statutory authority and responsibility. In addition to the responsibilities defined in previous countywide planning policies, this section further clarifies the planning roles and responsibilities of the KRCC and member agencies. 1. The KITSAP REGIONAL COORDINATING COUNCIL was established by interlocal agreement to assure coordination, consensus, consistency, and compliance in the implementation of the Growth Management Act and comprehensive planning by County, city and tribal governments within-Kitsap County. The Kitsap Regional Coordinating Council also provides a voice for all jurisdictions and opportunity for citizens and stakeholders to provide input to planning policies to be applied countywide. The interlocal agreement adopted by the County, the Cities and the Tribal governments declared that the Kitsap Regional Coordinating Council is necessary to maintain a regular intergovernmental communication network for all local and tribal governments within the county, facilitate compliance with the coordination and consistency requirements of the Growth Management Act, provide an effective vehicle to resolve conflict among and/or between jurisdictions with respect to urban growth boundaries or comprehensive plan consistency, and to build consensus on planning solutions for countywide growth management issues. The Kitsap Regional Coordinating Council shall: a. submit agreed_upon recommendations on behalf of member jurisdictions to multi-county regional agencies and State government on proposed changes to multi-county regional plans, State plans, and laws; b. provide a forum, as necessary, for achieving coordination in the development of local plans and resolving planning and plan implementation issues that are common among jurisdictior~_; c. promote coordination and consistency among local plans and between local plans and the Countywide Planning Policy and the Growth Management Act to the extent necessary to achieve regional policies and objectives. Through the Kitsap Regional Coordinating Council forum, jurisdictions should establish a process to monitor and review individual comprehensive plans and associated implementation mechanisms To determine consistency with the Countywide Planning Policy. Further, issues related to consistency may be brought to the attention of the Regional Council by one or more members; d. serve as a forum_for resolving disputes locally. The process shall not preclude appeals to the Central Puget Sound Growth Planning Heatings Board if the local process has been exhausted without resolution of the dispute e. promote_coordination of educational programs and the dissemination of plarming-related inf°rmati°n °f regional interest; f. coordinate the review, revision and monitoring_of the Countywide Planning Policy; g. apply for grants and administer contracts relative to regional tasks and plans; h. conduct the region wide growth management planning consistent with Element A. Countywide Growth Patterns~ i. initiate and coordinate the development of other regional planning policies and implementation mechanisms that may improve the effectiveness of the comprehensive planning process. j. define and implement procedures that assure opportunities for early and continuous public involvement in Y,.P~CC policF discussions facilitated by KRCC. 18 DATE SUBMITTED: 11/20/03 BILL # AGENDA BILL q CITY OF BREMERTON CITY COUNCIL SUBJECT: Public Hearing and Ordinance Committee Meeting Date: ~O&-ic- ~'~SI OIx~ Adopting the 2004 Annual Budget, COUNCIL MEETING Date: Repealing BMC Chps 2, 3.10 and 3.38 Department: 'Pinance and Amending BMC Chp 3.36 Presenter: Michael Wilson Phone: 473-5590 SUMMARY: This ordinance adopts the City of Bremerton's 2004 Annual Budget at the Fund level as described in the Mayor's Proposed 2004 Budget. ATTACHMENTS: FISCAL IMPACTS (Include Budgeted Amount): APPROVALS: DEPARTMENT DIRECTOR: CITY ATTORNEY: FINANCE DIRECTOR: MAYOR: FISCAL/BUDGET: 12/15/03 CONSENT AGENDA [] OPERATIONS: 12/15/03 COUNCIL PRESIDENT: RECOMMENDED MOTION: Move to approve an Ordinance adopting the City of Bremerton's 2004 Annual Budget on first reading. Move to pass Ordinance # on second reading. COUNCIL ACTION: [] Approve [] Deny [] Table [] Continue [] No Action 5t Option A ORDINANCE NO. AN ORDINANCE of the City Council of thc City of Bremcrton, Washington, approving and adopting the financial budget for the several funds of the City of Brcmerton for the fiscal year 2004, and appropriating the amounts set forth in each budget to each fund in accordance with RCW 35.33.075; repealing Bremerton Municipal Code Chapter 3.10 entitled "Conference Center Fund" and Chapter 3.38 entitled "Discretionary Reserve Fund;" and amending Brcmerton Municipal Code Chapter 3.36.020 relating to the source of funds for the Contingency Reserve Fund. WHEREAS, State law, Chapter 35.33 RCW requires the City to adopt an annual budget and provides procedures for the filing of estimates, a preliminary budget, deliberations, public heatings, and final fixing of the budget; and WHEREAS, a preliminary budget for the fiscal year 2004 has been prepared and filed in the Office of the City Clerk for the City of Bremerton; public hearings have been held for the purposes of fixing the final City Budget; and the City Council has deliberated and has made adjustments and changes deemed necessary and proper; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHiNGTON, DOES HEREBY ORDAiN AS FOLLOWS: SECTION1. That the 2004 Budget for the City of Bremerton, Washington, on file in the office of the City Clerk, covering the period from January 1, 2004 through December 31, 2004, with regular revenues and unencumbered fund balances of $142,992,232 and expenditures and ending fund balances of $142,992,232 is hereby approved and adopted, and the respective amounts provided for in said budget for the several funds of the City of Bremerton are hereby fixed and adopted as follows: ESTIMATED REVENUES AND EXPENDITURES FOR THE YEAR 2004 General Fund Executive ~/~t/~ $ 290,834 Q, Administrative Services/Fince~~ty~-P' 1,038,348 Human Resources 289,421 Community Development 936,407 Legal 525,202 Municipal Court 791,632 Law Enfomement 7,824,047 Fire/Emergency Medical 5,374,836 General Parks 2,376,891 1 5~' 2004 Budget Option A City Auditor 106,879 Engineering 287,647 General Facilities 508,040 Economic Development 148,106 Non-Departmental 4,873,948 Ending Fund Balance 1,269,392 Total General Fund $ 26,851,032 Arterial Street (102) 9,698,270 Street (101) 2,391,809 Contingency Reserve (103) 910,000 Civic Improvement (104) 437,000 Parking System (105) 1,747,509 Community Development Block Grant (106) 4,027,788 Abatement Revolving (108) 197,100 Police Special Projects (110) 255,000 Public Access Television (113) 267,420 Gift & Donations Fund (114) 112,658 Discretionary Reserve (115) 1,020,000 Bond Fund (201) 1,958,780 LID Guaranty (202) 169,800 Conference Center (401) 13,770,809 Park Facilities Construction (310) 928,606 Public Safety Bond (302) 9,950,998 Maritime Park (303) 1,000,000 ULID 2002-01 (403) 963,654 Government Center (305) 7,862,956 General Government Capital Improvement (308) 766,000 Pedestrian/BTC Access (309) 5,700,000 Water Utility (401 ) 13,002,591 Gold Mountain Golf Complex (407) 4,195,728 Conference Center Operating (410) 865,000 Wastewater Utility (451 ) 21,976,127 Stormwater Utility (481 ) 1,190,804 Risk Management (503) 2,306,071 Equipment Rental Reserve (510) 5,859,141 Information Services (511) 756,440 Police & Fire Pension (601) 1,853,141 Total All Funds $142,992,232 SECTION 2. That the totals for the funds noted in Section 1 above as set forth in the official "City of Bremerton 2004 Annual Budget" adopted herein, are hereby appropriated for the fiscal year 2004. 2004 Budget Option A SECTION3. Chapter 3.10 of the Bremerton Municipal Code, entitled "Conference Center Fund", is hereby repealed in its entirety. SECTION4. Chapter 3.38 of the Bremerton Municipal Code, entitled "Discretionary Reserve Fund" is hereby repealed in its entirety effective February 1, 2004. SECTION& Section 3.36.020 of the Bremerton Municipal Code relating to the "Contingency Reserve Fund", is hereby amended to read as follows: 3.36.020 ............. SOURCE OF FUND The proceeds of sale of all general fund real property shall be deposited to the Contingency Reserve Fund." SECTION 6. Nothing contained herein shall be construed to require the City of Bremerton or its officers to fill any vacancy in any of the positions established by this ordinance resulting from the discharge, resignation or retirement of such employee. Nothing herein contained shall require the City of Bremerton or its officers to pay the maximum amount budgeted for any position shown therein. SECTION 7. Severability. If any one or more sections, subsections, or sentences of this Ordinance are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Ordinance and the same shall remain in full force and effect. SECTION& E_[fective Date. This ordinance shall take effect and be in force ten (10) days from and after its passage, approval and publication as provided by law. APPROVED