Loading...
HomeMy WebLinkAboutHARRISON HOSPITAL (2) Storm main relocation Emergency Expansion DEED OF CONVEYANCE OF PUBLIC IMPROVEMENTS The Grantor, Harrison Hospital conveys and warrants to the City of Br~ncrton the following described public improvements and/or real property interests: APPROXIMATELY 402 LINEAR FEET OF 12-INCH PVC STORM PIPE AND TWO (2)TYPE II MANHOLES AND FIVE (5) TYPE I CATCH BASINS. BEGINNING AT THE INTERSECTION OF CHERRY AVE. AND HICKORY STREET THEN RUNNING EAST ON THE NORTH SIDE OF HICKORY STREET APPROXIMATELY 402 FEET. ENGINEERING COSTS ........................... 8,000.00 CONSTRUCTION COSTS ..................... 11,457.00 TOTAL $19,457.00 situated in the County of Kitsap, State of Washington. DATED this q~ay of ~ ,2004. Grantor: Harrison Hospital STATE OF WASHINGTON ) D i r~ ~-~t~C~ (2~'~-r'd s~t~5 : SS. COUNTY OF K1TSAP ) On this~/ day of,/z~e~,~a,,,c,r..ff 2004, before me personally appeared ~o,o,a/,~/ g~'/fe~r-~?~,~ to me known to %e the owner/constructor of the water main that executed the within and foregoing instrument, and acknowledged said instnmaent to be the free and voluntary act and deed of said water main, for the uses and purposes therein mentioned, and on oath stated that ~ was authorized to execute said instrument. In Wimess Whereof, I have hereunto set my hand and affixed my official seal the day and year first above wfitten. ~~te~.~_ ~. ~,~~ ............ NOTARY PUBLIC in and for the ~t'ate of Washington, NotarY,PublIc residing at ~ Stat. o~ Wa~a~n0to~ ' ~A A. EC~Em My Commission expires: ?//~,?f~//~ o o ~ Storm main relocation Emergency Expansion ACCEPTED AND APPROVED for the City ofBremerton this/~g.0ay of~004. CITY OF BREMERXO,N ~. BY: C~y~E ~~OR/ ~ DEP~~~P)OVAL: W. EUGENE SAMPLEY, DIRECTOR PUBLIC WORKS AND UTILITIES ROG~(-'L"U~OVI~I~ CITY ATTORNEY