by the City Council the day of ,2003 PASSED by the City Council the day of _, 2003 CAROL ARENDS, Council President Approved this day of ., 2003 CARY BOZEMAN, Mayor 2004 Budget Option A ATTEST: APPROVED AS TO FORM: KATHLEEN MCCLUSKEY, City Clerk ROGER A. LUBOVICH, City Attorney PUBLISHED the day of ., 2003 EFFECTIVE the day of ,2003 ORDINANCE NO. R:\LEGAL\Ordinances~Finance~2004 budget ordinancel Option A.doc 2004 Budget Option B ORDINANCE NO. AN ORDINANCE of the City Council of the City of Bremerton, Washington, approving and adopting the financial budget for the several funds of the City of Bremerton for the fiscal year 2004, and appropriating the amounts set forth in each budget to each fund in accordance with RCW 35.33.075; repealing Bremerton Municipal Code Chapter 3.10 entitled "Conference Center Fund" and Chapter 3.38 entitled "Discretionary Reserve Fund;" and amending Bremerton Municipal Code Chapter 3.36.020 relating to the source of funds for the Contingency Reserve Fund. WHEREAS, State law, Chapter 35.33 RCW requires the City to adopt an annual budget and provides procedures for the filing of estimates, a preliminary budget, deliberations, public hearings, and final fixing of the budget; and WHEREAS, a preliminary budget for the fiscal year 2004 has been prepared and filed in the Office of the City Clerk for the City of Bremerton; public heatings have been held for the purposes of fixing the final City Budget; and the City Council has deliberated and has made adjustments and changes deemed necessary and proper; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY ORDAIN AS FOLLOWS: SECTION 1. That the 2004 Budget for the City of Bremerton, Washington, on file in the office of the City Clerk, covering the period from January 1, 2004 through December 31, 2004, with regular revenues and unencumbered fund balances of $143,902,232 and expenditures and ending fund balances of $143,902,232 is hereby approved and adopted, and the respective amounts provided for in said budget for the several funds of the City of Bremerton are hereby fixed and adopted as follows: ESTIMATED REVENUES AND EXPENDITURES FOR THE YEAR 2004 General Fund Executive $ 341,848 City Council 210,139 Administrative Services/Finance 1,029,800 Human Resources 290,435 Community Development 941,292 Legal 526,953 Municipal Court 795,135 Law Enforcement 7,852,530 Fire/Emergency Medical 5,341,695 General Parks 2,383,620 1 5 & 2004 Budget Option B City Auditor 106,879 Engineering 287,647 General Facilities 508,040 Economic Development 149,120 Non-Departmental 4,808,257 Ending Fund Balance 2,187642 Total General Fund $ 27,761,032 Arterial Street (102) 9,698,270 Street (101) 2,391,809 Contingency Reserve ( 103 ) 910,000 Civic Improvement (104) 437,000 Parking System (105) 1,747,509 Community Development Block Grant (106) 4,027,788 Abatement Revolving (108) 197,100 Police Special Projects (110) 255,000 Public Access Television (113) 267,420 Gift & Donations Fund (114) 112,658 Discretionary Reserve (115) 1,020,000 Bond Fund (201) 1,958,780 LID Guaranty (202) 169,800 Conference Center (401) 13,770,809 Park Facilities Construction (310) 928,606 Public Safety Bond (302) 9,950,998 Maritime Park (303) 1,000,000 ULID 2002-01 (403) 963,654 Government Center (305) 7,862,956 General Government Capital Improvement (308) 766,000 Pedestrian/BTC Access (309) 5,700,000 Water Utility (401) 13,002,591 Gold Mountain Golf Complex (407) 4,195,728 Conference Center Operating (410) 865,000 Wastewater Utility (451) 21,976,127 Stormwater Utility (481) 1,190,804 Risk Management (503) 2,306,071 Equipment Rental Reserve (510) 5,859,141 Information Services (511) 756,440 Police & Fire Pension (601) 1,853,14l Total All Funds $143,902,232 SECTION2. That the totals for the funds noted in Section 1 above as set forth in the official "City of Bremerton 2004 Annual Budget" adopted herein, are hereby appropriated for the fiscal year 2004. 2004 Budget Option B SECTION 3. Chapter 3.10 of the Bremerton Municipal Code, entitled "Conference Center Fund", is hereby repealed in its entirety. SECTION4. Chapter 3.38 of the Bremerton Municipal Code, entitled "Discretionary Reserve Fund" is hereby repealed in its entirety effective February 1, 2004. SECTION 5. Section 3.36.020 of the Bremerton Municipal Code relating to the "Contingency Reserve Fund", is hereby amended to read as follows: 3.36.020 A~,~I'~kTT~rI~ ~r~ SOURCE OF FUND The proceeds of sale of all general fund real property shall be deposited to the Contingency Reserve Fund." SECTION 6. Nothing contained herein shall be construed to require the City of Bremerton or its officers to fill any vacancy in any of the positions established by this ordinance resulting from the discharge, resignation or retirement of such employee. Nothing herein contained shall require the City of Bremerton or its officers to pay the maximum amount budgeted for any position shown therein. SECTION 7. Severabilitv. If any one or more sections, subsections, or sentences of this Ordinance are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Ordinance and the same shall remain in full force and effect. SECTION 8. Effective Date. This ordinance shall take effect and be in force ten (10) days from and after its passage, approval and publication as provided by law. APPROVED by the City Council the day of ,2003 PASSED by the City Council the day of ,2003 CAROL ARENDS, Council President Approved this day of 2003 CARY BOZEMAN, Mayor 2004 Budget Option B ATTEST: APPROVED AS TO FORM: KATHLEEN MCCLUSKEY, City Clerk ROGER A. LUBOVICH, City Attorney PUBLISHED the day of _, 2003 EFFECTIVE the day of _, 2003 ORDiNANCE NO. R:\LEGAL\Ordinances~Finance~2004 budget ordinancel Option B.doc 2004 Budget DATE SUBMITTED: 11/20/03 BILL # C AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Public Hearing and Ordinance Committee Meeting Date: Updating BMC Chapter 3.01 Rate and Fees COUNCIL MEETING Date: Department: Finance /,,~ -.~ Presenter: Michael Wilson Phone: 473-5590 SUMMARY: The proposed ordinance updates the rates and fees for certain City departmems. ATTACHMENTS: FISCAL IMPACTS (Include Budgeted Amount): APPROVALS: / / FINANCE DIRECTOR: MAYOR: FISCAL/BUDGET: 12/15/03 CONSENT AGENDA [] OPERATIONS: 12/15/03 COUNCIL PRESIDENT: RECOMMENDED MOTION: Move to approve an Ordinance amending BMC Chapter 3.01 Rates and Fees. Move to pass Ordinance #__ on second reading. COUNCIL ACTION: [] Approve [] Deny [] Table [] Continue [] No Action 6, o ORDINANCE NO. AN ORDINANCE of the City Council of the City of Bremerton, Washington, amending Chapter 3.01 of the Brcmerton Municipal Code updating rates and fees for 2004. WHEP,~AS, the City Council desires to update the rates and fees for the year 2004; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY ORDAIN AS FOLLOWS: SECTION1. Chapter 3.01 of the Bmmerton Municipal Code entitled "Rates and Fees" is hereby amended to read as follows: 3.01.010 INCORPORATION OF RATE TABLES. The following Rate Tables A-G attached hereto are incorporated herein by this reference and hereby adopted. Where the City has adopted State codes pursuant to Chapters 17.04 and 18.02 of the Bremerton Municipal Code, State rates listed for the Uniform Building, Plumbing, Mechanical and Fire Codes are adopted as city rates as listed in Tables C and E and are subject to uniform rate changes made by the State. 3.01.020 ADMINISTRATIVE SERVICES - RATE TABLE A. Regulatory License Fees Business License Fees Parking Fees Utility/Lien Search Fees Document Reproduction Check Handling Fee 3.01.030 MUNICIPAL COURT - RATE TABLE B. Hearing Examiner Appeal Parking Fines 3.01.040 COMMUNITY DEVELOPMENT - RATE TABLE C. Cam~rehensivc Plan Subdivisions Shoreline Master Program State Environmental Policy Act (SEPA) Site Plan Review Appeal Abatements Building Permits Mechanical Permits Plumbing Permits 1 (0 { 2004 Rates Zoning Comprehensive Plan 3.01.050 POLICE DEPARTMENT - RATE TABLE D. Traffic Accident Reports Fingerprints Criminal History Check Verification Letter for Lost or Stolen Property Photo Prints Licenses for Dogs and Cats Alarm Compliance Fee Service Fee for Anti-Harassment Order Service of Arrest Warrants and Subpoenas 3.01.060 FIRE DEPARTMENT - RATE TABLE E. Ambulance Transport Fee Fire Rescue Boat Response Hazard Materials Response Stand-By Time Active Firefighting False Alarm Fee Sprinkler/Fire Alarm Plans 3.01.070 PARKS AND RECREATION DEPARTMENT - RATE TABLES F Fl. Facility Use Rental Rates Sheridan Community Center Bremerton Sr. Citizens Center Jarstad Aquatic Center Evergreen Park Shelters Athletic Field Blueberry Park - Pea Patch Program Fees and Charges Jarstad Aquatic Center Athletic Programs Bremerton Sr. Citizens Center/Recreation Programs Ivy Green Cemetery Gold Mountain Golf Complex 3.01.080 PUBLIC WORKS AND UTILITIES - RATE TABLE G. Right-of-Way Permits Right-of-Way Vacation Telecom Master Permit Fee Telecom License Fee Utility/Lien Search Fee 2 (~ ~_ 2004 Rates 3.01.100 NON-RESIDENTIAL USE OF CITY SERVICES. Non-city residents shall pay the rates shown on Rate Table F multiplied by 120% with the exception of daily admission fees and merchandise for sale. SECTION2. Rate Tables Amended. Rate Tables A, B, C, D, E, F, and G of Chapter 3.01 of the Bremerton Municipal Code are hereby amended to read as set forth in Exhibit A of this Ordinance. SECTIONS. Rate Tables Repealed and Amended. Rate Table F1 is hereby repealed in its entirety and the fees listed in Rate Table F1 are hereby incorporated into Rate Table F. The 2004 rates established in Rate Table F1 remain the same upon incorporation into Rate Table F. SECTION4. Severabilit¥. If any one or more sections, subsections, or sentences of this Ordinance are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Ordinance and the same shall remain in full force and effect. SECTION 5. Effective Date. This ordinance shall take effect and be in force ten (10) days from and after its passage, approval and publication as provided by law. APPROVED by the City Council the day of ,2003 PASSED by the City Council the day of ,2003 CAROL ARENDS, Council President 2004 Rates Approved this day of 2003 CARY BOZEMAN, Mayor ATTEST: APPROVED AS TO FORM: KATHLEEN MCCLUSKEY, City Clerk ROGER A. LUBOVICH, City Attorney PUBLISHED the day of _, 2003 EFFECTIVE the .day of ,2003 ORDINANCE NO. RSLEGAL\Ordinances~Administration~2004 Rate Tables\3.01 rate changes ordinance.doc 2004 Rates ADMINISTRATIVE SERVICES - RATE TABLE A All Rates Listed Are "Not To Exceed" Fees A. ADMINISTRATIVE SERVICES 1. REGULATORY LICENSE FEES 2003 RATE BMC 18.06 Ambulance Services Ambulance Inspections $60/veh BMC 5.17 Charitable Solicitation Non-Profit $25/60 days Professional Fundraiser $675/60 days BMC 5.22 Dance/Public $265/yr or $70/30 days BMC 5.96 Erotic Dance Studios $700/yr Dancers $100/yr BMC 9.48 Fireworks Stands $100/stand/yr BMC 10.24 Housemoving/Oversize Loads $600+$65/mile to .10 of a mile BMC 5.16 Mobile Food Vendor $150/veh/yr BMC 5.16 Peddlers $75/yr or $25/30days BMC 5.04 Petshops $150/yr Grooming Parlors $50/yr Animal Welfare Facilities $50/yr BMC 5.36 Special Events: Profit $675/event Non-Profit $70/event BMC 5,20 Street/Sidewalk Vendors $250/yr BMC 5.16 Temporary Merchant $400/30 days 2. BUSINESS LICENSE FEE 2003 RATE BMC 5.02 $=~65/yr 3. PARKING On-Street Locations Not to Exceed $20/3 hrs $30/10 hrs Off-Street Location Not to Exceed $20/3 hrs $30/10 hrs Table A-A1 ~' ADMINISTRATIVE SERVICES - RATE TABLE A All Rates Listed Are "Not To Exceed" Fees RATE Parking Garage Not to Exceed $!00140/mo 4. UTILITY/LIEN SEARCH FEES ~ Per Parcel $30/search per parcel 5. DOCUMENT REPRODUCTION FEES 2gO34;IAT~ Per Page $.15/pg Audio or Video Tapes Cost of Tape +$8.50 Computer Disks $8.50 Certification $3.50 Blue Prints- Aerial Photos, Drawings, Maps $8/pg Documents: Medical Records $19/1st 5 pages $.83/Pgs 6-31 $.63/Pgs 31 + Fire Reports $. 15/pg Budget $25 Annual Report $25 6. CHECK HANDLING FEE $40 APPL!C.n. TION ON APP'-AL Table A - A2 MUNICIPAL COURT - RATE TABLE B All Rates Listed Are "Not To Exceed" Fees B. MUNICIPAL COURT 2003 RATE 1. HEARING EXAMINER APPEAL $65 2. PARKING FINES Overtime or Non-Payment in Collection Devices: 1~ Violation in 30 Days $25 2® Violation in 30 Days $32 3r~ Violation in 30 Days $56 Loading Zones $17 No Parking $45 Wrong Way $45 Parked on Sidewalk $56 Fire Hydrant $45 12" From Curb $10 Physically Disabled (Public and Private) $250 Counterfeiting or User of Counterfeit Permits, $500 Tokens or Script Unauthorized Use of Permits $150 All Other Infractions Not Specified Above $27 Replacement of parking permit $10 Blocked Driveway $45 Expired Tabs $45 30 Foot to Stop Sign $45 Double Parked $45 No Stopping/No Standing $45 Parking Capacity Survey $250 Table B - B1 COMMUNITY DEVELOPMENT - RATE TABLE C All Rates Listed are "Not To Exceed" Fees C. DEPARTMENT OF COMMUNITY DEVELOPMENT ~ 0!/0!/0! 0!/0!/02 RAT-E-S RAT-ES RATES ~ ¢7nn nn $729.00 $7A0 90 D ..... ~.~,~ ^,-.--.-.~,.,~.,,~-~ e?nn nn $720.00 SvAO O0 ~ $500.00 + $*S-1,.8¢;~2~- $530.00 3.01 -C1 COMMUNITY DEVELOPMENT - RATE TABLE C Alt Rates Listed are "Not To Exceed" Fees ~Z/,Mb1999 01!01!01 01!01/02 R.~ES RAT-ES RATES 1.SUBDIVISIONS '"'" ~ ..... d lot) '"~ .... lot) "~ '"" I0t)$1000 plus $150 per lot Long Plat e?ne t~t~ ~ $7")7 0O ''[' -I-~ !0 !crc + for 1~9 for .... ~"'~ -I~$2500 ..... 0 plus 9150 per lot Final Plat $300.00 ~ $3!2.00315 2. SHORELINE MASTER PROGRAM Substantial Development Permit w.v~.¢REt7 ..~nEt '*'----~- ~ ¢ ~ O t::; net $8~~, .00650 Conditional Use Permit ~.~,~:~Et7.vvnn ~,~-~.vvca'~ net $~d.001750 Shoreline Variance ,~.~¢~n7..~nn ,.,~-v.~¢~ or:; Etn $Pe44~1750 Permit Revision ,~,~ ~. ¢ ,.~ n7 .~nn .+.~¢:'~4.~.~t:; net $325.4~ Shoreline Exemption $200 3. STATE ENVIRONMENTAL POLICY ACT (SEPA) Checklist ¢oEtEt nn ~-3n~ nEt $2!2 00320 Environmental Impact Statement $~07.00 + $E2§.00 + $~d~..00650 Review/Adoption "-~'~;"'"""~ """* ~'~;*;"""~ + additional ef-exgertise ccst cf cost of exgergse expertise 4. SITE PLAN REVIEW .... ~ ......... · .................. our or Less N/C N/C N/C$250 Residential Units Others ¢,lEtEt nn ~,ln,~ Etn $ ...... 500 5. APPEAL T~ Ol.'~nn;nn t~mm;e.e.l~,. ~4OEt nn ¢4'3.4 ,',Et $!32 00 To Hearinq Examiner 9175 6. ABATEMENTS Dangerous Building $8-1.0.00 -'- $885.00 + $8go:og900 ~ Dire~ + Direct ""~ e ....~" SeP,4ee-a,qd Service and r.,,o, e .... k, r.,,o, Supply Cost Garbage & Weed ...~..~ ~¢~nn nn ~ ~..-¢~'~.~.-~c~ nn ~ $ ......640 ~ Dir-ec:,t + Direct ""~ ~ .... ~" ~""'~"" ...d Service and r-,-,,., ~.~.~..., ~ost Supply Cost (off 3.0 - c: COMMUNITY DEVELOPMENT - RATE TABLE C All Rates Listed are "Not To Exceed" Fees · 2434hll}90 01!01!01 0!!0!!02 RAT-ES RP~TES RATES 7. BUILDING PERMIT FEES - UBC Rates - Refer to Exhibit 1 8. MECHANICAL PERMIT FEES - UBC Rates - Refer to Exhibit 2 9. PLUMBING PERMIT FEES - UBC Rates - Refer to Exhibit 3 10. ZONING ORDINANCE Ordinance Amendments Text $740 Rezone (Map Amendment) $740 Variance Administrative $325 Public Hearinq/Sinqle Family $500 Public Hearin.q/Other $1750 Planned Unit Development Residential Only $1500 + $100/DU Industrial, Commercial, Mixed Use or $2500 + Other $100/DU + $100/acre Development A.qreements $1600 Special Use Permit Administrative (No public hearinq) $350 Hearinq Examiner/SF Residential $500 Hearin.q Examiner/Other $1750 Non-Conforminq Use Determination $275 Director's Code Interpretation $175 Zoning Verification Letter $125 11. COMPREHENSIVE PLAN Text or Map Amendment $1500 Combined Text and Map Amendment $2500 3.01 -C3 TJLB~ C E~IIBIT 2 TABLE 1.A 1997 UNI~t~VI FECHANICAL C~3E AS A~)ED 1997 UNIFORM MECHANICAL CODE TABLE 1-A~MECHANICAL PERMIT FEES [!nil Fee Schedule I. Furnaces F',r xhc installation or relocation of each boiler or comprer,.qnr ~vcr three h0r~epower (ltl 6 kW)to and including 15 hr,re=power (~;2 7 t~i ..... t4.7I} .r ~ ch absorplion sys cm vet 10fl.OU0 Blu/h (29.3 kW) Io and including 5O0.{R}O Btu& (146 6 kW) ................ 27.15 F.r Ih¢ installation or rel0calion of each boiler or compr~sor over 15 horsepower (52.7 kW) to and including 30 horsepower ( 105.5' kW), "r each absorption system owr 500,01111Btu/h (!46.6 kW) to and including 1,000,000 Btu/h (293.1 kW) ................................... 37.2, F.r Ih= installation r,r relocation of each boiler ~)r compressor over 30 horsepower (105.5 kW) to and including 5Il horsepower ( 176 kW). .r c~ch absorption sTstem over l,flO0,000 Btu/h (293.1 kW) to and including 1.750,000 Btu/h (512.9 kW) .................................. 55.45 1.75U.D00 Btu/h (512.9 kW) .................................................................. 5. Air Handlers ............................. 92.65 absorption unit for which a permit is required }~sewhere in he M,chon cai Code. Fnr each ~*ntilation fan connected to a single ddcl ..................................... ' ............ . · . ......... 7.25 For the installation of each hood which is served by mechanical exhaust, including the ducts for For Ihe installation or rein=alien of tach domastic-lype incinerlkior .............................................. ~ ................... 18~20 U. Miscellaneous ............................................... ...... 14.50 ........................................................ ' 10.65 3. Inspections for which no I'ce is specifically indicated, per hour (minimum charge--one-halt hour) ....................................... I;49.5B* 4. Additional plan review r~quired by chang=s, additions or revisions Io plans or to plans for which an initial review has been completed Imlnimum charge, one-half hoe0 ........................................................................................ $49.50' -9 Miseel 1 ~neous For each gas piping system ~f 1-5 Outlets $6.25 For each additional gas piping system outlet, per outlet $1.25 3.01-C4 TABLE C EXHIBIT 3 Table 1-1 199"/ UN'I,B~ PLf_IVI3I[~ OZDE AS _AA'~ED UNIFORM PLUMBING CODE TABLE 1-1 Plumbing Permit Fees Permit Issuance 1. For issuing each permit ..................................................................................................... $20.00 2 For issuing each supplemental permi[ ........................................................................................... $ ! 0.O0 Unit.Fee Schedule (in addition to items 1 and 2 above) I ~dor each plumbing lixture on one trap or a set of fixtures on one trap (including water, drainage piping and backflow protection therefor) ............................................................. : ................ $7.00- 2. For e~ch building s'ewer and each trailer park sewer ........................................................................ $15.00 3 Rainwater systems- per drain (inside building) .................................................................................. $7.00 4. For each cesspool (where permitted) ................................ ~ ............................................................... $25.00 5. For each private sewage disposal system .............. : ............................................ : ............................ $40.00 6. For each water heater and/or vent ...................................................................................................... $7.00 7, For each gas-piping system of one to five outlets ............................................................... 8. For each additional gas piping system outlet, per outlet ..................................................................... $1.00 §. For each industrial waste pretreatment interceptor including its trap and vent, except kitchen-type grease interceptors functioning as fixture traps ................................................ 2.$7.00 10. For each installation, alteration or repair of water piping and/or water treating equipment, each ....... $7.00 11. For each repair or alteration of drainage or vent piping, each fixture .................................................. $7.00 12. For each lawn sprinkler system on any one meter including backfiow protection devices therefor _..$7.00 13. For atmospheric-type vacuum breakers not included in item 12: 1 to 5 ....................... . ............. : ....................... : ......................... ~ ..................................................... $5.00 over 5, each ................................. , ................................................................................................ $1.00 14. For each backflow protective device other than atmospheric type vacuum breakers: 2 inch (51 mm) diameter and smaller .......................................................................................... $7100 over 2 inch (51 mm) diameter ............ , ........................................................................................ $15.00 15. For each graywater system .. .............................; ............................. ; .................................... .-. ........... $40.00 16. For initial installation and testing for a reclaimed water system ........................................................ $30.00' 17. For each annual cross-connection testing of a reclaimed water system (excluding initial test) ........ $30.00' 18. For each medical gas piping system serving one to five inlet(s)/outlet(s) for a specific gas ............. $50.00 19. For each additional medical gas inlet(s)/out[et(s) ..................................................... ; ........................ $5.00 Other Inspections and Fees 1. Inspections outside of normal business hours .................................................................................. $30.00' 2. Reinspection.fee ................................................................................................................................ $30.00 3. I~spections for which no fee is specifically indicated ........................................................................ $30.00' 4. Additional plan review required by changes, additions or revisions to approved plans (minimum charge - one-half hour) ....................................................... $30.00* 'Per hour Ior each hour worked or the total houdy cost to the jurisdiction, whichever is greater. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of all the employees involved. 3.01-C5 '73 POLICE DEPARTMENT - RATE TABLE D All Rates Listed Are "Not To Exceed" Fees D. POLICE DEPARTMENT 2003 RATE 1. TRAFFIC ACCIDENT REPORTS $7.00 2. FINGERPRINTS - 1st Card $8.00 Each Additional Card $8.00 3. CRIMINAL HISTORY CHECK $8.00 4. VERIFICATION LETTER FOR LOST OR STOLEN PROPERTY $8.00 5. PHOTO PRINTS Actual Cost of (Per Set When in Possession of the Dept.) Processing 6. LICENSES FOR DOGS AND CATS For Each Cat Spayed or Neutered $6.507.50 (Upon Proof of Spaying or Neutering) For Each Dog Spayed or Neutered $! ! .0012.00 (Upon Proof of Spaying or Neutering) For Each Cat Not Spayed or Neutered $35.0036~00 For Each Dog Not Spayed or Neutered $35.0036,00 7. ALARM COMPLIANCE FEE 1st False Alarm in any 1 Quarter $40.00 2nd False Alarm in the same Quarter $80.00 3rd False Alarm in the same Quarter $160.00 or Subsequent Alarms in a Calendar Quarter 8. SERVICE FEE FOR ANTI-HARASSMENT ORDER $40.00 9. SERVICE OF ARREST WARRANTS AND SUBPOENAS Arrest Warrant $15.00 plus mileage Subpoena $6.00 plus mileage Preparation of return of service $5.00 Mileage (for each mile actually and necessarily traveled by a $0.25 per member of the Police Department in going to or returning from mile any place of service, or attempted service) Table D- D1 ~ FIRE DEPARTMENT - RATE TABLE E All Rates Listed Are "Not To Exceed" Fees E. FIRE DEPARTMENT 2003 RATE 1. AMBULANCE TRANSPORT FEE ALS Residents $375425 ALS Non-Residents $-!-!, 0~90 BLS Residents $3 !0360 BLS Non-Residents $370420 Mileage $5/mile 2. EMS SERVICE CALL TO ASSISTED LIVING, LONG TERM CARE $100 After AND ADULT CARE FACILITIES first response per quarter 3. FIRE RESCUE BOAT RESPONSE Resident $115 Non-Residents $200 4. HAZARD MATERIALS RESPONSE Rice Hull Ash Actual Cost per Bag Absorbent Pads Actual Cost per Bag 5. STAND-BY-TIME Per crew of 3 $98/hour Fire Engine - Crew of 4 $115/hour 6. ACTIVE FIREFIGHTING Fire Engine $121/hour Aerial Ladder $200/hour 7. FALSE ALARM FEE $120 for second $225 for 3 or more per quarter 8. SPRINKLER/FIRE ALARM PLANS UBC or ICC Rates* *Uniform Building Code as~nendedor International Fire Code Table E- E1 7~' PARKS RECREATION DEPT - RATE TABLE F All Rates Listed Are "Not To Exceed" Fees F. PARKS AND RECREATION DEPARTMENT NON-RESIDENT FEE - BASE FEE PLUS 20% 1.FACILITY USE RENTAL RATES Facility use policies apply. Appropriate taxes are included in rates unless otherwise noted. (a) SHERIDAN COMMUNITY CENTER - ROOM RENTAL RATER 2003 RATE (Group A) NON-COMMERCIAL - Rental Rate~ Recreation and/or educational purposes only. Per hour, two (2) hour minimum Daytime (Monday- Friday: 8:00 AM to 5:00 PM) Lounge $6.25 Room A, B, C, or Conference Room $5.00 Gym $15.00 Eveninqs (Monday - Friday: 5:00 PM to 10:00 PM)/Saturday and Sunday Lounge $12.50 Room A, B, C $7.50 Conference Room $10.00 Gym $20.00 Party Packa.qe (Lounqe & Gym) $25.00 Entire building - Up to eight (8) hours $400.00 Additional staff (per hour) $10.75 (Group B) COMMERCIAL - Rental Rat~--- Recreational and/or educational purposes only. Per hour, two (2) hour minimum Daytime (Monday - Friday: 7:30 AM to 5:30 PM) Lounge $25.00 Room A, B, C $15.00 Conference Room $20.00 Gym $40.00 Party Packaqe (Lounqe & Gym) $50.00 Entire Building - Up to eight (8) hours $800.00 Additional Staff (per hour) $10.75 Table F- F1 .~, PARKS RECREATION DEPT- RATE TABLE F All Rates Listed Are "Not To Exceed" Fees 3003 RATE (b) BREMERTON SR. CITIZENS CENTER - ROOM RENTAL RATER (Group A) NON-COMMERCIAL - Rental Rates Room Rental Fees - per hour, two (2) hour minimum Cardmom/Meeting Room $15.00 Main Room $25.00 Kitchen $10.00 Additional staffing per hour $10.75 Entire Facility up to eight (8) hours $200.00 (Group B) COMMERCIAL - Rental Rates Room Rental Fees - per hour, (two) 2 hour minimum Cardroom/Meeting Room $30.00 Main Room $50.00 Kitchen $20.00 Additional staffing per hour $16.25 Entire Facility - Up to eight (8) hours $400.00 (c) JARSTAD AQUATIC CENTER (Group A) NON-COMMERCIAL - Rental Rates Private - Non-Profit Up to 50 participants Per hr $52.0055.00 Staffing each added hour $10.00 51 - 100 Per hr $62.0065.00 101-150+ Per hr $72.0075.00 Gallery $5.00 Team Deep Lanes Per hr per lane $3.003.25 Shallow Lanes Per hr per lane $2.002.25 Table F~ F2 PARKS RECREATION DEPT- RATE TABLE F All Rates Listed Are "Not To Exceed" Fees Staffing Per hr as needed $15.00 School Lessons Up to 35 students $52.0055.00 36 - 45 students $69.0955.00 46 - 55 students $72.0075.00 (Group B) COMMERCIAL - Rental Rates Commercial Per hr $~0.0066.00 Deep Lanes Per hr per lane $6.006.60 Shallow Lanes Per hr per lane $4.004.40 Staffing Per hr as needed $15.00 2003 RATE (d) EVERGREEN PARK SHELTERS - RESERVATION FEES Four (4) hour sessions per reservation unless noted. Note: Shelter #4 is not reservable. Use of shelter fl4 is on a first come/first served basis. Parties who have reserved the other Evergreen Park shelters may not use this shelter at the same time. (Group A) NON-COMMERCIAL - Rental Rates Shelter 1 $30.00 Shelter 2, 3, 5, or 6f $15.00 Shelter 4 (not reservable) no charge Upper NAD $15.00 Lent Landing $15.00 (Group B) COMMERCIAL - Rental Rates Shelter 1 $60.00 Shelter 2, 3, 5, or 6 $30.00 Shelter 4 (not reservable) no charge Upper NAD $30.00 Lent Landing $30.00 Table F- F3 7~ PARKS RECREATION DEPT - RATE TABLE F All Rates Listed Are "Not To Exceed" Fees (e) PARK RESERVATION PROCESSING FEES Ail Parks except Upper NAD and Lent Landing $10.00 20O3-RAT-E (f) ATHLETIC FIELD - RESERVATIONS Per hour unless noted (Group A) NON-COMMERCIAL - Rental Rates $12.0013.00 (Group B) COMMERCIAL - Rental Rates $22.0024.00 Game Fee - Softball $22.0024.00 Game Fee - Soccer $35.0040.00 (.q) BLUEBERRY PARK - PEA PATCH ANNUAL RATE Recreational purposes only. $34.00 RATE 2. PROGRAM FEES & CHARGES 2-O4;)3-RA-T~ not to (a) NEW PROGRAMS exceed cost plus 25% (b) GLENN JARSTAD AQUATIC CENTER ADMISSIONS Youth (0-3 yrs.) NC Youth (4-17 yrs.) $2.252.50 Adult (18-54 yrs.) $3.00 Seniors (55 & up) $2.252.50 Disabled $2.252.50 Adult Fitness $3.00 Senior Fitness $2.252.50 Disabled Fitness $2.252.50 Special Public $1,00 PUNCH CARDS Table F - F4 -~ ~ PARKS RECREATION DEPT - RATE TABLE F All Rates Listed Are "Not To Exceed" Fees Youth 10 ~unch $!2.0020.00 Youth 20 ~unch $3~.00-!0.00 Adult 10 ~unch $24.00 Adult 20 ;unch $48.00 Senior/Disabled 10 ~unch $!9.0020.00 SeniodDisabled 20 ~unch $36.00~9.00 Fitness/Lesson 10 ~unch $24.00 Fitness/Lesson 20 ~unch $48.00 SeniodDisabled Fitness 10 ~unch $?..,9020.00 SeniodDisabled Fitness 20 ~unch $36~9040.00 PASSES Youth 6 months $ ! 00.00108.00 Youth 12 months $-1-80~O207.00 Adult 6 months $ ! 35.00132.00 Adult 12 months $250.00253.00 SeniodDisabled 6 months $ !09.00108.00 SeniodDisabled 12 months $ ! 90.00207.00 SWIMMING LESSONS Youth/Adult 30 min. $3.253.50 Private 30 min. $ !2.0013.00 Semi-Private 30 min. $!2.0020.00 Parent Tot $3.00 Family Lessons 4 lessons $65.0058.00 ITEMS FOR SALE Basic goggles $5.005.50 Deluxe goggles $ !2.0013.00 Latex cap $3.003.50 Ear plug $2.002.25 Nose plug $2.002.25 New items (includes Washington not to exceed State Sales Tax) cost plus 75% 2003 RATE (c) ATHLETIC PROGRAM FEES VOLLEYBALL Co-ed (Fall & Winter) per team $200.09210.00 Men and Women (Spring) per team $200.00210.00 Men and Co-ed Sand (Summer) per team $110.00 Open Gym (Oct. - June) per person $2.00 Table F - F5 ~ O PARKS RECREATION DEPT - RATE TABLE F All Rates Listed Are "Not To Exceed" Fees 2003 RATE SOCCER Player's fee per player $37.90d0.00 BASKETBALL Men's League (Fall & Winter) per team $~,00.00425.00 Boy's League (Winter) per team $225.00 Girl's (Fall) per player $5~.0055.00 Blacktop League (Summer) no charge SOFTBALL Men's League (Spring) per team $44g~gg450.00 Men's League - Players fee (Spg) per player $ !~.0017.00 Sunday Co-ed (Spring) per team $ ......330.00 Sunday Co-ed - Players fee (Spg) per player $! ! .0012.00 Co-ed League (Fall) per team $350.00360.00 Co-ed - Players fee (Fall) per player $!2.0013.00 Men's League (Fall) per team $350.00360.00 Men's League - Players fee (Fall) per player $!2.0013.00 TOURNAMENTS (SOFTBALL AND SOCCER - INVITATIONAL TOURNAMENTS Lions - One Day $220.00 Lions - Two Day $350.00 Lions - Three Day $460.00 Pendergast - One Day $290.00 Pendergast - Two Day $485.00 Pendergast - Three Day $615.00 -- STATE TOURNAMENTS Lions - One Day $270.00 Lions - Two Day $400.00 Lions - Three Day $510.00 Pendergast - One Day $390.00 Pendergast - Two Day $580.00 Pendergast - Three Day $710.00 Table F - F6 ~ PARKS RECREATION DEPT - RATE TABLE F All Rates Listed Are "Not To Exceed" Fees 2003 RATE -- Regional and National Tournaments will pay no less than State fees, but rates will be negotiated 3. SENIOR CITIZEN CENTER AND RECREATION DIVISION PROGRAMS (a) PROGRAM FEE FORMULA~_ Except for the Sr. Citizens Trip program, participant fees for activities (programs, classes, events, etc.) promoted by the Sr. Citizen Center and the Recreation Division are established by the following formulas: A. Activities when the instructor is on the payroll. [(Total class hours including preparation) x (Instructor's hourly wage) x (1.2 Administration factor)] divided by(minimum # of students per activity)] + (the cost of group supplies divided by minimum # of students) + Cost of individual class supplies, if applicable = Student class fee for City of Bremerton Resident. B. Activities when the instructor is on contract. [(Price per student required by the Instructor less class supply fees) x (1.2 Administration factor)]+ Class supply fees = Student class fee for City of Bremerton Resident. C. Non-Resident Fees For recreation classes, programs, swim passes and rentals - ranging from: $5.00 to $25.00 add on 20% $25.01 to $50.00 add a flat $5.00 $50.01 to $100.00 add a flat $10.00 $100.01 to $200.00 add a flat $20.00 $200.01 + add a flat $40.00 For Sr. Center activities, participants pay an annual membership fee of $65.50 (resident) or $-1~11.00 (non resident) in lieu of the 20% non-resident rate. 2003 RATE actual costs {b) SENIOR CENTER TRIPS plus 5%8% 4, IVY GREEN CEMETERY - FEES AND CHARGES 3003 RATE 2003 RATE RESIDENT NON-RESIDENT (a) ADULT BURIAL Grave Site $700.00840.00 $~.0,001,008.00 Opening/Closing $~.00,00480,00 $~,80.00576.00 Liner $~, 15,00498.00 $498~g.597.60 Oversize Liner (if required) $~22.00746.40 $7~.~,00595.68 Grave Side Service Preparation (optional) $!22.00146.40 $!d~.00175.68 (b) VETERANS PLOT Table F- F7 ~-' PARKS RECREATION DEPT - RATE TABLE F All Rates Listed Are "Not To Exceed" Fees 2003 RATE 2003-RATE RESIDENT NON-RESIDENT Opening/Closing $~00.00480.00 $~0.00576.00 Liner ?.15.00498.00 ,~597.60 Oversize Liner (if required) $522.00746.40 $7-!.~_.00895.68 Grave Side Service Preparation (optional) $!22.09146.40 $! d~_.00175.68 Stone Marker Setting $7~.0088.80 $89~106.56 Bronze Marker Setting $58.0079.20 ~95.04. (c) INFANT BURIAL Infant Plot in Babyland $171.00205.20 $205.00246.24 Opening/Closing $255.09319.20 $,=3-:19~383.04 Liner $!87.00224.40 $22~- ..00269.28 Grave Side Service Preparation (optional) $!22.00146.40 $ .~!~.00175.68 (d) DISINTERNMENT Removal & opening of new site $94~,~;~1,098.00 ~1,317.60 Site Purchase $537.00840.00 $~.~..901,008.00 Liner $,!. ! 5.00~-98.00 $49~(~597.60 Removal (only) $~!0.00722.00 $7.32,00878.40 Cremaining $!'!8.00175.20 $~75.00210.24 (e) ADDITIONAL BURIAL COSTS 2 hr. max. $!22.00146.40 $!'1.8.00175.68 4 hour max. $2'!-!.00292.80 $29,:%(~351.36 (f) LINERS Adult $-!, 15.00498.0q $498~597.60 Infant $! 37.00224.40 $22'!..00269.28 Cremation Vault (2 piece) $100.00120.00 $!20.00144.00 Oversize Liner (if required) $822.00746.40 $7-!.8.00895.68 {q) OPENING AND CLOSING Adult $'!.90.00'1-80.00 $'!.30.00576.00 Infant (Babyland) $288.00319,20 $,3.,t9.~383.04 Urn Interment (per urn) $73.0097.60 $88.00105.12 (h) BURIAL SITES Adult $700.00840.00 $3'!.0.001,008.00 Table F- F8 00.~ PARKS RECREATION DEPT - RATE TABLE F All Rates Listed Are "Not To Exceed" Fees 2003 RATE 2003 RATE RESIDENT NON-RESIDENT Infant (Babyland) $! 7! .00205.20 $205.00246.24 Infant (any site not in Babyland) $700.00840.00 $8~,0.001,008.00 (i) INURNMENT Cement Vault $!00.00120.00 $!20.00144.00 Opening/Closing $73.0087.60 $88.00105.12 Grave Side Service Preparation (optional) $!22.00146.40 $!d~.00175.68 Second Right of Inurnment $150.00180.00 $!89.00216.00 {i) DISURNMENTS Urn $!d~.00175.20 $!75.09210.24 (k) RAISE GRAVE $98.00117.60 $!!8.00141.12 {I) MARKERS 5" x 8" bronze )lus tax $55.0056.00 $5~.0079.20 4" x 12" x 2" x 3" )lus tax $50.0072.00 $72.0086.40 8" x 16" x 2" x 3" )lus tax $85.0078.00 $78.0093.60 10" x 20" x 2" x 3" )lus tax $70.9084.00 $8~,.00100.80 12" x 24" x 2" x 3" )lus tax $75.0090.00 $90.00108.00 12" x 24" bronze )lus tax $75.9090.00 $99.00108.00 12" x 36" x 2" x 3" )lus tax $! !0.00132.00 $!32.00158.40 14" x 36" x 2" x 3" )lus tax $! !0.90132.00 $! 32.00158.40 5. GOLD MOUNTAIN GOLF COMPLEX (a) CASCADE COURSE RATE Weekday 18 Holes * 27.00 Weekend/Holiday 18 Holes (3) 36,00 Weekday 9 Holes * 19.00 Weekend/Holiday 9 Holes 22.00 Weekday 9 Hole Continue* 8.00 Weekend/Holiday 9 Hole Continue 14.00 Twiliqht Weekday* 19.00 Twiliqht Weekend/Holiday 22.00 Leaque Rate** 18.00 Senior 18 Holes* 21.00 Junior 18 Holes* 11.00 Junior Twiliqht Weekend/Holiday 13.00 Annual Pass Sinqle 1.400.00 Table F-F9 PARKS RECREATION DEPT - RATE TABLE F All Rates Listed Are "Not To Exceed" Fees Annual Pass Couple 2,200.00 Annual Pass Sr. Sin.qle** 900.00 Annual Pass Sr. Couple** 1,400.00 Semi Annual Sin.qle 700/750 Semi Annual Couple 1,100/1,150 Semi Annual Sr. Sinqle** 450/500 Semi Annual Sr. Couple** 800/850 Senior Punch Card** (2) 190.00 Reqular 20 Rnd Punch Card 450.00 Re~lular 10 Rnd Punch Card 245.00 Low Income Sr. Punch Card** **** (2) 80.00 Corporate Pass-Non Taxable .... (2) 2,200.00 Corporate Pass-Taxable* *** (2) 2,200.00 Daily Private Cart 16.00 Shotf:lun Tournament (Not To Exceed) 18 Hole Green Fee 45.00 * Mondaythrouqh Thursday ** Not for Saturday, Sunday or Holiday *** Beqinninq 1/1/02 the Jots are reduced to 100 rounds **** Aqe 62 & up with household income < $18,000. RCW 71.38.070 1. A reduced rate, not less than the current twi-liqht rate, may be offered with the approval of the Director of Parks & Recreation 2. May be used for twilight any day of the week includinq Holidays 3. Saturday, Sunday or Holiday (May - September Not to Exceed Rate) (b) OLYMPIC COURSE RATE Weekday 18 Holes* 37.00 Weekend/Holiday 18 Holes (2) 54.00 Weekday 9 Holes* 21.00 Weekend/Holiday 9 Holes 30.00 Weekday 9 Hole Continue* 16.00 Weekend/Holiday 9 Hole Continue 24.00 Twiliqht Weekday* 20.00 Twiliqht Weekend/Holiday 24.00 Leaque Rate** 18.00 Senior 18 Holes* 30.00 Junior 18 Holes* 20.00 Cascade Passes And Punch Cards 10.00 Shot.qun Tournament (Not To Exceed 18 Hole Green Fee) (2) 65.00 * Mondaythrouqh Thursday ** Not for Saturday, Sunday or Holiday .... Aqe 62 & up with household income < $18,000. RCW 71.38.070 Table F - Fl0 PARKS RECREATION DEPT - RATE TABLE F All Rates Listed Are "Not To Exceed" Fees 1. A reduced rate, not less than the current twi-liqht rate, may be offered with the approval of the Parks & Recreation Director. 2. Saturday, Sunday or Holiday (May - September Not to Exceed Rate) Table F-Fll ~ GREENS FEES RATE T^S' = FI EFFECTIVE E-FFE-CT4VE ~ 11113002 !!!.;2003 ~ 25.00 2~.00 27.09 ~t4~5~-Ne~ 17.09 !8.00 T,,,;I;~h+ IM~b~AIM~I;~,, on nn 21 O0 22 O0 ' * 19.00 2n.nn ~ ' * ~ 4 n nn ~ o nnn nn 2,200 09 o ann nn A ..... I D~ e. ~ .... I~** 4 onnnn ~ annnn 4 d00~unn ~ ~SO~OO 700~50 7OO.~EO ~ ...... e~ D~ ~1.~ T~v~hl ..... IO~ q nnn nn ~.~O,l~n~nn o ann nn ~ d!.OO 43.00 dS.OO · *** ~"" ~2 & ...... ~*~ h ..... ~ ~ ...... $!~ OOO ~m~/71 38 070 thc D?cctcr ~* °~'~s & o ..... Table F1 - F1-1 EFFECTIVE ~ E-FFE4DT-IVE ~ ~" ~ ~ ~ 37 09 ........ ~ C ~ ............. ,~ ~ · Twilight Weekday* ~,~° . nn ~ -~ on , nn ~ -°n ~ . nn ~ ~ ~ on nn on nn Shc+ ....~ ......... + (Hat Tc c ....~ ! ~ Table F1 - F1-2 PUBLIC WORKS AND UTILITIES - RATE TABLE G Ail Rates Listed Are "Not To Exceed" Fees G. PUBLIC WORKS AND UTILITIES DEPARTMENT 2003 RATE 1. RIGHT-OF WAY USE PERMITS FEES Type A (Short Term Use) Regular $140 Type B (Disturbance of ROW) Sidewalk Repairs $50 Driveway, Transverse Street Patch $140 and Spot Patches New Curb, Gutter & Sidewalk Longitudinal $1/ft with a $140 minimum Street Patch New Street $3/ft with a $600 minimum Water & Sewer Mains & Laterals ROW $50 Permit Type C (Long Term Use) Application and Processing $100 Use longer than one year 1/10 adjoining land value set in the County Assessor's records per square foot of impacted ROW annually with a $100 minimum. Use shorter than one year 1/50 adjoining land value set in the County Assessor's records per square foot of impacted ROW monthly with a $100 minimum. Type D Regular (Franchised Utility Routine $100 Maintenance) Plan Reviews $0.10/feet of improvement with $100 minimum Additional Work $40/hour + equipment charges 2. RIGHT-OF-WAY VACATION $547 3. TELECOM MASTER PERMIT FEE $500/one time 4. TELECOM LICENSE FEE $200/one time Table G- G1 ~ DATE SUBMiTTED: 11/20/03 BILL # c. ~ - :<¥ AGENDA BILL CITY OF BREMERTON q ~ CITY COUNCIL SUBJECT: Public Hearing and Ordinance Committee Meeting Date: f~0c~-- ,~35/ Amending BMC Chapter 3.50 Utility Taxes COUNCIL MEETING Date: /~a~ --?_~ '~ ¥ /~~~O ~ Department: Finance .2 ~ Presemer: Michael Wilson Phone: 473-5590 SUMMARY: The proposed ordinance increases the utility tax rate for Water, Wastewater, Storm Water and Cable utilities from 7% to 8.5%. ATTACHMENTS: FISCAL IMPACTS (Include Budgeted Amount): APPROVALS: DEPARTMENT DIRECTOR: CITY ATTORNEY: FINANCE DIRECTOR: MAYOR: FISCAL/BUDGET: 12/15/03 CONSENT AGENDA [] OPERATIONS: 12/i 5/03 COUNCIL PRESIDENT: RECOMMENDED MOTION: Move to approve an Ordinance amending BMC Chapter 3.50 Utility Taxes. Move to pass Ordinance #__ on second reading. COUNCIL ACTION: [] Avvrove [] Deny [] Table [] Continue [] No Action ORDINANCE NO. AN ORDINANCE of the City Council of the City of Bremerton, Washington, amending Chapter 3.50 relating to utility taxes for 2004 increasing the tax for water, wastewater, stormwater and cable utilities. WHEREAS, the City Council desires to increase the taxes for the year 2004 for water, wastewater, stormwater and cable utilities; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHiNGTON, DOES HEREBY ORDAIN AS FOLLOWS: SECTIONL Section 3.50.050 of the Bremerton Municipal Code entitled "Persons Subject to Tax - Amount" relating to utility taxes is hereby amended to read as follows: 3.50.050 PERSONS SUBJECT TO TAX - AMOUNT. In addition to other taxes or fees that may be imposed or levied by the City, there is hereby levied upon all persons (including the City) engaging in business within the City, a fee or tax to be collected as follows: (a) Gas. Upon every person engaging in the business of transmitting, distributing or the selling of manufactured or natural gas, a fee or tax equal to six (6) percent of the total gross income from such business conducted within the City. (b) Water. Upon every person engaging in the business of providing water utility service, a fee or tax equal to sevea-4-7-)eight and one-half (8.5) percent of the total gross income from such business conducted within the City. The total gross income from the business of providing water utility service includes the "gross income from timber sales" of the utility as that term is defined in this chapter. (c) Wastewater. Upon every person engaging in the business of providing wastewater utility service, a fee or tax equal to ~c;':n (7)eight and one-half (8.5) percent of the total gross income from such business conducted within the City. (d) Stormwater. Upon every person engaging in the business of providing stormwater utility service, a fee or tax equal to sevca-(g)eight and one-half (8.5) percent of the total gross income from such business conducted within the City. (e) Cable. Upon every person engaging in the business of transmitting television signals by means of a cable distribution system commonly known as television cable service, a fee or tax equal to sevcm-(C)eight and one-half (8.5) percent of the total gross income from such business conducted within the City. (f) Solid waste. Upon every person engaging in the business of providing solid waste collection service, a fee or tax equal eleven (11) percent of the total gross income from such business conducted within the City. 1 ct 2004 Utility Taxes I -I (g) Electricity. Upon every person engaging in the business of producing, transmitting, distributing or selling electricity, a fee or tax equal to six (6) percent of the total gross income from such business conducted within the City. (h) Telephone. Upon every person engaged in carrying on a telephone business for hire or for sale of a commodity or a service within or partly within the corporate limits of the City, a tax for the privilege of so doing business a tax equal to six percent (6%) of the total gross income rendered within the City. (1) "Deductions" In computing the telephone tax, there shall be deducted from the gross operating revenues the following items: (i) Amounts derived from transactions in interstate or foreign commerce or from any business which the City is prohibited from taxing under the Constitutions of the United States or the State of Washington. (ii) Amounts derived from that portion of network telephone service, as defined in RCW 82.04.065, which represents charges to another telecommunications company, as defined in RCW 80.04.010, for connecting fees, switching charges or cartier access charges relating to intrastate toll telephone services, or for access to, or charges for, interstate services or charges for network telephone service that is purchased for the purpose of resale. (iii) Adjustments made to a billing or to a customer account or to a telecommunications company accrual account in order to reverse a billing or charge that had been made as a result of third-party fraud or other crime and was not properly a debt of a customer. (iv) A complete deduction from gross income shall be allowed for credit losses, only to cellular telephone service companies which keep their regular books of account on an accrual basis, for cash discounts and credit losses actually sustained by a taxpayer as a result of telephone service business. (2) Allocation of Income - Cellular Telephone Service. (i) Service address: Payments by a customer for the telephone service from telephones without a fixed location shall be allocated among taxing jurisdictions to the location of the customer's principal service address during the period for which the tax applies. (ii) Roaming phones: When the service is provided while a subscriber is roaming outside the subscriber's normal cellular network area, the gross income shall be assigned consistent with the taxpayer's accounting system to the location of the originating cell site of the call, or to the location of the main cellular switching office that switched the call. SECTION2. Referendum Procedure. Pursuant to RCW 35.21.706, the tax increase set forth in this ordinance is subject to a referendum procedure to apply to an ordinance increasing the rate of the tax. A referendum petition may be filed within seven days of passage of the ordinance with the City Clerk. Within ten days, the City Clerk shall confer with the petitioner concerning form and style of the petition, issue the petition an identification number, and secure an accurate, concise, and positive ballot title from the designated local official. The petitioner shall have thirty days in which to secure the signatures of not less than fifteen percent of the registered voters of the city, as of the last municipal general election, upon petition forms which contain the ballot title and the full text of the measure to be referred. The City Clerk shall verify the sufficiency of the signatures on the petition and, if sufficient valid signatures are properly 2004 Utility Taxes submitted, shall certify the referendum measure to the next election ballot within the city or at a special election ballot as provided pursuant to RCW 35.17.260(2). This referendum procedure shall be exclusive in all instances for any city ordinance imposing a business and occupation tax or increasing the rate of the tax and shall supersede the procedures provided under chapters 35.17 and 35A. 11 RCW and all other statutory or charter provisions for initiative or referendum which might otherwise apply. SECTION3. Severabilit~. If any one or more sections, subsections, or sentences of this Ordinance are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Ordinance and the same shall remain in full force and effect. SECTION4. Effective Date. This ordinance shall take effect and be in force ten (10) days from and after its passage, approval and publication as provided by law. APPROVED by the City Council the day of ,2003 PASSED by the City Council the day of ., 2003 CAROL ARENDS, Council President Approved this day of ., 2003 CARY BOZEMAN, Mayor ATTEST: APPROVED AS TO FORM: KATHLEEN MCCLUSKEY, City Clerk ROGER A. LUBOVICH, City Attorney PUBLISHED the day of ., 2003 EFFECTIVE the day of ., 2003 ORDINANCE NO. R:~LEGAL\Ordinances~AdministrationX2004 Rate TablesX3.50 utility tax changes.doc 2004 utitity taxes DATE SUBMITTED: 11/20/03 BILL # AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Public Hearing and Ordinance Committee Meeting Date: Amending BMC Chapter 3.82 Commercial COUNCIL MEETING Date: Parking Tax Department: Finance ~-~ Presenter: Michael Wilson Phone: 473-5590 SUMMARY: The proposed ordinance increases the commercial parking tax rate from 8% to 10%. ATTACHMENTS: FISCAL IMPACTS (Include Budgeted Amount): APPROVALS: ~,~ [& ~_~ DEPARTMENT DIRECTOR: //~ FINANCE DIRECTOR: _ f- FISCAL/BUDGET: 12/15/o3 CONSENT AGENDA [] OPERATIONS: 1 2/15/03 COUNCIL PRESIDENT: ~r_~ /~'~-~-~'~:-~ RECOMMENDED MOTION: Move to approve an Ordinance amending BMC Chapter 3.82 Commercial Parking Tax. Move to pass Ordinance #__ on second reading. COUNCIL ACTION: [] Aonrove [] Deny [] Table [] Continue [] No Action ORDINANCE NO. AN ORDINANCE of the City Council of the City of Bremerton, Washington, amending Chapter 3.82 relating to commercial parking taxes for 2004. WHEREAS, the City Council desires to increase commercial parking taxes for the year 2004; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY ORDAIN AS FOLLOWS: SECTION1. Section 3.82.020 of the Bremerton Municipal Code entitled "Tax Rate - Who Must Pay" relating to commercial parking tax is hereby amended to read as follows: 3.82.020 TAX RATE - WHO MUST PAY. There is levied upon and shall be collected from every person engaged in a commercial parking business within the City a commercial parking tax in an amount equal to eigh-t-per~-~4 (8%)ten percent (10%) of the gross proceeds of the commercial parking business. SECTION2. Referendum Procedure. The tax adopted in this ordinance as authorized under RCW 82.80.030 is subject to a referendum. A referendum petition must be filed with the City Clerk within seven days of passage of the ordinance. Within ten days, the City Clerk shall confer with the petitioner concerning form and style of the petition, issue an identification number for the petition, and write a ballot title for the measure. The ballot title shall be posed as a question so that an affirmative answer to the question and an affirmative vote on the measure results in the tax or fee being imposed and a negative answer to the question and a negative vote on the measure results in the tax or fee not being imposed. The petitioner shall be notified of the identification number and ballot title within this ten-day period. After this notification, the petitioner has thirty days in which to secure on petition forms the signatures of not less than fifteen percent of the registered voters of the county for county measures, or not less than fifteen percent of the registered voters of the city for city measures, and to file the signed petitions with the City Clerk. Each petition form must contain the ballot title and the full text of the measure to be referred. The City Clerk shall verify the sufficiency of the signatures on the petitions. If sufficient valid signatures are properly submitted, the City Clerk shall submit the referendum measure to the county or city voters at a general or special election held on one of the dates provided in RCW 29A.04.320 as determined by the county or city legislative authority, which election shall not take place later than one hundred twenty days after the signed petition has been filed with the filing officer. The referendum procedure provided in this section is the exclusive method for subjecting any county or city ordinance imposing a tax or fee under RCW 82.80.030 to a referendum vote. 2004 Commercial Parking Taxes SECTION3. Severability. If any one or more sections, subsections, or sentences of this Ordinance are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Ordinance and the same shall remain in full force and effect. SECTION 4. Effective Date. This ordinance shall take effect and be in force ten (10) days from and after its passage, approval and publication as provided by law. APPROVED by the City Council the day of _, 2003 PASSED by the City Council the day of _, 2003 CAROL ARENDS, Council President Approved this day of ,2003 CARY BOZEMAN, Mayor ATTEST: APPROVED AS TO FORM: KATHLEEN MCCLUSKEY, City Clerk ROGER A. LUBOVICH, City Attorney PUBLISHED the day of ,2003 EFFECTIVE the day of ,2003 ORDINANCE NO. R:\LEGAL\OrdinancesXAdministration~2004 Rate Tablesk3.82 parking tax changes.doc 2004 Commercial Parking Taxes DATE SUBMITTED: 11/20/03 BILL it L ~ -- AGENDA BILL q CITY OF BREMERTON CITY COUNCIL SUBJECT: Public Hearing and Ordinance Committee Meeting Date: Setting Rates and Fees for Water, COUNCIL MEETING Date: ~ ,~l~--O 3 <~ /~~.l~[~-d Wastewater and Storm Water Utilities and Departmem: Finance amending Chapter 15.06 of the BMC Presemer: Michael Wilson Phone: 473-5590 SUMMARY: An increase in assessments, rates, fees and charges is required in order to meet the ongoing maintenance, operation, capital and debt service needs of the City's Water, Wastewater, Storm Water Utilities. This ordinance establishes new rates for all categories to incorporate a 2.1% CPI adjustment from the year 2003 rotes to year 2004 rates. ATTACHMENTS: FISCAL IMPACTS (Include Budgeted Amount): APPROVALS: DEPARTMENT DIRECTOR: .......... CITY ATTORNEY: FINANCE DIRECTOR: . MAYOR: FISCAL/BUDGET: 12/15/03 CONSENT AGENDA [] OPERATIONS: 12/15/03 COUNCIL PRESIDENT: RECOMMENDED MOTION: Move to approve an Ordinance establishing new rates for all categories of assessments, fees, rates and charges for Water, Wastewater and Storm Water Utilities for 2004 on first reading. Move to pass Ordinance # on second reading. COUNCIL ACTION: [] Al>prove [] Deny [] Table [] Continue [] No Action ORDINANCE NO. AN ORDINANCE amending Appendix A of Section 15.06.015 of the Bremerton Municipal Code relating to assessments, rates, fees and charges for municipal water, wastewater and stormwater services establishing new rates for all categories to incorporate a 2.1% CPI adjustment from the year 2003 rates to year 2004 rates. WHEREAS, the City Council desires to amend the rates, fees and charges set forth in Appendix A of Section 15.06.015 of the Bremerton Municipal Code in order to make the automatic Consumer Price Index adjustment as provided in Section 15.06.015 BMC; WHEREAS, no other rate adjustments are proposed for Appendix A of Section 15.06.015 BMC; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY ORDAIN AS FOLLOWS: SECTION 1. Appendix A of Section 15.06.015 of the Bremerton Municipal Code is hereby repealed in its entirety, and there is hereby created a new Appendix A attached hereto as Exhibit A and incorporated herein by reference establishing new rates for all categories to incorporate a 2.1% CPI adjustment from the year 2003 rates to year 2004 rates. SECTION2. Section 1 of this Ordinance shall be effective January 1, 2004. The rates currently in effect as set forth in Appendix A of Section 15.06.015 on the date of adoption of this Ordinance shall remain in effect until January 1, 2004. SECTION 3. Severability. If any one or more sections, subsections, or sentences of this Ordinance are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Ordinance and the same shall remain in full force and effect. SECTION 4. Effective Date. This ordinance shall take effect and be in force ten (10) days from and after its passage, approval and publication as provided by law. APPROVED by the City Council the _ day of ., 2003 PASSED by the City Council the day of ,2003 CAROL ARENDS, Council President 2004 Assessments Approved this day of _, 2003 CARY BOZEMAN, Mayor ATTEST: APPROVED AS TO FORM: KATHLEEN MCCLUSKEY, City Clerk ROGER A. LUBOVICH, City Attomey PUBLISHED the day of ,2002 EFFECTIVE the day of ,2002 ORDINANCE NO. R:\LEGAL\Ordinances\Public Works & Utilities~.004 CPI Rates 15.06.doc 2004 Assessments Appendix A ASSESSMENTS, RATES, FEES, AND CHARGES EFFECTIVE JANUARY 1, 2004 Within City Limits Outside City Limits 2004 2004 GENERAL FACILITY FEES Water (per ER.U) $ 249.12 $ 376.75 Wastewater (per EP-,U) $ 249.12 $ 376.75 FRONT FOOTAGE FEES Water Per Front Foot $ 20.42 $ 30.63 OffRoad R,ate $ 1.021.00 $ 1,531.50 Wastewater Per Front Foot $ 25.53 $ 38.29 OffRoadRate $ 1,27&25 $ 1,914.38 Properties not included in ULID #327 $ 73.05 Fronting the sewer main in Northlake Way. Installed as part of the Kitsap Lake Sewer Extension Project. CONNECTION/INSPECTION FEES Water 3/4" $ 1,527.42 $ 2,291.12 1" $ 1,531.50 $ 2,297.25 1 1/2" $ 2,374.85 $ 3,562.27 2" $ 2,477.97 $ 3,716.44 Greater than 2" Actual Time & Materials 150% of Actual Time & Materials Field Inspection Fees Water main extensions (per foot) $ 1.02 $ 1.53 but not less than: $ 408.40 $ 612.60 Pump Station $ 536.03 $ 804.04 Miscellaneous (per hour) $ 42.88 $ 64.32 Wastewater Lateral Connection at P/L $ 42.88 $ 64.32 Lateral Connection at Main $ 268.01 $ 402.02 Conveyance Facility Ext. (Per Foot) $ 1.33 $ 1.99 but not less than: $ 321.62 $ 482.42 Pump Station $ 536.03 $ 804.04 Miscellaneous (per hour) $ 42.88 $ 64.32 1 of 7 Within City Limits Outside City Limits 2004 2004 RETAIL WATER SERVICE RATES General Service - Monthly Service Charge Meter Size 5/8 x 3/4 inches $ 5.31 $ 7.96 1 inch $ 6.07 $ 9.09 1 1/2 inch $ 8.63 $ 12.97 2 inch $ 11.59 $ 17.46 3 inch $ 22.00 $ 32.93 4 inch $ 40.94 $ 61.52 6 inch $ 145.29 $ 217.93 8 inch $ 530.26 $ 795.41 10inch $ 1,893.19 $ 2,839.76 12inch $ 7,118.87 $ 10,678.33 Commodity Charge (per HCF) $ 0.77 $ 1.15 Fire Protection - Monthly Service Charge Service Size 1 inch $ 10.52 $ 15.83 1 1/2 inch $ 15.83 $ 23.69 2 inch $ 20.57 $ 30.83 3 inch $ 22.67 $ 34.00 4 inch $ 24.71 $ 37.01 6 inch $ 30.83 $ 46.30 8 inch $ 41.04 $ 61.57 10 inch $ 57.53 $ 86.33 12 inch $ 82.24 $ 123.34 Commodity Charge (per HCF) $ 1.53 $ 2.30 - For Useage Other Than Firefighting Low-Income Senior and Low-Income Disabled Citizen - Monthly Service Charge Meter Size 5/8 x 3/4" Base Charge (per account) $ 5.31 $ 7.96 Commodity Charge 0 - 10 HCF/Billing No Charge No Charge Over 10 HCF/Billing (per HCF) $ 0.77 $ 1.15 Temporary/Construction Meter 1" Meter Deposit $ 102.10 $ 102.10 Base Fee (per month) $ 6.07 $ 9.09 Set Up Fee $ 79.64 $ 119.46 Hydrant meter Deposit $ 510.50 $ 510.50 Base Fee (per month) $ 19.09 $ 28.64 Set Up Fee $ 79.64 $ 119.46 Equipment Loss/Damage Actual Time & Materials 150% of Actual Time & Materials Commodity Charge (per HCF) $ 0.77 $ 1.15 2of7 Within City Limits Outside City Limits 2004 20O4 RETAIL WASTEWATER SERVICE RATES Monthly Service Charge Single Family Base Charge (per accoun0 $ 11.84 $ 13.58 Commodity Charge (per HCF) $ 3.68 $ 4.24 Duplex on 1 Meter or 2 Bldgs on 1 Meter Base Charge (per unit) $ 9.39 $ 10.82 Commodity Charge (per HCF) $ 3.68 $ 4.24 Multiple Family Base Charge (per unit) $ 9.39 $ 10.82 Commodity Charge (per HCF) $ 3.68 $ 4.24 Commercial I Base Charge (per account) $ 17.51 $ 20.16 Commodity Charge (per HCF) $ 3.78 $ 4.34 Commercial II Base Charge (per accoun0 $ 17.82 $ 20.52 Commodity Charge (per HCF) $ 5.92 $ 6.81 Commercial III Base Charge (per account) $ 17.66 $ 20.32 Commodity Charge (per HCF) $ 4.85 $ 5.57 Low-Income Senior and Low-Income Disabled Citizen Base Charge (per account) $ 7.35 $ 8.47 Commodity Charge (per HCF) 0 - 5 HCF/Month No charge No charge Over 5 HCF/Month $ 3.68 $ 4.24 Septa~e Disposal (Per Gallon of Tank Capacity) $ 0.13 $ 0.13 3of7 I Within City Limits Outside City Limits 2004 2004 RETAIL STORMWATER RATES Monthly Service Charge Single Farmly / Duplex Base Charge (per account) $ 4.59 N/A Exception: Duplex w/2 Meters (per account) $ 2.55 N/A Multiple Family Base Charge (per ISU) $ 4.59 N/A Commercial Base Charge (per ISU) $ 4.59 N/A Public School Districts (per account) $ 4.59 N/A Low-Income Senior and Low-Income Disabled Citizen Base Charge (per account) $ 2.81 N/A Multiple Family & Commercial Rate Adjustment Water Quality (per ISU) $ (0,51) N/A Water Quantity (per ISU) $ (1.53) N/A Stormwater Penalty New Multiple Family & Commercial development without on-site detention Charge (per ISU) $ 1.02 N/A IMPROPER STORMWATER INFLOW RATES The following rates are established for Improper Stormwater Inflow, based upon the storrawatar ISU for each lot and adjusted annually on the following schedule: EFFECTIVE DATE RATE May 1, 2002 25% Stormwater Fee for Property May 1, 2003 50% Stormwater Fee for Property May 1, 2004 75% Stormwater Fee for Property May 1, 2005 100% Stormwater Fee for Property After May 1, 2005, the Improper Stormwater Inflow Rate wil! remain at 100% of the Stormwater Fee for a property unless otherwise modified by the City Council. The fees shall be deposited in the Wastewater Fund (# 451). 40f7 Within City Limits Outside City Limits 2004 2004 MISCELLANEOUS FEES AND CHARGES Park Reservation Fee $ 30.63 $ 30.63 (non-refundable) Office Services New Account (includes water rum-on) $ 20.00 $ 20.00 Account Maintenance $ 5.11 $ 5.11 Past Due Notice $ 2.55 $ 2.55 Lien Recovery Charge $ 102.10 $ 102.10 Duplicate Bill Charge $ 1.02 $ 1.02 Close Account/Meter Read/Water Service Tum- off $ 25.00 $ 25.00 Field Services Pavement Restoration Charge (refundable, if assessed and not required) Asphalt $ 816.80 $ 1,225.20 Concrete $ 2,348.30 $ 3,522.45 County Road Permit N/A Cost Wet Tapping (Water Main Only)* 8" and smaller - incl excavation & backfill $ 1,995.03 $ 2,992.55 8" and smaller - service to property line $ 3,586.77 $ 5,379.65 8" and smaller - tap only $ 490.08 $ 735.12 Greater than 8" Actual Time & Materials 150% of Actual Time & Materials *Does Not Include Pavement Restoration Charge Fire Hydrant Installation* $ 4,087.06 $ 6,131.11 *Does Not Include Pavement Restoration Charge Water Meter Reinstallation 3/4" & 1" $ 60.24 $ 60.24 1-1/2" & 2" $ 94.95 $ 94.95 3" and greater Time &Materials Time & Materials Water Meter Reactivation $ 42.88 $ 42.88 Water Meter Tampering Tampering Removal $ 134.77 $ 134.77 Tampering Reinstallation Time & Materials Time & Materials Cross-Connection Control Inspection $ 42.88 $ 42.88 Fire Service - Detector, Meter & MXU $ 316.51 $ 316.51 Storz Adapter $ 231.77 $ 231.77 5of7 Within City Limits Outside City Limits 2004 2004 MISCELLANEOUS (cont'd) Water Service Turn-off/Turn-on (Customer Request) Regular Hours $ 20.00 $ 20.00 After Hours $ 107.21 $ 107.21 Delinquency Notice $ 10.72 $ 10.72 Water Service Turn-off/Turn-on (Delinquent Accounts) Regular Hours $ 42.88 $ 42.88 After Hours $ 107.21 $ 107.21 Flow and Pressure Test (Uncertified) 3/4" & 1" meters only $ 42.88 $ 42.88 1-1/2" & 2" meters only $ 85.76 $ 85.76 Larger than 2" Time & Materials Time & Materials Utility Plant Locates Regular Hours N/C N/C After Hours $ 107.21 $ 107.21 Emergency N/C N/C Meter Test Fee (based on meter size) 3/4" & 1" $ 94.95 $ 94.95 1-1/2" & 2" $ 153.15 $ 153.15 3" or greater Time & Materials Time & Materials Engineering Services* Plan Check Fees Main Extensions: per foot $ 0.22 $ 0.34 BUT not less than $ 214.4l $ 321.62 (Includes hydrants and appurtenances and connection to water system) Pump Stations $ 536.03 $ 804.04 Fireline Extension $ 85.76 $ 128.65 Irrigation Systems $ 85.76 $ 128.65 System Connections $ 85.76 $ 128.65 Miscellaneous (per hour) $ 42,88 $ 64.32 * Fees include original review and one resubmittal review. Additional reviews will be charged at miscellaneous hourly rate (above). 6of7 Within City Limits Outside City Limits 2004 2004 MISCELLANEOUS (cont'd} Storm Drainage Plan Review Fees ** Preliminary Drainage Plans Residential Development $ 331.83 N/A Non-Residential Development $ 229.73 N/A Plus per ISU $ 10.21 Final Detailed Drainage Plans Residential Development (per lot) 0 - 20 Lots $ 35.74 N/A 21 - 50 Lots $ 25.53 N/A 51 - 100 Lots $ 22.97 N/A 100+ Lots $ 20.42 N/A Minimum Charge $ 255.25 N/A Non-Residential Development per ISU $ 20.42 N/A Minimum Charge $ 306.30 N/A Resubmittal Fees First Resubmittal No Charge N/A Subsequent Resubmittal $ 255.25 N/A Storm Drainage Inspection Fees ** Residential Development (per lot) $ 15.32 N/A Non-Residential Development (per ISU) $ 15.32 N/A Minimum Charge $ 153.15 N/A Conveyance Fac. Ext. (per foot) $ 0.77 N/A Minimum Charge $ 306.30 N/A Unscheduled Inspections* (per site visit) $ 42.88 N/A *(Unscheduled inspections shall be tzacked through the course of a project and billed after the final site inspection. Fees for unscheduled inspections shall be paid prior to fmal occupancy approval.) ** Does not apply to single family residence or duplex constxuction on an existing established lot. Utility/Lien Searc¥ Fee (Manual)* $ 30.00 $ 30.00 *Search per parcel 7 of 7